A waterproof breathable membrane processing technology
By spraying silicone treatment agent and lightly applying double-sided adhesive during die cutting, combined with the use of blue release film and manual assembly, the problem of compressed wounds of the breathable film and inability to roll up the silicone during die cutting is solved, and the production efficiency and product quality are improved.
Patent Information
- Application Number
- CN202311032354.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-15
- Publication Date
- 2025-06-06
- Estimated Expiration
- 2043-08-15
AI Technical Summary
The existing breathable films are prone to crush during die cutting, have low production efficiency, and cannot be rolled after double-sided bonding of silicone, resulting in difficulty in die cutting.
A waterproof and breathable film processing technology was designed, including spraying silicone treatment agent in the injection coding room, lightly pasting double-sided adhesive with a modified lamination machine, replacing the original paper with a blue release film, die-cutting while bonding, and manual assembly of each layer of semi-finished products at the end.
It effectively avoids the crushing problem caused by material thickness, improves the die-cutting efficiency, solves the problem of silicone being unable to be rolled, and achieves smooth die-cutting production.
Smart Images

Figure CN116901461B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of breathable membranes on doorbells, and in particular to a waterproof breathable membrane processing technology. Background Art
[0002] The breathable membrane is used on the doorbell to play the role of waterproofing, ventilation and tuning. The breathable membrane is composed of: breathable membrane body + 3 layers of double-sided tape + silicone material. The product thickness is relatively thick (2.53mm thick), but there are many problems with die-cutting at present: 1) It is not easy to discharge waste during die-cutting, and the production efficiency is low; 2) There are pressure injuries during die-cutting, and after testing, the product function cannot meet the requirements of different jobs; 3) The silicone cannot be rolled up after being attached to the double-sided tape on both sides, and die-cutting cannot be performed.
[0003] In summary, the present invention solves the existing problems by designing a waterproof breathable membrane processing technology. Summary of the invention
[0004] The purpose of the present invention is to provide a waterproof breathable membrane processing technology to solve the problems raised in the above background technology.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] A waterproof breathable membrane processing technology, the specific process flow is as follows:
[0007] S1, die cutting: In the inkjet printing room, evenly spray the silicone treatment agent on one side of the silicone raw material, and use a hair dryer to dry the treatment agent and roll it up;
[0008] S2, the die-cutting and laminating machine gently sticks the black double-sided tape on the side of the silicone sprayed with the treatment agent, and rewinds;
[0009] S3, die-cutting: In the inkjet room, evenly spray the unbonded silicone with silicone treatment agent, dry the treatment agent with a hair dryer, roll it up, and cut it in the warehouse;
[0010] S4, a circular knife is used to attach the adhesive surface of the silicone protective film to the black surface of the breathable film. The rubber shaft of the circular knife cannot directly contact the white surface of the breathable film. It should be wrapped with clean release paper. The protective film is attached to the back of the blue protective film. The circular knife is cut into strips and half cut onto the protective film. The blue silicone protective film is rolled up together with the breathable film. During the whole process, the hand is controlled to contact the white surface of the breathable film.
[0011] S5, die cutting of the first cutting edge and die cutting of the laminating edge;
[0012] S6, die-cutting set cutting second cutting, the peripheral waste of the second cutting is not removed, the cutting machine cuts the sheet, the first cutting and the second cutting are operated online, the peripheral knife of the second cutting cannot be padded with foam, and the peripheral waste is not removed to ensure the position of the silicone semi-finished product and the positioning hole, and to ensure the quality of the subsequent manual assembly; if the peripheral waste is discharged, in the process of discharging the waste, the waste will definitely pull the silicone semi-finished product, causing the position of the silicone semi-finished product and the positioning hole to change, and the size and peripheral size of the four sides of the product are measured by IPQC;
[0013] S7, the third cutting of die-cutting is to fit the materials, die-cutting while fitting, the die-cutting machine discharges the peripheral waste, the sealing tape sticks off the white release film waste, and then the whole white release film is fitted, and the product cannot be shifted on the release film, and the third cutting is cut on the basis of the semi-finished product;
[0014] S8, die cutting, set cutting, fourth cutting, waste removal by waste removal knife, reeling, and IPQC measuring the size of the hole to the 4 sides of the product and the outer dimensions;
[0015] S9, the die-cutting and laminating machine laminates the black surface of the breathable film onto the blue silicone protective film, and the hands are not allowed to touch the white effective surface of the breathable film. In the process, except for the clean glue shaft of the laminating machine, nothing else can touch the white effective surface of the breathable film. Cut the breathable film surface, and after the laminating machine discharges the waste of the breathable film, laminate the whole white release film and roll it up. There is a back glue on the colored silicone protective film, and the back glue is a weak adhesive.
[0016] S10, the sixth die-cut laminating material, wherein the non-release surface of the blue release film is laminated to the protective film, and die-cutting is performed while laminating, wherein peripheral waste cannot be removed, there is a weakly sticky adhesive on the blue release film, and the protective film is laminated together through the adhesive on the blue release film;
[0017] S11, manually assemble the semi-finished products, which are assembled in a dust-free workshop, and transfer the products to the transparent release film. Specifically, the three layers below are the semi-finished products obtained by the first cut, and the two layers above are the semi-finished products obtained by the fifth cut. The two layers of double-sided adhesive sandwiched breathable films in the middle are cut on the blue silicone protective film by the fifth cut. At the same time, positioning holes are cut on the blue protective film. After the breathable film is accurately transferred to the double-sided adhesive by the positioning holes of the blue protective film, the weakly sticky silicone protective film is torn off. Secondly, after the air film is accurately transferred to the double-sided adhesive, the weakly sticky silicone protective film is torn off.
[0018] Further, the product is transferred to the transparent release film, specifically, the first and second cut silicone semi-finished products are replaced with the transparent release film;
[0019] S12, screen printing and baking breathable film;
[0020] S13, perform CCD full inspection in the dust-free workshop.
[0021] As a preferred solution of the present invention, double-sided tape must be pasted within 24 hours after the treatment agent is sprayed in S1, the silicone treatment agent in S3 has a time limit, the amount of treatment sprayed must be evaluated, and the subsequent manual work must be completed within 24 hours, the silicone raw material in S1 and S2 is 60 degrees, the model of the black double-sided tape in S2 is TESA61335 black double-sided tape / 124, the model of the silicone protective film in S4 is MY3806B silicone protective film / 75, the model of the protective film is DA004, the model of the white release film in S7 is DC022W, and the The model of the breathable film in S9 is AYN-M80T02, the model of the white release film is DC022W, the model of the protective film in S10 is P60A30, the model of the transparent release film in S10 is DC035, the baking temperature of the screen printing baking in S12 is 62°C, and the baking time is 1 hour. The warehouse in S3 is cut into 20mm / roll, the cutting machine in S6 cuts 60PCS / sheet, IPQC measures the size of the hole to the 4 sides of the product and the outer dimensions of 2.0, and IPQC measures the size of the hole to the 4 sides of the product and the outer dimensions of 2.6 in S8.
[0022] As a preferred solution of the present invention, S5, the first cutting method is to clean up the waste in the blanking groove of the engraving knife die in time, and the waste cannot contact the upper template of the die-cutting machine, otherwise it will affect the shape and size of the hole. The hole is completely broken, and the waste is cleaned by a waste cleaning knife. No yellow board can be used as a pad. The die-cutting pulling length of the first cut is 22.93MM.
[0023] As a preferred solution of the present invention, the second die-cutting pull length in the die-cutting set in S6 is 22.93MM, and the third die-cutting pull length in S7 is 22.93MM, wherein the punching times are twice that of the first cut, the holes are completely cut, and the waste is cleaned with a waste cleaning knife, and no yellow board can be used as a pad.
[0024] As a preferred solution of the present invention, the fourth cut in S8 has a die-cutting drawing length of 22.93MM, wherein the number of punching passes is twice that of the first cut, the holes are completely cut, and the waste is cleaned with a waste cleaning knife, and no yellow board can be used as a pad.
[0025] As a preferred solution of the present invention, the length of the die-cutting drawing material of the fifth cut in S8 is 22.73MM. When the half-cut is on the silicone protective film, no foam can be padded in the knife cavity. When the hole is fully cut and the waste cleaning knife is used for waste cleaning, no bottom plate can be padded.
[0026] As a preferred solution of the present invention, the sixth die-cutting drawing length in S10 is 22.93MM, the holes are completely cut and the waste is cleaned with a waste cleaning knife, and a bottom plate cannot be used.
[0027] As a preferred solution of the present invention, the holes at the four corners of the material strip segment from the first cut to the fifth cut are positioning holes that cooperate with the manual assembly jig, and the semi-finished product cut out by the third cut is a three-layer cylindrical structure. The third cut is to cut a hole in the middle of the double-sided tape, and the airflow passes through the breathable membrane through the hole. This hole is concentric with the silicone hole of the first cut, and is required for manual assembly.
[0028] Compared with the prior art, the present invention has the following beneficial effects:
[0029] In the present invention, a silicone treatment agent is sprayed on both sides of the silicone by design, and then a laminating machine laminates double-sided tape on one side of the silicone, and the original surface paper of the double-sided tape is replaced with a blue release film, which is die-cut while laminating. A further die-cutting laminating machine laminates the double-sided tape on the blue release film, which is die-cut while laminating to discharge waste, and then the die-cut breathable film is laminared on the blue protective film, which is die-cut while laminating, and finally the semi-finished products of each layer are manually assembled together using a jig to form a finished product, so that each layer or two layers of the die-cut product are die-cut separately, which effectively avoids product crushing due to thick die-cutting materials, and effectively avoids the difficulty of die-cutting waste discharge caused by thick die-cutting double-sided tape layers and high viscosity, and solves the problem that the silicone cannot be rolled up after being laminared on both sides of the double-sided tape, thereby changing to silicone single-backed adhesive to overcome the problem that the material cannot be rolled up, thereby realizing die-cutting production. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a schematic diagram of the state structure of the first cutting method of the present invention;
[0031] Figure 2 It is a schematic diagram of the state structure of the second cutting method of the present invention;
[0032] Figure 3 It is a schematic diagram of the state structure of the third cutting method of the present invention;
[0033] Figure 4 It is a schematic diagram of the state structure of the fourth cutting method of the present invention;
[0034] Figure 5 It is a schematic diagram of the state structure of the fifth cutting method of the present invention;
[0035] Figure 6 It is a schematic diagram of the state structure of the sixth cutting method of the present invention;
[0036] Figure 7 This is a schematic diagram of the manual assembly hierarchical structure of the present invention. DETAILED DESCRIPTION
[0037] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0038] For examples, see Figure 1-7 , the present invention provides a technical solution:
[0039] A waterproof breathable membrane processing technology, the specific process flow is as follows:
[0040] S1, die cutting: In the inkjet printing room, evenly spray the silicone treatment agent on one side of the 60-degree silicone raw material, and use a hair dryer to dry the treatment agent and roll it up;
[0041] S2, die-cutting and laminating machine gently sticks TESA61335 black double-sided tape / 124 on the side of 60-degree silicone sprayed with treatment agent, and rewinds;
[0042] S3, die-cutting: In the inkjet room, evenly spray the silicone treatment agent on the unbonded silicone, dry the treatment agent with a hair dryer, and roll it up, and cut it into 20mm / roll in the warehouse;
[0043] S4, use a circular knife to stick the adhesive surface of MY3806B silicone protective film / 75 to the black surface of the breathable film. The rubber shaft of the circular knife cannot directly contact the white surface of the breathable film. It should be wrapped with clean release paper. Stick the DA004 protective film on the back of the blue protective film. The circular knife cuts the strips in half onto the DA004 protective film. The blue silicone protective film is rolled up together with the breathable film. During the whole process, the hand is controlled to touch the white surface of the breathable film.
[0044] S5, die cutting of the first cutting edge and die cutting of the laminating edge;
[0045] S6, die-cutting set cutting second cutting, the peripheral waste of the second cutting is not removed, the cutting machine cuts 60 PCS / sheet, the first cutting and the second cutting are online, the second cutting peripheral knife cannot be padded with foam, the peripheral waste is not removed to ensure the position of the silicone semi-finished product and the positioning hole, and to ensure the quality of the subsequent manual assembly; if the peripheral waste is discharged, the waste will be discharged during the waste discharge process.
[0046] It will definitely pull the silicone semi-finished product, causing the position of the silicone semi-finished product and the positioning hole to change, and measure the size and peripheral size of the 2.0 hole to the four sides of the product through IPQC;
[0047] S7, the third die-cutting laminating material, die-cutting while laminating, the die-cutting machine discharges the peripheral waste, the sealing tape sticks off the DC022W white release film waste, and then the whole DC022W white release film is laminated. The product cannot be shifted on the release film, and the third cut is cut on the basis of the semi-finished product;
[0048] S8, die cutting, set cutting, fourth cutting, waste removal by waste removal knife, winding, and IPQC measuring the size of the 2.6 hole to the 4 sides of the product and the outer dimensions;
[0049] S9, the die-cutting and laminating machine laminates the black surface of the AYN-M80T02 breathable film onto the blue silicone protective film. The hands are not allowed to touch the white effective surface of the breathable film. In the process, the clean glue shaft of the laminating machine can touch the white effective surface of the breathable film. Nothing else can touch the white effective surface of the breathable film. Cut the breathable film surface. After the laminating machine discharges the waste of the breathable film, it laminates the whole DC022W white release film and rolls it up. There is a back glue on the colored silicone protective film, and the back glue is a weak adhesive.
[0050] S10, the sixth die-cut laminating material, wherein the non-release surface of the blue release film is laminated to the P60A30 protective film, and die-cutting is performed while laminating, wherein the peripheral waste cannot be removed, there is a weakly sticky adhesive on the blue release film, and the P60A30 protective film is laminated together through the adhesive on the blue isolation film;
[0051] S11, manually assemble the semi-finished products, which are assembled in a dust-free workshop, and transfer the products to the DC035 transparent release film. Specifically, the three layers below are the semi-finished products obtained by the first cut, and the two layers above are the semi-finished products obtained by the fifth cut. The two layers of double-sided adhesive sandwiched breathable film in the middle are cut on the blue silicone protective film by the fifth cut. At the same time, there are positioning holes cut on the blue protective film. After the breathable film is accurately transferred to the double-sided adhesive by the positioning holes of the blue protective film, the weakly sticky silicone protective film is torn off. Secondly, after the air film is accurately transferred to the double-sided adhesive, the weakly sticky silicone protective film is torn off.
[0052] Further, the product is transferred to the DC035 transparent release film, specifically, the first and second cut silicone semi-finished products are replaced with the DC035 transparent release film;
[0053] S12, screen printing and baking the breathable film, wherein the baking temperature is 62° C. and the baking time is 1 hour;
[0054] S13, perform CCD full inspection in the dust-free workshop.
[0055] As a preferred embodiment of the present invention: double-sided tape must be applied within 24 hours after the treatment agent is sprayed in S1, the silicone treatment agent in S3 has a time limit, the amount of treatment sprayed must be evaluated, and the subsequent manual work must be completed within 24 hours.
[0056] As a preferred embodiment of the present invention: S5, the first cutting method is to carve the waste material of the blanking groove of the die, and the waste material cannot contact the upper template of the die-cutting machine, otherwise it will affect the shape and size of the hole. The hole is completely broken, and the waste is cleaned by a waste cleaning knife. No yellow board can be used as a pad. The length of the die-cutting drawing material of the first cutting is 22.93MM, and Mylar pulling cycle is useful, but the knife mark must be leveled, otherwise it will affect the shape and size of the hole.
[0057] As a preferred embodiment of the present invention: the second die-cutting pull length of the die-cutting set in S6 is 22.93MM, and the third die-cutting pull length in S7 is 22.93MM, wherein the punching times are twice that of the first cut, the holes are completely cut, and the waste is cleaned with a waste cleaning knife, and no yellow board can be used as a pad.
[0058] As a preferred embodiment of the present invention: the fourth cut in S8 has a die-cutting drawing length of 22.93MM, wherein the number of punching passes is twice that of the first cut, the holes are completely cut, and the waste is cleaned with a waste cleaning knife, and no yellow board can be used as a pad.
[0059] As a preferred embodiment of the present invention: the length of the fifth die-cutting drawing in S8 is 22.73MM, and foam cannot be padded in the knife cavity on the silicone protective film when the half-cut is performed, and the bottom plate cannot be padded when the hole is fully cut and the waste cleaning knife is used for waste cleaning.
[0060] As a preferred embodiment of the present invention: the sixth die-cutting drawing length in S10 is 22.93MM, the holes are completely cut and the waste is cleaned with a waste cleaning knife, and a bottom plate cannot be used.
[0061] As a preferred embodiment of the present invention: the holes at the four corners of the material strip segment from the first cut to the fifth cut are positioning holes that cooperate with the manual assembly jig, the semi-finished product cut out by the third cut is a three-layer cylindrical structure, the third cut is to cut a hole in the middle of the double-sided tape, the airflow passes through the breathable membrane through the hole, this hole is concentric with the silicone hole of the first cut, and is required for manual assembly. Example
[0062] 1. Material:
[0063] 0.2TTESA61335 black double-sided tape / 20 (2 times);
[0064] +0.2TTESA61335 black double-sided tape / 124 internally divided into 6 rolls 20mm);
[0065] +0.9T60 degree black silicone (hardness 60-0 / +5 degree) / 130 (divided into 6 rolls of 20mm inside);
[0066] +0.075TPET blue release film / RC-8050L / 70 (3 times);
[0067] +Large sealing tape / 15 (4 times) (6 modules);
[0068] +0.07TAYN-M80T02 black waterproof breathable membrane / 65 (circular knife and strip knife are used to divide the strips into 4 strips of 16.2 and then die-cut);
[0069] +0.085TPET blue silicone protective film (MY3806B) (30-50G) / 75 (for circular knife cutting breathable film);
[0070] +0.05TDA004PET protective film (1-2G) / 75 (for circular knife cutting of breathable film);
[0071] +0.085TPET blue silicone protective film (MY3806B) (30-50G) / 55;
[0072] +0.075TPET blue release film / RC-8050L / 55;
[0073] +0.025TPET white release film (DC022W3-5G) / 30 (5 times);
[0074] +0.075TPET transparent release film (DC035) / 30;
[0075] +HRC-P60A30 protective film / 30;
[0076] Process:
[0077] 1. Die-cutting: In the inkjet room, spray the silicone treatment agent evenly on one side of the 60-degree silicone raw material, use a hair dryer to dry the treatment agent and roll it up (note that double-sided tape must be attached within 24 hours after spraying the treatment agent). Spraying the silicone treatment agent on the silicone raw material effectively solves the problem that ordinary double-sided tape cannot stick to silicone directly. Therefore, only after the silicone is sprayed with the treatment agent, the double-sided tape can stick to it;
[0078] 2. The die-cutting and laminating machine gently sticks TESA61335 black double-sided tape / 124 on the side of the 60-degree silicone sprayed with the treatment agent, and rewinds;
[0079] 3. Die-cutting: In the inkjet room, evenly spray the unbonded silicone with silicone treatment agent, use a hair dryer to dry the treatment agent and roll it up (the silicone treatment agent has a time limit, and the amount of treatment sprayed must be evaluated and the manual work must be completed within 24 hours), and the warehouse is cut into 20mm / roll;
[0080] 4. Use a circular knife to stick the adhesive side of the MY3806B silicone protective film / 75 to the black side of the breathable film (the rubber shaft of the circular knife cannot directly contact the white side of the breathable film, and must be wrapped with clean release paper), stick the DA004 protective film on the back of the blue protective film, and cut the strips and half of the circular knife onto the DA004 protective film. Roll up the blue silicone protective film together with the breathable film (note that the hands should not touch the white side of the breathable film during the whole process);
[0081] 5. Die cutting reference Figure 1 The first cut is die-cut while fitting. For the specific cutting method, see the first cut schematic diagram on the right;
[0082] 6. Die cutting and second cutting (note that the peripheral waste should not be removed) Figure 2 , the cutting machine cuts 60 PCS / sheet (the first and second cuts are operated inline, and the second cutter cannot be padded with foam), and the peripheral waste is not removed to ensure the position of the silicone semi-finished product and the positioning hole, and to ensure the quality of the subsequent manual assembly. If the peripheral waste is discharged, the waste will definitely pull the silicone semi-finished product during the waste discharge process, causing the position of the silicone semi-finished product and the positioning hole to change;
[0083] 7. Die cutting reference Figure 3 The third step is to cut the laminating materials in the laminating layer diagram, die-cut while laminating, and the die-cutting machine discharges the peripheral waste. After the sealing tape sticks off the DC022W white release film waste, the whole DC022W white release film is laminated (note that the product cannot be shifted on the release film). Its function is to immediately discharge the pieces of white inner film waste to prevent long-term placement.
[0084] The double-sided adhesive overflows to the side section of the white release film. When the white release film is removed, the double-sided adhesive will be removed together. At the same time, replacing the whole white release film can also improve the efficiency of the subsequent manual work. The third cut is made on the basis of the semi-finished product.
[0085] 8.Reference Figure 4 , die cutting, set cutting, fourth cutting, waste cleaning knife, waste cleaning, and winding;
[0086] 9. The die-cutting and laminating machine will laminate the black surface of the AYN-M80T02 breathable film onto the blue silicone protective film (hands should not touch the white effective surface of the breathable film. During the process, only the clean rubber shaft of the laminating machine can touch the white effective surface of the breathable film. Other things should not touch the white effective surface of the breathable film). Cut the breathable film surface. For specific cutting methods, see reference. Figure 5 After the laminating machine discharges the waste of breathable film, it rolls up the whole sheet of DC022W white release film. The colored silicone protective film has a backing adhesive, so that the breathable film can be attached to the blue silicone film. The backing adhesive is a weak adhesive.
[0087] 10. Die cutting reference Figure 6The sixth cutting is to laminate the materials (note: the non-release surface of the blue release film is laminated to the P60A30 protective film), and die-cut while laminating. For the specific cutting method, see the sixth cutting diagram on the right. The peripheral waste cannot be removed. There is a weak adhesive backing on the blue release film, and the P60A30 protective film is laminated together through the adhesive on the blue isolation film.
[0088] 11. Manually assemble the semi-finished products (dust-free workshop operation) and transfer the products to the DC035 transparent release film (engineering follow-up). Specifically, refer to the manual assembly hierarchy diagram. Figure 7 Specifically, the three layers below are semi-finished products obtained by the first cut, and the two layers above are semi-finished products obtained by the fifth cut. The two layers of double-sided adhesive sandwiched breathable film in the middle are obtained by cutting the breathable film on the blue silicone protective film through the fifth cut. At the same time, positioning holes are cut on the blue protective film. The breathable film is manually transferred to the double-sided adhesive accurately by the positioning holes of the blue protective film, and then the weakly sticky silicone protective film is torn off. After the air film is accurately transferred to the double-sided adhesive, the weakly sticky silicone protective film is torn off.
[0089] The product was transferred to the DC035 transparent release film. Specifically, the first and second cut silicone semi-finished products were replaced with the DC035 transparent release film. The purpose was to make it easier for customers to take the product from the DC035 transparent release film. The blue release film of the silicone semi-finished product was tightly bonded to the double-sided adhesive, making it difficult to take it directly.
[0090] 12. Screen print and bake the breathable film (62℃, 1 hour). The purpose of baking is to activate the double-sided adhesive quickly and stick the breathable film tightly to achieve the purpose of waterproof tuning.
[0091] 13.CCD full inspection (dust-free workshop operation);
[0092] The holes at the four corners of the first to fifth cut strips are positioning holes for cooperation with the manual assembly jig;
[0093] The outer periphery of the semi-finished product from the second to the fifth cut is half-cut, and the hole is fully cut;
[0094] The first to fifth cuts are not rolled up, and are all sliced;
[0095] The process steps of manual assembly are assembled sequentially according to the assembly level;
[0096] The old die-cutting process is to fit the material strips together as if they were assembled by hand, and then die-cut the shape at one time. The bruises of the old die-cutting process are the places where the blades cut, which are obviously uneven and have concave wrinkles.
[0097] The semi-finished product cut out by the third cut is a three-layer cylindrical structure. The third cut is to cut a hole in the middle of the double-sided tape. The airflow passes through the breathable membrane through the hole to achieve the tuning effect. This hole is concentric with the silicone hole cut in the first cut, and is available for manual assembly.
[0098] 1. Each delivery must be accompanied by a 10mm*10mm size silicone raw material for customer testing;
[0099] 2. QC conducts a full inspection of the finished product in the dust-free workshop with the help of a CCD magnifying glass (a flat lamp needs to be placed on the CCD base in advance). Both the front and back sides of the product need to be inspected to confirm that the circular breathable membrane mesh has no glue overflow, no hair or dust, no broken wires, no perforations, and the upper and lower circular holes are as concentric as possible (the outline of the black silicone must not be blocked, and the boundaries must be clear and clearly visible).
[0100] When using a circular knife to slit the breathable film, please note:
[0101] 1) The force of the breathable film discharge shaft should not be too large;
[0102] 2) When the reel retracts the breathable film, it should be retracted together with the blue protective film to avoid excessive force from the reel reel.
[0103] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A waterproof breathable membrane processing technology, the specific process flow is as follows: S1, the die-cutting workshop staff sprays the silicone treatment agent evenly on one side of the silicone raw material, and uses a hair dryer to dry the treatment agent and roll it up; S2, the die-cutting workshop staff uses a laminating machine to gently stick the black double-sided tape on the side of the silicone sprayed with the treatment agent and rewind it; S3, the die-cutting workshop staff evenly sprays the silicone treatment agent on the side of the silicone that is not pasted with black double-sided tape, uses a hair dryer to dry the treatment agent, rewinds, and slits in the warehouse; S4, the circular knife machine sticks the adhesive surface of the blue silicone protective film to the black surface of the breathable film. The rubber shaft of the circular knife cannot directly touch the white surface of the breathable film. It should be wrapped with clean release paper. Stick the protective film on the back of the blue silicone protective film. The circular knife cuts the protective film into strips and halves. The blue silicone protective film is rolled up together with the breathable film. During the whole process, the hands cannot directly touch the white surface of the breathable film. S5, the laminating machine laminates the side of the silicone with black double-sided tape on the PET blue release film / RC-8050L, and die-cuts while laminating. The first cut is to cut the silicone surface, cut all the holes, and clean the waste with a waste cleaning knife; S6, die-cutting sets cut the silicone surface, cut the second cut, and the peripheral waste of the second cut is not removed. The cutting machine cuts the sheets, and the first and second cuts are operated online. The second cut peripheral knife cannot be padded with foam. The peripheral waste is not removed to ensure the position of the silicone semi-finished product and the positioning hole after the first and second cuts, and to ensure the quality of the subsequent manual assembly; if the peripheral waste is discharged, during the waste discharge process, when the waste pulls the silicone semi-finished product, it will cause the position of the silicone semi-finished product and the positioning hole to change, and the size and peripheral size of the hole to the four sides of the product are measured by IPQC; S7, the laminating machine laminates the black double-sided tape on the PET blue release film / RC-8050L, and replaces the original paper of the black double-sided tape with the DC022W white release film. Die-cutting is performed while laminating. The third cut is to cut the surface of the DC022W white release film, and the holes are completely cut. The die-cutting machine discharges the peripheral waste, and the sealing tape sticks off the waste of the DC022W white release film, and then the whole sheet of DC022W white release film is laminated. S8, based on the third cut semi-finished product, the fourth cut is made, the die-cutting set is used to cut the DC022W white release film surface, the holes are completely cut, the waste is removed by the waste removal knife, and the roll is rolled up. The IPQC measures the size of the holes to the four sides of the product and the outer dimensions to obtain the double-sided adhesive semi-finished product; S9, the die-cutting and laminating machine laminates the black surface of the breathable film onto the blue silicone protective film, cuts the fifth cut, cuts the breathable film surface, and after the laminating machine discharges the waste of the breathable film, laminates the whole white release film and rolls it up to obtain a semi-finished breathable film; S10, the die-cutting and laminating machine laminates the protective film on the non-release surface of the blue release film, cuts the release surface of the blue release film for the sixth time, and cuts all the holes to obtain a blue hand-tearable semi-finished product; S11, manually assemble the semi-finished products in a dust-free workshop. Specifically, the three lower layers are the silicone semi-finished products obtained by the second cutting, the two upper layers are the blue hand-tearable semi-finished products obtained by the sixth cutting, and the three middle layers are two layers of double-sided adhesive with a layer of breathable film sandwiched between them. The double-sided adhesive is the double-sided adhesive semi-finished product obtained by S8, and the breathable film is the breathable film semi-finished product obtained by S9. Meanwhile, positioning holes are cut on the blue silicone protective film of the breathable film semi-finished product in S9. The manual personnel use the positioning holes of the blue silicone protective film to accurately transfer the breathable film of the breathable film semi-finished product to the double-sided adhesive semi-finished product of S8, and then tear off the blue silicone protective film. Further, the product is transferred to the transparent release film; S12, screen printing and baking products; S13, perform CCD full inspection in the dust-free workshop.
2. A waterproof breathable membrane processing technology according to claim 1, Features: The double-sided tape must be attached within 24 hours after the treatment agent is sprayed in S1. The silicone treatment agent in S3 has a time limit, and the amount of treatment sprayed must be evaluated. The post-manual work must be completed within 24 hours. The hardness of the silicone raw material in S1 and S2 is 60 degrees. The model of the black double-sided tape in S2 is TESA 61335 black double-sided tape / 124. The model of the blue silicone protective film in S4 is MY3806B blue silicone protective film / 75, and the model of the protective film is DA004. The model of the breathable film in S9 is AYN-M80T02 The model of the white release film is DC022W, the model of the protective film in S10 is P60A30, the model of the transparent release film in S11 is DC035, the baking temperature of the screen printing baking in S12 is 62°C, and the baking time is 1 hour. The warehouse in S3 is cut into 20mm / roll, the cutting machine in S6 cuts 60PCS / sheet, IPQC measures the size of the hole to the 4 sides of the product and the outer dimensions of 2.0, and IPQC measures the size of the hole to the 4 sides of the product and the outer dimensions of 2.6 in S8.
3. A waterproof breathable membrane processing technology according to claim 1, Features: The cutting method of the first cut in S5 is that the waste of the engraving die blanking groove must be cleaned in time, and the waste cannot contact the upper template of the die-cutting machine, otherwise it will affect the shape and size of the hole. The hole is completely broken, and the waste is cleaned by a waste cleaning knife. No yellow board can be used as a pad. The die-cutting pulling length of the first cut is 22.93mm.
4. A waterproof breathable membrane processing technology according to claim 1, Features: The second die-cutting pull length in the die-cutting set in S6 is 22.93mm, and the third die-cutting pull length in S7 is 22.93mm. The punching times are twice that of the first cut. The holes are completely broken and the waste is cleaned with a waste cleaning knife. No yellow board can be used as a pad.
5. A waterproof breathable membrane processing technology according to claim 1, Features: The fourth cut in S8 has a die-cutting pull length of 22.93 mm, wherein the punching times are twice that of the first cut, the holes are completely cut, and the waste is cleaned with a waste cleaning knife, and no yellow board can be used as a pad.
6. A waterproof breathable membrane processing technology according to claim 1, Features: The fifth cut of the S9 has a die-cutting pull length of 22.73mm, which is half-cut to the blue silicone protective film. No foam pads can be placed in the knife cavity. The hole is completely cut and the waste is cleared by the waste cleaning knife. No base plate can be placed in the knife cavity.
7. A waterproof breathable membrane processing technology according to claim 1, Features: The sixth die-cutting drawing length in S10 is 22.93 mm, the hole is completely cut, and the waste is cleaned by a waste cleaning knife, and a bottom plate cannot be used.
8. A waterproof breathable membrane processing technology according to claim 1, Features: The holes at the four corners of the material strip segment from the first cut to the fifth cut are positioning holes for cooperating with the manual assembly jig. The semi-finished product produced by the third cut is a three-layer cylindrical structure. The third cut is to cut a hole in the middle of the double-sided tape. The airflow passes through the breathable membrane through the hole. This hole is concentric with the silicone hole of the first cut.
Citation Information
Patent Citations
Knife extraction process for protective film production
CN107962855A
Waterproof breathable film component and preparation method thereof
CN108949058A