A method and device for boring a ship joint bearing lifting deck ear plate

By adjusting the position of the joint bearing through the adjustment mechanism, the center of its hole is aligned with the center of the hole of the lifting deck ear plate, thus solving the problem of misalignment during boring and achieving precise boring and efficient production.

CN116728139BActive Publication Date: 2026-02-06GUANGZHOU SHIPYARD INTERNATIONAL LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310892576.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-07-19
Publication Date
2026-02-06
Estimated Expiration
2043-07-19

AI Technical Summary

Technical Problem

In the existing technology, it is difficult to align the center of the bearing hole of the ship's joint with the center of the lug hole of the lifting deck, resulting in misalignment of the boring holes, making it impossible to install the connecting shaft, causing repeated rework and wasting manpower and resources.

Method used

The position of the joint bearing is adjusted by adjusting the mechanism so that the center of its hole is in the same straight line as the center of the hole in the fore and aft lifting deck lugs. Precision boring is then performed using a boring bar and boring tool to ensure that the centers of all holes are consistent before proceeding with the boring operation.

Benefits of technology

This achieves precision in boring, avoids rework, saves material and labor costs, and improves production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116728139B_ABST
    Figure CN116728139B_ABST
Patent Text Reader

Abstract

The application discloses a ship knuckle bearing lifting deck ear plate boring method and device, and the method comprises the following steps: corresponding front and rear arrangement of front and rear lifting deck ear plates; the pile leg ear plate is located between the front and rear lifting deck ear plates, and the hole center of the pile leg ear plate is adjusted to be on the straight line; the knuckle bearing is installed on the pile leg ear plate through an adjusting mechanism, the relative position of the knuckle bearing and the pile leg ear plate is adjusted through the adjusting mechanism, the hole center point of the knuckle bearing corresponds to the hole center of the pile leg ear plate, and then the hole center point of the knuckle bearing and the hole centers of the front and rear lifting deck ear plates are all on the same straight line; after the hole center is adjusted, boring is performed; after boring is completed, a connecting shaft is used to connect the front and rear lifting deck ear plates and the knuckle bearing together. The application realizes accurate boring operation and ensures that the boring quality meets the requirements.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of ship manufacturing, in particular to a ship knuckle bearing lifting deck ear plate boring method and device. BACKGROUND

[0002] The special equipment leg ear plate in the ship needs to install a knuckle bearing due to the working condition, and the hole center of the knuckle bearing needs to be installed on the same straight line with the hole center of the lifting deck ear plate. The knuckle bearing is composed of an outer ring and an inner ring, the inner spherical surface of the outer ring and the outer spherical surface of the inner ring form a rolling friction pair, the knuckle bearing is fixed on the leg, and the center point of the knuckle bearing is fixed. After the knuckle bearing is installed on the leg, the center point of the knuckle bearing cannot be fixed due to the characteristics of the knuckle bearing, that is, the knuckle bearing can roll. Therefore, it is impossible to find the center of the knuckle bearing, and it is impossible to realize the precise boring operation of the center points of the hole of the leg ear plate, the hole center points of the front lifting deck ear plate and the rear lifting deck ear plate on the same straight line, resulting in that the boring quality is not centered, the connecting shaft cannot be installed, and the manpower and material resources are wasted due to repeated rework. SUMMARY

[0003] The purpose of the embodiment of the present application is to provide a ship knuckle bearing lifting deck ear plate boring method and device, which can solve the above-mentioned problems existing in the prior art, and realize precise boring operation by ensuring that the hole center of the knuckle bearing and the hole center of the front lifting deck ear plate and the rear lifting deck ear plate are on the same straight line, thereby ensuring that the boring quality meets the requirements.

[0004] In order to achieve the above-mentioned purpose, the following technical solutions are adopted in the present application:

[0005] On the one hand, a ship knuckle bearing lifting deck ear plate boring method is provided, comprising the following steps:

[0006] The front lifting deck ear plate and the rear lifting deck ear plate are arranged in front of and behind each other, and the hole centers of the front lifting deck ear plate and the rear lifting deck ear plate are adjusted to be on the same straight line;

[0007] The leg ear plate is installed in the middle of the front lifting deck ear plate and the rear lifting deck ear plate, and the hole center of the leg ear plate is adjusted to be on the same straight line with the hole centers of the front lifting deck ear plate and the rear lifting deck ear plate;

[0008] The knuckle bearing is installed on the leg ear plate through the adjusting mechanism, the relative position of the knuckle bearing and the leg ear plate is adjusted through the adjusting mechanism, so that the hole center point of the knuckle bearing corresponds to the hole center of the leg ear plate, and then the hole center point of the knuckle bearing corresponds to the hole centers of the front lifting deck ear plate and the rear lifting deck ear plate, and the hole center points of the knuckle bearing, the front lifting deck ear plate and the rear lifting deck ear plate are on the same straight line;

[0009] After the hole center adjustment is completed, the boring bar and the boring cutter are used to perform boring operation on the front lifting deck ear plate and the rear lifting deck ear plate respectively.

[0010] After boring, the boring bar is pulled out, the dummy shaft and the limiting sleeve are installed in the joint bearing, the pile leg is placed in the middle of the lifting deck, the dummy shaft is pushed out from the side using the connecting shaft, and the connecting shaft is connected together through the center of the front and rear lifting deck ear plates and the joint bearing.

[0011] Optionally, the concentricity measuring instrument is used to detect whether the centers of the holes are located on the same straight line, and the next step can be performed only when it is judged that the centers of the holes are located on the same straight line; when the centers of the holes have position deviation, the hole center position is readjusted.

[0012] Optionally, the position information when the hole centers of the front and rear lifting deck ear plates and the pile leg ear plate are located on the same straight line is measured in advance, and the corresponding installation positions are marked according to the measurement results, and the front lifting deck ear plate, the rear lifting deck ear plate and the pile leg ear plate are installed according to the marks.

[0013] Optionally, the front, rear, left and right positions of the joint bearing on the pile leg ear plate are adjusted through the adjusting mechanism, the front and rear positions of the joint bearing are first adjusted through the adjusting mechanism, so that the front and rear positions of the joint bearing correspond to the front and rear positions of the pile leg ear plate, then the left and right positions of the joint bearing are adjusted through the adjusting mechanism, so that the left and right positions of the joint bearing correspond to the left and right positions of the pile leg ear plate, and then the center positions of the joint bearing and the pile leg ear plate correspond.

[0014] Optionally, the horizontal height of the boring bar is adjusted through the lifting mechanism, so that the center axis of the boring bar coincides with or is parallel to the straight line of the hole center.

[0015] Optionally, processing marks are pasted at the positions where the front and rear lifting deck ear plates need to be bored, and a sensor for identifying the processing marks is arranged on the boring bar, when the sensor detects the processing marks, the boring bar rotates to drive the boring cutter to rotate to bore the front and rear lifting deck ear plates, respectively.

[0016] In addition, a ship joint bearing lifting deck ear plate boring device is also provided, comprising a front lifting deck ear plate, a rear lifting deck ear plate, a pile leg ear plate, a joint bearing and an adjusting mechanism, the front lifting deck ear plate and the rear lifting deck ear plate are horizontally spaced apart, the pile leg ear plate is installed between the front lifting deck ear plate and the rear lifting deck ear plate, the joint bearing is movably installed on the pile leg ear plate through the adjusting mechanism, the adjusting mechanism can drive the joint bearing to move relative to the pile leg ear plate, so that the joint bearing and the hole center position of the pile leg ear plate are relatively consistent, and then the hole center of the joint bearing is located on the same straight line with the hole centers of the front and rear lifting deck ear plates.

[0017] Optionally, the adjusting mechanism comprises a fixing plate, a fixing member and an adjusting member, the fixing plate is locked to the leg ear plate through the fixing member, the adjusting member is movably installed on the fixing plate and connected with the joint bearing, and the adjusting member can drive the joint bearing to move relative to the fixing plate.

[0018] Optionally, the fixing member is a fixing bolt, and the adjusting member is an adjusting bolt.

[0019] Optionally, the front lifting deck ear plates and the rear lifting deck ear plates are connected through front fixing frames and rear fixing frames respectively to form a boring channel, a boring bar is arranged in the boring channel, and a boring cutter is fixed on the boring bar.

[0020] The beneficial effects of the present application are as follows: before boring, the position of the joint bearing is adjusted by the adjusting mechanism, so that the center of the hole of the joint bearing is in the same straight line with the center of the hole of the front lifting deck ear plate and the rear lifting deck ear plate, accurate boring is performed after the position of the hole center is ensured, the connecting shaft can be accurately installed in place, repeated rework is avoided, material cost and labor cost are greatly saved, labor intensity is reduced, and production efficiency is greatly improved. BRIEF DESCRIPTION OF DRAWINGS

[0021] The present application will be further described in detail below according to the drawings and embodiments.

[0022] Figure 1 A flowchart of the boring method according to the embodiment of the present application is shown in the figure;

[0023] Figure 2 A structure diagram of the boring device according to the embodiment of the present application is shown in the figure.

[0024] In the figure: 1, front lifting deck ear plate; 2, rear lifting deck ear plate; 3, leg ear plate; 4, joint bearing; 5, fixing plate; 6, fixing member; 7, adjusting member; 8, boring bar; 9, boring cutter; 10, front fixing frame; 11, rear fixing frame. DETAILED DESCRIPTION

[0025] In order to make the technical problems solved by the present application, the technical solutions adopted and the technical effects achieved more clear, the technical solutions of the embodiments of the present application are described in further detail below. Obviously, the described embodiments are only part of the embodiments of the present application, not all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the present application.

[0026] In the description of the present application, unless specifically defined and limited otherwise, the terms "connected", "connected", "fixed" should be understood broadly, for example, it can be fixed connection, or detachable connection, or integrated; it can be mechanical connection, or electrical connection; it can be directly connected, or indirectly connected through intermediate medium, or the internal communication of two elements or the interaction relationship of two elements. For those skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.

[0027] In the present application, unless specifically defined and limited otherwise, the first feature "on" or "under" the second feature can include that the first and second features are in direct contact, or that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, the first feature "on", "above" and "above" the second feature includes that the first feature is directly above and obliquely above the second feature, or only indicates that the horizontal height of the first feature is higher than that of the second feature. The first feature "below", "below" and "below" the second feature includes that the first feature is directly below and obliquely below the second feature, or only indicates that the horizontal height of the first feature is less than that of the second feature.

[0028] As shown in Figure 1 The present embodiment provides a ship knuckle bearing lifting deck ear plate boring method, which comprises the following steps:

[0029] Step one: the front lifting deck ear plate 1 and the rear lifting deck ear plate 2 are arranged correspondingly in front and back, and the hole centers of the front lifting deck ear plate 1 and the rear lifting deck ear plate 2 are adjusted to be on the same straight line;

[0030] Step two: the pile leg ear plate 3 is installed in the middle of the front lifting deck ear plate 1 and the rear lifting deck ear plate 2, and the hole center of the pile leg ear plate 3 is adjusted to be on the same straight line with the hole centers of the front lifting deck ear plate 1 and the rear lifting deck ear plate 2;

[0031] Step three: the knuckle bearing 4 is installed on the pile leg ear plate 3 through the adjusting mechanism, the relative position of the knuckle bearing 4 and the pile leg ear plate 3 is adjusted through the adjusting mechanism, so that the hole center point of the knuckle bearing 4 corresponds to the hole center of the pile leg ear plate 3, and then the hole center point of the knuckle bearing 4 is on the same straight line with the hole centers of the front lifting deck ear plate 1 and the rear lifting deck ear plate 2;

[0032] Step four: after the hole center adjustment is completed, the boring bar 8 and the boring cutter 9 are used to bore the front lifting deck ear plate 1 and the rear lifting deck ear plate 2 respectively;

[0033] Step five: after boring, pull out the boring bar 8, install the dummy shaft and the limiting sleeve in the knuckle bearing 4, put the pile leg into the middle of the lifting deck, use the connecting shaft to push the dummy shaft from the side, so that the connecting shaft is connected together through the center of the front and rear lifting deck ear plates 2 and the knuckle bearing 4.

[0034] Based on the above scheme, because the knuckle bearing 4 of the ship special equipment pile leg is installed, because of the rolling characteristics of the knuckle bearing 4, the center point of the knuckle bearing 4 cannot be fixed, so the adjustment and fixation of the knuckle bearing 4 are realized through the adjusting mechanism. First, the position of the knuckle bearing 4 is adjusted through the adjusting mechanism, so that the hole centers of the knuckle bearing 4 and the pile leg ear plate 3 are consistent in the vertical direction. Simply put, the horizontal coordinate point of the hole center of the knuckle bearing 4 is the same as that of the pile leg ear plate 3. After the position of the knuckle bearing 4 is adjusted, the position of the knuckle bearing 4 can be further fixed through the adjusting mechanism, so that the knuckle bearing 4 will not deviate and will not roll. Before adjusting the knuckle bearing 4, the positions of the front and rear lifting deck ear plates 1 and 2 need to be adjusted and fixed, and the hole centers of the front and rear lifting deck ear plates 1 and 2 need to be ensured to be on the same straight line. Then, the position of the pile leg ear plate 3 is adjusted so that the hole center of the pile leg ear plate 3 is also on the straight line. As long as the position of the knuckle bearing 4 on the pile leg ear plate 3 is adjusted and fixed, the hole center of the knuckle bearing 4 can also be ensured to be on the straight line. At this time, the accurate boring operation can be directly started, and the boring can be completed at one time, effectively improving the work efficiency. After the boring is completed, the connecting shaft can be accurately installed in place, avoiding rework.

[0035] Further, in order to effectively detect whether the hole centers are on the same straight line, a concentricity measuring instrument is used for detection and judgment. When it is judged that the hole centers are on the same straight line, the next step can be performed. When the hole centers deviate, the hole center positions are readjusted. The working principle of the concentricity measuring instrument belongs to the prior art, which will not be described here.

[0036] In order to improve the overall work efficiency and assembly process, the position information when the hole centers of the front and rear lifting deck ear plates 2 and the pile leg ear plate 3 are on the same straight line is measured in advance, and the corresponding installation position is marked according to the measurement result. The front and rear lifting deck ear plates 1 and 2 and the pile leg ear plate 3 are installed according to the marks. This scheme can be understood as that the installation positions of the front and rear lifting deck ear plates 1 and 2 are divided in advance. When the two components are installed in the corresponding positions respectively, it can be ensured that the hole centers of the front and rear lifting deck ear plates 1 and 2 are on the same straight line. This can effectively save the positioning and installation time, and can directly reach the target in one step. In addition, the installation positions need to be adjusted adaptively according to the front and rear lifting deck ear plates 1 and 2 of different sizes or shapes.

[0037] It should be particularly pointed out that the front lifting deck ear plate 1 and the rear lifting deck ear plate 2 are the same structure or the same component, only the setting positions are different.

[0038] In some embodiments, the joint bearing 4 is adjusted in the four positions of front, back, left and right on the leg ear plate 3 through the adjusting mechanism. First, the front and back positions of the joint bearing 4 are adjusted through the adjusting mechanism, so that the joint bearing 4 corresponds to the front and back positions of the leg ear plate 3. Then, the left and right positions of the joint bearing 4 are adjusted through the adjusting mechanism, so that the joint bearing 4 corresponds to the left and right positions of the leg ear plate 3, and then the center position of the joint bearing 4 corresponds to the center position of the leg ear plate 3.

[0039] Optionally, the horizontal height of the boring bar 8 is adjusted through the lifting mechanism, so that the center axis of the boring bar 8 coincides with or is parallel to the straight line of the hole center.

[0040] In order to realize full-automatic operation in the boring process, processing marks are pasted on the positions of the front lifting deck ear plate 1 and the rear lifting deck ear plate 2 that need to be bored. A sensor for identifying the processing marks is arranged on the boring bar 8. When the sensor detects the processing marks, the boring bar 8 rotates to drive the boring cutter 9 to rotate to bore the front lifting deck ear plate 1 and the rear lifting deck ear plate 2, respectively. In this scheme, the sensor adaptively senses the processing marks and drives the boring cutter 9 to move to the corresponding position for boring. In the whole process, no manual operation intervention is needed, intelligent automatic processing is realized, and the processing efficiency and accuracy are higher.

[0041] It is worth mentioning that when the boring cutter 9 is used for boring, two boring cutters 9 can be correspondingly arranged according to the distance between the front lifting deck ear plate 1 and the rear lifting deck ear plate 2. In this way, the front lifting deck ear plate 1 and the rear lifting deck ear plate 2 can be bored at the same time, and the processing efficiency is higher. When the boring cutter 9 is used for boring, the boring cutter 9 needs to leave a certain space allowance between the front lifting deck ear plate 1 and the rear lifting deck ear plate 2, so as to facilitate the boring cutter 9 to retreat.

[0042] In addition, as another optional embodiment, a boring device for a ship joint bearing lifting deck ear plate is also provided, as shown in Figure 2As shown, it comprises: a front lifting deck ear plate 1, a rear lifting deck ear plate 2, a pile leg ear plate 3, an articulation bearing 4 and an adjusting mechanism, the front lifting deck ear plate 1 and the rear lifting deck ear plate 2 are arranged horizontally and spaced apart, the pile leg ear plate 3 is installed between the front lifting deck ear plate 1 and the rear lifting deck ear plate 2, the articulation bearing 4 is movably installed on the pile leg ear plate 3 through the adjusting mechanism, the adjusting mechanism can drive the articulation bearing 4 to move relative to the pile leg ear plate 3, so that the hole center position of the articulation bearing 4 is relatively consistent with the pile leg ear plate 3, and then the hole center of the articulation bearing 4 is on the same straight line with the hole center of the front lifting deck ear plate 1 and the rear lifting deck ear plate 2.

[0043] Based on the above scheme, the boring method of the boring device is as follows: the front lifting deck ear plate 1 and the rear lifting deck ear plate 2 are arranged correspondingly in front and back, and the hole centers of the front lifting deck ear plate 1 and the rear lifting deck ear plate 2 are adjusted to be on the same straight line; the pile leg ear plate 3 is located between the front lifting deck ear plate 1 and the rear lifting deck ear plate 2, and the hole center of the pile leg ear plate 3 is adjusted to be on the same straight line with the hole centers of the front lifting deck ear plate 1 and the rear lifting deck ear plate 2; the articulation bearing 4 is installed on the pile leg ear plate 3 through the adjusting mechanism, the relative position of the articulation bearing 4 and the pile leg ear plate 3 is adjusted through the adjusting mechanism, so that the hole center point of the articulation bearing 4 corresponds to the hole center of the pile leg ear plate 3, and then the hole center point of the articulation bearing 4 is on the same straight line with the hole centers of the front lifting deck ear plate 1 and the rear lifting deck ear plate 2; after the hole center adjustment is completed, the boring bar 8 and the boring cutter 9 are used to perform boring operation on the front lifting deck ear plate 1 and the rear lifting deck ear plate 2 respectively; after boring is completed, the boring bar 8 is pulled out, the false shaft and the limiting sleeve are installed in the articulation bearing 4, the pile leg is put into the middle of the lifting deck, the false shaft is pushed out from the side using the connecting shaft, and the connecting shaft is connected together through the centers of the front and rear lifting deck ear plates 2 and the articulation bearing 4. Through the corresponding boring method of the device, accurate boring operation can be realized, the connecting shaft can be accurately installed in place, repeated rework is avoided, material cost and labor cost are greatly saved, and labor intensity of workers is reduced.

[0044] Further, the adjusting mechanism comprises a fixing plate 5, a fixing member 6 and an adjusting member 7, the fixing plate 5 is locked on the leg ear plate 3 through the fixing member 6, the adjusting member 7 is movably installed on the fixing plate 5 and connected with the joint bearing 4, the adjusting member 7 can drive the joint bearing 4 to move relative to the fixing plate 5, specifically, the fixing member 6 is a fixing bolt, and the adjusting member 7 is an adjusting bolt. One end of the fixing bolt is fixedly connected with the fixing plate 5, and the other end is fixedly connected with the leg ear plate 3, so that the fixing plate 5 is fixed on the leg ear plate 3, then the installation position of the joint bearing 4 is adjusted through the adjusting bolt, so that the joint bearing 4 and the hole center of the leg ear plate 3 are in the same straight line, and then the joint bearing 4 is locked to prevent it from rolling.

[0045] Optionally, at least two front lifting deck ear plates 1 and two rear lifting deck ear plates 2 are included, the two front lifting deck ear plates 1 are connected through a front fixing frame 10, the two rear lifting deck ear plates 2 are connected through a rear fixing frame 11, so as to form a boring channel, a boring bar 8 is arranged in the boring channel, and a boring cutter 9 is fixed on the boring bar 8.

[0046] Based on the boring method used by the boring device, great economic benefits can be achieved, specifically as follows:

[0047] (1) Re-work material cost: replace one set of new lifting deck ear plate, cost 100000 yuan, material is EH500 high-strength steel with thickness of 150.

[0048] (2) Re-work labor cost: reassemble, weld, polish and paint, 10 days X 400 yuan / day X 6 people = 24000 yuan; boring operation, 7 days X 400 yuan / day X 2 people = 5600 yuan.

[0049] (3) Node delay loss cost: delay node for 17 days, 10000 yuan / day X 17 days = 170000 yuan, and 3000 yuan is invested to manufacture a new joint bearing adjusting tool.

[0050] The ship joint bearing lifting deck ear plate boring method used by a ship can save the following costs: 100000 + 5600 + 170000 - 3000 = 272600 yuan, and according to the calculation of manufacturing 4 ships per year, 272600 X 4 = 1090400 = 109.04 ten thousand yuan can be saved per year.

[0051] In the description of the present application, it should be understood that the terms "upper", "lower", "left", "right", and the like, are intended to facilitate the description and simplify the operation, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", are only used to distinguish in the description, and have no special meaning.

[0052] In the description of the present application, the description of the terms "an embodiment", "an example" and the like means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In the present application, the illustrative description of the above terms does not necessarily refer to the same embodiment or example.

[0053] In addition, it should be understood that although the present application is described in terms of embodiments, not every embodiment contains only one independent technical solution, and the description of the present application is only for the sake of clarity, and those skilled in the art should consider the present application as a whole, and the technical solutions in each embodiment can be appropriately combined to form other embodiments that those skilled in the art can understand.

[0054] The technical principles of the present application are described above in conjunction with specific embodiments. These descriptions are only for the purpose of explaining the principles of the present application, and cannot be interpreted in any way as a limitation on the scope of protection of the present application. Based on the explanation here, those skilled in the art do not need to make creative efforts to think of other specific embodiments of the present application, and these embodiments will fall within the scope of protection of the present application.

Claims

1. A method of boring an ear plate of a ship joint bearing lifting deck, characterized in that, The method comprises the following steps: The front and rear lifting deck ear plates (1) and (2) are arranged in correspondence and the hole centers of the front and rear lifting deck ear plates (1) and (2) are adjusted to be in the same straight line; The pile leg ear plate (3) is installed in the middle of the front and rear lifting deck ear plates (1) and (2), and the hole center of the pile leg ear plate (3) is adjusted to be in the same straight line with the hole centers of the front and rear lifting deck ear plates (1) and (2); The joint bearing (4) is installed on the pile leg ear plate (3) through the adjusting mechanism, the relative position of the joint bearing (4) and the pile leg ear plate (3) is adjusted through the adjusting mechanism, the hole center point of the joint bearing (4) corresponds to the hole center of the pile leg ear plate (3), and then the hole center point of the joint bearing (4) is in the same straight line with the hole centers of the front and rear lifting deck ear plates (1) and (2). After the hole center adjustment is completed, the boring bar (8) and the boring cutter (9) are used to perform boring operations on the front and rear lifting deck ear plates (1) and (2) respectively. After the boring is completed, the boring bar (8) is pulled out, the dummy shaft and the limiting sleeve are installed in the joint bearing (4), the pile leg is placed in the middle of the lifting deck, the dummy shaft is pushed out from the side by using the connecting shaft, and the connecting shaft is connected together through the centers of the front and rear lifting deck ear plates and the joint bearing (4).

2. The method of boring an ear of a ship's knuckle bearing lifting deck as defined in claim 1, wherein, Whether the hole centers are in the same straight line is detected by using the concentricity measuring instrument, and when it is judged that the hole centers are in the same straight line, the next step can be performed; when the hole centers have position deviation, the hole center positions are readjusted.

3. The ship journal bearing lift deck ear plate boring method according to claim 1 or 2, characterized in that, The position information when the hole centers of the front and rear lifting deck ear plates and the pile leg ear plate (3) are in the same straight line is measured in advance, the corresponding installation positions are marked according to the measurement results, and the front and rear lifting deck ear plates (1) and (2) and the pile leg ear plate (3) are installed according to the marks.

4. The method of boring an ear of a ship's knuckle bearing lifting deck as defined in claim 1 or 2, characterized in that, The front and rear and left and right positions of the joint bearing (4) on the pile leg ear plate (3) are adjusted through the adjusting mechanism, the front and rear positions of the joint bearing (4) are adjusted through the adjusting mechanism first, the front and rear positions of the joint bearing (4) correspond to the front and rear positions of the pile leg ear plate (3), then the left and right positions of the joint bearing (4) are adjusted through the adjusting mechanism, the left and right positions of the joint bearing (4) correspond to the left and right positions of the pile leg ear plate (3), and then the center positions of the joint bearing (4) and the pile leg ear plate (3) correspond to each other.

5. The method of boring an ear of a ship's knuckle bearing lifting deck as defined in claim 1 or 2, characterized in that, The horizontal height of the boring bar (8) is adjusted through the lifting mechanism, so that the center axis of the boring bar (8) coincides with or is parallel to the straight line of the hole center.

6. The boat bearing bore method of claim 1 or 2, wherein, The processing marks are pasted on the positions of the front and rear lifting deck ear plates (1) and (2) that need to be bored, the sensor for identifying the processing marks is arranged on the boring bar (8), when the sensor detects the processing marks, the boring bar (8) rotates to drive the boring cutter (9) to rotate, and the front and rear lifting deck ear plates (1) and (2) are bored.

7. A vessel knuckle bearing lift deck ear plate boring device characterized by, The method comprises the following steps: The front lifting deck ear plate (1), the rear lifting deck ear plate (2), the pile leg ear plate (3), the joint bearing (4) and the adjusting mechanism, the front lifting deck ear plate (1) and the rear lifting deck ear plate (2) are horizontally spaced, the pile leg ear plate (3) is installed between the front lifting deck ear plate (1) and the rear lifting deck ear plate (2), the joint bearing (4) is movably installed on the pile leg ear plate (3) through the adjusting mechanism, the adjusting mechanism can drive the joint bearing (4) to move relative to the pile leg ear plate (3), so that the hole center position of the joint bearing (4) is relatively consistent with the pile leg ear plate (3), and then the hole center of the joint bearing (4) is on the same straight line with the hole center of the front lifting deck ear plate (1) and the rear lifting deck ear plate (2).

8. The vessel knuckle bearing lift deck ear plate bore apparatus of claim 7, wherein, The adjusting mechanism comprises a fixed plate (5), a fixing piece (6) and an adjusting piece (7), the fixed plate (5) is locked on the pile leg ear plate (3) through the fixing piece (6), the adjusting piece (7) is movably installed on the fixed plate (5) and connected with the joint bearing (4), and the adjusting piece (7) can drive the joint bearing (4) to move relative to the fixed plate (5).

9. A vessel journal bearing lift deck ear plate boring apparatus according to claim 7 or 8, characterised in that, The fixing piece (6) is a fixing bolt, and the adjusting piece (7) is an adjusting bolt.

10. A vessel knuckle bearing lift deck ear plate boring apparatus according to claim 7 or 8, characterised in that, The front lifting deck ear plate (1) and the rear lifting deck ear plate (2) are connected through the front fixed frame (10) and the rear fixed frame (11) to form a boring channel, and the boring rod (8) is arranged in the boring channel, and the boring cutter (9) is fixed on the boring rod (8).

Citation Information

Patent Citations

  • Portable hole boring machine

    CN102248195A

  • Porous boring machine for combined boring bar

    CN102615309A