A method and device for treating urban construction waste

By receiving the reservation information of the user's equipment and determining the number of garbage bins according to the decoration area, the garbage bins are delivered to the user's address, which solves the problem of insufficient garbage bins during the decoration process and improves the efficiency of construction waste processing.

CN115924354BActive Publication Date: 2025-01-21杭州琛晖建材有限公司
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202211368282.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-03
Publication Date
2025-01-21
Estimated Expiration
2042-11-03

AI Technical Summary

Technical Problem

During the renovation process, when there is a lot of construction waste, the number of garbage bins in the community is not enough, and the owner needs to spend more time waiting for the construction waste bin to deal with the construction waste.

Method used

Provide a method and device for treating urban construction waste. By receiving the reservation information sent by the user's equipment, the required number of garbage bins is determined according to the decoration area and sent to the user's address, so as to facilitate the user to clear and transport construction waste.

Benefits of technology

It reduces the time owners spend on transporting garbage, improves transportation efficiency, prioritizes reservation information for completed renovations, and sets the corresponding number of garbage bins according to the decoration area in the reservation information.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115924354B_ABST
    Figure CN115924354B_ABST
Patent Text Reader

Abstract

The present application provides a method and device for treating urban construction waste, which is applied to a construction waste removal platform. The construction waste removal platform receives a first reservation information for a garbage bin sent by a first user device; wherein the first reservation information includes a first address and a first decoration area; according to the first decoration area and the correspondence between the decoration area and the number of garbage bins stored in advance, the number of garbage bins corresponding to the first decoration area is determined; the number of garbage bins corresponding to the first decoration area and the first address are sent to a recycling client, so that the recycling client prompts the construction waste removal staff to transport the number of garbage bins corresponding to the first decoration area to the location of the first address, thereby facilitating the user corresponding to the user device to carry out construction waste removal work. The above method solves the problem that when there is a lot of decoration waste, the number of garbage bins in the community is insufficient, and the owner needs to spend a lot of time waiting for the construction waste bin to handle the construction waste, thereby improving the user experience.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of urban construction waste management, and in particular to a method and device for treating urban construction waste. Background Art

[0002] With the rapid development of society, more and more cities have begun to pay attention to the treatment of garbage. According to the different sources of garbage, urban garbage can be divided into food garbage, ordinary garbage, construction garbage, cleaning garbage and hazardous garbage; among them, construction garbage also includes decoration garbage, which generally refers to the garbage generated during the construction and decoration process, including cement gypsum, wood plastic, metal ceramics and other types of decorative waste.

[0003] At present, when a house is being renovated, the garbage generated needs to be transported to a designated garbage bin for storage, and then staff will collect the garbage in the garbage bin and transport it to the factory for processing. However, there are still the following defects: when there is a lot of garbage, there are not enough construction garbage bins in the community, and the owner needs to go back and forth many times, spending a lot of time waiting for the construction garbage bin to process the construction garbage.

[0004] At present, there is an urgent need for a method and device for treating urban construction waste. Summary of the invention

[0005] In view of the shortcomings of the prior art, the present application provides a method and device for treating urban construction waste, which solves the problem that when there is a lot of renovation waste, there are not enough garbage bins in the community, and the owners need to spend a lot of time waiting for construction waste bins to treat the construction waste. To achieve the above purpose, the present application adopts the following technical solution.

[0006] The first aspect of the present application provides a method for handling urban construction waste, which is applied to a construction waste removal platform, and the method includes: receiving a first reservation information for a garbage bin sent by a first user device; wherein the first reservation information includes a first address and a first decoration area; determining the number of garbage bins corresponding to the first decoration area according to the first decoration area and the correspondence between the decoration area and the number of garbage bins stored in advance; sending the number of garbage bins corresponding to the first decoration area and the first address to a recycling client, so that the recycling client can prompt the construction waste removal staff to transport the number of garbage bins corresponding to the first decoration area to the location located at the first address, thereby facilitating the user corresponding to the user device to carry out construction waste removal work. By adopting the above technical solution, when there is a lot of garbage, it is reduced that the owner needs to carry the garbage multiple times and stack it at the designated garbage bin location, and the garbage bin can be sent to the address location by appointment, which is convenient for users to handle decoration garbage.

[0007] The second aspect of the present application provides an urban construction waste treatment device, which is a construction waste removal platform, and the construction waste removal platform includes a receiving unit, a processing unit and a sending unit; the receiving unit receives first reservation information for a garbage bin sent by a user device; wherein the first reservation information includes a first address and a first decoration area; the processing unit determines the number of garbage bins corresponding to the first decoration area according to the first decoration area and the pre-stored correspondence between the decoration area and the number of garbage bins; the sending unit sends the number of garbage bins corresponding to the first decoration area and the first address to a recycling client, so that the recycling client can prompt the construction waste removal staff to transport the number of garbage bins corresponding to the first decoration area to the location corresponding to the first address, thereby facilitating the user corresponding to the user device to carry out construction waste removal work.

[0008] By adopting the above technical solution, the required garbage bins are delivered to the owner's address according to the reservation request sent by the owner, which is convenient for the owner to deal with the renovation garbage and reduces the owner's time spent on transporting garbage.

[0009] Optionally, the receiving unit includes a first subunit of decoration progress, and the first subunit of decoration progress is the first appointment information including the first decoration progress; the construction waste removal platform receives the second appointment information for the trash bin sent by the second user device, and the second appointment information also includes the second decoration progress; the first appointment information includes the first decoration progress; the construction waste removal platform determines whether the first decoration progress and the second decoration progress have been completed; confirms that the first decoration progress has been completed and the second decoration progress has not been completed, and gives priority to the first appointment information, and the priority of the first decoration progress being completed is greater than the priority of the second decoration progress being uncompleted.

[0010] By adopting the above technical solution, the construction waste removal platform receives the appointment information and determines whether there is any completed decoration progress in the appointment information. When there is completed appointment information, it will be processed first.

[0011] Optionally, the receiving unit also includes a second sub-unit of the decoration progress, and the second sub-unit of the decoration progress is that the first appointment information also includes a first appointment order time, and the second appointment information also includes a second appointment order time; the construction waste removal platform confirms that the first decoration progress has been completed and the second decoration progress has been completed; when the first appointment order time is before the second appointment order time, the construction waste removal platform gives priority to the first appointment information.

[0012] With the above technical solution, when the decoration progress in the reservation information has been completed, the reservation information is compared based on the order time of the reservation information, and the order time earlier is given priority.

[0013] Optionally, the construction waste removal platform also includes a storage unit, which constructs a correspondence between the decoration area and the number of garbage bins according to the historical decoration area and the number of garbage bins required for the historical decoration area; and locally stores the correspondence between the decoration area and the number of garbage bins.

[0014] By adopting the above technical solution, the number of trash bins required for the decoration area in the reservation information is determined according to the pre-stored decoration area and the required number of trash bins, thereby reducing the occurrence of insufficient or excess number of reserved trash bins.

[0015] Optionally, the receiving unit also includes a third sub-unit of decoration progress, and the third sub-unit of decoration progress is that the first appointment information includes a first address, and the second appointment information includes a second address; the construction waste removal platform confirms that the first decoration progress is not completed, and the second decoration progress is not completed; obtains a first distance from the first address to the garbage removal station, and obtains a second distance from the second address to the garbage removal station; when the first distance is greater than the second distance, the first appointment information is given priority.

[0016] By adopting the above technical solution, when the renovation progress in the appointment information is not completed, the appointment information with the longest distance among the multiple appointment information is processed first according to the distance between the address in the multiple appointment information and the garbage removal station.

[0017] Optionally, the construction waste removal platform further includes a numbering unit, which numbers any garbage bin of the construction waste removal platform, and the garbage bin corresponding to the first decoration area includes a first garbage bin; an association relationship is established between the number of the first garbage bin and the first address; and the association relationship is stored locally.

[0018] By adopting the above technical solution, the trash bins are numbered, the required trash bins are matched according to the reservation information, and the trash bins are associated with the addresses in the reservation information, so as to facilitate subsequent recycling by the staff.

[0019] Optionally, the construction waste removal platform also includes a recycling unit, which receives a completed garbage removal message sent by the user device for the construction waste removal platform, and the completed garbage removal message is used to indicate that the construction waste has been transported to the garbage bin; the completed garbage removal message is sent to a recycling client, so that the recycling client prompts the construction waste removal staff to go to the address corresponding to the positioning information to recycle the garbage bin.

[0020] By adopting the above technical solution, according to the completed garbage removal message sent by the user, the recycling client prompts the construction waste removal staff to go to the address of the appointment information to recycle the garbage bin.

[0021] Optionally, the receiving unit also includes a common sub-unit, which receives the third reservation information for the garbage bin sent by the second user device for the construction waste removal platform, the third reservation information including a third address and a third decoration area, and the first reservation information and the third reservation information are reservation information within a preset time; confirms that the first address and the third address belong to the same community; merges the third decoration area with the first decoration area to obtain a fourth decoration area; determines the number of garbage bins corresponding to the fourth decoration area based on the pre-stored correspondence between the decoration area and the number of garbage bins, and sends the number of garbage bins corresponding to the fourth decoration area and the address of the same community to the recycling client, so that the recycling client can prompt the construction waste removal staff to transport the number of garbage bins corresponding to the fourth decoration area to the corresponding location of the same community, thereby facilitating the user corresponding to the user device to carry out construction waste removal work.

[0022] By adopting the above technical solution, when there are multiple reservation information, it is determined whether the address belongs to the same community. When it is confirmed that they belong to the same community, the decoration areas in the reservation information are merged to prevent the situation where there are too many surpluses in the reserved trash cans.

[0023] The third aspect of the present application provides an electronic device, which includes a processor, a memory, a user interface and a network interface, the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory, so that an electronic device unit executes a method as described in any one of the first aspects of the present application.

[0024] A fourth aspect of the present application provides a computer-readable storage medium, which stores instructions. When the instructions are executed, the method described in any one of the first aspects of the present application is executed.

[0025] Compared with the prior art, the beneficial effects of the present application are: when there is a lot of renovation waste, it reduces the time spent by the owner on transporting the waste back and forth; the renovation waste can be transported to the trash bin for processing at one time, which improves the transportation efficiency; priority is given to processing according to the renovation progress in the appointment information; the number of trash bins required is also set according to the renovation area in the appointment information; when the trash bin is used up, the construction waste removal platform responds to the user's operation, and the recycling client prompts the construction waste removal staff to recycle according to the address location; the trash bins are numbered and associated with the positioning information, which is beneficial to the recycling work of the construction waste removal staff; when there are multiple appointment information, the distance between the positioning information in the multiple appointment information and the garbage removal station is calculated, and the obtained distance is compared to give priority to the one with a long distance; special circumstances are prevented from occurring and cannot be processed in time, thereby improving the owner experience. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of a process of treating urban construction waste provided by an embodiment of the present application;

[0027] Figure 2 It is a flow chart of another method for treating urban construction waste provided in an embodiment of the present application;

[0028] Figure 3 It is a flow chart of another method for treating urban construction waste provided in an embodiment of the present application;

[0029] Figure 4 It is a flow chart of another method for treating urban construction waste provided in an embodiment of the present application;

[0030] Figure 5 It is a flow chart of another method for treating urban construction waste provided in an embodiment of the present application;

[0031] Figure 6 It is a schematic diagram of a process of another method for treating urban construction waste provided in an embodiment of the present application;

[0032] Figure 7 It is a structural schematic diagram of a device for treating urban construction waste provided in an embodiment of the present application;

[0033] Figure 8 It is a structural schematic diagram of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0034] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below in conjunction with the accompanying drawings.

[0035] In the description of the embodiments of the present application, words such as "illustrative", "for example" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "illustrative", "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "illustrative", "for example" or "for example" is intended to present related concepts in a specific way.

[0036] In addition, the terms "first", "second", "third", "fourth", etc. in the specification of this application are used to distinguish different objects rather than to describe a specific order, and may explicitly or implicitly include one or more of the features.

[0037] Before introducing the embodiments of the present application, some terms involved in the embodiments of the present application are first defined and explained.

[0038] Construction waste: refers to the general term for slag, waste concrete, waste bricks and stones and other wastes generated by people in the production activities of the construction industry such as demolition, construction, decoration and repair. According to the source of generation, construction waste can be divided into engineering slag, decoration waste, demolition waste, engineering mud, etc.; according to the composition, construction waste can be divided into slag, concrete blocks, broken stones, brick and tile fragments, waste mortar, mud, asphalt blocks, waste plastics, waste metals, waste bamboo and wood, etc.

[0039] Decoration waste: generally refers to the waste generated during the construction and decoration process, mainly various decorative wastes such as cement gypsum, wood, plastic, metal and ceramics.

[0040] The user of the user device in this application refers to the owner or property staff. At present, after people buy a house, house decoration is very important for everyone. After the house is decorated, various decoration wastes will be generated. The decoration waste is different from domestic waste. It cannot be thrown into the domestic waste bin at will. It must be placed in a designated trash can; it must be uniformly recycled and transported to the factory for treatment. When the owner generates a lot of decoration waste when decorating the house, it needs to be transported back and forth many times before the waste can be piled in the designated trash can. The owner spends more time on transporting the waste. In order to solve this problem, a mobile trash can that can be booked at any time is used, so that the owner can make an appointment and use it when needed.

[0041] The embodiment of the present application provides a method for treating urban construction waste, which is applied to a construction waste removal platform. Figure 1 is a flow chart of a method for treating urban construction waste provided by an embodiment of the present application; Figure 1 , including the following steps S101-S103.

[0042] Step S101: receiving first reservation information for a garbage bin sent by a first user device; wherein the first reservation information includes a first address and a first decoration area.

[0043] Step S102: determining the number of trash bins corresponding to the first decoration area according to the first decoration area and a pre-stored correspondence between the decoration area and the number of trash bins.

[0044] In a possible embodiment, the correspondence between the decoration area and the number of garbage bins is pre-stored, specifically including: the construction waste removal platform constructs a correspondence between the decoration area and the number of garbage bins according to the historical decoration area and the number of garbage bins required for the historical decoration area; and the correspondence between the decoration area and the number of garbage bins is locally stored on the construction waste removal platform.

[0045] In the above example, when the construction waste removal platform is used to reserve a trash bin, when the owner reserves a trash bin on the construction waste removal platform, one trash bin is selected in the reservation information. During the use of the trash bin, it is found that the number of trash bins is insufficient. The owner needs to reserve another trash bin; during the reservation process, the user feedbacks the required number of trash bins to the construction waste removal platform based on the decoration area and the purchased decoration materials, and the construction waste removal platform further confirms the authenticity of the user feedback; after confirming that the feedback is true, the construction waste removal platform will update the relationship between the decoration area and the required number of trash bins.

[0046] In addition, when the owner's decoration area is 100 square meters, the number of garbage bins selected is one; during use, it is found that some of the decoration garbage has not been completely loaded, and another garbage bin needs to be reserved for disposal. The owner can then feedback this situation to the construction waste removal platform to verify the owner's reservation information. If the owner's feedback is true, the transaction will be stored in the database of the construction waste removal platform based on the correspondence between the owner's decoration area and the number of garbage bins required, so that other owners can choose the number of garbage bins with higher accuracy. The number of garbage bins required for the decoration area is based on the actual situation.

[0047] Furthermore, when the owner makes a reservation for a trash bin on the construction waste removal platform, the number of trash bins in the reservation information is set to three. During the use of the trash bins, it is found that there are too many reserved trash bins. The actual situation is that two trash bins can handle the current decoration waste; and one trash bin is not used. After use, you can feedback on the construction waste removal platform and feedback the number of trash bins required based on the decoration area and the decoration materials purchased; by checking with the transportation staff to confirm that the owner's feedback is true, the recommended number of trash bins will be adjusted based on the decoration area and the decoration materials purchased. Adjusting to a more accurate range will facilitate the owner to use the recommended number of trash bins to load the decoration waste at one time and avoid choosing too many trash bins.

[0048] Step S103: Send the number of garbage bins corresponding to the first decoration area and the first address to the recycling client, so that the recycling client can prompt the construction waste removal staff to transport the number of garbage bins corresponding to the first decoration area to the location corresponding to the first address, thereby facilitating the user corresponding to the user device to carry out construction waste removal work.

[0049] In the above steps, the construction waste removal platform receives the first reservation information for the garbage bin sent by the first user device, and the first reservation information includes the first address and the first decoration area. The construction waste removal platform processes the first reservation information, queries the database according to the first decoration area, and stores the relationship between the decoration area and the number of garbage bins in the database; obtains the number of garbage bins required for the first decoration area, and determines the number of garbage bins. The construction waste removal platform sends the required number of garbage bins and the first address to the recycling client, and the recycling client determines the owner's address and the required number of garbage bins through the display interface; the recycling client prompts the construction waste removal staff to deliver the required number of garbage bins to the owner's address based on the owner's address. After the construction waste removal staff delivers the required number of garbage bins to the address set by the owner, the customer can carry out construction waste removal work. By adopting the above method, when there is a lot of garbage, it reduces the number of customer transportations, which facilitates customers to quickly dispose of construction waste.

[0050] In one possible embodiment, Figure 2 is a flow chart of another method for treating urban construction waste provided by an embodiment of the present application; the first appointment information also includes the first decoration progress, reference Figure 2 , including the following steps S201-S203.

[0051] Step S201: The construction waste removal platform receives second reservation information for a garbage bin sent by a second user device, where the second reservation information also includes a second renovation progress.

[0052] Step S202: The construction waste removal platform determines whether the first decoration progress and the second decoration progress have been completed.

[0053] In a possible embodiment, the correspondence between the decoration area and the number of garbage bins is pre-stored, specifically including: the construction waste removal platform constructs a correspondence between the decoration area and the number of garbage bins according to the historical decoration area and the number of garbage bins required for the historical decoration area; and the correspondence between the decoration area and the number of garbage bins is locally stored on the construction waste removal platform.

[0054] In the above example, when the construction waste removal platform is used to reserve a trash bin, when the owner reserves a trash bin on the construction waste removal platform, one trash bin is selected in the reservation information. During the use of the trash bin, it is found that the number of trash bins is insufficient. The owner needs to reserve another trash bin; during the reservation process, the user feedbacks the required number of trash bins to the construction waste removal platform based on the decoration area and the purchased decoration materials, and the construction waste removal platform further confirms the authenticity of the user feedback; after confirming that the feedback is true, the construction waste removal platform will update the relationship between the decoration area and the required number of trash bins.

[0055] In addition, when the owner's decoration area is 100 square meters, the number of garbage bins selected is one; during use, it is found that some of the decoration garbage has not been completely loaded, and another garbage bin needs to be reserved for disposal. The owner can then feedback this situation to the construction waste removal platform to verify the owner's reservation information. If the owner's feedback is true, the transaction will be stored in the database of the construction waste removal platform based on the correspondence between the owner's decoration area and the number of garbage bins required, so that other owners can choose the number of garbage bins with higher accuracy. The number of garbage bins required for the decoration area is based on the actual situation.

[0056] Furthermore, when the owner makes a reservation for a trash bin on the construction waste removal platform, the number of trash bins in the reservation information is set to three. During the use of the trash bins, it is found that there are too many reserved trash bins. The actual situation is that two trash bins can handle the current decoration waste; and one trash bin is not used. After use, you can feedback on the construction waste removal platform and feedback the number of trash bins required based on the decoration area and the decoration materials purchased; by checking with the transportation staff to confirm that the owner's feedback is true, the recommended number of trash bins will be adjusted based on the decoration area and the decoration materials purchased. Adjusting to a more accurate range will facilitate the owner to use the recommended number of trash bins to load the decoration waste at one time and avoid choosing too many trash bins.

[0057] Step S203: confirm that the first decoration progress has been completed and the second decoration progress has not been completed, give priority to the first appointment information, and the priority of the first decoration progress that has been completed is higher than the priority of the second decoration progress that has not been completed.

[0058] In the above steps, when the construction waste removal platform receives the first appointment information and the second appointment information, it judges the first decoration progress in the first appointment information and the second decoration progress in the second appointment information to determine whether the first decoration progress and the second decoration progress have been completed. When the owner selects the decoration progress that has been completed, he needs to provide pictures or record videos; when the owner selects the decoration progress that has been completed, but cannot provide pictures or videos, the construction waste removal platform will determine that the decoration progress selection in the appointment information sent by the owner is unreasonable, and the user needs to reselect the decoration progress. When it is confirmed that the first decoration progress has been completed and the second decoration progress has not been completed, the first appointment information is given priority. The priority of the completed decoration progress is greater than the priority of the uncompleted decoration progress. The construction waste removal platform will give priority to the completed decoration progress, reduce the stacking time of the decoration waste, and facilitate other owners to make subsequent reservations for trash cans to avoid the situation where there are no empty trash cans in the reserved trash cans and please wait.

[0059] In a possible embodiment, the construction waste removal platform receives the first appointment information and the second appointment information, and determines whether the first decoration progress in the first appointment information and the second decoration progress in the second appointment information have been completed. When it is confirmed that the first decoration progress is not completed and the second decoration progress is completed, the second appointment information is processed first. The priority of the completed decoration progress is higher than the priority of the uncompleted decoration progress.

[0060] In one possible embodiment, Figure 3 is a flow chart of another method for treating urban construction waste provided by an embodiment of the present application; the first appointment information also includes the first appointment order time, and the second appointment information also includes the second appointment order time, reference Figure 3 , including the following steps S301-S302.

[0061] Step S301: The construction waste removal platform confirms that the first renovation progress has been completed and the second renovation progress has been completed.

[0062] Step S302: When the first appointment order time is before the second appointment order time, the construction waste removal platform gives priority to processing the first appointment information.

[0063] In the above steps, the construction waste removal platform determines whether the first renovation progress in the first appointment information and the second renovation progress in the second appointment information have been completed; when the first renovation progress is confirmed to be completed, the second renovation progress is confirmed to be completed. The judgment is made based on the first appointment order time in the first appointment information and the second appointment order time in the second appointment information. When the first appointment order time is before the second appointment order time, the first appointment information is processed first.

[0064] In a possible embodiment, when the construction waste removal platform determines that the decoration progress in the two appointment information has been completed, the first appointment order time of the first appointment information is 10:30:25 am, and the second appointment order time of the second appointment information is 10:31:35 am; the first appointment order time is before the second appointment order time, and the construction waste removal platform gives priority to the first appointment information.

[0065] In one possible embodiment, Figure 4 is a flow chart of another method for treating urban construction waste provided by an embodiment of the present application; the first reservation information includes a first address, and the second reservation information includes a second address; Figure 4 , including the following steps S401-S403.

[0066] Step S401: The construction waste removal platform confirms that the first renovation progress is not completed and the second renovation progress is not completed.

[0067] Step S402: Obtain a first distance between the first address and the garbage collection station, and obtain a second distance between the second address and the garbage collection station.

[0068] Step S403: When the first distance is greater than the second distance, the first reservation information is processed preferentially.

[0069] In the above steps, the construction waste removal platform receives the first appointment information and the second appointment information, and judges the first decoration progress in the first appointment information and the second decoration progress in the second appointment information to determine whether the first decoration progress and the second decoration progress have been completed. When it is confirmed that the first decoration progress is not completed, it is confirmed that the second decoration progress is not completed. According to the first address in the first appointment information and the second address in the second appointment information, the first distance from the first address to the garbage removal station is obtained; when the first distance is 6km; the second distance from the second address to the garbage removal station is obtained, and the second distance is 2km; the first distance is greater than the second distance, and the first appointment information is given priority. The distance from the second address to the garbage removal station is smaller than the distance from the first address to the garbage removal station, and the distance is mainly based on the actual distance. When the smaller distance is given priority, the decoration waste with a larger distance will be piled up, affecting the user experience. When encountering special circumstances, the appointment information with a small distance can be processed in time.

[0070] In a possible embodiment, when the construction waste removal platform confirms that the first decoration progress and the second decoration progress have been completed; and the first appointment order time is the same as the second appointment order time; according to the distance between the first address and the garbage removal station is the first distance, the first distance is 2.5km; the distance between the second address and the garbage removal station is the second distance, the second distance is 5km; the first distance is less than the second distance, the second appointment information is given priority.

[0071] In a possible embodiment, the construction waste removal platform numbers the available garbage bins of the garbage removal station, receives the first reservation information sent by the user device, processes the first reservation information, and the garbage bin required for the first decoration area in the first reservation information is the first garbage bin; an association relationship is established between the number on the first garbage bin and the first address in the first reservation information, and then the association relationship is stored in the construction waste removal platform. This is convenient for construction waste removal staff to recycle the corresponding garbage bin according to the first address, and for subsequent garbage removal stations to check the number of garbage bins.

[0072] In the above example, when the number of garbage bins required for the first decoration area in the first appointment information is 2, the recycling client will transport the two garbage bins numbered 23 and 45 to the first address; the construction waste removal platform will associate the two garbage bins numbered 23 and 45 with the first address to facilitate the subsequent garbage removal station to verify the number of garbage bins, and the numbering is based on the actual situation.

[0073] In one possible embodiment, Figure 5 It is a flow chart of another method for treating urban construction waste provided by the embodiment of the present application; Figure 5 , including the following steps S501-S502.

[0074] Step S501: the construction waste removal platform receives a waste removal completion message sent by a user device, where the waste removal completion message is used to indicate that the construction waste has been transported to a waste bin.

[0075] Step S502: Sending a message that the garbage removal has been completed to the recycling client, so that the recycling client can prompt the construction waste removal staff to go to the address to recycle the garbage bin.

[0076] In the above steps, when the owner transports the construction waste to the trash bin, the user needs to click on the message that the garbage removal has been completed on the construction waste removal platform; the construction waste removal platform receives the message that the garbage removal has been completed sent by the user's device, and sends the message to the recycling client. The recycling client determines the owner's address and the number of the trash bin to be recycled through the display interface, and prompts the transportation staff to handle it. After the transportation staff arrives according to the user's address, they check the trash bin number and recycle the trash bin after confirming that it is correct. Ensure that the recycled trash bin is the same as the delivered trash bin.

[0077] It should be noted that the trash can in this manual is not a traditional trash can. It is a traditional trash can that has been equipped with hardware such as light and ultrasonic sensors, solar charging panels, lithium batteries, GPS and Internet of Things cards to upgrade the traditional recycling box into a smart box.

[0078] In one possible embodiment, Figure 6 is a flow chart of another method for treating urban construction waste provided in an embodiment of the present application; Figure 6 , including the following steps S601-S604.

[0079] Step S601: the construction waste removal platform receives the third reservation information for the garbage bin sent by the second user device, the third reservation information includes a third address and a third decoration area, and the first reservation information and the third reservation information are reservation information within a preset time.

[0080] Step S602: confirm that the first address and the third address belong to the same cell.

[0081] Step S603: merge the third decoration area with the first decoration area to obtain a fourth decoration area.

[0082] Step S604: Determine the number of garbage bins corresponding to the fourth decoration area based on the pre-stored correspondence between the decoration area and the number of garbage bins, and send the number of garbage bins corresponding to the fourth decoration area and the address of the same community to the recycling client, so that the recycling client can prompt the construction waste removal staff to transport the number of garbage bins corresponding to the fourth decoration area to the corresponding location of the same community, thereby facilitating the user corresponding to the user device to carry out construction waste removal work.

[0083] In the above steps, the construction waste removal platform receives reservation information sent by multiple owners, determines whether the addresses in the reservation information within the reservation time belong to the same community; confirms that the first address in the first reservation information and the third address in the third reservation information belong to the same community, and merges the third decoration area in the third reservation information with the first decoration area in the first reservation information to obtain the fourth decoration area. According to the correspondence between the decoration area and the number of trash bins pre-stored on the construction waste removal platform, confirm the number of trash bins required for the fourth decoration area, and send the required number of trash bins and the community address to the recycling client, so that the recycling client can prompt the construction waste removal staff to deliver the required number of trash bins to the community location, which is convenient for users to carry out construction waste removal work.

[0084] For example, the appointment time is set to within 12 hours, and the construction waste removal platform receives the first appointment information and the third appointment information. Determine whether the first address and the third address belong to the same community, and confirm that the first address and the third address belong to the same community; the first address in the first appointment information is 303, Unit 1, Nianhuali, and the third address in the third appointment information is 505, Unit 2, Nianhuali; merge the third decoration area with the first decoration area, the first decoration area is 90 square meters, and the second decoration area is 100 square meters; the fourth decoration area is 190 square meters. The pre-stored decoration area of ​​200 square meters corresponds to the need for 3 garbage bins. The construction waste removal staff will deliver 3 garbage bins to the Nianhuali community, and deliver the garbage bins to the first address according to the address of the first appointment information; and then deliver the garbage bins to the third address according to the address of the third appointment information. The first decoration area and the third decoration area are combined to set up two trash bins in the first decoration area, which will result in a large amount of waste, and the third decoration area will also have a large amount of waste. By combining the first reservation information and the third reservation information, three trash bins are used together to achieve the effect of resource sharing and reduce the occurrence of a large amount of waste bins. The actual reservation situation is based on the actual situation.

[0085] Furthermore, if the user's address is set to belong to the same area, when the user is carrying garbage, the garbage bin is placed far away from the user's address, which affects the efficiency of the user's carrying of renovation garbage. If the user's address is set to belong to the same building, when placing the public garbage bin, the garbage bin will be placed downstairs. When the user is on a higher floor, it is not convenient to carry renovation garbage. If the user's address is set to two adjacent communities, there is no place to place the public garbage bin. Therefore, it is the best choice to set the user's address to the same community.

[0086] In the above method, when there is a lot of decoration waste, the time spent by the owner on transporting the waste back and forth is reduced; the decoration waste can be transported to the trash bin for processing at one time, which improves transportation efficiency; priority is given to processing according to the decoration progress in the appointment information; the number of trash bins required is also set according to the decoration area in the appointment information; when the trash bin is used up, the construction waste removal platform responds to the user operation, and the recycling client prompts the construction waste removal staff to recycle according to the address location; the trash bins are numbered and associated with the positioning information, which is conducive to the recycling work of the construction waste removal staff; when there are multiple appointment information, the distance between the positioning information in the multiple appointment information and the garbage removal station is calculated, and the obtained distance is compared to give priority to the long distance; prevent special circumstances from occurring and cannot be processed in time, thereby improving the owner experience.

[0087] The present application also provides a device for treating urban construction waste. Figure 7 This is a schematic diagram of a process flow of a device for treating urban construction waste provided by an embodiment of the present application; Figure 7 The construction waste removal platform includes a receiving unit 701, a processing unit 702 and a sending unit 703.

[0088] The receiving unit 701 receives first reservation information for a garbage bin sent by a user device, wherein the first reservation information includes a first address and a first decoration area.

[0089] The processing unit 702 determines the number of trash bins corresponding to the first decoration area according to the first decoration area and a pre-stored correspondence between the decoration area and the number of trash bins.

[0090] The sending unit 703 sends the number and positioning information of the garbage bins corresponding to the first decoration area to the recycling client, so that the recycling client can prompt the construction waste removal staff to transport the number of garbage bins corresponding to the first decoration area to the location located at the first address, thereby facilitating the user corresponding to the user device to carry out construction waste removal work.

[0091] In a possible embodiment, the receiving unit 701 includes a first sub-unit of decoration progress, and the first sub-unit of decoration progress is the first appointment information including the first decoration progress; the construction waste removal platform receives the second appointment information for the trash bin sent by the second user device, and the second appointment information also includes the second decoration progress; the first appointment information includes the first decoration progress; the construction waste removal platform determines whether the first decoration progress and the second decoration progress have been completed; confirms that the first decoration progress has been completed and the second decoration progress has not been completed, and gives priority to the first appointment information, and the priority of the first decoration progress being completed is greater than the priority of the second decoration progress being uncompleted.

[0092] In a possible embodiment, the receiving unit 701 also includes a second sub-unit of the decoration progress, and the second sub-unit of the decoration progress is that the first appointment information also includes the first appointment order time, and the second appointment information also includes the second appointment order time; the construction waste removal platform confirms that the first decoration progress has been completed and the second decoration progress has been completed; when the first appointment order time is before the second appointment order time, the construction waste removal platform gives priority to the first appointment information.

[0093] In a possible embodiment, the construction waste removal platform includes a storage unit, which constructs a correspondence between the decoration area and the number of garbage bins based on the historical decoration area and the number of garbage bins required for the historical decoration area; and locally stores the correspondence between the decoration area and the number of garbage bins.

[0094] In a possible embodiment, the receiving unit 701 also includes a third sub-unit of the decoration progress, and the third sub-unit of the decoration progress is that the first appointment information includes the first address, and the second appointment information includes the second address; the construction waste removal platform confirms that the first decoration progress is not completed and the second decoration progress is not completed; the first distance from the first address to the garbage removal station is obtained, and the second distance from the second address to the garbage removal station is obtained; when the first distance is greater than the second distance, the first appointment information is given priority.

[0095] In a possible embodiment, the construction waste removal platform also includes a numbering unit, which is used to number any garbage bin of the construction waste removal platform, and the garbage bin corresponding to the first decoration area includes a first garbage bin; an association relationship is established between the number of the first garbage bin and the first address; and the association relationship is stored locally.

[0096] In a possible embodiment, the construction waste removal platform also includes a recycling unit, which receives a completed garbage removal message sent by a user device for the construction waste removal platform, and the completed garbage removal message is used to indicate that the construction waste has been transported to the garbage bin; the completed garbage removal message is sent to a recycling client, so that the recycling client can prompt the construction waste removal staff to go to the address corresponding to the location information to recycle the garbage bin.

[0097] In a possible embodiment, the receiving unit 701 also includes a common sub-unit, which is a construction waste removal platform that receives third reservation information for a garbage bin sent by a second user device, the third reservation information including a third address and a third decoration area, and the first reservation information and the third reservation information are reservation information within a preset time; confirming that the first address and the third address belong to the same community; merging the third decoration area with the first decoration area to obtain a fourth decoration area; determining the number of garbage bins corresponding to the fourth decoration area based on a pre-stored correspondence between the decoration area and the number of garbage bins, and sending the number of garbage bins corresponding to the fourth decoration area and the same community address to the recycling client, so that the recycling client can prompt the construction waste removal staff to transport the number of garbage bins corresponding to the fourth decoration area to the location located in the same community, thereby facilitating the user corresponding to the user device to perform construction waste removal work.

[0098] It should be noted that: when the device provided in the above embodiment realizes its function, only the division of the above functional modules is used as an example. In actual application, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the device and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.

[0099] See also Figure 8 , Figure 8 A schematic diagram of the structure of an electronic device is provided for an embodiment of the present application. Figure 8 As shown, the electronic device 800 may include: at least one processor 801 , at least one network interface 804 , a user interface 803 , a memory 805 , and at least one communication bus 802 .

[0100] The communication bus 802 is used to realize the connection and communication between these components.

[0101] The user interface 803 may include a display screen (Display) and a camera (Camera). Optionally, the user interface 803 may also include a standard wired interface and a wireless interface.

[0102] The network interface 804 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).

[0103] Among them, the processor 801 may include one or more processing cores. The processor 801 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 805, and calling data stored in the memory 805. Optionally, the processor 801 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 801 can integrate one or a combination of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface and application programs; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 801, and it can be implemented separately through a chip.

[0104] Among them, the memory 805 may include a random access memory (Random Access Memory, RAM) and may also include a read-only memory (Read-Only Memory). Optionally, the memory 805 includes a non-transitory computer-readable storage medium. The memory 805 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 805 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc.; the data storage area may store data involved in the above-mentioned various method embodiments, etc. The memory 805 may also be optionally at least one storage device located away from the aforementioned processor 801. As Figure 8 As shown, the memory 805 as a computer storage medium may include an operating system, a network communication module, a user interface module, and an application program of a method and device for treating urban construction waste.

[0105] exist Figure 8In the electronic device 800 shown, the user interface 803 is mainly used to provide an input interface for the user and obtain data input by the user; and the processor 801 can be used to call an application program stored in the memory 805 for a method and device for treating urban construction waste. When executed by one or more processors, the electronic device executes one or more of the methods described in the above embodiments.

[0106] An electronic device readable storage medium stores instructions, which, when executed by one or more processors, enable the electronic device to execute one or more of the methods described in the above embodiments.

[0107] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the order of the actions described, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application.

[0108] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0109] In the several embodiments provided in the present application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of the units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.

[0110] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0111] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0112] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, mobile hard drives, magnetic disks or optical disks.

[0113] The above is only an exemplary embodiment of the present disclosure and cannot be used to limit the scope of the present disclosure. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification and the truth of practice, it will be easy for those skilled in the art to think of other embodiments of the present disclosure. This application is intended to cover any variation, use or adaptive change of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the technical field that are not recorded in the present disclosure.

Claims

1. A method for treating urban construction waste, characterized in that: Applied to a construction waste removal platform, the method comprises: Receiving first reservation information for a trash bin sent by a first user device; wherein the first reservation information includes a first address and a first decoration area; Determine the number of trash bins corresponding to the first decoration area according to the first decoration area and the pre-stored correspondence between the decoration area and the number of trash bins; the pre-storing the correspondence between the decoration area and the number of trash bins specifically includes: the construction waste removal platform constructs the correspondence between the decoration area and the number of trash bins according to the historical decoration area and the number of trash bins required for the historical decoration area; and locally stores the correspondence between the decoration area and the number of trash bins; The number of garbage bins corresponding to the first decoration area and the first address are sent to a recycling client, so that the recycling client can prompt the construction waste removal staff to transport the number of garbage bins corresponding to the first decoration area to the location corresponding to the first address, thereby facilitating the user corresponding to the user device to carry out construction waste removal work; the construction waste removal platform numbers any garbage bin, and the garbage bins corresponding to the first decoration area include the first garbage bin; an association is established between the number of the first garbage bin and the first address; the association is locally stored; the construction waste removal platform receives the third reservation information for the garbage bin sent by the second user device, and the third reservation information includes the third address and the third address. The first reservation information and the third reservation information are reservation information within a preset time; confirming that the first address and the third address belong to the same community; merging the third decoration area with the first decoration area to obtain a fourth decoration area; determining the number of garbage bins corresponding to the fourth decoration area according to the pre-stored correspondence between the decoration area and the number of garbage bins, and sending the number of garbage bins corresponding to the fourth decoration area and the address of the same community to a recycling client, so that the recycling client can prompt the construction waste removal staff to transport the number of garbage bins corresponding to the fourth decoration area to the corresponding location of the same community, thereby facilitating the user corresponding to the user device to carry out construction waste removal work.

2. The method according to claim 1, characterized in that The first appointment information also includes a first decoration progress, and the method further includes: The construction waste removal platform receives second reservation information for the garbage bin sent by the second user device, where the second reservation information also includes a second renovation progress; The construction waste removal platform determines whether the first decoration progress and the second decoration progress have been completed; confirms that the first decoration progress has been completed and the second decoration progress has not been completed, and gives priority to the first appointment information, and the priority of the first decoration progress being completed is higher than the priority of the second decoration progress being uncompleted.

3. The method according to claim 2, characterized in that The first appointment information further includes a first appointment order time, and the second appointment information further includes a second appointment order time; the method further includes: the construction waste removal platform confirming that the first decoration progress has been completed and the second decoration progress has been completed; When the first appointment ordering time is before the second appointment ordering time, the construction waste removal platform gives priority to processing the first appointment information.

4. The method according to claim 2, characterized in that: The first reservation information includes a first address, and the second reservation information includes a second address; the method further includes: The construction waste removal platform confirms that the first decoration progress is not completed, and the second decoration progress is not completed; Obtaining a first distance from a first address to the garbage removal station, and obtaining a second distance from a second address to the garbage removal station; When the first distance is greater than the second distance, the first reservation information is processed preferentially.

5. The method according to claim 1, characterized in that The method further comprises: The construction waste removal platform receives a garbage removal completion message sent by the user equipment, where the garbage removal completion message is used to indicate that the construction waste has been transported to the garbage bin; The completed garbage removal message is sent to the recycling client so that the recycling client can prompt the construction waste removal staff to go to the address to recycle the garbage bin.

6. A device for treating urban construction waste, characterized in that: The device is a construction waste removal platform, which includes a receiving unit, a processing unit and a sending unit; The receiving unit receives first reservation information for the trash bin sent by the user equipment; wherein the first reservation information includes a first address and a first decoration area; The processing unit determines the number of trash bins corresponding to the first decoration area according to the first decoration area and the pre-stored correspondence between the decoration area and the number of trash bins; the pre-storing the correspondence between the decoration area and the number of trash bins specifically includes: the construction waste removal platform constructs the correspondence between the decoration area and the number of trash bins according to the historical decoration area and the number of trash bins required for the historical decoration area; and locally stores the correspondence between the decoration area and the number of trash bins; The sending unit sends the number of garbage bins corresponding to the first decoration area and the first address to the recycling client, so that the recycling client can prompt the construction waste removal staff to transport the number of garbage bins corresponding to the first decoration area to the location corresponding to the first address, thereby facilitating the user corresponding to the user device to carry out construction waste removal work; the construction waste removal platform numbers any garbage bin, and the garbage bins corresponding to the first decoration area include the first garbage bin; establishes an association relationship between the number of the first garbage bin and the first address; and locally stores the association relationship; the construction waste removal platform receives the third reservation information for the garbage bin sent by the second user device, and the third reservation information includes the third address and a third decoration area, the first reservation information and the third reservation information are reservation information within a preset time; confirming that the first address and the third address belong to the same community; merging the third decoration area with the first decoration area to obtain a fourth decoration area; determining the number of garbage bins corresponding to the fourth decoration area according to the pre-stored correspondence between the decoration area and the number of garbage bins, and sending the number of garbage bins corresponding to the fourth decoration area and the address of the same community to a recycling client, so that the recycling client can prompt the construction waste removal staff to transport the number of garbage bins corresponding to the fourth decoration area to the corresponding location of the same community, thereby facilitating the user corresponding to the user device to carry out construction waste removal work.

7. An electronic device, characterized in that: It includes a processor, a memory, a user interface and a network interface, the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes the method as described in any one of claims 1-5.

Citation Information

Patent Citations

  • Catering order processing method and system, storage medium and electronic device

    CN113888066A

  • System and method of administrating container recovery

    JP2002073895A

  • Washing agent management system

    JP2009207583A

  • Method and system for property damage analysis

    US20170330207A1