A production scheduling method for unmanned mining vehicles
Through the cloud platform, the mining car status is built and monitored, the dynamic dispatch of unmanned mine cars is realized, the problems of low operating efficiency and high transportation costs are solved, and the unmanned operation of the mining area is realized. .
Patent Information
- Application Number
- CN202310640965.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-30
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2043-05-30
AI Technical Summary
The implementation of dynamic traffic planning and real-time scientific scheduling technology of driverless mine cars in mines has led to low operating efficiency, difficulty in recruiting drivers and high transportation costs.
Obtain the mine task set through the cloud work platform, determine the task priority and production requirements, build service rules, monitor the status of the mine and mine trucks, optimize the scheduling plan, and realize the collaborative work of the mine trucks.
It significantly improves the operating efficiency of the mine, reduces transportation costs, solves the problem of difficulty in recruiting drivers, and realizes unmanned operation of the mine area.
Smart Images

Figure CN116882645B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of mine car dispatching, and in particular to a production dispatching method for unmanned mine cars. Background Art
[0002] At present, the unmanned driving industry has experienced a blowout, but there are few projects that have really landed and brought benefits. Mines are relatively closed and mining operations are very hard and boring. It is difficult to recruit drivers, and the management and transportation costs are very high. Large mining companies focus on the realization of smart mining areas and the overall unmanned operation of mining areas. There is a vast demand for the unmanned driving industry here. Dynamic traffic planning and real-time scientific scheduling of unmanned mining vehicles have significantly improved the efficiency of mine operations.
[0003] Therefore, the present invention provides a method for production scheduling of unmanned mining vehicles. Summary of the invention
[0004] The present invention provides a production scheduling method for unmanned mining vehicles, which is used to improve equipment operation efficiency by dynamically and scientifically scheduling mining tasks.
[0005] The present invention provides a method for scheduling production of unmanned mining vehicles, comprising:
[0006] Step 1: Obtain the mine task set captured by the cloud work platform at the current moment, and determine the priority of each mine task in the mine task set and the production demand of each mine task;
[0007] Step 2: Based on the task priority and production demand, construct service rules for each mine task to obtain a first scheduling solution;
[0008] Step 3: Monitor the target mine corresponding to each mine task and the current working mine car of the target mine to obtain the second scheduling plan of the target mine;
[0009] Step 4: Based on the first scheduling scheme and the second scheduling scheme, determine the first scheduling task of the same target mine, and optimize the first scheduling task according to the usage status of the mine car tasks in the idle state to obtain the second scheduling task;
[0010] Step 5: According to the second scheduling task, the coordinated work of the mine cars is realized.
[0011] Preferably, in step 1, the mine task set captured by the cloud work platform at the current moment is obtained, and the priority of each mine task in the mine task set and the production demand of each mine task are determined, including:
[0012] Obtain the newly issued tasks and unprocessed tasks captured by the cloud work platform at the current moment, and form a mine task set;
[0013] According to the issuing time and the latest allowed execution time of each mine task in the mine task set, setting a priority for the corresponding mine task;
[0014] At the same time, each mine task is analyzed to obtain the corresponding production requirements.
[0015] Preferably, task analysis is performed on each mine task to obtain corresponding production requirements, including:
[0016] Based on the cloud work platform, task analysis is performed on the same mine task to obtain several task keywords;
[0017] Performing cluster analysis on the task keywords to obtain a number of cluster blocks, and matching them with the cluster type-mechanism mapping table respectively to obtain a screening mechanism for each cluster block, wherein each screening mechanism includes a corresponding preset comparison table;
[0018] Obtaining the cluster center of each cluster block, and obtaining a preset value consistent with the cluster center based on a preset comparison table corresponding to the screening mechanism;
[0019] Based on all preset values and parameter types matching the preset values, corresponding production requirements are obtained.
[0020] Preferably, in step 2, based on the task priority and production demand, a service rule for each mine task is constructed to obtain a first scheduling solution, including:
[0021] Calculate the initial tolerable delay value of the same mining task ;
[0022] ;in, It is the maximum time interval of production tasks obtained by the cloud work platform through analyzing all actual production task sets at the current moment. It is the moment when the cloud work platform receives the task, that is, the present moment; is the latest execution time of the production task; It is The corresponding production demand of each production task The demand for the type of ore; It means the In the mine The actual storage volume of a type of ore is the number of supply mines; Indicates the rounding symbol;
[0023] Analyze the task reception and transmission data of different mines at historical moments to determine the occurrence of data transmission errors;
[0024] According to the obtained situation, a comprehensive analysis is conducted on the network transmission sources of the parameter types of the production requirements of the same mine task, the error range that may occur in the transmission medium and data communication method during the transmission process is obtained, and the delay factor of each data communication method is calculated. ;
[0025] ;in, It is the first The error probability of the factors that cause data transmission errors, It is the historical data of the same mine task. The average error of the factors, It is the same mine task received at the current moment Observation value; is the total number of factors that lead to data transmission errors;
[0026] Based on the delay factor, set the error function ;
[0027] ;in, Indicates the network delay of the data communication method corresponding to the c0th parameter involved in the current production task, Indicates the difference between the average communication time for the c0th parameter in the historical data and the current network transmission time; The total number of parameters involved in the production requirements of the current production task; Indicates the delay factor corresponding to the c0th parameter involved in the production task at the current moment;
[0028] According to the error function, the initial tolerable delay value is adjusted to obtain the maximum tolerable delay value ;
[0029] ;
[0030] According to the priority set for each mine production task, the mine tasks are organized into corresponding priority queues according to their priority;
[0031] Setting a preset delay threshold for each priority queue;
[0032] The preset delay threshold of the priority queue is compared with the maximum tolerable delay value, and the production tasks of the priority queue are adjusted according to the comparison result to obtain a first scheduling plan for the mine production tasks.
[0033] Preferably, step 3, in the process of monitoring the target mine corresponding to each mine task and the currently working mine car corresponding to the target mine, further includes:
[0034] Performing a first monitoring of the surrounding environment during the operation of the mine car according to the first monitoring terminal on each currently working mine car;
[0035] Performing a second monitoring of the target mine according to a second monitoring terminal installed in a mining area corresponding to the target mine;
[0036] The first monitoring result and the second monitoring result are transmitted to the cloud work platform to simulate the mine road and construct a mine map;
[0037] Analyze the emergencies in the first monitoring result and the second monitoring result, and determine the occurrence location, event type, and event solution of the emergencies;
[0038] Marking the occurrence location on the mining area map, and annotating and displaying the event type and the solution to the event at the marked location;
[0039] A database is established for emergencies to obtain processing models for different types of emergencies.
[0040] Preferably, analyzing the emergencies in the first monitoring result and the second monitoring result, and determining the occurrence location, event type and event solution of the emergencies, and obtaining the second scheduling solution, includes:
[0041] For each emergency situation and solution, store it in the database and establish a corresponding processing model;
[0042] Automatically search all roads at the current moment in the database and determine the first road that can carry out production tasks at the current moment;
[0043] The possible emergencies and treatment plans for each first road are obtained, and a second scheduling plan for the roads on which the current mine can execute production tasks is generated.
[0044] Preferably, in step 4, determining the first scheduling task of the same target mine based on the first scheduling scheme and the second scheduling scheme includes:
[0045] Based on the first scheduling scheme and the second scheduling scheme, a target scheduling function of the same target mine is established, which is as follows:
[0046] Based on the first scheduling scheme, determine the production optimization function of the same target mine :
[0047] ;in, Indicates The current working mining car receives the instruction from the cloud working platform to execute the first scheduling plan. When the next working mine car receives successfully, otherwise The current working mine car is based on the current work task carrying coefficient, Indicates The current position of the current working minecart Go to the target location of the target mine The degree of road accessibility between Indicates the total number of currently working minecarts in the same target mine;
[0048] Based on the second scheduling scheme, determining a first scheduling coefficient for each currently working mine car in the current mine task;
[0049] ;in, Indicates The current working mining car receives the instruction from the cloud working platform to execute the second scheduling plan. When the next working mine car receives successfully, otherwise Indicates The current working mine car is in the path planned from the current working mine car to the target position of the target mine The urgency of the task, It refers to The degree of road smoothness of the route ab between point A and point B of the current working mine car, Indicates The first dispatch coefficient of the currently working mine car;
[0050] Constructing a scheduling constraint function ;
[0051] in, Indicates the minimum boundary value of the determination range of the scheduling coefficient;
[0052] Based on production optimization function And the scheduling constraint function Y2, the first scheduling task is obtained.
[0053] Preferably, in step 4, obtaining the second scheduling task according to the used status of the mine car task in the idle state includes:
[0054] According to the road information and mine car information obtained in the first scheduling task, the mine cars near the target mine corresponding to the task production requirements are retrieved;
[0055] Connect the mine car terminal to the cloud work platform to obtain real-time information of nearby mine cars;
[0056] Analyze the usage of the mine car based on the time required for the first dispatching task, the load of the mine car and the fuel consumption;
[0057] Select an actual mine car that is suitable for executing the production task, and obtain the second scheduling task;
[0058] The production of the mine cars is scheduled according to the second scheduling task.
[0059] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings.
[0060] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0061] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0062] Figure 1 The present invention is a flowchart of a method for production scheduling of unmanned mining vehicles in an embodiment of the present invention. DETAILED DESCRIPTION
[0063] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0064] The present invention provides a method for scheduling production of unmanned mining vehicles. Figure 1 As shown, including:
[0065] Step 1: Obtain the mine task set captured by the cloud work platform at the current moment, and determine the priority of each mine task in the mine task set and the production demand of each mine task;
[0066] Step 2: Based on the task priority and production demand, construct service rules for each mine task to obtain a first scheduling solution;
[0067] Step 3: Monitor the target mine corresponding to each mine task and the current working mine car of the target mine to obtain the second scheduling plan of the target mine;
[0068] Step 4: Based on the first scheduling scheme and the second scheduling scheme, determine the first scheduling task of the same target mine, and optimize the first scheduling task according to the usage status of the mine car tasks in the idle state to obtain the second scheduling task;
[0069] Step 5: According to the second scheduling task, the coordinated work of the mine cars is realized.
[0070] In this embodiment, the cloud work platform obtains the mine tasks submitted by the user at the current moment, and simply processes the conditions and parameter types of the mine tasks to obtain a mine task set, that is, the mine task set contains several mineral tasks, wherein the mine tasks include: task submission time, latest execution time, required minerals and their mineral quantities, etc. By calculating the task submission time and the latest execution time, the mine task set is prioritized, and for the small calculated value, the priority is set to a higher priority, and so on, and every 10 units of value are defined as a priority to generate a priority queue for the mine tasks. In addition, the analysis of production needs includes: the company or individual submitting the task, the submission time, the minerals required in the mine task and their corresponding mineral quantities, etc. The corresponding target mine and the vehicle type that can be used can be obtained by analyzing the mineral task information.
[0071] In this embodiment, the service rules set for the mine tasks are further adjusted based on the priority queue obtained by simple processing of the cloud work platform and the production demand content of each task therein. It is taken into account here that since it is an unmanned mining car, in the process of issuing instructions to the mining car, it may be due to network delays or unsuccessful connection between the unmanned mining car and the instruction issuing end. This may cause errors in the information data such as the quantity of minerals in each mining area in the mine received by the cloud work platform. An error function is constructed to obtain an accurate priority queue. For each production task in the priority queue, the corresponding target mine has been determined in order of priority, thereby obtaining the first scheduling plan for the mine tasks.
[0072] In this embodiment, the target mine corresponding to the mining task is monitored, and the monitoring data of the road and the monitoring data during the operation of the mine car are obtained, and the monitoring data is transmitted to the cloud work platform for processing to obtain the mining area map information of the target mine and the corresponding road conditions at the current moment. Big data analysis of the roads is performed on the cloud work platform to obtain several current accessible roads and their corresponding road conditions, and obtain a second scheduling plan for the mine roads.
[0073] In this embodiment, based on the first scheduling plan, the execution order of the mine tasks is obtained, based on the second scheduling plan, the road traffic conditions of the target mine are obtained, and according to the first scheduling plan and the second scheduling plan, the production arrangement of each mine task corresponding to the task priority at the current moment is analyzed, and a production optimization function and a scheduling constraint function are constructed to ensure that the working mine car receives the task execution instruction and ensures that each task can be scheduled to the most unobstructed road and the best transportation conditions at the execution time, ensuring that there is only one mine car passing through a certain section of road at the same time, avoiding time delays or other conditions caused by traffic jams, and obtaining the first scheduling task.
[0074] In this embodiment, the usage status of the mine cars in the target mine is checked, including the load capacity of the mine cars, the endurance time at the current moment, the tire pressure data of the mine cars, whether there is any fault, etc., and the mine cars suitable for the current mine tasks are selected. After the mine cars are selected, the second scheduling task is obtained in combination with the first scheduling task.
[0075] In this embodiment, collaborative work refers to coordinating the matching mining vehicles to perform corresponding operations according to the second scheduling task.
[0076] The beneficial effect of the above technical solution is: through the scientific scheduling of the mine tasks at the current moment, a reasonable scheduling task at the current moment is obtained. Among them, by comprehensively considering the priority of production tasks and the production conditions in the mine, the mine cars and roads that meet the current mine are obtained, and reasonable scheduling is achieved, which significantly improves the mine operation efficiency to a certain extent.
[0077] The present invention provides a method for scheduling production of unmanned mine vehicles. In step 1, a mine task set captured by a cloud work platform at the current moment is obtained, and the priority of each mine task in the mine task set and the production demand of each mine task are determined, including:
[0078] Obtain the newly issued tasks and unprocessed tasks captured by the cloud work platform at the current moment, and form a mine task set;
[0079] According to the issuing time and the latest allowed execution time of each mine task in the mine task set, setting a priority for the corresponding mine task;
[0080] At the same time, each mine task is analyzed to obtain the corresponding production requirements.
[0081] In this embodiment, the production tasks at the current moment are collected, and the unexecuted tasks at the previous moment are collected to obtain the mine task set at the current moment, ensuring that each unexecuted production task at the current moment is captured to form the mine task set at the current moment, and according to the issuance time of each mine task in the mine task set and the latest allowed execution time, the tolerable delay value of each mine task is calculated, and the priority queue is sorted according to the size of the tolerable delay value. The smaller the tolerable delay value, the higher the priority should be, and the priority is divided according to every 10 time units, and the initial priority queue of the corresponding mine task is obtained in this way.
[0082] In this embodiment, the mine task information is used as the corpus information corresponding to the task analysis. The corpus information is segmented and clustered to analyze the task requirements. For example, if the given conditions in the task requirements are unclear, the latest allowable execution time cannot be directly obtained. If [prepayment time] [acceptance period], etc. are given in the task, the execution time of the corresponding task can be obtained by calculating the execution time required for the task content, and then the corresponding data is subtracted to obtain the latest allowable execution time. Other production requirements can obtain clearer demand conditions in a similar way, which will not be repeated here.
[0083] The beneficial effects of the above technical solution are: obtaining a more accurate priority queue through data analysis, processing production demand conditions, and obtaining quantitative production demand information about each task, so as to better carry out production scheduling of tasks, indirectly improving mine operation efficiency.
[0084] The present invention provides a method for scheduling production of unmanned mine vehicles, which performs task analysis on each mine task to obtain corresponding production requirements, including:
[0085] Based on the cloud work platform, task analysis is performed on the same mine task to obtain several task keywords;
[0086] Performing cluster analysis on the task keywords to obtain a number of cluster blocks, and matching them with the cluster type-mechanism mapping table respectively to obtain a screening mechanism for each cluster block, wherein each screening mechanism includes a corresponding preset comparison table;
[0087] Obtaining the cluster center of each cluster block, and obtaining a preset value consistent with the cluster center based on a preset comparison table corresponding to the screening mechanism;
[0088] Based on all preset values and parameter types matching the preset values, corresponding production requirements are obtained.
[0089] In this embodiment, the analysis of production demand is performed by first performing word segmentation on the several task information, for example, [Blue Sky Company needs 5 tons of coal, 20 tons of chalcopyrite, and 15 tons of sphalerite, with a prepayment time of April 15, 2023], [Land Company needs 10 tons of chalcopyrite, with an acceptance period of 30 days]; based on the task information, word segmentation is performed to obtain [Blue Sky Company, coal (5 tons), chalcopyrite (20 tons), sphalerite (15 tons), prepayment time (April 15, 2023)] Land Company, chalcopyrite [10 tons], acceptance period (30 days)]; after word segmentation, several task keywords and corresponding data information are obtained. According to the keywords in the task, the company name, the required minerals and their ore quantity, and the time are extracted for each task for keyword clustering analysis, and the contents of these aspects of each task are obtained respectively. After finding the cluster center, the data is processed, and the time data that needs to be calculated needs to be simply calculated according to the current time. Since each keyword contains its corresponding data information, a cluster type-mechanism mapping table is set. First, the corresponding data screening mechanism is mapped according to the parameter type of the data information, and then the specific data is compared according to the preset comparison table in the screening mechanism to obtain the preset value consistent with the cluster center. For example, for [chalcopyrite, 25 tons], the corresponding data screening mechanism [ore output - 10-50 tons - small ton - type A vehicle] [chalcopyrite - first mining area, third mining area], it is obtained that the chalcopyrite in the mine task can be collected in the first mining area and the third mining area, and can be produced using a small ton type A mining vehicle.
[0090] In this embodiment, the data screening mechanism is established based on the mining area information and mine car information in the current mine, and is highly compatible with the current mine. Data screening based on the mine can be performed to obtain reliable quantitative information on production demand.
[0091] In this embodiment, the screening of the tonnage level in the mine task and the corresponding mine car data contains the characteristics of upward compatibility, but each upward compatibility level may incur some cost losses. However, in the case of tight mine car resources and urgent tasks, upward compatibility can be performed according to the corresponding level, and the mine task can be processed as soon as possible.
[0092] The beneficial effects of the above technical solution are: conducting data analysis on mine tasks, including word segmentation and cluster analysis, determining preset values for production needs, and obtaining quantitative information about production needs, which helps to improve mine operation efficiency.
[0093] The present invention provides a method for scheduling production of unmanned mining vehicles. In step 2, based on the task priority and production demand, a service rule for each mine task is constructed to obtain a first scheduling solution, including:
[0094] Calculate the initial tolerable delay value of the same mining task ;
[0095] ;in, It is the maximum time interval of production tasks obtained by the cloud work platform through analyzing all actual production task sets at the current moment. It is the moment when the cloud work platform receives the task, that is, the present moment; is the latest execution time of the production task; It is The corresponding production demand of each production task The demand for the type of ore; It means the In the mine The actual storage volume of a type of ore is the number of supply mines; Indicates the rounding symbol;
[0096] Analyze the task reception and transmission data of different mines at historical moments to determine the occurrence of data transmission errors;
[0097] According to the obtained situation, a comprehensive analysis is conducted on the network transmission sources of the parameter types of the production requirements of the same mine task, the error range that may occur in the transmission medium and data communication method during the transmission process is obtained, and the delay factor of each data communication method is calculated. ;
[0098] ;in, It is the first The error probability of the factors that cause data transmission errors, It is the historical data of the same mine task. The average error of the factors, It is the same mine task received at the current moment Observation value; is the total number of factors that lead to data transmission errors;
[0099] Based on the delay factor, set the error function ;
[0100] ;in, Indicates the network delay of the data communication method corresponding to the c0th parameter involved in the current production task, Indicates the difference between the average communication time for the c0th parameter in the historical data and the current network transmission time; The total number of parameters involved in the production requirements of the current production task; Indicates the delay factor corresponding to the c0th parameter involved in the production task at the current moment;
[0101] According to the error function, the initial tolerable delay value is adjusted to obtain the maximum tolerable delay value ;
[0102] ;
[0103] According to the priority set for each mine production task, the mine tasks are organized into corresponding priority queues according to their priority;
[0104] Setting a preset delay threshold for each priority queue;
[0105] The preset delay threshold of the priority queue is compared with the maximum tolerable delay value, and the production tasks of the priority queue are adjusted according to the comparison result to obtain a first scheduling plan for the mine production tasks.
[0106] In this embodiment, when calculating the initial tolerable delay value for each task, the time priority and the mineral reserves of each mining area in the mine corresponding to the required mineral products and mineral quantities are taken into account. That is to say, only tasks that are more urgent in time and tasks with reserves in the current mining area are prioritized for scheduling. For tasks that are urgent in time but the corresponding mineral quantities cannot be completed in the current mining area, they need to be fed back to the cloud work platform for subsequent docking work.
[0107] In this embodiment, the occurrence of data transmission errors is mainly due to the complex network environment in the mine. Some production area networks are mixed with life networks. The life network may affect the production area network, or there are problems with the mining equipment. There are too many intermediate nodes. Sometimes a problem occurs in one of the intermediate links, which will affect the entire network. For example, an intermediate node is invaded by traffic from other directions and lacks high-quality alternative routes, so it will be interrupted for a few seconds. In this way, since different mining areas use different network forms to transmit real-time data to the cloud work platform, data errors of varying degrees may occur at certain times.
[0108] In this embodiment, when establishing the error function, the delay factor of each data communication mode is first calculated, and then multiplied by the corresponding time delay to obtain the maximum value, which is the maximum error value with respect to the error range at the current moment. Then, the initial tolerable delay value is adjusted according to the error function to obtain the maximum tolerable delay value, and the priority queue preliminarily established on the cloud work platform is adjusted according to the maximum tolerable delay value: based on the minimum value of the maximum tolerable delay value as a benchmark, a preset delay threshold is set for each priority queue according to every 10 time units. When the maximum tolerable delay value of the task is less than the preset delay threshold of the current queue, the mine task is adjusted to a higher priority queue. Similarly, when the maximum tolerable delay value of the task is greater than the preset delay threshold of the current queue, the mine task is adjusted to a lower priority queue to obtain the first scheduling plan for the mine production task.
[0109] The beneficial effects of the above technical solution are: optimizing the tolerable delay value of mine tasks, analyzing the errors of data in the mine, and designing corresponding error functions to avoid errors caused by network delays, restore actual data to the greatest extent, obtain a more accurate task priority queue, and ensure the accuracy of the task execution order in the subsequent production scheduling process, so that each mine task can be completed with high quality in the end, thereby maximizing the mine's operating efficiency.
[0110] The present invention provides a method for scheduling production of unmanned mine vehicles. In step 3, during the process of monitoring the target mine corresponding to each mine task and the current working mine vehicle corresponding to the target mine, the method includes:
[0111] Performing a first monitoring of the surrounding environment during the operation of the mine car according to the first monitoring terminal on each currently working mine car;
[0112] Performing a second monitoring of the target mine according to a second monitoring terminal installed in a mining area corresponding to the target mine;
[0113] The first monitoring result and the second monitoring result are transmitted to the cloud work platform to simulate the mine road and construct a mine map;
[0114] Analyze the emergencies in the first monitoring result and the second monitoring result, and determine the occurrence location, event type, and event solution of the emergencies;
[0115] Marking the occurrence location on the mining area map, and annotating and displaying the event type and the solution to the event at the marked location;
[0116] A database is established for emergencies to obtain processing models for different types of emergencies.
[0117] In this embodiment, the first monitoring is mainly to monitor the data of the vehicle-mounted monitoring installed on the mine car that is in working state at the moment. Therefore, the unmanned mine cars in the mine are required to be equipped with advanced vehicle-mounted sensors, controllers, actuators and other devices, and the vehicle sensor status on the mine car and environmental perception and path information such as lidar, camera, GPS positioning, etc. are collected and uploaded to realize the unmanned driving sample in the mine, including positioning, perception, planning, and decision-making. However, the difference from the urban scene lies in the complexity of the mine scene. It is necessary to integrate modern communication and network technologies to realize the seamless connection of the intra-vehicle network, the extra-vehicle network, and the inter-vehicle network. Taking into account the characteristics and communication needs of different working areas in the mine, combined with the development status of 5G, V2X and other technologies, multiple communication systems are adopted, and the frequency band and bandwidth are increased to enhance the reliability of the communication system, improve the system's anti-interference ability, and realize the data collection of the visual operation scene of the mine.
[0118] In this embodiment, the second monitoring is for the second monitoring terminal installed in the mine, that is, the road monitoring installed in the mine and the monitoring devices in various production areas such as the mining area and the mining transportation area. The data within the observable range of the monitoring probe is compared and analyzed with the data at the current moment and the previous moment, and the information about the road information in the mine, the gathering of mine cars, the output of the mine, etc. is monitored and transmitted back to the cloud work platform to obtain remote monitoring of the production status of the mine.
[0119] In this embodiment, the first monitoring result and the second monitoring result are uploaded to the cloud work platform. First, the overall area map of the mining area is obtained through satellite data, and then the monitoring results are edited and spliced to generate a real-life map of the mining area. Key data is extracted from the data in the monitoring results, such as the running trajectory of mine cars, sections prone to failures, and road maintenance status. These situations are displayed on the map at the current moment, and the ecology of the entire mining area is established. The production and operation costs of the mining area can be calculated on the cloud work platform.
[0120] In this embodiment, through the monitoring results, the times and locations of road congestion at the current moment and in history can be obtained, the historical data can be stored and analyzed, a database can be established, and corresponding risk analysis modules can be established for different conditions. The data can be updated on the cloud work platform to obtain more accurate road risk estimates and efficient mine task scheduling routes.
[0121] In this embodiment, on the mining area map, accident-prone sections in historical data and road conditions caused by weather conditions or other conditions are marked at corresponding fixed positions on the mining area map using some colors or texts, and a corresponding marking system is established. Annotations are displayed for corresponding times to obtain a more intuitive mining area road operation map. For example, the marking information may be [Rainy day - blue - the third street in zone A is prone to water accumulation - the road is unsafe], [Windy day - yellow - the entire zone C is prone to sandstorms - the road vision and conditions are complex], [Normal weather - light yellow - the first street in zone F is prone to congestion - the congestion duration is long in the afternoon, and it is recommended to change roads].
[0122] The beneficial effects of the above technical solution are: obtaining a mine map, analyzing the current road conditions and establishing a risk prediction and processing model for emergencies, making the scheduled mine tasks more efficient, and significantly improving the mine operation efficiency.
[0123] The present invention provides a method for scheduling production of unmanned mining vehicles, which analyzes emergencies existing in the first monitoring result and the second monitoring result, and determines the occurrence location, event type and event solution of the emergencies, including:
[0124] For each emergency situation and solution, store it in the database and establish a corresponding processing model;
[0125] Automatically search all roads at the current moment in the database, and obtain the possible emergencies and treatment plans for each road for the roads that can carry out production tasks at the current moment;
[0126] A second scheduling plan for roads on which the current mine can perform production tasks is obtained.
[0127] In this embodiment, based on the first monitoring result and the second monitoring result, as well as the corresponding historical monitoring data, the operating status of the production tasks in the mine is analyzed on the cloud work platform, and the operating status of the road under conditions such as road conditions and special weather conditions is analyzed and processed, and a database is established for storage.
[0128] In this embodiment, according to the data in the database, the production tasks are classified according to the degree of impact on the production tasks themselves under emergency situations, and the impact on different production tasks under different situations is obtained, so that timely remedies or early prevention can be carried out when emergencies occur. In addition, a corresponding emergency processing module is established for the emergencies of mine tasks in the database, as well as the corresponding impacts and specific situation descriptions. That is, when the road is planned to a certain accident-prone section, the speed and other controls are carried out on the vehicle end in time to prevent accidents, and the response situation and measures for the situation are placed in the module. Even if the situation inevitably occurs, a timely solution can be made to reduce losses. For example, road models under different weather conditions are established. When the weather conditions change, the corresponding weather model is automatically switched to avoid the use of some unsafe roads. A road congestion model can also be established. When a certain section of road is congested, a new route is planned in time for the mine car route planned in this section to avoid congestion.
[0129] In this embodiment, when scheduling mine tasks, especially when selecting roads, the pre-selected roads for the production task can be retrieved, and the safest and most reliable road can be selected without affecting the progress. If the task to be executed is urgent and a road prone to accidents is inevitably selected, a handling plan must be determined in advance.
[0130] In this embodiment, the road sections in the database that are prone to accidents due to problems with the road itself are uploaded to the corresponding module of the cloud work platform, and orders are issued in time to maintain the road.
[0131] The beneficial effects of the above technical solution are: based on the monitoring of actual mine conditions, more efficient mine task scheduling is carried out, and on this basis, the relevant actual risk prediction and processing models in the database are called to ensure the safety and reliability of the scheduling plan and further improve the mine operation efficiency.
[0132] The present invention provides a method for scheduling production of unmanned mine vehicles. In step 4, based on the first scheduling scheme and the second scheduling scheme, a first scheduling task of the same target mine is determined, including:
[0133] Based on the first scheduling scheme and the second scheduling scheme, a target scheduling function of the same target mine is established, which is as follows:
[0134] Based on the first scheduling scheme, determine the production optimization function of the same target mine :
[0135] ;in, Indicates The current working mining car receives the instruction from the cloud working platform to execute the first scheduling plan. When the next working mine car receives successfully, otherwise The current working mine car is based on the current work task carrying coefficient, Indicates The current position of the current working minecart Go to the target location of the target mine The degree of road accessibility between Indicates the total number of currently working minecarts in the same target mine;
[0136] Based on the second scheduling scheme, determining a first scheduling coefficient for each currently working mine car in the current mine task;
[0137] ;in, Indicates The current working mining car receives the instruction from the cloud working platform to execute the second scheduling plan. When the next working mine car receives successfully, otherwise Indicates The current working mine car is in the path planned from the current working mine car to the target position of the target mine The urgency of the task, It refers to The degree of road smoothness of the route ab between point A and point B of the current working mine car, Indicates The first dispatch coefficient of the currently working mine car;
[0138] Constructing a scheduling constraint function ;
[0139] in, Indicates the minimum boundary value of the determination range of the scheduling coefficient;
[0140] Based on production optimization function And the scheduling constraint function Y2, the first scheduling task is obtained.
[0141] In this embodiment, the second scheduling task is obtained by combining the production optimization function established based on the first scheduling plan and the scheduling constraint function established based on the second scheduling plan. It is based on the fact that after the mine car receives the execution instruction, it dispatches the appropriate vehicle and selects the appropriate road according to the load factor of the work task, the road conditions and the urgency of the task.
[0142] In this embodiment, the minimum boundary value in the scheduling constraint function is set to 0.3, excluding the situation where the mine car does not receive the instruction and the road is seriously congested. Such a boundary value is comprehensively given. According to this minimum variable, a better scheduling coefficient can be determined, and then a better scheduling plan can be obtained.
[0143] In this embodiment, The value range of is [0.5,1], where the more urgent the task, the corresponding The larger the value of The value range of is [0,1], where the smoother the road, the corresponding The larger the value of .
[0144] The beneficial effects of the above technical solution are: by designing the production optimization function and the scheduling constraint function, some low-quality or even undesirable scheduling schemes are directly excluded in the function, the efficiency of task scheduling is improved, and the mine car status, road conditions and task requirements are comprehensively considered to select the best scheduling scheme corresponding to the mine task at the current moment, thereby further improving the mine's operating efficiency.
[0145] The present invention provides a method for scheduling production of unmanned mine vehicles. In step 4, based on the first scheduling scheme and the second scheduling scheme, a first scheduling task of the same target mine is determined, including:
[0146] According to the road information and mine car information obtained in the first scheduling task, the mine cars near the target mine corresponding to the task production requirements are retrieved;
[0147] Connect the mine car terminal to the cloud work platform to obtain real-time information of nearby mine cars;
[0148] Analyze the usage of the mine car based on the time required for the first dispatching task, the load of the mine car and the fuel consumption;
[0149] Select an actual mine car that is suitable for executing the production task, and obtain the second scheduling task;
[0150] The production of the mine cars is scheduled according to the second scheduling task.
[0151] In this embodiment, according to the first scheduling task, the mine carts near the target mine corresponding to the task production demand are searched. Since there may be multiple types of minerals required for the same task and one mining area cannot meet the required amount of minerals for the task, it will lead to the need to schedule minerals in different mining areas. Therefore, the mine carts for this task need to be searched for the different corresponding mining areas at the same time.
[0152] In this embodiment, after the available vehicles are retrieved, the production demand information is matched with the status of the mine car by connecting the vehicle end and the cloud. Based on the execution time of the first scheduling task and the vehicle's load and fuel consumption, etc., the cloud work platform calculates the mine car information that can match the task, including: driving time, speed and mileage, statistics on fuel consumption, vehicle departure, speeding, fuel theft, and failure to drive according to the route, etc., matches the most suitable mine car at the current moment and saves the historical trajectory data of the mine car's driving, and adds it to the task mine car queue of the mine task. After determining the number of mine cars executing the current task and each specific mine car, the route and scheduling status of the production task are transmitted to the mine car end on the cloud work platform to execute the mine task, that is, scheduling is performed according to the second scheduling task.
[0153] The beneficial effect of the above technical solution is: by combining the actual mine car situation, the production scheduling tasks of the mine cars are arranged, and the best task mine car queue that can match the mine tasks at the current moment is selected, so that the mine operation efficiency is significantly improved.
[0154] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for scheduling production of unmanned mining vehicles, characterized in that: include: Step 1: Obtain the mine task set captured by the cloud work platform at the current moment, and determine the priority of each mine task in the mine task set and the production demand of each mine task; Step 2: Based on the task priority and production demand, construct service rules for each mine task to obtain a first scheduling solution; Step 3: Monitor the target mine corresponding to each mine task and the current working mine car of the target mine to obtain the second scheduling plan of the target mine; Step 4: Based on the first scheduling scheme and the second scheduling scheme, determine the first scheduling task of the same target mine, and optimize the first scheduling task according to the usage status of the mine car tasks in the idle state to obtain the second scheduling task; Step 5: According to the second scheduling task, realize the coordinated work of the mine car; Wherein, step 1 includes: Obtain the newly issued tasks and unprocessed tasks captured by the cloud work platform at the current moment, and form a mine task set; According to the issuing time and the latest allowed execution time of each mine task in the mine task set, setting a priority for the corresponding mine task; At the same time, each mine task is analyzed to obtain the corresponding production requirements, including: Based on the cloud work platform, task analysis is performed on the same mine task to obtain several task keywords; Performing cluster analysis on the task keywords to obtain a number of cluster blocks, and matching them with the cluster type-mechanism mapping table respectively to obtain a screening mechanism for each cluster block, wherein each screening mechanism includes a corresponding preset comparison table; Obtaining the cluster center of each cluster block, and obtaining a preset value consistent with the cluster center based on a preset comparison table corresponding to the screening mechanism; Based on all preset values and parameter types matching the preset values, corresponding production requirements are obtained; Wherein, step 2 includes: Calculate the initial tolerable delay value of the same mining task ; ;in, It is the maximum time interval of production tasks obtained by the cloud work platform through analyzing all actual production task sets at the current moment. It is the moment when the cloud work platform receives the task, that is, the present moment; is the latest execution time of the production task; It is The corresponding production demand of each production task The demand for the type of ore; It means the In the mine The actual storage volume of the type of ore, is the number of supply mines; [] indicates the rounding symbol; Analyze the task reception and transmission data of different mines at historical moments to determine the occurrence of data transmission errors; According to the obtained situation, a comprehensive analysis is conducted on the network transmission sources of the parameter types of the production requirements of the same mine task, the error range that may occur in the transmission medium and data communication method during the transmission process is obtained, and the delay factor of each data communication method is calculated. ; ;in, It is the first The error probability of the factors that cause data transmission errors, and , It is the historical data of the same mine task. The average error of the factors, It is the same mine task received at the current moment Observation value; is the total number of factors that lead to data transmission errors; Based on the delay factor, set the error function ; ;in, Indicates the network delay of the data communication method corresponding to the c0th parameter involved in the current production task, Indicates the difference between the average communication time for the c0th parameter in the historical data and the current network transmission time; Indicates the total number of parameters involved in the production requirements of the current production task; Indicates the delay factor corresponding to the c0th parameter involved in the production task at the current moment; According to the error function, the initial tolerable delay value is adjusted to obtain the maximum tolerable delay value ; ; According to the priority set for each mine production task, the mine tasks are organized into corresponding priority queues according to their priority; Setting a preset delay threshold for each priority queue; Comparing the preset delay threshold of the priority queue with the maximum tolerable delay value, and adjusting the production tasks of the priority queue according to the comparison result to obtain a first scheduling plan for the mine production tasks; Wherein, step 3 further includes: Performing a first monitoring of the surrounding environment during the operation of the mine car according to the first monitoring terminal on each currently working mine car; Performing a second monitoring of the target mine according to a second monitoring terminal installed in a mining area corresponding to the target mine; The first monitoring result and the second monitoring result are transmitted to the cloud work platform to simulate the mine road and construct a mine map; Analyze the emergencies in the first monitoring result and the second monitoring result, and determine the occurrence location, event type, and event solution of the emergencies; Marking the occurrence location on the mining area map, and annotating and displaying the event type and the solution to the event at the marked location; Establish a database for emergencies and obtain processing models for different types of emergencies; The method of analyzing the emergencies in the first monitoring result and the second monitoring result, and determining the occurrence location, event type, and event solution of the emergencies to obtain a second scheduling solution includes: For each emergency situation and solution, store it in the database and establish a corresponding processing model; Automatically search all roads at the current moment in the database and determine the first road that can carry out production tasks at the current moment; Obtain the possible emergencies and treatment plans for each first road, and generate a second scheduling plan for the roads where the current mine can perform production tasks; Wherein, step 4 includes: Based on the first scheduling scheme and the second scheduling scheme, a target scheduling function of the same target mine is established, which is as follows: Based on the first scheduling scheme, determine the production optimization function of the same target mine : ;in, Indicates The current working mining car receives the instruction from the cloud working platform to execute the first scheduling plan. When the next working mine car receives successfully, otherwise The current working mine car is based on the current work task carrying coefficient, Indicates The current position of the current working minecart Go to the target location of the target mine The degree of road accessibility between Indicates the total number of currently working minecarts in the same target mine; Based on the second scheduling scheme, determining a first scheduling coefficient for each currently working mine car in the current mine task; ;in, Indicates The current working mining car receives the instruction from the cloud working platform to execute the second scheduling plan. When the next working mine car receives successfully, otherwise Indicates The current working mine car is in the path planned from the current working mine car to the target position of the target mine The urgency of the task, It refers to The degree of road smoothness of the route ab between point A and point B of the current working mine car, Indicates The first dispatch coefficient of the currently working mine car; Constructing a scheduling constraint function ; in, Indicates the minimum boundary value of the determination range of the scheduling coefficient; Based on production optimization function And the scheduling constraint function Y2, the first scheduling task is obtained.
2. The method for scheduling production of unmanned mining vehicles according to claim 1, characterized in that: In step 4, according to the used status of the mine car tasks in the idle state, a second scheduling task is obtained, including: According to the road information and mine car information obtained in the first scheduling task, the mine cars near the target mine corresponding to the task production requirements are retrieved; Connect the mine car terminal to the cloud work platform to obtain real-time information of nearby mine cars; Analyze the usage of the mine car based on the time required for the first dispatching task, the load of the mine car and the fuel consumption; Select an actual mine car that is suitable for executing the production task, and obtain the second scheduling task; The production of the mine cars is scheduled according to the second scheduling task.