A high-suspended decorative beam cast-in-situ and prefabricated integrated installation structure and construction method
By adopting an integrated prefabrication and decoration construction method, combined with integrated steel plates and steel bracket clamps, the problems of complex construction and safety hazards of high-suspension decorative beams have been solved, achieving an efficient and safe construction process and reducing costs and construction period.
Patent Information
- Application Number
- CN202311400488.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-26
- Publication Date
- 2026-02-03
- Estimated Expiration
- 2043-10-26
AI Technical Summary
The construction of suspended decorative beams in high-rise residential buildings is complex, costly, and poses safety hazards. Existing construction methods cannot guarantee installation quality and safety.
The construction method of overall prefabrication and integrated decoration is adopted. By combining integrated steel plates, steel bracket clamps and support rods, the overall hoisting and fixing of the high-suspended decorative beams can be achieved, avoiding high-altitude operations and improving construction efficiency by using tower crane equipment.
It improved construction quality and progress, reduced high-altitude operations, ensured construction safety, saved construction time and costs, and enhanced the connection stability between precast beams and wall column supports.
Smart Images

Figure CN117432128B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building construction technology, and in particular to an integrated installation structure and construction method for high-suspension decorative beams that can be converted from cast-in-place to prefabricated. Background Technology
[0002] To enhance the aesthetic appeal of high-rise residential buildings, suspended decorative concrete beams are often installed. The common practice is to use cantilevered I-beams with lower supports, upper tensioning, and formwork. This method is not only technically complex and costly, but also involves working at heights, posing significant safety hazards. While steel beams are simpler to install than suspended decorative concrete beams, the subsequent enclosure costs are high, and safety risks may arise over time.
[0003] The installation and dismantling of high-altitude cantilever formwork is challenging. An operating platform needs to be erected at the lower support of the I-beams, and collisions with the external scaffolding are inevitable during installation, requiring adjustments to the scaffolding's crossbars. Furthermore, high-altitude work poses significant safety hazards and makes it difficult to guarantee installation quality. After the high-altitude cantilever formwork is erected, it cannot be dismantled until the decoration work in the area is completed, resulting in a long period of time occupied by the scaffolding and making it uneconomical. Summary of the Invention
[0004] To address the aforementioned issues, this invention provides an integrated installation structure and construction method for high-suspension decorative beams that can be converted from cast-in-place to prefabricated. This integrated decorative beam, provided the on-site tower crane lifting capacity meets the requirements, is constructed using a method of overall prefabrication, integrated decoration, and one-time hoisting. This fully utilizes the efficiency of existing on-site equipment, improves construction quality and progress, avoids the need for erecting high-altitude work platforms, reduces high-altitude operations, ensures construction safety, and saves time and costs.
[0005] To solve the above problems, the technical solution adopted by the present invention is as follows:
[0006] An integrated installation structure for high-suspension decorative beams, transitioning from cast-in-place to precast construction, includes a pair of cast-in-place beams. Precast beam support walls are cast at the ends of each pair of cast-in-place beams. Precast beams are installed between the precast beam support walls. Partially integrated steel plates are embedded at both ends of each precast beam. The exposed portions of the integrated steel plates are embedded within the core area of the precast beam support walls. Support components for preventing the precast beams from overturning are installed on the precast beam support walls. Round-headed hanging nails are also embedded at the top of both ends of the precast beams.
[0007] Preferably, the integrated steel plate includes a connecting steel plate, a steel pad, and multiple studs. The steel pad is welded to the bottom of the exposed portion of the connecting steel plate, and the multiple studs are evenly distributed and welded to both sides of the embedded portion of the connecting steel plate.
[0008] Preferably, the connecting steel plate is 30mm thick, the steel pad is 100mm wide and 500mm long, and the stud is 22mm in diameter and 70mm in length.
[0009] Preferably, the support assembly is a steel bracket clamp, which includes a mounting steel plate, flange steel plates welded to both sides of the mounting steel plate, channel steel welded to the sidewalls of the flange steel plates, and multiple screw holes provided on the mounting steel plate. Multiple screws adapted to the multiple screw holes are embedded in the precast beam support wall column. The screws pass through the corresponding screw holes and are threaded with double nuts. The two flange steel plates clamp the ends of the precast beam.
[0010] Preferably, the thickness of the mounting steel plate is 20mm, the dimensions of the flange steel plate are 120mm wide x 12mm thick x 850mm long, and the dimensions of the channel steel are 140mm wide x 750mm long.
[0011] Preferably, the support component is a support rod, which is embedded in the precast beam support wall column. The support rod includes a steel pipe and a support steel plate, and the steel pad is welded to the support steel plate.
[0012] Preferably, the dimensions of the supporting steel plate are the same as those of the steel pad.
[0013] This invention also provides a construction method for converting cast-in-place to precast integrated installation structure of high-suspension decorative beams, including the following specific steps:
[0014] S1. Precast beam fabrication: After the drawings are refined, the steel cage of the beam is tied. An integrated steel plate is fabricated on site, and part of it is embedded in both ends of the steel cage. Then, two round-headed hanging nails are embedded in the top of both ends of the steel cage. After the formwork is set up around the steel cage, concrete is poured and cured. The decorative surface is then constructed on the precast beam.
[0015] S2. Precast beam hoisting:
[0016] When the bottom elevation of the cast-in-place beam is greater than or equal to the bottom elevation of the precast beam, the following fixing and support methods shall be adopted:
[0017] A. Positioning and layout: In the precast beam support wall column, according to the design requirements of the structural drawings and the position of the precast beam, mark out the position of the pre-embedded bolts;
[0018] B. Embedded threaded rods: Verify the location and install multiple threaded rods into the steel mesh tied to the precast beam support wall column, and fix them firmly;
[0019] C. First concrete pouring for precast beam support wall columns: Erect wall column formwork and pour concrete to the bottom elevation of the precast beam, which is the first pouring surface. The area above the first pouring surface is the second pouring area.
[0020] D. Roughening, cleaning, and leveling: After the concrete strength of the wall column reaches 50%, remove the wall column formwork and roughen, clean, and level the first pouring surface according to the elevation.
[0021] E. Fabrication and installation of steel bracket clamps: Steel bracket clamps are fabricated on-site by welding, and the fabricated steel bracket clamps are connected to the pre-embedded bolts and fastened with double nuts;
[0022] F. Precast beam hoisting: After the concrete strength of the wall column reaches 100%, the precast beam is hoisted by tower crane and round-headed lifting nails. The integrated steel plates exposed at both ends of the precast beam are placed on the corresponding first pouring surface and located in the second pouring area. The two flange steel plates of the steel bracket clamp hold the ends of the precast beam.
[0023] G. Second concrete pouring for precast beam support wall columns: After hoisting is completed, pour the remaining concrete on the first pouring surface, i.e., in the second pouring area, and cure it.
[0024] When the bottom elevation of the cast-in-place beam is lower than that of the precast beam, the following fixing and support methods shall be adopted:
[0025] A. Positioning and layout: In the precast beam support wall column, position and layout the support members according to the design requirements of the structural drawings;
[0026] B. Embedded support members in walls and columns: The steel pipes of the support members are embedded in the reinforcing mesh of the precast beam support wall and column, and fixed firmly.
[0027] C. First concrete pouring for precast beam support wall columns: Erect wall column formwork and pour concrete to the bottom elevation of the cast-in-place beam, which is the first pouring surface. The supporting steel plate of the support members is higher than the first pouring surface and is consistent with the bottom elevation of the precast beam.
[0028] D. Precast beam hoisting: After the concrete strength of the wall column reaches 100%, the precast beam is hoisted using a tower crane and round-headed lifting nails. The steel pads at the bottom of the integrated steel plates exposed at both ends of the precast beam are placed on the corresponding support steel plates and fully welded.
[0029] E. Second concrete pouring for precast beam support walls and columns: After hoisting is completed, pour the remaining concrete on the surface of the first pouring and cure it.
[0030] Preferably, the integrated steel plate has a total length of 1300mm, is centrally embedded in the reinforcing cage, 800mm is embedded in the precast beam, and 500mm is exposed and embedded in the core area of the wall column.
[0031] Preferably, the multiple studs on both sides of the integrated steel plate are welded to the stirrups in the reinforcing cage.
[0032] The beneficial effects of this invention are as follows:
[0033] 1. Provided that the lifting capacity of the tower crane on site meets the requirements, the high-suspension decorative beams are constructed using the method of overall prefabrication, integrated decoration, and one-time hoisting. This can make full use of the efficiency of the existing equipment on site, improve the construction quality and progress, avoid the construction of high-altitude work platforms, reduce high-altitude work, ensure construction safety, and save construction time and costs.
[0034] 2. By setting an integrated steel plate, it can provide support when the precast beam is hoisted to the wall column support, and can also strengthen the connection between the precast beam and the core area of the wall column support.
[0035] 3. By setting steel bracket clamps, it is applicable to cast-in-place beams with a bottom elevation greater than or equal to that of precast beams. It can play an auxiliary support role when the precast beam is hoisted to the wall column support, and can also play an anti-overturning role after the precast beam is hoisted.
[0036] 4. By setting up support rods, the support steel plates of the support rods are fully welded to the steel pads of the integrated steel plates, which not only serve as construction supports, but also as an anti-overturning function for the precast beams. Attached Figure Description
[0037] Figure 1 This is a schematic diagram illustrating the applicable state of the steel bracket clamp of the present invention;
[0038] Figure 2 This is a schematic diagram of the applicable state of the support rod of the present invention;
[0039] Figure 3 This is a schematic diagram of the precast beam structure proposed in this invention;
[0040] Figure 4 This is a front view of the integrated steel plate proposed in this invention;
[0041] Figure 5 This is a side view of the integrated steel plate proposed in this invention;
[0042] Figure 6 This is a front view of the steel bracket clamp proposed in this invention;
[0043] Figure 7 This is a side view of the steel bracket clamp proposed in this invention;
[0044] Figure 8 This is a schematic diagram of the clamping state of the steel bracket clamp proposed in this invention;
[0045] Figure 9 for Figure 8 Side view;
[0046] Figure 10 This is a schematic diagram of the support rod structure proposed in this invention;
[0047] Figure 11 This is a schematic diagram of the support state of the support rod proposed in this invention.
[0048] In the diagram: 1 Cast-in-place beam, 2 Precast beam, 3 Precast beam support wall column, 4 First pouring surface, 5 Second pouring area, 6 Integrated steel plate, 61 Connecting steel plate, 62 Steel pad, 63 Stud, 7 Steel bracket clamp, 71 Flange steel plate, 72 Mounting steel plate, 73 Channel steel, 74 Screw hole, 8 Support rod, 81 Steel pipe, 82 Supporting steel plate, 9 Round head hanging nail, 10 Screw, 11 Double nut. Detailed Implementation
[0049] To make the above-mentioned objects, features, and advantages of the present invention more apparent and understandable, specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings. Many specific details are set forth in the following description to provide a thorough understanding of the present invention. However, the present invention can be practiced in many other ways different from those described herein, and those skilled in the art can make similar modifications without departing from the spirit of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0050] It should be noted that when an element is referred to as being "fixed to" another element, it can be directly attached to the other element or there may be an intervening element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or there may be an intervening element. The terms "vertical," "horizontal," "left," "right," and similar expressions used herein are for illustrative purposes only and do not represent the only possible implementation.
[0051] Reference Figures 1-11 A high-suspension decorative beam integrated installation structure from cast-in-place to precast includes a pair of cast-in-place beams 1. Each end of the pair of cast-in-place beams 1 is cast with a precast beam support wall column 3. A precast beam 2 is installed between the precast beam support wall columns 3. Both ends of the precast beam 2 are partially embedded with integrated steel plates 6. The exposed part of the integrated steel plates 6 is embedded in the core area of the precast beam support wall column 3. Support components for supporting the precast beam 2 and preventing the precast beam 2 from overturning are installed on the precast beam support wall column 3. Round-headed hanging nails 9 are also embedded at the top of both ends of the precast beam 2, at a distance of L / 4 from the end.
[0052] Furthermore, the integrated steel plate 6 includes a connecting steel plate 61, a steel pad 62, and multiple studs 63. The steel pad 62 is welded to the bottom of the exposed part of the connecting steel plate 61, and the multiple studs 63 are evenly distributed and welded to both sides of the embedded part of the connecting steel plate 61. The thickness of the connecting steel plate 61 is 30mm, the width of the steel pad 62 is 100mm, the length is 500mm, and the diameter of the studs 63 is 22mm and the length is 70mm. The integrated steel plate 6 is a permanent component, embedded in the concrete of the core area of the precast beam support wall column 3, that is, in the second pouring area 5. It can play a supporting role when the precast beam 2 is hoisted to the wall column support, and can strengthen the connection between the precast beam and the core area of the wall column support.
[0053] When the bottom elevation of the cast-in-place beam 1 is greater than or equal to the bottom elevation of the precast beam 2, the support assembly adopts the support method of steel bracket clamp 7. The steel bracket clamp 7 includes a mounting steel plate 72, with flange steel plates 71 welded to both sides of the mounting steel plate 72. Channel steel 73 is welded to the side wall of the flange steel plate 71. The mounting steel plate 72 is provided with multiple screw holes 74. Multiple screws 10 adapted to the multiple screw holes 74 are embedded in the precast beam support wall column 3. The screws 10 pass through the corresponding screw holes 74 and are threaded with double nuts 11. The two flange steel plates 71 clamp the end of the precast beam 2. The steel bracket clamp 7 is a temporary component and is removed after the precast beam 2 is installed. It can play an auxiliary support role when the precast beam 2 is hoisted to the wall column support, and can play an anti-overturning role after the precast beam 2 is hoisted.
[0054] A steel pad is placed in the gap between the top of the steel plate 72 and the bottom of the precast beam 2.
[0055] Furthermore, the thickness of the mounting steel plate 72 is 20mm, the dimensions of the flange steel plate 71 are 120mm wide x 12mm thick x 850mm long, and the dimensions of the channel steel 73 are 140mm wide x 750mm long. The weld between the 20mm thick mounting steel plate 72 and the flange steel plate 71 is a slit weld, and the weld between the 14# channel steel 73 and the flange steel plate 71 is a full fillet weld.
[0056] When the bottom elevation of the cast-in-place beam 1 is lower than that of the precast beam 2, the support assembly adopts the form of support rod 8. The support rod 8 is embedded in the precast beam support wall column 3. The support rod 8 includes a steel pipe 81 and a support steel plate 82. The steel pad 62 is welded on the support steel plate 82. It not only serves as a construction support but also as an anti-overturning function for the precast beam.
[0057] Furthermore, the dimensions of the supporting steel plate 82 are the same as those of the steel pad 62, and the supporting steel plate 82 and the steel pad 62 are fully welded together.
[0058] This invention also provides a construction method for converting cast-in-place to precast integrated installation structure of high-suspension decorative beams, including the following specific steps:
[0059] S1. Precast beam fabrication: After the drawings are refined, the steel cage of the beam is tied. An integrated steel plate 6 is fabricated on site, and part of it is embedded in both ends of the steel cage. Then, two round-headed hanging nails 9 are embedded in the top of both ends of the steel cage. After the formwork is set up around the steel cage, concrete is poured and cured. The decorative surface is constructed on the precast beam 2.
[0060] S2. Precast beam hoisting:
[0061] When the bottom elevation of cast-in-place beam 1 is greater than or equal to the bottom elevation of precast beam 2, the following fixing and support methods shall be adopted:
[0062] A. Positioning and layout: In the precast beam support wall column 3, according to the design requirements of the structural drawings and based on the position of the precast beam 2, the position of the pre-embedded screw 10 is laid out;
[0063] B. Embedded screws: Verify the position and install multiple screws 10 into the steel mesh tied to the precast beam support wall column 3. Fix them firmly. When embedding screws 10 in the steel bracket clamp, control the distance from the bottom of the beam to ensure that the steel bracket clamp 7 is slightly lower than the bottom of the beam after installation. The main purpose is to control construction errors. After hoisting, insert pads into the gaps.
[0064] C. First concrete pouring of precast beam support wall column: Erect wall column formwork and pour concrete to the bottom elevation of precast beam 2, which is the first pouring surface 4. The area above the first pouring surface 4 is the second pouring area 5.
[0065] D. Roughening, cleaning, and leveling: After the concrete strength of the wall column reaches 50%, remove the wall column formwork and, according to the elevation, roughen, clean, and level the first pouring surface 4.
[0066] E. Fabrication and installation of steel bracket clamps: Steel bracket clamps 7 are fabricated on site by welding. The fabricated steel bracket clamps 7 are connected to the pre-embedded screws 10 and fastened with double nuts 11.
[0067] F. Precast beam hoisting: After the concrete strength of the wall column reaches 100%, the precast beam 2 is hoisted by tower crane and round-headed lifting nails 9. The integrated steel plates 6 exposed at both ends of the precast beam 2 are placed on the corresponding first pouring surface 4 and located in the second pouring area 5. The two flange steel plates 71 of the steel bracket clamp 7 clamp the ends of the precast beam 2. The gap between the precast beam 2 and the flange steel plates 71 is 10mm. After the precast beam 2 is hoisted, a large-headed wedge is placed in the gap.
[0068] G. Second concrete pouring for precast beam support wall columns: After hoisting is completed, pour the remaining concrete on the first pouring surface 4, i.e. the second pouring area 5, and cure it.
[0069] When the bottom elevation of cast-in-place beam 1 is lower than the bottom elevation of precast beam 2, the following fixing and support methods shall be adopted:
[0070] A. Positioning and layout: In the precast beam support wall column 3, the positioning and layout of the support members 8 are carried out according to the design requirements of the structural drawings;
[0071] B. Embedded support members in the wall column: The steel pipe 81 of the support member 8 is embedded in the steel mesh tied to the precast beam support wall column 3 and fixed firmly.
[0072] C. First concrete pouring of precast beam support wall column: Erect wall column formwork and pour concrete to the bottom elevation of cast-in-place beam 1, which is the first pouring surface 4. The supporting steel plate 82 of the supporting member 8 is higher than the first pouring surface 4 and is consistent with the bottom elevation of precast beam 2.
[0073] D. Precast beam hoisting: After the concrete strength of the wall column reaches 100%, the precast beam 2 is hoisted by tower crane and round head lifting nail 9. The steel pad 62 at the bottom of the integrated steel plate 6 exposed at both ends of the precast beam 2 is placed on the corresponding support steel plate 82 and fully welded.
[0074] E. Second concrete pouring for precast beam support walls and columns: After hoisting is completed, pour the remaining concrete on the surface of the first pouring and cure it.
[0075] Furthermore, the integrated steel plate 6 has a total length of 1300mm, is centrally embedded in the reinforcing cage, 800mm is embedded in the precast beam 2, and 500mm is exposed and embedded in the core area of the wall column. Multiple studs 63 on both sides of the integrated steel plate 6 are welded to the stirrups in the reinforcing cage.
[0076] This invention, under the premise that the lifting capacity of the tower crane on site meets the requirements, adopts the method of overall prefabrication, decoration integration and one-time hoisting for the construction of high-suspension decorative beams. This can give full play to the efficiency of existing equipment on site, improve construction quality and progress, avoid the construction of high-altitude work platforms, reduce high-altitude work, ensure construction safety, and save construction time and costs.
[0077] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A high-suspension decorative beam integrated installation structure for cast-in-place to precast construction, comprising a pair of cast-in-place beams (1), characterized in that, Precast beam support columns (3) are cast at the ends of a pair of cast-in-place beams (1). Precast beams (2) are installed between the precast beam support columns (3). Part of an integrated steel plate (6) is embedded at both ends of the precast beams (2). The exposed part of the integrated steel plate (6) is embedded in the core area of the precast beam support column (3). Support components for preventing the precast beams (2) from overturning are installed on the precast beam support columns (3). Round-headed hanging nails (9) are also embedded at the top of both ends of the precast beams (2). The integrated steel plate (6) includes a connecting steel plate (61), a steel pad (62) and multiple studs (63). The precast beam support wall column (3) has multiple screws (10) embedded in it, which are adapted to multiple screw holes (74). The screws (10) pass through the corresponding screw holes (74) and are threaded with double nuts (11). The support assembly is a support rod (8). The support rod (8) includes a steel pipe (81) and a support steel plate (82). The steel pad (62) is welded to the support steel plate (82). The construction method for this installation structure includes the following specific steps: S1. Precast beam fabrication: After the drawings are refined, the steel cage of the beam is tied. An integrated steel plate (6) is fabricated on site, and part of it is embedded in both ends of the steel cage. Then, two round-headed nails (9) are embedded in the top of both ends of the steel cage. After the formwork is set up around the steel cage, concrete is poured and cured. The decorative surface is constructed on the precast beam (2). S2. Precast beam hoisting: When the bottom elevation of the cast-in-place beam (1) is greater than or equal to the bottom elevation of the precast beam (2), the following fixing and support methods shall be adopted: A. Positioning and layout: In the precast beam support wall column (3), according to the design requirements of the structural drawings, the position of the embedded screw (10) is laid out according to the position of the precast beam (2); B. Embedded screws: Verify the location and install multiple screws (10) into the steel mesh tied to the precast beam support wall column (3) and fix them firmly; C. First concrete pouring of precast beam support wall column: Set up wall column formwork and pour concrete to the bottom elevation of the precast beam (2), which is the first pouring surface (4). The area above the first pouring surface (4) is the second pouring area (5). D. Roughening, cleaning and leveling: After the concrete strength of the wall column reaches 50%, remove the wall column formwork and roughen, clean and level the first pouring surface (4) according to the elevation. E. Steel bracket clamp fabrication and installation: Steel bracket clamp (7) is fabricated on site by welding. The fabricated steel bracket clamp (7) is connected to the pre-embedded screw (10) and fastened with double nuts (11). F. Precast beam hoisting: After the concrete strength of the wall column reaches 100%, the precast beam (2) is hoisted by tower crane and round head lifting nail (9). The integrated steel plate (6) exposed at both ends of the precast beam (2) is placed on the corresponding first pouring surface (4) and located in the second pouring area (5). The two flange steel plates (71) of the steel bracket clamp (7) hold the ends of the precast beam (2). G. Second concrete pouring of precast beam support wall column: After hoisting is completed, pour the remaining concrete on the first pouring surface (4), that is, in the second pouring area (5) and cure it. When the bottom elevation of the cast-in-place beam (1) is lower than the bottom elevation of the precast beam (2), the following fixing and support methods shall be adopted: A. Positioning and layout: In the precast beam support wall column (3), the positioning and layout of the support members (8) are carried out in accordance with the design requirements of the structural drawings; B. Embedded support members in the wall column: The steel pipe (81) of the support member (8) is embedded in the steel mesh of the precast beam support wall column (3) and fixed firmly. C. First concrete pouring of precast beam support wall column: Set up wall column formwork and pour concrete to the bottom elevation of the cast-in-place beam (1), which is the first pouring surface (4). The supporting steel plate (82) of the supporting member (8) is higher than the first pouring surface (4) and is consistent with the bottom elevation of the precast beam (2). D. Precast beam hoisting: After the concrete strength of the wall column reaches 100%, the precast beam (2) is hoisted by tower crane and round head lifting nail (9). The steel pad (62) at the bottom of the integrated steel plate (6) exposed at both ends of the precast beam (2) is placed on the corresponding support steel plate (82) and fully welded. E. Second concrete pouring for precast beam support walls and columns: After hoisting is completed, pour the remaining concrete on the surface of the first pouring and cure it.
2. The integrated installation structure for cast-in-place to precast high-suspension decorative beams according to claim 1, characterized in that, The steel pad (62) is welded to the bottom of the exposed part of the connecting steel plate (61), and the multiple studs (63) are evenly distributed and welded to both sides of the embedded part of the connecting steel plate (61).
3. The integrated installation structure for cast-in-place to precast high-suspension decorative beams according to claim 2, characterized in that, The thickness of the connecting steel plate (61) is 30mm, the width of the steel pad (62) is 100mm and the length is 500mm, and the diameter of the stud (63) is 22mm and the length is 70mm.
4. The integrated installation structure for cast-in-place to precast high-suspension decorative beams according to claim 3, characterized in that, The support assembly is a steel bracket clamp (7), which includes a mounting steel plate (72). Flange steel plates (71) are welded to both sides of the mounting steel plate (72). Channel steel (73) is welded to the side wall of the flange steel plate (71). The mounting steel plate (72) is provided with multiple screw holes (74). The two flange steel plates (71) clamp the ends of the precast beam (2).
5. The integrated installation structure for cast-in-place to precast high-suspension decorative beams according to claim 4, characterized in that, The thickness of the mounting steel plate (72) is 20mm, the dimensions of the flange steel plate (71) are 120mm wide x 12mm thick x 850mm long, and the dimensions of the channel steel (73) are 140mm wide x 750mm long.
6. The integrated installation structure for high-suspension decorative beams, transitioning from cast-in-place to precast construction, as described in claim 5, is characterized in that... The support rod (8) is embedded in the precast beam support wall column (3).
7. The integrated installation structure for cast-in-place to precast high-suspension decorative beams according to claim 6, characterized in that, The dimensions of the supporting steel plate (82) are the same as those of the steel pad (62).
8. The integrated installation structure for cast-in-place to precast high-suspension decorative beams according to claim 7, characterized in that, The integrated steel plate (6) has a total length of 1300mm, is centrally embedded in the steel cage, 800mm is embedded in the precast beam (2), and 500mm is exposed and embedded in the core area of the wall column.
9. The integrated installation structure for cast-in-place to precast high-suspension decorative beams according to claim 8, characterized in that, The multiple studs (63) on both sides of the integrated steel plate (6) are welded to the stirrups in the steel cage.
Citation Information
Patent Citations
Construction method for cast-in-place beam of fabricated overall frame structure without opening and formwork support
CN112696023A
Fully-fabricated concrete building structure
CN115977233A