A method for evaluating the seismic stability of prestressed anchor-reinforced slopes

By establishing a dynamic damage mechanism and real-time displacement mode, decoupling the coupling relationship between yield acceleration and seismic displacement, the problem of inaccurate seismic displacement caused by yield acceleration being regarded as a constant in the prior art is solved, and the stability of the slope seismicity is achieved More accurate assessment.

CN116663274BActive Publication Date: 2024-11-08CHINA FOURTH ENG OF CHINA RAILWAY SEVENTH GROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310578358.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-05-22
Publication Date
2024-11-08
Estimated Expiration
2043-05-22

Smart Images

  • Figure CN116663274B_ABST
    Figure CN116663274B_ABST
Patent Text Reader

Abstract

The invention discloses a method for evaluating the seismic stability of a prestressed anchor rod reinforced slope, comprising the following steps: step 1, establishing a dynamic destruction mechanism of the prestressed anchor rod reinforced slope under earthquake action; step 2, establishing an instant displacement mode of the prestressed anchor rod reinforced slope under earthquake action, and obtaining a temporal recursive formula of the anchor rod axial force, anchoring angle, slope height and slope angle; step 3, deriving a change of the yield acceleration with time based on a limit analysis upper bound method; step 4, decoupling the coupling relationship between the yield acceleration and the seismic displacement based on a temporal analysis method, thereby obtaining a change of the yield acceleration of the prestressed anchor rod reinforced slope and a permanent seismic displacement; and step 5, evaluating the seismic stability of the prestressed anchor rod reinforced slope using the obtained permanent seismic displacement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of risk assessment of slopes and retaining structures caused by earthquake disasters, and in particular relates to a method for assessing the seismic stability of a slope reinforced with prestressed anchor rods. Background Art

[0002] Newmark proposed a slider model for calculating the seismic permanent deformation of slopes and suggested using seismic permanent deformation to evaluate the seismic stability of slopes. The Newmark slider model posits that when the seismic inertial force acting on the potential sliding body equals the yield resistance on the sliding surface, the corresponding seismic acceleration is the yield acceleration, and the seismic permanent deformation of the sliding body can be obtained by performing a quadratic time-history integration of the acceleration time-history curve that exceeds the yield acceleration of the sliding body. Currently, when calculating the seismic permanent displacement of prestressed anchor-reinforced slopes based on the Newmark theory, the yield acceleration is treated as a constant. However, since the actual yield acceleration changes dynamically, the seismic permanent displacement obtained by treating the yield acceleration as a constant is inaccurate, which may lead to erroneous conclusions when using seismic permanent deformation to evaluate the seismic stability of slopes.

[0003] Therefore, it is necessary to design a new seismic stability assessment method for prestressed anchor reinforced slopes. Summary of the Invention

[0004] The purpose of the present invention is to provide a method for evaluating the seismic stability of prestressed anchor-reinforced slopes, so as to solve the problem proposed in the background art that the seismic permanent displacement obtained by the calculation method that regards the yield acceleration as a constant is inaccurate, which may lead to erroneous conclusions when using seismic permanent deformation to evaluate the seismic stability of the slope.

[0005] To achieve the above object, the present invention provides a method for evaluating the seismic stability of a prestressed anchor reinforced slope, comprising the following steps:

[0006] Step 1: Establish the dynamic failure mechanism of prestressed anchor reinforcement slope under earthquake action;

[0007] Step 2: Establish the instantaneous displacement pattern of the prestressed anchor reinforced slope under earthquake action, and obtain the temporal recursive formula of the anchor axial force, anchor angle, slope height and slope angle;

[0008] Step 3: Derived the change of yield acceleration with time based on the upper bound method of limit analysis;

[0009] Step 4: Decouple the coupling relationship between yield acceleration and seismic displacement based on the temporal analysis method, thereby obtaining the change in yield acceleration of the prestressed anchor reinforced slope and the seismic permanent displacement;

[0010] Step 5: Use the obtained seismic permanent displacement to evaluate the seismic stability of the prestressed anchor reinforced slope.

[0011] In a specific embodiment, in step 1, the dynamic destruction mechanism is a dynamic destruction mechanism based on a temporally varying logarithmic spiral potential slip surface;

[0012] The mathematical expression of the potential slip surface of the logarithmic spiral at time t in polar coordinates is:

[0013]

[0014] Among them, R0(t) and θ0(t) are the polar radius and polar angle of the starting point of the potential slip surface, is the internal friction angle of the slope soil; R(t) and θ(t) are the polar radius and polar angle of any point on the potential slip surface; e is the base of the natural logarithm.

[0015] In a specific embodiment, in step 2, the temporal recursive formulas for the anchor axial force, anchoring angle, slope height, and slope angle are:

[0016]

[0017] Among them, β(t) and β(t+dt) are the slope angles at time t and time t+dt respectively; h(t) and h(t+dt) are the slope heights at time t and time t+dt respectively; ζ i (t+dt) is the anchor inclination angle of the i-th anchor at time t+dt; T i (t), T i (t+dt) are the axial forces of the i-th anchor at time t and time t+dt respectively; l i (t), l i (t+dt) are the lengths of the free section of the i-th anchor at time t and time t+dt respectively;

[0018] R h (t), θ h (t) is the polar radius and polar angle of the slope foot, R it (t), θ it (t) is the polar radius and polar angle of the intersection of the ith anchor and the potential slip surface; is the angular acceleration at time t; dt is the time element; z i (t), z i (t+dt) are the anchor positions of the i-th anchor at time t and time t+dt respectively; du x 、du z are the horizontal displacement and vertical displacement of the earthquake generated in the time element dt; E i 、A iare the elastic modulus and cross-sectional area of ​​the i-th anchor rod respectively.

[0019] In a specific embodiment, in step 3, the seismic load is expressed as inertial forces in the horizontal and vertical directions using the pseudo-static method. The dynamic equilibrium equation of the limit state is established based on the upper limit theory of limit analysis, that is, the internal energy dissipation power is equal to the external force power, and the yield acceleration at time t is obtained:

[0020]

[0021] Where c is the cohesion of the slope soil, is the internal friction angle of the slope soil, γ is the weight of the slope soil; λ is the ratio of vertical seismic force to horizontal seismic force; f1(t)~f6(t) are the coefficients of θ0(t) and θ h (t) are:

[0022]

[0023] R0(t) and θ0(t) are the polar radius and polar angle of the starting point of the potential slip surface, e is the base of the natural logarithm, and θ h (t) is the polar angle of the slope foot; T i (t) is the axial force of the i-th anchor at time t; θ it (t) is the polar angle of the intersection of the ith anchor and the potential slip surface; ζ i (t) is the anchor inclination angle of the i-th anchor at time t; L(t) is the length of the free section of the anchor; h(t) is the slope height at time t.

[0024] In a specific embodiment, based on the Newmark slider theory, combined with the dynamic failure mechanism and the instantaneous displacement mode, the coupling relationship between seismic displacement and yield acceleration is obtained:

[0025]

[0026] Where u is the earthquake displacement, k y is the yield acceleration;

[0027] Based on the extremely high sampling frequency of seismic data, the yield acceleration in each time step is regarded as the yield acceleration at the start of the time step to decouple the coupling relationship between seismic displacement and yield acceleration. The mathematical expressions of horizontal seismic displacement and vertical seismic displacement in each time step are:

[0028]

[0029] Among them, k h (t) is the ground acceleration at time t obtained by sampling, k y(t) is the yield acceleration at time t obtained through calculation; Δt is the sampling time interval; u xj is the horizontal earthquake displacement in the jth time step; u zj is the vertical earthquake displacement in the jth time step.

[0030] In a specific implementation, in step 4, the permanent earthquake displacement is regarded as the sum of the earthquake displacements at each time step, that is:

[0031]

[0032] u xj is the horizontal earthquake displacement in the jth time step; u zj is the vertical earthquake displacement in the jth time step.

[0033] In a specific embodiment, in step 5, the earthquake permanent displacement is used to set a threshold value of earthquake permanent deformation. When the deformation generated during the earthquake exceeds the threshold value of earthquake permanent deformation, it can be assessed that the slope reinforced with prestressed anchor rods is unstable.

[0034] Compared with the prior art, the present invention has the following beneficial effects:

[0035] The present invention establishes a practical method for calculating the permanent seismic displacement of prestressed anchor-reinforced slopes. By obtaining the changes in the anchor axial force, anchoring angle, slope height and slope angle as the earthquake lasts, the temporal change of the yield acceleration is obtained. The seismic permanent displacement of the prestressed anchor-reinforced slope calculated using the relevant parameters is more accurate, thereby enabling a more accurate assessment of the seismic stability of the prestressed anchor-reinforced slope.

[0036] This invention provides a practical, accurate, and easily generalizable method for calculating the permanent displacement of prestressed anchor-reinforced slopes during earthquakes. By establishing the dynamic failure mechanism and instantaneous displacement pattern of prestressed anchor-reinforced slopes under earthquakes, and decoupling the coupling relationship between yield acceleration and seismic displacement using temporal analysis, the yield acceleration change and seismic permanent displacement of prestressed anchor-reinforced slopes are derived. This facilitates the use of seismic permanent displacement to assess the seismic stability of prestressed anchor-reinforced slopes.

[0037] In addition to the above-described objects, features and advantages, the present invention has other objects, features and advantages. The present invention will be further described in detail below with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] The accompanying drawings, which constitute part of this application, are intended to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are intended to explain the present invention and do not constitute an undue limitation of the present invention. In the accompanying drawings:

[0039] Figure 1 is a flow chart of obtaining permanent seismic displacement according to an embodiment of the present invention;

[0040] Figure 2 Schematic diagram of a dynamic failure mechanism of a prestressed anchor reinforced slope at time t according to an embodiment of the present invention;

[0041] Figure 3 It is a schematic diagram of the instantaneous displacement mode of a prestressed anchor rod reinforced slope according to an embodiment of the present invention. DETAILED DESCRIPTION

[0042] The embodiments of the present invention are described in detail below with reference to the accompanying drawings. The specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0043] Example 1

[0044] A method for evaluating the seismic stability of a prestressed anchor reinforced slope comprises the following steps:

[0045] Step 1: Establish the dynamic failure mechanism of prestressed anchor reinforced slope under earthquake action.

[0046] In step 1, the dynamic destruction mechanism is a dynamic destruction mechanism based on a temporally changing logarithmic spiral potential slip surface;

[0047] The mathematical expression of the potential slip surface of the logarithmic spiral at time t in polar coordinates is:

[0048]

[0049] Among them, R0(t) and θ0(t) are the polar radius and polar angle of the starting point of the potential slip surface, is the internal friction angle of the slope soil; R(t) and θ(t) are the polar radius and polar angle of any point on the potential slip surface; e is the base of the natural logarithm.

[0050] Step 2: Establish the instantaneous displacement pattern of the prestressed anchor reinforced slope under earthquake action, and obtain the temporal recursive formula of the anchor axial force, anchoring angle, slope height and slope angle.

[0051] In step 2, the temporal recursive formulas for the anchor axial force, anchoring angle, slope height, and slope angle are:

[0052]

[0053] Among them, β(t) and β(t+dt) are the slope angles at time t and time t+dt respectively; h(t) and h(t+dt) are the slope heights at time t and time t+dt respectively; ζ i (t+dt) is the anchor inclination angle of the i-th anchor at time t+dt; Ti (t), T i (t+dt) are the axial forces of the i-th anchor at time t and time t+dt respectively; l i (t), l i (t+dt) are the lengths of the free section of the i-th anchor at time t and time t+dt respectively;

[0054] R h (t), θ h (t) is the polar radius and polar angle of the slope foot, R it (t), θ it (t) is the polar radius and polar angle of the intersection of the ith anchor and the potential slip surface; is the angular acceleration at time t; dt is the time element; z i (t), z i (t+dt) are the anchor positions of the i-th anchor at time t and time t+dt respectively; du x 、du z are the horizontal displacement and vertical displacement of the earthquake generated in the time element dt; E i 、A i are the elastic modulus and cross-sectional area of ​​the i-th anchor rod respectively.

[0055] According to the recursive formula, the slope angle, slope height, anchor inclination and anchor axial force at the end of a time step (t+dt) can be obtained based on the slope angle, slope height, anchor inclination and anchor axial force at the starting time (t) of a time step and the seismic displacement of the time step, that is, the slope angle, slope height, anchor inclination and anchor axial force at the starting time (t+dt) of the next time step.

[0056] Step 3: Derived the change of yield acceleration with time based on the upper bound method of limit analysis;

[0057] In step 3, the seismic load is expressed as lateral and longitudinal inertial forces using the pseudo-static method. The dynamic equilibrium equation of the limit state is established based on the upper limit theory of limit analysis, that is, the internal energy dissipation power is equal to the external force power, and the yield acceleration at time t is obtained:

[0058]

[0059] Where c is the cohesion of the slope soil, is the internal friction angle of the slope soil, γ is the weight of the slope soil; λ is the ratio of vertical seismic force to horizontal seismic force; f1(t)~f6(t) are the coefficients of θ0(t) and θ h (t) are:

[0060]

[0061] R0(t) and θ0(t) are the polar radius and polar angle of the starting point of the potential slip surface, e is the base of the natural logarithm, and θ h (t) is the polar angle of the slope foot; T i (t) is the axial force of the i-th anchor at time t; θ it (t) is the polar angle of the intersection of the ith anchor and the potential slip surface; ζ i (t) is the anchor inclination angle of the i-th anchor at time t; L(t) is the length of the free section of the anchor; h(t) is the slope height at time t.

[0062] Step 4: Based on the Newmark slider theory, combined with the dynamic failure mechanism and instantaneous displacement mode, the coupling relationship between earthquake displacement and yield acceleration is obtained:

[0063] Where u is the earthquake displacement, k y is the yield acceleration;

[0064] The table below shows the ground acceleration data obtained by high-frequency sampling of a seismic wave. The recording starts at time 0, with a time step of 0.02 seconds.

[0065] Time(s) <![CDATA[Ground seismic acceleration (m / s 2 )]]> Time(s) <![CDATA[Ground motion acceleration (m / s 2 )]]> 0 -0.00579793377071016 0.18 -0.0041470161412294 0.02 -0.00559661995947501 0.2 -0.00393423321763169 0.04 -0.00566401598548107 0.22 -0.00989345570626342 0.06 -0.00519601895748592 0.24 -0.00557096574118411 0.08 -0.00500547574890629 0.26 -0.00361658788583567 0.1 -0.00595307407893206 0.28 -0.00622644138676887 0.12 -0.0046535646089326 0.3 0.000125380450915067 0.14 -0.00445236456500866 0.32 -0.000746827635227709 0.16 -0.00743396515994504

[0066] Based on the extremely high sampling frequency of seismic data, the yield acceleration in each time step is regarded as the yield acceleration at the start of the time step to decouple the coupling relationship between seismic displacement and yield acceleration. The mathematical expressions of horizontal seismic displacement and vertical seismic displacement in each time step are:

[0067]

[0068] Among them, k h (t) is the ground acceleration at time t obtained by sampling, k y (t) is the yield acceleration at time t obtained through calculation; Δt is the sampling time interval; u xj is the horizontal earthquake displacement in the jth time step; u zj is the vertical earthquake displacement in the jth time step.

[0069] The permanent earthquake displacement is regarded as the sum of the earthquake displacements at each time step, that is:

[0070]

[0071]

[0072] Step 5: Use the obtained seismic permanent displacement to evaluate the seismic stability of the prestressed anchor reinforced slope.

[0073] In step 5, the earthquake permanent displacement is used to set a threshold value of earthquake permanent deformation. When the deformation generated during the earthquake exceeds the threshold value of earthquake permanent deformation, it can be assessed that the slope reinforced with prestressed anchor rods is unstable.

[0074] When conducting seismic stability assessment of prestressed anchor reinforced slopes,

[0075] By measuring the anchor axial force, anchoring angle, slope height and slope angle at the start of the first time step, and establishing the dynamic failure mechanism of the first time step,

[0076] Based on the upper limit theory of limit analysis, the yield acceleration at the start of the first time step is calculated. Based on the Newmark slider theory, the seismic displacement within the first time step is calculated by inputting the seismic motion data and treating the yield acceleration of the first time step as the yield acceleration at the start of the first time step.

[0077] Establish an instant displacement pattern within the first time step, and obtain the temporal recursive formula for slope angle, slope height, anchor rod inclination angle, and anchor rod axial force. According to the recursive formula, substitute the obtained earthquake displacement within the first time step and the anchor rod axial force, anchoring angle, slope height, and slope angle at the start of the first time step to obtain the anchor rod axial force, anchoring angle, slope height, and slope angle at the end of the first time step. The anchor rod axial force, anchoring angle, slope height, and slope angle at the end of the first time step are the anchor rod axial force, anchoring angle, slope height, and slope angle at the start of the second time step.

[0078] Substitute the anchor axial force, anchor angle, slope height and slope angle at the start of the second time step to establish the dynamic failure mechanism of the second time step, calculate the yield acceleration at the start of the second time step, and calculate the seismic displacement within the second time step by considering the yield acceleration of the second time step as the yield acceleration at the start of the second time step.

[0079] By analogy, the slope angle, slope height, anchor inclination and anchor axial force at the start and end of all time steps, as well as the yield acceleration at the start of all time steps and the seismic displacement within each time step are obtained; the superposition of the seismic displacements generated in each time step is the permanent earthquake displacement.

[0080] The obtained earthquake permanent displacement is used to set the threshold of earthquake permanent deformation. When the deformation generated by the earthquake exceeds the threshold of earthquake permanent deformation, it can be assessed that the slope reinforced with prestressed anchor rods is unstable; when the deformation generated by the earthquake does not exceed the threshold of earthquake permanent deformation, it can be assessed that the slope reinforced with prestressed anchor rods is stable.

[0081] The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and the specific implementation of the present invention should not be considered to be limited to these descriptions. For those skilled in the art of the present invention, several simple deductions and substitutions can be made without departing from the concept of the present invention, and all of these should be considered to fall within the scope of protection of the present invention.

Claims

1. A method for evaluating the seismic stability of a prestressed anchor reinforced slope, characterized in that: The steps include: Step 1: Establish the dynamic failure mechanism of prestressed anchor reinforcement slope under earthquake action; Step 2: Establish the instant displacement mode of the prestressed anchor reinforced slope under earthquake action, and obtain the temporal recursive formula of the anchor axial force, anchoring angle, slope height and slope angle; Step 3, derive the change of yield acceleration with time based on the upper bound method of limit analysis; In step 3, the earthquake load is expressed as lateral and longitudinal inertial forces by the pseudo-static method, and the dynamic equilibrium equation of the limit state is established based on the upper limit theory of limit analysis, that is, the internal energy dissipation power is equal to the external force power, and the yield acceleration at time t is obtained: Where c is the cohesion of the slope soil, is the internal friction angle of the slope soil, γ is the weight of the slope soil; λ is the ratio of vertical seismic force to horizontal seismic force; f1(t)~f6(t) are the coefficients of θ0(t) and θ h The functions of (t) are: R0(t) and θ0(t) are the polar radius and polar angle of the starting point of the potential slip surface, e is the base of the natural logarithm, and θ h (t) is the polar angle of the slope foot; T i (t) is the axial force of the i-th anchor bolt at time t; θ it (t) is the polar angle of the intersection of the ith anchor and the potential slip surface; ζ i (t) is the inclination angle of the i-th anchor at time t; L(t) is the length of the free section of the anchor; h(t) is the slope height at time t; β(t) is the slope angle at time t; Step 4: Decouple the coupling relationship between yield acceleration and seismic displacement based on the temporal analysis method, so as to obtain the change of yield acceleration of the prestressed anchor reinforced slope and the permanent displacement of the earthquake; Step 5: Use the obtained seismic permanent displacement to evaluate the seismic stability of the prestressed anchor reinforced slope.

2. The seismic stability assessment method for prestressed anchor reinforced slope according to claim 1, characterized in that: In the step 1, the dynamic failure mechanism is a dynamic failure mechanism based on a temporally changing logarithmic spiral potential slip surface; The mathematical expression of the potential slip surface of the logarithmic spiral at time t in polar coordinates is: Among them, R0(t) and θ0(t) are the polar radius and polar angle of the starting point of the potential slip surface. is the internal friction angle of the slope soil; R(t) and θ(t) are the polar radius and polar angle of any point on the potential sliding surface; e is the base of the natural logarithm.

3. The seismic stability assessment method for prestressed anchor reinforced slope according to claim 1, characterized in that: In step 2, the temporal recursive formulas for the anchor axial force, anchor angle, slope height and slope angle are: Among them, β(t+dt) is the slope angle at time t+dt; h(t) and h(t+dt) are the slope heights at time t and time t+dt respectively; ζ i (t+dt) is the anchor inclination angle of the i-th anchor at time t+dt; T i (t), T i (t+dt) are the axial forces of the i-th anchor at time t and time t+dt respectively; l i (t), l i (t+dt) are the lengths of the free section of the i-th anchor at time t and time t+dt respectively; R h (t),θ h (t) is the polar radius and polar angle of the slope foot, R it (t),θ it (t) is the polar radius and polar angle of the intersection of the ith anchor and the potential slip surface; is the angular acceleration at time t; dt is the time unit; z i (t), z i (t+dt) are the anchor positions of the i-th anchor at time t and time t+dt respectively; du x 、 z are the horizontal displacement and vertical displacement of the earthquake generated in the time element dt respectively; E i , A i are the elastic modulus and cross-sectional area of ​​the i-th anchor respectively.

4. The seismic stability assessment method for prestressed anchor reinforced slope according to claim 1, characterized in that: Based on the Newmark slider theory, combined with the dynamic failure mechanism and instant displacement mode, the coupling relationship between earthquake displacement and yield acceleration is obtained: Where u is the earthquake displacement, k y is the yield acceleration; Based on the extremely high sampling frequency of seismic data, the yield acceleration in each time step is regarded as the yield acceleration at the start of the time step to decouple the coupling relationship between seismic displacement and yield acceleration, and the mathematical expressions of horizontal seismic displacement and vertical seismic displacement in each time step are obtained: Among them, k h (t) is the ground acceleration at time t obtained by sampling, k y (t) is the yield acceleration at time t obtained through calculation; Δt is the sampling time interval; u xj is the horizontal earthquake displacement in the jth time step; u zj is the vertical seismic displacement in the jth time step.

5. The seismic stability assessment method for prestressed anchor reinforced slope according to claim 4, characterized in that: In step 4, the permanent earthquake displacement is regarded as the sum of the earthquake displacements at each time step, that is: u xj is the horizontal earthquake displacement in the jth time step; u zj is the vertical seismic displacement in the jth time step.

6. The seismic stability assessment method for prestressed anchor reinforced slope according to claim 1, characterized in that: In step 5, the earthquake permanent displacement is used to set a threshold of earthquake permanent deformation. When the deformation generated during an earthquake exceeds the threshold of earthquake permanent deformation, it can be evaluated that the slope reinforced with prestressed anchor rods is unstable.