A method for constructing a drilling rig

By using a step-by-step welding method for the drilling platform deck and base, the problems of structural segmentation and assembly timing control in the construction of the drilling platform were solved, improving accuracy and efficiency.

CN117533476BActive Publication Date: 2026-11-10CSSC HUANGPU WENCHONG SHIPBUILDING CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311531885.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-16
Publication Date
2026-11-10
Estimated Expiration
2043-11-16

AI Technical Summary

Technical Problem

The lack of rational structural segmentation and precise assembly timing control in existing technologies leads to low precision control and efficiency in the construction of drilling rig structures.

Method used

By adopting a step-by-step welding method for the drilling platform deck and base, the deck is arranged laterally to form the drilling platform deck, and then combined with the welding base and legs to achieve reasonable structural division and precise control of assembly timing.

Benefits of technology

It improved the precision control and efficiency of drilling platform structure construction, simplified the construction process, and created convenient construction conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117533476B_ABST
    Figure CN117533476B_ABST
Patent Text Reader

Abstract

This invention provides a method for constructing a drilling platform. The method includes forming a drilling platform deck by connecting a first deck, a second deck, and a third deck arranged laterally; welding a first drilling platform base and a second drilling platform base to form a first side base, and welding at least a first connecting leg; welding a third drilling platform base and a fourth drilling platform base to form a second side base, and welding at least a second connecting leg; installing guide wheel bases and docking legs on the drilling platform deck, and welding the docking legs; and connecting the first side base, the second side base, and the drilling platform deck to the docking legs via the first and second connecting legs, and then welding them together. By welding the drilling platform deck, base, and legs in stages, this method helps to solve the technical problem in the prior art of lacking a rational structural division and precise control of assembly timing, thereby improving precision control and construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical fields:

[0001] This invention relates to the field of drilling rig construction, and in particular to a method for constructing a drilling rig. Background technology:

[0002] The drilling rig structure is a crucial part of the drilling and production vessel, filled with various high-precision equipment. This makes the precision control of the entire drilling rig structure construction extremely stringent. Due to the large number of equipment, the number and structure of the equipment bases on the drilling rig increase significantly, making the construction of the drilling rig structure a complex project. It requires meticulous design and manufacturing to ensure the smooth progress of drilling and production operations. In particular, there is still a gap in the area of ​​improving the level of precision control and construction efficiency through rational structural division and precise control of assembly timing.

[0003] There is an urgent need for a construction method for drilling rigs that can help solve the technical problem of the lack of a rational structural division and precise control of assembly timing in existing technologies, in order to improve the level of precision control and construction efficiency. Summary of the Invention:

[0004] In one embodiment, the present invention provides a method for constructing a drilling platform. By welding the drilling platform deck, base, and legs in stages, it helps to solve the technical problem in the prior art of lacking a rational structural division and precise control of assembly timing, thereby improving the level of precision control and construction efficiency.

[0005] The construction method includes:

[0006] The first and second decks, which are arranged laterally, are connected by the third deck to form a drilling platform deck.

[0007] After welding the first drill base and the second drill base, a first side base is formed, and at least the first connecting leg is welded.

[0008] After welding the third and fourth drill bases, a second side base is formed, and at least a second connecting leg is welded.

[0009] Guide wheel bases and docking legs are installed on the drilling rig deck, and the docking legs are welded.

[0010] The first side base and the second side base, as well as the drilling deck, are welded and fixed together by connecting the first connecting leg and the second connecting leg to the docking leg.

[0011] In one embodiment, after the step of welding and fixing the first side base and the second side base, and the drilling deck, together with the docking leg via the first connecting leg and the second connecting leg, the method further includes:

[0012] The derrick base and tensioner base are installed on the drilling rig deck.

[0013] In one embodiment, after the step of forming the first side base by welding the first drill base and the second drill base, the method further includes:

[0014] A pre-set platform is installed on the upper surface of the first side base.

[0015] In one embodiment, the first connecting leg includes a first transverse wall and a second transverse wall arranged in the same direction, and the first longitudinal wall and the second longitudinal wall arranged in the same direction enclose four sides to form a cylindrical structure with a rectangular cross-section.

[0016] In one embodiment, connecting pieces are welded from the inside of the rectangle from the four vertices toward the adjacent vertices.

[0017] In one embodiment, connecting pieces are welded to the outer sides of the four apex corners of the rectangle.

[0018] In one embodiment, the method of constructing the drilling rig includes the drilling rig deck located at the top, and the drilling rig deck having an upper upper deck and a lower deck.

[0019] The first side base has a first central platform;

[0020] The second side base has a second central platform.

[0021] In one embodiment, the upper surfaces of the first central platform and the second central platform have different heights.

[0022] In one embodiment, the first side base has a third central platform extending outward;

[0023] The second side base has a fourth central platform that extends outward.

[0024] In one embodiment, the first side base and the second side base have supporting legs. Attached image description:

[0025] Figure 1 This is a schematic flowchart of a method for constructing a drilling platform according to an embodiment of the present invention;

[0026] Figure 2 This is a schematic diagram of the drilling platform deck flipping step in another embodiment of the present invention;

[0027] Figure 3 This is a schematic diagram of the tilting space of the drilling platform deck in another embodiment of the present invention;

[0028] Figure 4 This is a schematic diagram of the installation process of the derrick base and tensioner base in another embodiment of the present invention;

[0029] Figure 5 This is a schematic diagram of the installation process of the first side base in another embodiment of the present invention;

[0030] Figure 6 This is a schematic diagram of the installation process of the second side base in another embodiment of the present invention;

[0031] Figure 7 This is a schematic diagram of the installation process of the drilling platform deck, the first side base, and the second side base in another embodiment of the present invention;

[0032] Figure 8 This is a schematic diagram of the side structure of the drilling rig in another embodiment of the present invention;

[0033] Figure 9 This is a schematic diagram of the welding sequence of the first connecting leg in another embodiment of the present invention.

[0034] Figure label:

[0035] First deck 1

[0036] Second deck 2

[0037] Third Deck 3

[0038] Drill deck 4

[0039] derrick base 41

[0040] Tensioner base 42

[0041] First Drilling Platform Base 5

[0042] Second drilling rig base 6

[0043] First side base 7

[0044] First Central Platform 71

[0045] Third Central Platform 72

[0046] First connecting leg 8

[0047] First transverse wall 81

[0048] Second transverse wall 82

[0049] First longitudinal wall 83

[0050] Second longitudinal wall 84

[0051] Rectangle 85

[0052] Welded connecting piece 86

[0053] Third Drilling Platform Base 9

[0054] Second side base 11

[0055] Second Central Platform 111

[0056] Second connecting leg 12

[0057] Guide wheel base 13

[0058] docking outrigger 14

[0059] Pre-built platform 15

[0060] Support leg 16 Detailed implementation method:

[0061] Figure 1 This is a schematic flowchart of a method for constructing a drilling platform according to an embodiment of the present invention; Figure 2 This is a schematic diagram of the drilling platform deck flipping step in another embodiment of the present invention; Figure 3 This is a schematic diagram of the tilting space of the drilling platform deck in another embodiment of the present invention; Figure 4 This is a schematic diagram of the installation process of the derrick base and tensioner base in another embodiment of the present invention; Figure 5 This is a schematic diagram of the installation process of the first side base in another embodiment of the present invention; Figure 6 This is a schematic diagram of the installation process of the second side base in another embodiment of the present invention; Figure 7 This is a schematic diagram of the installation process of the drilling platform deck, the first side base, and the second side base in another embodiment of the present invention; Figure 8 This is a schematic diagram of the side structure of the drilling rig in another embodiment of the present invention; Figure 9 This is a schematic diagram of the welding sequence of the first connecting leg in another embodiment of the present invention.

[0062] like Figures 1 to 9 As shown, the drilling rig has a large number of structural equipment and a relatively complex internal structure. Due to the high precision requirements of each piece of equipment, the overall precision control of the drilling rig is more difficult. By rationally dividing the structure and planning the precise timing of installation, the construction accuracy and assembly efficiency can be improved, thus creating convenient conditions for construction.

[0063] In one embodiment, the present invention provides a method for constructing a drilling rig, the method comprising:

[0064] S101, formed by connecting the first deck 1 and the second deck 2 arranged laterally and the third deck 3 to form a drilling platform deck 4.

[0065] This step provides a drilling deck 4 that is formed by welding three decks, namely the first deck 1, the second deck 2, and the third deck 3, arranged laterally.

[0066] S102, after welding the first drill base 5 and the second drill base 6, a first side base 7 is formed, and at least the first connecting leg 8 is welded.

[0067] This step provides a specific procedure for welding the first side base 7. The first drill base 5 and the second drill base 6 are left and right structures with the same height. After welding, they form a unified upper surface to form a platform.

[0068] S103, after welding the third drill base 9 and the fourth drill base 10, a second side base 11 is formed, and at least a second connecting leg 12 is welded.

[0069] This step provides a specific procedure for welding a third drill base 9 and a fourth drill base 10 to form a second side base 11, the structural features of which are basically the same as those of the first side base 7.

[0070] S104, Install guide wheel base 13 and docking leg 14 on the drilling deck 4, and weld docking leg 15.

[0071] This step provides a specific procedure for installing the guide wheel base 13 and docking leg 14 on the drilling deck 4.

[0072] S105, the first side base 7 and the second side base 11, as well as the drilling deck 4, are welded and fixed after being connected to the docking support 15 via the first connecting support 8 and the second connecting support 12.

[0073] This step provides a specific procedure for the final connection of a first side base 7 and a second side base 11, as well as the drilling deck 4.

[0074] This embodiment provides a specific implementation method for constructing a drilling platform. The drilling platform is divided into three main parts: a drilling platform deck 4, a first side base 7, and a second side base 11. The first side base 7 and the second side base 11 are welded to the left and right sides respectively and then placed on both sides. Finally, the drilling platform deck 4 is placed on top and then welded and fixed. The upper and lower structures are connected by connecting legs 14, first connecting legs 8, and second connecting legs 12. All three parts can be constructed simultaneously in segments, shortening the construction process. This helps to solve the technical problem in the prior art of lacking a rational structural division and precise control of assembly timing to improve the level of precision control and construction efficiency.

[0075] The drilling deck 4, the first side base 7, and the second side base 11 are constructed internally by supporting structures, such as profiles.

[0076] In one embodiment, after the step of welding and fixing the first side base 7, the second side base 11, and the drill deck 4 to the butt support 14 via the first connecting leg 8 and the second connecting leg 12, the method further includes:

[0077] A derrick base 41 and a tensioner base 42 are installed on the drilling deck 4.

[0078] This embodiment provides a specific implementation of a derrick base 41 and a tensioner base 42 provided on the drilling deck 4.

[0079] In one embodiment, after the step of forming the first side base 7 by welding the first drill base 5 and the second drill base 6, the method further includes:

[0080] A pre-set platform 15 is installed on the upper surface of the first side base 7.

[0081] This embodiment provides a specific implementation method for installing a pre-set platform 15 on the upper surface of the first side base 7.

[0082] In one embodiment, the first connecting leg 8 includes a first transverse wall 81 and a second transverse wall 82 arranged in the same direction, and a first longitudinal wall 83 and a second longitudinal wall 84 arranged in the same direction enclose the four sides to form a cylindrical structure with a rectangular cross-section 85.

[0083] This embodiment provides a basic structure for a first connecting leg 8, which has four side wall plates arranged vertically from four directions. Then, the four apex corners of a rectangle 85 are provided with stiffeners in the vertical direction. The stiffeners are right-angled triangles, and the two right-angled sides are perpendicular to the plane and the side wall plates respectively.

[0084] like Figure 9 As shown, in one embodiment, connecting pieces 86 are welded from the inside of rectangle 85 from the four vertices toward the adjacent vertices.

[0085] This embodiment provides a specific implementation method for the welding direction of the four walls of a rectangular 85.

[0086] In one embodiment, a rectangular piece 86 is welded to the outer side of the four apex corners of the rectangle 85.

[0087] This embodiment provides a welding sequence for welding connecting pieces 86 to the outer sides of the four apex corners of a rectangle 85.

[0088] In one embodiment, the method of constructing the drilling rig includes a drilling rig deck 4 located at the top, a drilling upper deck 41 and a drilling lower deck 42 of the drilling rig deck 4;

[0089] The first side base 7 has a first central platform 71;

[0090] The second side base 11 has a second central platform 111.

[0091] This embodiment provides an overall structural configuration of a drilling platform. The uppermost layer is the drilling platform deck 4, and the first side base 7 and the second side base 11 are also allocated to the first central platform 71 and the second central platform 111 for configuring various equipment.

[0092] In one embodiment, the upper surfaces of the first central platform 71 and the second central platform 111 have different heights.

[0093] This embodiment provides a specific implementation in which the upper surfaces of the first central platform 71 and the second central platform 111 have different heights.

[0094] In one embodiment, the first side base 7 has an outwardly extending third central platform 72;

[0095] The second side base 11 has a fourth central platform 112 that extends outward.

[0096] This embodiment also provides a third central platform 72 and a fourth central platform 112, which are different from each other.

[0097] In one embodiment, the first side base 7 and the second side base 11 have support legs 17.

[0098] In this embodiment, a first side base 7 and a support leg 17 at the bottom of the second side base 11 are provided for supporting the platform.

Claims

1. A method for constructing a drilling rig, characterized in that, The construction method includes: The drilling deck (4) is formed by connecting the first deck (1) and the second deck (2) arranged laterally and the third deck (3). After welding the first drill base (5) and the second drill base (6), a first side base (7) is formed, and at least the first connecting leg (8) is welded. After welding the third drill base (9) and the fourth drill base (10), a second side base (11) is formed, and at least a second connecting leg (12) is welded. A guide wheel base (13) and a docking leg (14) are installed on the drilling deck (4), and the docking leg (14) is welded. The first side base (7) and the second side base (11), as well as the drill deck (4), are welded and fixed by connecting the first connecting leg (8) and the second connecting leg (12) to the docking leg (14); After the step of welding and fixing the first side base (7) and the second side base (11), and the drill deck (4) to the docking support (14) via the first connecting support (8) and the second connecting support (12), the method further includes: A derrick base and a tensioner base are provided on the drilling deck (4); After the step of forming the first side base (7) by welding the first drill base (5) and the second drill base (6), the method further includes: A pre-set platform (15) is installed on the upper surface of the first side base (7); The first connecting leg (8) includes a first transverse wall (81) and a second transverse wall (82) arranged in the same direction, and a first longitudinal wall (83) and a second longitudinal wall (84) arranged in the same direction enclose four sides to form a cylindrical structure with a rectangular cross section (85); Welding connecting pieces (86) from the four vertices toward the adjacent vertices from inside the rectangle (85); The rectangle (85) is welded with connecting pieces (86) along the outer sides of its four apex corners; The drilling deck (4) is located on top of the drilling platform and has an upper drilling deck (41) and a lower drilling deck (42). The first side base (7) has a first central platform (71); The second side base (11) has a second central platform (111).

2. The method for constructing a drilling rig according to claim 1, characterized in that, The upper surfaces of the first central platform (71) and the second central platform (111) have different heights.

3. The method for constructing a drilling rig according to claim 2, characterized in that, The first side base (7) has a third central platform (72) extending outward; The second side base (11) has a fourth central platform (112) extending outward.

4. The method for constructing a drilling rig according to claim 3, characterized in that, The first side base (7) and the second side base (11) have supporting legs (16).