A method for automatic rapid installation and correction of steel columns
Through the combination of clamps, wedge-shaped pins, electronic level and laser line projectors, automatic rapid installation and correction of steel columns is achieved, solving the problems of low installation efficiency and waste of resources in the existing technology, improving construction efficiency and reducing construction efficiency Cost and security risks.
Patent Information
- Application Number
- CN202211496869.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-25
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2042-11-25
AI Technical Summary
The installation and calibration efficiency of steel columns in existing steel structures is low, requiring a lot of manpower and mechanical equipment, and the temporary connection structure leads to waste of resources and safety hazards.
Automatic rapid installation and calibration method consisting of clamps, wedge-shaped latch, electronic level and laser projector. Through clamping the steel column surface, laser projector and electronic level can achieve horizontal, vertical and centering correction, instead of temporary Connect ear plates and cable ropes to reduce the use of manpower and mechanical equipment.
It improves the efficiency of steel column installation and correction, reduces the cost of material and machinery use, avoids resource waste and safety hazards, and realizes automated adjustment and rapid alignment.
Smart Images

Figure CN115770992B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of assembled steel structure construction, and in particular relates to an automatic rapid installation and correction method for steel columns. Background Art
[0002] In recent years, with the increasing popularity of the concept of green engineering and the vigorous promotion and application of prefabricated buildings across the country, steel structures, as a typical form of prefabricated structures, have also been increasingly used and promoted.
[0003] Compared with precast concrete components, steel structural components have considerable advantages in terms of self-weight, strength, and especially processing and manufacturing conditions and technology. Steel structural components are flexible to process, have high precision requirements, and are formed in a variety of ways. Components can be processed in the factory or on site. Component disassembly is relatively flexible, and assembly can be done by welding and bolting.
[0004] At present, the installation and correction of steel columns in prefabricated steel structures all use ear plates in combination with temporary fixing bolts and the installation of cables and wind ropes. This method will use a lot of existing site space in the construction of group columns because the installation of cables and wind ropes in multiple directions will cause difficulties in construction site layout and transportation. The multiple personnel deployment during the correction process also increases the labor cost of correction, while making the steel column correction efficiency low. The installation of cables and wind ropes everywhere will also cause certain safety hazards and increase the cost of accessories and materials. In addition, the method of temporarily fixing the upper and lower sections of steel columns using ear plates in combination with temporary fixing bolts will add ear plates and other similar connection structures during the component processing process. After the upper and lower sections of the columns are welded and connected, the ear plates will be cut off, which increases the cost of component production and causes a waste of resources. Summary of the invention
[0005] The present invention aims to invent an automated and rapid installation and correction method for steel columns, which eliminates the need for temporary connection ear plates and temporary fixing bolts used in welding and butting steel columns, replaces the guy ropes used in steel column correction, and reduces the investment in manpower and mechanical equipment during installation and correction, thereby achieving the purpose of optimizing the operation during steel column installation and correction, improving construction efficiency, and reducing processing and construction costs.
[0006] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0007] A method for automatic rapid installation and correction of steel columns, for installing an upper section column on top of an already installed lower section column to form a steel column, comprises the following steps:
[0008] Step 1, respectively set two clamps on the outer sides of the butt ends of the upper and lower section columns to be butted, each clamp includes two L-shaped clamp parts, each L-shaped clamp part includes two strip members, the two strip members are both arranged horizontally, one end of the two strip members is vertically connected and a pin hole perpendicular to the strip members is provided at the connection, the other ends of the two strip members are provided with comb-toothed slots along their own axes, the comb-toothed slot opening of one L-shaped clamp part is set upward, and the comb-toothed slot opening of the other L-shaped clamp part is set downward, the two L-shaped clamp parts are clamped together by the corresponding comb-toothed slots to form a rectangular structure with adjustable size, and the lower section column has an L-shaped clamp part on the upper side. Vertical geometric center lines are marked on adjacent column surfaces respectively, and vertical geometric center lines are marked on a pair of adjacent column surfaces on the upper section column respectively. A slide groove is provided along its own axis on the strip-shaped component corresponding to the column surface with the vertical geometric center line in each L-shaped clamp component of the upper section column, and each slide groove is provided with an electronic level and a laser line projector. The electronic level is fixedly connected to the corresponding laser line projector. The electronic level and the corresponding laser line projector can move along the corresponding slide groove, and the laser line projector can project a laser line. When the electronic level is horizontal, the laser line projector can have a projection angle of 180° in the vertical elevation perpendicular to the surface of the upper section column;
[0009] Step 2: Mark two control lines on the ground, each of which intersects with the corresponding vertical geometric center line on the lower section column and is perpendicular to each other;
[0010] Step 3, insert a wedge-shaped pin between the strip-shaped member and the steel column, so that the clamp is tightly clamped on the upper and lower section column surfaces;
[0011] Step 4: Use the lifting equipment to suspend the upper column, preliminarily align the upper and lower columns, and slowly lower the upper column until it falls on the connection surface of the lower column;
[0012] Step 5: Manually fine-tune the upper section column, insert limit pins into the upper and lower corresponding pin holes in the two clamps to temporarily fix the upper and lower section columns, set four electric hydraulic rods between the two clamps, and set the four electric hydraulic rods around the rectangular structure respectively. The clamps, wedge-shaped pins, limit pins and electric hydraulic rods form a temporary fixed support structure when the upper and lower section steel columns are connected, and the upper section column is separated from the lifting equipment;
[0013] Step 6: Turn on the laser line projector and the electronic level and move them horizontally to observe the laser line projector directed to the surface of the upper column. When the laser line coincides with the vertical geometric center line of the upper column, the laser line projector is aligned relative to the upper column.
[0014] Step 7: According to the projection of the laser projection instrument and the situation shown by the electronic level, the electric hydraulic rod is raised and lowered to calibrate and adjust the horizontal, vertical and centering conditions of the upper section column. When the two electronic levels on the upper section column show horizontality and the laser line projected by the laser projection instrument toward the upper section column coincides with the geometric center line of the upper section column, and the laser lines projected outward in two directions by the laser projection instrument coincide with the corresponding control lines on the ground, the upper section column is horizontal, vertical and centered.
[0015] Step 8: The upper and lower sections are connected by welding, and the clamps are removed after welding is completed.
[0016] Preferably, in the above-mentioned automated rapid installation and correction method for steel columns, a slide groove is provided along its own axial direction on the strip-shaped component corresponding to the column surface with the vertical geometric center line in each L-shaped clamp component located in the lower section column, and each slide groove is provided with an electronic level and a laser line projector, and the electronic level and the corresponding laser line projector are fixedly connected, and the electronic level and the corresponding laser line projector can move along the corresponding slide groove, and the laser line projector points outward. When the electronic level is horizontal, the laser line projector can have a projection angle of 180° in the vertical facade perpendicular to the surface of the lower section column, and by moving the position of the electronic level and the corresponding laser line projector, the laser line projected by the laser line projector to the surface of the lower section column coincides with the corresponding vertical geometric center line on the lower section column.
[0017] Preferably, in the above-mentioned automated rapid installation and correction method for steel columns, when the control line on the ground is not long enough, the light projected by the laser line projector located at the lower clamp when the corresponding electronic level is horizontal serves as the extension line of the corresponding control line; when the two electronic levels located on the upper section column display horizontality and the laser line projector is centered relative to the upper section column, the laser lines projected outward in two directions coincide with the corresponding control line or the corresponding extension line on the ground, the upper section column is horizontal, vertical and centered.
[0018] Preferably, in the above-mentioned method for automated rapid installation and correction of steel columns, a support plate for supporting the electric hydraulic rod is provided on the strip-shaped component.
[0019] Preferably, in the above-mentioned method for automated rapid installation and correction of steel columns, the support plate located at the upper clamp is arranged below the corresponding slide groove, and the support plate located at the lower clamp is arranged above the corresponding slide groove.
[0020] Preferably, in the above-mentioned method for automated rapid installation and correction of steel columns, the lower section column is proofread and installed in advance, and a laser line is projected outward by a laser projector located at the lower clamp to mark the ground control line.
[0021] It can be seen from the technical solutions disclosed above that, compared with the prior art, the beneficial effects of the present invention are as follows:
[0022] In summary, the present invention provides an automated rapid installation and correction method for steel columns, which comprises the following steps: by respectively setting two clamps on the outside of the butt ends of the upper and lower section columns to be butted, marking two control lines on the ground, each control line intersecting with the corresponding vertical geometric center line on the lower section column and being perpendicular to each other, and setting a pin hole at the connection between the two strip components of each L-shaped clamp component; by inserting a wedge-shaped pin between the strip component and the steel column, the clamp is tightly clamped on the surface of the upper section column; by suspending the upper section column by a lifting device, the upper and lower section columns are preliminarily aligned, and the upper section column is slowly lowered until it falls on the connection surface of the lower section column; By manually fine-tuning the upper column section, the limit pins are inserted into the corresponding upper and lower pin holes in the two clamps, and four electric hydraulic rods are set around the column between the two clamps to form a temporary fixed support structure, so that the upper and lower column sections are temporarily fixed, and the upper column section is separated from the lifting equipment; by turning on the laser line projector and the electronic level and moving them horizontally, the laser line projector is observed to be shot to the surface of the upper column section. When the laser line coincides with the vertical geometric center line of the upper column section, the laser line projector completes the centering, thereby completing the installation of the automatic rapid installation and correction device for the steel column; according to the projection of the laser line projector and the electronic level, the laser line projector is used to adjust the center line of the upper column section. In the situation shown, the clamp of the upper section column is lifted and lowered by an electric hydraulic rod to correct and adjust the horizontal, vertical and centering conditions of the upper section column. When the two electronic levels located on the upper section column show horizontality and the laser lines projected outward in two directions by the centered laser projection instrument coincide with the corresponding control lines on the ground, the upper section column is horizontal, vertical and centered, and the correction of the upper section column is completed, so that the upper and lower section columns can be quickly aligned. It can realize automatic adjustment, effectively reduce the time for steel column correction, and improve construction efficiency; it can replace the temporary connection ear plate used when the upper and lower section steel columns are welded and connected. and temporary fixing bolts, saving material usage; it can reduce the use time of lifting machinery during steel column installation and correction, saving machinery use costs; it can replace the cable wind rope in conventional correction methods, reduce the impact of cable wind rope pulling on the inconvenience of personnel and materials on the on-site construction operation surface during steel column construction, and reduce the number of collaborative workers during the installation and correction process, while avoiding safety hazards during cable wind rope setting; it has a simple structure and is easy to install and use. The two L-shaped clamp components are connected through the corresponding comb-shaped slots, and can be used with a variety of cross-sectional sizes and shapes of steel columns with wedge-shaped pins; in addition, it can be recycled to avoid waste of resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a structural schematic diagram of an automated rapid installation and correction method for steel columns.
[0024] Figure 2 yes Figure 1Installation diagram (exploded view).
[0025] Figure 3 It is a structural diagram of the clamp.
[0026] Figure 4 It is a schematic diagram of the structure of the L-shaped clamp component located at the upper section column.
[0027] Figure 5 It is a top view schematic diagram of the L-shaped clamp component located at the upper section column.
[0028] Figure 6 It is a side view schematic diagram of the L-shaped clamp component located at the upper section column.
[0029] Figure 7 This is one of the assembly diagrams of the electronic level and the laser line projector.
[0030] Figure 8 This is one of the assembly diagrams of the electronic level and the laser line projector.
[0031] Fig. 9 It is a structural diagram of the electric hydraulic rod.
[0032] Fig.10 It is a schematic diagram of the structure of the limit pin.
[0033] Fig.11 It is a schematic diagram of the structure of a steel column with a rectangular cross-section used in the present invention.
[0034] Fig.12 It is a schematic structural diagram of a steel column with a circular cross section used in the present invention.
[0035] Fig.13 It is a schematic diagram of the structure of a steel column with a special-shaped cross-section used in the present invention.
[0036] In the figure:
[0037] 1-Wedge Latch
[0038] 2-Laser line projector
[0039] 3-L-type clamp parts
[0040] 4-Chute
[0041] 5-Electronic level
[0042] 6-Comb-shaped card slot
[0043] 7-Pallet
[0044] 8-Electric hydraulic lever
[0045] 9-Limiting pin
[0046] 10-Laser Line
[0047] 11-Vertical geometric centerline
[0048] 12-Control line
[0049] 13-Pin hole
[0050] 14- Slider
[0051] 100-upper section column
[0052] 200-lower section column. DETAILED DESCRIPTION
[0053] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The technical content and features of the present invention will be described in detail below by combining the enumerated embodiments with the accompanying drawings. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention. For the convenience of description, the "upper" and "lower" described below are consistent with the upper and lower directions of the accompanying drawings, but this cannot be a limitation of the technical solution of the present invention.
[0054] See also Figures 1 to 13 This embodiment discloses a method for automatic rapid installation and correction of steel columns, which is used to install an upper section column above an already installed lower section column to form a steel column, including the following steps:
[0055] Step 1, respectively set the two clamps on the outer sides of the butt ends of the upper and lower section columns to be butted, each clamp includes two L-shaped clamp parts, each L-shaped clamp part includes two strip members, the two strip members are both arranged horizontally, one end of the two strip members is vertically connected and a pin hole perpendicular to the strip members is provided at the connection, the other ends of the two strip members are provided with comb-toothed slots along their own axes, the comb-toothed slot opening of one L-shaped clamp part is set upward, and the comb-toothed slot opening of the other L-shaped clamp part is set downward, the two L-shaped clamp parts are connected by corresponding comb-toothed slots to form a rectangular structure with adjustable size, the vertical geometric center line 11 is marked on the surface of a pair of adjacent columns on the lower section column, and the vertical geometric center line 11 is marked on the surface of a pair of adjacent columns on the upper section column. Record the vertical geometric center line 11, the vertical geometric center lines 11 of the upper and lower section columns are arranged correspondingly up and down, and a slide groove 4 is arranged along its own axis on the strip-shaped component corresponding to the column surface with the vertical geometric center line 11 in each L-shaped clamp component located in the upper section column, and each slide groove is provided with an electronic level and a laser line projector, and the electronic level 5 is fixedly connected with the corresponding laser line projector 2, and the electronic level 5 and the corresponding laser line projector 2 can move along the corresponding slide groove 4, and four electric hydraulic rods 8 are arranged between the two clamps, and the four electric hydraulic rods 8 are respectively arranged around the rectangular structure, and the laser line projector 2 has an outward laser line 10, and when the electronic level 5 is horizontal, the laser line projector 2 can have a projection angle of 180° in the vertical facade perpendicular to the surface of the upper section column;
[0056] Step 2, mark two control lines 12 on the ground, each control line 12 intersects with the corresponding vertical geometric center line 11 on the lower section column and is perpendicular to each other;
[0057] Step 3, insert a wedge-shaped pin 1 between the strip-shaped member and the steel column, so that the clamp is tightly clamped on the surface of the upper section column;
[0058] Step 4: Use the lifting equipment to suspend the upper column, preliminarily align the upper and lower columns, and slowly lower the upper column until it falls on the connection surface of the lower column;
[0059] Step 5, manually fine-tune the upper section column, insert the limit pin 13 into the upper and lower corresponding pin holes in the two clamps to temporarily fix the upper and lower section columns, set four electric hydraulic rods 8 between the two clamps, and the four electric hydraulic rods are respectively set around the rectangular structure. The clamps, wedge-shaped pins, limit pins and electric hydraulic rods form a temporary fixed support structure when the upper and lower section steel columns are connected, and the upper section column is separated from the lifting equipment;
[0060] Step 6, turn on the laser line projector 2 and the electronic level 5 and move them horizontally, observe the laser line projector directed to the surface of the upper column, and when the laser line coincides with the vertical geometric center line of the upper column, the laser line projector is aligned relative to the upper column;
[0061] Step 7, according to the projection of the laser projection instrument and the situation shown by the electronic level 5, the clamp of the upper section column is lifted and lowered by the electric hydraulic rod 8 to calibrate and adjust the horizontal, vertical and centering conditions of the upper section column. When the two electronic levels 5 located on the upper section column show horizontality and the laser line projected by the laser projection instrument 2 toward the upper section column coincides with the geometric center line of the upper section column, and the laser lines 10 projected outward in two directions by the laser projection instrument coincide with the corresponding control lines 12 on the ground, the upper section column is horizontal, vertical and centered, and the calibration of the upper section column is completed;
[0062] Step 8: The upper and lower sections are connected by welding, and the clamps are removed after welding is completed.
[0063] The present invention provides an automated rapid installation and correction method for steel columns. The method comprises the following steps: two clamps are respectively arranged on the outer sides of the butt ends of the upper and lower section columns to be butted, two control lines 12 are marked on the ground, each control line 12 intersects with the corresponding vertical geometric center line 11 on the lower section column and is perpendicular to each other, and a pin hole 13 is arranged at the connection between the two strip components of each L-shaped clamp component; a wedge-shaped pin 1 is inserted between the strip component and the steel column to tighten the clamp to the surface of the upper section column; the upper section column is suspended by a lifting device, the upper and lower section columns are preliminarily aligned, and the upper section column is slowly lowered until it falls on the connection surface of the lower section column; and the upper section column is manually fixed. Fine-tune the upper column, insert the limit pin 9 into the corresponding upper and lower pin holes 13 in the two clamps to temporarily fix the upper and lower columns, and set four electric hydraulic rods 8 between the two clamps. The four electric hydraulic rods are respectively set around the rectangular structure to form a temporary fixed support structure to separate the upper column from the lifting equipment; turn on the laser line projector 2 and the electronic level and move them horizontally, observe the laser line projected by the laser line projector 2 to the surface of the upper column, and when the laser line coincides with the vertical geometric center line of the upper column, the laser line projector 2 completes the centering; according to the projection of the laser line projector 2 and the situation shown by the electronic level 5, use The electric hydraulic rod 8 is used to calibrate and adjust the horizontal, vertical and centering of the upper section column. When the two electronic levels 5 located on the upper section column show horizontality and the laser line projected by the laser projection instrument 2 in the direction of the upper section column coincides with the geometric center line 11 of the upper section column, and the laser lines projected outward in two directions by the laser projection instrument coincide with the corresponding control lines 12 on the ground, the upper section column is horizontal, vertical and centered, and the upper section column calibration is completed, so that the upper and lower section columns can be quickly aligned. It can realize automatic adjustment, effectively reduce the time of steel column calibration, and improve construction efficiency; it can replace the welding connection of the upper and lower section steel columns. The temporary connecting ear plates and temporary fixing bolts used can save material usage; it can reduce the use time of lifting machinery during steel column installation and correction, saving machinery use costs; it can replace the cable wind rope in the conventional correction method, reduce the impact of the cable wind rope pulling on the inconvenience of people and materials on the on-site construction operation surface during steel column construction, and reduce the number of collaborative workers during the installation and correction process, while avoiding safety hazards during the setting of the cable wind rope; it has a simple structure and is easy to install and use. The two L-shaped clamp components are connected through the corresponding comb-shaped slots, and can be used with a variety of cross-sectional sizes and shapes of steel columns with wedge-shaped pins; in addition, it can be recycled to avoid waste of resources.
[0064] Preferably, in the above-mentioned automated rapid installation and correction method for steel columns, a slide groove is provided along its own axial direction on the strip-shaped component corresponding to the column surface with the vertical geometric center line in each L-shaped clamp component located in the lower column segment, and each slide groove is provided with an electronic level and a laser line projector, and the electronic level and the corresponding laser line projector are fixedly connected, and the electronic level and the corresponding laser line projector can move along the corresponding slide groove, and the laser line projector points outward. When the electronic level is horizontal, the laser line projector can have a projection angle of 180° in the vertical plane perpendicular to the surface of the lower column segment, and by moving the position of the electronic level and the corresponding laser line projector, the laser line projector projected by the laser line projector to the surface of the lower column segment coincides with the corresponding vertical geometric center line on the lower column segment, thereby realizing the centering setting of the laser line projector relative to the lower column segment.
[0065] Preferably, in the above-mentioned automatic rapid installation and correction method for steel columns, when the control line on the ground is not long enough, the light projected by the laser line projector located at the lower clamp when the corresponding electronic level is horizontal is used as the extension line of the corresponding control line, and the electric hydraulic rod 8 is used to lift and lower the clamp of the upper section column. When the two electronic levels located on the upper section column show horizontality and the laser line projector is centered relative to the upper section column, the laser lines in two directions projected outwards by the laser line projector coincide with the corresponding control line or the corresponding extension line on the ground, the upper section column is horizontal, vertical and centered.
[0066] Preferably, in the above-mentioned method for automated rapid installation and correction of steel columns, a support plate 7 for supporting the electric hydraulic rod 8 is provided on the strip-shaped component.
[0067] Preferably, in the above-mentioned method for automated rapid installation and correction of steel columns, the support plate 7 located at the upper clamp is arranged below the corresponding slide groove 4, and the support plate 7 located at the lower clamp is arranged above the corresponding slide groove 4, thereby preventing motion interference between the electronic level 5 and the laser line projector 2 and the corresponding electric hydraulic rod 8.
[0068] Preferably, in the above-mentioned method for automated rapid installation and correction of steel columns, the lower section column is proofread and installed in advance, and a laser line is projected outward by a laser projector located at the lower clamp to mark the ground control line.
[0069] The automatic rapid installation and correction method for steel columns provided by the present invention can not only be used repeatedly, but also has a wide range of applicable occasions, such as being able to be used for the correction of steel columns with rectangular cross sections, such as Fig.11 As shown; it can also be used to correct steel columns with circular cross-sections, such as Fig.12 As shown; it can also be used to correct steel columns with special cross-sections, such as Fig.13 As shown; in addition, it can also be used for the correction of upper and lower steel columns with the same cross-sectional shape and different sizes.
[0070] In summary, the automatic rapid installation and correction method for steel columns provided by the present invention utilizes a clamp 3, a wedge-shaped pin 1, a limit pin 9 and an electric hydraulic rod 8 to form a temporary fixed support structure during the steel column docking construction; a horizontal sliding groove 4 for measuring instruments is provided on the clamp, so as to facilitate the geometric alignment of the steel column component section column by the instrument; a laser line projector 2 capable of vertical 180° aiming and an electronic level 5 with an automatic leveling measurement function are provided on the clamp, and after the clamps of the upper and lower section columns are set, the electronic level 5 and the corresponding laser line projector 2 can be horizontally slid to align the electronic level 5 with the corresponding laser line projector 2 and the steel column component, and the center line of the steel column component can be projected to the outside; after the upper and lower section columns are docked in place, the limit pin 9 is inserted into the tubular pin to achieve the limiting and preliminary alignment of the upper and lower section columns; a vertical electric hydraulic adjustment rod is provided between the support plates 7 of the upper and lower clamps, and the extension and retraction of the hydraulic adjustment rod to adjust the horizontality and verticality of the steel column; by observing whether the center lines of the upper and lower sections of the column projected outward by the laser projection instrument 2 in both directions coincide with the existing control line 12 on the ground when the electronic level 5 is horizontal, it is judged whether the horizontality and verticality of the upper section of the column meet the requirements, thereby replacing the temporary connection ear plates and temporary fixing bolts used in the welding connection of the upper and lower sections of the steel column, saving material use; it can reduce the use time of the lifting machinery in the installation and correction of the steel column, saving the cost of machinery use; it can replace the cable wind rope in the conventional correction method, reduce the impact of the cable wind rope pulling on the inconvenience of the movement of people and materials on the on-site construction operation surface during the construction of the steel column, and reduce the deployment of collaborative workers during the installation and correction process, while avoiding safety hazards when the cable wind rope is set; it has a simple structure and is easy to install and use. The two L-shaped clamp components are connected by the corresponding comb-shaped slots, and can be applied to steel columns of various cross-sectional sizes and shapes with the wedge-shaped pin; in addition, it can be recycled to avoid waste of resources.
[0071] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art in the field of the present invention based on the above disclosure shall fall within the scope of protection of the claims.
Claims
1. A method for the automated rapid installation and correction of steel columns, for installing an upper section column on top of an already installed lower section column to form a steel column, characterized in that: The steps include: Step 1, respectively set two clamps on the outer sides of the butt ends of the upper and lower section columns to be butted, each clamp includes two L-shaped clamp parts, each L-shaped clamp part includes two strip members, the two strip members are both arranged horizontally, one end of the two strip members is vertically connected and a pin hole perpendicular to the strip members is provided at the connection, the other ends of the two strip members are provided with comb-toothed slots along their own axes, the comb-toothed slot opening of one L-shaped clamp part is set upward, and the comb-toothed slot opening of the other L-shaped clamp part is set downward, the two L-shaped clamp parts are clamped together by the corresponding comb-toothed slots to form a rectangular structure with adjustable size, and the lower section column has an L-shaped clamp part on the upper side. Vertical geometric center lines are marked on adjacent column surfaces respectively, and vertical geometric center lines are marked on a pair of adjacent column surfaces on the upper section column respectively. A slide groove is provided along its own axis on the strip-shaped component corresponding to the column surface with the vertical geometric center line in each L-shaped clamp component of the upper section column, and each slide groove is provided with an electronic level and a laser line projector. The electronic level is fixedly connected to the corresponding laser line projector. The electronic level and the corresponding laser line projector can move along the corresponding slide groove, and the laser line projector can project a laser line. When the electronic level is horizontal, the laser line projector can have a projection angle of 180° in the vertical elevation perpendicular to the surface of the upper section column; Step 2, mark two control lines on the ground, each of which intersects with the corresponding vertical geometric center line on the lower section column and is perpendicular to each other; Step 3, insert a wedge-shaped pin between the strip-shaped member and the steel column, so that the clamp is tightly clamped on the upper and lower section column surfaces; Step 4: Use a lifting device to suspend the upper column, preliminarily align the upper and lower columns, and slowly lower the upper column until it falls on the connection surface of the lower column; Step 5: Manually fine-tune the upper section column, insert limit pins into the upper and lower corresponding pin holes in the two clamps to temporarily fix the upper and lower section columns, set four electric hydraulic rods between the two clamps, and set the four electric hydraulic rods around the rectangular structure respectively. The clamps, wedge-shaped pins, limit pins and electric hydraulic rods form a temporary fixed support structure when the upper and lower section steel columns are connected, and the upper section column is separated from the lifting equipment; Step 6: Turn on the laser line projector and the electronic level and move them horizontally to observe the laser line projector directed to the surface of the upper column. When the laser line coincides with the vertical geometric center line of the upper column, the laser line projector is aligned relative to the upper column. Step 7: According to the projection of the laser projection instrument and the situation shown by the electronic level, the clamp of the upper section column is lifted and lowered by the electric hydraulic rod to calibrate and adjust the horizontal, vertical and centering conditions of the upper section column. When the two electronic levels located on the upper section column show horizontality and the laser line projected by the laser projection instrument toward the upper section column coincides with the geometric center line of the upper section column, and the laser lines projected outward in two directions by the laser projection instrument coincide with the corresponding control lines on the ground, the upper section column is horizontal, vertical and centered. Step 8: The upper and lower sections are connected by welding, and the clamps are removed after welding is completed.
2. The method for automatic rapid installation and correction of steel columns according to claim 1, characterized in that: A slide groove is provided along the axis of the strip-shaped component corresponding to the column surface with the vertical geometric center line in each L-shaped clamp component located in the lower section column. An electronic level and a laser line projector are provided in each slide groove. The electronic level and the corresponding laser line projector are fixedly connected. The electronic level and the corresponding laser line projector can move along the corresponding slide groove. The laser line projector emits a laser line outward. When the electronic level is horizontal, the laser line projector can have a projection angle of 180° in the vertical plane perpendicular to the surface of the lower section column. By moving the position of the electronic level and the corresponding laser line projector, the laser line projected by the laser line projector to the surface of the lower section column coincides with the corresponding vertical geometric center line on the lower section column.
3. The method for automatic rapid installation and correction of steel columns according to claim 2, characterized in that: When the control line on the ground is not long enough, the light projected by the laser line projector located at the lower clamp when the corresponding electronic level is horizontal serves as the extension line of the corresponding control line. When the two electronic levels located on the upper section column display horizontality and the laser line projector is centered relative to the upper section column, the laser lines projected in two directions coincide with the corresponding control line or the corresponding extension line on the ground, the upper section column is horizontal, vertical and centered.
4. The method for automatic rapid installation and correction of steel columns according to claim 1, characterized in that: The strip-shaped component is provided with a supporting plate for supporting the electric hydraulic rod.
5. The method for automatic rapid installation and correction of steel columns according to claim 4, characterized in that: The supporting plate located at the upper clamp is arranged below the corresponding slide slot, and the supporting plate located at the lower clamp is arranged above the corresponding slide slot.
6. The method for automatic rapid installation and correction of steel columns according to claim 2, characterized in that: The lower section column is pre-calibrated and installed, and a laser line is projected outwards through a laser line projector located at the lower clamp to mark the ground control line.