Lightning warning identification and cancellation method, system, computer equipment and storage medium

Through reconstruction and multivariate linear regression analysis of radar monitoring data and lightning positioning data, the problem that the existing technology cannot infer the sustained state of lightning activity is solved, accurate inference and life cycle prediction of lightning activity are achieved, and lightning disaster response is improved Proactive.

CN115793103BActive Publication Date: 2024-11-15GUIZHOU POWER GRID CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202211228373.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-09
Publication Date
2024-11-15
Estimated Expiration
2042-10-09

AI Technical Summary

Technical Problem

The existing technology cannot accurately infer the continuous state and time of lightning activities, determine the passive state of lightning development, and cannot predict the development trend of lightning in advance.

Method used

By reconstructing radar monitoring data and lightning positioning data and multivariate linear regression analysis, combining data analysis algorithms such as correlation analysis and lag correlation analysis, the life cycle of lightning activity is inferred, and the statistical area is updated in real time to track ground flash changes.

Benefits of technology

Accurate inference and life cycle prediction of lightning activity processes are achieved, response plans can be formulated in advance, and proactive response capabilities are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115793103B_ABST
    Figure CN115793103B_ABST
Patent Text Reader

Abstract

The invention discloses a lightning warning identification and release method, system, computer equipment and storage medium. The method comprises: reconstructing radar monitoring data and lightning positioning data; outputting and analyzing, and updating the statistical area of ​​radar parameter data in real time according to ground lightning, and only counting the change rate of each parameter within the ground lightning range; obtaining an inference of the duration of the thunderstorm activity process by adopting multivariate linear regression analysis on multiple independent variables; the invention predicts or estimates the dependent variable by the optimal combination of multiple independent variables, which is more effective and more practical than predicting or estimating with only one independent variable, and can more accurately infer the thunderstorm activity process, thereby predicting the life cycle of the lightning activity, so that the initiative can be taken in the face of natural disasters, and relevant response plans can be formulated in advance, which plays a vital role in practical application.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The technical field to which the present invention relates is the field of lightning monitoring technology, and in particular to a lightning warning identification and release method, system, computer equipment and storage medium. Background Art

[0002] Lightning disasters are one of the natural disasters that threaten the safety of human life and property. It is of great significance to accurately warn before cloud-to-ground lightning strikes. In the existing technology, most of them use very low frequency (VLF) lightning location system and very high frequency (VHF) cloud-to-ground lightning location system and local atmospheric electric field strength monitoring equipment to achieve lightning monitoring and early warning. Although it can accurately measure whether lightning and thunderstorm warning occur within the local measurement radius, it is impossible to infer the duration and time of lightning activity. The judgment of lightning is still in a passive state, and the development of lightning cannot be predicted. Summary of the invention

[0003] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.

[0004] In view of the above-mentioned problems, the present invention is proposed.

[0005] Therefore, the technical problem solved by the present invention is that it is impossible to infer the duration and time of lightning activity, the identification of lightning is still in a passive state, and the development state of lightning cannot be predicted.

[0006] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0007] In a first aspect, an embodiment of the present invention provides a method for distinguishing and releasing a lightning warning, including:

[0008] Reconstruct radar monitoring data and lightning location data, output the reconstructed data, and further analyze the data through data analysis algorithms;

[0009] The number of ground flashes is obtained according to the data analysis result. When the number of ground flashes reaches a set value, radar parameter data within a rectangular area with all ground flashes reaching the set value as vertices are counted, and radar monitoring data and lightning location data are continuously reconstructed, output and analyzed in real time. As new ground flashes exceeding the set value appear, the statistical area of ​​radar parameter data is updated in real time.

[0010] By performing a multivariate linear regression analysis on the rate of change of the radar parameter data, the duration of the thunderstorm activity process can be inferred, thereby obtaining the life cycle of the lightning activity.

[0011] As a preferred solution for lightning warning identification and release method, the following are some examples:

[0012] The data reconstruction includes: reconstructing the data by a reconstruction filter bank method or a down-and-up frequency modulation slope processing method;

[0013] Among them, the filter group is divided into an analysis filter group and a synthesis filter group; the analysis filter group is used to divide the radar monitoring data and lightning location data into M sub-band signals, the bandwidth of the original signal is compressed to 1 / M, each sub-band signal is extracted M times, and the sampling rate is reduced M times; at the same time, M times interpolation is performed in front of the synthesis filter group.

[0014] As a preferred solution for lightning warning identification and release method, the following are some examples:

[0015] The real-time updating of the statistical area of ​​the radar parameter data includes: when the number of ground flashes exceeding a set value occurs, the statistical area of ​​the radar parameter data is updated to a rectangular area with all the ground flashes occurring as vertices.

[0016] As a preferred solution for lightning warning identification and release method, the following are some examples:

[0017] The change rate of each parameter in the statistical area is counted, wherein the selected radar parameter data is the maximum value in the statistical area, and the radar parameter data format includes Grib, NetCDF and HDF formats.

[0018] As a preferred solution for lightning warning identification and release method, the following are some examples:

[0019] The radar parameter data include: lightning frequency, echo intensity, echo top height, vertical liquid water content and combined reflectivity; wherein the echo intensity is the radar echo frequency, the echo top height is the echo of the strong part in the cloud, the vertical liquid water content is the reflectivity factor data converted into an equivalent liquid water value, and the combined reflectivity is the ratio of radar waves reflected by clouds at different heights within the radar receiving range; the vertical liquid water content is obtained by Doppler radar layered calculation.

[0020] As a preferred solution for lightning warning identification and release method, the following are some examples:

[0021] The data analysis algorithms include: correlation analysis, lagged correlation analysis, regression analysis, partial correlation analysis, and Monte Carlo test of correlation significance level.

[0022] The thunderstorm coefficient k is defined as:

[0023] k=a+b*x 1 +c*x 2 +d*x 3 +e*x 4 +f*x 5

[0024] Among them, x 1 、x 2 、x 3 、x 4 、x 5 They are the change rate of lightning frequency, echo intensity, echo top height, vertical liquid water content and combined reflectivity respectively; coefficients a, b, c, d, e and f are determined by combining and analyzing the data collected during the observation period with historical data;

[0025] The duration t of thunderstorm activity is preliminarily predicted based on the thunderstorm coefficient k, in minutes. First, the thunderstorm coefficient k is normalized to a number between 0 and 1, and the duration t can be expressed as:

[0026]

[0027] As a preferred solution for lightning warning identification and release method, the following are some examples:

[0028] The life cycle includes: dividing the lightning activity life cycle into a development stage and an extinction stage, the dividing line between the two stages is the time point when 90% of the lightning frequency occurs, the development stage is before 90% of the lightning frequency occurs, and the extinction stage is after 90% of the lightning frequency occurs.

[0029] In a second aspect, an embodiment of the present invention provides a lightning warning identification and release system, characterized in that it includes:

[0030] The data analysis module is used to reconstruct the radar monitoring data and lightning location data, output the reconstructed data, and further analyze the data through the data analysis algorithm;

[0031] A data updating module is used to obtain the number of ground flashes according to the data analysis result. When the number of ground flashes reaches a set value, the radar parameter data within a rectangular area with all ground flashes reaching the set value as vertices are counted, and the radar monitoring data and lightning location data are continuously reconstructed, output and analyzed in real time. As new ground flashes exceeding the set value appear, the statistical area of ​​the radar parameter data is updated in real time;

[0032] The prediction module is used to infer the duration of the thunderstorm activity process by performing a multivariate linear regression analysis on the change rate of the radar parameter data, thereby obtaining the life cycle of the lightning activity.

[0033] In a third aspect, an embodiment of the present invention provides a computing device, including:

[0034] Memory and processor;

[0035] The memory is used to store computer executable instructions, and the processor is used to execute the computer executable instructions. When the one or more programs are executed by the one or more processors, the one or more processors implement the lightning warning identification and release method as described in any embodiment of the present invention.

[0036] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium storing computer-executable instructions, which, when executed by a processor, implement the lightning warning identification and release method.

[0037] Beneficial effects of the present invention: The present invention predicts or estimates dependent variables through the optimal combination of multiple independent variables, which is more effective and practical than predicting or estimating with only one independent variable. It can more accurately infer the thunderstorm activity process, thereby predicting the life cycle of lightning activity, so that the initiative can be taken in the face of natural disasters, and relevant response plans can be formulated in advance, which plays a vital role in practical applications. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:

[0039] Figure 1 It is an overall flow chart of the lightning warning identification and release method described in the first embodiment of the present invention;

[0040] Figure 2 It is a curve diagram of the time variation of ground flash frequency and radar vertical liquid water content in a simulation example of the lightning warning identification and release method described in the second embodiment of the present invention. DETAILED DESCRIPTION

[0041] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0042] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0043] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0044] The present invention is described in detail with reference to schematic diagrams. When describing the embodiments of the present invention, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.

[0045] At the same time, in the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "upper, lower, inner and outer" are based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first, second or third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0046] In the present invention, unless otherwise clearly specified and limited, the terms "install, connect, connect" should be understood in a broad sense, for example: it can be a fixed connection, a detachable connection or an integral connection; it can also be a mechanical connection, an electrical connection or a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0047] Example 1

[0048] Reference Figure 1 , which is the first embodiment of the present invention, provides a lightning warning identification and release method, comprising:

[0049] S1: Reconstruct radar monitoring data and lightning location data, output the reconstructed data, and further analyze the data through data analysis algorithms;

[0050] Specifically, the data reconstruction includes: reconstructing the data by a reconstruction filter bank method or a ramp-down frequency modulation slope processing method.

[0051] Among them, the filter group is divided into an analysis filter group and a synthesis filter group; the analysis filter group is used to divide the radar monitoring data and lightning location data into M sub-band signals, the bandwidth of the original signal is compressed to 1 / M, each sub-band signal is extracted M times, and the sampling rate is reduced M times; at the same time, M times interpolation is performed in front of the synthesis filter group.

[0052] It should be noted that the above method can better achieve unambiguous recovery of azimuthally non-uniformly sampled data and reconstruct it uniformly, while improving the computing speed, and is suitable for application and real-time processing.

[0053] It should also be noted that each sub-band signal is decimated M times, thereby reducing the sampling rate by M times. This can reduce the amount of coding and processing calculations, and at the same time, can also reduce the requirements for system performance during hardware implementation, thereby reducing costs.

[0054] Furthermore, the data analysis algorithm includes: correlation analysis method, lagged correlation analysis method, regression analysis method, partial correlation analysis method, and Monte Carlo test method of correlation significance level.

[0055] It should be noted that the use of the above-mentioned algorithms can better eliminate the influence of variables; reduce the selection of indicators; retain most of the information; and objectively and reasonably complete the analysis of data.

[0056] S2: The number of ground flashes is obtained according to the data analysis result. When the number of ground flashes reaches a set value, the radar parameter data within a rectangular area with all ground flashes reaching the set value as vertices are counted, and the radar monitoring data and lightning location data are continuously reconstructed, output and analyzed in real time. As new ground flashes exceeding the set value appear, the statistical area of ​​the radar parameter data is updated in real time.

[0057] Specifically, the real-time updating of the statistical area of ​​the radar parameter data includes: when a new ground flash occurs, updating the statistical area of ​​the radar parameter data to a rectangular area with all the ground flashes occurring as vertices.

[0058] It should be noted that the above method can perform real-time tracking according to the real-time situation of ground lightning, thus ensuring the accuracy of radar parameter data.

[0059] Furthermore, the statistics of the radar parameter data include: counting the change rate of each parameter in the statistical area, wherein the selected radar parameter data is the maximum value in the statistical area, and the radar parameter data format includes Grib, NetCDF and HDF formats.

[0060] S3: By performing a multivariate linear regression analysis on the rate of change of the radar parameter data, the duration of the thunderstorm activity process can be inferred, thereby obtaining the life cycle of the lightning activity.

[0061] Specifically, the radar parameter data include: lightning frequency, echo intensity, echo top height, vertical liquid water content and combined reflectivity; wherein the echo intensity is the radar echo frequency, the echo top height is the echo of the strong part in the cloud, the vertical liquid water content is the reflectivity factor data converted into an equivalent liquid water value, and the combined reflectivity is the ratio of radar waves reflected by clouds at different heights within the radar receiving range; the vertical liquid water content is obtained by Doppler radar layered calculation.

[0062] The thunderstorm coefficient k is defined as:

[0063] k=a+b*x 1 +c*x 2 +d*x 3 +e*x 4 +f*x 5

[0064] Among them, x 1 、x 2 、x 3 、x 4 、x 5 They are the change rate of lightning frequency, echo intensity, echo top height, vertical liquid water content and combined reflectivity respectively; coefficients a, b, c, d, e and f are determined by combining and analyzing the data collected during the observation period with historical data;

[0065] The duration t of thunderstorm activity is preliminarily predicted based on the thunderstorm coefficient k, in minutes. First, the thunderstorm coefficient k is normalized to a number between 0 and 1, and the duration t can be expressed as:

[0066]

[0067] The life cycle includes: dividing the lightning activity life cycle into a development stage and an extinction stage, the dividing line between the two stages is the time point when 90% of the lightning frequency occurs, the development stage is before 90% of the lightning frequency occurs, and the extinction stage is after 90% of the lightning frequency occurs.

[0068] It should be noted that predicting or estimating the dependent variable by the optimal combination of multiple independent variables is more effective than predicting or estimating with only one independent variable, and can more accurately infer the thunderstorm activity process.

[0069] Example 2

[0070] Reference Figure 2, which is an embodiment of the present invention, provides a lightning warning identification and release method. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through simulation experiments.

[0071] The experimental data used in this simulation experiment are radar parameter data obtained in the central my country region from January to December 2021, as shown in the following table:

[0072]

[0073] Note: In the table I + MAX : Strongest positive flash intensity (kA): I: Average positive flash intensity (kA); I MAX - : the strongest negative flash intensity (kA); Γ: the average negative flash intensity (kA)

[0074] Firstly, the radar monitoring data and lightning location data are reconstructed by the reconstruction filter bank method, and the reconstructed data are output and further analyzed by the correlation analysis method.

[0075] The number of ground flashes is obtained according to the data analysis results. When four ground flashes occur, the radar parameter data in the rectangular area with the four ground flashes as vertices are counted. At the same time, the radar monitoring data and lightning location data in step 1 are reconstructed, output and analyzed in real time. As N new ground flashes occur, the radar parameter data in the rectangular area with 4+N ground flashes as vertices are counted, and the statistical area of ​​the radar parameter data is updated in real time. Only the change rate of each parameter within the ground flash range is counted. The selected radar grid data is the maximum value within the current statistical range. The radar grid data formats include Grib, NetCDF and HDF.

[0076] By performing multiple linear regression analysis on the change rates of lightning frequency, echo intensity CAPPI (radar echo wave frequency), echo top height ET (echo of the strong part in the cloud), vertical liquid water content VIL (converting reflectivity factor data into equivalent liquid water value) and combined reflectivity CR (the ratio of radar waves reflected by clouds at different heights within a certain range around the radar receiver obtained by Doppler radar layered calculation) at t0-t1 and t1-t2, we can infer the duration of thunderstorm activity and measure the life cycle of lightning activity. The life cycle of lightning activity is divided into development stage and extinction stage. The dividing line between the two stages is the time point when 90% of the lightning frequency occurs.

[0077] Compared with the traditional lightning warning method, the lightning warning identification and cancellation method used in this simulation experiment has the following experimental results as shown in the following table:

[0078] This method Traditional method (single independent variable prediction) Accuracy of lightning occurrence identification 85.2% 65.7% Lightning clearance judgment accuracy 80.3% 69.8%

[0079] It can be seen that predicting or estimating the dependent variable by the optimal combination of multiple independent variables is more effective than predicting or estimating with only one independent variable, and can more accurately infer the thunderstorm activity process.

[0080] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A lightning warning identification and release method, characterized in that: include: Reconstruct radar monitoring data and lightning location data, output the reconstructed data, and further analyze the data through data analysis algorithms; The data analysis algorithms include: correlation analysis, lagged correlation analysis, regression analysis, partial correlation analysis, and Monte Carlo test of correlation significance level; The thunderstorm coefficient k is defined as: k=a+b*x1+c*x2+d*x3+e*x4+f*x5 Among them, x1, x2, x3, x4, and x5 are the change rates of lightning frequency, echo intensity, echo top height, vertical liquid water content, and combined reflectivity respectively; coefficients a, b, c, d, e, and f are determined by combining and analyzing the data collected during the observation period with historical data; The duration t of thunderstorm activity is preliminarily predicted based on the thunderstorm coefficient k, in minutes. First, the thunderstorm coefficient k is normalized to a number between 0 and 1, and the duration t is expressed as: The number of ground flashes is obtained according to the data analysis result. When the number of ground flashes reaches a set value, radar parameter data within a rectangular area with all ground flashes reaching the set value as vertices are counted, and radar monitoring data and lightning location data are continuously reconstructed, output and analyzed in real time. As new ground flashes exceeding the set value appear, the statistical area of ​​radar parameter data is updated in real time. By performing a multivariate linear regression analysis on the rate of change of the radar parameter data, the duration of the thunderstorm activity process can be inferred, thereby obtaining the life cycle of the lightning activity.

2. The lightning warning identification and release method according to claim 1, characterized in that: The data reconstruction includes: reconstructing the data by a reconstruction filter bank method or a down-and-up frequency modulation slope processing method; Among them, the filter group is divided into an analysis filter group and a synthesis filter group; the analysis filter group is used to divide the radar monitoring data and lightning location data into M sub-band signals, the bandwidth of the original signal is compressed to 1 / M, each sub-band signal is extracted M times, and the sampling rate is reduced M times; at the same time, M times interpolation is performed in front of the synthesis filter group.

3. The lightning warning identification and release method according to claim 1, characterized in that: The real-time updating of the statistical area of ​​the radar parameter data includes: when the number of ground flashes exceeding a set value occurs, the statistical area of ​​the radar parameter data is updated to a rectangular area with all the ground flashes occurring as vertices.

4. The lightning warning identification and release method according to claim 1 or 3, characterized in that: include: The change rate of each parameter in the statistical area is counted, wherein the selected radar parameter data is the maximum value in the statistical area, and the radar parameter data format includes Grib, NetCDF and HDF formats.

5. The lightning warning identification and release method according to claim 4, characterized in that: The radar parameter data include: lightning frequency, echo intensity, echo top height, vertical liquid water content and combined reflectivity; wherein the echo intensity is the radar echo frequency, the echo top height is the echo of the strong part in the cloud, the vertical liquid water content is the reflectivity factor data converted into an equivalent liquid water value, and the combined reflectivity is the ratio of radar waves reflected by clouds at different heights within the radar receiving range; the vertical liquid water content is obtained by Doppler radar layered calculation.

6. The lightning warning identification and release method according to claim 1, characterized in that: The life cycle includes: dividing the lightning activity life cycle into a development stage and an extinction stage, the dividing line between the two stages is the time point when 90% of the lightning frequency occurs, the development stage is before 90% of the lightning frequency occurs, and the extinction stage is after 90% of the lightning frequency occurs.

7. A lightning warning identification and release system, characterized in that: include: The data analysis module is used to reconstruct the radar monitoring data and lightning location data, output the reconstructed data, and further analyze the data through the data analysis algorithm; A data updating module is used to obtain the number of ground-to-ground flashes according to the data analysis result. When the number of ground-to-ground flashes reaches a set value, the radar parameter data within a rectangular area with all ground-to-ground flashes reaching the set value as vertices are counted, and the radar monitoring data and lightning location data are continuously reconstructed, output and analyzed in real time. As new ground-to-ground flashes exceeding the set value appear, the statistical area of ​​the radar parameter data is updated in real time. The prediction module is used to infer the duration of the thunderstorm activity process by performing a multivariate linear regression analysis on the change rate of the radar parameter data, thereby obtaining the life cycle of the lightning activity.

8. A computing device comprising: Memory and processor; The memory is used to store computer executable instructions, and the processor is used to execute the computer executable instructions. When the computer executable instructions are executed by the processor, the steps of the lightning warning identification and release method according to any one of claims 1 to 6 are implemented.

9. A computer-readable storage medium storing computer-executable instructions, which, when executed by a processor, implement the steps of the lightning warning identification and release method according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Television signal receiver capable of receiving emergency alert signals

    AU2003228941A1

  • A lightning forecasting method and system

    CN108957595A

  • Thunderstorm early warning system and method

    CN111897030A

  • Intelligent thunder and lightning forecasting method based on Doppler weather radar data

    CN112731564A

  • Early warning method for strong wind caused by strong convection in summer for power grid production

    CN113238230A