Fireproof structure with built-in cable steel truss suspension structure

By incorporating prestressed cables and multiple layers of fire-resistant materials into the steel truss suspension structure, the risk of member failure and collapse under fire was mitigated, achieving higher fire resistance and safety redundancy.

CN117868303BActive Publication Date: 2026-11-10HONG KONG HUAYI DESIGN CONSULTANT (SHENZHEN) CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410140402.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-31
Publication Date
2026-11-10
Estimated Expiration
2044-01-31

AI Technical Summary

Technical Problem

Existing steel truss suspension structures are at risk of member failure and progressive collapse in the event of a fire, and lack effective fire safety reserves.

Method used

Prestressed cables are installed in the steel truss suspension structure, and steel sleeves and fireproof materials are installed on them to form a multi-layer fireproof structure, including separable fireproof material overlap sections and flexible materials, which provide a closed wrapping effect and extend the fire resistance limit of the components.

Benefits of technology

It improves the fire resistance and safety redundancy of the steel truss suspension structure, reduces the risk of continuous collapse under fire, and extends the fire resistance limit of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117868303B_ABST
    Figure CN117868303B_ABST
Patent Text Reader

Abstract

This invention discloses a fireproof structure for a steel truss suspension structure with built-in cables. At least one prestressed cable is installed in the inner cavity connecting the steel truss vertical member at its mid-span and the lower steel column. The prestressed cable is covered by a steel sleeve. A first fireproof structure is provided between the steel sleeve and the inner cavity of the steel truss vertical member and the lower steel column. The first fireproof structure includes at least two sections of first fireproof material disposed on the outer periphery of the steel sleeve. The two sections of first fireproof material are separable and overlap each other to form an overlapping section. Compared with the prior art, when a fire occurs and some structural components fail, causing large deformation and elongation of the prestressed cable, the two sections of first fireproof material deform synchronously and remain overlapping, providing a closed wrapping effect for the prestressed cable. This provides effective fire protection for critical components, extends the fire resistance limit of critical components, and improves the safety redundancy of the steel truss suspension structure against collapse.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a building structure, and more particularly to a fireproof structure for a built-in cable steel truss suspension structure for a large-span steel truss suspension structure in a building structure. Background Technology

[0002] In commercial and convention buildings, to increase interior transparency and interactivity, there is often a need for large, open-plan atriums in the middle of each floor plan. Simultaneously, to enrich the diversity of interior spatial layouts, several sky bridges are constructed on the upper floors of the atrium, forming large-span connecting passages, enriching traffic flow on each floor and allowing for flexible arrangements to adapt to different scenarios. In terms of structural system construction, by setting up steel trusses at the top of the atrium and suspending several floors downwards (referring to several floors suspended below the steel trusses via hanging steel columns, a common term in this field), a clear primary and secondary structural form is formed, meeting the requirement for large spaces on the floors below the atrium. Another application scenario involves setting up a high-level connecting structure between two towers, with steel trusses on the top floors suspending several floors to create a connected structural system. This type of structural system has minimal impact on the rigidity of the main structure, and since no diagonal braces are installed in the suspended floors, it provides unobstructed architectural views, and is gradually being applied in actual engineering projects. However, if a fire occurs in a localized area of ​​the steel truss suspension structure, based on existing technology and conventional design and construction requirements, the fire resistance of all steel trusses and the vertical members of the lower floors is balanced and can meet the requirements of national fire protection codes. However, lacking additional fire safety reserves, the special stress characteristics of the suspension structure system may lead to the failure of some steel truss members or some steel components of the lower floors during a fire, significantly increasing the risk of progressive collapse. The "Basic Requirements" of the "General Code for Engineering Structures" (GB55001-2021) clearly state that "the structure should be able to maintain its load-bearing capacity and overall stability within a specified time." Based on the practical application of existing technology, how to improve the additional fire protection stress mechanism for this type of structure has become an urgent research topic. Summary of the Invention

[0003] The purpose of this invention is to provide a fireproof structure with a built-in cable steel truss suspension structure. The technical problem to be solved is to improve its fire resistance and safety redundancy.

[0004] To solve the above problems, the present invention adopts the following technical solution: a fireproof structure with a built-in cable-stayed steel truss suspension structure, including a steel truss, lower floor steel beams, and bottom floor steel beams. At least in the inner cavity of the steel truss vertical members located at the mid-span of the steel truss and the lower floor steel columns, there are prestressed cables passing through the inner cavity of the steel truss vertical members and the lower floor steel columns. The upper end of the prestressed cable is connected and fixed to the upper flange of the steel truss through a clamp anchoring system to form a tension end. The lower end of the prestressed cable is connected and fixed to the bottom floor steel beam through a clamp anchoring system to form an anchoring end. The prestressed cable is covered with a steel sleeve. A first fireproof structure is provided between the steel sleeve and the inner cavity of the steel truss vertical members and the lower floor steel columns. The first fireproof structure includes at least a first fireproof material provided on the outer periphery of the steel sleeve. The first fireproof material has at least two sections. The two sections of the first fireproof material are separable and overlap each other to form an overlap section.

[0005] Furthermore, the overlap length of the lap segment is greater than the axial ultimate tensile deformation value of the prestressed cable.

[0006] Furthermore, the first fireproof structure also includes a deformable second fireproof material disposed between the steel sleeve and the first fireproof material.

[0007] Furthermore, the second fireproof material is made of flexible material.

[0008] Furthermore, the upper end of the steel truss vertical member is provided with a metal upper cover plate, and a hole for the prestressed cable to pass through is provided in the center of the metal upper cover plate. The metal upper cover plate is fixed to the upper flange. The lower end of the lower hanging steel column is provided with a metal lower cover plate, and a hole for the prestressed cable to pass through is provided in the center of the metal lower cover plate. The metal lower cover plate is fixed to the bottom floor steel beam.

[0009] Furthermore, a second fireproof structure is provided outside the clamp anchoring system. The second fireproof structure includes a third fireproof material disposed outside the clamp anchoring system and a fourth fireproof material disposed outside the third fireproof material.

[0010] Furthermore, the second fireproof structure is equipped with an anchor protection cover.

[0011] Furthermore, the third fireproof material is made of flexible fireproof material and / or the fourth fireproof material is made of fireproof boards spliced ​​together.

[0012] Furthermore, the first fireproof material is made of fireproof boards spliced ​​together.

[0013] Furthermore, the cross-sectional shape of the first fireproof material is circular or quadrilateral.

[0014] Compared with the prior art, this invention provides a prestressed cable with a steel sleeve in the inner cavity connecting the vertical member of the steel truss and the lower steel column at least at the mid-span of the steel truss. A first fireproof structure, composed of at least two sections of a first fireproof material, is provided outside the steel sleeve. The two sections of the first fireproof material are separable and overlap to form an overlap section. This ensures that in the event of an accidental fire, if the failure of some structural components causes large deformation and elongation of the prestressed cable, the two sections of the first fireproof material deform synchronously and maintain the overlap section, continuously providing a closed wrapping effect for the prestressed cable. This provides effective fire protection for critical components, extends the fire resistance limit of critical components, and effectively improves the safety redundancy of the steel truss suspension structure against collapse. Attached Figure Description

[0015] Figure 1 This is an elevation view of an embodiment of the present invention.

[0016] Figure 2 for Figure 1 The node graph of node A.

[0017] Figure 3 for Figure 2 Cross-sectional view along the CC direction.

[0018] Figure 4 for Figure 2 Cross-sectional view along the DD direction.

[0019] Figure 5 for Figure 1 The node graph of node B.

[0020] Figure 6 for Figure 5 EE cross-section diagram. Detailed Implementation

[0021] The present invention will now be described in further detail with reference to the accompanying drawings and embodiments.

[0022] like Figure 1 As shown, this invention discloses a fireproof structure with a built-in cable-stayed steel truss suspension structure. In the prior art, the steel truss suspension structure includes a steel truss 12, lower floor steel beams 15, and bottom floor steel beams 16. The steel truss 12 includes an upper flange 8, a lower flange 14, and diagonal web members 13. Figure 1 As can be seen, steel truss vertical members 9 and lower steel columns 10 are provided at the joint positions of two adjacent diagonal web members 13. Both the lower steel columns 10 and the steel truss vertical members 9 have closed cross sections and are welded together at their joints. The lower steel columns 10 are also welded or bolted to the lower floor steel beams 15 and the bottom floor steel beams 16. This part is existing technology and will not be described in detail here. The outer surface of the above structures is conventionally sprayed with a fireproof coating.

[0023] like Figure 1 As shown, the improvement of the present invention is that a prestressed cable 4 is provided in the inner cavity connecting the steel truss vertical member 9 and the lower steel column 10 at the mid-span of the steel truss 12, passing through the inner cavity of the steel truss vertical member 9 and the lower steel column 10. The upper end of the prestressed cable 4 is connected and fixed to the upper flange 8 of the steel truss 12 by an existing clamp anchoring system 6 to form a tensioning end, and the lower end of the prestressed cable 4 is connected and fixed to the bottom floor steel beam 16 by an existing clamp anchoring system 6 to form an anchoring end; as Figure 2 , Figure 5 and Figure 6 As shown, the prestressed cable 4 is covered by a steel sleeve 3 that is integrally formed. The inner diameter of the steel sleeve 3 is larger than that of the prestressed cable 4. A first fireproof structure is provided between the steel sleeve 3 and the inner cavity of the steel truss vertical member 9 and the lower steel column 10. The first fireproof structure includes a deformable second fireproof material 2 and a first fireproof material 1 that are integrally wrapped around the outer periphery of the steel sleeve 3. The first fireproof material 1 is located outside the second fireproof material 2. The first fireproof material 1 located at the end of the steel truss vertical member 9 near the tensioning end is set as a two-section structure. The first fireproof material in the remaining parts can be integrally formed. The two sections of the first fireproof material 1 can be separated and overlapped to form an overlapping section. This ensures that if a fire occurs in a local area, the fireproof coating sprayed on the surface of the steel component loses its protective function locally, which may lead to the collapse of some members of the steel truss 12. If any component (such as the steel truss vertical member 9, diagonal web member 13, etc.) or the steel components of the lower floor fail, the internal forces of the steel truss 12 will be redistributed. At the same time, the prestressed cable 4 at the mid-span will undergo a large vertical deformation and elongate instantaneously. That is, the prestressed cable 4 will immediately activate the additional stress mechanism. The first fireproof material 1 and the second fireproof material 2 will also elongate simultaneously. Since the first fireproof material 1 near the tensioning end adopts a separate overlapping structure and the second fireproof material 2 is a deformable fireproof material, the first fireproof material 1 and the second fireproof material 2 always provide an effective closed wrapping for the prestressed cable 4. This can continuously provide additional fire resistance for the vertical members of the steel truss suspension structure, effectively improve its resistance to progressive collapse, significantly extend the time before progressive collapse occurs, and ultimately improve the safety redundancy of the entire structural system.

[0024] Preferably, such as Figure 2 As shown, the overlap length L of the overlap segment a The axial ultimate tensile deformation value is greater than that of the prestressed cable 4, thereby enabling the first fireproof material 1 to provide a more effective sealing and wrapping of the prestressed cable 4.

[0025] In addition to the existing fire-retardant coating, this invention adds a local fire-resistant structure as another fire protection measure, together constructing a fire-resistant system with an internal cable-stayed steel truss suspension structure. This improves the fire resistance limit of important load-bearing components, achieves continuous fire protection, and thus enhances the fire resistance and safety redundancy of the steel truss suspension structure.

[0026] like Figures 2 to 5 As shown, based on the above structure, the upper end (tensioning end) of the steel truss vertical member 9 is provided with a metal upper cover plate 7, which is welded and fixed to the upper flange 8. The lower end (fixed end of the prestressed cable) of the lower hanging steel column 10 is provided with a metal lower cover plate 11. The center of both the metal upper cover plate 7 and the metal lower cover plate 11 is provided with holes for the prestressed cable 4 to pass through. The metal lower cover plate 11 is welded and fixed to the lower end of the lower hanging steel column 10. The two ends of the prestressed cable 4 are respectively tightened and fixed to the metal upper cover plate 7 and the metal lower cover plate 11 through the clamp anchor system 6.

[0027] Both the metal upper cover plate 7 and the metal lower cover plate 11 are made of high-temperature resistant (600 degrees Celsius) steel plate or weldable steel plate that meets the requirements of high temperature resistance.

[0028] like Figure 2 and Figure 5 As shown, a second fireproof structure is provided outside the clamp anchoring system 6. The second fireproof structure includes a third fireproof material 17 and a fourth fireproof material 18 provided outside the third fireproof material 17. An anchor protective cover 5 is provided outside the second fireproof structure to completely enclose the second fireproof structure and the clamp anchoring system 6, thereby further protecting the clamp anchoring system 6. The anchor protective cover 5 is fixed to the metal upper cover plate 7 and the metal lower cover plate 11 by welding. The perimeter of the anchor protective cover 5 is fully welded.

[0029] In this invention, the second fireproof material 2 and the third fireproof material 17 can be flexible fireproof materials, such as rock wool. When rock wool is used, the thickness is not less than 50 mm. The first fireproof material and the fourth fireproof material 18 are spliced ​​together from fireproof boards. The fireproof boards can be Bode boards or ALC fireproof boards, etc., and their thickness is not less than 12 mm. The cross-sectional shape of the first fireproof material 1 and the fourth fireproof material 18 can be circular or quadrilateral. The quadrilateral can be square, preferably square.

[0030] like Figure 4 and Figure 6 As shown, the second fireproof material 2 tightly wraps around the steel sleeve 3 and fills the gap between the first fireproof material 1 and the steel sleeve 3, while the third fireproof material 17 fills the gap between the fourth fireproof material 18 and the clip anchoring system 6.

[0031] In this invention, if the first fireproof material and the fourth fireproof material in the first and second fireproof structures are fireproof boards, only the first fireproof material 1 can be provided in the first fireproof structure outside the steel sleeve 3, and the second fireproof material 2 is no longer provided; similarly, only the fourth fireproof material 18 can be provided in the second fireproof structure inside the anchor protective cover 5, and the third fireproof material 17 is no longer provided.

[0032] The construction steps of this invention are as follows:

[0033] 1. Based on the construction drawing design requirements, conduct detailed construction drawing design for steel truss 12 and its lower steel frame, reasonably determine the processing dimensions and positioning of the steel component units to be processed in the factory, and carry out steel component processing;

[0034] 2. The steel components are assembled and welded in the factory. The remaining steel components are processed in sections according to the installation requirements. In order to facilitate the construction of the fireproof material at the anchor end, the connection node between the lower steel column 10 and the bottom floor steel beam 16 should be set in sections. The section is located in the part of the bottom floor steel beam 16 that is easy to weld and install fireproof material.

[0035] 3. Transport the various steel components (including steel truss 12, lower steel column 10, lower floor steel beam 15 and bottom floor steel beam 16) processed in the factory to the site, set up the jig, hoist the steel components into place, and assemble the steel truss 12, lower steel column 10, lower floor steel beam 15 and bottom floor steel beam 16 in sequence, and complete the on-site connection process by welding and high-strength bolts.

[0036] IV. Considering the ease of construction, the metal upper cover plate 7 of the steel truss 12 can be closed after the first and second fireproof structures are completed, and the metal lower cover plate 11 at the lower end of the hanging steel column 10 can be welded in the factory. The metal upper cover plate 7 and the metal lower cover plate 11 are required to be made of steel plates that can withstand high temperatures of 600 degrees Celsius or other weldable high-temperature resistant steel plates as required by the design, and holes for passing through prestressed cables 4 are reserved in the center of the metal upper cover plate 7 and the metal lower cover plate 11.

[0037] 5. Wrap the outer side of the steel sleeve 3 with a certain thickness of second fireproof material 2 according to the design requirements, and assemble the first fireproof material 1. The first fireproof material 1 is vertically lapped at the end of the steel truss vertical rod 9 near the tensioning end. The specific location can be adjusted vertically along the steel sleeve 3 according to the convenience of construction (usually near the tensioning end for easy construction operation). The lapped section of the first fireproof material 1 consists of two sections overlapping each other and can move freely. The lap length La of the lapped section is a calculation requirement, and the design principle for determining its length is that it should not be less than the vertical ultimate tensile deformation value of the prestressed cable. No fixing is required between the two sections of the first fireproof material 1 within the lap length La range.

[0038] 6. Inside the steel sleeve 3, the prestressed cable 4 is inserted through the entire length. The two ends of the prestressed cable 4 pass through the holes in the upper metal cover plate 7 and the lower metal cover plate 11, respectively, and the clamp anchor system 6 is installed at the tensioning end position on the top surface of the upper flange 8. The clamp anchor system 6 is installed at the anchoring end position of the bottom floor steel beam 16. Then, the prestressed cable 4 is tensioned. When the design tensile stress value is reached, the prestressed cable is fixed.

[0039] This invention addresses the weakness of steel truss suspension structures in resisting progressive collapse during fires due to their inherent structural stress characteristics. It proposes an improved fire-resistant structure for steel truss suspension structures, fully considering the airtightness requirements of fire prevention measures and addressing the potential for large deformation and elongation of prestressed cables. This improvement enhances the fire-resistant structure of traditional steel truss suspension structures, providing clear dual fire protection measures and a well-defined construction process, making it suitable for large-span aerial corridors and connected structures.

Claims

1. A fireproof structure with an internal cable-stayed steel truss suspension structure, comprising a steel truss (12), lower floor steel beams (15), and bottom floor steel beams (16), characterized in that: At least in the steel truss (12), at the mid-span position of the steel truss vertical member (9) and the inner cavity of the lower steel column (10), there is a prestressed cable (4) passing through the inner cavity of the steel truss vertical member (9) and the lower steel column (10). The upper end of the prestressed cable (4) is connected and fixed to the upper flange (8) of the steel truss (12) by a clamp anchoring system (6) to form the tensioning end; the lower end of the prestressed cable (4) is connected and fixed to the bottom floor steel beam (16) by a clamp anchoring system (6) to form the anchoring end; the prestressed cable (4) is covered with a steel sleeve (3). A first fireproof structure is provided between the steel sleeve (3) and the steel truss vertical rod (9) and the inner cavity of the lower steel column (10). The first fireproof structure includes at least a first fireproof material (1) on the outer periphery of the steel sleeve (3). The first fireproof material (1) has at least two sections. The two sections of the first fireproof material (1) can be separated. The two sections of the first fireproof material (1) overlap each other to form an overlap section. The overlap length of the overlap section is greater than the axial limit tensile deformation value of the prestressed cable (4). The two sections of the first fireproof material (1) within the overlap length range are not fixed in any way.

2. The fireproof structure with built-in cable-stayed steel truss suspension structure according to claim 1, characterized in that: The first fireproof structure also includes a deformable second fireproof material (2) disposed between the steel sleeve (3) and the first fireproof material (1).

3. The fireproof structure with built-in cable-stayed steel truss suspension structure according to claim 2, characterized in that: The second fireproof material (2) is made of flexible material.

4. The fireproof structure with built-in cable-stayed steel truss suspension structure according to claim 1, characterized in that: The upper end of the steel truss vertical rod (9) is provided with a metal upper cover plate (7), and a hole for the prestressed cable (4) to pass through is provided in the center of the metal upper cover plate (7). The metal upper cover plate (7) is fixed on the upper flange (8). The lower end of the lower hanging steel column (10) is provided with a metal lower cover plate (11), and a hole for the prestressed cable (4) to pass through is provided in the center of the metal lower cover plate (11). The metal lower cover plate (11) is fixed on the bottom floor steel beam (16).

5. The fireproof structure with built-in cable-stayed steel truss suspension structure according to claim 4, characterized in that: The clamp anchoring system (6) is provided with a second fireproof structure, which includes a third fireproof material (17) provided outside the clamp anchoring system (6) and a fourth fireproof material (18) provided outside the third fireproof material (17).

6. The fireproof structure with built-in cable-stayed steel truss suspension structure according to claim 5, characterized in that: The second fireproof structure is equipped with an anchor protection cover (5).

7. The fireproof structure with built-in cable-stayed steel truss suspension structure according to claim 6, characterized in that: The third fireproof material (17) is made of flexible fireproof material and / or the fourth fireproof material (18) is made of fireproof boards spliced ​​together.

8. The fireproof structure with built-in cable-stayed steel truss suspension structure according to any one of claims 1-7, characterized in that: The first fireproof material (1) is made of fireproof boards spliced ​​together.

9. The fireproof structure with built-in cable-stayed steel truss suspension structure according to claim 8, characterized in that: The cross-sectional shape of the first fireproof material (1) is circular or quadrilateral.

Citation Information

Patent Citations

  • Stay cable fireproof device and stay cable with same

    CN216640263U

  • Sealed and coated anti-corrosion and fireproof composite coating structure

    CN217998471U