A steel plate transportation management method, device, equipment and medium based on blockchain

By using blockchain technology to store and verify relevant information during steel plate transportation, the problem of missing records caused by manual recording is solved, the efficiency and accuracy of transportation management are improved, and the traceability of the transportation process is ensured.

CN116703278BActive Publication Date: 2024-12-06GUANGZHOU SHIPYARD INTERNATIONAL LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310778293.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-06-28
Publication Date
2024-12-06
Estimated Expiration
2043-06-28

AI Technical Summary

Technical Problem

In the prior art, manual recording during steel plate transportation may lead to missing records, resulting in low efficiency and accuracy of transportation management, and the lack of missing records cannot be effectively traced.

Method used

Adopt the blockchain-based steel plate transportation management method, and store and verify the information of lifting steel plates through different blockchains to ensure the accuracy and completeness of the transportation process and improve traceability and management efficiency.

Benefits of technology

Blockchain technology ensures the record integrity and accuracy of the steel plate transportation process, improves the efficiency and traceability of transportation management, reduces manual errors, and enhances the credibility of data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116703278B_ABST
    Figure CN116703278B_ABST
Patent Text Reader

Abstract

The present application discloses a steel plate transportation management method, device, equipment and medium based on blockchain, and the present application belongs to the field of Internet of Things technology. The method includes: in response to the operation instruction of steel plate lifting, at least one steel plate in the starting pile is lifted, and the steel plate information of the lifted steel plate, the starting pile information, the identity information of the transport vehicle, and the lifting timestamp are obtained, and stored in the first blockchain; the path pile information, steel plate information and path timestamp in the steel plate transportation process are obtained, and stored in the second blockchain; the target pile information, steel plate information and arrival timestamp of the steel plate transported to the target pile are obtained, and stored in the third blockchain; the lifting information is verified based on the first blockchain, the second blockchain and the third blockchain. If the verification is passed, it is determined that the transportation of the lifted steel plate is completed. This scheme can ensure the accuracy and completeness of the lifting process record, and improve the traceability of the steel plate transportation process and the efficiency of steel plate transportation management.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the field of Internet of Things technology, and specifically relates to a steel plate transportation management method, device, equipment and medium based on blockchain. Background Art

[0002] The transportation process of steel plates involves multiple links, including the transfer from the manufacturer to the yard, and the transfer of steel plates between different piles in the yard. In order to ensure that the transfer process of each steel plate is accurately recorded and tracked, and to ensure the accuracy of the storage and transportation of the steel plates, a transfer record of the steel plates is established.

[0003] In the prior art, during the transportation of steel plates, it is necessary to manually record the starting stacking position, the passing stacking position and the target stacking position of the steel plates, the number and serial number of the transported steel plates, and the transport vehicles used, and then synchronize this information into a database to establish a transfer record of the steel plates. When querying the transfer record of a certain steel plate, it is necessary to manually query the database based on the steel plate serial number information as the query condition.

[0004] However, manual recording may result in missing records. If part of the record of a steel plate is missing, the record of the corresponding stacking position of the steel plate during transportation may also be wrong. In addition, the missing records cannot be traced back through manual recording, resulting in low efficiency and accuracy of steel plate transportation management. Therefore, how to automatically record the transfer process of steel plates, improve the traceability of the steel plate transportation process, and improve the efficiency and accuracy of steel plate transportation management are issues that need to be urgently addressed in this field. Summary of the invention

[0005] The embodiments of the present application provide a steel plate transportation management method, device, equipment and medium based on blockchain, the purpose of which is to solve the problem in the prior art that the steel plate transportation process is manually recorded, and the missing records cannot be traced, resulting in low efficiency and accuracy of steel plate transportation management. Through the blockchain-based steel plate transportation management method, the lifting information is verified based on different blockchains to ensure the accuracy and completeness of the entire lifting process record. By storing the information of the lifted steel plate, the path stacking information and the target stacking information in different blockchains, the traceability of the steel plate transportation process and the efficiency of steel plate transportation management can be improved.

[0006] In a first aspect, an embodiment of the present application provides a steel plate transportation management method based on blockchain, the method comprising:

[0007] In response to the operation instruction of lifting the steel plate, at least one steel plate in the starting pile is lifted, and the steel plate information of the lifted steel plate, the starting pile information, the identity information of the transport vehicle, and the lifting timestamp are obtained, and stored in the first blockchain;

[0008] Obtain the route stacking information, steel plate information and route timestamp during the steel plate transportation process, and store them in the second blockchain;

[0009] Obtain the target location information, steel plate information and arrival timestamp of the steel plate transported to the target location, and store them in the third blockchain;

[0010] The lifting information is verified based on the first blockchain, the second blockchain and the third blockchain. If the verification passes, it is determined that the transportation of the lifted steel plate is completed.

[0011] Furthermore, if the verification is passed, after it is determined that the transportation of the hoisted steel plate is completed, the method further includes:

[0012] Determine the lifting path information according to the first blockchain, the second blockchain, and the third blockchain;

[0013] Obtaining feasible path information from the starting stack location to the target stack location, and determining distance information of each path according to the feasible path information;

[0014] Determine the shortest path according to the distance information;

[0015] If the lifting path information coincides with the shortest path, determining to keep the lifting path information;

[0016] If the lifting path information does not overlap with the shortest path, the lifting path information is updated based on the shortest path.

[0017] Furthermore, after verifying the lifting information based on the first blockchain, the second blockchain, and the third blockchain, the method further includes:

[0018] If the verification fails, the verification failure type is determined;

[0019] If it is the first failure type, obtaining feasible path information from the starting stack location to the target stack location, and determining distance information of each path according to the feasible path information;

[0020] Determine the lifting path information according to the lifting timestamp, the arrival timestamp, the distance information of each path, and the speed information of the transport vehicle when performing the transport task;

[0021] According to the lifting path information and the speed information, the missing path stacking information and path timestamp in the second blockchain are supplemented.

[0022] Furthermore, after completing the missing path stack information and path timestamp in the second blockchain, the method further includes:

[0023] Determine the shortest path according to the distance information;

[0024] If the lifting path information coincides with the shortest path, determining to keep the lifting path information;

[0025] If the lifting path information does not overlap with the shortest path, the lifting path information is updated based on the shortest path.

[0026] Furthermore, after determining the verification failure type, the method further includes:

[0027] If it is the second failure type, the lifting path information is determined according to the path and stacking information of the steel plate during transportation;

[0028] Determine the distance information between the stacking positions in each path in the lifting path information;

[0029] The lost route timestamp in the second blockchain is supplemented according to the lifting timestamp, the arrival timestamp, the distance information, and the speed information of the transport vehicle when performing the transport task.

[0030] Furthermore, after storing in the second blockchain, the method further includes:

[0031] Acquire the real-time weight information of the steel plate during transportation, and confirm whether the plate drop event occurs according to the real-time weight information;

[0032] If a board drop event occurs, obtain the board drop timestamp;

[0033] The location of the dropped steel plate is determined according to the timestamp of the dropped steel plate and the timestamp of the route, and the steel plate information of the dropped steel plate is determined according to the real-time weight information and the steel plate information of the hoisted steel plate, and the second blockchain and the third blockchain are updated based on the steel plate information of the dropped steel plate.

[0034] Furthermore, before obtaining the feasible path information from the starting stack location to the target stack location, the method further includes:

[0035] Acquire stacking information, and establish a stacking information storage table based on the stacking information; wherein the stacking information includes stacking identification information and stacking position information;

[0036] Accordingly, obtaining feasible path information from the starting stack location to the target stack location includes:

[0037] The feasible path information from the starting stack location to the target stack location is determined according to the stack location information storage table.

[0038] In a second aspect, an embodiment of the present application provides a steel plate transportation management device based on blockchain, the device comprising:

[0039] The first blockchain storage module is used to respond to the operation instruction of lifting the steel plate, lift at least one steel plate in the starting pile, obtain the steel plate information of the lifted steel plate, the starting pile information, the identity information of the transport vehicle, and the lifting timestamp, and store them in the first blockchain;

[0040] The second blockchain storage module is used to obtain the route stacking information, steel plate information and route timestamp during the transportation of the steel plate, and store them in the second blockchain;

[0041] The third blockchain storage module is used to obtain the target stacking location information, steel plate information and arrival timestamp of the steel plate transported to the target stacking location, and store them in the third blockchain;

[0042] The lifting information verification module is used to verify the lifting information based on the first blockchain, the second blockchain and the third blockchain. If the verification is passed, it is determined that the transportation of the lifted steel plate is completed.

[0043] Furthermore, the device further includes a path optimization module, and the path optimization module is used to:

[0044] Determine the lifting path information according to the first blockchain, the second blockchain, and the third blockchain;

[0045] Obtaining feasible path information from the starting stack location to the target stack location, and determining distance information of each path according to the feasible path information;

[0046] Determine the shortest path according to the distance information;

[0047] If the lifting path information coincides with the shortest path, determining to keep the lifting path information;

[0048] If the lifting path information does not overlap with the shortest path, the lifting path information is updated based on the shortest path.

[0049] Furthermore, the device further includes a first failure type determination module, wherein the first failure type determination module is configured to:

[0050] If the verification fails, the verification failure type is determined;

[0051] If it is the first failure type, obtaining feasible path information from the starting stack location to the target stack location, and determining distance information of each path according to the feasible path information;

[0052] Determine the lifting path information according to the lifting timestamp, the arrival timestamp, the distance information of each path, and the speed information of the transport vehicle when performing the transport task;

[0053] According to the lifting path information and the speed information, the missing path stacking information and path timestamp in the second blockchain are supplemented.

[0054] Furthermore, the device further comprises a lifting path information updating module, and the lifting path information updating module is used to:

[0055] Determine the shortest path according to the distance information;

[0056] If the lifting path information coincides with the shortest path, determining to keep the lifting path information;

[0057] If the lifting path information does not overlap with the shortest path, the lifting path information is updated based on the shortest path.

[0058] Furthermore, the device further includes a second failure type determination module, wherein the second failure type determination module is configured to:

[0059] If it is the second failure type, the lifting path information is determined according to the path and stacking information of the steel plate during transportation;

[0060] Determine the distance information between the stacking positions in each path in the lifting path information;

[0061] The lost route timestamp in the second blockchain is supplemented according to the lifting timestamp, the arrival timestamp, the distance information, and the speed information of the transport vehicle when performing the transport task.

[0062] Furthermore, the device further includes a board drop event determination module, and the board drop event determination module is used to:

[0063] Acquire the real-time weight information of the steel plate during transportation, and confirm whether the plate drop event occurs according to the real-time weight information;

[0064] If a board drop event occurs, obtain the board drop timestamp;

[0065] The location of the dropped steel plate is determined according to the timestamp of the dropped steel plate and the timestamp of the route, and the steel plate information of the dropped steel plate is determined according to the real-time weight information and the steel plate information of the hoisted steel plate, and the second blockchain and the third blockchain are updated based on the steel plate information of the dropped steel plate.

[0066] Furthermore, the device also includes a stacking information storage table establishment module, and the stacking information storage table establishment module is used to:

[0067] Acquire stacking information, and establish a stacking information storage table based on the stacking information; wherein the stacking information includes stacking identification information and stacking position information;

[0068] Accordingly, obtaining feasible path information from the starting stack location to the target stack location includes:

[0069] The feasible path information from the starting stack location to the target stack location is determined according to the stack location information storage table.

[0070] In a third aspect, an embodiment of the present application provides an electronic device, which includes a processor, a memory, and a program or instruction stored in the memory and executable on the processor, wherein the program or instruction, when executed by the processor, implements the steps of the method described in the first aspect.

[0071] In a fourth aspect, an embodiment of the present application provides a readable storage medium, on which a program or instruction is stored, and when the program or instruction is executed by a processor, the steps of the method described in the first aspect are implemented.

[0072] In a fifth aspect, an embodiment of the present application provides a chip, comprising a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is used to run a program or instruction to implement the method described in the first aspect.

[0073] In an embodiment of the present application, in response to an operation instruction for lifting a steel plate, at least one steel plate at the starting pile is lifted, and the steel plate information of the lifted steel plate, the starting pile information, the identity information of the transport vehicle, and the lifting timestamp are obtained and stored in the first blockchain; the path pile information, steel plate information, and path timestamp during the transportation of the steel plate are obtained and stored in the second blockchain; the target pile information, steel plate information, and arrival timestamp of the steel plate transported to the target pile are obtained and stored in the third blockchain; the lifting information is verified based on the first blockchain, the second blockchain, and the third blockchain. If the verification is passed, it is determined that the transportation of the lifted steel plate is completed. Through the above-mentioned blockchain-based steel plate transportation management method, the lifting information verification is performed based on different blockchains, which can ensure the accuracy and completeness of the entire lifting process record. By storing the information of the lifted steel plate, the path pile information, and the target pile information in different blockchains, the traceability of the steel plate transportation process and the efficiency of steel plate transportation management can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0074] Figure 1 This is a flow chart of the steel plate transportation management method based on blockchain provided in Example 1 of the present application;

[0075] Figure 2This is a flow chart of the steel plate transportation management method based on blockchain provided in Example 2 of the present application;

[0076] Figure 3 It is a structural schematic diagram of a steel plate transportation management device based on blockchain provided in Example 3 of the present application;

[0077] Figure 4 It is a schematic diagram of the structure of the electronic device provided in Example 4 of the present application. DETAILED DESCRIPTION

[0078] In order to make the purpose, technical scheme and advantages of the present application clearer, the specific embodiments of the present application are further described in detail below in conjunction with the accompanying drawings. It is understood that the specific embodiments described herein are only used to explain the present application, rather than to limit the present application. It should also be noted that, for the convenience of description, only the part related to the present application but not all the contents are shown in the accompanying drawings. Before discussing the exemplary embodiments in more detail, it should be mentioned that some exemplary embodiments are described as processes or methods depicted as flow charts. Although the flow chart describes each operation (or step) as a sequential process, many of the operations therein can be implemented in parallel, concurrently or simultaneously. In addition, the order of each operation can be rearranged. The process can be terminated when its operation is completed, but it can also have additional steps not included in the accompanying drawings. The process can correspond to a method, a function, a procedure, a subroutine, a subprogram, etc.

[0079] The following will be combined with the drawings in the embodiments of the present application to clearly describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application belong to the scope of protection of this application.

[0080] The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.

[0081] In combination with the accompanying drawings, the blockchain-based steel plate transportation management method, device, equipment and medium provided in the embodiments of the present application are described in detail through specific embodiments and their application scenarios.

[0082] Embodiment 1

[0083] Figure 1 : is a flow chart of the steel plate transportation management method based on blockchain provided in Example 1 of the present application. Figure 1 As shown, the specific steps include:

[0084] S101, in response to an operation instruction for lifting a steel plate, lift at least one steel plate in a starting pile, obtain steel plate information of the lifted steel plate, starting pile information, identity information of the transport vehicle, and a lifting timestamp, and store them in the first blockchain.

[0085] First of all, the usage scenario of this solution can be to record and store the lifting information, route information and arrival information respectively during the transportation of steel plates, and verify the steel plate transfer records based on the above information to determine whether there is a scenario of data loss.

[0086] Based on the above usage scenarios, it can be understood that the executor of the present application can be a blockchain-based steel plate transportation management system that integrates the recording of the steel plate transfer process and determines whether there is data loss based on the transfer records. No excessive limitations are made here.

[0087] In this solution, the steel plate may be a ship-grade steel plate, which may be a steel plate specially used for shipbuilding and needs to meet the standards and specifications set by international classification societies. These specifications and standards may include requirements for the chemical composition, mechanical properties, dimensional tolerances, welding properties, impact toughness, and corrosion resistance of the steel plate. Ship-grade steel plates usually have higher tensile strength, yield strength, and impact toughness.

[0088] The operation instruction may be an instruction for the lifting equipment to select at least one steel plate in the starting pile, suspend or lift it, and move it to the target position according to the instruction requirements.

[0089] The starting stacking position may be the initial stacking position of the steel plates, and specifically, may be a specific area, storage unit or a specific position in a warehouse.

[0090] Steel plate information may include steel plate entity information and steel plate identification information, wherein the steel plate entity information may include information such as the size, weight, material and grade of the steel plate. The size of the steel plate may include length, width and thickness. Length refers to the length of the long side of the steel plate, width refers to the length of the short side of the steel plate, and thickness refers to the thickness of the steel plate or the thickness of the plate. The size may be expressed in cm, for example, the length of the steel plate is 300 cm, the width is 100 cm, and the thickness is 3 cm.

[0091] The weight of the steel plate may refer to the total weight of the steel plate, which may be expressed in kg. For example, the total weight of the steel plate is 2000 kg.

[0092] The material of the steel plate may be the specific steel grade or material type used for the steel plate, which may include carbon steel, stainless steel, alloy steel and the like.

[0093] The steel plate grades of general strength hull structures can be divided into four grades: A, B, C, and D. The yield strength and tensile strength of these four grades of steel are the same, but the impact energy at different temperatures is different; among them, the yield strength is not less than 235N / mm 2 , tensile strength is 400~520N / mm 2 within the range.

[0094] High-strength steel for hull structures is divided into steel plate strength grades according to its minimum yield strength, and each strength grade is divided into four grades: A, D, E, and F according to its impact toughness.

[0095] The yield strength of A32, D32, E32 and F32 is not less than 315N / mm 2 , tensile strength is 440~570N / mm 2 , A, D, E, and F represent the impact toughness that can be achieved at 0°, -20°, -40°, and -60°, respectively;

[0096] The yield strength of A36, D36, E36, F36 is not less than 355N / mm 2 , the tensile strength is 490~~620N / mm2, A, D, E, F represent the impact toughness that can be achieved at 0°, -20°, -40°, -60° respectively;

[0097] The yield strength of A40, D40, E40 and F40 is not less than 390N / mm 2 , tensile strength is 510~660N / mm 2 , A, D, E, and F represent the impact toughness that can be achieved at 0°, -20°, -40°, and -60°, respectively.

[0098] The steel plate identification information may be the numbering information of the steel plate, which may be a unique number for identifying and tracking the identity of the steel plate, and may be composed of a serial number, a batch number, and a steel plate identification code. Among them, the serial number may be the sequential number of the steel plate in a specific batch or production sequence, and is used to distinguish the sequential relationship between different steel plates. It may be allocated according to the production sequence and the time sequence.

[0099] The batch number may be a number that identifies the production batch to which the steel plate belongs, and is used to distinguish different batches of steel plates, and may be associated with a specific production time, production process or other attributes.

[0100] The steel plate identification code can be a code used to uniquely identify and recognize the steel plate, which can be a combination of a set of characters, numbers or symbols to distinguish the identity of each steel plate. For example, if the steel plate serial number is 1001, the batch number is 20230620, and the steel plate identification code is abc123, then the steel plate number information can be 100120230620abc123.

[0101] The starting stacking position information may include the position information and numbering information of the starting stacking position. The position information may be the three-dimensional coordinates of the stacking position in the yard, wherein the position of the stacking position in the horizontal direction may be represented by X, the position of the stacking position in the vertical direction may be represented by Y, the height of the stacking position in the vertical direction may be represented by Z, and the unit length may be represented by m. For example, if the origin of the three-dimensional coordinate system of the yard is at the exact center of the first floor of the yard, it is stipulated that the positive direction of the X axis is from left to right, the positive direction of the Y axis is from back to front, and the positive direction of the Z axis is from bottom to top, if the height of each layer of stacking position is 3m, there is a stacking position located on the second floor of the yard, and this stacking position is 8m to the left of the origin and 2m in front of the origin, then the three-dimensional coordinates of this stacking position may be represented as (-8, 2, 3).

[0102] The numbering information may be a unique number for identifying and recognizing each stacking position. Specifically, the yard may be divided into multiple areas, and the numbering information may be represented in the form of the area where the stacking position is located - the layer where the stacking position is located - the row where the stacking position is located - the column where the stacking position is located. For example, there are six areas A to F in the yard, and the yard has three layers, each layer has two areas, and each area has ten rows and ten columns. If a stacking position is numbered A123, it means that the stacking position is located at the 2nd row and 3rd column of the 1st layer area A.

[0103] The identity information of the transport vehicle can be the frame number of the transport vehicle. The frame number is a unique identifier used to identify and distinguish different vehicles. The frame number usually consists of a series of numbers and letters, and the length can be different, usually 17 characters. The frame number is the identification of the vehicle. Through the frame number, detailed information and history of the vehicle can be obtained, including the manufacturer, model, production year, engine type, body color, and configuration options.

[0104] The lifting timestamp can refer to the system time when the steel plate is lifted. It is a time mark used to record the time of the lifting operation and can be expressed in the form of a combination of date and time. For example, if the lifting time is 10:00:00 on June 20, 2023, the lifting timestamp can be expressed as 2023-06-20-10-00-00.

[0105] Blockchain is a distributed database that records and stores data through ever-increasing blocks. Each block contains a certain amount of data and a link to the previous block, forming an unalterable data chain. The first blockchain can be a block that stores lifting information, that is, a block that stores the steel plate information of the lifted steel plate, the starting stack information, the identity information of the transport vehicle, and the lifting timestamp information.

[0106] The operation instructions for lifting steel plates can be responded to by the crane computer of the lifting equipment. The specific steps are as follows:

[0107] 1. Analyze the information contained in the instruction, which may include the position of the starting pile and the number of steel plates to be lifted.

[0108] 2. According to the location information of the starting stack provided in the instruction, the driving computer locates to the location. Specifically, it can be achieved through laser ranging and sensors.

[0109] 3. Once the starting position is reached, the on-board computer can use image recognition technology to detect and identify the steel plates in the starting position. Specifically, this can be achieved through a camera or laser scanner.

[0110] 4. Based on the lifting quantity required in the instruction, the driving computer determines the number of steel plates to be lifted.

[0111] 5. The driving computer lifts the steel plates in the starting pile by controlling the movement and operation of the crane according to the number of steel plates to be lifted. The movement and operation of the crane may include controlling the movement of the crane arm, the lifting device or other lifting devices.

[0112] 6. Once the steel plate is successfully lifted, the crane computer can send a completion command to the steel plate management system to confirm the successful execution of the steel plate lifting operation.

[0113] Before the steel plates are stacked in the stack, the scanning device can be used to align the QR code or barcode on the steel plate in the order in which the steel plates are stacked in the stack, and the corresponding scanning application can be used to scan. The scanning device will decode the scanned code and convert it into readable information. Then the decoded information is used as the query condition, and the query is performed by connecting to the steel plate information database to obtain the physical information and identification information of the steel plate. Then the steel plates are stacked in the stack in the order in which the steel plates are stacked in the stack, and a steel plate information storage table is established. When the driving computer of the transport vehicle receives the operation instruction for lifting the steel plate, the instruction is transmitted to the intelligent terminal through wireless communication technology. The intelligent terminal queries the steel plate information storage table according to the number of steel plates to be lifted in the operation instruction to obtain the steel plate information of the lifted steel plate. For example, there are 10 steel plates stored in the current stack, which are numbered 1001 to 1010 in the order in which they are stacked. If the received operation instruction is to lift 4 steel plates, then by querying the steel plate information storage table, it can be determined that the numbers of the lifted steel plates are 1007, 1008, 1009, and 1010. After the numbers of the lifted steel plates are determined, the numbers can be used as query conditions to query the steel plate information storage table for the steel plate information of the four steel plates.

[0114] After the stacking positions are divided, the number information and location information of the stacking positions can be stored in the database. When the transport vehicle arrives at the starting stacking position, the location information of the current starting stacking position is obtained through the position sensor, and the location information is transmitted to the smart terminal through wireless communication technology. After receiving this information, the smart terminal searches the database for the number information of the starting stacking position according to the location information, and integrates the number information and location information of the starting stacking position into the starting stacking position information.

[0115] The identity information of the transport vehicle can be obtained by transmitting instructions to the on-board computer of the transport vehicle through the intelligent terminal using wireless communication technology. Specifically, after receiving the instruction, the on-board computer will parse the instruction, and then initiate a query to the corresponding database or system according to the requirements in the instruction to obtain the identity information of the transport vehicle. After the identity information of the transport vehicle is obtained, the identity information is transmitted to the intelligent terminal through wireless communication technology.

[0116] When lifting the steel plate, the on-board computer of the transport vehicle can automatically read the current system time, convert the system time into the format of the lifting timestamp, and transmit it to the smart terminal through wireless communication technology.

[0117] The steel plate information, the starting stacking position information, the identity information of the transport vehicle, and the lifting timestamp of the lifted steel plate can be stored in the first blockchain through the following steps:

[0118] 1. The smart terminal needs to be connected to the established blockchain network and become a node of the network. Specifically, it can be connected by using the node software or application of the blockchain network.

[0119] 2. The smart terminal can use the transaction function of the blockchain to create a transaction containing the lifting information of the steel plate. The transaction can contain multiple fields, including steel plate information, starting stack information, transportation vehicle identity information and lifting timestamp, etc.

[0120] 3. The smart terminal needs to use its private key to digitally sign the created transaction to ensure the authentication and integrity of the transaction.

[0121] 4. The smart terminal broadcasts the signed transaction to other nodes in the blockchain network. Through network transmission, other nodes can receive the transaction and verify it.

[0122] 5. The nodes in the blockchain network will verify the received transaction and confirm its validity. Once confirmed, the transaction will be packaged into the first block.

[0123] 6. When the first block is created, it contains the transactions related to lifting the steel plate. The data of these transactions will be permanently stored in the blockchain's immutable data structure to ensure data security and traceability.

[0124] S102, obtaining the route stacking information, steel plate information and route timestamp during the steel plate transportation process, and storing them in the second blockchain.

[0125] The path stacking location information may be the stacking location information of the stacking locations that the steel plates pass through during transportation, and may include the numbering information of the path stacking locations and the numbering information of the path stacking locations.

[0126] The steel plate information may be the steel plate information of the transported steel plate, and may include the steel plate identification information and the steel plate entity information of the transported steel plate.

[0127] The route timestamp may be the system timestamp when the transport vehicle passes through the stacking location, and may be expressed in the form of a combination of date and time. For example, the transport vehicle passes through two stacking locations in total, and the system timestamps when passing through the stacking locations are 10:00:00 on June 20, 2023 and 10:00:05 on June 20, 2023, respectively. The route timestamp may be expressed as 2023-06-20-10-00-00 and 2023-06-20-10-00-05.

[0128] The location information of the route pile can be obtained by using the location sensor of the transport vehicle, and the location information can be transmitted to the smart terminal through wireless communication technology. After receiving this information, the smart terminal queries the number information of the route pile in the database according to the location information, and integrates the number information and location information of the route pile into the route pile information. When the position sensor obtains the location information of the route pile, the location information can be transmitted to the driving computer, and the driving computer automatically obtains the current system time, converts the current system time into the format of the route timestamp, and transmits it to the smart terminal through wireless communication technology. At the same time, the smart terminal can use the query function of the blockchain to query the steel plate information in the first blockchain as the steel plate information during transportation.

[0129] The steel plate information, the starting stacking position information, the identity information of the transport vehicle, and the lifting timestamp of the lifted steel plate can be stored in the second blockchain through the following steps:

[0130] 1. The smart terminal needs to be connected to the established blockchain network and become a node of the network. Specifically, it can be connected by using the node software or application of the blockchain network.

[0131] 2. The smart terminal can use the transaction function of the blockchain to create a transaction containing the transport steel plate information. The transaction can contain multiple fields, including the route stacking information, steel plate information, and route timestamp.

[0132] 3. The smart terminal needs to use its private key to digitally sign the created transaction to ensure the authentication and integrity of the transaction.

[0133] 4. The smart terminal broadcasts the signed transaction to other nodes in the blockchain network. Through network transmission, other nodes can receive the transaction and verify it.

[0134] 5. The nodes in the blockchain network will verify the received transaction and confirm its validity. Once confirmed, the transaction will be packaged into the second block.

[0135] 6. When the second block is created, it contains the relevant transactions of transporting steel plates. The data of these transactions will be permanently stored in the tamper-proof data structure of the blockchain to ensure the security and traceability of the data.

[0136] S103, obtaining the target stack location information, steel plate information and arrival timestamp of the steel plate transported to the target stack location, and storing them in the third blockchain.

[0137] The target stack location information may be the stack location information of the stack location reached during the transportation of the steel plate, and may include the number information of the target stack location and the number information of the target stack location.

[0138] The steel plate information may be the steel plate information of the steel plates contained in the transport vehicle when the transport vehicle arrives at the target stacking location, and may include the steel plate identification information and the steel plate entity information of the steel plate.

[0139] The arrival timestamp may be a system timestamp when the transport vehicle arrives at the target stack location, and may be expressed in the form of a combination of date and time.

[0140] The location information of the target stack can be obtained by using the location sensor of the transport vehicle, and the location information can be transmitted to the smart terminal through wireless communication technology. After receiving this information, the smart terminal queries the number information of the target stack in the database according to the location information, and integrates the number information and location information of the target stack into the target stack information. When the position sensor obtains the location information of the target stack, the location information can be transmitted to the driving computer, and the driving computer automatically obtains the current system time, converts the current system time into the format of the arrival timestamp, and transmits it to the smart terminal through wireless communication technology. At the same time, the smart terminal can use the query function of the blockchain to query the steel plate information in the second blockchain as the steel plate information of the steel plates contained when the transport vehicle arrives at the target stack.

[0141] The target stack location information, steel plate information and arrival timestamp of the target stack location can be stored in the third blockchain through the following steps:

[0142] 1. The smart terminal needs to be connected to the established blockchain network and become a node of the network. Specifically, it can be connected by using the node software or application of the blockchain network.

[0143] 2. The smart terminal can use the transaction function of the blockchain to create a transaction containing the information of the transported steel plate. The transaction can contain multiple fields, including the target stacking location information, steel plate information, and arrival timestamp, etc.

[0144] 3. The smart terminal needs to use its private key to digitally sign the created transaction to ensure the authentication and integrity of the transaction.

[0145] 4. The smart terminal broadcasts the signed transaction to other nodes in the blockchain network. Through network transmission, other nodes can receive the transaction and verify it.

[0146] 5. The nodes in the blockchain network will verify the received transaction and confirm its validity. Once confirmed, the transaction will be packaged into the third block.

[0147] 6. When the third block is created, it contains the relevant transactions of the steel plates contained in the transport vehicle when it arrives at the target pile. The data of these transactions will be permanently stored in the blockchain's tamper-proof data structure to ensure data security and traceability.

[0148] S104, verifying the lifting information based on the first blockchain, the second blockchain and the third blockchain. If the verification is successful, it is determined that the transportation of the lifted steel plate is completed.

[0149] The lifting information can be verified by the following steps:

[0150] 1. The smart terminal can query the lifting-related information on the first blockchain, the second blockchain, and the third blockchain to obtain records of each stage.

[0151] 2. The intelligent terminal can compare the information of the starting pile, the path pile and the target pile to verify their consistency and integrity. Check whether the steel plate information, pile information and timestamp are recorded correctly in sequence and ensure that there are no missing links.

[0152] 3. Smart terminals can verify whether the data on each blockchain has been tampered with through the characteristics of blockchain, such as hash value and blockchain connectivity. The immutability of blockchain can ensure the integrity and credibility of data.

[0153] 4. A verification algorithm can be designed to further verify the lifting information. For example, check whether the time interval between each time stamp is consistent with the rationality of the actual lifting process. If the verification is passed, it is confirmed that the transportation of the lifted steel plate is completed.

[0154] In an embodiment of the present application, in response to an operation instruction for lifting a steel plate, at least one steel plate at the starting pile is lifted, and the steel plate information of the lifted steel plate, the starting pile information, the identity information of the transport vehicle, and the lifting timestamp are obtained and stored in the first blockchain; the path pile information, steel plate information, and path timestamp during the transportation of the steel plate are obtained and stored in the second blockchain; the target pile information, steel plate information, and arrival timestamp of the steel plate transported to the target pile are obtained and stored in the third blockchain; the lifting information is verified based on the first blockchain, the second blockchain, and the third blockchain. If the verification is passed, it is determined that the transportation of the lifted steel plate is completed. Through the above-mentioned blockchain-based steel plate transportation management method, the lifting information verification is performed based on different blockchains, which can ensure the accuracy and completeness of the entire lifting process record. By storing the information of the lifted steel plate, the path pile information, and the target pile information in different blockchains, the traceability of the steel plate transportation process and the efficiency of steel plate transportation management can be improved.

[0155] Based on the above technical solutions, optionally, after verifying the lifting information based on the first blockchain, the second blockchain and the third blockchain, the method further includes:

[0156] If the verification fails, the verification failure type is determined;

[0157] If it is the first failure type, obtaining feasible path information from the starting stack location to the target stack location, and determining distance information of each path according to the feasible path information;

[0158] Determine the lifting path information according to the lifting timestamp, the arrival timestamp, the distance information of each path, and the speed information of the transport vehicle when performing the transport task;

[0159] According to the lifting path information and the speed information, the missing path stacking information and path timestamp in the second blockchain are supplemented.

[0160] In this solution, the verification failure type can be a classification of errors or problems that occur during the verification of the lifting information. Specifically, the verification failure type can include a first failure type and a second failure type. Among them, the failure cause corresponding to the first failure type can be that the path stacking information and the corresponding path timestamp are missing in the second blockchain; the failure cause corresponding to the second failure type can be that the path stacking information is complete in the second blockchain, but there is a problem that the path timestamp is missing. The rules corresponding to the verification failure type can be stored in the database in advance.

[0161] When the intelligent terminal queries the lifting-related information on the first blockchain, the second blockchain, and the third blockchain, and determines that there is a data loss problem in the second blockchain, it can be determined that the verification fails. Then, the route stacking information and route timestamps in the second blockchain are traversed to determine the type of data that is lost, and then the rules corresponding to the verification failure type pre-stored in the database are queried to determine the verification failure type.

[0162] If it is the first failure type, perform the following steps:

[0163] 1. Obtain the geographical location information or layout information of the steel plate stacks. Specifically, this information may include the coordinates or number of each stack.

[0164] 2. Convert the relationship between the steel plate stacks into a graph model. Each stack can be represented as a node in the graph, and the path can be represented as an edge in the graph. Construct the starting node and the target node based on the starting stack and the target stack.

[0165] 3. Select a suitable path planning algorithm, which may include the shortest path algorithm, minimum spanning tree algorithm, and dynamic programming.

[0166] 4. Run the selected path planning algorithm to search for feasible paths from the start node to the target node. The algorithm will calculate multiple feasible paths.

[0167] 5. For each feasible path, calculate the total distance of the path based on the piles passed by the path, using the existing location information or the distance calculation method between piles. The distance calculation can be based on Euclidean distance, Manhattan distance, etc.

[0168] 6. Record and output the obtained feasible path information and distance information of each path. The feasible path information may include the number of the stacking position passed, and the distance information may include the total distance value of the path.

[0169] The speed information of the transport vehicle when performing the transport task may refer to the average speed or rate of the transport vehicle during the transport process, which may be expressed in the form of m / s.

[0170] The speed information of the vehicle can be obtained using a speed sensor, which calculates the speed of the vehicle by measuring the change in rotation speed or motion state. This data can be obtained through the vehicle's electronic control unit or a data bus connected to the vehicle. The output of the sensor can then be parsed and processed by the system or application to obtain real-time vehicle speed information. After the vehicle's speed information is obtained, the speed information can be transmitted to the smart terminal through wireless communication technology.

[0171] After the intelligent terminal obtains the lifting timestamp, arrival timestamp, distance information of each path, and speed information of the transport vehicle when performing the transport task, the travel time of the transport vehicle can be obtained by the following formula:

[0172] Travel time = arrival timestamp - lifting timestamp;

[0173] After obtaining the driving time, the actual driving distance can be calculated based on the driving time and speed information using the following formula:

[0174] Actual driving distance = speed information × driving time;

[0175] After the actual driving distance is obtained, the actual driving distance is compared with the distance information of each path, and the path corresponding to the same distance information is determined as the lifting path information.

[0176] For example, there is a transport vehicle traveling from the starting pile A12 to the target pile D234, the lifting timestamp is 2023-06-20-10-00-00, and the arrival timestamp is 2023-06-20-10-00-30, then the driving time is 30s. If the speed information is 5m / s, the actual driving distance is 150m. If there are currently two paths, the first path is A123-B123-C123-D234, and the distance information is 100m; the second path is A123-B234-F345-D234, and the distance information is 150m. Then it can be determined that the lifting path information is A123-B234-F345-D234.

[0177] After the lifting path information is determined, the intelligent terminal can first query the stack position corresponding to each stack number in the database according to the stack number in the lifting path information, and then calculate the interval distance between each stack position. Then calculate the time information of the transport vehicle traveling between adjacent stacks by the following formula:

[0178] Travel time = distance between each stacking position ÷ speed information;

[0179] After obtaining the time information of the transport vehicle traveling between adjacent stacks, the route timestamp of the transport vehicle arriving at the routed stack can be calculated based on the lifting timestamp and the arrival timestamp. For example, if the lifting route information is A123-B234-F345-D234, the interval between A123 and B234 is 40m, the interval between B234 and F345 is 50m, and the interval between F345 and D234 is 60m. If the speed information is 5m / s, the travel time between A123 and B234 is 8s, the travel time between B234 and F345 is 10s, and the travel time between F345 and D234 is 12s. If the lifting timestamp is 2023-06-20-10-00-00 and the arrival timestamp is 2023-06-20-10-00-30, then the passage timestamp of the transport vehicle arriving at B234 is 2023-06-20-10-00-08, and the passage timestamp of the transport vehicle arriving at F345 is 2023-06-20-10-00-18.

[0180] After the intelligent terminal determines the path stack information and the path timestamp, it can traverse the data stored in the second blockchain and determine the missing data, and then complete the missing data in the second blockchain and store it.

[0181] In this solution, by classifying and determining the verification failure type according to the regulations, the problem can be dealt with in a targeted manner and the problem handling efficiency can be improved. At the same time, by determining the missing information according to the verification failure type and completing the missing information, the integrity of the steel plate transportation data can be guaranteed, and the traceability of the steel plate transportation process can be improved, thereby enhancing the integrity and credibility of the data and improving the efficiency of steel plate transportation management.

[0182] On the basis of the above technical solutions, optionally, after completing the lost route stack information and route timestamp in the second blockchain, the method further includes:

[0183] Determine the shortest path according to the distance information;

[0184] If the lifting path information coincides with the shortest path, determining to keep the lifting path information;

[0185] If the lifting path information does not overlap with the shortest path, the lifting path information is updated based on the shortest path.

[0186] In this solution, after the lost data during the transportation of steel plates is supplemented, the lifting path information is updated, which not only ensures the integrity of the data, but also optimizes the driving path of the transport vehicle, while improving the management efficiency of the steel plates and the work efficiency of the transport vehicles.

[0187] Based on the above technical solutions, optionally, after determining the verification failure type, the method further includes:

[0188] If it is the second failure type, the lifting path information is determined according to the path and stacking information of the steel plate during transportation;

[0189] Determine the distance information between the stacking positions in each path in the lifting path information;

[0190] The lost route timestamp in the second blockchain is supplemented according to the distance information and the speed information of the transport vehicle when performing the transport task.

[0191] In this solution, the distance information between the stacking locations in each path may be the actual physical distance between adjacent stacking locations.

[0192] Position sensors can be installed in transport vehicles to obtain the position data of transport vehicles in real time, and then transmit the position data to smart terminals through wireless communication technology. Smart terminals visualize the position data of transport vehicles on a map. After the transport vehicle arrives at the target stacking location, the path stacking location information during the transportation process is determined on the map based on the real-time position of the transport vehicle, and the driving trajectory of the transport vehicle is drawn based on the path stacking location information to determine the lifting path information.

[0193] After the lifting path information is determined, the distance information between the stacks in each path can be calculated based on the position information in the path stack information. For example, the coordinates of A123 are (-10, 1, 1), and the coordinates of B234 are (-10, 5, 1). If the unit length of this coordinate system is 10m, the distance information between A123 and B234 is 40m.

[0194] After determining the distance information and speed information, the travel time of the transport vehicle between adjacent stacks can be calculated. The route timestamp of the transport vehicle arriving at each route stack is calculated based on the lifting timestamp, arrival timestamp and travel time. The data in the second blockchain is traversed to determine the missing route timestamps, and the route timestamps are completed and stored.

[0195] In this solution, by classifying and determining the verification failure type according to the regulations, the problem can be dealt with in a targeted manner and the problem handling efficiency can be improved. At the same time, by determining the missing information according to the verification failure type and completing the missing information, the integrity of the steel plate transportation data can be guaranteed, and the traceability of the steel plate transportation process can be improved, thereby enhancing the integrity and credibility of the data and improving the efficiency of steel plate transportation management.

[0196] Based on the above technical solutions, optionally, after storing in the second blockchain, the method further includes:

[0197] Acquire the real-time weight information of the steel plate during transportation, and confirm whether the plate drop event occurs according to the real-time weight information;

[0198] If a board drop event occurs, obtain the board drop timestamp;

[0199] The location of the dropped steel plate is determined according to the timestamp of the dropped steel plate and the timestamp of the route, and the steel plate information of the dropped steel plate is determined according to the real-time weight information and the steel plate information of the hoisted steel plate, and the second blockchain and the third blockchain are updated based on the steel plate information of the dropped steel plate.

[0200] In this solution, the real-time weight information may be the real-time total weight of the transported steel plates. Specifically, the real-time weight information may include the starting weight information, the real-time weight information during transportation, and the weight information at the target stack. The real-time weight information may be expressed in kg. For example, the real-time weight information of the steel plate is 500 kg.

[0201] A plate drop event may be an event in which a steel plate drops during transportation.

[0202] Weight sensors can be installed on the hooks or slings of the lifting equipment. These sensors can measure the weight of the hoisted object and provide accurate starting weight information. After the steel plate is lifted, the hoisting equipment's driving computer can communicate through the data interface or signal line connected to the sensor to obtain the weight information provided by the sensor. The weight sensor can establish a connection with the driving computer through wireless communication technology. During transportation, the driving computer can send a request command to the weight sensor in real time. After receiving the command, the weight sensor sends the collected weight information to the driving computer. After receiving the weight information, the driving computer performs necessary data processing and conversion so that the real-time weight information can be displayed on the interface through real-time charts.

[0203] The preset weight range of the steel plate can be stored in the intelligent terminal in advance. Specifically, the starting weight information of the steel plate when the steel plate is lifted can be graded, and the allowable error values ​​corresponding to different levels are also different. Then the starting weight information and the allowable error value are added to obtain the preset weight range. For example, the starting weight information can be divided into 1 to 5 levels from light to heavy. When the starting weight information is less than or equal to 100kg, the corresponding level is level 1, and the allowable error value is 20kg; when the starting weight information is in the range of 100kg (not included) to 300kg (inclusive), the corresponding level is level 2, and the allowable error value is 40kg; when the starting weight information is in the range of 300kg (not included) to 500kg (inclusive), the corresponding level is level 3, and the allowable error value is 80kg; when the starting weight information is in the range of 500kg (not included) to 700kg (inclusive), the corresponding level is level 4, and the allowable error value is 120kg; when the starting weight information exceeds 700kg, the corresponding level is level 5, and the allowable error value is 160kg. If the starting weight information of the lifting steel plate is 600kg, the preset weight range can be 480kg to 720kg.

[0204] The preset level, the preset weight range corresponding to the preset level, and the allowable error value can be stored in the driving computer. When the driving computer receives the starting weight information, it automatically compares the starting weight information with the preset weight range corresponding to the preset level to determine the preset level corresponding to this starting weight information. Then, the allowable error value corresponding to the preset level is called according to the preset level, and combined with the starting weight information to determine the preset weight range. Finally, the real-time weight information is compared with the preset weight range to determine whether there is a board drop event. If the real-time weight information is not within the preset weight range, it is determined that a board drop event has occurred; if it is within the preset range, it is determined that no board drop event has occurred. For example, if the starting weight information is 600kg, the preset weight range can be 480kg to 720kg, and the real-time weight information obtained in real time is 300kg, which is not within the preset weight range, and it is determined that a board drop event has occurred.

[0205] When the on-board computer detects a board drop event, it automatically obtains the current system time and converts it into the format of a board drop timestamp.

[0206] The drop position can be the position of the transport vehicle in the yard when the drop event occurs. Specifically, the drop position can be a range, indicating that the steel plate falls within a range from a certain stacking position to a certain stacking position. For example, if the steel plate lifting path is A123-B123-C123-D234, it can be indicated that the drop position is between A123 and B123.

[0207] When the smart terminal obtains the board drop event stamp and the path timestamp, it can query which two path timestamps the board drop timestamp is between to determine the corresponding board drop position. Specifically, if the board drop timestamp is before the first path timestamp, it can be determined that the board drop position is between the starting position and the first path position; if the board drop timestamp is between any two path timestamps, it can be determined that the board drop position is between the corresponding path positions; if the board drop timestamp is after the last path timestamp, it can be determined that the board drop position is between the last path position and the target position.

[0208] When the intelligent terminal obtains the real-time weight information, the weight information of the dropped steel plate can be determined based on the difference between the real-time weight information and the starting weight information. The weight information of each steel plate in the steel plate information of the hoisted steel plate is queried, and the weight information of the dropped steel plate is compared with the weight information of each steel plate to determine the steel plate information of the dropped steel plate. For example, the real-time weight information is 400kg, the starting weight information is 600kg, and a total of 3 steel plates are hoisted, numbered 1001, 1002 and 1003 from bottom to top, and the weights are 200kg, 100kg and 300kg respectively. The weight information of the dropped steel plate is 200kg. Accordingly, it can be determined that the dropped steel plate is the steel plate numbered 1001.

[0209] After the steel plate information of the fallen steel plate is determined, the intelligent terminal can delete the steel plate information of the fallen steel plate in the second blockchain and the third blockchain.

[0210] In this solution, by real-time identification of whether a plate drop event occurs and deleting the steel plate information of the dropped steel plate when a plate drop event occurs, the accuracy of the transportation record can be ensured and the efficiency of steel plate transportation management can be improved.

[0211] Based on the above technical solutions, optionally, before obtaining the feasible path information from the starting stack location to the target stack location, the method further includes:

[0212] Acquire stacking information, and establish a stacking information storage table based on the stacking information; wherein the stacking information includes stacking identification information and stacking position information;

[0213] Accordingly, obtaining feasible path information from the starting stack location to the target stack location includes:

[0214] The feasible path information from the starting stack location to the target stack location is determined according to the stack location information storage table.

[0215] The stack information storage table may refer to a database table created according to the location information and number information of the stack. The stack identification information may be the number information of the stack, and the stack location information may be the three-dimensional coordinates of the stack in the yard.

[0216] You can create a stack information storage table by following the steps below:

[0217] 1. Conduct a survey and investigation of the yard to determine the existing stockpiles, their quantity and layout. Specifically, this can be done by on-site inspection, measurement and recording the location and characteristics of the stockpiles.

[0218] 2. Assign unique identification information to each stack location, which can be an identifier in the form of numbers, letters or a combination, to ensure that each stack location has a unique identification.

[0219] 3. Based on the results of the investigation and survey, record the identification and location information of the pile, which may include using a spreadsheet, database or other suitable data storage format.

[0220] 4. Based on the recorded stack information, a stack information storage table is established. The table may include the stack identification information, location information, and other related information, such as stack capacity, type, and status.

[0221] 5. Enter the recorded stack position information one by one into the stack position information storage table, and update the table in time to reflect any changes, such as adding, deleting or adjusting the stack position.

[0222] 6. Regularly maintain the stack information storage table to ensure the accuracy of the table.

[0223] You can obtain feasible path information by following the steps below:

[0224] 1. Obtain the identification information of the required starting and target stack locations.

[0225] 2. Using the identification information field in the stack location information storage table, query the table to find the corresponding records of the starting stack location and the target stack location.

[0226] 3. Based on the query results, analyze the relationship between the starting and target locations, considering the layout, location, and possible path connections between the locations.

[0227] 4. Use appropriate algorithms or rules to calculate the feasible path from the starting pile location to the target pile location in the pile location information storage table.

[0228] 5. Extract path information from the output of the algorithm or rule, which may include the identification information and order of the stack locations passed through.

[0229] 6. Organize and combine the extracted path information into feasible path information. Lists, arrays, or other data structures can be used to represent the order and details of the path.

[0230] In this solution, by establishing a stacking location information storage table, the identification information and location information of each stacking location can be accurately recorded, and a feasible path can be calculated based on this, thereby improving the efficiency of path planning and reducing calculation time.

[0231] Embodiment 2

[0232] Figure 2 This is a flow chart of the steel plate transportation management method based on blockchain provided in Example 2 of this application. Figure 2 As shown, the specific steps include:

[0233] S201, in response to an operation instruction for lifting a steel plate, lift at least one steel plate in a starting pile, obtain steel plate information of the lifted steel plate, starting pile information, identity information of the transport vehicle, and a lifting timestamp, and store them in the first blockchain.

[0234] S202, obtaining the route stacking information, steel plate information and route timestamp during the steel plate transportation process, and storing them in the second blockchain.

[0235] S203, obtaining the target stack location information, steel plate information and arrival timestamp of the steel plate transported to the target stack location, and storing them in the third blockchain.

[0236] S204, verifying the lifting information based on the first blockchain, the second blockchain and the third blockchain. If the verification is successful, it is determined that the transportation of the lifted steel plate is completed.

[0237] S205: Determine the lifting path information according to the first blockchain, the second blockchain, and the third blockchain.

[0238] The lifting path information may be the transport track of the transport vehicle transporting the steel plate from the starting pile to the target pile, and may include the number information of the starting pile, the number information of the passing pile, and the number information of the target pile. For example, if the number information of the starting pile is A123, the number information of the passing piles is A124 and A125, and the number information of the target pile is A126, the lifting path information may be expressed as A123-A124-A125-A126.

[0239] The smart terminal can determine the lifting path information by querying the stack number information in the first blockchain, the second blockchain and the third blockchain, and integrating the number information in sequence.

[0240] S206, obtaining feasible path information from the starting stack location to the target stack location, and determining distance information of each path according to the feasible path information.

[0241] The feasible path information can be a description of all possible paths for the transport vehicle to transport the steel plate from the starting location to the target location. It includes the numbering information of the starting location, the numbering information of the path locations, and the numbering information of the target location contained in the path, and is arranged in the order of the path. For example, the location number of the starting location is A123, and the location number of the target location is D234. If there are two feasible paths between the starting location and the target location, the numbering information of the path locations of the first path is B123 and C123, and the numbering information of the path locations of the second path is B234 and F345, then the first path can be expressed as A123-B123-C123-D234, and the second path can be expressed as A123-B234-F345-D234.

[0242] The distance information of each path may refer to the actual physical distance of each path, that is, the length from the starting pile position to the passing pile position and then to the target pile position. For example, the path information of a certain lifting path is A123-B123-C123-D234, and the distance information is 100m, which means that the transport vehicle starts from the A123 pile position, passes the B123 pile position and the C123 pile position, and finally arrives at the D234 pile position, traveling a total of 100m.

[0243] The feasible path information and the distance information of each path can be obtained through the following steps:

[0244] 1. Obtain the geographical location information or layout information of the steel plate stacks. Specifically, this information may include the coordinates or number of each stack.

[0245] 2. Convert the relationship between the steel plate stacks into a graph model. Each stack can be represented as a node in the graph, and the path can be represented as an edge in the graph. Construct the starting node and the target node based on the starting stack and the target stack.

[0246] 3. Select a suitable path planning algorithm, which may include the shortest path algorithm, minimum spanning tree algorithm, and dynamic programming.

[0247] 4. Run the selected path planning algorithm to search for feasible paths from the start node to the target node. The algorithm will calculate multiple feasible paths.

[0248] 5. For each feasible path, calculate the total distance of the path based on the piles passed by the path, using the existing location information or the distance calculation method between piles. The distance calculation can be based on Euclidean distance, Manhattan distance, etc.

[0249] 6. Record and output the obtained feasible path information and distance information of each path. The feasible path information may include the number of the stacking position passed, and the distance information may include the total distance value of the path.

[0250] S207: Determine the shortest path according to the distance information.

[0251] After determining the distance information of each path, the total distance values ​​of each path can be compared, and the path with the smallest total distance value can be determined as the shortest path. For example, the starting location is numbered A123, and the target location is numbered D234. If there are two feasible paths between the starting location and the target location, the first path is A123-B123-C123-D234, and the distance information is 100m; the second path is A123-B234-F345-D234, and the distance information is 120m. Then the shortest path is A123-B123-C123-D234.

[0252] S208: If the lifting path information coincides with the shortest path, determine to keep the lifting path information.

[0253] When the steel plate is transported from the starting location to the target location, the intelligent terminal can establish a lifting path information table to store the lifting path information of the steel plate from the starting location to the target location. Specifically, for the same starting location and target location, only one path is stored in the lifting path information table. After determining the lifting path information and the shortest path, the intelligent terminal can compare the lifting path information and the shortest path to determine whether they overlap. If the lifting path information overlaps with the shortest path, it means that the lifting path is already the shortest path and no update is required. The lifting path information remains unchanged in the lifting path information table.

[0254] S209: If the lifting path information does not overlap with the shortest path, update the lifting path information based on the shortest path.

[0255] After determining the lifting path information and the shortest path, the intelligent terminal can compare the lifting path information and the shortest path to determine whether they overlap. If the lifting path information does not overlap with the shortest path, the intelligent terminal replaces the lifting path information with the shortest path to ensure that the lifting process is carried out along the shortest path. For example, the starting stack number information is A123, and the target stack number information is D234. If the lifting path information in the lifting path information table is A123-B123-C123-D234, and the shortest path is A123-B234-F345-D234, the intelligent terminal will delete the record with the lifting path information A123-B123-C123-D234 and update it to the lifting path information of A123-B234-F345-D234.

[0256] In this embodiment, by determining the lifting path information according to the shortest path, ensuring that the transportation of the steel plate is carried out along the optimal path, the transportation time can be reduced, the cost can be reduced, and the efficiency of steel plate transportation can be improved. At the same time, since the relevant information of the steel plate transportation is recorded in the blockchain, the integrity and credibility of the data are guaranteed. In addition, the decentralized nature of the blockchain makes it impossible to tamper with the data, ensuring the accuracy of the lifting path information and the shortest path.

[0257] Embodiment 3

[0258] Figure 3 Schematic diagram of the structure of the steel plate transportation management device based on blockchain provided in Example 3 of the present application. Figure 3 As shown, specifically including the following:

[0259] The first blockchain storage module 301 is used to lift at least one steel plate in the starting position in response to the operation instruction of lifting the steel plate, obtain the steel plate information of the lifted steel plate, the starting position information, the identity information of the transport vehicle, and the lifting timestamp, and store them in the first blockchain;

[0260] The second blockchain storage module 302 is used to obtain the route stacking information, steel plate information and route timestamp during the transportation of the steel plate, and store them in the second blockchain;

[0261] The third blockchain storage module 303 is used to obtain the target stacking location information, steel plate information and arrival timestamp of the steel plate transported to the target stacking location, and store them in the third blockchain;

[0262] The lifting information verification module 304 is used to verify the lifting information based on the first blockchain, the second blockchain and the third blockchain. If the verification is passed, it is determined that the transportation of the lifted steel plate is completed.

[0263] Furthermore, the device further includes a path optimization module, and the path optimization module is used to:

[0264] Determine the lifting path information according to the first blockchain, the second blockchain, and the third blockchain;

[0265] Obtaining feasible path information from the starting stack location to the target stack location, and determining distance information of each path according to the feasible path information;

[0266] Determine the shortest path according to the distance information;

[0267] If the lifting path information coincides with the shortest path, determining to keep the lifting path information;

[0268] If the lifting path information does not overlap with the shortest path, the lifting path information is updated based on the shortest path.

[0269] Furthermore, the device further includes a first failure type determination module, wherein the first failure type determination module is configured to:

[0270] If the verification fails, the verification failure type is determined;

[0271] If it is the first failure type, obtaining feasible path information from the starting stack location to the target stack location, and determining distance information of each path according to the feasible path information;

[0272] Determine the lifting path information according to the lifting timestamp, the arrival timestamp, the distance information of each path, and the speed information of the transport vehicle when performing the transport task;

[0273] According to the lifting path information and the speed information, the missing path stacking information and path timestamp in the second blockchain are supplemented.

[0274] Furthermore, the device further comprises a lifting path information updating module, and the lifting path information updating module is used to:

[0275] Determine the shortest path according to the distance information;

[0276] If the lifting path information coincides with the shortest path, determining to keep the lifting path information;

[0277] If the lifting path information does not overlap with the shortest path, the lifting path information is updated based on the shortest path.

[0278] Furthermore, the device further includes a second failure type determination module, wherein the second failure type determination module is configured to:

[0279] If it is the second failure type, the lifting path information is determined according to the path and stacking information of the steel plate during transportation;

[0280] Determine the distance information between the stacking positions in each path in the lifting path information;

[0281] The lost route timestamp in the second blockchain is supplemented according to the lifting timestamp, the arrival timestamp, the distance information, and the speed information of the transport vehicle when performing the transport task.

[0282] Furthermore, the device further includes a board drop event determination module, and the board drop event determination module is used to:

[0283] Acquire the real-time weight information of the steel plate during transportation, and confirm whether the plate drop event occurs according to the real-time weight information;

[0284] If a board drop event occurs, obtain the board drop timestamp;

[0285] The location of the dropped steel plate is determined according to the timestamp of the dropped steel plate and the timestamp of the route, and the steel plate information of the dropped steel plate is determined according to the real-time weight information and the steel plate information of the hoisted steel plate, and the second blockchain and the third blockchain are updated based on the steel plate information of the dropped steel plate.

[0286] Furthermore, the device also includes a stacking information storage table establishment module, and the stacking information storage table establishment module is used to:

[0287] Acquire stacking information, and establish a stacking information storage table based on the stacking information; wherein the stacking information includes stacking identification information and stacking position information;

[0288] Accordingly, obtaining feasible path information from the starting stack location to the target stack location includes:

[0289] The feasible path information from the starting stack location to the target stack location is determined according to the stack location information storage table.

[0290] In an embodiment of the present application, the first blockchain storage module is used to respond to the operation instruction of steel plate lifting, lift at least one steel plate in the starting pile, obtain the steel plate information of the lifted steel plate, the starting pile information, the identity information of the transport vehicle, and the lifting timestamp, and store them in the first blockchain; the second blockchain storage module is used to obtain the path pile information, steel plate information and path timestamp during the steel plate transportation process, and store them in the second blockchain; the third blockchain storage module is used to obtain the target pile information, steel plate information and arrival timestamp of the steel plate transported to the target pile, and store them in the third blockchain; the lifting information verification module is used to verify the lifting information based on the first blockchain, the second blockchain and the third blockchain. If the verification is passed, it is determined that the transportation of the lifted steel plate is completed. Through the above-mentioned blockchain-based steel plate transportation management device, the lifting information verification is performed based on different blockchains, which can ensure the accuracy and completeness of the entire lifting process record. By storing the information of the lifted steel plate, the path pile information and the target pile information in different blockchains, the traceability of the steel plate transportation process and the efficiency of steel plate transportation management can be improved.

[0291] The steel plate transportation management device based on blockchain in the embodiment of the present application can be a device, or a component, integrated circuit, or chip in a terminal. The device can be a mobile electronic device or a non-mobile electronic device. Exemplarily, the mobile electronic device can be a mobile phone, a tablet computer, a laptop computer, a PDA, an in-vehicle electronic device, a wearable device, an ultra-mobile personal computer (UMPC), a netbook or a personal digital assistant (PDA), etc., and the non-mobile electronic device can be a server, a network attached storage (NAS), a personal computer (PC), a television (TV), a teller machine or a self-service machine, etc., which is not specifically limited in the embodiment of the present application.

[0292] The steel plate transportation management device based on blockchain in the embodiment of the present application may be a device having an operating system. The operating system may be an Android operating system, an iOS operating system, or other possible operating systems, which are not specifically limited in the embodiment of the present application.

[0293] The blockchain-based steel plate transportation management device provided in the embodiment of the present application can implement the various processes implemented by the above-mentioned method embodiments. To avoid repetition, they will not be repeated here.

[0294] Embodiment 4

[0295] like Figure 4 As shown, the embodiment of the present application also provides an electronic device 400, including a processor 401, a memory 402, and a program or instruction stored in the memory 402 and executable on the processor 401. When the program or instruction is executed by the processor 401, each process of the above-mentioned blockchain-based steel plate transportation management device embodiment is implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.

[0296] It should be noted that the electronic devices in the embodiments of the present application include the mobile electronic devices and non-mobile electronic devices mentioned above.

[0297] Embodiment 5

[0298] The embodiment of the present application also provides a readable storage medium, on which a program or instruction is stored. When the program or instruction is executed by the processor, the various processes of the above-mentioned blockchain-based steel plate transportation management device embodiment are implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.

[0299] The processor is a processor in the electronic device described in the above embodiment. The readable storage medium includes a computer readable storage medium, such as a computer read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0300] Embodiment 6

[0301] An embodiment of the present application further provides a chip, which includes a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is used to run programs or instructions to implement the various processes of the above-mentioned blockchain-based steel plate transportation management device embodiment, and can achieve the same technical effect. To avoid repetition, it will not be repeated here.

[0302] It should be understood that the chip mentioned in the embodiments of the present application can also be called a system-level chip, a system chip, a chip system or a system-on-chip chip, etc.

[0303] It should be noted that, in this article, the terms "comprise", "include" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise one..." do not exclude the presence of other identical elements in the process, method, article or device including the element. In addition, it should be pointed out that the scope of the methods and devices in the embodiments of the present application is not limited to performing functions in the order shown or discussed, and may also include performing functions in a substantially simultaneous manner or in reverse order according to the functions involved, for example, the described method may be performed in an order different from that described, and various steps may also be added, omitted, or combined. In addition, the features described with reference to certain examples may be combined in other examples.

[0304] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a computer software product, which is stored in a storage medium (such as ROM / RAM, a disk, or an optical disk), and includes a number of instructions for a terminal (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present application.

[0305] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.

[0306] The above are only preferred embodiments of the present application and the technical principles used. The present application is not limited to the specific embodiments described herein, and various obvious changes, readjustments and substitutions that can be made by those skilled in the art will not deviate from the scope of protection of the present application. Therefore, although the present application is described in more detail through the above embodiments, the present application is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present application, and the scope of the present application is determined by the scope of the claims.

Claims

1. A steel plate transportation management method based on blockchain, characterized in that: The method comprises: In response to the operation instruction of lifting the steel plate, at least one steel plate in the starting pile is lifted, and the steel plate information of the lifted steel plate, the starting pile information, the identity information of the transport vehicle, and the lifting timestamp are obtained, and stored in the first blockchain; Obtain the route stacking information, steel plate information and route timestamp during the steel plate transportation process, and store them in the second blockchain; Obtain the target location information, steel plate information and arrival timestamp of the steel plate transported to the target location, and store them in the third blockchain; Verifying the lifting information based on the first blockchain, the second blockchain, and the third blockchain, and if the verification is successful, determining that the transportation of the lifted steel plate is completed; Wherein, if the verification is passed, after it is determined that the transportation of the hoisted steel plate is completed, the method further includes: Determine the lifting path information according to the first blockchain, the second blockchain, and the third blockchain; Obtaining feasible path information from the starting stack location to the target stack location, and determining distance information of each path according to the feasible path information; Determine the shortest path according to the distance information; If the lifting path information coincides with the shortest path, determining to keep the lifting path information; If the lifting path information does not overlap with the shortest path, the lifting path information is updated based on the shortest path.

2. The steel plate transportation management method based on blockchain according to claim 1 is characterized in that: After verifying the lifting information based on the first blockchain, the second blockchain, and the third blockchain, the method further includes: If the verification fails, the verification failure type is determined; If it is the first failure type, obtaining feasible path information from the starting stack location to the target stack location, and determining distance information of each path according to the feasible path information; Determine the lifting path information according to the lifting timestamp, the arrival timestamp, the distance information of each path, and the speed information of the transport vehicle when performing the transport task; According to the lifting path information and the speed information, the missing path stacking information and path timestamp in the second blockchain are supplemented.

3. The steel plate transportation management method based on blockchain according to claim 2 is characterized in that: After completing the missing path stack information and path timestamp in the second blockchain, the method further includes: Determine the shortest path according to the distance information; If the lifting path information coincides with the shortest path, determining to keep the lifting path information; If the lifting path information does not overlap with the shortest path, the lifting path information is updated based on the shortest path.

4. The steel plate transportation management method based on blockchain according to claim 2 is characterized in that: After determining the verification failure type, the method further includes: If it is the second failure type, the lifting path information is determined according to the path and stacking information of the steel plate during transportation; Determine the distance information between the stacking positions in each path in the lifting path information; The lost route timestamp in the second blockchain is supplemented according to the lifting timestamp, the arrival timestamp, the distance information, and the speed information of the transport vehicle when performing the transport task.

5. The steel plate transportation management method based on blockchain according to claim 2 or 3 is characterized in that: After storing in the second blockchain, the method further includes: Acquire the real-time weight information of the steel plate during transportation, and confirm whether the plate drop event occurs according to the real-time weight information; If a board drop event occurs, obtain the board drop timestamp; The location of the dropped steel plate is determined according to the timestamp of the dropped steel plate and the timestamp of the route, and the steel plate information of the dropped steel plate is determined according to the real-time weight information and the steel plate information of the hoisted steel plate, and the second blockchain and the third blockchain are updated based on the steel plate information of the dropped steel plate.

6. The steel plate transportation management method based on blockchain according to claim 1 or 2, characterized in that: Before obtaining the feasible path information from the starting stack location to the target stack location, the method further includes: Acquire stacking information, and establish a stacking information storage table based on the stacking information; wherein the stacking information includes stacking identification information and stacking position information; Accordingly, obtaining feasible path information from the starting stack location to the target stack location includes: The feasible path information from the starting stack location to the target stack location is determined according to the stack location information storage table.

7. A steel plate transportation management device based on blockchain, characterized in that: The device comprises: The first blockchain storage module is used to respond to the operation instruction of lifting the steel plate, lift at least one steel plate in the starting pile, obtain the steel plate information of the lifted steel plate, the starting pile information, the identity information of the transport vehicle, and the lifting timestamp, and store them in the first blockchain; The second blockchain storage module is used to obtain the route stacking information, steel plate information and route timestamp during the transportation of the steel plate, and store them in the second blockchain; The third blockchain storage module is used to obtain the target stacking location information, steel plate information and arrival timestamp of the steel plate transported to the target stacking location, and store them in the third blockchain; The lifting information verification module is used to verify the lifting information based on the first blockchain, the second blockchain and the third blockchain. If the verification is passed, it is determined that the transportation of the lifted steel plate is completed.

8. An electronic device, characterized in that: It includes a processor, a memory, and a program or instruction stored in the memory and executable on the processor, wherein when the program or instruction is executed by the processor, the steps of the blockchain-based steel plate transportation management method as described in any one of claims 1 to 6 are implemented.

9. A readable storage medium, characterized in that: The readable storage medium stores a program or instruction, and when the program or instruction is executed by the processor, the steps of the blockchain-based steel plate transportation management method as described in any one of claims 1-6 are implemented.