An integrated design method for well pattern transformation and energy replenishment in ultra-low permeability reservoirs

Through the integrated design of well pattern modification and energy replenishment in ultra-low permeability reservoirs, combined with technologies such as pulse sand addition, stress interference, and surfactant fracture network modification, the problem of the remaining recoverable reserves in ultra-low permeability reservoirs not being effectively utilized has been solved. , achieving increased production and recovery, and reducing risks and costs.

CN117189033BActive Publication Date: 2024-10-18DAQING OILFIELD CO LTD +1
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202210596415.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-30
Publication Date
2024-10-18
Estimated Expiration
2042-05-30

AI Technical Summary

Technical Problem

Existing technology cannot effectively utilize the remaining recoverable reserves of ultra-low permeability reservoirs (k≤5mD), single well fracture network fracturing stimulation is poorly targeted, and lacks unified well patterns, sand bodies, and energy supplement methods, resulting in rapid production decline, The accumulated oil volume is small, and the remaining recoverable reserves of these reservoirs cannot be effectively utilized on a large scale.

Method used

An integrated design method of well pattern modification and energy supplementation is adopted for ultra-low permeability reservoirs, and the well pattern-sandbody modification and energy supplementation design is carried out based on the brittle plasticity of the reservoir, the distribution of main oil layers, the overall treatment potential area, and the influence of well spacing and row spacing. , including technologies such as pulse sand addition, stress interference, surfactant fracture network modification and well network reconstruction, to optimize the pump injection process and energy supplement process.

Benefits of technology

It has achieved the overall resumption of production in ultra-low permeability reservoir blocks, increased single well liquid production and oil production by 23-41 percentage points, reduced pressure channeling and reservoir pollution risks, and improved recovery rate and economic effectiveness. The validity period of formation energy is extended.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117189033B_ABST
    Figure CN117189033B_ABST
Patent Text Reader

Abstract

The present invention relates to an integrated design method for well network transformation and energy replenishment of ultra-low permeability reservoirs. The problem that the existing technology cannot effectively utilize the remaining recoverable reserves of ultra-low permeability reservoirs (k≤5mD) is solved. The method includes: 1) clarifying the brittle-plastic characteristics of the reservoir and the main oil layer according to the reservoir brittle-plastic classification standard and the main oil layer screening standard; 2) screening the overall governance potential area and optimizing the overall governance potential area; 3) designing reservoir transformation of well networks with different well spacings and optimizing the process; 4) based on the optimized reservoir transformation design and process of well networks with different well spacings, designing energy replenishment and optimizing the process for different row spacings. The present invention comprehensively considers the brittle-plasticity of the reservoir, the distribution of the main oil layers, the overall governance potential area and the influence of the well spacing and row spacing, and the mature single well governance technology in reservoir transformation and energy replenishment, and carries out the well network-sand body-transformation-energy replenishment design to provide technical support for improving the development effect of ultra-low permeability reservoirs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of oil field production, and in particular to an integrated design method for ultra-low permeability reservoir well pattern transformation and energy replenishment. Background Art

[0002] For blocks with low recovery rate of ultra-low permeability reservoirs (k≤5mD) and high proportion of long-term shutdown and low production of oil wells, the currently commonly used treatment method is single-well fracture network fracturing transformation. However, single-well fracture network fracturing transformation only selects oil wells with large thickness and low water content for treatment. After the treatment, there are still a large number of remaining recoverable reserves in the blocks that have not been used. In addition, for different well network forms, the single-well fracture network fracturing transformation technology has poor pertinence, does not consider the well network, fracture-controlled sand body and energy supplement in a unified manner, and lacks effective energy supplement means. The production decreases rapidly, the cumulative oil volume is small, and the remaining recoverable reserves of ultra-low permeability reservoirs (k≤5mD) cannot be effectively used on a large scale. The existing technology has poor adaptability. Summary of the invention

[0003] The present invention aims to overcome the problem that the existing technology in the background technology cannot effectively utilize the remaining recoverable reserves of ultra-low permeability reservoirs (k≤5mD), and provide an ultra-low permeability reservoir well network transformation-energy replenishment integrated design method. The ultra-low permeability reservoir well network transformation-energy replenishment integrated design method is based on the existing well network, comprehensively considers the brittle plasticity of the reservoir, the distribution of the main oil layers, the overall management potential area and the influence of the well spacing and row spacing, and the mature single well management technology in reservoir transformation and energy replenishment, and carries out the well network-sand body-transformation-energy replenishment design to improve the development effect of the ultra-low permeability reservoir and provide technical support for improving the recovery rate.

[0004] The present invention solves the problem through the following technical solution: A method for integrating well pattern transformation and energy replenishment in ultra-low permeability reservoirs, comprising the following steps:

[0005] Step (1), according to the reservoir brittle-plastic classification standard and the main oil layer screening standard, clarify the reservoir brittle-plastic characteristics and the main oil layer;

[0006] Step (2): Based on the clear reservoir brittle-plastic characteristics and main oil layers, the overall governance potential area is screened and the overall governance potential area is selected; all oil and water wells in the overall governance potential area are subjected to well network transformation-energy replenishment integrated design;

[0007] Step (3), based on the preferred overall governance potential area, preferably select the reservoir transformation design and process of well patterns with different well spacings; the reservoir transformation of well patterns with different well spacings includes reservoir transformation of brittle reservoirs with different well spacings and reservoir transformation of brittle-plastic reservoirs with different well spacings;

[0008] Step (4), based on the preferred reservoir transformation design and process for well patterns with different well spacings, the energy supplement design and process for different well spacings are preferred.

[0009] Preferably, the reservoir brittle-plastic classification standard in step (1) includes:

[0010] ① A brittle reservoir is one with a brittle index of more than 45%;

[0011] ② The brittleness index is 30-45% for brittle-plastic reservoirs;

[0012] and / or,

[0013] The main oil layer screening criteria in step (1) include:

[0014] ① Formation coefficient (KH)>6mD.m; ② Oil saturation>47%; ③ Effective thickness>2m; ④ Sand body width>300m.

[0015] Preferably, the overall governance potential area screening criteria in step (2) include:

[0016] ① The exploitable oil layer is an ultra-low permeability reservoir (k≤5mD); ② The recovery rate of the block or well area is <8%, and the oil recovery rate is <0.5%; ③ The average effective thickness of a single well is >10m; ④ The average initial daily oil production of a single well is >1t / d; ⑤ The comprehensive water content of the entire area is <60%.

[0017] Preferably, the step (3) of the reservoir reconstruction method for brittle reservoirs with different well spacings and well patterns comprises:

[0018] When the well spacing L≤420m: the reservoir transformation design is separated well fracture network fracturing, pulse sanding is used to achieve effective support of the fracture network, and the fluid injection intensity of the construction well is 280m 3 / m~420m 3 / m, sand adding strength 10m 3 / m or more;

[0019] When the well spacing L>420m: the reservoir transformation design is to perform fracturing of all well fracture networks, and effective support of fracture networks is achieved through pulse sand addition and selection of low-density proppant. The fluid addition intensity of the construction well is 280m 3 / m~420m 3 / m, sand adding strength 8~15m 3 / m.

[0020] Preferably, the pulse sand adding method: after the cracks in the ultra-low permeability reservoir are opened by pressure, the proppant has a high density and settlement occurs in the cracks. In order to effectively support the longitudinal cracks, the pumping process is optimized; the optimized pumping procedure: first pump the artificial complex fracture network system of slippery water + clean water + slippery water, and pump the modified guar gum fracturing fluid with a viscosity of >35mPa·s to ensure the extension of the main fracture. During the sand adding process, the fiber ladder is added according to the sand ratio of 7%-10%-13%-16%-19%-22%-25%-28%-30%-32%, the pulse frequency is 30-40 times, and the segmented sand volume is 0.8-1.0m 3 Pumping fiber-carrying fluid; by pumping fiber-carrying fluid in a pulsed manner, the fiber-bound proppant forms a low-density mass in the fracture and fills the fracture, achieving full support of the main fracture and forming a high conductivity channel to slow down the decline in production after compression.

[0021] Preferably, the step (3) of the reservoir reconstruction method for brittle-plastic reservoirs with different well spacings and well patterns comprises:

[0022] When 150m≤well spacing L≤250m: the reservoir transformation design is adjacent well staggered or capacity expansion management (also known as "1 belt 2" management), surfactant fracture network transformation is preferred, and the fluid injection intensity of the construction well is 450m 3 / m~530m 3 / m, the sand adding strength is 10m 3 / m~15m 3 / m;

[0023] When 250m<well spacing L≤350m: reservoir reconstruction design adjacent well stress interference construction, construction well fluid injection intensity is 350m 3 / m~150m 3 / m, sand adding strength 8~15m 3 / m;

[0024] When the well spacing L>350m: the reservoir transformation design is surfactant fracture network fracturing construction for all wells, the fracture network proppant is low-density proppant, and the fluid injection intensity of the construction well is 400m 3 / m~510m 3 / m, sand adding strength design 12~18m 3 / m.

[0025] Preferably, the "1 belt 2" treatment method: through the material balance and the maximum and minimum principal stress difference calculation results, the "proppant number method" is applied to optimize the design, optimize the transformation fracture volume, optimize the proppant scale, optimize the construction displacement, ensure that the well is fully transformed and the fracture network range exceeds the bottom of the two adjacent wells, and during the construction process, the pressure rise is measured by the pressure gauge at the wellhead of the adjacent well. After the pressure rises, it is maintained at a certain pressure for 5-7 days, that is, the transformation of the adjacent well is completed. After the construction, the three wells are opened at the same time, and the transformation effect is seen in all;

[0026] and / or,

[0027] The stress interference method is as follows: for the ultra-low permeability developed area, the maximum and minimum principal stress differences are large, the extension length in the maximum principal stress direction is long after the fracture network is transformed, the width of the fracture zone in the minimum principal stress direction is small, the complexity of the fracture network is low, and the risk of pressure channeling is high, and stress interference construction is designed. During the construction of two adjacent wells in the well group, two fracturing vehicle groups are constructed at the same layer and scale at the same time, and the two wells are simultaneously pumped into the formation to increase the formation pressure, balance the pressure difference in the maximum principal stress direction between the two wells, reduce the stress difference Δσ at the bottom of the construction well, force the rock to break in the minimum principal stress direction, and form a larger fracture zone width, thereby achieving the purpose of high complexity of the fracture network and low risk of construction pressure channeling;

[0028] and / or,

[0029] The surfactant seam network transformation method comprises:

[0030] Firstly, in view of the low formation energy retention level and poor matrix utilization of ultra-low permeability reservoirs, different types of surfactants were evaluated and optimized indoors from the aspects of interfacial tension, interfacial tension stability, emulsification performance, imbibition capacity, surfactant loss, and compatibility with fracturing fluids, and petroleum sulfonate surfactants with strong oil washing ability, low interfacial tension, and good compatibility with fracturing fluids were determined as oil displacement agents.

[0031] Secondly, the dosage of surfactant was optimized by indoor experiments, and 0.35% petroleum sulfonate surfactant was added to the clean water fracturing fluid;

[0032] Finally, the slug is injected into the formation in advance to achieve the effect of reservoir matrix replacement and advance replenishment of formation energy;

[0033] Preferably, in the step (4) of optimizing the energy supplement design and process of well patterns with different spacings, the influence of the well pattern spacing and the degree of development of natural fractures are included, and the specific optimization method includes:

[0034] (1) Reservoirs with fewer natural fractures:

[0035] When 50m≤row spacing H<80m: the energy supplement design is conventional water well fracturing and water injection supplement. The supplement well process adopts conventional fracturing construction. After fracturing, no backflow is made. When the pressure drops to the water injection condition, water injection is resumed. The water injection intensity is ≤1.0m 3 / d·m;

[0036] When 80m≤row spacing H<200m: the energy supplement design is water well seam network water injection supplement. The supplement well technology adopts the method of water well slick water carrying sand and no return after pressure is pressed. When the pressure drops to the water injection condition, water injection is resumed. The water injection intensity is 0.9 m 3 / d·m~1.2m 3 / d·m;

[0037] When the row spacing H≥200m: the energy supplement design is well network reconstruction; the original well network is infilled with oil wells, the new oil well network is fracturing, the old water well network is fracturing and then water injection, the original well network side wells are pressure driven to supplement energy in the north-south direction, and the water injection intensity is <1.0m 3 / d·m, 5000m3 of fracturing fluid is injected into a single well of a pressure-driven well 3 above;

[0038] Irregular well pattern: The energy supplement design is a combination of water well pumping and central well energy supplement. The energy supplement well technology adopts pressure drive. The pressure drive well injects 5000m of fracturing fluid into each well. 3 above;

[0039] (2) Reservoirs with more developed natural fractures

[0040] For any well spacing pattern, the water well energy replenishment method is not considered; the energy replenishment design is separated well fracturing and adjacent well energy replenishment, the energy replenishment well process is pressure drive, and the pressure drive well injects 5000m of fracturing fluid into a single well. 3 above.

[0041] Preferably, the method for preventing the slick water from carrying sand from the well from flowing back after fracturing is as follows: in the case of continuing to inject water after the water well fracture network is transformed, the fracturing fluid system is optimized, and the slick water fracturing medium with the least damage to the reservoir is selected to replace the guar gel liquid, and a viscosity enhancer component is added to the slick water at the initial stage of pumping to quickly increase the viscosity and reach the maximum viscosity within 30 seconds to enhance the sand carrying capacity; after adding sand, the slick water system is adjusted, and potassium persulfate and sodium sulfite are added to enhance the gel-breaking effect, so that the fracturing fluid in the formation does the least damage to the reservoir and does not flow back after construction; all the fracturing fluid is stored in the reservoir to replenish the formation energy, and the seepage capacity of the distal oil layer will not be affected when continuing to inject water after the transformation.

[0042] Preferably, the method for reconstructing the well pattern is as follows: by increasing the density of oil wells and converting old oil wells into pressure-driven energy recovery wells, the original square well pattern with close well spacing is adjusted to a rectangular well pattern with large well spacing and small row spacing, thereby realizing well pattern conversion.

[0043] Compared with the above background technology, the present invention has the following beneficial effects:

[0044] The ultra-low permeability reservoir well network transformation-energy replenishment integrated design method of the present invention combines reservoir type, well network form, injection-production system, transformation process optimization and parameter design, and determines the ultra-low permeability reservoir well network transformation-energy replenishment integrated design method, which can achieve the overall production of ultra-low permeability reservoir (k≤5mD) long-term shutdown-low production ratio of high block, single well liquid production and oil production increased by 23-41 percentage points, reduced the risk of pressure channeling and reservoir pollution, and increased the complexity of reservoir fracture network transformation. The measure well is upgraded from a non-profit well to a profit Class I or II well, the reservoir formation energy is replenished, and the effective period can be maintained for 3-10 years, and the block recovery factor is increased by 3.6-8.4 percentage points.

[0045] The pulse sanding method is used to achieve effective support for artificial fractures: After the ultra-low permeability reservoir is cracked, the proppant has a high density and settles in the fracture, which cannot effectively support the longitudinal fractures. Therefore, the pumping process is optimized. By pumping the fiber sand-carrying liquid in a pulsed manner, the proppant bound by the fiber forms a low-density mass in the fracture and fills the fracture, achieving full support for the main fracture and forming a high-conductivity channel to slow down the decline in production after compression. After application, the oil production of a single well can be increased by 23.5%, the liquid production can be increased by 41.2%, and the bottom-hole liquid supply capacity of the construction well is strong.

[0046] Adopting the "1 belt 2" treatment method to achieve both technical and economic standards: For well networks with small well spacing, there is a situation of pressure channeling in the fracture network fracturing construction of two adjacent wells and loss of reserves in the fracture network fracturing construction of separated wells during the overall transformation. The "1 belt 2" treatment method is innovatively designed. After application, it can save 150% of the cost of measures, and the input-output ratio is increased from the original 1:0.83 to 1:1.42, which improves the economic effectiveness of the measures.

[0047] The stress interference method was adopted to design the stress interference construction innovatively for the ultra-low permeability developed areas, where the maximum and minimum principal stress differences were large, the maximum principal stress direction had a long extension length after the fracture network transformation, the minimum principal stress direction had a small fracture width, the fracture network had a low complexity, and the risk of pressure channeling was high. Compared with the construction of two wells in succession, the formation pressure was maintained at a level that was 12.9 percentage points higher, the risk of pressure channeling was reduced to 0, and the fracture network width was increased from the original 43m to 49m.

[0048] The surfactant fracture network transformation method is used to achieve crude oil replacement in the matrix and replenishment of formation energy: In view of the low formation energy retention level and poor matrix utilization of ultra-low permeability reservoirs, firstly, different types of surfactants are evaluated and optimized indoors from the aspects of interfacial tension, interfacial tension stability, emulsification performance, imbibition capacity, surfactant loss, and compatibility with fracturing fluid, and petroleum sulfonate surfactants with strong oil washing ability, low interfacial tension, and good compatibility with fracturing fluid are determined as oil displacement agents. Secondly, the dosage of surfactant is optimized through indoor experiments, and 0.35% petroleum sulfonate surfactant is added to the clear water fracturing fluid. Finally, it is injected into the formation in advance by means of a pre-slug to achieve the effect of reservoir matrix replacement and advance replenishment of formation energy. Compared with conventional fracture network fracturing, the daily liquid production is 1.5-2 times that of conventional fracture network fracturing wells 70 days after construction, and the daily liquid production is still maintained at 15t three months after oil is seen. The daily oil production does not decrease within one year after construction. The formation is effectively replenished, and the replacement effect is also well reflected. The recovery rate of the constructed wells is increased by 7.8 percentage points.

[0049] The method of not returning the sand after fracturing by slick water in water wells is adopted to realize the integration of energy replenishment and oil layer protection: for the case of continuing water injection after water well fracture network fracturing transformation, the fracture creation effect and the oil layer pollution problem of the later water injection to push the fracturing fluid into the formation need to be considered in the process of optimizing the fracturing fluid system. Therefore, the slick water fracturing medium with the least damage to the reservoir is selected to replace the guar gum liquid, and the viscosity enhancer component is added to the slick water at the initial stage of pumping to quickly increase the viscosity. The maximum viscosity can be reached within 30 seconds to enhance the sand carrying capacity. After adding sand, the slick water system is adjusted, and potassium persulfate and sodium sulfite are added to enhance the gel breaking effect, so that the fracturing fluid in the formation minimizes the damage to the reservoir. No return is made after construction, and all the fracturing fluid can be stored in the reservoir to replenish the formation energy. The seepage capacity of the distal oil layer will not be affected by continuing to inject water after transformation. Seven months after construction, the formation energy level was maintained at 1.67 times that before the measures were taken. The reservoir injection capacity was not affected after water injection. Water quality tests of adjacent oil wells all showed that they were injected water. The fracturing fluid system caused little damage to the reservoir, and the recovery rate of the well group increased by 2.6 percentage points. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] The accompanying drawings herein are incorporated into the specification and constitute a part of this specification. These drawings illustrate embodiments consistent with the present invention and are used to explain the technical solutions of the present invention together with the specification.

[0051] The above and other objects, features and advantages of the present invention will become more apparent through the following description of the present invention with reference to the accompanying drawings:

[0052] Figure 1 is a flow chart of the integrated design method of the present invention;

[0053] Figure 2 This is a schematic diagram of the "1 with 2" treatment method in an embodiment of the present invention;

[0054] Figure 3 Schematic diagram of the corresponding fracture network fracturing method for oil and water wells in an embodiment of the present invention;

[0055] Figure 4 Schematic diagram of a well pattern reconstruction method in an embodiment of the present invention;

[0056] Figure 5 It is a schematic diagram of the method for isolated well fracturing and adjacent well energy replenishment in an embodiment of the present invention. DETAILED DESCRIPTION

[0057] In order to have a clearer understanding of the technical features, purposes and beneficial effects of the present invention, the technical solution of the present invention is now described in detail below, but it should not be construed as limiting the applicable scope of the present invention.

[0058] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments: In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the embodiments obtained are only embodiments of a part of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work should fall within the scope of protection of the present invention.

[0059] like Figure 1 As shown, a method for integrating well pattern transformation and energy replenishment design for ultra-low permeability reservoirs includes the following steps:

[0060] (1) According to the reservoir brittle-plastic classification standard and the main oil layer screening standard, the reservoir brittle-plastic characteristics and the main oil layer are clarified;

[0061] The brittle-plastic characteristics of the reservoir provide a design basis for the transformation methods of different well patterns, and the main oil layer is the main stratum for construction.

[0062] Reservoir brittle-plastic classification standards:

[0063] ① A brittle reservoir is one with a brittleness index of more than 45%;

[0064] ② The brittleness index of 30-45% is a brittle-plastic reservoir.

[0065] Main oil layer screening criteria:

[0066] ① Formation coefficient (KH)>6mD.m;

[0067] ② Oil saturation>47%;

[0068] ③Effective thickness>2m;

[0069] ④Sand body width>300m.

[0070] (2) Screening and selecting the overall governance potential areas

[0071] On the basis of clarifying the brittle-plastic characteristics of the reservoir and the main oil layers, the overall governance potential areas are screened, and all oil and water wells in the overall governance potential areas need to carry out well network transformation-energy replenishment integrated design.

[0072] Screening criteria for overall governance potential areas:

[0073] ① The exploited oil layer is an ultra-low permeability reservoir (k≤5mD);

[0074] ② The recovery degree of the block or well area is less than 8%, and the oil recovery rate is less than 0.5%;

[0075] ③ The average effective thickness of a single well is >10m;

[0076] ④ The average initial daily oil production of a single well is >1t / d;

[0077] ⑤The overall water content of the whole area is <60%.

[0078] (3) Optimize reservoir reconstruction design and technology for different well spacings (L represents well spacing)

[0079] The reservoir transformation with different well spacing and well pattern includes the reservoir transformation with different well spacing and well pattern of brittle reservoir and the reservoir transformation with different well spacing and well pattern of brittle-plastic reservoir.

[0080] On the basis of the overall optimization of the potential area for treatment, reservoir transformation with different well spacing and well patterns is first carried out. Based on the integration of existing transformation oil production process technologies, the present invention innovates pulse sanding, expansion treatment (i.e. "1 belt 2" treatment), stress interference, surfactant seam network transformation and other technologies, highlighting the flexibility, combination and innovation of the design.

[0081] Pulse sanding: After the cracks in the ultra-low permeability reservoir are opened, the proppant has a high density and settles in the cracks, which cannot effectively support the longitudinal cracks. Therefore, the pumping process is optimized. Improved pumping procedure: First, pump the complex artificial fracture network system of slippery water + clean water + slippery water, and pump the modified guar gum fracturing fluid with a viscosity of >35mPa·s to ensure the extension of the main fracture. During the sanding process, fiber ladders are added, according to the sand ratio of 7%-10%-13%-16%-19%-22%-25%-28%-30%-32%, the pulse frequency is 30-40 times, and the segmented sand volume is 0.8-1.0m 3 By pumping the fiber-carrying fluid in a pulsed manner, the fiber-bound proppant forms a low-density mass in the fracture and fills the fracture, achieving full support for the main fracture and forming a high-conductivity channel to slow down the decline in production after compression.

[0082] "1 belt 2" governance: For well networks with smaller well spacing, there is pressure channeling between the fracture networks of two adjacent wells during the overall transformation, and reserve loss due to the fracture network construction of the separated wells. Innovative "1 belt 2" governance is adopted. Through the calculation results of material balance and maximum and minimum principal stress difference, the "proppant number method" is applied to optimize the design, optimize the transformation fracture volume, optimize the proppant scale, and optimize the construction displacement to ensure that the well is fully transformed while the fracture network range exceeds the bottom of the two adjacent wells. During the construction process, the pressure rise is seen on the pressure gauge at the wellhead of the adjacent well. After the pressure rises, it is maintained at a certain pressure for 5-7 days, that is, the transformation of the adjacent wells is completed. After the construction, the three wells are opened at the same time, and the transformation effect is seen in all of them.

[0083] Stress interference: For the ultra-low permeability developed areas, the difference between the maximum and minimum principal stresses is large. After the fracture network is transformed, the extension length in the direction of the maximum principal stress is long, the width of the fracture zone in the direction of the minimum principal stress is small, the complexity of the fracture network is low, and the risk of pressure channeling is high. Innovative stress interference construction is designed. During the construction of two adjacent wells in the well group, two fracturing vehicle groups are constructed at the same level and scale at the same time. The two wells pump liquid into the formation at the same time to increase the formation pressure, balance the pressure difference in the direction of the maximum principal stress between the two wells, reduce the stress difference Δσ at the bottom of the construction well, force the rock to break in the direction of the minimum principal stress, and form a larger fracture zone width, thereby achieving the purpose of high complexity of the fracture network and low risk of construction pressure channeling.

[0084] Surfactant fracture network transformation: In view of the low formation energy retention level and poor matrix utilization in ultra-low permeability reservoirs, firstly, different types of surfactants were evaluated and optimized indoors from the aspects of interfacial tension, interfacial tension stability, emulsification performance, imbibition capacity, surfactant loss, and compatibility with fracturing fluid. Petroleum sulfonate surfactants with strong oil washing ability, low interfacial tension, and good compatibility with fracturing fluid were determined as oil displacement agents. Secondly, the dosage of surfactant was optimized through indoor experiments, and 0.35% petroleum sulfonate surfactant was added to the clear water fracturing fluid. Finally, it was injected into the formation in advance by means of pre-slug, so as to achieve the effect of reservoir matrix replacement and advance replenishment of formation energy.

[0085] ① Brittle reservoir

[0086] L≤420m: The reservoir reconstruction design is separated well fracture network fracturing, and pulse sand addition is used to achieve effective support of the fracture network. The fluid addition intensity of the construction well is 280m 3 / m~420m 3 / m, sand adding strength 10m 3 / m or above.

[0087] L>420m: The reservoir reconstruction design is for all well fracture network fracturing construction, and the fracture network is effectively supported by pulse sand addition and the selection of low-density proppant. The fluid addition intensity of the construction well is 280m 3 / m~420m 3 / m, sand adding strength 8~15m 3 / m.

[0088] ② Brittle-plastic reservoir

[0089] When 150m≤well spacing L≤250m: the reservoir transformation design is adjacent well staggered or "1 belt 2" management, surfactant fracture network transformation is preferred, and the fluid injection intensity of the construction well is 450m 3 / m~530m 3 / m, the sand adding strength is 10m 3 / m~15m 3 / m;

[0090] When 250m<well spacing L≤350m: reservoir reconstruction design adjacent well stress interference construction, construction well fluid injection intensity is 350m 3 / m~150m 3 / m, sand adding strength 8~15m 3 / m;

[0091] When the well spacing L>350m: the reservoir transformation design is surfactant fracture network fracturing construction for all wells, the fracture network proppant is low-density proppant, and the fluid injection intensity of the construction well is 400m 3 / m~510m 3 / m, sand adding strength design 12~18m 3 / m.

[0092] (4) Energy supplement design and process optimization for well patterns with different row spacings (H represents row spacing)

[0093] On the basis of completing the reservoir transformation design and process optimization of well networks with different well spacings, energy supplement design and process optimization of different well spacings are carried out. The field test effect analysis shows that the energy supplement effect can be seen in reservoirs with less natural fractures, but for reservoirs with more developed natural fractures, water content in oil wells often rises quickly and production decreases rapidly after water injection. Therefore, in the energy supplement design and process optimization, both the influence of well network spacing and the influence of the degree of natural fracture development should be considered. Innovative water well slick water carrying sand after pressure non-return technology and well network reconstruction design can achieve diversity and pertinence of energy supplement.

[0094] Method for preventing slick water from flowing back after fracturing with sand in a water well: For the situation of continuing water injection after fracture network fracturing transformation of a water well, the fracture creation effect and the oil layer pollution problem caused by the subsequent water injection that pushes the fracturing fluid deep into the formation need to be considered in the process of optimizing the fracturing fluid system. Therefore, the slick water fracturing medium with the least damage to the reservoir is selected to replace the guar gum fluid. A viscosity enhancer component is added to the slick water at the initial stage of pumping to quickly increase the viscosity. The maximum viscosity can be reached within 30 seconds to enhance the sand carrying capacity. After adding sand, the slick water system is adjusted, and potassium persulfate and sodium sulfite are added to enhance the gel-breaking effect, so that the fracturing fluid in the formation does the least damage to the reservoir. No flowback is performed after construction, and all the fracturing fluid can be stored in the reservoir to replenish the formation energy. The seepage capacity of the distal oil layer will not be affected by continued water injection after transformation.

[0095] Well network reconstruction: By increasing the density of oil wells and converting old oil wells into pressure-driven energy-boosting wells, the original square well network with close well spacing is adjusted to a rectangular well network with large well spacing and small row spacing, thus realizing well network conversion.

[0096] ① Reservoirs with fewer natural fractures

[0097] 50m≤H<80m: The energy replenishment design is conventional fracturing and water injection for water wells. The energy replenishment well technology adopts conventional fracturing construction. There is no backflow after fracturing. When the pressure drops to the water injection condition, water injection is resumed. The water injection intensity is ≤1.0m 3 / d·m.

[0098] 80m≤H<200m: The energy replenishment design is water well network injection energy replenishment. The energy replenishment well technology adopts network fracturing slick water sand carrying transformation. After fracturing, there is no backflow. When the pressure drops to the water injection condition, the water injection is resumed. The water injection intensity is 0.9 m 3 / d·m~1.2m 3 / d·m.

[0099] H≥200m: Energy supplement design is well network reconstruction. Increasing oil wells between rows of the original well network, fracturing of new oil wells, water injection after fracturing of old water wells, pressure drive energy supplement of side wells of the original well network in the north-south direction, water injection intensity <1.0m 3 / d·m, 5000m3 of fracturing fluid is injected into a single well of a pressure-driven well 3 above.

[0100] Irregular well pattern: The energy supplement design is a combination of water well pumping and central well energy supplement. The energy supplement well technology adopts pressure drive. The pressure drive well injects 5000m of fracturing fluid into each well. 3 above.

[0101] ② Reservoirs with more developed natural fractures

[0102] For any well spacing pattern, the water well energy replenishment method is not considered. The energy replenishment design is separated well fracturing and adjacent well energy replenishment. The energy replenishment well process is pressure drive. The pressure drive well injects 5000m3 of fracturing fluid into each well. 3 above.

[0103] The following is a specific example of the ultra-low permeability reservoir well pattern transformation-energy replenishment integrated design method of the present invention (see the attached Figure 1 Specific instructions are given as shown.

[0104] Example 1: Application of the ultra-low permeability reservoir well pattern transformation-energy replenishment integrated design method of the present invention in the Y121-3 block of Zhaoyuan Oilfield, comprising the following steps:

[0105] Step 1: Identify the brittle-plastic characteristics of the reservoir and the main oil layer

[0106] Reservoir brittle-plastic classification standards: ① Brittleness index of more than 45% is brittle reservoir; ② Brittleness index of 30-45% is brittle-plastic reservoir. Main oil layer screening standards: ① Formation coefficient (KH)>6mD.m; ② Oil saturation>47%; ③ Effective thickness>2m; ④ Sand body width>300m.

[0107] Block Y121-3 is an ultra-low permeability reservoir (K=1.0mD), with a geological reserve of 218×10 4 t, oil-bearing area 4.3Km 2 The brittleness index of the developed strata is about 40%, with FⅠ11, FⅠ12, FⅠ13, FⅠ14, FⅠ15, FⅠ21, FⅠ22, FⅠ31, FⅠ32, FⅠ4, FⅠ51, FⅠ52, FⅠ61, FⅠ62, FⅠ71, FⅠ72, FⅡ1, FⅡ21 and FⅡ22 layers, a total of 16 small layers. According to the classification and screening standards, it is determined that the Y121-3 block has brittle plastic reservoirs, and the main oil layers are FI22, FI32, FI4, FI52, FI71 and FII1.

[0108] Step 2: Select the overall governance potential area

[0109] Screening criteria for overall governance potential areas: ① The exploitable oil layer is an ultra-low permeability reservoir (K≤5mD); ② The recovery rate of the block or well area is <8%, and the oil recovery rate is <0.5%; ③ The average effective thickness of a single well is >10m; ④ The average initial daily oil production of a single well is >1t / d; ⑤ The comprehensive water content of the entire area is <60%.

[0110] The Y121-3 block is an ultra-low permeability reservoir (K=1.0mD), with an average single well effective thickness of 12.9m, a recovery rate of 5.23%, a long-term shutdown-low-yield well ratio of 82.7%, an oil production rate of 0.1%, a comprehensive water content of 43.7%, and a single well daily oil production of 1.5t in the initial stage of production. Based on the screening criteria, it is determined that the Y121-3 block has overall governance potential.

[0111] Step 3: Reservoir reconstruction design and process optimization for different well spacing and well patterns

[0112] The Y121-3 block develops into a brittle-plastic reservoir:

[0113] 150m ≤ L ≤ 250m: The reservoir stimulation design is staggered layers of adjacent wells or "1 zone with 2 treatments". Surfactant fracture network stimulation is preferred. The fluid injection intensity of the construction well is 450m 3 / m to 530m 3 / m, and the proppant injection intensity is 10m 3 / m to 15m 3 / m.

[0114] 250m < L ≤ 350m: The reservoir stimulation design is for the construction affected by stress interference of adjacent wells. The fluid injection intensity of the construction well is 350m 3 / m to 150m 3 / m, and the proppant injection intensity is 8 - 15m 3 / m.

[0115] L > 350m: The reservoir stimulation design is for surfactant fracture network fracturing construction of all wells. The fracture network proppant is low-density proppant. The fluid injection intensity of the construction well is 400m 3 / m to 510m 3 / m, and the designed proppant injection intensity is 12 - 18m 3 / m.

[0116] The Y121-3 block has two sets of well patterns, a 350m × 100m rectangular well pattern and a 175m × 50m rectangular well pattern. According to the reservoir stimulation design principle, for the well pattern with a 350m well spacing, the reservoir stimulation design is for the construction affected by stress interference of adjacent wells. The fluid injection intensity of the construction well is 350m 3 / m to 150m 3 / m, and the proppant injection intensity is about 10m 3 / m; for the well pattern with a 175m well spacing, the reservoir stimulation design is staggered layers of adjacent wells or "1 zone with 2 treatments" (as shown in the appendix Figure 2 ), surfactant fracture network stimulation is preferred. The fluid injection intensity of the construction well is 450m 3 / m to 530m 3 / m, and the proppant injection intensity is 10m 3 / m to 15m 3 / m.

[0117] Step 4: Energy replenishment design and process optimization for well patterns with different row spacings

[0118] ① Reservoirs with less developed natural fractures

[0119] 50m ≤ H < 80m: The energy replenishment design is for water wells to replenish energy by conventional fracturing injection. The process of the energy replenishment well is conventional fracturing construction. After fracturing, there is no flowback. Wait until the pressure drops to the injection condition and resume injection. The injection intensity ≤ 1.0m 3 / d·m.

[0120] 80m≤H<200m: The energy replenishment design is water well network injection energy replenishment. The energy replenishment well technology adopts network fracturing slick water sand carrying transformation. After fracturing, there is no backflow. When the pressure drops to the water injection condition, the water injection is resumed. The water injection intensity is 0.9 m 3 / d·m~1.2m 3 / d·m.

[0121] H≥200m: Energy supplement design is well network reconstruction. Increasing oil wells between rows of the original well network, fracturing of new oil wells, water injection after fracturing of old water wells, pressure drive energy supplement of side wells of the original well network in the north-south direction, water injection intensity <1.0m 3 / d·m, 5000m3 of fracturing fluid is injected into a single well of a pressure-driven well 3 above.

[0122] Irregular well pattern: The energy supplement design is a combination of water well pumping and central well energy supplement. The energy supplement well technology adopts pressure drive. The pressure drive well injects 5000m of fracturing fluid into each well. 3 above.

[0123] The Y121-3 block has few natural fractures and has two well patterns, a 350m×100m rectangular well pattern and a 175m×50m rectangular well pattern. According to the energy replenishment design principle, the energy replenishment design of the 100m spacing well pattern is water injection energy replenishment of the water well fracture network (such as the attached Figure 3 As shown in the figure), the energy-boosting well technology adopts the seam network fracturing and slick water sand-carrying transformation. After fracturing, no backflow is made. When the pressure drops to the water injection condition, water injection is resumed. The water injection intensity is 0.9m 3 / d·m~1.2m 3 / d·m; The energy replenishment design of the 50m spacing well pattern is conventional fracturing and water injection for water wells. The energy replenishment well technology adopts conventional fracturing construction. After fracturing, no backflow is made. When the pressure drops to the water injection condition, water injection is resumed. The water injection intensity is ≤1.0m 3 / d·m.

[0124] Implementation effect: In the Y121-3 block, a total of 4 wells were tested using the ultra-low permeability reservoir well network transformation and energy replenishment integrated design method. Compared with previously constructed wells, the average daily liquid production intensity of the 4 test wells after measures were taken was 0.3t / d•m higher, the average daily oil production intensity was 0.06t / d•m higher, the initial decline rate was 9.9% lower, and the cumulative oil production of single wells and well groups was high. Among them, the single well of the "1 belt 2" test well saved 150% of the cost of measures, and the input-output ratio increased from the original 1:0.83 to 1:1.42; the formation pressure maintenance level of the stress interference test well increased by 12.9 percentage points, the risk of pressure channeling was reduced to 0, and the fracture network width increased from the original 43m to 49m; the daily oil production of the surfactant fracture network transformation well did not decrease within one year after construction, the formation was effectively supplemented, the replacement effect was also well reflected, and the recovery degree of the construction well increased by 7.8 percentage points; the method of no backflow after the slick water carrying sand pressure in the water well, the formation energy maintenance level within 7 months after construction was 1.67 times that before the measures, and the reservoir injection capacity was not affected after water injection. The water quality detection of adjacent oil wells was all injected water, the fracturing fluid system had little damage to the reservoir, and the recovery rate of the well group increased by 2.6 percentage points. The test results show that the reservoir transformation design of this method is reasonable, the reservoir transformation is sufficient, the fracture network width is large, the energy supplement design is reasonable, the formation fluid supply capacity is strong, and the economic effectiveness of the measures is high.

[0125] Example 2: Application of the ultra-low permeability reservoir well pattern transformation-energy replenishment integrated design method of the present invention in the DG block of Longhupao Oilfield, comprising the following steps:

[0126] Step 1: Identify the brittle-plastic characteristics of the reservoir and the main oil layer

[0127] Reservoir brittle-plastic classification standards: ① Brittleness index of more than 45% is brittle reservoir; ② Brittleness index of 30-45% is brittle-plastic reservoir. Main oil layer screening standards: ① Formation coefficient (KH)>6mD.m; ② Oil saturation>47%; ③ Effective thickness>2m; ④ Sand body width>300m.

[0128] The DG block of Longhupao Oilfield is a medium-porosity and ultra-low permeability reservoir (K=0.51mD), with a geological reserve of 8.77 million tons and an oil-bearing area of ​​37.3km 2 The developed oil layer group is the GIII layer, with a reservoir brittleness index of 47%, and the development of GIII1, GIII2, GIII3, GIII4, GIII5, GIII7, GIII8, and GIII9. According to the classification and screening criteria, it is determined that the DG block has developed brittle reservoirs, and the main oil layers are GIII2, GIII3, GIII4, GIII5, and GIII9.

[0129] Step 2: Select the overall governance potential area

[0130] Screening criteria for overall governance potential areas: ① The exploited oil layer is an ultra-low permeability reservoir (K≤5mD); ② The recovery rate of the block or well area is <8%, and the oil recovery rate is <0.5%; ③ The average effective thickness of a single well is >10m; ④ The average initial daily oil production of a single well is >1t / d; ⑤ The comprehensive water content of the whole area is <60%. The DG block is developed using a 300m×300m well network with an average single well effective thickness of 5.8m. Currently, 276 oil and water wells have been put into production. The initial daily oil production of the oil wells is 3.2t, the oil recovery rate is 0.11%, the recovery rate is 8.47%, and the comprehensive water content is 67.1%. According to the screening criteria, only the area with a larger thickness of the main oil layer in the DG block has the potential for overall governance, and the potential area covers an area of ​​19.6km 2 The geological reserves are 4.666 million tons, accounting for 52.4% of the oil-bearing area of ​​the DG block. There are 156 oil and water wells, accounting for 56.8% of the total number of wells in the DG block.

[0131] Step 3: Reservoir reconstruction design and process optimization for different well spacing and well patterns

[0132] ① Brittle reservoir

[0133] L≤420m: The reservoir reconstruction design is separated well fracture network fracturing, and pulse sand addition is used to achieve effective support of the fracture network. The fluid addition intensity of the construction well is 280m 3 / m~420m 3 / m, sand adding strength 10m 3 / m or above.

[0134] L>420m: The reservoir reconstruction design is for all well fracture network fracturing construction, and the fracture network is effectively supported by pulse sand addition and the selection of low-density proppant. The fluid addition intensity of the construction well is 280m 3 / m~420m 3 / m, sand adding strength 8~15m 3 / m.

[0135] The DG block is developed with a 300m×300m well pattern. Therefore, the reservoir reconstruction design is to use a well-separated fracture network fracturing. Pulse sanding is used to achieve effective support of the fracture network. The fluid injection intensity of the construction well is 280m 3 / m~420m 3 / m, sand adding strength 10m 3 / m or above.

[0136] Step 4: Energy supplement design and process optimization for well patterns with different spacings

[0137] ① Reservoirs with fewer natural fractures

[0138] 50m≤H<80m: The energy replenishment design is conventional fracturing and water injection for water wells. The energy replenishment well technology adopts conventional fracturing construction. There is no backflow after fracturing. When the pressure drops to the water injection condition, water injection is resumed. The water injection intensity is ≤1.0m3 / d·m.

[0139] 80m≤H<200m: The energy replenishment design is water well network injection energy replenishment. The energy replenishment well technology adopts network fracturing slick water sand carrying transformation. After fracturing, there is no backflow. When the pressure drops to the water injection condition, the water injection is resumed. The water injection intensity is 0.9 m 3 / d· m~1.2m 3 / d· m.

[0140] H≥200m: Energy supplement design is well network reconstruction. Increasing oil wells between rows of the original well network, fracturing of new oil wells, water injection after fracturing of old water wells, pressure drive energy supplement of side wells of the original well network in the north-south direction, water injection intensity <1.0m 3 / d·m, 5000m3 of fracturing fluid is injected into a single well of a pressure-driven well 3 above.

[0141] Irregular well pattern: The energy supplement design is a combination of water well pumping and central well energy supplement. The energy supplement well technology adopts pressure drive. The pressure drive well injects 5000m of fracturing fluid into each well. 3 above.

[0142] The DG block has few natural fractures and a well pattern spacing of 300m. Therefore, the energy supplement design is a well pattern reconstruction (such as the attached Figure 4 The original well network is used to increase the number of oil wells, fracture the new oil wells, and inject water after fracture and fracturing the old water wells. The side wells of the original well network in the north-south direction are pressurized to replenish energy, and the water injection intensity is <1.0m 3 / d·m, 5000m3 of fracturing fluid is injected into a single well of a pressure-driven well 3 above.

[0143] Implementation effect: DG block applied the ultra-low permeability reservoir well network transformation-energy supplement integrated design method to test a total of 5 wells. Compared with the previously constructed wells, the daily liquid production of the 5 test wells after 70 days of fracturing oil was 1.5-2 times that of the previously constructed wells. After 3 months of oil, the daily liquid production was still 15t, and the daily oil production was 0.5t / d higher. Among them, the pulse sand addition test well increased the oil production of a single well by 23.5% and the liquid production by 41.2%. This shows that the reservoir transformation design using this method is reasonable, the reservoir transformation is sufficient, and the energy supplement design is reasonable. The formation has a strong liquid supply capacity.

[0144] Example 3: Application of the ultra-low permeability reservoir well pattern transformation-energy replenishment integrated design method of the present invention in the F layer of the Y51 block of the Talaha Oilfield, comprising the following steps:

[0145] Step 1: Identify the brittle-plastic characteristics of the reservoir and the main oil layer

[0146] Reservoir brittle-plastic classification standards: ① Brittleness index of more than 45% is brittle reservoir; ② Brittleness index of 30-45% is brittle-plastic reservoir. Main oil layer screening standards: ① Formation coefficient (KH)>6mD.m; ② Oil saturation>47%; ③ Effective thickness>2m; ④ Sand body width>300m.

[0147] The brittleness index of the F oil layer in the Y51 block of the Talaha oilfield is 45-49%, with an oil content of 4.45 km 2 The geological reserves are 644,000 tons, and FⅠ1, FⅠ2, FⅠ3, FⅠ4, FⅠ5, FⅠ6, and FⅠ7 are developed. According to the classification and screening standards, it is determined that the Y51 block has brittle plastic reservoirs, and the main oil layers are FⅠ1, FⅠ4, FⅠ5, FⅠ6, and FⅠ7.

[0148] Step 2: Select the overall governance potential area

[0149] Screening criteria for overall governance potential areas: ① The exploitable oil layer is an ultra-low permeability reservoir (K≤5mD); ② The recovery rate of the block or well area is <8%, and the oil recovery rate is <0.5%; ③ The average effective thickness of a single well is >10m; ④ The average initial daily oil production of a single well is >1t / d; ⑤ The comprehensive water content of the entire area is <60%.

[0150] The F layer of the Y51 block is an ultra-low permeability reservoir (K=0.41mD), with an oil production intensity of 0.1%, a recovery rate of 2.86%, an average single well effective thickness of 12.7m, and a single well daily oil production of 1.2t / d in the initial production period. The comprehensive water content of the F layer is only 24.3%. According to the screening criteria, it is determined that the F layer of the Y51 block has overall governance potential.

[0151] Step 3: Reservoir reconstruction design and process optimization for different well spacing and well patterns

[0152] ① Brittle reservoir

[0153] L≤420m: The reservoir reconstruction design is separated well fracture network fracturing, and pulse sand addition is used to achieve effective support of the fracture network. The fluid addition intensity of the construction well is 280m 3 / m~420m 3 / m, sand adding strength 10m 3 / m or above.

[0154] L>420m: The reservoir reconstruction design is for all well fracture network fracturing construction, and the fracture network is effectively supported by pulse sand addition and the selection of low-density proppant. The fluid addition intensity of the construction well is 280m 3 / m~420m 3 / m, sand adding strength 8~15m 3 / m.

[0155] The well pattern of the F layer in the Y51 block is a 200m×200m inverted nine-point well pattern with a well spacing of 200m. Therefore, the reservoir reconstruction design is to use separated well fracture network fracturing, and pulse sanding is used to achieve effective support of the fracture network. The fluid injection intensity of the construction well is 280m 3 / m~420m 3 / m, sand adding strength 10m 3 / m or above.

[0156] Step 4: Energy supplement design and process optimization for well patterns with different spacings

[0157] ② Reservoirs with more developed natural fractures

[0158] For any well spacing pattern, the water well energy replenishment method is not considered. The energy replenishment design is separated well fracturing and adjacent well energy replenishment. The energy replenishment well process is pressure drive. The pressure drive well injects 5000m3 of fracturing fluid into each well. 3 above.

[0159] The natural fractures in the F layer of the Y51 block are relatively developed, and water flooding is serious during conventional fracturing and water injection development. Therefore, the energy supplement design is to use separated well fracturing and adjacent well energy supplement (such as adjacent wells). Figure 5 As shown in the figure), the energy replenishment well technology is pressure drive, and 5000m3 of fracturing fluid is injected into each pressure drive well. 3 above.

[0160] Implementation effect: In the Y51 block, two wells were tested using the ultra-low permeability reservoir well network transformation-energy replenishment integrated design method. Compared with the previously constructed wells, the two test wells increased oil production more. The initial daily liquid production of a single well was 12.4 tons, which was 4.3 times the daily liquid production in the initial stage of production. The initial daily oil production of a single well was 6.8 tons, which was 5.6 times the daily oil production in the initial stage of production. This shows that the application of this method can achieve effective transformation and energy replenishment of the reservoir. The above is only a partial embodiment of the present invention, but the present invention should not be limited to the contents disclosed in the embodiment and the accompanying drawings. Therefore, any equivalent or modification that does not deviate from the technical solution disclosed in the present invention falls within the scope of protection of the present invention.

Claims

1. A method for integrating well pattern transformation and energy replenishment design for ultra-low permeability reservoirs, characterized in that: The following steps are involved: Step (1), according to the reservoir brittle-plastic classification standard and the main oil layer screening standard, clarify the reservoir brittle-plastic characteristics and the main oil layer; Step (2): Based on the clear reservoir brittle-plastic characteristics and main oil layers, the overall governance potential area is screened and the overall governance potential area is selected; all oil and water wells in the overall governance potential area are subjected to well network transformation-energy replenishment integrated design; Step (3), based on the preferred overall governance potential area, preferably select the reservoir transformation design and process of well patterns with different well spacings; the reservoir transformation of well patterns with different well spacings includes reservoir transformation of brittle reservoirs with different well spacings and reservoir transformation of brittle-plastic reservoirs with different well spacings; The method for transforming a brittle reservoir with different well spacing and well pattern comprises: When the well spacing L≤420m: the reservoir transformation design is separated well fracture network fracturing, pulse sanding is used to achieve effective support of the fracture network, and the fluid injection intensity of the construction well is 280m 3 / m~420m 3 / m, sand adding strength 10m 3 / m or more; When the well spacing L>420m: the reservoir transformation design is to perform fracturing of all well fracture networks, and effective support of fracture networks is achieved through pulse sand addition and selection of low-density proppant. The fluid addition intensity of the construction well is 280m 3 / m~420m 3 / m, sand adding strength 8~15m 3 / m; Step (4), based on the preferred reservoir transformation design and process for well patterns with different well spacings, the energy supplement design and process for different well spacings are preferred.

2. According to claim 1, a method for integrating well pattern transformation and energy replenishment design for ultra-low permeability reservoirs, characterized in that: The reservoir brittle-plastic classification standard in step (1) includes: ① A brittle reservoir is one with a brittleness index of more than 45%; ② The brittleness index is 30-45% for brittle-plastic reservoirs; and / or, The main oil layer screening criteria in step (1) include: ① Formation coefficient KH>6mD.m; ② Oil saturation>47%; ③ Effective thickness>2m; ④ Sand body width>300m.

3. According to claim 1, a method for integrating well pattern transformation and energy replenishment design for ultra-low permeability reservoirs, characterized in that: The overall governance potential area screening criteria in step (2) include: ① The exploitable oil layer is an ultra-low permeability reservoir with a permeability k≤5mD; ② The recovery rate of the block or well area is <8%, and the oil recovery rate is <0.5%; ③ The average effective thickness of a single well is >10m; ④ The average initial daily oil production of a single well is >1t / d; ⑤ The comprehensive water content of the entire area is <60%.

4. According to claim 1, a method for integrating well pattern transformation and energy replenishment design for ultra-low permeability reservoirs, characterized in that: The pulse sand adding method comprises the following steps: after cracks are opened in the ultra-low permeability reservoir, the proppant has a large density and settlement occurs in the cracks. In order to effectively support the longitudinal cracks, the pumping process is optimized; the optimized pumping procedure comprises the following steps: firstly, a man-made complex fracture network system of slippery water + clean water + slippery water is pumped, and a modified guar gum fracturing fluid with a viscosity of >35 mPa·s is pumped to ensure the extension of the main fractures. During the sand adding process, fibers are added in a stepwise manner, and the sand ratio is 7%-10%-13%-16%-19%-22%-25%-28%-30%-32%, the pulse frequency is 30-40 times, and the amount of segmented sand is 0.8-1.0 m 3 Fiber-carrying fluid is pumped in between; by pumping the fiber-carrying fluid in a pulsed manner, the proppant bound by the fibers forms a low-density mass in the cracks and fills the cracks, achieving full support for the main cracks and forming a high conductivity channel, thereby slowing down the decline in production after compression.

5. According to claim 1, a method for integrating well pattern transformation and energy replenishment design for ultra-low permeability reservoirs, characterized in that: The step (3) of transforming a brittle-plastic reservoir with different well spacing and well pattern comprises: When 150m≤well spacing L≤250m: the reservoir transformation design is adjacent well staggered or expanded, surfactant fracture network transformation is preferred, and the fluid injection intensity of the construction well is 450m 3 / m~530m 3 / m, the sand adding strength is 10m 3 / m~15m 3 / m; When 250m<well spacing L≤350m: reservoir reconstruction design adjacent well stress interference construction, construction well fluid injection intensity is 350m 3 / m~150m 3 / m, sand adding strength 8~15m 3 / m; When the well spacing L>350m: the reservoir reconstruction design is surfactant fracture network fracturing construction for all wells, the fracture network proppant is a low-density proppant, and the fluid injection intensity of the construction well is 400m 3 / m~510m 3 / m, sand adding strength design 12~18m 3 / m.

6. The method for integrating well pattern transformation and energy replenishment design for ultra-low permeability reservoirs according to claim 5, characterized in that: Expansion and treatment methods: Through the calculation results of material balance and the difference between the maximum principal stress and the minimum principal stress, the proppant number method is used to optimize the design, optimize the fracture volume, optimize the proppant scale, and optimize the construction displacement to ensure that the well is fully transformed and the fracture network range exceeds the bottom of the two adjacent wells. During the construction process, the pressure rise is measured on the pressure gauge at the wellhead of the adjacent well. After the pressure rises, it remains at a certain pressure for 5-7 days, which means that the transformation of the adjacent well is completed. After the construction, the three wells are opened at the same time, and all of them see the transformation effect; and / or, Stress interference method: For the ultra-low permeability developed areas, the difference between the maximum principal stress and the minimum principal stress is large, the extension length in the direction of the maximum principal stress is long after the fracture network is transformed, the width of the fracture zone in the direction of the minimum principal stress is small, the complexity of the fracture network is low, and the risk of pressure channeling is high. Stress interference construction is designed. During the construction of two adjacent wells in the well group, two fracturing vehicle groups are constructed at the same level and scale at the same time. The two wells pump liquid into the formation at the same time to increase the formation pressure, balance the pressure difference in the direction of the maximum principal stress between the two wells, reduce the stress difference Δσ at the bottom of the construction well, force the rock to break in the direction of the minimum principal stress, and form a larger fracture zone width, thereby achieving the purpose of high complexity of the fracture network and low risk of construction pressure channeling; and / or, The surfactant seam network modification method includes: Firstly, in view of the low formation energy retention level and poor matrix utilization of ultra-low permeability reservoirs, different types of surfactants were evaluated and optimized indoors from the aspects of interfacial tension, interfacial tension stability, emulsification performance, imbibition capacity, surfactant loss, and compatibility with fracturing fluids, and petroleum sulfonate surfactants with strong oil washing ability, low interfacial tension, and good compatibility with fracturing fluids were determined as oil displacement agents. Secondly, the dosage of surfactant was optimized by indoor experiments, and 0.35% petroleum sulfonate surfactant was added to the clean water fracturing fluid; Finally, the material is injected into the formation in advance by means of a pre-placed plug to achieve the effect of reservoir matrix replacement and advance replenishment of formation energy.

7. The method for integrating well pattern transformation and energy replenishment design for ultra-low permeability reservoirs according to claim 1, characterized in that: In the step (4) of optimizing the energy supplement design and process of well patterns with different spacings, the influence of the well pattern spacing and the degree of development of natural fractures are included. The specific optimization method includes: (1) Reservoirs with fewer natural fractures: When 50m≤row spacing H<80m: the energy supplement design is conventional water well fracturing and water injection supplement. The supplement well process adopts conventional fracturing construction. After fracturing, no backflow is made. When the pressure drops to the water injection condition, water injection is resumed. The water injection intensity is ≤1.0m 3 / d·m; When 80m≤row spacing H<200m: the energy supplement design is water well seam network water injection supplement. The supplement well technology adopts the method of water well slick water carrying sand and no return after pressure is pressed. When the pressure drops to the water injection condition, water injection is resumed. The water injection intensity is 0.9 m 3 / d·m~1.2m 3 / d·m; When the row spacing H≥200m: the energy supplement design is well network reconstruction; the original well network is infilled with oil wells, the new oil well network is fracturing, the old water well network is fracturing and then water injection, the original well network side wells are pressure driven to supplement energy in the north-south direction, and the water injection intensity is <1.0m 3 / d·m, 5000m3 of fracturing fluid is injected into a single well of a pressure-driven well 3 above; Irregular well pattern: The energy supplement design is a combination of water well pumping and central well energy supplement. The energy supplement well technology adopts pressure drive. The pressure drive well injects 5000m of fracturing fluid into each well. 3 above; (2) Reservoirs with more developed natural fractures The energy supplement design is separated well fracturing and adjacent well energy supplementation. The energy supplementation well process is pressure drive. The pressure drive well injects 5000m3 of fracturing fluid into each well. 3 above.

8. The method for integrating well pattern transformation and energy replenishment design for ultra-low permeability reservoirs according to claim 7, characterized in that: The method for preventing slick water from flowing back after fracturing and carrying sand in a water well includes: optimizing the fracturing fluid system in case of continuing water injection after water well fracture network fracturing transformation, selecting a slick water fracturing medium with minimal damage to the reservoir, adding a viscosity enhancer component to the slick water at the initial stage of pumping, and achieving maximum viscosity within 30 seconds to enhance the sand carrying capacity; adjusting the slick water system after adding sand, adding potassium persulfate and sodium sulfite to enhance the gel breaking effect, minimizing the damage of the fracturing fluid in the formation to the reservoir, and preventing the fracturing fluid from flowing back after construction; and storing all the fracturing fluid in the reservoir to replenish formation energy.

9. The method for integrating well pattern transformation and energy replenishment design for ultra-low permeability reservoirs according to claim 7, characterized in that: Well network reconstruction method: By increasing the density of oil wells and converting old oil wells into pressure-driven energy-boosting wells, the original square well network with close well spacing is adjusted to a rectangular well network with large well spacing and small row spacing, thus realizing well network conversion.

Citation Information

Patent Citations

  • Well spacing method of ultralow-permeability tight-oil reservoir horizontal well

    CN104141481A

  • Optimization method for reformation of multi-stratum tight sandstone gas reservoirs

    CN104481524A

  • Reservoir modification method of low-seepage heavy oil reservoir

    CN107869344A

  • Oil and gas exploitation method for increasing recovery ratio through artificial crack control reserves

    CN108561106A

  • Multilayer stress sensitive oil reservoir fracturing water drive well pattern and production system optimization method

    CN111160669A