Information-synchronized renewable energy green power tracing method, system and terminal
By uploading the information of power generation and transmission nodes and branch nodes to the chain, combined with the data collected by smart meters, the information of all aspects of green power is synchronized, solving the problem that existing technology cannot trace green power and fossil energy from the source, reducing costs and Improved the accuracy and security of traceability.
Patent Information
- Application Number
- CN202310185718.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-01
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2043-03-01
AI Technical Summary
Existing renewable energy power generation traceability technology cannot trace the use of green electricity and fossil energy from the source. There are problems such as high technical cost, reliance on management systems, limited technology, difficulty in cross-regional traceability, and low safety.
By sending the information of power generation and transmission nodes and branch nodes to the time synchronization device, information blocks are generated and uploaded to the chain, and smart meters are used to collect real-time data to form node blocks and perform blockchain storage management to realize the information of each link of green power. Synchronize and trace.
It ensures the traceability of power production, transmission and consumption of green energy and fossil energy, reduces technical costs, improves the accuracy and safety of traceability, and realizes cross-regional power traceability.
Smart Images

Figure CN116151983B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of new energy and energy-saving technology, and in particular relates to a method, system and terminal for tracing the source of renewable energy green electricity with information synchronization. Background Art
[0002] At present, the existing technology for tracing the source of renewable energy power generation reflects the transaction contract, transaction commitment and green power consumption certificate (GPCC) circulation information signed by users and renewable energy power generation enterprises in the power trading center, and analyzes the transaction vouchers, obtains the list of renewable energy power generation enterprises, grasps the green power production information, and obtains the transaction subject, transaction time, transaction method, transaction volume and transaction price and other green power transaction and use information. Combined with the relevant information of the dispatching system and geographic information system, the information of the power transmission and distribution process is obtained. Blockchain technology is used to chain the key information of the green power production, transaction and use process to ensure that the information of the power generation party, the consumption party, the power supply party, the transmission party and the power volume, electricity price and other information cannot be tampered with and the source can be traced. Its disadvantage is that it cannot be traced from the source, and can only be distinguished by the price subscribed by the user at the time of the transaction. The actual consumption of green power and fossil energy cannot be determined. Therefore, it is urgent to design a new method for tracing the source of renewable energy and green power.
[0003] Through the above analysis, it is found that in the existing technology, the cloud platform energy management system is based on which data analysis and matching of renewable energy power generation is carried out. The matching method often has errors and omissions, and the data traceability is not very accurate. The renewable energy power traceability method cannot be traced back from the source, and can only be distinguished by the price subscribed by the user at the time of the transaction, while the actual consumption of green electricity and fossil energy cannot be determined.
[0004] The existing defects of green power traceability technology are mainly: 1) High technical cost: Since large-scale transformation of the power supply system is required, the technical cost is relatively high; 2) Main reliance on management system: Traceability technology mainly relies on management system to ensure the effective operation of the power system; 3) Limited technology: Due to the limited technical level, traceability technology is greatly restricted, and it is difficult to achieve cross-regional traceability; 4) Lack of collection: The lack of data collection on the operating status of power plants seriously affects the authenticity of traceability data; 5) Low security: The security of traceability technology is low and it is very vulnerable to attacks. Summary of the invention
[0005] In view of the problems existing in the prior art, the present invention provides a method, system and terminal for tracing the source of renewable energy green electricity with information synchronization.
[0006] The present invention is implemented as follows: a renewable energy green power tracing method with information synchronization, the renewable energy green power tracing method with information synchronization includes: sending the power generation and transmission nodes and branch nodes as input / output information to a time synchronization device; sending the node information to a node information processing terminal, generating information blocks and transmitting them on the chain through the network; sending the information blocks to a power information collection terminal, and sending various types of power information blocks to an energy router through network transmission; monitoring is performed through an information front-end, and the underlying service system of the blockchain communicates with an information collection main station; the front-end block parses the node block information, and stores and manages it on the chain to the information collection main station, and broadcasts it to the time synchronization device through the information collection main station.
[0007] Furthermore, the information-synchronized renewable energy green power tracing method includes the following steps:
[0008] Step 1: Consider power generation, transmission, distribution and consumption as nodes, upload the real-time data of each physical node to the blockchain through smart meter collection equipment, and publish the information to all nodes of the blockchain;
[0009] Step 2: Generate the node i information block and branch information block through the node information processing terminal to form the i-node block at time t, and transmit it to the chain through the network;
[0010] Step 3: Calculate the branch node information and user consumption accounting information of a certain node, record the input and output information of the branch node and the next node, and transmit it to the chain through the network;
[0011] Step 4: integrate various types of power information by deploying a large number of energy router nodes, and collect various types of power information blocks at time t through the node energy router;
[0012] Step 5: Use the energy router channel to transmit the information block to the power information collection main station, perform block analysis through the communication front-end, and form node block information on-chain storage management;
[0013] Step 6: Each node transmits the power information block to the master station system through the power information block collection terminal unit, which is the terminal node of the blockchain. The information is automatically uploaded to the chain to form a node block.
[0014] Step seven: All power plants on the same transmission, transformation and distribution trunk lines synchronize their information, establish a unified information reporting mechanism with the entire power grid, agree on the time and interval for synchronous reporting of information, and broadcast it to each branch node. Each branch node is responsible for accounting and uploading information to the chain.
[0015] Furthermore, in step one, each node includes a time synchronization device, and the input information of each node includes the information of the upstream node; the information collected by the smart meter collection device includes the total power input of the node, the energy branch composition of the power and the corresponding proportion of energy power, output branches and power information.
[0016] Among them, the total power input of each node is composed of the power of each input branch:
[0017]
[0018] In the formula, represents the sum of the power generated by the i-th energy branch, C i Wind, solar, hydro or fossil energy; represents the power of the ith node of the ith energy source, n j Represents the total number of nodes in the i-th energy branch; Represents the total power generated by various energy sources, P in Input power of the node, where N = 1 + 2 + ... + n j +…, C=1+2+…+C i +….
[0019] The proportion of each energy branch to the total power is r c for:
[0020]
[0021] The node output power and the output power of each branch node are expressed as:
[0022]
[0023] In the formula, represents the total output power of the i-th branch of a certain node, Indicates the total output power of a node.
[0024] The output proportion of each type of energy in each branch output is:
[0025]
[0026] If a branch output node also includes other power inputs, the total power of the node together is:
[0027]
[0028] Where P other Indicates that the output branch node includes other power inputs, P s Represents the total power of the output branch node.
[0029] Then the output proportion of a certain type of energy in the output of a branch node is:
[0030]
[0031] In the formula, Indicates the power from Category C energy sources among other input powers.
[0032] Furthermore, in step 2, the node information processing terminal obtains the node information sent by the blockchain, and the node information includes the node name, node domain name and public key; the node information processing terminal generates the node i information block and the branch information block based on the node information to form the i-node block at time t, and uses the public key to encrypt the node block information to obtain encrypted information, and finally transmits the encrypted information through the network to the chain.
[0033] Furthermore, in step three, the end users who use the branch node directly and do not redistribute power include user ID, time, consumption amount, and the power ratio of each type of energy consumed.
[0034] Furthermore, in step 4, the power information integration service design document and data interaction file are obtained; the power information integration service design document and data interaction file are parsed to generate a design model file and a data model file; based on the design model file and the data model file, it is determined whether the power information integration service design document and the data interaction file comply with the power information integration technical specifications; if so, various types of power information integration are implemented by deploying nodes of energy routers, and various types of power information blocks at time t are collected through the node energy routers.
[0035] Furthermore, in step five, after the information block is transmitted to the power information collection main station using the channel of the energy router, the communication front-end obtains the information block to be parsed corresponding to the current batch from the blockchain to be parsed and responds to the block parsing operation of the current batch; obtains the parsing time when the parsing operation is performed on the blocks of the current batch, and determines the parsing time adjustment coefficient according to the parsing time; according to the parsing time adjustment coefficient, the block parsing operation of the current batch is adjusted to form the node block information on-chain storage management.
[0036] Furthermore, in step six, blocks are chained and stored in time series.
[0037] The power information block acquisition terminal unit is equipped with various power information acquisition, remote transmission and node information unified management modules. The remote transmission relies on the power grid communication network transmission system and the communication channel of the communication operator. The main station system includes a communication front-end machine responsible for information collection and monitoring, and a blockchain underlying service system.
[0038] Furthermore, in step seven, when the information synchronization process is started, the system receives synchronization information data packets sent by all power plants on the same transmission, substation and distribution trunk lines, and interprets the synchronization information data packets to obtain data update information; generates synchronization elements based on the update information, and establishes a unified information reporting mechanism with the entire power grid based on the synchronization elements; uses the information reporting mechanism to agree on the synchronization reporting time and interval, and broadcasts it to each branch node for accounting and information chain storage management.
[0039] Another object of the present invention is to provide an information-synchronized renewable energy green power tracing system using the information-synchronized renewable energy green power tracing method, the information-synchronized renewable energy green power tracing system comprising:
[0040] An information block generation module, used to send the power generation and transmission nodes and the branch nodes as input / output information to the time synchronization device, and send the node information to the node information processing terminal to generate an information block;
[0041] An information sending module is used to send information blocks to the power information collection terminal through network transmission, and send various power information blocks to the energy router through network transmission;
[0042] The block analysis module is used to use the front-end block analysis to form node block information, and upload it to the information collection main station for storage and management, and broadcast it to the time synchronization device through the information collection main station.
[0043] Another object of the present invention is to provide a computer device, which includes a memory and a processor, wherein the memory stores a computer program, and when the computer program is executed by the processor, the processor executes the steps of the information-synchronized renewable energy green power tracing method.
[0044] Another object of the present invention is to provide a computer-readable storage medium storing a computer program. When the computer program is executed by a processor, the processor executes the steps of the information-synchronized renewable energy green power tracing method.
[0045] Another object of the present invention is to provide an information data processing terminal, which is used to implement the information synchronized renewable energy green power tracing system.
[0046] In combination with the above technical solutions and the technical problems solved, the advantages and positive effects of the technical solutions to be protected by the present invention are as follows:
[0047] First, in view of the technical problems existing in the above-mentioned prior art and the difficulty of solving the problems, the technical solutions to be protected by the present invention and the results and data during the research and development process are closely combined to analyze in detail and deeply how the technical solutions of the present invention solve the technical problems, and some creative technical effects brought about after solving the problems. The specific description is as follows:
[0048] The information-synchronized renewable energy green power tracing method provided by the present invention mainly tracks and traces the power from green energy and fossil energy in the actual power consumption of users from the links of power generation, transmission, distribution and power consumption, combined with power dispatching, trading centers, etc. The present invention regards each link of power generation, transmission, distribution and power consumption as a node, uploads the real-time data of each physical node to the blockchain through the smart meter collection device, and publishes the total power input of the node, the energy branch composition of the power, the corresponding energy power ratio, the output branch and the power information to all nodes in the blockchain.
[0049] Second, considering the technical solution as a whole or from the perspective of the product, the technical effects and advantages of the technical solution to be protected by the present invention are described in detail as follows:
[0050] The information-synchronized renewable energy green power tracing method provided by the present invention can ensure the consistency of the output or input power through the node at a certain point in time, while ensuring the traceability of power production, transmission (link multi-level node information transmission), transaction, consumption, etc. of various energy sources at the same point in time. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments of the present invention. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0052] Figure 1 It is a flow chart of the information synchronization renewable energy green power source tracing method provided by an embodiment of the present invention;
[0053] Figure 2 It is a principle diagram of the information synchronization renewable energy green power source tracing method provided by an embodiment of the present invention;
[0054] Figure 3 It is a flowchart of a method provided by an embodiment of the present invention for generating a node i information block and a branch information block through a node information processing terminal, forming an i-node block at time t and transmitting it to a chain through a network. DETAILED DESCRIPTION
[0055] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0056] In view of the problems existing in the prior art, the present invention provides a method, system and terminal for tracing the source of renewable energy green electricity with information synchronization. The present invention is described in detail below with reference to the accompanying drawings.
[0057] like Figure 1 As shown, the information-synchronized renewable energy green power tracing method provided by the embodiment of the present invention includes the following steps:
[0058] S101, sending the power generation and transmission nodes and the branch nodes as input / output information to a time synchronization device;
[0059] S102, sending the node information to the node information processing terminal, generating an information block and uploading it to the chain;
[0060] S103, sending the information block to the power information collection terminal through network transmission, and sending various power information blocks to the energy router through network transmission;
[0061] S104, through the information front-end and monitoring, the blockchain underlying service system communicates with the information collection main station;
[0062] S105, the front-end block parses to form node block information, and stores and manages it on the chain to the information collection main station, and broadcasts it to the time synchronization device through the information collection main station.
[0063] The principle diagram of the information synchronization renewable energy green power tracing method provided by the embodiment of the present invention is shown in Figure 2 .
[0064] The information-synchronized renewable energy green power tracing method provided by the embodiment of the present invention regards each link such as power generation, transmission, distribution and power consumption as a node, uploads the real-time data of each physical node to the blockchain through the smart meter collection device, and publishes this information to all nodes in the blockchain at the same time.
[0065] The information collected by the smart meter collection device provided in the embodiment of the present invention includes the total power input of the node, which energy branches the power is composed of and the corresponding energy power ratio, and which branches the output contains and their power. Among them, the total power input of each node is composed of the power of each input branch:
[0066]
[0067] In the formula, Represents the sum of the power generation of the i-th energy branch, such as C i It can be wind energy, solar energy, water resources or fossil energy, etc. represents the power of the ith node of the ith energy source, n j Represents the total number of nodes in the i-th energy branch. Represents the total power generated by various energy sources, P in Input power of the node, where N = 1 + 2 + ... + n j +…, C=1+2+…+C i +….
[0068] The proportion of each energy branch to the total power is r c for:
[0069]
[0070] The output power of the node and each branch node is expressed as:
[0071]
[0072] In the formula, represents the total output power of the i-th branch of a certain node, Indicates the total output power of a node.
[0073] The output proportion of each type of energy in each branch output is:
[0074]
[0075] If there are other power inputs in a branch output node, they together constitute the total power of the node:
[0076]
[0077] Where P other Indicates that there is other power input in the output branch node, P s Represents the total power of the output branch node.
[0078] Then the output ratio of a certain type of energy in the output of a branch node of this node is:
[0079]
[0080] In the formula, It represents the power from Category C energy in other input power, and the calculation method is the same as formula (2).
[0081] The calculation method for the output power ratio of a certain type of energy in each node is the same as above. In this way, the power consumption ratio of each type of energy in the power consumption of each user can be calculated, and then the power consumption of each type of energy can be further calculated based on the total power consumption of the user.
[0082] First, each node includes a time synchronization device, and the input information of each node includes the information of the upstream node, that is, the total power input, which energy branches the power is composed of and the corresponding energy power ratio, and which branches the output contains and their power, etc. The calculation method is obtained by formula (1) to (6). This ensures that the output or input power of the node at a certain point in time is consistent, and at the same time ensures the traceability of power production, transmission (link multi-level node information transmission), transaction, consumption, etc. of various energy sources at the same time.
[0083] Second, the node i information block and branch information block are generated through the node information processing terminal to form the i-node block at time t. The information contained in the information block is the same as that in the previous step and is transmitted to the chain through the network.
[0084] like Figure 3 As shown, the embodiment of the present invention provides that the node i information block and the branch information block are generated by the node information processing terminal to form the i-node block at time t and transmit it to the chain through the network, including:
[0085] S201, the node information processing terminal obtains the node information sent by the blockchain, the node information includes the node name, node domain name and public key;
[0086] S202, the node information processing terminal generates a node i information block and a branch information block based on the node information to form an i-node block at time t;
[0087] S203, use the public key to encrypt the node block information to obtain encrypted information, and finally transmit the encrypted information through the network to the chain.
[0088] Third, the branch node information of a certain node, as well as the user consumption accounting information (for example, the end users who directly use the branch node without power redistribution, including user ID, time, consumption amount, and the ratio of the power of various types of energy consumed), are calculated in the same way as the node information, recording the input and output information of the branch node and its next node, and are also transmitted to the chain through the network.
[0089] Fourth, various types of power information integration are realized by deploying a large number of energy router nodes. Various types of power information blocks at time t are collected through node energy routers, including:
[0090] (1) Obtaining power information integration service design documents and data interaction files;
[0091] (2) Parse the power information integration service design documents and data interaction files, and generate design model files and data model files;
[0092] (3) Based on the design model file and the data model file, determine whether the power information integration service design document and the data interaction file comply with the power information integration technical specifications;
[0093] (4) If it meets the requirements, various types of power information integration are realized by deploying nodes of energy routers, and various types of power information blocks at time t are collected through node energy routers.
[0094] At the same time, the energy router channel is used to transmit information blocks to the power information collection main station, and the blocks are parsed through the communication front-end, and the node block information is stored and managed on the chain, including:
[0095] (1) After the information block is transmitted to the power information collection main station through the channel of the energy router, the communication front-end obtains the information block to be parsed corresponding to the current batch from the blockchain to be parsed and responds to the block parsing operation of the current batch;
[0096] (2) Obtaining the parsing time for parsing the blocks in the current batch, and determining a parsing time adjustment coefficient according to the parsing time;
[0097] (3) According to the parsing time adjustment coefficient, the block parsing operation of the current batch is adjusted to form the node block information on-chain storage management.
[0098] Fifth, each node transmits network information to the main station system through the power information block acquisition terminal unit, which can be the terminal node of the blockchain, and the information is autonomously uploaded to the chain to form a node block (the block is chained and stored in a time series). Among them, the power information block acquisition terminal unit has various power information acquisition, remote transmission and node information unified management modules, among which the remote transmission can rely on the power grid communication network transmission system and the communication channel of the communication operator; the main station system includes a communication front-end responsible for information collection and monitoring, and a blockchain underlying service system.
[0099] Sixth, all power plants on the same transmission, substation, distribution and other trunk lines synchronize information, establish a unified information reporting mechanism with the entire power grid, agree on the time and interval for synchronous reporting, and broadcast it to each branch node. Each branch node is responsible for accounting and information chain, including:
[0100] (1) When the information synchronization process is started, the system receives synchronization information packets sent by all power plants on the same transmission, substation and distribution trunk lines;
[0101] (2) Interpreting the synchronization information data packet to obtain data update information; generating synchronization elements based on the update information, and establishing a unified information reporting mechanism with the entire power grid based on the synchronization elements;
[0102] (3) Use the information reporting mechanism to agree on the time and interval for synchronous reporting of information, and broadcast it to each branch node for accounting and information chain storage management.
[0103] The information-synchronized renewable energy green power tracing system provided by the embodiment of the present invention includes:
[0104] An information block generation module, used to send the power generation and transmission nodes and the branch nodes as input / output information to the time synchronization device, and send the node information to the node information processing terminal to generate an information block;
[0105] An information sending module is used to send information blocks to the power information collection terminal through network transmission, and send various power information blocks to the energy router through network transmission;
[0106] The block analysis module is used to use the front-end block analysis to form node block information, and upload it to the information collection main station for storage and management, and broadcast it to the time synchronization device through the information collection main station.
[0107] In order to prove the creativity and technical value of the technical solution of the present invention, this section provides application examples of the claimed technical solution on specific products or related technologies.
[0108] An application embodiment of the present invention provides a computer device, which includes a memory and a processor. The memory stores a computer program. When the computer program is executed by the processor, the processor executes the steps of a renewable energy green power tracing method with information synchronization.
[0109] An application embodiment of the present invention provides a computer-readable storage medium storing a computer program. When the computer program is executed by a processor, the processor executes the steps of a renewable energy green power tracing method with information synchronization.
[0110] An application embodiment of the present invention provides an information data processing terminal, which is used to implement an information-synchronized renewable energy green power source tracing system.
[0111] It should be noted that the embodiments of the present invention can be implemented by hardware, software, or a combination of software and hardware. The hardware part can be implemented using dedicated logic; the software part can be stored in a memory and executed by an appropriate instruction execution system, such as a microprocessor or dedicated design hardware. It can be understood by a person of ordinary skill in the art that the above-mentioned devices and methods can be implemented using computer executable instructions and / or contained in a processor control code, such as a carrier medium such as a disk, CD or DVD-ROM, a programmable memory such as a read-only memory (firmware), or a data carrier such as an optical or electronic signal carrier. Such code is provided on the carrier medium. The device and its modules of the present invention can be implemented by hardware circuits such as very large-scale integrated circuits or gate arrays, semiconductors such as logic chips, transistors, etc., or programmable hardware devices such as field programmable gate arrays, programmable logic devices, etc., can also be implemented by software executed by various types of processors, and can also be implemented by a combination of the above-mentioned hardware circuits and software, such as firmware.
[0112] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any modifications, equivalent substitutions and improvements made by any technician familiar with the technical field within the technical scope disclosed by the present invention and within the spirit and principle of the present invention should be covered by the protection scope of the present invention.
Claims
1. A method for tracing the source of renewable energy green electricity with information synchronization, It is characterized in that The information-synchronized renewable energy green power traceability method includes: sending the power generation and transmission nodes and branch nodes as input / output information to the time synchronization device; sending the node information to the node information processing terminal, generating information blocks and transmitting them to the chain through the network; sending the information blocks to the power information collection terminal, and sending various power information blocks to the energy router through the network transmission; monitoring through the information front-end, and the blockchain underlying service system communicates with the information collection master station; the front-end block parses the node block information, and stores and manages it on the chain to the information collection master station, and broadcasts it to the time synchronization device through the information collection master station; The information-synchronized renewable energy green power tracing method includes the following steps: Step 1: Consider power generation, transmission, distribution and consumption as nodes, upload the real-time data of each physical node to the blockchain through smart meter collection equipment, and publish the information to all nodes of the blockchain; Step 2: Generate the node i information block and branch information block through the node information processing terminal to form the i-node block at time t, and transmit it to the chain through the network; Step 3: Calculate the branch node information and user consumption accounting information of a certain node, record the input and output information of the branch node and the next node, and transmit it to the chain through the network; Step 4: integrate various types of power information by deploying a large number of energy router nodes, and collect various types of power information blocks at time t through the node energy router; Step 5: Use the energy router channel to transmit the information block to the power information collection main station, perform block analysis through the communication front-end, and form node block information on-chain storage management; Step 6: Each node transmits the power information block to the master station system through the power information block collection terminal unit, and the information is automatically uploaded to the chain to form a node block; Step 7: All power plants on the same transmission, substation and distribution trunk lines synchronize their information, establish a unified information reporting mechanism with the entire power grid, agree on the time and interval for synchronous information reporting, and broadcast it to each branch node. Each branch node is responsible for accounting and uploading information to the chain. In step 1, each node includes a time synchronization device, and the input information of each node includes the information of the upstream node; the information collected by the smart meter collection device includes the total power input of the node, the energy branch composition of the power and the corresponding energy power ratio, output branch and power information; Among them, the total power input of each node is composed of the power of each input branch: In the formula, represents the sum of the power generation of the j-th energy branch, c j is the jth type of energy; represents the power of the i-th node of the j-th energy source, n j Represents the total number of nodes in the j-th energy branch; The proportion of each energy branch to the total power is r c for: The node output power and the output power of each branch node are expressed as: In the formula, represents the total output power of the mth branch of a node, Indicates the total output power of a node; The output proportion of each type of energy in each branch output is: If a branch output node also includes other power inputs, the total power of the node together is: In the formula, p other represents the other power input included in the output branch node, p s Represents the total power of the output branch node; Then the output proportion of a certain type of energy in the output of a branch node is: In the formula, Indicates the power from Category C energy sources among other input powers.
2. The renewable energy green power source tracing method with information synchronization as claimed in claim 1, It is characterized in that In step 2, the node information processing terminal obtains the node information sent by the blockchain, and the node information includes the node name, node domain name and public key; the node information processing terminal generates the node i information block and the branch information block based on the node information to form the i node block at time t, and uses the public key to encrypt the node block information to obtain the encrypted information, and finally transmits the encrypted information through the network to the chain; In step 3, the end users under the branch node that do not perform power redistribution include user ID, time, consumption amount, and the power ratio of each type of energy consumed.
3. The renewable energy green power source tracing method with information synchronization as claimed in claim 1, It is characterized in that In step 4, the power information integration service design document and the data interaction file are obtained; the power information integration service design document and the data interaction file are parsed to generate a design model file and a data model file; Based on the design model file and the data model file, determine whether the power information integration service design document and the data interaction file comply with the power information integration technical specifications; If it meets the requirements, various types of power information integration are realized by deploying nodes of energy routers, and various power information blocks at time t are collected through node energy routers; In step 5, after the information block is transmitted to the power information collection main station using the channel of the energy router, the communication front-end obtains the information block to be parsed corresponding to the current batch from the blockchain to be parsed and responds to the block parsing operation of the current batch; Obtain the parsing time for the parsing operation of the current batch of blocks, and determine the parsing time adjustment coefficient based on the parsing time; adjust the parsing operation of the current batch of blocks based on the parsing time adjustment coefficient to form the node block information on-chain storage management.
4. The renewable energy green power source tracing method with information synchronization as claimed in claim 1, It is characterized in that In step 6, blocks are chained and stored in time sequence; The power information block acquisition terminal unit is equipped with various power information acquisition, remote transmission and node information unified management modules. The remote transmission relies on the power grid communication network transmission system and the communication channel of the communication operator. The main station system includes a communication front-end responsible for information acquisition and monitoring, and a blockchain underlying service system. In step seven, when the information synchronization process is started, the system receives synchronization information packets sent by all power plants on the same transmission, substation and distribution trunk lines, and interprets the synchronization information packets to obtain data update information; generates synchronization elements based on the update information, and establishes a unified information reporting mechanism with the entire power grid based on the synchronization elements; uses the information reporting mechanism to agree on the synchronization reporting time and interval, and broadcasts it to each branch node for accounting and information chain storage management.
5. A renewable energy green power source tracing system using the information synchronization renewable energy green power source tracing method according to any one of claims 1 to 4, It is characterized in that The information-synchronized renewable energy green power traceability system includes: An information block generation module, used to send the power generation and transmission nodes and the branch nodes as input / output information to the time synchronization device, and send the node information to the node information processing terminal to generate an information block; An information sending module is used to send information blocks to the power information collection terminal through network transmission, and send various power information blocks to the energy router through network transmission; The block analysis module is used to use the front-end block analysis to form node block information, and upload it to the information collection main station for storage and management, and broadcast it to the time synchronization device through the information collection main station.
6. A computer device, It is characterized in that The computer device includes a memory and a processor, the memory stores a computer program, and when the computer program is executed by the processor, the processor executes the steps of the information synchronized renewable energy green power tracing method as described in any one of claims 1 to 4.
7. A computer-readable storage medium storing a computer program, which, when executed by a processor, enables the processor to execute the steps of the information-synchronized renewable energy green power tracing method as described in any one of claims 1 to 4.