A pressure testing method, apparatus, electronic device and medium

By pre-configuring stress test plans and scenarios and utilizing business report data sources, the problem of complex configuration in traditional systems has been solved, enabling flexible analysis and accurate calculation of various risk scenarios.

CN116089269BActive Publication Date: 2026-11-17BEIJING PACTERA JINXIN TECH LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211610299.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-14
Publication Date
2026-11-17
Estimated Expiration
2042-12-14

AI Technical Summary

Technical Problem

Traditional stress testing systems are complex and cumbersome to configure, and cannot flexibly configure the entire process from data source, stress test factors, stress test projects and stress test reports. They also cannot simultaneously meet the analysis of multiple risk scenarios, resulting in a large amount of calculations relying on manual work.

Method used

By pre-configuring stress test plans, scenarios, and situations, using business reports as data sources, and combining stress test factors and project attribute information, customized stress test scenarios can be realized, supporting simultaneous analysis of interest rate risk and liquidity risk.

Benefits of technology

It reduces the complexity of scheme configuration, improves data quality and analysis accuracy, can flexibly adapt to various complex scenario requirements, and supports NII and EVE stress tests and liquidity tests for interest rate risk.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116089269B_ABST
    Figure CN116089269B_ABST
Patent Text Reader

Abstract

This application provides a stress testing method, apparatus, electronic device, and medium. The method includes: responding to a selection command for a stress testing system, sequentially determining a target stress testing scheme, a target stress testing scenario, and a target stress testing situation; wherein, a stress testing scenario is pre-configured under the target stress testing scheme, a stress testing situation is pre-configured under the stress testing situation, and stress testing items are pre-configured under the stress testing situation; based on the item attribute information of each stress testing item in the target stress testing situation, obtaining the first target data required for each stress testing item from a data source; calculating the item calculation result of the stress testing item based on the first target data, and then determining the changes in stress testing indicators and stress testing results of the target stress testing situation, thereby judging the financial institution's ability to cope with stress scenarios, thereby supporting the financial institution's management decisions and meeting the needs of complex regulatory scenarios.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of digital information processing technology, and more specifically, to a pressure testing method, apparatus, electronic device, and medium. Background Technology

[0002] In the asset and liability management process of financial institutions, regulatory authorities require them to establish risk stress testing systems and mechanisms to analyze their ability to withstand risks under stress events. Simultaneously, to meet the internal management needs of financial institutions, it is necessary to calculate and monitor relevant indicators of liquidity risk and interest rate risk under stress scenarios in real time to meet management decision-making requirements. To meet these internal and external management needs, financial institutions establish asset and liability systems that include stress testing modules. These modules set up stress testing scenarios based on account-level cash flow, establishing interest rate stress scenarios and liquidity stress scenarios respectively. This enables the calculation, analysis, and early warning analysis of risk stress indicators such as liquidity gaps, shortest survival period, repricing gaps, and NII and EVE. However, traditional stress testing systems are complex, cumbersome, and involve numerous configuration items, making it impossible for business personnel to configure them according to business scenarios. Moreover, traditional business systems rely on account books and cash flow to implement algorithms; account books lack business meaning and cannot achieve flexible configuration across the entire process from data sources, stress testing factors, stress testing items, and stress testing reports, resulting in extremely complex configuration schemes. Meanwhile, with the development of financial business, the scenarios requiring supervision and management are becoming increasingly complex. Traditional systems cannot simultaneously meet the analysis of multiple risk scenarios such as liquidity scenarios, NII scenarios, and EVE scenarios, resulting in a large amount of calculation still having to be done manually. Summary of the Invention

[0003] In view of this, the purpose of this application is to provide a stress testing method, apparatus, electronic device and medium that can meet the needs of complex regulatory scenarios through pre-configured target stress testing schemes, target stress testing scenarios and target stress testing situations, and can realize the analysis of multiple risk scenarios.

[0004] This application provides a stress testing method applied to a stress testing system, the method comprising:

[0005] In response to the selection command for the stress testing system, the target stress testing scheme, target stress testing scenario, and target stress testing situation are sequentially determined from the stress testing system; wherein, the target stress testing scheme is pre-configured with at least one stress testing scenario, the stress testing scenario is pre-configured with at least one stress testing situation, and the stress testing situation is pre-configured with at least one stress testing item and situation parameters.

[0006] Based on the project attribute information of each stress test item in the target stress test scenario, obtain the first target data required for each stress test item from the data source;

[0007] Based on the scenario parameters of the target stress test scenario, as well as the first target data and stress test factor required for each stress test item, the test results of each stress test item are calculated.

[0008] Based on the test results of each stress test item, calculate the scenario test results of the target stress test scenario; based on the scenario test results of the target stress test scenario, determine the stress test results under the stress test scenario of the target stress test scheme.

[0009] In some embodiments, the stress testing method calculates the test results for each stress test item based on the scenario parameters of the target stress test scenario, the first target data required for each stress test item, and the stress test factor, including:

[0010] Based on each stress test factor associated with the stress test item, determine the second target data corresponding to that stress test factor from the first target data;

[0011] Based on the scenario parameters of the target stress test scenario, each stress test factor and its corresponding second target data, the result of each stress test factor is calculated.

[0012] Based on the results of each stress test factor, the project test results for that stress test item are determined.

[0013] In some embodiments, in the stress testing method, the first target data is data obtained from a business report of a business system; the business report carries date information.

[0014] Based on the project attribute information of each stress test item in the target stress test scenario, the first target data required for each stress test item is obtained from the data source, including:

[0015] Based on the pre-configured deadline management information, determine the deadline information for the data required for each stress test item in the target stress test scenario;

[0016] Based on the time limit information and the business report associated with each stress test project, obtain the first target data required by the stress test project and matching the time limit management information from the associated business report.

[0017] In some embodiments, the stress testing method further includes, in response to a selection instruction for the stress testing system, sequentially selecting a target stress testing scheme, a target stress testing scenario, and a target stress testing situation from the stress testing system;

[0018] Configure multiple stress testing schemes in the stress testing system;

[0019] For each stress testing solution, multiple stress testing scenarios are configured based on market environment, internal environment, and external environment;

[0020] Configure multiple stress test scenarios for each stress test scenario;

[0021] Configure the stress test items and scenario parameters associated with each stress test scenario.

[0022] In some embodiments, the project attribute information of the stress testing item in the stress testing method is configured in the following way:

[0023] Configure multiple stress test factors;

[0024] Configure the calculation parameters for each stress test factor;

[0025] For each stress test item, configure the association information between the stress test item and at least one stress test factor, and configure the association information between the stress test item and at least one business report.

[0026] In some embodiments, the stress testing method further includes:

[0027] Obtain stress test results under different stress test scenarios;

[0028] The stress test results under different stress test scenarios were compared and analyzed to obtain the comparative analysis results.

[0029] In some embodiments, the stress testing method further includes:

[0030] When the stress test result of the target stress test scenario meets the preset warning conditions, a warning message is generated.

[0031] The warning message will be pushed to the target personnel via a preset push method.

[0032] In some embodiments, a pressure testing apparatus is also provided, the apparatus comprising:

[0033] The first configuration module is used to respond to the selection command for the stress testing system and sequentially determine the target stress testing scheme, the target stress testing scenario, and the target stress testing situation from the stress testing system; wherein, the target stress testing scheme is pre-configured with at least one stress testing scenario, the stress testing scenario is pre-configured with at least one stress testing situation, and the stress testing situation is pre-configured with at least one stress testing item and situation parameters.

[0034] The acquisition module is used to acquire the first target data required for each stress test item from the data source based on the project attribute information of each stress test item in the target stress test scenario.

[0035] The first calculation module is used to calculate the test results of each stress test item based on the scenario parameters of the target stress test scenario, as well as the first target data and stress test factor required for each stress test item.

[0036] The second calculation module is used to calculate the scenario test results of the target stress test scenario based on the project test results of each stress test item.

[0037] The determination module is used to determine the stress test results under the stress test scenario of the target stress test scheme based on the scenario test results of the target stress test scenario.

[0038] In some embodiments, an electronic device is also provided, including: a processor, a memory, and a bus, wherein the memory stores machine-readable instructions executable by the processor, and when the electronic device is running, the processor communicates with the memory via the bus, and when the machine-readable instructions are executed by the processor, the steps of the stress testing method are performed.

[0039] In some embodiments, a computer-readable storage medium is also provided, on which a computer program is stored, which, when executed by a processor, performs the steps of the stress testing method.

[0040] Based on this, this application provides a stress testing method, apparatus, electronic device, and medium. The stress testing method is applied to a stress testing system pre-configured with multiple stress testing schemes. Each stress testing scheme pre-configures at least one stress testing scenario, and each stress testing scenario pre-configures at least one stress testing situation. Each stress testing situation pre-configures at least one stress testing item. The stress testing item is a free combination of associated data sources and stress testing factors to create different risk items within a scenario, thereby supporting self-scalable stress testing scenarios. These combined risk items correspond to various complex scenarios and situations requiring supervision and management. Through this customized stress testing scenario, it is possible to simultaneously support NII and EI interest rate risk. The system supports VE stress testing and liquidity stress testing scenarios, eliminating the need for multiple modules to configure scenarios and calculation schemes separately. This significantly reduces the complexity of scheme configuration, enabling the completion of various stress tests and meeting diverse and complex scenario requirements. The data used in the stress testing process comes from business reports of the business system, rather than account cash flow. Business reports are typically rigorously reviewed, with minimal discrepancies in definitions, high data quality, and have undergone multiple verifications, ensuring the accuracy of stress test results for management. Furthermore, the system allows for flexible adjustments to the mapping between business reports and projects, which can be pre-configured in the project attribute information of the stress test projects. This allows a single business report to be referenced in various stress test scenarios, further reducing the complexity of scheme configuration. Attached Figure Description

[0041] To more clearly illustrate the technical solutions of the embodiments of this application, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of this application and should not be regarded as a limitation of the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0042] Figure 1 A flowchart of the stress testing method according to an embodiment of this application is shown;

[0043] Figure 2 A framework diagram of the stress testing system described in an embodiment of this application is shown;

[0044] Figure 3 A schematic diagram of a method for configuring a stress testing system according to an embodiment of this application is shown;

[0045] Figure 4 A schematic diagram of the method for configuring stress test items according to an embodiment of this application is shown;

[0046] Figure 5 This illustration shows a schematic diagram of the term management information described in an embodiment of this application;

[0047] Figure 6 A schematic diagram of the interface for configuring deadline management information in the stress testing system described in this application embodiment is shown.

[0048] Figure 7 A schematic diagram of the pressure testing scheme described in an embodiment of this application is shown;

[0049] Figure 8 A schematic diagram of the configuration interface for the stress testing scheme in the stress testing system described in this application embodiment is shown;

[0050] Figure 9 A flowchart illustrating the method for obtaining the first target data required for each stress test item from a data source according to an embodiment of this application is shown.

[0051] Figure 10 A flowchart of a method for calculating the test result of each stress test item based on the first target data required for each stress test item, as described in an embodiment of this application, is shown.

[0052] Figure 11 A schematic diagram of the pressure testing device described in an embodiment of this application is shown;

[0053] Figure 12 A schematic diagram of the structure of the electronic device described in an embodiment of this application is shown. Detailed Implementation

[0054] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. It should be understood that the accompanying drawings in this application are for illustrative and descriptive purposes only and are not intended to limit the scope of protection of this application. Furthermore, it should be understood that the schematic drawings are not drawn to scale. The flowcharts used in this application illustrate operations implemented according to some embodiments of this application. It should be understood that the operations in the flowcharts may not be implemented in sequence, and steps without logical contextual relationships may be reversed or implemented simultaneously. In addition, those skilled in the art, guided by the content of this application, may add one or more other operations to the flowcharts, or remove one or more operations from the flowcharts.

[0055] Furthermore, the described embodiments are merely some, not all, of the embodiments of this application. The components of the embodiments of this application described and illustrated herein can typically be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of this application provided in the accompanying drawings is not intended to limit the scope of the claimed application, but merely to illustrate selected embodiments of the application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application.

[0056] It should be noted that the term "comprising" will be used in the embodiments of this application to indicate the presence of the features declared thereafter, but does not exclude the addition of other features.

[0057] In the asset and liability management process of financial institutions, they are required to establish risk stress testing systems and mechanisms to analyze their ability to withstand risks under stress events. Simultaneously, to meet the internal management needs of financial institutions, it is necessary to calculate and monitor relevant indicators of liquidity risk and interest rate risk under stress scenarios in real time to meet decision-making requirements. To meet the internal and external management needs of financial institutions, they establish asset and liability systems that include stress testing modules. This module sets up stress testing scenarios based on account-level cash flow, establishing interest rate stress scenarios and liquidity stress scenarios respectively, enabling the calculation, analysis, reporting, and early warning analysis of risk stress indicators such as liquidity gaps, shortest survival period, repricing gaps, and NII and EVE. However, traditional stress testing systems are characterized by numerous, complex, and cumbersome configuration items, making it impossible for business personnel to configure them according to business scenarios. Moreover, traditional business systems rely on account books and cash flow to implement algorithms; account books lack business meaning and cannot achieve flexible configuration across the entire process from data sources, stress testing factors, stress testing items, and stress testing reports, resulting in extremely complex scheme configuration. Meanwhile, with the development of financial business, the scenarios requiring supervision and management are becoming increasingly complex. Traditional systems cannot simultaneously meet the analysis of multiple risk scenarios such as liquidity scenarios, NII scenarios, and EVE scenarios, resulting in a large amount of calculation still having to be done manually.

[0058] Based on this, embodiments of this application provide a stress testing method, apparatus, electronic device, and medium. The stress testing method is applied to a stress testing system pre-configured with multiple stress testing schemes. Each stress testing scheme pre-configured with at least one stress testing scenario, each stress testing scenario pre-configured with at least one stress testing situation, and each stress testing situation pre-configured with at least one stress testing item. The stress testing item is used to acquire corresponding source data and calculate the test result for that item. This configuration corresponds to various complex scenarios and situations requiring supervision and management, such as liquidity scenarios, NII scenarios, and EVE scenarios, among other risk scenario analyses. During testing, the target stress test is selected sequentially according to the testing requirements. The system includes a test plan, a target stress test scenario, and a target stress test situation. Based on the project attribute information of each stress test item in the target stress test situation, it obtains the first target data required for each stress test item from the data source. Based on the first target data required for each stress test item, it calculates the project test result of the stress test item. Based on the project test result of each stress test item, it determines the stress test result of the target stress test situation under the target stress test plan. This allows for convenient and flexible analysis of various scenarios under multiple risk scenarios, such as liquidity scenarios, NII scenarios, and EVE scenarios, through a single stress test system, meeting increasingly complex regulatory and management needs.

[0059] Based on this, please refer to Figure 1 , Figure 1 A flowchart of the stress testing method according to an embodiment of this application is shown; specifically, the stress testing method includes the following steps S101-S105;

[0060] S101. In response to the selection command for the stress testing system, determine the target stress testing scheme, target stress testing scenario, and target stress testing situation sequentially from the stress testing system; wherein, the target stress testing scheme is pre-configured with at least one stress testing scenario, the stress testing scenario is pre-configured with at least one stress testing situation, and the stress testing situation is pre-configured with at least one stress testing item and situation parameters.

[0061] S102. Based on the project attribute information of each stress test item in the target stress test scenario, obtain the first target data required for each stress test item from the data source;

[0062] S103. Based on the scenario parameters of the target stress test scenario, as well as the first target data and stress test factor required for each stress test item, calculate the test result of each stress test item.

[0063] S104. Based on the test results of each stress test item, calculate the scenario test results of the target stress test scenario;

[0064] S105. Based on the scenario test results of the target stress test scenario, determine the stress test results under the stress test scenario of the target stress test scheme.

[0065] In this embodiment, the stress testing method can run on a terminal device or a server; wherein, the terminal device can be a local terminal device, and when the stress testing method runs on a server, the stress testing method can be implemented and executed based on a cloud interaction system, wherein the cloud interaction system includes at least a server and a client device (i.e., a terminal device).

[0066] Specifically, taking the application to terminal devices as an example, when the stress testing method is run on the terminal device, the stress testing method is used to determine the stress test results of the target stress test scenario under the target stress test scheme.

[0067] In step S101, in response to the selection command for the stress testing system, a target stress testing scheme, a target stress testing scenario, and a target stress testing situation are sequentially determined from the stress testing system. Specifically, the target stress testing scheme has at least one pre-configured stress testing scenario, the stress testing scenario has at least one pre-configured stress testing situation, and the stress testing situation has at least one pre-configured stress testing item. In other words, the system has multiple pre-configured stress testing schemes, each stress testing scheme has at least one pre-configured stress testing scenario, each stress testing scenario has at least one pre-configured stress testing situation, and each stress testing situation has at least one pre-configured stress testing item.

[0068] The target stress test plan refers to different types of test plans set up by business personnel according to management needs, such as the 2022 version stress test plan, the 2022 popularity plan, the 2022 interest rate plan, the first quarter stress test plan, and the second quarter stress test plan. Each stress test plan is associated with multiple stress test scenarios, and the stress test scenarios associated with different stress test plans are not entirely the same.

[0069] The stress test scenario refers to the business scenario of stress testing, which refers to the market environment and internal and external environment during the operation of financial institutions, such as scenarios like parallel decline in interest rates and tight market liquidity.

[0070] The stress test scenarios refer to different scenarios in the stress test, such as mild stress, moderate stress, and severe stress. Different scenarios are mainly configured by business personnel according to management needs, with different scenario parameters, such as an asset inflow rate of 90% and a liability outflow rate of 100%.

[0071] Please refer to Figure 2 , Figure 2 A framework diagram of the stress testing system described in an embodiment of this application is shown.

[0072] like Figure 2 As shown in the stress test scenario management module, the stress test system in this embodiment supports the management of stress test schemes, scenarios referenced by the schemes, and configuration of stress scenarios under the scenarios, including "light stress," "moderate stress," and "severe stress," and sets stress parameters corresponding to different scenarios to meet the calculation needs of multiple schemes and scenarios. Simultaneously, the stress test system supports configuring stress test items under stress test scenarios, as well as attributes such as data source, stress test factor, and whether it is a final / summary item, referencing data sources, and defining calculation rules using stress test factors.

[0073] Here, the stress test factors referenced in the stress test project are calculation models that reflect business changes under stress scenarios. By summarizing the logic of business changes under stress scenarios, they are developed into stress test calculation factors to meet the customization needs of the scenarios.

[0074] Therefore, the stress testing system needs to be configured in advance.

[0075] Please refer to Figure 3 , Figure 3 A schematic diagram of a method for configuring a stress testing system according to an embodiment of this application is shown; as follows: Figure 3 As shown, in response to the selection command for the stress testing system, the method further includes the following steps S301-S303: sequentially selecting the target stress testing scheme, the target stress testing scenario, and the target stress testing situation from the stress testing system.

[0076] S301. Configure multiple stress testing schemes in the stress testing system;

[0077] S302. For each stress test solution, configure multiple stress test scenarios based on the market environment, internal environment, and external environment;

[0078] S303. Configure multiple stress test scenarios for each stress test scenario;

[0079] S304. Configure the stress test items and scenario parameters associated with each stress test scenario.

[0080] Among these, the stress test items associated with different stress test scenarios are not entirely the same and / or the scenario parameters of different stress test items are not entirely the same.

[0081] In other words, the following situations apply: First, the stress test items associated with different stress test scenarios are not exactly the same, and the scenario parameters of the stress test items are not exactly the same.

[0082] Alternatively, in the second scenario, the stress test items associated with different stress test scenarios are exactly the same, but the scenario parameters of the different stress test items are not exactly the same.

[0083] Alternatively, in a third scenario, the stress test items associated with different stress test scenarios are not entirely the same, but the scenario parameters of the different stress test items are exactly the same.

[0084] The stress test items associated with different stress test scenarios are not completely the same, that is, the stress test items associated with different stress test scenarios are different, or there is overlap in the stress test items associated with different stress test scenarios.

[0085] Typically, the first and second scenarios are considered because the scenarios in this application focus on different stress conditions. For example, when the scenario parameter asset inflow rate is 100%, 90%, or 80%, stress calculations are performed. In a test plan, the stress test items for different scenarios are the same or similar. By using scenario parameters such as different asset inflow rates and different interest rate changes, at least some test items are calculated based on the scenario parameters to obtain stress test results under different scenarios.

[0086] In other words, under normal production conditions, the scenario parameter values ​​are different for each stress test scenario.

[0087] Please refer to Figure 4 , Figure 4 A schematic diagram of the method for configuring stress test items according to an embodiment of this application is shown; as follows: Figure 4 As shown, the project attribute information of the stress test project is configured through the following steps S401-S403:

[0088] S401, configured with multiple stress test factors;

[0089] S402. Configure the calculation parameters for each stress test factor.

[0090] S403. For each stress test item, configure the association information between the stress test item and at least one stress test factor, and configure the association information between the stress test item and at least one business report.

[0091] The stress testing system can also manage deadline information, enabling the management of stress test deadlines. Configuring deadline management information allows users to define the remaining deadline and repricing period for stress tests, fulfilling the business's goal of independently defining stress test deadlines. Basic data, parameters, and stress test calculations are all performed according to the deadlines, configuring deadline schemes, detailed deadlines, and start and end dates.

[0092] Traditional stress testing modules rely on account cash flow as their data source. Cash flow calculations are complex, and there are many differences in the source data definitions, resulting in poor cash flow data quality. Furthermore, it is impossible to accurately verify the data against related reports. In addition, it is impossible to manually adjust stress test data and reference data from multiple data sources, causing stress test results to fail to meet the requirements of accuracy and timeliness in management.

[0093] In this embodiment, the source data in the data source is either a business report from the business system or manually imported data. The business report carries date information. After configuring the period management information, the stress test needs to use the configured specific time point data as the starting point. The stress test system in this embodiment supports using custom business reports from the asset and liability system as the basis, such as the 1104 report, G21 report, asset and liability business balance sheet, repricing gap table, etc., as the data source. At the same time, the system can configure the mapping between source data and project in the project attribute information of the stress test project, so that the business reports in the data source can be referenced in various stress test scenarios.

[0094] Please refer to Figure 5 and Figure 6 , Figure 5 This illustration shows a schematic diagram of the term management information described in an embodiment of this application. Figure 6 This diagram illustrates the interface for configuring deadline management information in the stress testing system. Figure 5 The diagram shows the term distribution for the amount calculation defined in the gap term scheme and the term distribution for the pressure parameter defined in the parameter term scheme.

[0095] For example, the calculation rules for the stress test factor are as follows:

[0096] Asset inflow factor: Its calculation rule is: Inflow amount at each remaining term of asset business = Amount at each remaining term of asset business × Inflow rate at each remaining term of asset business.

[0097] The debt churn factor is calculated as follows: Amount churned at each remaining term of debt business = Amount at each remaining term of debt business × Churn rate at each remaining term of debt business.

[0098] The calculation rule for the demand deposit loss factor is as follows: Loss amount at each remaining term of demand deposit = Demand deposit amount on the next day × Loss rate at each remaining term of demand deposit.

[0099] The liquidity support factor is calculated as follows: the change in amount at each remaining term point = the amount of liquidity support provided by subsidiaries or overseas branches at each remaining term point.

[0100] The liquidity asset realization factor is calculated as follows: Liquid asset realization amount = Liquid asset business stress test period not yet due × Liquid asset realization discount rate.

[0101] The calculation rule for the indefinite term business factor is as follows: Change in amount at each remaining term point of the indefinite term business = Amount at each remaining term point of the indefinite term business × Change parameter at each remaining term point of the indefinite term business.

[0102] The calculation rule for the required reserve return factor is as follows: the required reserves released by deposit outflows at each remaining term point = the cumulative amount of each deposit at the corresponding remaining term point × the required reserve ratio.

[0103] The calculation rule for the NII calculation factor is: Interest change = Amount corresponding to each business × Interest rate change × Time weight.

[0104] The EVE calculation factor is calculated as follows: Market value change = Amount corresponding to each business × Market value after interest rate change.

[0105] In step S303, the scenario parameters differ under different test scenarios; please refer to [the relevant documentation]. Figure 7 , Figure 7 A schematic diagram of the stress test scheme is shown. Figure 7 The document includes the 2022 liquidity scenario and the 2022 interest rate scenario. The 2022 liquidity scenario includes stress test scenario 1 and stress test scenario 2. Each stress test scenario includes multiple stress test scenarios. In stress test scenario 1, the scenario parameter is the asset inflow rate. Specifically, the asset inflow rate for the mild stress scenario is 100%; the asset inflow rate for the moderate stress scenario is 90%; and the asset inflow rate for the severe stress scenario is 80%. As mentioned in the embodiments of this application, the test results of the stress test scenario are determined by the stress test items associated with the scenario. Since the scenario parameters are configured, even if the stress test items associated with different scenarios are the same, but the scenario parameters are different, the stress test results under different scenarios can be calculated based on the same source data.

[0106] Please refer to Figure 8 , Figure 8The diagram shows the configuration interface of the stress test scheme in the stress test system. The diagram shows the relationship between stress test scheme, stress test scenario, stress test situation, stress test item and stress test factor.

[0107] Traditional stress testing systems are characterized by numerous, complex, and cumbersome configuration items, making it impossible for business personnel to configure them according to business scenarios. Traditional business systems rely on account books and cash flow to implement algorithms, but account books have no business meaning and cannot achieve flexible configuration of the entire process from data source, stress test factors, stress test items, and stress test reports, making solution configuration extremely complex. As regulatory and management scenarios become increasingly complex, traditional systems cannot simultaneously meet the risk scenario analysis requirements of liquidity scenarios, NII scenarios, and EVE scenarios, resulting in a large amount of calculations still needing to be performed manually.

[0108] The stress testing method described in this application is based on accurately verified business reports from the business system, ensuring high data quality. These reports can be referenced by multiple stress test projects. Furthermore, stress test factors are pre-configured based on business logic summarized from business scenarios. Then, various stress test schemes are configured, requiring only the configuration of the stress test scheme-stress test scenario-stress test context logic, and associating each stress test context with the necessary stress test projects. The specific calculation logic of the stress test projects does not require underlying configuration; instead, it references the pre-configured stress test factors. In other words, the stress calculation logic is transformed into a stress test factor model, where factors are combined with multiple data sources to form different risk pressures and risk factors. The data source can be chosen from the asset and liability system's result layer reports, rather than the basic cash flow. The system ensures consistency between stress test data and report data. Stress test scenarios allow for customized stress test items, with data sources and stress test factors freely combined to create different risk items within a given scenario. This supports self-scalable stress test scenarios. Through these customized scenarios, the system can simultaneously support the configuration of NII and EVE calculations for interest rates and liquidity stress test scenarios, instead of requiring multiple modules to configure scenarios and calculation schemes separately. This significantly reduces the complexity of scheme configuration and allows for flexible combinations and configurations of different schemes, scenarios, and situations to complete various stress tests. This meets the needs of diverse and complex scenarios. For example, for risk scenario analysis of liquidity, NII, and EVE scenarios, multiple scenarios can be analyzed within a single system by selecting different stress test scenarios.

[0109] Since the source data in the data source is a business report from the business system; and the business report carries date information; in step S102, please refer to... Figure 9Based on the project attribute information of each stress test item in the target stress test scenario, the first target data required for each stress test item is obtained from the data source, including the following steps S901-S902.

[0110] S901. Based on the pre-configured deadline management information, determine the deadline information for the data required for each stress test item in the target stress test scenario;

[0111] S902. Based on the term information and the business report associated with each stress test project, obtain the first target data required by the stress test project and matching the term management information from the data source.

[0112] The term information includes the remaining term and repricing term, detailed term, and start and commencement dates.

[0113] Here, different stress test projects have different attributes, including data source, stress test factor and related parameters.

[0114] In step S103, the test results of each stress test item are calculated based on the scenario parameters of the target stress test scenario, the first target data and stress test factor required for each stress test item.

[0115] For details, please refer to Figure 10 , Figure 10 The flowchart illustrates a method for calculating the test result of each stress test item based on scenario parameters of the target stress test scenario, and the first target data and stress test factor required for each stress test item, according to an embodiment of this application. Calculating the test result of each stress test item based on scenario parameters of the target stress test scenario, and the first target data and stress test factor required for each stress test item includes the following steps S1001-S1003:

[0116] S1001. Based on each stress test factor associated with the stress test item, determine the second target data corresponding to that stress test factor from the first target data;

[0117] S1002. Based on the scenario parameters of the target stress test scenario, each stress test factor and its corresponding second target data, calculate the result of each stress test factor.

[0118] S1003. Based on the results of each stress test factor, determine the project test result for this stress test item.

[0119] Here, the test results of the stress test project are determined based on the results of each stress test factor. This may include the results of each stress test factor, or the indicators of multiple stress test factors may be fused together to obtain at least a portion of the project test results.

[0120] When a stress test scenario includes multiple stress test items, multiple test results can be obtained.

[0121] Here, the stress test factor is essentially a calculation rule, a calculation model, or a calculation formula.

[0122] Therefore, each stress test factor is calculated based on different types of parameters; for example, the asset inflow factor: its calculation formula is: inflow amount at each remaining term of asset business = amount at each remaining term of asset business × inflow rate at each remaining term of asset business.

[0123] Therefore, calculating the asset inflow factor requires two types of parameters: the amount at each remaining term of the asset business and the inflow rate at each remaining term of the asset business.

[0124] Since the test project obtains the first target data required by the stress test project and matching the time limit management information from the corresponding business report based on its configuration information, the stress test factor in the test project can determine the second target data with matching parameter type from the first target data based on the calculation parameters in its calculation formula.

[0125] Here, second target data matching the parameter type of the stress test factor can be determined based on the identifier fields carried by different data in the first target data. Here, the identifier field can be the name of the business report containing the first target data, or the name of the first target data itself, such as inflow rate, required reserve ratio, etc. Based on the scenario parameters of the target stress test scenario, each stress test factor and its corresponding second target data are used to calculate the result of each stress test factor. Specifically, by substituting the corresponding calculation parameters of the stress test factor into a pre-configured calculation formula, the result of that stress test factor can be obtained.

[0126] Based on the results of each stress test factor, the project test result of the stress test project is determined, including several cases. First: the result of each stress test factor is directly used as part of the project test result; that is, the project test result of the stress test project includes the settlement results of at least some of the stress test factors. Second: according to the pre-configured factor fusion calculation rules, the stress test factors in the factor fusion calculation rules are fused and calculated to obtain the factor fusion calculation result.

[0127] Typically, each stress test factor represents an indicator in the asset management process, such as asset inflow or liability outflow. Staff can directly conduct asset management analysis based on these stress test factors. Therefore, the calculation results of each stress test factor in the stress test results are usually displayed directly as the project test results for that stress test project.

[0128] Based on this, in step S104, the scenario test result of the target pressure test scenario is calculated according to the project test result of each pressure test item.

[0129] The scenario test results of the target stress test scenario include the project test results of at least one stress test item.

[0130] In step S105, the stress test results under the stress test scenario of the target stress test scheme are determined based on the scenario test results of the target stress test scenario.

[0131] The scenario test results of the target stress test scenario include the scenario test results of at least one stress test scenario.

[0132] Here, for each stress test scenario, we can obtain the stress test results for each stress test scenario. For example, we can obtain the stress test results for a mild stress scenario with an asset inflow rate of 100%, a moderate stress scenario with an asset inflow rate of 90%, and a severe stress scenario with an asset inflow rate of 80%.

[0133] Similarly, for the stress testing solution, stress test results can be obtained for each stress test scenario. In other words, the stress testing method shown in this application can flexibly conduct stress tests in multiple scenarios and situations.

[0134] The stress test results for each stress test scenario are displayed on the graphical user interface of the stress test system, and graphical analysis can also be performed based on the test results.

[0135] In some embodiments, stress test result reports and graphical analysis results of stress test results under stress test scenarios can also be exported or sent.

[0136] In this embodiment of the application, for stress testing scenarios, stress test results can be obtained for each stress testing scenario. The stress test items under different stress testing scenarios are often the same. Essentially, it is to analyze the stress test items under various different scenarios. Therefore, in this embodiment of the application, stress test items under different stress testing scenarios are compared. Based on the comparative analysis results, risks can be better managed and management strategies can be formulated.

[0137] Specifically, in this embodiment of the application, the stress testing method further includes:

[0138] Obtain stress test results under different stress test scenarios;

[0139] The stress test results under different stress test scenarios were compared and analyzed to obtain the comparative analysis results.

[0140] In this embodiment of the application, after obtaining the stress test results of the target stress test scenario under the target stress test scheme, the stress test method further includes:

[0141] When the stress test result of the target stress test scenario meets the preset warning conditions, a warning message is generated.

[0142] The warning message will be pushed to the target personnel via a preset push method.

[0143] The preset warning conditions can be the warning range of at least some of the stress test factors in the stress test results; if the indicator of a certain stress test factor exceeds the warning range corresponding to that indicator, a warning message is generated.

[0144] The warning information is pushed to the target personnel through a preset push method. Specifically, the stress testing system can push the information to the target personnel in the preset cortex via email, large screen, mini-program, etc.

[0145] In some embodiments, the stress test results of the target stress test scenario under the target stress test scheme are obtained, and the stress test results are directly pushed to the target personnel through a preset push method, so that the target personnel can see the stress test results in a timely manner and facilitate the sharing of stress test results among business personnel.

[0146] Based on this, embodiments of this application provide a stress testing method, apparatus, electronic device, and medium. The stress testing method is applied to a stress testing system pre-configured with multiple stress testing schemes. Each stress testing scheme pre-configured with at least one stress testing scenario, each stress testing scenario pre-configured with at least one stress testing situation, and each stress testing situation pre-configured with at least one stress testing item. The data sources and stress testing factors associated with the stress testing items can be freely combined to create different risk items within the scenario, thereby supporting self-scalable stress testing scenarios. These combined risk items correspond to various complex scenarios and situations requiring supervision and management. Through this customized stress testing scenario, it is possible to simultaneously support the configuration of NII and EVE calculations for interest rates and liquidity stress testing scenarios, instead of requiring multiple modules to configure scenarios and calculation schemes separately. This greatly reduces the complexity of scheme configuration, completes various different stress tests, and meets the needs of various complex and ever-changing scenarios.

[0147] Based on the same inventive concept, this application also provides a pressure testing device corresponding to the pressure testing method. Since the principle of the device in this application is similar to the pressure testing method described above, the implementation of the device can refer to the implementation of the method, and the repeated parts will not be described again.

[0148] Please refer to Figure 11 , Figure 11 A schematic diagram of the pressure testing device according to an embodiment of this application is shown. The device includes:

[0149] The first configuration module is used to respond to the selection command for the stress testing system and sequentially determine the target stress testing scheme, the target stress testing scenario, and the target stress testing situation from the stress testing system; wherein, the target stress testing scheme is pre-configured with at least one stress testing scenario, the stress testing scenario is pre-configured with at least one stress testing situation, and the stress testing situation is pre-configured with at least one stress testing item and situation parameters.

[0150] The acquisition module is used to acquire the first target data required for each stress test item from the data source based on the project attribute information of each stress test item in the target stress test scenario.

[0151] The first calculation module is used to calculate the test results of each stress test item based on the scenario parameters of the target stress test scenario, as well as the first target data and stress test factor required for each stress test item.

[0152] The second calculation module is used to calculate the scenario test results of the target stress test scenario based on the project test results of each stress test item.

[0153] The determination module is used to determine the stress test results under the stress test scenario of the target stress test scheme based on the scenario test results of the target stress test scenario.

[0154] Based on this, this application provides a stress testing device applied to a stress testing system pre-configured with multiple stress testing schemes. Each stress testing scheme pre-configured with at least one stress testing scenario, each stress testing scenario pre-configured with at least one stress testing situation, and each stress testing situation pre-configured with at least one stress testing item. The data sources and stress testing factors associated with the stress testing items can be freely combined to create different risk items in the scenario, thereby supporting self-scalable stress testing scenarios. These combined risk items correspond to various complex scenarios and situations that require supervision and management. Through this customizable stress testing scenario, it is possible to simultaneously support the configuration of NII and EVE calculations for interest rates and liquidity stress testing scenarios, instead of requiring multiple modules to configure scenarios and calculation schemes separately. This greatly reduces the complexity of scheme configuration, completes various different stress tests, and meets the needs of various complex and ever-changing scenarios.

[0155] In some embodiments, the first calculation module in the stress testing apparatus, when calculating the test result of each stress test item based on the scenario parameters of the target stress test scenario, and the first target data and stress test factor required for each stress test item, is specifically used for:

[0156] Based on each stress test factor associated with the stress test item, determine the second target data corresponding to that stress test factor from the first target data;

[0157] Based on the scenario parameters of the target stress test scenario, each stress test factor and its corresponding second target data, the result of each stress test factor is calculated.

[0158] Based on the results of each stress test factor, the project test results for that stress test item are determined.

[0159] In some embodiments, the first target data is data obtained from a business report of a business system; the business report carries date information; the acquisition module in the stress testing device, when acquiring the first target data required for each stress test item from the data source based on the project attribute information of each stress test item in the target stress test scenario, is specifically used for:

[0160] Based on the pre-configured deadline management information, determine the deadline information for the data required for each stress test item in the target stress test scenario;

[0161] Based on the time limit information and the business report associated with each stress test project, obtain the first target data required by the stress test project and matching the time limit management information from the associated business report.

[0162] In some embodiments, the stress testing apparatus further includes a second configuration module, which is configured to configure multiple stress testing schemes in the stress testing system before sequentially selecting a target stress testing scheme, a target stress testing scenario, and a target stress testing situation from the stress testing system in response to a selection instruction for the stress testing system.

[0163] For each stress testing solution, multiple stress testing scenarios are configured based on market environment, internal environment, and external environment;

[0164] Configure multiple stress test scenarios for each stress test scenario;

[0165] Configure the stress test items and scenario parameters associated with each stress test scenario.

[0166] In some embodiments, the second configuration module in the stress testing device, when configuring the project attribute information of the stress testing item, is specifically used for:

[0167] Configure multiple stress test factors;

[0168] Configure the calculation parameters for each stress test factor;

[0169] For each stress test item, configure the association information between the stress test item and at least one stress test factor, and configure the association information between the stress test item and at least one business report in the data source.

[0170] In some embodiments, the pressure testing device further includes a comparison analysis module, which is used to obtain pressure test results under different pressure test scenarios;

[0171] The stress test results under different stress test scenarios were compared and analyzed to obtain the comparative analysis results.

[0172] In some embodiments, the stress testing device further includes a push module, which is used to generate a warning message when the stress test result of the target stress test scenario under the target stress test scenario meets the preset warning conditions;

[0173] The warning message will be pushed to the target personnel via a preset push method.

[0174] Based on the same inventive concept, this application also provides an electronic device corresponding to the stress testing method. Since the principle of the electronic device in this application is similar to the stress testing method described above, the implementation of the electronic device can refer to the implementation of the method, and the repeated parts will not be described again.

[0175] Please refer to Figure 12 , Figure 12 A schematic diagram of the structure of the electronic device according to an embodiment of this application is shown. Specifically, the electronic device 1200 includes: a processor 1201, a memory 1202, and a bus. The memory 1202 stores machine-readable instructions that can be executed by the processor 1201. When the electronic device 1200 is running, the processor 1201 and the memory 1202 communicate through the bus. When the machine-readable instructions are executed by the processor 1201, the steps of the stress test method are performed.

[0176] Based on the same inventive concept, this application also provides a computer-readable storage medium corresponding to the stress testing method. Since the principle of the computer-readable storage medium in this application is similar to the stress testing method described above, the implementation of the computer-readable storage medium can refer to the implementation of the method, and the repeated parts will not be described again.

[0177] A computer-readable storage medium storing a computer program that, when executed by a processor, performs the steps of the stress testing method.

[0178] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the specific working processes of the systems and devices described above can be referred to the corresponding processes in the method embodiments, and will not be repeated here. In the several embodiments provided in this application, it should be understood that the disclosed systems, devices, and methods can be implemented in other ways. The device embodiments described above are merely illustrative. For example, the division of modules is only a logical functional division, and in actual implementation, there may be other division methods. Furthermore, multiple modules or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the displayed or discussed mutual coupling or direct coupling or communication connection can be through some communication interfaces; the indirect coupling or communication connection of devices or modules can be electrical, mechanical, or other forms.

[0179] The modules described as separate components may or may not be physically separate. The components shown as modules may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.

[0180] In addition, the functional units in the various embodiments of this application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit.

[0181] If the aforementioned functions are implemented as software functional units and sold or used as independent products, they can be stored in a processor-executable, non-volatile, computer-readable storage medium. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, or a portion of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, a platform server, or a network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of this application. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, ROM, RAM, magnetic disks, or optical disks.

[0182] The above are merely specific embodiments of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.

Claims

1. A pressure testing method, characterized in that, The method, applied to a stress testing system, includes: In response to the selection command for the stress testing system, the target stress testing scheme, target stress testing scenario, and target stress testing situation are sequentially determined from the stress testing system; wherein, the target stress testing scheme is pre-configured with at least one stress testing scenario, the stress testing scenario is pre-configured with at least one stress testing situation, and the stress testing situation is pre-configured with at least one stress testing item and situation parameters. Based on the project attribute information of each stress test item in the target stress test scenario, obtain the first target data required for each stress test item from the data source; Based on each stress test factor associated with the stress test item, determine the second target data corresponding to that stress test factor from the first target data; Based on the scenario parameters of the target stress test scenario, each stress test factor and its corresponding second target data, the result of each stress test factor is calculated. Based on the results of each stress test factor, the project test results for this stress test item are determined; Based on the test results of each stress test item, calculate the scenario test results of the target stress test scenario; Based on the scenario test results of the target stress test scenario, determine the stress test results under the stress test scenario of the target stress test scheme.

2. The pressure testing method according to claim 1, characterized in that, The first target data is data obtained from business reports in the business system; the business reports carry date information. Based on the project attribute information of each stress test item in the target stress test scenario, the first target data required for each stress test item is obtained from the data source, including: Based on the pre-configured deadline management information, determine the deadline information for the data required for each stress test item in the target stress test scenario; Based on the time limit information and the business report associated with each stress test project, obtain the first target data required by the stress test project and matching the time limit management information from the associated business report.

3. The method according to claim 1, characterized in that, In response to a selection command for the stress testing system, the method further includes sequentially selecting a target stress testing scheme, a target stress testing scenario, and a target stress testing situation from the stress testing system: Configure multiple stress testing schemes in the stress testing system; For each stress testing solution, multiple stress testing scenarios are configured based on market environment, internal environment, and external environment; Configure multiple stress test scenarios for each stress test scenario; Configure the stress test items and scenario parameters associated with each stress test scenario.

4. The pressure testing method according to claim 1, characterized in that, The project attribute information for the stress test item is configured in the following way: Configure multiple stress test factors; Configure the calculation parameters for each stress test factor; For each stress test item, configure the association information between the stress test item and the stress test factor, and configure the association information between the stress test item and at least one business report.

5. The pressure testing method according to claim 1, characterized in that, The method further includes: Obtain stress test results under different stress test scenarios; The stress test results under different stress test scenarios were compared and analyzed to obtain the comparative analysis results.

6. The pressure testing method according to claim 1, characterized in that, The method further includes: When the stress test result of the target stress test scenario meets the preset warning conditions, a warning message is generated. The warning message will be pushed to the target personnel via a preset push method.

7. A pressure testing device, characterized in that, The device includes: The first configuration module is used to respond to the selection command for the stress testing system and sequentially determine the target stress testing scheme, the target stress testing scenario, and the target stress testing situation from the stress testing system; wherein, the target stress testing scheme is pre-configured with at least one stress testing scenario, the stress testing scenario is pre-configured with at least one stress testing situation, and the stress testing situation is pre-configured with at least one stress testing item and situation parameters. The acquisition module is used to acquire the first target data required for each stress test item from the data source based on the project attribute information of each stress test item in the target stress test scenario. The first calculation module is used to determine the second target data corresponding to each stress test factor associated with the stress test item from the first target data. Based on the scenario parameters of the target stress test scenario, each stress test factor and its corresponding second target data, the result of each stress test factor is calculated. Based on the results of each stress test factor, the project test results for this stress test item are determined; The second calculation module is used to calculate the scenario test results of the target stress test scenario based on the project test results of each stress test item. The determination module is used to determine the stress test results under the stress test scenario of the target stress test scheme based on the scenario test results of the target stress test scenario.

8. An electronic device, characterized in that, include: The device includes a processor, a memory, and a bus. The memory stores machine-readable instructions executable by the processor. When the electronic device is running, the processor communicates with the memory via the bus. When the machine-readable instructions are executed by the processor, the steps of the stress testing method as described in any one of claims 1 to 6 are performed.

9. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores a computer program that, when executed by a processor, performs the steps of the stress testing method as described in any one of claims 1 to 6.

Citation Information

Patent Citations

  • System early-warning method and device, electronic equipment and computer readable medium

    CN107704387A

  • Performance pressure measurement method, device and equipment

    CN112148599A