A method for pre-adjusting total tip clearance of centrifugal compressor impeller

By using a clamping device and gaskets to replace the main cover in a centrifugal compressor for pre-adjusting the impeller's overall axial movement clearance, the problem of repeatedly disassembling the main cover in existing technologies is solved, improving measurement efficiency and quality, reducing labor intensity, and shortening maintenance time.

CN117189643BActive Publication Date: 2026-06-23BAOTOU IRON & STEEL (GROUP) CO LTD
2 Cites 0 Cited by

Patent Information

Application Number
CN202311242230.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-25
Publication Date
2026-06-23
Estimated Expiration
2043-09-25

AI Technical Summary

Technical Problem

Existing technology requires repeated disassembly of the cover when measuring the total impeller clearance of an Ingersoll Rand centrifugal compressor, which is time-consuming and labor-intensive, and requires high installation experience and technical expertise, making it difficult to quickly and efficiently measure and adjust the total impeller clearance.

Method used

The method of not installing the unit cover is adopted. The clamping device and washers are connected by bolt holes on the casing to replace the cover for clamping. The force is controlled by adjusting the bolts to achieve the pre-adjustment of the total impeller axial movement clearance. The specific steps include installing washers, adjusting the diffuser position and measuring the clearance until the requirements are met, and then removing the clamping device.

Benefits of technology

This allows for the pre-adjustment of the total axial clearance without the cover being installed, avoiding the increased workload caused by the disassembly of the cover, improving work efficiency, reducing labor intensity, shortening the maintenance period, and ensuring maintenance quality.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The application discloses a kind of centrifugal compressor impeller total play clearance pre-adjustment method, this pre-adjustment method can carry out total play clearance prediction when not installing big cover, only need to utilize the pressing device made of casing connecting bolt hole, instead of big cover and carry out pressing, and the gasket made for stress uniformity, total play clearance prediction can be completed, and if total play clearance does not meet requirements after big cover is reloaded, it is effectively avoided.The application overcomes the problem that the workload is obviously increased due to the disassembly of the big cover, improves the work efficiency, reduces the labor intensity, shortens the maintenance period, and ensures the maintenance quality.
Need to check novelty before this filing date? Find Prior Art