A marine disaster risk prevention and control early warning system
Through the design of the marine disaster risk prevention and control early warning system, the problem that existing technology is difficult to assess the impact of various marine disasters has been solved, comprehensive risk assessment and early warning of coastal projects have been achieved, defense capabilities and early warning accuracy have been improved, and disaster losses have been reduced. .
Patent Information
- Application Number
- CN202310584400.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-23
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2043-05-23
AI Technical Summary
Existing marine disaster risk prevention and control methods mainly focus on a single disaster factor and are difficult to apply to areas affected by multiple marine disasters. They lack systematic risk assessment and early warning mechanisms, resulting in reduced defense capabilities of coastal projects in extreme climate events and increased Disaster losses.
A marine disaster risk prevention and control early warning system is designed, including key defense area delineation, risk assessment, risk monitoring and early warning units. Through grid division, hydrometeorological monitoring, satellite remote sensing monitoring and unmanned boat emergency monitoring, comprehensive assessment and early warning, providing real-time monitoring and early warning.
It improves the defense capabilities of coastal projects against various marine disaster risks, reduces disaster losses, provides more refined risk assessment and early warning, and enhances the pertinence and effectiveness of disaster prevention and relief.
Smart Images

Figure CN116797019B_ABST
Abstract
Description
Technical Field
[0001] The present invention mainly relates to the technical field of marine disaster prevention, control and early warning, and in particular to a marine disaster risk prevention, control and early warning system. Background Art
[0002] The damage caused by marine disasters to coastal economies and societies has become a factor restricting the economic and social development of coastal areas. At the same time, against the backdrop of global warming and frequent extreme climate events, the defense capabilities of large coastal projects have been reduced due to factors such as storm surges, waves, tsunamis and sea ice, increasing the risk of damage caused by marine disasters. Therefore, marine disaster risk prevention and control for marine engineering projects is an important basic work to prevent and mitigate marine disasters, reduce the loss of life and property caused by marine disasters, and rationally develop and utilize the ocean.
[0003] At present, the prevention and control of marine disaster risks is mainly carried out by the government at the macro level for county and city pilot projects, while risk prevention and control for large marine projects, especially new projects, is still rare, and there is no systematic method and standard. In order to prevent and resolve the harm of marine disaster risks to nuclear power projects, it is of great significance to carry out monitoring, assessment, prevention and control, and early warning of various marine disaster risks. However, the current survey of marine disaster risk factors mostly only assesses the impact of a single disaster factor, and the assessment results are one-sided and difficult to apply to areas affected by multiple marine disasters. Therefore, the development of marine disaster risk prevention and control early warning systems, the improvement of disaster prevention and disaster resistance capabilities, and the reduction of marine disaster risks are urgent and of great significance. It will help prevent and resolve major safety risks from the source, solve problems at the budding stage and before disasters occur, and provide scientific and comprehensive support for regional disaster comprehensive risk assessment, risk warning, and disaster emergency rescue.
[0004] The above-mentioned record of background technical knowledge is intended to help ordinary technicians in this field understand the existing technologies that are relatively close to the present invention, and at the same time facilitate the understanding of the inventive concept and technical solution of this application. It should be clear that in the absence of clear evidence that the above-mentioned content has been disclosed before the filing date of this patent application, the above-mentioned background technology should not be used to evaluate the novelty of the technical solution of this application. Summary of the invention
[0005] In order to solve at least one of the technical problems mentioned in the above background technology, the purpose of the present invention is to provide a marine disaster risk prevention and control early warning system, which aims to formulate disaster risk prevention and control and safety assurance service plans based on the identification of marine natural disaster risks and potential environmental disaster risks of nuclear power plant projects, propose countermeasures and suggestions for marine disaster risk prevention and control, and issue relevant forecasts and warnings when marine disaster risks may occur.
[0006] A marine disaster risk prevention and control early warning system, comprising:
[0007] The key defense area demarcation unit is used to demarcate key defense areas according to the importance of the disaster-bearing body and the prevention and control warning area;
[0008] Risk assessment unit, used to investigate and assess marine disaster risks in key defense areas;
[0009] Risk monitoring unit, used to carry out marine disaster risk monitoring in the sea area near the nuclear power plant area;
[0010] The early warning unit, based on the risk assessment and risk monitoring results, issues forecasts and warnings on possible marine disaster risks during the construction and operation periods.
[0011] Preferably, the key defense area demarcation unit is further used to divide the demarcated key defense area into grids to obtain sub-defense areas.
[0012] Preferably, the risk assessment unit conducts marine disaster risk screening for key defense areas including:
[0013] Risk investigation of protection projects for disaster-stricken objects such as nuclear power plants under the influence of storm surges, waves and tsunamis, risk investigation of warm wastewater from nuclear power plants, risk investigation of radioactive liquid effluents and risk investigation of water intake safety.
[0014] Preferably, the risk assessment unit performs marine disaster risk assessment on key defense areas including:
[0015] Assessment of marine disaster risks under conditions of possible maximum storm surge increase and decrease;
[0016] Assessment of marine hazard risks under tsunami conditions.
[0017] Preferably, the risk monitoring unit carries out marine disaster risk monitoring in the sea area near the nuclear power plant area including: hydrological and meteorological monitoring, water quality and ecological monitoring, satellite remote sensing monitoring, wave height monitoring and unmanned boat emergency monitoring.
[0018] Preferably, the elements for issuing early warnings for possible marine disaster risks during the construction and operation periods include: storm surges, disastrous waves and tsunamis.
[0019] Preferably, the early warning unit further includes a comprehensive risk level assessment for each sub-defense zone, and the comprehensive risk level assessment formula for the sub-defense zone is:
[0020]
[0021] Among them, RS is the comprehensive risk level of the sub-defense area; n is the number of disaster-prone objects in the sub-defense area; D is the defense risk capability level of the sub-defense area; d i is the defense risk capability level of the ith disaster-bearing body in the sub-defense zone; iis the importance level of the ith disaster-bearing body in the sub-defense zone; F i It is the comprehensive disaster level of the ith disaster-bearing object in the sub-defense area.
[0022] Preferably, the early warning unit further includes evaluating the comprehensive disaster level of each disaster-bearing body in each sub-defense zone, and the comprehensive disaster level evaluation formula of each disaster-bearing body is:
[0023]
[0024] Among them, F i is the comprehensive disaster level of the ith disaster-bearing body in the sub-defense zone, R ij is the level of the jth marine disaster risk borne by the ith hazard-bearing body in the sub-defense zone, and m is the number of marine disaster risks.
[0025] A marine disaster risk prevention and control early warning method, comprising:
[0026] Step 1: Delineate key defense areas according to the importance of the disaster-bearing body, and divide the key defense areas into grids to obtain sub-defense areas;
[0027] Step 2: Conduct marine disaster risk investigation and assessment in key defense areas;
[0028] Step 3: Conduct marine disaster risk monitoring in the waters near the nuclear power plant area;
[0029] Step 4: Based on the risk assessment and risk monitoring results, forecasts and warnings are issued for possible marine disaster risks during the construction and operation periods;
[0030] Step 5: Conduct a comprehensive risk level assessment on each of the sub-defense areas, conduct a comprehensive disaster level assessment on each disaster-prone body within each of the sub-defense areas, and sort the assessment results for use as auxiliary warnings.
[0031] A computer-readable storage medium stores a computer program that can be executed by a processor, and when the computer program is executed by the processor, it runs at least one step of the aforementioned marine disaster risk prevention and control early warning method.
[0032] A computer device, comprising a memory, a processor, a communication interface and a communication bus; wherein the memory, the processor and the communication interface communicate with each other via the communication bus; the memory is used to store computer programs; the processor is used to execute the computer programs stored in the memory, and when the processor executes the computer program, it implements at least one step of the aforementioned marine disaster risk prevention and control early warning method.
[0033] The beneficial effects of this application are:
[0034] The scheme of the present invention includes demarcating key defense areas and sub-defense areas for the prevention and control warning areas, and then conducting marine disaster risk investigation and risk assessment in the key defense areas. It also carries out hydrological and meteorological monitoring, water quality ecological monitoring, satellite remote sensing monitoring, and wave height monitoring in the sea areas near the nuclear power plant. In special circumstances, unmanned boat platforms can also be used for emergency monitoring to provide real-time monitoring and warnings of various disasters, and provide accurate real-time data for forecasts and warnings. It also includes issuing forecasts and warnings of marine disaster risks that may occur during the construction and operation periods based on risk assessment results and risk monitoring results, formulating risk prevention and control and safety assurance service plans to deal with marine disasters, and proposing marine disaster risk prevention and control countermeasures and suggestions.
[0035] When marine disaster risks come, while issuing marine disaster risk warnings, the comprehensive risk level ranking results of each sub-defense area and the comprehensive disaster level ranking results of each disaster-prone body in each sub-defense area will be warned together. This will help each sub-defense area and each disaster-prone body to take timely and effective risk avoidance according to their own risk level, and can greatly exert the mobility of small units, greatly improve the overall ability of the defense area to resist marine disaster risks, and minimize disaster losses.
[0036] The present application can also evaluate the comprehensive disaster level of a disaster-prone body within a sub-defense zone. When evaluating it, it takes into account that different disaster-prone bodies are affected differently by the same marine disaster risk, and flexibly sets the level at which they are subject to the same marine disaster risk. Therefore, it can provide each disaster-prone body with a more refined comprehensive disaster level, which is conducive to targeted early warning and disaster prevention and relief for different disaster-prone bodies. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] In order to make the above and / or other purposes, features, advantages and examples of the present invention more obvious and easy to understand, the drawings required for use in the specific implementation of the present invention will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without paying creative work.
[0038] Figure 1 It is a flow chart of the marine disaster risk prevention and control early warning system of the present invention;
[0039] Figure 2 is a schematic diagram of emergency monitoring of an unmanned boat of the present invention;
[0040] Figure 3 It is a flow chart of the specific steps of the marine disaster risk prevention and control early warning method of the present invention. DETAILED DESCRIPTION
[0041] Those skilled in the art can refer to the content of this article and appropriately replace and / or modify the process parameters to achieve the same. However, it should be particularly noted that all similar replacements and / or modifications are obvious to those skilled in the art and are considered to be included in the present invention. The products and preparation methods described in the present invention have been described through preferred examples. It is obvious that relevant personnel can modify or appropriately change and combine the products and preparation methods described herein without departing from the content, spirit and scope of the present invention to implement and apply the technology of the present invention.
[0042] Unless otherwise defined, technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which the invention belongs. The present invention uses the methods and materials described herein; however, other suitable methods and materials known in the art may also be used. The materials, methods, and examples described herein are illustrative only and are not intended to be limiting. All publications, patent applications, patents, provisional applications, database entries, and other references mentioned herein are incorporated herein by reference in their entirety. In the event of a conflict, the present specification, including definitions, shall prevail.
[0043] Unless specifically stated, the materials, methods, and examples described herein are illustrative only and not limiting. Although methods and materials similar or equivalent to those described herein can be used in the practice or testing of the present invention, suitable methods and materials are still described herein.
[0044] The present invention is described in detail below with specific embodiments.
[0045] Embodiment 1:
[0046] Provided is a marine disaster risk prevention and control early warning system, including:
[0047] The key defense area demarcation unit is used to demarcate key defense areas according to the importance of the disaster-bearing body and the prevention and control warning area;
[0048] Risk assessment unit, used to investigate and assess marine disaster risks in key defense areas;
[0049] Risk monitoring unit, used to carry out marine disaster risk monitoring in the sea area near the nuclear power plant area;
[0050] The early warning unit, based on the risk assessment and risk monitoring results, issues forecasts and warnings on possible marine disaster risks during the construction and operation periods.
[0051] The flowchart of the marine disaster risk prevention and control early warning system in this application is as follows Figure 1As shown in the figure, firstly, the key defense areas are divided into grid-based sub-defense areas for the prevention and control warning areas, and then the key defense areas including the sub-defense areas are checked and evaluated for marine disaster risks. The marine disaster risks in the sea areas near the nuclear power plant are also monitored. Based on the risk assessment results and risk monitoring results, the possible marine disaster risks are forecasted and warned. At the same time, the comprehensive risk level is assessed for each sub-defense area, and the comprehensive disaster level is assessed for each disaster-bearing body in each sub-defense area. According to the assessment results, a comprehensive risk level warning for the sub-defense area and a comprehensive disaster level warning for each disaster-bearing body in the sub-defense area are issued. The system can provide real-time monitoring and warning for various disasters. Early warning for each sub-defense area and each disaster-bearing body helps to greatly exert the mobility of small units, greatly improve the overall ability of the defense area to resist marine disaster risks, minimize disaster losses, and provide each disaster-bearing body with a more refined comprehensive disaster level, which is conducive to targeted early warning and disaster prevention and relief for different disaster-bearing bodies.
[0052] As a preferred embodiment of the specific implementation scheme, the area to be controlled and warned includes the nuclear power plant area.
[0053] As a preferred embodiment of the specific implementation plan, the key defense areas to be demarcated according to the importance of the disaster-bearing body include:
[0054] Identify the engineering facilities under construction and in operation within 15km of the coast;
[0055] The engineering facilities under construction and in operation are designated as key defense areas if they meet at least one of the following conditions: the investment amount is more than 10 billion yuan, the storm surge disaster may cause major casualties, the storm surge disaster may cause major economic losses, and the storm surge disaster may cause particularly severe social impacts.
[0056] As a preference for the specific implementation scheme, the engineering facilities under construction and in operation include, but are not limited to: nuclear power plants, petrochemical enterprises, airports, industrial parks, densely populated residential areas, and schools.
[0057] According to the Technical Guidelines for Delineation of Key Defense Areas for Storm Surge Disasters DB33 / T2142-2018, the delineation of key defense areas for storm surge disasters should be updated in a timely manner based on factors such as the natural environment, social and economic development, key technological innovation, and coastal storm surge disaster risks. When there are major changes in the natural environment or social and economic development in the delineated area, it should be re-delineated in a timely manner. After the construction and operation of nuclear power and its supporting projects, the local natural environment or social and economic development will undergo major changes, and the defense area should be re-delineated in a timely manner. Therefore, for areas to be controlled and warned that are vulnerable to marine disaster risks and contain particularly important disaster-bearing bodies, they should be determined as key defense areas for storm surge disasters.
[0058] As a preferred embodiment of the specific implementation scheme, the key defense area demarcation unit is also used to divide the demarcated key defense area into grids to obtain sub-defense areas.
[0059] As a preferred embodiment of the specific implementation plan, when the designated key defense area is divided into grids to obtain various sub-defense areas, it is ensured that all parts of any disaster-stricken object are within a certain sub-defense area.
[0060] As a preferred embodiment of the specific implementation plan, the risk assessment unit conducts marine disaster risk inspections on key defense areas, including risk inspections on protective projects of disaster-stricken objects such as nuclear power plants under the influence of storm surges, waves and tsunamis, risk inspections on warm wastewater from nuclear power plants, risk inspections on radioactive liquid effluents and risk inspections on water safety.
[0061] As a preferred embodiment of the specific implementation plan, when the risk assessment unit conducts marine disaster risk inspections in key defense areas, the characteristic parameters of storm surges and wave effects include: astronomical tides, possible maximum storm surge and reduction calculations; possible maximum typhoon wave calculations; and review of design benchmark flood levels and plant elevations.
[0062] As a preferred embodiment of the specific implementation plan, when the risk assessment unit conducts marine disaster risk inspection in key defense areas, the characteristic parameters of tsunami effects include: astronomical tide, possible maximum tsunami increase, water reduction calculation and maximum tsunami height calculation.
[0063] As a preferred embodiment of the specific implementation plan, the process of the risk assessment unit conducting marine disaster risk screening for key defense areas includes:
[0064] Collection of basic data: Study relevant technical documents and basic data of the projects under investigation, collect historical and current data, and conduct preliminary analysis of basic data and project data;
[0065] Preparation of technical investigation plan: Prepare a technical investigation plan based on the preliminary analysis results, including: clarifying the characteristic parameters of the investigation, including tsunami simulation parameters, sea level changes, engineering and foundation settlement, and the calculation model used, and determining the investigation content and results requirements;
[0066] Supplementary investigation and survey of the current situation: Based on the collected basic data and information, and in accordance with the investigation contents determined in the investigation technical plan, necessary supplementary investigation of the current situation is carried out, including investigation of the current situation of defense facilities, protective engineering, etc.;
[0067] Characteristic parameter analysis and calculation: Based on the collected and supplemented survey data, analyze and calculate the engineering design parameters and key characteristic parameters under tsunami conditions. The characteristic parameters of the engineering investigation include storm surge, tsunami simulation parameters, sea level changes, engineering and foundation settlement, analysis and calculation models, etc.
[0068] Marine disaster risk analysis: Based on the characteristic parameter analysis and calculation results, a comparative analysis is conducted with the characteristic parameters of the original engineering design; combined with the engineering defense design standards and the current status of the protection project, the design standard change analysis of storm surges, waves, and tsunamis and the risk analysis of design parameters are conducted to provide a screening conclusion;
[0069] Preparation of investigation report: Based on the conclusions of the engineering marine disaster risk investigation, put forward countermeasures and suggestions for improving marine disaster prevention, and prepare a marine disaster risk investigation report for large coastal projects.
[0070] As a preferred embodiment of the specific implementation plan, the risk assessment unit's marine disaster risk screening for key defense areas also includes screening for storm surge and wave risks of nuclear power projects and screening for tsunami risks of nuclear power projects.
[0071] As a preferred embodiment of the specific implementation scheme, the investigation of storm surge and wave risks of the nuclear power project includes:
[0072] (1) Data collection and processing: Collect historical and current data related to the investigation project, mainly including tidal level, waves, meteorological data, project overview, protection project overview, terrain data, and other data related to the investigation project;
[0073] (2) Determination of storm surge and wave characteristic parameters: The characteristic parameters of nuclear power projects are mainly astronomical high tide level, sea level change, possible maximum storm surge, possible maximum typhoon wave, and design base flood level;
[0074] (3) Storm surge and wave risk analysis: Risk analysis is conducted based on the design base flood level, plant elevation, levee crest elevation, and water intake;
[0075] (4) Investigation conclusions and suggestions: Based on the investigation results, give investigation conclusions and corresponding reasonable suggestions.
[0076] As a preferred embodiment of the specific implementation scheme, the investigation of tsunami risks in nuclear power projects includes:
[0077] (1) Data collection and processing: Collect historical and current data and information related to the investigation, mainly including data on tide levels, tsunamis, earthquakes, etc.; project overview, protection project overview, terrain data, and other relevant information for the investigation project;
[0078] (2) Determination and calculation of characteristic parameters: The characteristic parameters of nuclear power projects are mainly astronomical high tide level, sea level change, possible maximum earthquake source parameters, possible maximum tsunami, and design base flood level;
[0079] (3) Tsunami risk analysis: Conduct risk analysis based on the design benchmark flood level and plant elevation;
[0080] (4) Investigation conclusions and suggestions: Based on the investigation results, the investigation conclusions and corresponding reasonable suggestions are given for the deterministic investigation contents.
[0081] As a preferred embodiment of the specific implementation plan, if the risk assessment unit is unable to collect and check historical and current data and information when conducting marine disaster risk inspections in key defense areas, it should carry out necessary on-site surveys and investigations, specifically: select a site to establish a temporary marine element observation point, and conduct temporary observations of waves, tides, weather and other elements for no less than 1 year. The observed elements include: wind speed, wind direction, wave height, wave direction, wave period, tide level and drift speed, etc.
[0082] As a preferred embodiment of the specific implementation plan, the disaster risk characteristic parameters of the risk assessment unit when conducting marine disaster risk inspection in key defense areas include: astronomical high tide level, sea level change, possible maximum storm surge increase, decrease, possible maximum typhoon wave; design benchmark flood level, top elevation of protective project and factory floor elevation.
[0083] As a preferred embodiment of the present invention, the analysis and calculation of the astronomical high tide level includes:
[0084] Calculation of astronomical high and low tides with 10% exceedance probability: Analyze and calculate the tidal characteristics of the sea area where the project is located and calculate the astronomical tides of the previous 19 years. Take the maximum astronomical tides of each month and rank them to obtain the astronomical high and low tides with 10% exceedance probability;
[0085] Calculation of astronomical high and low tides in the previous 19 years: Analyze and calculate the tidal characteristics of the sea area where the project is located and calculate the astronomical tides in the previous 19 years, taking the maximum (minimum) value as the highest and lowest astronomical tides.
[0086] As a preferred embodiment of the specific implementation plan, the analysis and calculation of sea level changes include: based on the multi-year tide level data (not less than 19 consecutive years) of the sea area where the project is located or the nearby tide level station with high tidal properties similar to the sea area where the project is located, the historical multi-year average sea level value and annual average change trend of the sea area where the project is located are analyzed, and according to the design service life of the investigation project, the annual average change trend of the sea level in the future design service period and the predicted height value of the maximum sea level change are estimated. The estimated value should be compared with the results in the latest "China Sea Level Bulletin" and be subject to expert technical review.
[0087] As a preferred embodiment of the specific implementation plan, the analysis and calculation of the possible maximum storm surge water increase includes: analyzing and calculating and determining the possible maximum typhoon parameters: typhoon center pressure, typhoon maximum wind speed radius, maximum wind speed, typhoon moving speed, outer sea surface pressure, and using a typhoon storm surge numerical model to calculate the maximum storm surge water increase. It should be understood that any model that can calculate the maximum storm surge water increase can be applied, and further typhoon storm surge numerical models should meet the following conditions: using a mature storm surge numerical model suitable for China's coastal areas; or using a mature astronomical tide-storm surge-wave coupling model; the grid resolution is high enough to better describe the terrain around the nuclear power plant project; the calculation area coverage is large enough to be comparable to the scale of a strong typhoon, and the distance from its outer sea boundary to the research object (nuclear power plant project) is at least 800 kilometers; simulate and test the typical storm surge process that has historically affected the area where the project is located to ensure that the maximum storm surge error of the main tide stations near the project is within 8%, and in principle, the number of typical storm surge cases used for testing is not less than 15.
[0088] As a preference for a specific implementation plan, the analysis and calculation of the possible maximum storm surge water reduction may refer to the analysis and calculation method of the possible maximum storm surge water increase; further, the possible maximum storm surge water reduction may be analyzed by using the astronomical low tide level with a 10% exceedance probability or the lowest astronomical tide level in the previous 19 years + the possible maximum storm water reduction.
[0089] As a preferred embodiment of the specific implementation plan, the analysis and calculation of the possible maximum typhoon wave includes: using the wave numerical model to calculate the possible maximum typhoon wave near the project based on the wind speed, wind direction, possible maximum storm surge and other parameters of the determined possible maximum tropical cyclone. The calculation position of the possible maximum typhoon wave should be consistent with the position calculated during the engineering design. The wave analysis during the possible maximum storm surge generally adopts the assumed calculation method, considering the principle of conservativeness, and calculates the process curves such as wave height and wave period at the designated project. It should be understood that any wave numerical model that can calculate the maximum typhoon wave can be applied, and the wave numerical model should meet certain conditions, mainly including: the grid resolution is high enough to better describe the terrain around the nuclear power plant project; the calculation area coverage is large enough, and the distance between its outer sea boundary and the inspection object is at least 800 kilometers; carry out hindcast inspection under strong sea conditions such as typhoons, cold waves, gale, and temperate cyclones, and the relative error of effective wave heights greater than 2 meters is in principle not more than 15%.
[0090] As a preferred embodiment of the specific implementation plan, the calculation and analysis of the design base flood level includes: 10% exceedance probability astronomical high tide level (or the highest astronomical tide level in 19 years), possible maximum storm surge and sea level change. The calculation of the design base flood level shall be carried out in accordance with the "Design Specifications for Marine Structures of Nuclear Power Plants" (NB / T 25002-2011) and "Determination of Design Base Flood for Coastal Nuclear Power Plant Sites" (HAD101 / 09).
[0091] As a preferred embodiment of the specific implementation scheme, the risk assessment unit performs marine disaster risk assessment on key defense areas including:
[0092] Assessment of marine disaster risks under conditions of possible maximum storm surge increase and decrease;
[0093] Assessment of marine hazard risks under tsunami conditions.
[0094] As a preferred embodiment of the specific implementation scheme, the assessment of the marine disaster risk under the possible maximum storm surge increase and decrease conditions includes:
[0095] (1) Analysis and determination of the possible maximum storm surge increase or decrease;
[0096] (2) Analysis and determination of the possible maximum storm surge increase and decrease and the superposition of wind, waves and tides and the superposition frequency;
[0097] (3) Characteristics of underwater disasters caused by possible maximum storm surge increase and decrease and their prediction and analysis;
[0098] (4) Analysis of the hazards and risks of secondary disasters that may occur under the maximum storm surge increase or decrease;
[0099] (5) Assessment of damage caused by secondary disasters due to possible maximum storm surge increase or decrease;
[0100] (6) Recommendations and countermeasures for engineering defense against marine disasters under extreme tidal levels caused by the possible maximum storm surge increase or decrease.
[0101] As a preferred embodiment of the specific implementation scheme, the assessment of marine disaster risk under tsunami conditions includes:
[0102] (1) Analysis and determination of tsunami characteristic values (wave height, wavelength, period, duration, travel speed, etc.);
[0103] (2) Analysis and evaluation of sea level change and ground (engineering) subsidence parameters;
[0104] (3) Tsunami disaster characteristics and prediction analysis;
[0105] (4) Tsunami disaster hazard and risk analysis;
[0106] (5) Assessment of secondary disaster damage to engineering projects under tsunami conditions;
[0107] (6) Recommendations and countermeasures for engineering defense against tsunami disasters.
[0108] As a preferred embodiment of the specific implementation plan, the risk monitoring unit conducts marine disaster risk monitoring in the sea area near the nuclear power plant area, including: hydrological and meteorological monitoring, water quality and ecological monitoring, satellite remote sensing monitoring, wave height monitoring and unmanned boat emergency monitoring.
[0109] As a preferred embodiment of the specific implementation plan, the hydrological and meteorological monitoring of the risk monitoring unit includes: establishing tide wells and meteorological observation points within the factory area to monitor hydrological and meteorological conditions, and projecting 3m wave buoys in the sea area about 8km outside the factory area to monitor waves and sea surface meteorology.
[0110] Tide wells (including temperature and salt) should be located in wide sea areas with smooth access to the open sea, stable water flow, not easy to silt, less wave impact, good water depth, and no scouring. They should be representative of a certain region in terms of geographical conditions. It is recommended to be located next to large-scale docks and in sea areas that do not affect the navigation of ships. 3m wave buoys should be deployed in sea areas with open areas around them, water depths of more than 10m, and no obstacles such as reefs, sandbars, and aquaculture and fishing areas. In particular, underwater terrains such as channels and culverts should be avoided. Monitoring of these stations can provide timely and accurate real-time data for daily forecasts during the construction and operation of nuclear power plants, as well as early warning of marine disasters. The statistical table of technical parameters of marine monitoring elements is shown in Table 1.
[0111] Table 1- Statistical table of technical parameters of ocean observation elements
[0112]
[0113]
[0114] As a preferred embodiment of the specific implementation plan, the water quality ecological monitoring of the risk monitoring unit includes: placing an ecological buoy at the water intake and outlet of the nuclear power plant respectively, carrying out online water quality monitoring, real-time monitoring of changes in water quality environmental characteristic elements, obtaining conventional water quality elements in the sea area where the representative station is located, transmitting the collected data to the shore base station in real time through the communication system, and storing and uploading the acquired data to ensure that real-time and accurate environmental element data are provided for water quality ecological warning. The online monitoring system mainly monitors the conventional water quality elements in the sea area where the representative station is located, and transmits the monitored elements to the forecast center in real time through the communication system. The forecast center stores, analyzes and distributes the acquired data.
[0115] As a preference for the specific implementation scheme, the conventional water quality elements of the water quality ecological monitoring of the risk monitoring unit include: chlorophyll-a, dissolved oxygen, salinity, pH, surface water temperature, turbidity, and nutrients.
[0116] As a preferred embodiment of the specific implementation plan, the satellite remote sensing monitoring of the risk monitoring unit includes: conducting red tide, green tide, water pollutant status monitoring and analysis, as well as sea surface temperature, wind, and wave monitoring and analysis through satellite remote sensing monitoring. Receive and process delayed and real-time satellite remote sensing water color data to provide basic data for initial field correction of water quality forecast models and comparison of forecast results. Satellite remote sensing data sources include EOS-AM1 (Terra), EOS-AM2 (Aqua) and Ocean No. 2 HY2A powered satellites equipped with MODIS sensors.
[0117] As a preferred embodiment of the specific implementation scheme, the monitoring elements of the satellite remote sensing monitoring of the risk monitoring unit include: chlorophyll a, sea surface temperature, wind, and waves.
[0118] As a preferred embodiment of the specific implementation plan, the wave height monitoring of the risk monitoring unit includes: constructing wave height video monitoring and wave dynamic pressure observation on the embankment directly facing the sea, receiving and processing real-time data on real-time monitoring of the marine environment such as wave height, period and wave direction, wave height in front of the embankment, etc., performing nearshore wave climbing calculations, studying the coupled physical process of nearshore storm surges and waves, and conducting real-time monitoring and early warning of the status of the embankment during the influence of typhoon storm surges.
[0119] As a preferred embodiment of the specific implementation plan, the unmanned boat emergency monitoring of the risk monitoring unit includes: using an integrated integrated monitoring and observation unmanned boat platform with meteorological, hydrological, water quality and video monitoring equipment installed on it to perform an emergency monitoring platform. Its detection elements include: data, image monitoring and video monitoring of wind speed, wind direction, air temperature, humidity, air pressure, visibility, flow velocity and direction, pH value, water temperature, salinity, water quality, marine life, marine chemistry, semi-volatile organic compounds, volatile organic compounds, seawater sampling, sediment quality, etc. Figure 2 shown.
[0120] With the goal of reducing the probability of production accidents and personnel safety accidents caused by factors such as strong winds, high waves, storm surges, and biological aggregation at sea, and improving the protection of safe production in the waters near the nuclear power plant during the construction and operation and maintenance periods, according to the characteristics of engineering construction, we will carry out the construction of marine hydrological meteorological and ecological environmental monitoring and alarm systems in the waters adjacent to the nuclear power plant to meet the needs of engineering construction, daily production and supervision for marine monitoring and alarm information. Therefore, hydrological and meteorological monitoring, ecological environmental monitoring, satellite remote sensing monitoring, and unmanned boat emergency comprehensive monitoring are carried out in the seas near the plant to provide real-time monitoring and warnings of various disasters, and provide accurate real-time data for forecasts and warnings.
[0121] As a preferred embodiment of the specific implementation scheme, the marine disaster risks that may occur during the construction period include:
[0122] Including storm surges, severe waves and tsunamis and the natural disaster risks caused by them;
[0123] The risks of ecological disasters include red tides, green tides and the enrichment of jellyfish.
[0124] As a preferred embodiment of the specific implementation scheme, the marine disaster risks that may occur during the operation period include:
[0125] Including storm surges, severe waves and tsunamis and the natural disaster risks caused by them;
[0126] Including the risk of ecological disasters caused by red tides, green tides, and the accumulation of jellyfish; and
[0127] This includes ecological and environmental risks caused by emissions from warm wastewater, radioactive liquid effluents, and residual chlorine from nuclear power plants.
[0128] As a preferred embodiment of the specific implementation scheme, the elements for forecasting the risks of marine disasters that may occur during the construction period include: wind, waves, currents, water temperature, salinity, chlorophyll and tides, as shown in Table 2.
[0129] Table 2- Construction period forecast elements
[0130]
[0131]
[0132] As a preferred embodiment of the specific implementation scheme, the elements for forecasting the marine disaster risks that may occur during the operation period include: wind, waves, currents, water temperature, plankton, and tide level, as shown in Table 3.
[0133] Table 3- Operation period forecast elements
[0134]
[0135] As a preferred embodiment of the specific implementation plan, the elements for issuing early warnings for possible marine disaster risks during the operation period also include: water temperature at the water intake, cold source threatening organisms at the water intake, red tides, green tides, jellyfish gatherings in nearby seas, warm discharge from nuclear power plants, and radioactive liquid effluents.
[0136] As a preferred embodiment of the specific implementation scheme, the water temperature warning at the water intake includes: at least three temperature sensors are arranged near the water intake, and a warning is issued when the temperature of all temperature sensors deviates from the normal water temperature by more than 2°C.
[0137] As a preferred embodiment of the specific implementation scheme, the cold source threat organism early warning for the water intake includes: conducting a forecast of the aggregation of cold source threat organisms at the water intake and providing plankton concentration.
[0138] As a preferred embodiment of the specific implementation plan, the red tide, green tide and jellyfish gathering warning in the nearby sea area includes: conducting weekly forecasts of red tide and green tide hydrological and meteorological conditions in spring and summer, and issuing probability forecasts and warnings of red tide and green tide occurrence in the sea area near the project in the next week.
[0139] As a preferred embodiment of the specific implementation scheme, the nuclear power plant warm wastewater early warning includes: issuing an early warning when it is monitored that the water temperature, dissolved oxygen, turbidity, salinity and residual chlorine emissions of the warm wastewater deviate from normal values and exceed set thresholds.
[0140] As a preferred embodiment of the present invention, the radioactive liquid effluent early warning includes:
[0141] Routine island wastewater sample measurement items include total gamma and 3 H;
[0142] The nuclear island waste liquid sample measurement items include total gamma, 3 H, total β and γ spectrum analysis;
[0143] Based on the measurement data of the above samples, the radioactive emission of liquid effluent is obtained;
[0144] An early warning is issued when the above measurement data and / or the radioactive emissions of liquid effluent exceed the standard threshold.
[0145] As a preferred embodiment of the specific implementation plan, the elements for issuing early warnings for the marine disaster risks that may occur during the construction period and the operation period include: storm surges, disastrous waves and tsunamis, as shown in Table 4.
[0146] Table 4- Warning elements during construction and operation periods
[0147]
[0148] As a preferred embodiment of the specific implementation plan, the warning of possible marine disaster risks during the construction and operation periods specifically includes:
[0149] (1) High wind warning: According to the sea wave warning emergency plan, in winter, timely issue high wind and high wave warnings for construction sea areas caused by cold air; in spring and autumn, timely issue high wind and high wave warnings for construction sea areas caused by cyclones; the warning content includes wind direction, wind speed, wave height, wave direction and engineering safety tips;
[0150] (2) Storm surge warning: During the period of storm surge disasters in the sea areas around the nuclear power plant, a sea storm surge warning will be issued, including the warning level and the storm surge warning for the next 24 hours; storm surge information for the sea areas near the nuclear power plant will be issued as required, with yellow and blue warnings issued no less than twice a day, and red and orange warnings issued every 6 hours until the warning is lifted;
[0151] (3) Disaster wave warning: During the period of wave disasters in the sea areas around the nuclear power plant, sea wave warnings will be issued, including warning levels, wave heights in the next 24 hours, and wave direction warnings; sea wave information in the sea areas near the nuclear power plant will be issued as required, with yellow and blue warnings issued no less than twice a day, and red and orange warnings issued every 6 hours until the alarm is lifted;
[0152] (4) Tsunami warning: Strictly refer to the relevant "Storm Surge, Wave, Sea Ice and Tsunami Disaster Emergency Response Plan" and promptly forward the tsunami warnings issued by the National Marine Environmental Forecast Center.
[0153] As a preferred embodiment of the specific implementation plan, the early warning unit further includes a comprehensive risk level assessment for each sub-defense zone, and the comprehensive risk level assessment formula for the sub-defense zone is:
[0154]
[0155] Among them, RS is the comprehensive risk level of the sub-defense area; n is the number of disaster-prone bodies in the sub-defense area; D is the defense risk capability level of the sub-defense area, which is set to 1, 2, and 3 in order from low to high defense risk capabilities; d i is the defense risk capability level of the ith disaster-bearing body in the sub-defense zone. The levels are set to 1, 2, 3, 4, and 5 in order from low to high defense risk capabilities; I i is the importance level of the ith disaster-bearing body in the sub-defense zone, and the levels are set to 1, 2, 3, 4, and 5 in order from low to high importance; F i is the comprehensive disaster level of the ith disaster-bearing body in the sub-defense zone, Where R ij is the level of the j-th marine disaster risk borne by the ith hazard-bearing body in the sub-defense zone, and the levels are set to 1, 2, 3, 4, 5, 6, 7, 8, 9, and 10, and m is the number of marine disaster risks.
[0156] As a preferred embodiment of the specific implementation plan, the marine disaster risks in the comprehensive risk level assessment of each sub-defense zone and the comprehensive disaster level assessment of the disaster-bearing objects in the sub-defense zone specifically include at least one of the ecological and environmental risks caused by astronomical tides, possible maximum storm surge, decrease in water level, typhoons, tsunamis, earthquakes, catastrophic waves, water temperature changes, salinity changes, tides, strong winds, relative humidity changes, air pressure changes, semi-volatile organic compounds, volatile organic compounds, red tides, green tides, jellyfish enrichment, warm discharge from nuclear power plants, radioactive liquid effluents, and residual chlorine emissions.
[0157] As a preferred implementation plan, when issuing a marine disaster risk warning, each sub-defense area will be ranked from high to low according to its corresponding comprehensive risk level, and the ranking results will be announced as an auxiliary warning.
[0158] As a preferred implementation plan, when issuing a marine disaster risk warning, the disaster-prone objects in each sub-defense zone will be ranked from high to low according to their comprehensive disaster level, and the ranking results will be announced as an auxiliary warning.
[0159] When marine disaster risks come, while issuing marine disaster risk warnings, the comprehensive risk level ranking results of each sub-defense area and the comprehensive disaster level ranking results of each disaster-prone body in each sub-defense area will be warned together. This will help each sub-defense area and each disaster-prone body to take timely and effective risk avoidance according to their own risk level, and can greatly exert the mobility of small units, greatly improve the overall ability of the defense area to resist marine disaster risks, and minimize disaster losses.
[0160] As a preferred embodiment of the specific implementation scheme, in the sub-defense zone comprehensive risk level assessment formula, the level R of the j-th marine disaster risk borne by the i-th disaster-bearing body in the sub-defense zone is ij , according to the different impacts of the same marine disaster risk on different disaster-bearing bodies, the levels of marine disaster risk they bear are different. In order to more precisely assess the comprehensive disaster level of a disaster-bearing body in a sub-defense zone and the comprehensive risk level of the sub-defense zone, the level of marine disaster risk they bear is flexibly set according to the different impacts of the same marine disaster risk on different disaster-bearing bodies. For example, but not limited to, for the same level 10 typhoon, the marine disaster risk level of a densely populated residential area bearing a level 10 typhoon can be set to 6, while the airport can be set to 10; for the same red tide disaster, the marine disaster risk level of an industrial park adjacent to the red tide can be set to 2, while the nuclear power plant can be set to 10.
[0161] In the process of comprehensively assessing the comprehensive risk level of the sub-defense zone, the defensive risk capability of the sub-defense zone, the number of disaster-bearing bodies in the sub-defense zone, the importance of different disaster-bearing bodies in the sub-defense zone, the defensive risk capability level of different disaster-bearing bodies in the sub-defense zone, and the impact of marine disaster risks on the disaster-bearing bodies are comprehensively considered. When a marine disaster risk occurs, it is conducive to an accurate and scientific assessment of the comprehensive risk level of the sub-defense zone, thereby improving the rationality, effectiveness and pertinence of the early warning, and organizing disaster prevention and relief work more scientifically, reasonably and timely, so as to minimize the losses caused by marine disasters. In addition, the present application can also assess the comprehensive disaster level of a disaster-bearing body in a sub-defense zone. When assessing it, it is considered that different disaster-bearing bodies are affected differently by the same marine disaster risk, and the level of the same marine disaster risk is flexibly set. Therefore, it is possible to provide each disaster-bearing body with a more refined comprehensive disaster level, which is conducive to targeted early warning and disaster prevention and relief for different disaster-bearing bodies.
[0162] Embodiment 2:
[0163] Provide a marine disaster risk prevention and control early warning method, Figure 3 The specific steps of the marine disaster risk prevention and control early warning method are shown in the flowchart, and the specific steps include:
[0164] Step 1: Delineate key defense areas according to the importance of the disaster-bearing body, and divide the key defense areas into grids to obtain sub-defense areas;
[0165] Step 2: Conduct marine disaster risk investigation and assessment in key defense areas;
[0166] Step 3: Conduct marine disaster risk monitoring in the waters near the nuclear power plant area;
[0167] Step 4: Based on the risk assessment and risk monitoring results, forecasts and warnings are issued for possible marine disaster risks during the construction and operation periods;
[0168] Step 5: Conduct a comprehensive risk level assessment on each of the sub-defense areas, conduct a comprehensive disaster level assessment on each disaster-prone body within each of the sub-defense areas, and sort the assessment results for use as auxiliary warnings.
[0169] As a preferred embodiment of the specific implementation scheme, the formula for evaluating the comprehensive risk level of each sub-defense area is as follows.
[0170]
[0171] As a preferred embodiment of the specific implementation plan, the formula for comprehensively evaluating the disaster level of each disaster-susceptible object in each sub-defense zone is as follows.
[0172]
[0173] It should be understood that each step of the marine disaster risk prevention, control and early warning method is appropriately applicable to each item in the marine disaster risk prevention, control and early warning system described in the aforementioned embodiment, such as but not limited to the following items. (1) Demarcating key defense areas based on the importance of the disaster-prone body to the prevention, control and early warning area includes: identifying the under-construction and operating engineering facilities within 15km of the coast, and the under-construction and operating engineering facilities are designated as key defense areas if they meet at least one of the following conditions: an investment of more than 10 billion yuan, storm surge disasters may cause major casualties, storm surge disasters may cause major economic losses, and storm surge disasters may cause particularly adverse social impacts. (2) The key defense area demarcation unit is also used to grid the designated key defense areas to obtain sub-defense areas. As a preferred embodiment of the specific implementation plan, when the designated key defense areas are gridded to obtain sub-defense areas, it is ensured that all parts of any disaster-prone body are within a certain sub-defense area. (3) The characteristic parameters of disaster risk when conducting marine disaster risk investigation in key defense areas include: astronomical high tide level, sea level change, possible maximum storm surge increase, decrease, possible maximum typhoon wave; design benchmark flood level, top elevation of protective project and plant elevation. (4) Marine disaster risk assessment in key defense areas includes: assessment of marine disaster risk under the conditions of possible maximum storm surge increase and decrease; assessment of marine disaster risk under tsunami conditions. (5) Marine disaster risk monitoring in the sea area near nuclear power plants includes: hydrological and meteorological monitoring, water quality and ecological monitoring, satellite remote sensing monitoring, wave height monitoring and unmanned boat emergency monitoring. (6) The possible marine disaster risks during the construction period include: storm surges, disastrous waves and tsunamis and the natural disaster risks caused by them; red tides, green tides, and the accumulation of jellyfish lead to ecological disaster risks; the possible marine disaster risks during the operation period include: storm surges, disastrous waves and tsunamis and the natural disaster risks caused by them; red tides, green tides, and the accumulation of jellyfish lead to ecological disaster risks; and the discharge of nuclear power plant warm water, radioactive liquid effluents, and residual chlorine discharge lead to ecological environmental risks. (7) The factors for issuing warnings for possible marine disaster risks during the operation period also include: water temperature at the water intake, cold source threatening organisms at the water intake, red tides, green tides, and the accumulation of jellyfish in the nearby sea area, nuclear power plant warm water, and radioactive liquid effluents. (8) The specific warnings for possible marine disaster risks during the construction and operation periods include: gale warnings, storm surge warnings, disastrous wave warnings, and tsunami warnings. It aims to develop disaster risk prevention and control and safety assurance service plans based on the identification of marine natural disaster risks and potential environmental disaster risks of nuclear power plant projects, propose countermeasures and suggestions for marine disaster risk prevention and control, and issue relevant forecasts and warnings when marine disaster risks may occur.In addition, when issuing marine disaster risk warnings, the comprehensive risk level ranking results of each sub-defense zone and the comprehensive disaster level ranking results of each disaster-prone body in each sub-defense zone will be warned together. This is conducive to each sub-defense zone and each disaster-prone body to take timely and effective risk avoidance according to its own risk level, which can greatly exert the mobility of small units, greatly improve the overall ability of the defense zone to resist marine disaster risks, and minimize disaster losses.
[0174] Embodiment 3:
[0175] Based on the aforementioned embodiment, a computer-readable storage medium is provided, in which a computer program executable by a processor is stored. When the computer program is executed by the processor, at least one step of the aforementioned marine disaster risk prevention and control warning method is run, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.
[0176] Embodiment 4:
[0177] Based on the aforementioned embodiment, a computer device is provided, which includes a memory, a processor, a communication interface and a communication bus; wherein the memory, the processor and the communication interface communicate with each other via the communication bus; the memory is used to store computer programs; the processor is used to execute the computer programs stored in the memory, and when the processor executes the computer program, it implements at least one step of the aforementioned marine disaster risk prevention and control early warning method, and can achieve the same technical effect. To avoid repetition, it will not be repeated here.
[0178] Computer readable media include permanent and non-permanent, removable and non-removable media, and can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PR AM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, read-only compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0179] The conventional techniques in the above embodiments are prior arts known to those skilled in the art, and thus will not be described in detail here.
[0180] The specific embodiments described herein are merely examples of the spirit of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in similar ways, but they will not deviate from the spirit of the present invention or exceed the scope defined by the appended claims.
[0181] Although the present invention has been described in detail and some specific embodiments have been cited, it is obvious to those skilled in the art that various changes and modifications can be made without departing from the spirit and scope of the present invention.
[0182] Although the above-mentioned specific embodiments have been shown, described and pointed out the novel features applied to various embodiments, it should be understood that various omissions, substitutions and changes can be made to the form and details of the described device or method without departing from the spirit of the present disclosure. In addition, the above-mentioned various features and methods can be used independently of each other, or can be combined in various ways. All possible combinations and sub-combinations are intended to fall within the scope of the present disclosure. Many of the above-mentioned embodiments include similar components, and therefore, these similar components are interchangeable in different embodiments. Although the present invention has been disclosed in the context of certain embodiments and examples, it should be understood by those skilled in the art that the present invention can extend beyond the specifically disclosed embodiments to other alternative embodiments and / or applications and obvious modifications and equivalents thereof. Therefore, the present invention is not intended to be limited by the specific disclosure of the preferred embodiments herein.
[0183] Matters not covered in the present invention are all known technologies.
Claims
1. A marine disaster risk prevention and control early warning system, characterized by: include: The key defense area demarcation unit is used to demarcate key defense areas according to the importance of the disaster-bearing body and the prevention and control warning area; Risk assessment unit, used to investigate and assess marine disaster risks in key defense areas; Risk monitoring unit, used to carry out marine disaster risk monitoring in the sea area near the nuclear power plant area; The early warning unit issues forecasts and early warnings for possible marine disaster risks during the construction and operation periods based on risk assessment and risk monitoring results; When issuing marine disaster risk warnings, each sub-defense zone will be ranked from high to low according to its corresponding comprehensive risk level, and the ranking results will be announced as an auxiliary warning; The key defense area demarcation unit is also used to divide the demarcated key defense area into grids to obtain sub-defense areas; The early warning unit also includes a comprehensive risk level assessment for each sub-defense zone. The comprehensive risk level assessment formula for the sub-defense zone is: in, is the comprehensive risk level of the sub-defense zone; is the number of disaster-sustaining objects in the sub-defense zone; is the defense risk capability level of the sub-defense zone, which is set to 1, 2, and 3 in order from low to high defense risk capabilities; It is the first The defense risk capability level of each disaster-prone body is set as 1, 2, 3, 4, and 5 in order from low to high defense risk capability; It is the first The importance level of each disaster-prone body is set from low to high, with the levels being 1, 2, 3, 4, and 5; It is the first The comprehensive disaster level of each disaster-affected body; The sub-defense area The evaluation formula for the comprehensive disaster level of a disaster-prone body is: in, It is the first The comprehensive disaster level of each disaster-affected body; It is the first The first The levels of marine disaster risk are 1, 2, 3, 4, 5, 6, 7, 8, 9, and 10; is the amount of marine hazard risk.
2. The marine disaster risk prevention and control early warning system according to claim 1 is characterized by: The risk assessment unit conducts marine disaster risk screening for key defense areas including: Risk investigation of protective engineering of nuclear power plant-type disaster-affected objects under the influence of storm surges, waves and tsunamis, risk investigation of nuclear power plant warm water discharge, risk investigation of radioactive liquid effluent and risk investigation of water safety; and / or The risk assessment unit conducts marine disaster risk assessment on key defense areas including: Assessment of marine disaster risks under conditions of possible maximum storm surge increase and decrease; Assessment of marine hazard risks under tsunami conditions.
3. The marine disaster risk prevention and control early warning system according to claim 1 is characterized by: The risk monitoring unit conducts marine disaster risk monitoring in the sea area near the nuclear power plant area, including: hydrological and meteorological monitoring, water quality and ecological monitoring, satellite remote sensing monitoring, wave height monitoring and unmanned boat emergency monitoring.
4. A marine disaster risk prevention and control early warning method, characterized by: include: Step 1: Delineate key defense areas according to the importance of the disaster-bearing body, and divide the key defense areas into grids to obtain sub-defense areas; Step 2: Conduct marine disaster risk investigation and assessment in key defense areas; Step 3: Conduct marine disaster risk monitoring in the waters near the nuclear power plant area; Step 4: Based on the risk assessment and risk monitoring results, forecasts and warnings are issued for possible marine disaster risks during the construction and operation periods; Step 5: Conduct a comprehensive risk level assessment on each sub-defense zone, conduct a comprehensive disaster level assessment on each disaster-bearing body within each sub-defense zone, and sort the assessment results for auxiliary warning; The formula for evaluating the comprehensive risk level of each sub-defense zone is as follows: in, is the comprehensive risk level of the sub-defense zone; is the number of disaster-sustaining objects in the sub-defense zone; is the defense risk capability level of the sub-defense zone, which is set to 1, 2, and 3 in order from low to high defense risk capabilities; It is the first The defense risk capability level of each disaster-prone body is set as 1, 2, 3, 4, and 5 in order from low to high defense risk capability; It is the first The importance level of each disaster-prone body is set from low to high, with the levels being 1, 2, 3, 4, and 5; It is the first The comprehensive disaster level of each disaster-affected body; The sub-defense area The evaluation formula for the comprehensive disaster level of a disaster-prone body is: in, It is the first The comprehensive disaster level of each disaster-affected body; It is the first The first The levels of marine disaster risk are 1, 2, 3, 4, 5, 6, 7, 8, 9, and 10; is the amount of marine hazard risk.
5. The marine disaster risk prevention and control early warning method according to claim 4 is characterized by: The marine disaster risks in the comprehensive risk level assessment of each sub-defense zone and the comprehensive disaster level assessment of the disaster-bearing objects in the sub-defense zone specifically include at least one of the ecological and environmental risks caused by astronomical tides, possible maximum storm surge, decrease, typhoons, tsunamis, earthquakes, disastrous waves, water temperature changes, salinity changes, tides, strong winds, relative humidity changes, air pressure changes, semi-volatile organic compounds, volatile organic compounds, red tides, green tides, jellyfish enrichment, warm discharge from nuclear power plants, radioactive liquid effluents, and residual chlorine emissions.
6. A computer-readable storage medium, wherein a computer program executable by a processor is stored in the computer-readable storage medium, characterized in that: When the computer program is executed by the processor, the marine disaster risk prevention and control early warning method according to claim 4 or 5 is executed.
7. A computer device, comprising a memory, a processor, a communication interface and a communication bus; wherein: The memory, processor, and communication interface communicate with each other via the communication bus; the memory is used to store computer programs; the processor is used to execute the computer programs stored in the memory, and is characterized in that: when the processor executes the computer program, it implements the marine disaster risk prevention and control early warning method described in claim 4 or 5.
Citation Information
Patent Citations
Emergency-oriented typhoon storm surge and sea wave disaster dynamic risk assessment method
CN113505988A
Tsunami disaster key defensive area delimiting method and system
CN115439029A
Predicting and managing system of coastal disasters through analysing ocean information
KR1020160117766A