Method, device and electronic equipment for evaluating the impact of traffic incidents on road traffic

By evaluating traffic flow and traffic capacity before and after traffic events and calculating service parameters, the problem of assessing the impact of traffic events on road traffic is solved, helping management departments to avoid congestion and improve road traffic efficiency.

CN115691117BActive Publication Date: 2024-12-03APOLLO INTELLIGENT CONNECTIVITY (BEIJING) TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211176971.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-26
Publication Date
2024-12-03
Estimated Expiration
2042-09-26

AI Technical Summary

Technical Problem

Traffic events such as road renovation, municipal construction and traffic control will lead to a decline in road traffic capacity and cause traffic congestion. It is difficult for existing technology to effectively evaluate and manage the impact of these events on road traffic.

Method used

By obtaining the first traffic flow and traffic capacity of the target road in the absence of traffic events, calculate the first service parameters, and obtaining the second traffic flow and traffic capacity in the presence of traffic events, calculate the second service parameters, based on both Assess the extent of traffic impact of traffic events on roads.

Benefits of technology

It provides a scientific assessment of the impact of traffic events, helps traffic management departments to formulate effective measures to avoid traffic congestion and improve road traffic smoothness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115691117B_ABST
    Figure CN115691117B_ABST
Patent Text Reader

Abstract

The present disclosure provides a method, device and electronic device for evaluating the impact of a traffic incident on road traffic, which relates to the field of artificial intelligence, and in particular to the field of intelligent transportation and vehicle-road collaboration. The specific implementation scheme is: obtaining a first traffic flow of a target road and obtaining a first traffic capacity of the target road, the first traffic capacity being the traffic capacity of the target road when there is no traffic incident; determining a first service parameter of the target road based on the first traffic flow and the first traffic capacity; obtaining a second traffic flow and a second traffic capacity of the target road when there is the traffic incident; determining a second service parameter of the target road based on the second traffic flow and the second traffic capacity; and evaluating the degree of traffic impact of the traffic incident on the target road based on the first service parameter and the second service parameter.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of artificial intelligence, in particular to the field of intelligent transportation and vehicle-road collaboration, and specifically to a method, device and electronic equipment for evaluating the impact of a traffic event on road traffic. Background Art

[0002] Traffic events such as road reconstruction, municipal construction, rail construction, and traffic control will occupy road resources, causing the overall traffic capacity of the road network to decline, which in turn leads to aggravated regular congestion and frequent abnormal congestion, which has a great impact on people's daily travel and also puts higher demands on the traffic management work of the traffic management department. Summary of the invention

[0003] The present disclosure provides a method, device and electronic equipment for evaluating the impact of a traffic event on road traffic.

[0004] According to a first aspect of the present disclosure, a method for evaluating the impact of a traffic incident on road traffic is provided, comprising:

[0005] Acquire a first traffic flow of a target road and acquire a first traffic capacity of the target road, where the first traffic capacity is the traffic capacity of the target road when no traffic incident occurs;

[0006] Determine a first service parameter of the target road based on the first traffic flow and the first traffic capacity;

[0007] Acquire a second traffic flow and a second traffic capacity of the target road when a traffic event occurs;

[0008] determining a second service parameter of the target road based on the second traffic flow and the second traffic capacity;

[0009] The traffic impact degree of the traffic event on the target road is evaluated based on the first service parameter and the second service parameter.

[0010] According to a second aspect of the present disclosure, there is provided a device for evaluating the impact of a traffic event on road traffic, comprising:

[0011] A first acquisition module, used to acquire a first traffic flow of a target road and acquire a first traffic capacity of the target road, wherein the first traffic capacity is the traffic capacity of the target road when no traffic incident occurs;

[0012] A first determining module, configured to determine a first service parameter of the target road based on the first traffic flow and the first traffic capacity;

[0013] A second acquisition module, used to acquire a second traffic flow and a second traffic capacity of the target road when a traffic event occurs;

[0014] A second determination module, configured to determine a second service parameter of the target road based on the second traffic flow and the second traffic capacity;

[0015] An evaluation module is used to evaluate the traffic impact of the traffic event on the target road based on the first service parameter and the second service parameter.

[0016] According to a third aspect of the present disclosure, there is provided an electronic device, including:

[0017] at least one processor; and

[0018] a memory communicatively connected to the at least one processor; wherein,

[0019] The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to perform the method described in the first aspect.

[0020] According to a fourth aspect of the present disclosure, a non-transitory computer-readable storage medium storing computer instructions is provided, wherein the computer instructions are used to cause the computer to execute the method described in the first aspect.

[0021] According to a fifth aspect of the present disclosure, a computer program product is provided, comprising a computer program, wherein the computer program implements the method described in the first aspect when executed by a processor.

[0022] In the disclosed embodiment, by obtaining the first service parameter of the target road when there is no traffic incident and the second service parameter of the target road when there is a traffic incident, the degree of impact of the traffic incident on the target road can be evaluated based on the first service parameter and the second service parameter, thereby providing effective advice for the traffic management of the target road and helping to avoid traffic congestion on the target road.

[0023] It should be understood that the content described in this section is not intended to identify the key or important features of the embodiments of the present disclosure, nor is it intended to limit the scope of the present disclosure. Other features of the present disclosure will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The accompanying drawings are used to better understand the present solution and do not constitute a limitation of the present disclosure.

[0025] Figure 1 is a flow chart of a method for evaluating the impact of a traffic incident on road traffic provided by an embodiment of the present disclosure;

[0026] Figure 2 is a flow chart of another method for evaluating the impact of a traffic event on road traffic provided by an embodiment of the present disclosure;

[0027] Figure 3 is a structural diagram of a device for evaluating the impact of a traffic event on road traffic provided by an embodiment of the present disclosure;

[0028] Figure 4 It is a block diagram of an electronic device used to implement the method for evaluating the impact of a traffic event on road traffic according to an embodiment of the present disclosure. DETAILED DESCRIPTION

[0029] The following is a description of exemplary embodiments of the present disclosure in conjunction with the accompanying drawings, including various details of the embodiments of the present disclosure to facilitate understanding, which should be considered as merely exemplary. Therefore, it should be recognized by those of ordinary skill in the art that various changes and modifications may be made to the embodiments described herein without departing from the scope and spirit of the present disclosure. Similarly, for the sake of clarity and conciseness, descriptions of well-known functions and structures are omitted in the following description.

[0030] A method for evaluating the impact of a traffic event on road traffic provided by an embodiment of the present disclosure is specifically explained below in conjunction with the accompanying drawings.

[0031] Please refer to Figure 1 , Figure 1 is a flow chart of a method for evaluating the impact of a traffic incident on road traffic provided by an embodiment of the present disclosure, such as Figure 1 As shown, the method comprises the following steps:

[0032] Step S101: obtaining a first traffic flow of a target road and obtaining a first traffic capacity of the target road, wherein the first traffic capacity is the traffic capacity of the target road when no traffic incident occurs.

[0033] It should be noted that the method provided in the embodiment of the present disclosure can be applied to electronic devices such as servers, such as traffic management servers, urban road network servers, etc., and the present disclosure does not specifically limit this. For better understanding, the method provided in the embodiment of the present disclosure will be explained later using electronic devices as the execution subject.

[0034] In the embodiment of the present disclosure, the electronic device may be used to obtain the first traffic flow of the target road collected by the road network monitoring device. It is understandable that the roadside or intersection of the road is usually equipped with road network monitoring equipment, such as a camera, etc., and the first traffic flow of the target road can be obtained by capturing and identifying vehicle information with the camera. For example, the first traffic flow may be the number of vehicles passing through the target road within a preset time period.

[0035] Alternatively, the first traffic flow may also be based on vehicle information collected by the road network monitoring device, combined with road network data, and obtained after data processing and conversion. For example, different vehicle types correspond to different conversion coefficients, as shown in Table 1 below:

[0036] Table 1. Vehicle types and their conversion factors

[0037] Vehicle Type Passenger car Large passenger car Large truck Articulated Truck Conversion factor 1 2 2.5 3

[0038] Based on the above Table 1, when counting the first traffic flow, the traffic flow corresponding to different types of vehicles is the product of the number of vehicles corresponding to the vehicle type and the conversion coefficient. For example, assuming that the number of large passenger cars is 5, the traffic flow corresponding to the large passenger cars is 5×2=10. In this way, the first traffic flow of the target road can be calculated based on the conversion coefficients of different types of vehicles.

[0039] The first traffic flow may refer to the traffic flow within the target time period when there is no traffic incident on the target road. Optionally, the traffic incident may refer to an event that affects road traffic, such as road reconstruction, municipal construction, rail construction, traffic control, road occupation construction, etc., which is not specifically limited in this disclosure.

[0040] In the disclosed embodiments, the target road may be an intersection, a road section (one end between two intersections), a lane, etc. It can be understood that the topological road network is the basic content for evaluating traffic conditions, and the road network can be constructed in combination with the actual situation of urban roads. The road network is a directed topological structure composed of points and lines, and includes the following objects: intersections, roads, road sections, branches (also known as entrance roads, exit roads), lanes, etc. Intersections are connected by directional road sections. An intersection can have multiple entrance roads and multiple exit roads; a road section can have multiple lanes.

[0041] This step also includes obtaining the first traffic capacity of the target road. The traffic capacity can also be called road capacity, which refers to the maximum number of vehicles passing through a certain section of a road section or a certain intersection within a unit time under certain road and traffic conditions. Optionally, the first traffic capacity of the target road can be determined based on parameters such as the road length of the target road, the average speed of vehicles, and the distance between vehicles. For example, the first traffic capacity of the target road can be obtained based on historical traffic data, or it can be preset.

[0042] In the embodiment of the present disclosure, a first traffic flow and a first traffic capacity of the target road within a preset time may be obtained.

[0043] Step S102: determining a first service parameter of the target road based on the first traffic flow and the first traffic capacity.

[0044] Optionally, the first service parameter may refer to the saturation of the target road, or the first service parameter may be determined based on the saturation of the target road, wherein saturation is the ratio of traffic flow to traffic capacity; the saturation of the target road within a preset time is also the first ratio of the first traffic flow to the first traffic capacity.

[0045] In the embodiment of the present disclosure, the first service parameter is determined based on the saturation, or in other words, there is a corresponding relationship between the first service parameter and the saturation, as shown in the following Table 2:

[0046] Table 2. Correspondence between the first service parameter and saturation

[0047] Traffic congestion level Smooth Smooth amble Congestion Congestion Severe congestion First service parameter A B C D E F Saturation [0,0.25) [0.25,0.5) [0.5,0.75) [0.75,0.85) [0.85,0.95) ≥0.95

[0048] Based on the above Table 2, the corresponding relationship between saturation and the first service parameter can be obtained, and the saturation is calculated based on the first traffic flow and the first traffic capacity, and then the first service parameter of the target road can be determined based on the first traffic flow and the first traffic capacity of the target road.

[0049] Optionally, the above different first service parameters may be used to characterize different road characteristics, as shown in the following Table 3:

[0050] Table 3. Correspondence between the first service parameter and road characteristics

[0051] First service parameter Road Features A Smooth traffic flow and little delay B Stable traffic flow with minor delays C Stable traffic flow, some delays, but drivers can accept it D Approaching unstable traffic, with large delays, but drivers can still tolerate it E Unstable traffic, heavy traffic, and huge delays are unbearable for drivers F Traffic is seriously congested, with vehicles moving and stopping from time to time.

[0052] For example, if the first service parameter corresponding to the target road is A, it indicates that the road feature of the target road is smooth traffic flow with basically no delays.

[0053] It should be noted that the correspondence between the saturation and the first service parameter in the above Table 2, and the correspondence between the first service parameter and the road characteristic in Table 3, are merely examples of an embodiment of the present disclosure, and constitute limitations on the first service parameter and the above two correspondences in the present disclosure.

[0054] Step S103: Acquire a second traffic flow and a second traffic capacity of the target road when a traffic event occurs.

[0055] Optionally, the electronic device may obtain the second traffic flow and the second traffic capacity of the target road when a traffic event occurs based on historical data. For example, if the target road was traffic-controlled during a certain period in the past, the second traffic flow and the second traffic capacity of the target road during the traffic control during that period may be obtained.

[0056] Alternatively, the second traffic flow and the second traffic capacity corresponding to the target road in this case may be obtained based on the simulated traffic event. For example, the second traffic flow and the second traffic capacity of the target road when a traffic event occurs in a certain period in the future may be estimated based on the historical traffic flow and traffic capacity.

[0057] Step S104: Determine a second service parameter of the target road based on the second traffic flow and the second traffic capacity.

[0058] It can be understood that after the second traffic flow and the second traffic capacity of the target road in the presence of a traffic event are obtained, the second service parameter of the target road in the presence of a traffic event is determined according to the second traffic flow and the second traffic capacity.

[0059] Optionally, the second service parameter may be the saturation of the target road when a traffic incident occurs, or the first service parameter may be determined based on the saturation. In the disclosed embodiment, the second service parameter may also be determined based on the saturation, and the corresponding relationship between the second service parameter and the saturation may also refer to the above Table 2, which will not be repeated here.

[0060] Step S105: Evaluate the traffic impact of the traffic event on the target road based on the first service parameter and the second service parameter.

[0061] In the embodiment of the present disclosure, after obtaining the first service parameter when there is no traffic incident on the target road and the second service parameter when there is a traffic incident on the target road, the traffic impact of the traffic incident on the target road can be evaluated based on the first service parameter and the second service parameter. For example, the changes of the first service parameter and the second service parameter before and after the traffic incident on the target road can be as shown in the following Table 4:

[0062] Table 4. Comparison table of first service parameters and second service parameters

[0063]

[0064] For example, if the first service parameter of the target road without a traffic incident is A, and the second service parameter of the target road with a traffic incident is B, the traffic condition of the target road has deteriorated. Based on the change of the second service parameter relative to the first service parameter in Table 4 above, it is possible to determine the change of the traffic condition of the target road with a traffic incident compared to the traffic condition without a traffic incident, and thus it is possible to evaluate the degree of traffic impact of the traffic incident on the target road. For example, the above-mentioned flat represents no impact, deterioration represents a large degree of traffic impact, and significant deterioration represents a very large degree of traffic impact.

[0065] It should be noted that the above Table 4 is only one possible form listed in the embodiment of the present disclosure. The first service parameter, the second service parameter and the traffic condition may also be other possible forms, and the rating of the degree of traffic impact may also include other possible forms. The present disclosure does not make specific limitations on this.

[0066] In addition, the parameter levels corresponding to the first service parameter and the second service parameter, as well as the level of traffic conditions, can be pre-set, so that after the electronic device obtains the first service parameter and the second service parameter, it can determine the traffic status of the target road after the traffic incident occurs, and then evaluate the degree of impact of the traffic incident on the target road.

[0067] Optionally, after evaluating the traffic impact of the traffic incident on the target road, the electronic device can handle the target road accordingly according to the traffic impact. For example, if the traffic impact is large, the traffic control department can be notified to reasonably divert traffic on the target road, or the duration of the traffic signal light can be appropriately extended to avoid traffic congestion and ensure smooth traffic on the target road.

[0068] In the disclosed embodiment, by obtaining the first service parameter of the target road when there is no traffic incident and the second service parameter of the target road when there is a traffic incident, the degree of impact of the traffic incident on the target road can be evaluated based on the first service parameter and the second service parameter, thereby providing effective advice for the traffic management of the target road and helping to avoid traffic congestion on the target road.

[0069] In the disclosed embodiment, the target road may be a road section or an intersection.

[0070] Optionally, in an implementation manner, the target road is a target road section, and the target road section includes n lanes, where n is an integer greater than or equal to 1; in this case, obtaining the first traffic capacity of the target road includes:

[0071] Acquire the traffic capacity of the target lane based on the driving speed and driving distance of the vehicles on the target lane, wherein the target lane is any one of the n lanes;

[0072] The first traffic capacity of the target road is determined based on the traffic capacity of each of the n lanes and a first preset attenuation coefficient corresponding to each lane.

[0073] It should be noted that the driving speed of the vehicles on the target lane may be the average speed of all vehicles passing through the target lane within a preset time period; the driving distance of the vehicles on the target lane may be the average distance of all vehicles passing through the target lane within a preset time period. For example, the traffic capacity of the target lane may be the ratio of the above driving distance to the driving speed.

[0074] Optionally, the traffic capacity of the target lane may be calculated based on the following formula:

[0075] C 车道 =3600 / (h / v);

[0076] Wherein, lane C is the traffic capacity of the target lane, h is the vehicle spacing, v is the vehicle speed, and (h / v) is the average headway of continuous passenger car traffic. For example, in the case of smooth urban traffic, the corresponding vehicle speed can be 40km / h and the vehicle spacing can be 30m.

[0077] Furthermore, based on the above formula, the capacity of each lane in the target section can be calculated. If the target section includes only one lane, the first capacity corresponding to the target section is the capacity of the lane; if the target section includes multiple lanes, the first capacity of the target section can be obtained based on the capacity corresponding to each of the multiple lanes and the first preset attenuation coefficient corresponding to each of the lanes.

[0078] Optionally, the first traffic capacity of the target road section including n lanes may be calculated based on the following formula:

[0079]

[0080] Among them, C 路段 is the first traffic capacity of the target section, C 车道i is the capacity of the i-th lane in the target road section, a i is the first preset attenuation coefficient corresponding to the i-th lane. Optionally, a1=1, a2=0.9, a3=0.8, ... may be taken.

[0081] In the embodiment of the present disclosure, when the target road is a target road section, the capacity of each lane in the target road section is obtained, and the first capacity of the target road section is determined based on the capacity of each lane. Thus, the first capacity of the target road section is related to the number of lanes it has, and the driving speed and driving distance of vehicles in each lane. This improves the accuracy of the first capacity of the target road section, thereby improving the accuracy of the first service parameter.

[0082] Optionally, in another implementation, the target road is an intersection, the intersection includes m entrance roads, any entrance road includes k lanes, and m and k are both integers greater than or equal to 1; in this case, obtaining the first traffic capacity of the target road includes:

[0083] Obtaining a first sub-capacity of a target lane in a target entrance road of the intersection, where the target entrance road is any one of the m entrance roads, and the target lane is any one of the k lanes of the target entrance road;

[0084] Determining a second sub-capacity of the target entrance road based on the first sub-capacity of each lane in the target entrance road;

[0085] The first traffic capacity of the target road is determined based on the second sub-traffic capacity of each of the m entrance roads.

[0086] It can be understood that an intersection usually includes multiple entrance roads, for example, a crossroad also includes four entrance roads; the first traffic capacity corresponding to the intersection can be the sum of the traffic capacities of the multiple entrance roads. Each entrance road can include at least one lane, and the traffic capacity of a certain entrance road can be the sum of the traffic capacities of all the lanes it includes.

[0087] For example, the first traffic capacity of the intersection can be obtained based on the following formula:

[0088]

[0089] Among them, C 交叉路口 is the first traffic capacity of the intersection, C 进口道i is the second sub-capacity of the i-th entrance.

[0090] The second sub-capacity of the i-th entrance can be obtained based on the following formula:

[0091]

[0092] Among them, C 进口道i is the second sub-capacity of the i-th entrance, C车道j is the first sub-capacity of the j-th lane in the i-th entrance lane.

[0093] Optionally, the calculation method of the first sub-capacity of the target lane in a certain entrance road may refer to the calculation formula of the capacity of the target lane in the above-mentioned target road section.

[0094] In the disclosed embodiment, when the target road is an intersection, the first sub-capacity of each lane in each entrance road is obtained to obtain the first capacity corresponding to the intersection. In this way, the capacity of each lane in the intersection is taken into account, which effectively improves the accuracy of the capacity of the intersection, thereby ensuring the accuracy of the final assessment of the impact of the traffic event on the traffic at the intersection.

[0095] Optionally, the obtaining of a first sub-capacity of a target lane in a target entrance road of the intersection includes:

[0096] Determine the traffic light corresponding to the target entrance road;

[0097] Determine the first parameter based on the first time of the traffic indicator light in the traffic light, the second time from the first vehicle on the target lane starting to passing the stop line after the traffic indicator light is on, and the average time for vehicles on the target entrance lane to pass the stop line;

[0098] A first sub-capacity of the target lane is determined based on the first parameter, a signal period of the traffic light, and a second preset attenuation coefficient.

[0099] It should be noted that the traffic light corresponding to the target entrance road is also the traffic light located in front of the target entrance road.

[0100] Specifically, after determining the traffic light corresponding to the target entrance road, the first time (or first duration) of the light of the traffic indicator light (e.g., green light) in the traffic light can be obtained through the traffic management platform, the second time from the start of the first vehicle in the target lane of the target entrance road to the passing of the stop line can be obtained through the road network monitoring device, and the average time for vehicles in the allowed lanes (e.g., green light lanes and right turn lanes) on the target entrance road to pass the stop line can be obtained through the road network monitoring device, and the first parameter can be determined based on these times. For example, the first parameter can be the ratio of the difference between the first time and the second time to the average time.

[0101] Further, the first sub-capacity of the target lane is calculated based on the first parameter, the signal cycle of the traffic light, and the second preset attenuation coefficient. For example, the first sub-capacity of the target lane is the ratio of the first parameter to the signal cycle of the traffic light multiplied by the second preset attenuation coefficient.

[0102] Optionally, the first sub-capacity of the target lane may be calculated based on the following formula:

[0103]

[0104] Among them, C s is the first sub-capacity of the target lane, T c is the signal period of the traffic light of the target entrance, t g is the first time of the traffic indicator light in the traffic light of the target entrance lane, t0 is the second time from the first vehicle in the target lane starting to passing the stop line after the traffic indicator light is on, and t i is the average time allowed for vehicles on the target entrance lane to pass through the stop line, and φ is a second preset attenuation coefficient.

[0105] It should be noted that the average time for a vehicle to pass through a stop line is related to the vehicle type, vehicle performance and driver. Exemplarily, the average time may be 3 seconds.

[0106] Optionally, for an intersection, different lane types may correspond to different second preset attenuation coefficients. For example, the second preset attenuation coefficient corresponding to a straight lane is 0.9, the second preset attenuation coefficient corresponding to a straight and right turn lane is 0.8, the second preset attenuation coefficient corresponding to a straight and left turn lane is 0.7, the second preset attenuation coefficient corresponding to a straight and left and right turn lane is 0.7, the second preset attenuation coefficient corresponding to a dedicated right turn lane is 0.7, and the second preset attenuation coefficient corresponding to a dedicated left turn lane is 0.5.

[0107] In the disclosed embodiment, based on the above calculation method of the first sub-capacity of the target lane, the first sub-capacity corresponding to each lane in each entrance road of the intersection can be calculated. In the calculation of the first sub-capacity corresponding to the lane in the intersection, the relevant parameters of the corresponding traffic light and the passing time of the vehicle on the lane are considered, which effectively improves the accuracy and comprehensiveness of the first sub-capacity.

[0108] Optionally, in the embodiment of the present disclosure, the obtaining of the second traffic flow and the second traffic capacity of the target road when the traffic event occurs includes:

[0109] Predicting the traffic flow of the target road in the presence of a traffic event based on the first traffic flow to obtain the second traffic flow;

[0110] A second traffic capacity of the target road is determined based on the first traffic capacity and a third preset attenuation coefficient, where the third preset attenuation coefficient is related to the traffic event.

[0111] It should be noted that, when the traffic event on the target road is a simulated traffic event, that is, assuming that the target road has a traffic event, the second traffic flow can be predicted based on the first traffic flow when there is no traffic event on the target road, and the second traffic flow on the target road when there is a traffic event can be obtained. For example, the second traffic flow can be the product of the first traffic flow and a preset attenuation coefficient. Alternatively, the second traffic flow on the target road when there may be a traffic event in the future can be predicted based on the traffic flow under historical traffic events on the target road, combined with the traffic flow under no traffic events.

[0112] Understandably, if there is a traffic incident on the target road, such as road construction, which will reduce the connectivity and traffic capacity of the road section or intersection, the road network and the traffic capacity of the road section or intersection may be adjusted. In this case, the second traffic capacity of the target road with a traffic incident can be calculated based on the first traffic capacity (i.e., the actual traffic capacity) when there is no traffic incident on the target road.

[0113] Optionally, the second traffic capacity may be calculated based on the following formula:

[0114]

[0115] Among them, C 路段 ' is the second traffic capacity of the target section, C 车道i is the capacity of the i-th lane in the target road section, a i is the first preset attenuation coefficient corresponding to the i-th lane, β i is the third preset attenuation coefficient corresponding to the i-th lane. Optionally, a1=1, a2=0.9, a3=0.8, ... can be taken. In addition, β i The value range of β is 0 to 1. When the target lane is not affected by traffic events, i =1, if the target lane is completely closed, then β i =0.

[0116] Among them, the third preset attenuation coefficient β iRelated to the traffic event. For example, assuming that the traffic event is a road construction event, the longer the period of the road construction event is, the lower the third preset attenuation coefficient is; the more lanes the road construction event occupies, the lower the third preset attenuation coefficient is, etc. Furthermore, the third preset attenuation coefficient can be determined based on the nature and period of the traffic event, the number of lanes occupied, and other parameters, so as to more accurately evaluate the second traffic capacity of the target road in the presence of a traffic event.

[0117] Furthermore, after determining the second traffic flow and the second traffic capacity of the target road in the presence of a traffic event, the second service parameter of the target road can be calculated based on the second traffic flow and the second traffic capacity, which will not be repeated here.

[0118] In the embodiment of the present disclosure, if the traffic event corresponding to the second traffic capacity is a simulated traffic event, the simulated traffic event includes at least one road construction scheme, and one road construction scheme corresponds to one second service parameter; then after evaluating the traffic impact of the traffic event on the target road based on the first service parameter and the second service parameter, the method further includes:

[0119] The traffic impact degree of each road construction scheme on the target road is obtained, and a target road construction scheme is determined from the at least one road construction scheme.

[0120] For example, assuming that the target road needs to undergo road construction or construction is needed around the target road and the target road needs to be occupied, if there are multiple road construction plans, the second traffic capacity and the second traffic flow of the target road when each road construction plan is implemented can be simulated for each road construction plan, so as to calculate the second service parameters corresponding to the target road under each road construction plan, and further evaluate the degree of impact of each road construction plan on the traffic of the target road, and the road construction plan with the least traffic impact can be used as the target road construction plan.

[0121] Furthermore, after determining the target road construction plan, a traffic diversion plan for the target road can also be determined based on the degree of impact of the target road construction plan on the traffic of the target road, such as a plan for guiding traffic on the target road to avoid congestion on the target road.

[0122] In this way, when there are multiple road construction plans for the target road, it is possible to determine the target road construction plan with the least traffic impact based on the evaluation of the impact of each road construction plan on the traffic of the target road, thereby providing technical support for road construction decisions and effectively reducing the impact of road construction on the traffic of the target road.

[0123] Please refer to Figure 2 , Figure 2 FIG. 1 is a flow chart of another method for evaluating the impact of a traffic incident on road traffic provided by an embodiment of the present disclosure. Figure 2 As shown, the method comprises the following steps:

[0124] Step S201: construct a topological road network.

[0125] For example, the topological road network may be constructed in combination with the actual situation of urban roads, or in combination with electronic maps.

[0126] Step S202: Use road network monitoring equipment to capture and identify vehicle information.

[0127] For example, it can be based on the electronic police, cameras, checkpoint monitoring and other equipment on the roadside to capture and identify vehicle information, including vehicle type, license plate number and other information.

[0128] Step S203: Count the traffic volume at the intersection or road section and the OD traffic volume.

[0129] It can be understood that based on the road network monitoring equipment capturing and identifying vehicle information, the traffic volume at the intersection or road section and the traffic volume between the origin and destination (OD) can be counted. For example, the traffic volume at the intersection or road section is shown in Table 5 below, and the OD traffic volume is shown in Table 6 below.

[0130] Table 5. Traffic flow at intersections or sections (unit: pcu / h)

[0131]

[0132] Table 6. OD traffic volume (unit: number of trips)

[0133]

[0134] Step S204: Calculate the service parameters of the intersection or road section.

[0135] For example, the service parameter is the ratio of the flow rate at the intersection or road section to the OD traffic volume.

[0136] Step S205: Simulate traffic events such as construction to adjust the road network.

[0137] For example, the flow rate at each intersection or section in the road network can be adjusted through traffic guidance, traffic light control, etc.

[0138] Step S206: Calculate the traffic capacity of the intersection or road section after the road network adjustment.

[0139] Optionally, the traffic capacity of an intersection or road section after the road network adjustment may be calculated based on vehicle information identified by the road network monitoring equipment.

[0140] Step S207: Based on the historical OD traffic volume, predict the future OD traffic volume, and use the traffic flow distribution algorithm to perform flow estimation.

[0141] For example, the future OD traffic volume can be the product of the historical OD traffic volume and the preset attenuation coefficient. Figure 1 The description in the method embodiment will not be repeated here.

[0142] Step S208: Calculate the service parameters of the intersection or road section affected by traffic events such as construction.

[0143] Similarly, the corresponding service parameters are calculated based on the flow rate and OD traffic volume of the intersection or road section under the traffic event.

[0144] Step S209: Evaluate the impact of the traffic incident on traffic.

[0145] By comparing the service parameters before and after the traffic incident, the impact of the traffic incident on the intersection or road section can be evaluated.

[0146] Step S210: Based on the evaluation results, select a better solution and formulate a traffic relief plan.

[0147] It should be noted that the implementation process of the embodiment of the present disclosure can refer to the above Figure 1 The specific description in the method embodiment can achieve the following Figure 1 To avoid repetition, the technical effects in the method embodiments will not be described in detail here.

[0148] Please refer to Figure 3 , Figure 3 is a structural diagram of a device for evaluating the impact of a traffic event on road traffic provided by an embodiment of the present disclosure. Figure 3 As shown, the evaluation device 300 for evaluating the impact of a traffic event on road traffic includes:

[0149] A first acquisition module 301 is used to acquire a first traffic flow of a target road and acquire a first traffic capacity of the target road, where the first traffic capacity is the traffic capacity of the target road when no traffic incident occurs;

[0150] A first determining module 302, configured to determine a first service parameter of the target road based on the first traffic flow and the first traffic capacity;

[0151] A second acquisition module 303 is used to acquire a second traffic flow and a second traffic capacity of the target road when a traffic event occurs;

[0152] A second determination module 304, configured to determine a second service parameter of the target road based on the second traffic flow and the second traffic capacity;

[0153] The evaluation module 305 is used to evaluate the impact of the traffic event on the target road based on the first service parameter and the second service parameter.

[0154] Optionally, the target road is a target road section, the target road section includes n lanes, and n is an integer greater than or equal to 1;

[0155] The first acquisition module 301 is further used for:

[0156] Acquire the traffic capacity of the target lane based on the driving speed and driving distance of the vehicles on the target lane, wherein the target lane is any one of the n lanes;

[0157] The first traffic capacity of the target road is determined based on the traffic capacity of each of the n lanes and a first preset attenuation coefficient corresponding to each lane.

[0158] Optionally, the target road is an intersection, the intersection includes m entrance roads, any entrance road includes k lanes, and m and k are both integers greater than or equal to 1;

[0159] The first acquisition module 301 is further used for:

[0160] Obtaining a first sub-capacity of a target lane in a target entrance road of the intersection, where the target entrance road is any one of the m entrance roads, and the target lane is any one of the k lanes of the target entrance road;

[0161] Determining a second sub-capacity of the target entrance road based on the first sub-capacity of each lane in the target entrance road;

[0162] The first traffic capacity of the target road is determined based on the second sub-traffic capacity of each of the m entrance roads.

[0163] Optionally, the first acquisition module 301 is further used for:

[0164] Determine the traffic light corresponding to the target entrance road;

[0165] Determine the first parameter based on the first time of the traffic indicator light in the traffic light, the second time from the first vehicle on the target lane starting to passing the stop line after the traffic indicator light is on, and the average time for vehicles on the target entrance lane to pass the stop line;

[0166] A first sub-capacity of the target lane is determined based on the first parameter, a signal period of the traffic light, and a second preset attenuation coefficient.

[0167] Optionally, the second acquisition module 303 is further used for:

[0168] Predicting the traffic flow of the target road in the presence of a traffic event based on the first traffic flow to obtain the second traffic flow;

[0169] A second traffic capacity of the target road is determined based on the first traffic capacity and a third preset attenuation coefficient, where the third preset attenuation coefficient is related to the traffic event.

[0170] Optionally, the traffic event corresponding to the second traffic capacity is a simulated traffic event, and the simulated traffic event includes at least one road construction scheme, and one road construction scheme corresponds to one second service parameter;

[0171] The device also includes:

[0172] The third determination module is used to obtain the traffic impact of each road construction plan on the target road, and determine the target road construction plan from the at least one road construction plan.

[0173] The device 300 for evaluating the impact of traffic events on road traffic provided in the embodiment of the present disclosure can implement the entire process of the above-mentioned method for evaluating the impact of traffic events on road traffic and can achieve the same technical effect. To avoid repetition, it will not be described here.

[0174] In the technical solution disclosed herein, the acquisition, storage and application of user personal information involved are in compliance with the provisions of relevant laws and regulations and do not violate public order and good morals.

[0175] According to an embodiment of the present disclosure, the present disclosure also provides an electronic device, a readable storage medium and a computer program product.

[0176] Figure 4 A schematic block diagram of an example electronic device 400 that can be used to implement an embodiment of the present disclosure is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present disclosure described and / or required herein.

[0177] like Figure 4 As shown, the device 400 includes a computing unit 401, which can perform various appropriate actions and processes according to a computer program stored in a read-only memory (ROM) 402 or a computer program loaded from a storage unit 408 into a random access memory (RAM) 403. In the RAM 403, various programs and data required for the operation of the device 400 can also be stored. The computing unit 401, the ROM 402, and the RAM 403 are connected to each other via a bus 404. An input / output (I / O) interface 405 is also connected to the bus 404.

[0178] A number of components in the device 400 are connected to the I / O interface 405, including: an input unit 406, such as a keyboard, a mouse, etc.; an output unit 407, such as various types of displays, speakers, etc.; a storage unit 408, such as a disk, an optical disk, etc.; and a communication unit 409, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 409 allows the device 400 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.

[0179] The computing unit 401 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the computing unit 401 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various computing units running machine learning model algorithms, digital signal processors (DSPs), and any appropriate processors, controllers, microcontrollers, etc. The computing unit 401 performs the various methods and processes described above, such as the evaluation method of the impact of traffic events on road traffic. For example, in some embodiments, the evaluation method of the impact of traffic events on road traffic may be implemented as a computer software program, which is tangibly included in a machine-readable medium, such as a storage unit 408. In some embodiments, part or all of the computer program may be loaded and / or installed on the device 400 via ROM 402 and / or communication unit 409. When the computer program is loaded into RAM 403 and executed by the computing unit 401, one or more steps of the evaluation method of the impact of traffic events on road traffic described above may be executed. Alternatively, in other embodiments, the computing unit 401 may be configured to execute the method for evaluating the impact of a traffic event on road traffic in any other appropriate manner (for example, by means of firmware).

[0180] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0181] The program code for implementing the method of the present disclosure may be written in any combination of one or more programming languages. These program codes may be provided to a processor or controller of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.

[0182] In the context of the present disclosure, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0183] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).

[0184] The systems and techniques described herein may be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), and the Internet.

[0185] A computer system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The relationship of client and server is generated by computer programs running on respective computers and having a client-server relationship with each other. The server may be a cloud server, a server of a distributed system, or a server combined with a blockchain.

[0186] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this disclosure can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solutions disclosed in this disclosure can be achieved, and this document does not limit this.

[0187] The above specific implementations do not constitute a limitation on the protection scope of the present disclosure. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present disclosure shall be included in the protection scope of the present disclosure.

Claims

1. A method for evaluating the impact of a traffic incident on road traffic, comprising: Acquire a first traffic flow of a target road and acquire a first traffic capacity of the target road, where the first traffic capacity is the traffic capacity of the target road when no traffic incident occurs; Determine a first service parameter of the target road based on the first traffic flow and the first traffic capacity; Acquire a second traffic flow and a second traffic capacity of the target road when a traffic event occurs; determining a second service parameter of the target road based on the second traffic flow and the second traffic capacity; Evaluating the traffic impact of the traffic event on the target road based on the first service parameter and the second service parameter; The target road is a target road section, and the target road section includes n lanes, where n is an integer greater than or equal to 1; The obtaining the first traffic capacity of the target road includes: Acquire the traffic capacity of the target lane based on the driving speed and driving distance of the vehicles on the target lane, wherein the target lane is any one of the n lanes; Determining a first traffic capacity of the target road based on the traffic capacity of each of the n lanes and a first preset attenuation coefficient corresponding to each lane; The target road is an intersection, the intersection includes m entrance roads, any entrance road includes k lanes, and m and k are both integers greater than or equal to 1; The obtaining the first traffic capacity of the target road includes: Obtaining a first sub-capacity of a target lane in a target entrance road of the intersection, where the target entrance road is any one of the m entrance roads, and the target lane is any one of the k lanes of the target entrance road; Determining a second sub-capacity of the target entrance road based on the first sub-capacity of each lane in the target entrance road; Determine the first traffic capacity of the target road based on the second sub-traffic capacity of each of the m entrance roads; The obtaining of the first sub-capacity of the target lane in the target entrance road of the intersection includes: Determine the traffic light corresponding to the target entrance road; Determine the first parameter based on the first time of the traffic indicator light in the traffic light, the second time from the first vehicle on the target lane starting to passing the stop line after the traffic indicator light is on, and the average time for vehicles on the target entrance lane to pass the stop line; Determine a first sub-capacity of the target lane based on the first parameter, the signal period of the traffic light, and a second preset attenuation coefficient; The obtaining of the second traffic flow and the second traffic capacity of the target road when a traffic event occurs includes: Predicting the traffic flow of the target road in the presence of a traffic event based on the first traffic flow to obtain the second traffic flow; determining a second traffic capacity of the target road based on the first traffic capacity and a third preset attenuation coefficient, wherein the third preset attenuation coefficient is related to the traffic event; Wherein, the first service parameter is the saturation of the target road, or is determined based on the saturation of the target road; The second service parameter is the saturation of the target road when a traffic event occurs, or is determined based on the saturation of the target road when a traffic event occurs.

2. The method according to claim 1, wherein: The traffic event corresponding to the second traffic capacity is a simulated traffic event, and the simulated traffic event includes at least one road construction scheme, and one road construction scheme corresponds to one second service parameter; After evaluating the traffic impact of the traffic event on the target road based on the first service parameter and the second service parameter, the method further includes: The traffic impact degree of each road construction scheme on the target road is obtained, and a target road construction scheme is determined from the at least one road construction scheme.

3. A device for evaluating the impact of a traffic incident on road traffic, comprising: A first acquisition module, used to acquire a first traffic flow of a target road and acquire a first traffic capacity of the target road, wherein the first traffic capacity is the traffic capacity of the target road when no traffic incident occurs; A first determining module, configured to determine a first service parameter of the target road based on the first traffic flow and the first traffic capacity; A second acquisition module, used to acquire a second traffic flow and a second traffic capacity of the target road when a traffic event occurs; A second determination module, configured to determine a second service parameter of the target road based on the second traffic flow and the second traffic capacity; An evaluation module, configured to evaluate the traffic impact of the traffic event on the target road based on the first service parameter and the second service parameter; Wherein, the target road is a target road section, the target road section includes n lanes, and n is an integer greater than or equal to 1; The first acquisition module is also used for: Acquire the traffic capacity of the target lane based on the driving speed and driving distance of the vehicles on the target lane, wherein the target lane is any one of the n lanes; Determining a first traffic capacity of the target road based on the traffic capacity of each of the n lanes and a first preset attenuation coefficient corresponding to each lane; The target road is an intersection, the intersection includes m entrance roads, any entrance road includes k lanes, and m and k are both integers greater than or equal to 1; The first acquisition module is also used for: Obtaining a first sub-capacity of a target lane in a target entrance road of the intersection, where the target entrance road is any one of the m entrance roads, and the target lane is any one of the k lanes of the target entrance road; Determining a second sub-capacity of the target entrance road based on the first sub-capacity of each lane in the target entrance road; Determine the first traffic capacity of the target road based on the second sub-traffic capacity of each of the m entrance roads; The first acquisition module is also used for: Determine the traffic light corresponding to the target entrance road; Determine the first parameter based on the first time of the traffic indicator light in the traffic light, the second time from the first vehicle on the target lane starting to passing the stop line after the traffic indicator light is on, and the average time for vehicles on the target entrance lane to pass the stop line; Determine a first sub-capacity of the target lane based on the first parameter, the signal period of the traffic light, and a second preset attenuation coefficient; The second acquisition module is also used for: Predicting the traffic flow of the target road in the presence of a traffic event based on the first traffic flow to obtain the second traffic flow; determining a second traffic capacity of the target road based on the first traffic capacity and a third preset attenuation coefficient, wherein the third preset attenuation coefficient is related to the traffic event; Wherein, the first service parameter is the saturation of the target road, or is determined based on the saturation of the target road; The second service parameter is the saturation of the target road when a traffic event occurs, or is determined based on the saturation of the target road when a traffic event occurs.

4. The device according to claim 3, wherein: The traffic event corresponding to the second traffic capacity is a simulated traffic event, and the simulated traffic event includes at least one road construction scheme, and one road construction scheme corresponds to one second service parameter; The device also includes: The third determination module is used to obtain the traffic impact of each road construction plan on the target road, and determine the target road construction plan from the at least one road construction plan.

5. An electronic device, comprising: at least one processor; as well as a memory communicatively connected to the at least one processor; wherein, The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to perform the method according to any one of claims 1 to 2.

6. A non-transitory computer-readable storage medium storing computer instructions, wherein: The computer instructions are used to cause the computer to execute the method according to any one of claims 1-2.

7. A computer program product, comprising a computer program, which, when executed by a processor, implements the method according to any one of claims 1 to 2.

Citation Information

Patent Citations

  • Method for predicting range influenced by abnormal traffic event of highway

    CN105023433A

  • Traffic flow disposing event decision making method

    CN109035765A