Product Process Subcontracting Management Method, System, and Rail Vehicle
By numbering and classifying and calculating the outsourced processes in rail vehicle manufacturing, the problems of inconsistent data and intricate cost accounting in process outsourced management are solved, and the total price of outsourced processes is quickly determined, reducing the outsourced manufacturing costs.
Patent Information
- Application Number
- CN202310009950.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-01-04
- Publication Date
- 2025-07-25
- Estimated Expiration
- 2043-01-04
AI Technical Summary
In the manufacturing of rail vehicle, there are problems such as extensive management, inconsistent basic data at the source, frequent changes, single standard price formulation model for process outsourcing, insufficient cost accounting, and cumbersome management of inventory and waste return.
By numbering outsourced processes in the process, combining process classification and process parameters, the standard outsourced prices for each process are calculated to form the total outsourced price, and providing a product process outsourced management method and system for outsourced production of parts of rail vehicles.
Quickly predict all processes used in outsourced manufacturing in the process, reduce outsourced manufacturing costs, and improve the efficiency and accuracy of outsourced management of process outsourced management.
Smart Images

Figure CN116089464B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of rail vehicle manufacturing, and particularly to a product process outsourcing management method, system, and rail vehicle. Background Art
[0002] In rail vehicle manufacturing, when a manufacturing enterprise is unable to manufacture on its own or has insufficient manufacturing capacity, there will be a need for outsourcing manufacturing. Therefore, process outsourcing management is an important part of enterprise management. Whether this part of the business can be effectively managed has an important impact on the production progress, product quality, and cost control of the enterprise's products.
[0003] Process outsourcing management faces problems such as extensive management, inconsistent source basic data, frequent changes, a single mode for formulating standard outsourcing prices for processes, insufficiently detailed cost accounting, and manual document management of inventory and waste to be returned at process outsourcing suppliers, resulting in a large workload and inconvenient statistical analysis. There is a need to design a process outsourcing management method and system that conforms to the actual business of the enterprise to support the management of the enterprise's process outsourcing business.
[0004] The information disclosed in this background art section is only intended to deepen the understanding of the overall background art of the present invention, and should not be regarded as an admission or any form of suggestion that this information constitutes prior art already known to those skilled in the art. Summary of the Invention
[0005] In view of the problems existing in the prior art, the present invention provides a product process outsourcing management method, system, and rail vehicle.
[0006] A product process outsourcing management method provided by the present invention is used for the outsourced production of components of a rail vehicle. The method includes:
[0007] Obtain production orders for a number of the rail vehicles;
[0008] Query the process based on the production order to obtain outsourcing data;
[0009] Based on the outsourcing data, obtain all process numbers, where different process numbers are used for any one of the process description, process content, and processing part that are different.
[0010] Based on the process classification and process parameters corresponding to all the process numbers, calculate the standard outsourcing price for each process;
[0011] Based on the standard outsourcing prices of all processes, form the total outsourcing price.
[0012] According to the product process outsourcing management method provided by the present invention, the outsourcing data includes:
[0013] Process-specified outsourced data and / or temporary outsourced data.
[0014] A product process outsourcing management method provided by the present invention,
[0015] When the outsourced data includes the temporary outsourced data;
[0016] Correspondingly, based on the outsourced data, obtain all process numbers, including:
[0017] Based on the temporary outsourced data, through temporary approval, obtain all process numbers that have passed the temporary approval.
[0018] A product process outsourcing management method provided by the present invention, based on the outsourced data, obtain all process numbers, including:
[0019] Based on the outsourced data, obtain all process numbers and the material codes required for the processes.
[0020] A product process outsourcing management method provided by the present invention, the method further includes:
[0021] Obtain the layout drawing of the cut parts of the rail vehicle;
[0022] Based on the layout drawing, generate the raw material quota of the rail vehicle;
[0023] Encode the suppliers, and obtain raw materials through the suppliers;
[0024] When the production order is completed, based on the raw material quota, the raw material codes, the codes of the suppliers, and the work breakdown structure of the rail vehicle, determine the raw material loss of the suppliers.
[0025] A product process outsourcing management method provided by the present invention, when the production order is completed, based on the raw material quota, the raw material codes, the codes of the suppliers, and the work breakdown structure of the rail vehicle, determine the raw material loss of the suppliers, including:
[0026] When the production order is completed, based on the raw material quota, the raw material codes, the codes of the suppliers, the work breakdown structure of the rail vehicle, and the scrap rate of the rail vehicle, determine the raw material loss of the suppliers;
[0027] Based on the raw material loss, obtain the quantity of raw materials that should be scrapped and returned by the suppliers.
[0028] A product process outsourcing management method provided by the present invention, obtain production orders for several of the rail vehicles, including:
[0029] Convert the pipeline parts into the first sub-production order according to the column quantity;
[0030] Convert the blanking parts into the second sub-production order according to the batch summary planned order;
[0031] Based on the first sub-production order and the second sub-production order, convert the planned order generated by running the material requirements plan of several of the rail vehicles into a production order.
[0032] According to a product process subcontracting management method provided by the present invention, based on the subcontracting data, obtain all process numbers, including:
[0033] In the process of the pipeline parts, the quantity of virtual self-made parts produced in the intermediate process is used as the number of processes in the intermediate process;
[0034] In the process of the blanking parts, the quantity of materials produced is used as the number of processes in the process of the blanking parts.
[0035] The present invention also provides a product process subcontracting management system for the subcontracting production of parts of a rail vehicle. The system includes:
[0036] An order module for obtaining the production orders of several of the rail vehicles;
[0037] A process module for querying the process based on the production order to obtain subcontracting data;
[0038] A process module for obtaining all process numbers based on the subcontracting data, wherein different numbers are used for any different processes in terms of process description, process content, and processing location;
[0039] A calculation module for calculating the subcontracting standard price of each process based on the process classification and process parameters corresponding to all the process numbers;
[0040] A total price module for forming the total subcontracting price based on the subcontracting standard prices of all processes.
[0041] The present invention also provides a rail vehicle, and the steps of the product process subcontracting management method as described in any one of the above are adopted in the manufacturing of the rail vehicle.
[0042] The product process subcontracting management method, system, and rail vehicle provided by the present invention can quickly predict all processes used in subcontracting manufacturing in the process by numbering the subcontracting processes in the process, and further quickly determine the total price of the subcontracting processes in combination with the process classification and process parameters, so as to provide a reference for the bidding work and reduce the subcontracting manufacturing cost. Description of the Drawings
[0043] To more clearly illustrate the technical solutions in the present invention or the prior art, the following will briefly introduce the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings in the following description are some embodiments of the present invention. For those of ordinary skill in the art, without creative efforts, other drawings can also be obtained based on these drawings.
[0044] Figure 1 It is a schematic flow chart of a product process subcontracting management method provided by the present invention;
[0045] Figure 2 It is a schematic structural diagram of a product process subcontracting management system provided by the present invention;
[0046] Figure 3 It is a schematic physical structure diagram of an electronic device provided by the present invention. Detailed implementation manners
[0047] To make the objectives, technical solutions, and advantages of the present invention clearer, the following will clearly and completely describe the technical solutions in the present invention in conjunction with the drawings in the present invention. Obviously, the described embodiments are some, but not all, of the embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
[0048] The following will, in conjunction with the drawings, through specific embodiments and their application scenarios, provide a detailed description of the product process subcontracting management method provided by the embodiments of the present application.
[0049] Figure 1 It is a schematic flow chart of a product process subcontracting management method provided by the present invention. As Figure 1 shown, a product process subcontracting management method provided by the present invention is used for the subcontracting production of parts of rail vehicles. The method may include the following steps.
[0050] S100. Obtain production orders for several rail vehicles.
[0051] Optionally, obtaining production orders for several rail vehicles includes:
[0052] Converting in-line parts into the first sub-production order according to the column quantity;
[0053] Converting blanking parts into the second sub-production order according to the batch summary planned order;
[0054] Based on the first sub-production order and the second sub-production order, converting the planned orders generated by the material requirements planning of several rail vehicles into production orders.
[0055] Preferably, convert the planned orders generated by running the Materiel Requirements Planning (MRP) according to the production plan into production orders. When the process route operations change, automatically update the operations in the production order and record the change notice number for subsequent traceability.
[0056] S200. Query the process based on the production order to obtain subcontracting data.
[0057] Optionally, the subcontracting data includes:
[0058] Process-specified subcontracting data and / or temporary subcontracting data.
[0059] Optionally,
[0060] when the subcontracting data includes temporary subcontracting data;
[0061] Correspondingly, based on the subcontracting data, obtain all operation numbers, including:
[0062] Based on the temporary subcontracting data, obtain all operation numbers that have passed the temporary approval through temporary approval.
[0063] Preferably, the temporary subcontracting data is data related to a temporary subcontracting task initiated when the own production capacity is insufficient.
[0064] S300. Based on the subcontracting data, obtain all operation numbers. Among them, different operation numbers are used for any one of the operation description, operation content, and processing part that are different for the operations. Generate a unique number for each operation. Although the operation description is the same, if the operation content or processing part is different, multiple operation numbers are generated.
[0065] Optionally, based on the subcontracting data, obtain all operation numbers, including:
[0066] Based on the subcontracting data, obtain all operation numbers and the material codes required for the operations. Based on the material codes and operation numbers, overall consider the personalized production of in-line parts and the batch production of blanking parts.
[0067] Optionally, based on the subcontracting data, obtain all operation numbers, including:
[0068] In the process of in-line parts, the quantity of virtual self-made parts produced in the intermediate process is used as the number of operations in the intermediate process;
[0069] In the process of blanking parts, the quantity of materials produced is used as the number of operations in the process of blanking parts.
[0070] Design different business processing modes according to personalized production of pipeline parts and batch production of blanking parts. The personalized production of pipeline parts is the main production process. The materials produced in the intermediate process are not regarded as the materials produced by the work order, but are treated as virtual self-made parts. The number of processes in this part is calculated by taking the number of virtual self-made parts input into the next process as the number of processes. The processes of blanking parts are simple, and the number of materials produced by the work order is used as the number of processes. For pipeline part work orders, one work order produces one pipeline part. For blanking part work orders, one work order may produce multiple blanking part materials, and the same material code is used.
[0071] It should be noted that for temporary outsourcing data, the bill of materials and process route are automatically calculated through the background, and the virtual self-made parts of pipeline parts and the processes of blanking parts are sorted into the format of material + process, and then selected for approval to ensure the uniqueness of the source data of outsourcing. When facing the problem that the production order has not been issued during the approval of temporary outsourcing, by querying a certain column of the process route, filling in the start and end columns, after the approval is completed, arrange a background job to automatically query the issuance status of the production order and trigger the generation of an outsourcing purchase application. To solve the problem of uncertain outsourcing working hours, in the same approval process, the outsourcing quantity can be approved first, and after the quantity approval is completed, the business personnel are allowed to modify the working hours and continue to initiate the process approval.
[0072] S400. Calculate the standard outsourcing price for each process based on the process classification and process parameters corresponding to all process numbers.
[0073] Preferably, to calculate the standard outsourcing price of the process, the outsourcing processes are classified according to business types, including blanking, processing, pressing, welding, heat treatment, flaw detection, pipeline cleaning, etc. Different calculation parameters are set according to different types to achieve accurate calculation of the standard outsourcing price. For example, blanking is related to the blanking method, plate thickness, material, and equipment, then these parameters are set as process parameters, and the standard outsourcing price is automatically generated according to the process parameters. The standard outsourcing price is used to limit the bidding price to ensure the controllability of the company's outsourcing costs.
[0074] S500. Form the total outsourcing price based on the standard outsourcing prices of all processes.
[0075] Preferably, through querying the specified outsourcing data and / or temporary outsourcing data of the process, conduct bidding, and sign a contract with the supplier when the bidding price does not exceed the price limit.
[0076] In this embodiment, by numbering the outsourcing processes in the process, all processes used in outsourcing manufacturing in the process can be quickly predicted. Combining the process classification and process parameters, the total price of the outsourcing processes can be further quickly determined, thus providing a reference for the bidding work and reducing the outsourcing manufacturing cost.
[0077] Furthermore, the purchase application generated according to the production order is matched with the purchase contract to transfer to the purchase order, and the purchase quantity of the purchase order is restricted not to exceed the quantity of the purchase contract.
[0078] Optionally, the method further includes:
[0079] Obtain the layout drawing of the cut parts of the rail vehicle;
[0080] Generate the raw material quota of the rail vehicle based on the layout drawing;
[0081] Code the suppliers and obtain raw materials through the suppliers;
[0082] When the production order is completed, determine the raw material loss of the supplier based on the raw material quota, raw material code, supplier code, and work breakdown structure of the rail vehicle.
[0083] Optionally, when the production order is completed, determining the raw material loss of the supplier based on the raw material quota, raw material code, supplier code, and work breakdown structure of the rail vehicle includes:
[0084] When the production order is completed, determine the raw material loss of the supplier based on the raw material quota, raw material code, supplier code, work breakdown structure of the rail vehicle, and scrap rate of the rail vehicle;
[0085] Obtain the quantity of raw materials that should be scrapped by the supplier based on the raw material loss.
[0086] It should be noted that when managing the raw materials of the supplier, due to the personalized customized production of the enterprise, when the same cut parts are used in different projects, the layout drawings will be inconsistent, and the raw material consumption of the bill of material (Bom) for the same cut part is inconsistent, which conflicts with the universality of the bill of material. If the inventory at the supplier is deducted according to the bill of material, there will be problems with inaccurate inventory. Generate the column quantity quota according to the layout drawing, maintain the column quantity deduction quota according to the work breakdown structure (WBS) of the specific column quantity, raw material code, and supplier code. When the production order on the main assembly line is completed (by default, it is considered that the attached cut part production order is also completed), automatically deduct the raw material quota at the supplier according to the column quantity supplier quota. Calculate the inventory at the supplier according to the first-in, first-out method. Automatically calculate and compare the quantity of raw materials that should be scrapped by the supplier and the actual quantity of scrapped materials returned by the supplier according to the scrap rate of the column quantity and the actual quantity of scrap materials returned by the supplier.
[0087] Preferably, the outsourced purchase order is sent to the supplier through the supplier collaboration platform for confirmation of quantity, price, and delivery date. After the supply is completed, a delivery note is printed for delivery. When receiving goods according to the delivery note, it triggers the automatic confirmation of work reporting for the corresponding production order process, and the procurement cost is included in the process cost of the production order. That is, it realizes that the receipt of the purchase order automatically triggers the work reporting of the production order process, and the cost settlement of the purchase order is transferred to the production order.
[0088] Preferably, an invoice list to be developed is generated based on the receipt of the purchase order, and the purchase order, the goods receipt note, and the contract are matched and verified for reimbursement.
[0089] The present invention also provides a rail vehicle, in which the steps of any of the above-mentioned product process outsourcing management methods are adopted in the manufacturing of the rail vehicle.
[0090] The product process outsourcing management system provided by the present invention will be described below. The product process outsourcing management system described below can be mutually referred to with the product process outsourcing management method described above.
[0091] Figure 2 It is a schematic structural diagram of a product process outsourcing management system provided by the present invention, as Figure 2 shown, the present invention also provides a product process outsourcing management system for the outsourced production of parts of a rail vehicle. The system includes:
[0092] An order module for obtaining production orders of several rail vehicles;
[0093] A process module for querying the process based on the production order to obtain outsourcing data;
[0094] A process module for obtaining all process numbers based on the outsourcing data, where different process numbers are used for any one of the process description, process content, and processing part that are different;
[0095] A calculation module for calculating the outsourcing standard price of each process based on the process classification and process parameters corresponding to all process numbers;
[0096] A total price module for forming the total outsourcing price based on the outsourcing standard prices of all processes.
[0097] In this embodiment, by numbering the outsourced processes in the process, it is possible to quickly predict all the processes used in the outsourced manufacturing in the process. Combining the process classification and process parameters, it is further possible to quickly determine the total price of the outsourced processes, thereby providing a reference for the bidding work and reducing the outsourced manufacturing cost.
[0098] Figure 3 It is a schematic physical structure diagram of an electronic device provided by the present invention, as Figure 3As shown in the figure, the electronic device may include: a processor 810, a communications interface 820, a memory 830, and a communication bus 840. Among them, the processor 810, the communications interface 820, and the memory 830 communicate with each other through the communication bus 840. The processor 810 may call the logic instructions in the memory 830 to execute the product process subcontracting management method for the subcontracting production of parts of a rail vehicle. The method includes:
[0099] Obtain production orders of several said rail vehicles;
[0100] Query the process based on the production order to obtain subcontracting data;
[0101] Based on the subcontracting data, obtain all process numbers, where different process numbers are used for any different processes in terms of process description, process content, and processing part;
[0102] Calculate the subcontracting standard price of each said process based on the process classification and process parameters corresponding to all the process numbers;
[0103] Form a total subcontracting price based on the subcontracting standard prices of all processes.
[0104] In addition, when the logic instructions in the above-mentioned memory 830 are implemented in the form of software function units and sold or used as an independent product, they may be stored in a computer-readable storage medium. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or a part of this technical solution, may be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute all or part of the steps of the methods described in various embodiments of the present invention. The foregoing storage medium includes: various media such as a USB flash drive, a mobile hard disk, a read-only memory (ROM, Read-Only Memory), a random access memory (RAM, Random Access Memory), a magnetic disk, or an optical disc that can store program codes.
[0105] On the other hand, the present invention also provides a computer program product. The computer program product includes a computer program stored on a non-transitory computer-readable storage medium. The computer program includes program instructions. When the program instructions are executed by a computer, the computer can execute the product process subcontracting management method provided by the above-mentioned various methods for the subcontracting production of parts of a rail vehicle. The method includes:
[0106] Obtain production orders for a number of the rail vehicles;
[0107] Query the process based on the production order to obtain outsourcing data;
[0108] Based on the outsourcing data, obtain all process numbers, where different process numbers are used for any process that is different in terms of process description, process content, and processing part;
[0109] Based on the process classification and process parameters corresponding to all the process numbers, calculate the outsourcing standard price for each process;
[0110] Based on the outsourcing standard prices of all processes, form the total outsourcing price.
[0111] In another aspect, the present invention also provides a non-transitory computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, it is used to implement the product process outsourcing management method provided above for the outsourcing production of parts of rail vehicles. The method includes:
[0112] Obtain production orders for a number of the rail vehicles;
[0113] Query the process based on the production order to obtain outsourcing data;
[0114] Based on the outsourcing data, obtain all process numbers, where different process numbers are used for any process that is different in terms of process description, process content, and processing part;
[0115] Based on the process classification and process parameters corresponding to all the process numbers, calculate the outsourcing standard price for each process;
[0116] Based on the outsourcing standard prices of all processes, form the total outsourcing price.
[0117] The device embodiments described above are merely illustrative. The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed to multiple network units. Some or all of the modules can be selected according to actual needs to achieve the purpose of the solution of this embodiment. Those of ordinary skill in the art can understand and implement it without creative labor.
[0118] Through the description of the above embodiments, those skilled in the art can clearly understand that each embodiment can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on such an understanding, the essence of the above technical solution, or the part that contributes to the prior art, can be embodied in the form of a software product. This computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, magnetic disk, optical disk, etc., and includes several instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.
[0119] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that they can still modify the technical solutions recorded in the foregoing embodiments, or perform equivalent replacements on some of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of each embodiment of the present invention.
Claims
1. A method for outsourcing management of product processes, characterized in that For the outsourced production of parts for rail vehicles, the method includes: Obtain production orders for a number of the rail vehicles; Query the process based on the production order to obtain outsourced data; Based on the outsourced data, obtain all process numbers, where different process numbers are used for any process with different descriptions, contents, or processing parts; Calculate the outsourced standard price for each process based on the process classification and process parameters corresponding to all the process numbers; Form an overall outsourced price based on the outsourced standard prices of all processes; The method further includes: Obtain the layout drawing of the cut parts of the rail vehicle; Generate the raw material quota for the rail vehicle based on the layout drawing; Encode the suppliers and obtain raw materials through the suppliers; When the production order is completed, determine the raw material loss of the supplier based on the raw material quota, the raw material code, the code of the supplier, and the work breakdown structure of the rail vehicle.
2. The product process outsourcing management method according to claim 1, wherein, The outsourced data includes: Process-specified outsourced data and / or temporary outsourced data.
3. The product process outsourcing management method according to claim 2, wherein: When the outsourced data includes the temporary outsourced data; Correspondingly, based on the outsourced data, obtain all process numbers, including: Based on the temporary outsourced data, obtain all process numbers that have passed temporary approval through temporary approval.
4. The product process outsourcing management method according to claim 1, characterized in that Based on the outsourced data, obtain all process numbers, including: Based on the outsourced data, obtain all process numbers and the material codes required for the processes.
5. The product process outsourcing management method according to claim 1, wherein, When the production order is completed, determine the raw material loss of the supplier based on the raw material quota, the raw material code, the code of the supplier, and the work breakdown structure of the rail vehicle, including: When the production order is completed, determine the raw material loss of the supplier based on the raw material quota, the raw material code, the code of the supplier, the work breakdown structure of the rail vehicle, and the scrap rate of the rail vehicle; Based on the raw material loss, obtain the quantity of raw materials that should be scrapped by the supplier.
6. The product process outsourcing management method according to claim 1, wherein Obtain production orders for a number of the rail vehicles, including: Convert the in-line parts into the first sub-production order according to the column quantity; Convert the cut parts into the second sub-production order according to the batch summary planned order; Based on the first sub-production order and the second sub-production order, convert the planned orders generated by the material requirements planning of a number of the rail vehicles into production orders.
7. The product process outsourcing management method according to claim 6, wherein Based on the outsourced data, obtain all process numbers, including: In the process of the in-line parts, the quantity of virtual self-made parts produced in the intermediate process is used as the number of processes in the intermediate process; In the process of the cut parts, the quantity of materials produced is used as the number of processes in the process of the cut parts.
8. A product process outsourcing management system, characterized in that For the outsourced production of parts for rail vehicles, the system includes: An order module for obtaining production orders for a number of the rail vehicles; A process module for querying the process based on the production order to obtain outsourced data; A process module, which is used to obtain all process numbers based on the subcontracting data, where different process numbers are used for any process with different descriptions, contents, or processing parts; A calculation module, which is used to calculate the subcontracting standard price of each process based on the process classification and process parameters corresponding to all the process numbers; A total price module, which is used to form the total subcontracting price based on the subcontracting standard prices of all processes; It further includes: Obtaining the layout drawing of the blanking parts of the rail vehicle; Generating the raw material quota of the rail vehicle based on the layout drawing; Encoding the suppliers and obtaining raw materials through the suppliers; When the production order is completed, determining the raw material loss of the suppliers based on the raw material quota, the raw material encoding, the encoding of the suppliers, and the work breakdown structure of the rail vehicle.
9. An orbital vehicle, characterized in that, The steps of the product process subcontracting management method as described in any one of claims 1-7 are adopted in the manufacturing of the rail vehicle.
Citation Information
Patent Citations
Method for promising order of semiconductor assembly and test enterprise
CN103246950A
Integrated management system that improves operating method for calculating cost of bag
KR102063113B1