Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

5826results about "Fire proofing" patented technology

Concrete prefabricated energy storage cabin

The invention provides a concrete prefabricated energy storage cabin which comprises a cabin body and a cabin door which are made of a concrete composite material, so that the energy storage cabin has high compressive strength and high fire resistance rating, and a plurality of energy storage cabins can also be transversely arranged without spacing or stacked in the height direction, so that the occupied area is effectively reduced; an energy storage box provided with a basin-shaped box body and a cover plate is arranged in the cabin body, the cover plate covers the basin-shaped box body to form a closed energy storage cavity for accommodating a battery module, and the basin-shaped box body and the cover plate are also made of a concrete composite material, so that high temperature generated by thermal runaway of a battery in a single energy storage box can be effectively limited in the energy storage box; as the oxygen content in the energy storage box is relatively low, the flame can be automatically extinguished after the battery with relatively light thermal runaway degree is on fire; and for a battery fire with a heavy thermal runaway degree, a long time can be provided for fire fighting and extinguishment, and flames can be extinguished in time in the energy storage box.
Owner:WUXI CHAOSHENG PHOTOVOLTAIC TECH CO LTD

Aluminum-plastic composite panel with fireproof structure

The invention discloses an aluminum-plastic composite panel with a fireproof structure, and relates to the technical field of aluminum-plastic composite panels, the aluminum-plastic composite panel comprises a fireproof layer, and a top aluminum plate mounting plate is mounted at the bottom of the fireproof layer. Then, the heat is transferred to a heat-conducting metal conduction sheet plate and then transferred to a wire fixing heat-conducting end, so that the temperature is rapidly increased, the wire fixing heat-conducting end transfers heat to a polyethylene fracture node, so that the polyethylene fracture node is melted and fractured, a polypropylene fiber connecting wire ring losing support also melts, a limiting hook is released, and a needling trigger piece rapidly punctures a flame-retardant gas storage device; the flame-retardant gas is released, and the flame-retardant gas is quickly diffused to the periphery of the flame along with the quick release of the flame-retardant gas to form a protective layer, so that the contact between the flame and surrounding combustible materials is effectively isolated, and further spreading of the fire behavior is slowed down or even stopped.
Owner:SHANDONG JIXIANGGE BUILDING MATERIALS TECH CO LTD

Method of and system for defending building projects from wildfire during and after construction

PCT designated stage expiredWO2025160100A1Fire rescueFire proofingFlame spreadArchitectural engineering
A wildfire defense system trailer and method of installing an automated sprinkler¬ based wildfire defense system on a wood (home) building construction site before the starting of the construction phase of a home building project in a wildfire urban interface (WUI) region. The first commissioned automated sprinkler-based wildfire defense system will continue in operation all during the home building construction phase, and will only be decommissioned from operation, and removed from the premises, including the job-site wildfire defense system trailer being removed from the property, when construction of the wood building project is totally completed, and the wood building is ready for occupation. At the same time when the first system is decommissioned, a second permanently-installed automated sprinkler-based wildfire defense system will be completely installed within the new building construction, independent from the first system, and ready for commissioning to provide a new proactive measure of defense against a wildfire storm occurring after wood building construction has been completed, thereby protecting all wood and combustible surfaces on the home and surrounding property, and preventing fire ignition and flame spread until the wildfire storm passes through the WUI region. By virtue of the present invention, it is now possible to significantly reduce the risk of wood building construction projects occurring within a wildfire urban interface (WUI) region, and better support the underwriting of building construction and ownership insurance policies within such regions.
Owner:MIGHTY FIRE BREAKER LLC

Connecting joint combination structure of modular building

The invention discloses a connection node combination structure of a modular building. The connection node combination structure comprises two lower module frame columns arranged side by side at an interval, two upper module frame columns arranged at the tops of the two lower module frame columns correspondingly, and upper and lower module connection plates connected between the two upper module frame columns and the two lower module frame columns. A lower module top frame beam is arranged at the top of one side of the lower module frame column; an upper module bottom frame beam is arranged at the top of one side, close to the lower module top frame beam, of the upper module frame column; a first slurry blocking structure is arranged between the two upper module bottom frame beams, and a second slurry blocking structure is arranged between the two lower module top frame beams; and a third slurry blocking structure is arranged between the upper module bottom frame beam and the corresponding lower module top frame beam. Gaps between beams are filled through the first slurry blocking structures, the second slurry blocking structures and the third slurry blocking structures, the overall performance of the structure is improved, and the problems of cold bridges, fire prevention, wind prevention and insect prevention existing between modules of the connection joint are effectively solved.
Owner:CHINA CONSTR SCI & IND CORP LTD +1

Fireproof plate and preparation method thereof

The invention relates to the field of building materials, and particularly discloses a fireproof plate and a preparation method thereof. The fireproof board comprises a base material, reinforcing layers wrapping the two sides of the base material and fireproof coatings coating the outer surfaces of the two sides of the board, the base material comprises wood flour, silicate compounds and phenolic resin adhesives, the two sides of the base material are wrapped with glass fiber mesh cloth to serve as the reinforcing layers, and the surfaces of the base material are coated with the fireproof coatings; the fireproof coating is prepared from the following raw materials in parts by weight: 20 to 30 parts of hollow glass beads, 10 to 15 parts of ammonium polyphosphate, 5 to 10 parts of nano metal oxide, 10 to 15 parts of magnesia, 5 to 10 parts of tetraethoxysilane, 15 to 30 parts of epoxy resin and 30 to 40 parts of water. The composition disclosed by the invention has the advantages of fire prevention and high temperature resistance.
Owner:ZHANGJIAGANG FEITENG ALUMINUM COMPOSITE PANEL

Heat-preservation and energy-saving column foundation heat-preservation joint of building

The utility model discloses a heat-preservation and energy-saving building column foundation heat-preservation joint which comprises an embedded part, a steel column and a high-strength heat-preservation cushion block. The embedded part comprises a positioning plate and a column foot anchor bolt and is embedded in the positioning plate when a reinforced concrete structural plate is poured, a higher part of the column foot anchor bolt is exposed according to the elevation of a steel column foot bottom plate, a high-strength heat preservation cushion block is arranged on the upper portion of the positioning plate, a hole is reserved in the position, corresponding to the column foot anchor bolt, of the high-strength heat preservation cushion block, and the column foot anchor bolt penetrates through the hole. A steel column base bottom plate penetrates through a column base anchor bolt to fall on the high-strength heat preservation cushion block and is firmly connected with the column base anchor bolt through a nut, a steel cover plate is arranged on the periphery of the steel column, the steel cover plate and the ground surface layer are located on the same horizontal plane, and the space between the steel cover plate and the steel column base bottom plate is filled with foaming polyurethane. On the premise that the structure bearing requirement is met, cold (heat) breaking is conducted on the column foundation part, a heat preservation surface layer does not need to be additionally adopted to wrap a building inner structure column (steel column), the size of the built building inner structure column is appropriate, and building space does not need to be additionally occupied.
Owner:NANJING YANGTZE RIVER URBAN AGCHITECTURAL DESIGN

Thermal-insulation fireproof composite material for building and preparation method of thermal-insulation fireproof composite material

The invention relates to a thermal-insulation fireproof composite material for buildings and a preparation method thereof, and belongs to the technical field of thermal-insulation material preparation, and the preparation method comprises the following steps: using 1, 3, 5-triformyl phloroglucinol and p-phenylenediamine to modify 9, 10-dihydro-9-oxa-10-phosphaphenanthrene-10-oxide to obtain a modified flame retardant; adding a modified flame retardant into a polyurethane material to prepare a fireproof layer; carrying out hydrophobic treatment on silk fibroin fibers, and then mixing the silk fibroin fibers with dopamine-modified carboxylated expanded graphite to prepare fiber-based gel; the surface of a fireproof layer is coated with fiber-based gel, then a layer of oxidizing solution is sprayed, then the fiber-based gel is clamped between the fireproof layer, pressure is applied, fixing is conducted, then the material is freeze-dried, a fireproof layer-gel layer-fireproof layer structure is formed, and the heat-preservation fireproof composite material for the building is obtained. The prepared thermal-insulation fireproof material has the characteristics of good mechanical property and low heat conductivity coefficient.
Owner:XIAN FENGXINSHUO BUILDING MATERIALS SALES CO LTD

Flame-retardant laminated solid wood composite floor and manufacturing method therefor

PCT designated stage expiredWO2025152438A1Fireproof paintsDomestic upholsteryPolymer scienceSide chain
A flame-retardant laminated solid wood composite floor and a manufacturing method therefor. The manufacturing method comprising: first reacting dopamine hydrochloride with acryloyl chloride to generate a dopamine acrylamide monomer; by means of a double bond in the dopamine acrylamide monomer, carrying out a click reaction with a phosphate monomer containing a sulfydryl group, so as to introduce a catechol group into a side chain of the phosphate monomer and obtain a flame-retardant monomer containing the double bond; and then mixing pentaerythritol tetra(3-mercaptopropionate), pentaerythritol triacrylate, perfluorodecanethiol and the flame-retardant monomer containing the double bond to obtain a photocurable coating material. The coating material is photocured after being coated on the surface of a wood veneer, thus effectively improving the flame-retardant performance of the wood veneer; moreover, the adhesion between the coating layer and the wood veneer is excellent. The wood veneers are laminated in multiple layers, are glued and assembled into a layered structure, and then hot-pressed to form the solid wood composite floor, thus improving the comprehensive performance.
Owner:VOHRINGER HOME TECH CO LTD

Aerogel composite fiber flame-retardant thermal insulation material as well as preparation method and application thereof

The invention discloses an aerogel composite fiber flame-retardant thermal insulation material as well as a preparation method and application thereof, and belongs to the technical field of novel building materials. The aerogel composite fiber flame-retardant thermal insulation material is prepared from the following components in parts by weight: 0.5 to 2.5 parts of SiO2 aerogel particles, 18 to 21 parts of a polymer, 1 to 3 parts of an inorganic flame retardant, 1 to 3 parts of Al2O3 microbeads and 0.9 to 3.2 parts of a cross-linking agent, the SiO2 aerogel particles and the inorganic flame retardant are wrapped in the aerogel composite fiber flame-retardant thermal insulation material, and the Al2O3 microbeads are loaded on the surface of the aerogel composite fiber flame-retardant thermal insulation material. According to the aerogel composite fiber flame-retardant thermal insulation material, the SiO2 aerogel particles and the polymer in specific parts are combined, and the inorganic flame retardant, the Al2O3 microbeads and the cross-linking agent are matched, so that the aerogel composite fiber flame-retardant thermal insulation material has the heat conductivity, the density, the flame retardant property and the mechanical property, overcomes the defects of an existing thermal insulation material, can replace an existing building thermal insulation material, and has a wide application prospect. The industrial application of the aerogel is promoted.
Owner:CHINA CONSTR EIGHTH ENG GRP (SHANDONG) NEW MATERIALS TECH CO LTD

A multifunctional integrated canopy for deep foundation pit construction of linear pipe gallery

The invention discloses a multifunctional integrated canopy applied to the construction of a linear pipeline corridor deep foundation pit, comprising a canopy body, a plurality of pulley structures and a track structure; the canopy body comprises a steel structure roof, a plurality of columns and a plurality of scissor frames; the scissor frames are movably arranged between two adjacent columns; the track structure comprises a guide rail and a track body; the track body comprises an upper steel plate, a supporting steel plate and a lower steel plate connected in sequence from top to bottom; the pulley structure comprises a support frame, a pulley and a limiter; the support frame comprises a top plate and two side plates, a support shaft is arranged between the two side plates, the pulley is sleeved on the support shaft and can slide on the guide rail; the two side plates are respectively fixed with limiters, and the limiters can extend between the upper steel plate and the lower steel plate; the top plate is fixed under the corresponding column so that the pulley can drive the canopy body to slide on the guide rail. The canopy realizes the protection of the flow operation of the linear pipeline corridor deep foundation pit construction, which is conducive to improving the construction efficiency and saving the engineering cost.
Owner:CHINA CONSTR THIRD BUREAU GRP (JIANGSU) CO LTD

High-pressure-resistant fireproof glass awning for rail transit

A high-pressure-resistant fireproof glass awning for rail transit comprises a left awning body, a right awning body and a steel structure frame, and the steel structure frame is arranged in the left awning body and the right awning body and serves as a supporting structure of the two glass awning bodies; the problems that an existing glass awning structure is prone to damage due to the fact that wind pressure is high in the high-speed running process of a train at present are solved, when the wind pressure exceeds a borne threshold value due to the fact that the speed of the train is too high, the pressure is balanced with the outside through the pressure relief unit, and the problem that the glass awning is damaged is effectively solved; the purposes of fire prevention and high pressure resistance of the glass awning are achieved.
Owner:GUANGDONG YIPU AUTOMATION TECH EQUIP CO LTD

Fireproof PVC coiled material

The utility model relates to the technical field of building waterproof materials, in particular to a fireproof PVC (polyvinyl chloride) coiled material which comprises a waterproof plastic laminating layer, the top surface of the waterproof plastic laminating layer is fixedly connected with a fastening frame, the fastening frame is made of a PE (polyethylene) protective film material, and a first sound insulation layer is arranged on the upper surface of the waterproof plastic laminating layer; the second sound insulation layer is mounted on the upper surface of the first sound insulation layer, a flame-retardant bonding layer is arranged on the top surface of the second sound insulation layer, and a top layer is arranged on the top surface of the flame-retardant bonding layer. The first sound insulation layer, the second sound insulation layer, the flame-retardant bonding layer and the top layer can be wrapped through the fastening frame, the overall protection effect is good, meanwhile, the fastening frame has the fastening effect, layer bodies can be tightly connected, the connecting effect is good, and the service life is long. And then through the design of attaching strips and fastening strips, the side walls of the first sound insulation layer, the second sound insulation layer, the flame-retardant bonding layer and the top layer can be clamped.
Owner:SUZHOU XULI IND CO LTD

Active-passive integrated fireproof insulation board and preparation method thereof

The invention relates to an active and passive integrated fireproof insulation board and a preparation method thereof. The active and passive integrated fireproof insulation board comprises n passive fireproof layers and n or n + 1 active fireproof layers, the passive fireproof layer and the active fireproof layer are laminated into a whole; the passive fireproof layer comprises inorganic fiber felt and aerogel; the aerogel is obtained by curing an adhesive aerogel stock solution, and the stock solution comprises the following components in parts by mass: 1000-4000 parts of silica sol, 50-150 parts of silicate, 10-50 parts of a phosphate adhesive, 5-20 parts of quick lime, 5-50 parts of titanium dioxide, 10-50 parts of calcium stearate, 5-50 parts of a hydrophobic modifier, 5-50 parts of an acid-base regulator and 1000-4000 parts of a solvent; the active fireproof layer is at least one of inorganic fireproof plates such as a gypsum fireproof plate and the like which can actively consume energy after being heated and decomposed. The problems that an existing fireproof insulation board is high in organic matter content, poor in flame retardance and high in hygroscopicity, and the thermal insulation performance and safety are obviously reduced after the fireproof insulation board is used are solved.
Owner:CHINA STATE CONSTR HAILONG TECH CO LTD +1

Natural stone heat preservation and decoration integrated plate based on foaming ceramic and preparation method thereof

The invention relates to the technical field of thermal insulation decorative plates. A base body layer is prepared from the following raw materials in parts by weight: 25 to 30 parts of quartz, 10 to 15 parts of clay, 8 to 12 parts of fly ash, 7 to 11 parts of a binding and balancing agent, 6 to 9 parts of a talc powder modified tonality agent, 5 to 8 parts of glass beads, 4 to 7 parts of a flame retardant, 2 to 4 parts of a dispersing agent, 1 to 3 parts of a foaming agent and 20 to 25 parts of deionized water. The thermal insulation and decoration integrated board is prepared by matching the base body layer with the facing layer, the base body layer is prepared by blending and coordinating quartz, clay and fly ash with glass beads, a flame retardant, a dispersing agent and a foaming agent, and the added coupling and balancing agent and the added adjusting agent modified by blended talcum powder are matched and jointly synergic, so that the thermal insulation and decoration integrated board is prepared. The thermal insulation property, the impact resistance and the fire resistance of the product are improved in a balanced and coordinated manner, and meanwhile, the product has remarkable water resistance, acid corrosion resistance and thermal cycling stability.
Owner:XINJIANG PROD & CONSTR CORPS CONSTR ENG SCI & TECH RES INST CO LTD +1

Thermal insulation slurry as well as preparation method and application thereof

The invention belongs to the technical field of thermal insulation materials, and particularly relates to thermal insulation slurry as well as a preparation method and application thereof. The thermal insulation slurry provided by the invention comprises organic thermal insulation particles, an inorganic cementing material and water, the ratio of the mass of the inorganic cementing material to the volume of the organic thermal insulation particles is (3.8-4.4) kg: (30-35) L, and the mass ratio of the inorganic cementing material to the water is (3.8-4.4): (4-5). The polyurethane particles are low in heat conductivity coefficient, low in water absorption rate and good in waterproof performance and have good compressive strength and binding power, the polyurethane particles serve as a building outer wall heat preservation material, comprehensive bonding between the heat preservation layer and a building outer wall base layer is facilitated, effective bonding between the wallboard and the heat preservation layer can be achieved without using anchoring parts, and integration of a heat preservation structure is truly achieved. The inorganic cementing material in the thermal insulation slurry wraps the organic thermal insulation particles to form a fireproof differential bin structure, heat transfer can be effectively prevented, and the combustion grade and durability of the polyphenyl particle and polyurethane particle thermal insulation material are improved.
Owner:CHINA NORTHEAST ARCHITECTURAL DESIGN & RES INST CO LTD

Innovative curtain wall with expansion joints

The invention relates to the field of curtain walls, in particular to an innovative curtain wall with an expansion joint, through the arrangement of the expansion joint, the function requirement for expansion of building materials is met, and through the arrangement of a connecting assembly, a first stand column, a second stand column, a first expansion piece, a second expansion piece, a third expansion piece and a panel, the expansion joint is hidden on the rear side of the panel; uniformity of vertical faces of the curtain wall is guaranteed, the effect and quality of the curtain wall are improved, and the problems of heat preservation, heat insulation and expansion joint water leakage of an existing curtain wall are solved. By arranging the connecting assembly, the first stand column and the second stand column, the curtain wall structure is more stable. The problems that a curtain wall expansion joint is arranged on an outer vertical face, waterproof is difficult, and attractiveness, heat insulation and waterproof performance of a curtain wall are damaged are solved.
Owner:GUANGZHOU HONGKE CURTAIN WALL ENG CO LTD

Electric induction sun-shading photovoltaic ceiling system and working method thereof

The invention relates to the technical field of building construction, in particular to an electric induction sun-shading photovoltaic suspended ceiling system and a working method thereof, and the electric induction sun-shading photovoltaic suspended ceiling system comprises a glass curtain roof, a roof structural member, a photovoltaic suspended ceiling structure, an induction operation mechanism and a sliding connection mechanism; the photovoltaic suspended ceiling structure adopts a modular design, and a plurality of groups of photovoltaic suspended ceiling structures are hinged to form a telescopic folding structure; the induction running mechanism comprises a tractor and an illumination sensor, and the sliding connection mechanism comprises a track beam, a pulley block and a connection structure. The illumination sensor is adopted to sense the illumination intensity, the induction running mechanism drives the photovoltaic ceiling structure to move along the track, automatic unfolding and folding of the photovoltaic ceiling structure are achieved through the control system, and the operation convenience is greatly improved; indoor temperature can be reduced, and use of equipment such as air conditioners is reduced; through the photovoltaic and suspended ceiling integrated design, solar energy is converted into green electric energy to be supplied to a building site for use, and therefore energy is saved.
Owner:ACRE COKING & REFRACTORY ENG CONSULTING CORP DALIAN MCC

Shock insulation layer rubber support supporting and protecting fabricated construction device

The invention provides a shock insulation layer rubber support supporting and protecting fabricated construction device, and relates to the field of building construction. The inner side of the rubber support main body is in threaded connection with four groups of mounting bolts in a rectangular array shape; four sets of fixing sleeves are arranged on the outer side of the rubber support body in a rectangular array shape. The tail ends of the four groups of mounting bolts are in threaded connection into the four groups of fixing sleeves respectively; steel bar main bodies are arranged in the four groups of fixed sleeves; and four groups of fire-resistant combined plates are arranged outside the rubber support main body in an annular array shape. When the fire-resistant composition board gets close to the rubber support body, the fire-resistant composition board is attracted to the rubber support body under the magnetic attraction effect of the magnetic attraction block, formwork supporting and fire-resistant and moisture-proof treatment are conducted at the same time, and the problem that formwork supporting, fire-resistant plugging and moisture-proof treatment are conducted in sequence according to the steps generally is solved; therefore, the problems that each step needs independent construction time and manual arrangement, and the whole construction period is long are solved.
Owner:SHANXI CONSTR ENG CO LTD +2

Fireproof wallboard of steel structure building

The utility model relates to the technical field of fireproof wallboards, and discloses a steel structure building fireproof wallboard which comprises a fireproof wallboard body and H-shaped steel, a cavity is formed in the fireproof wallboard body, a sealing bag is installed in the cavity, fire extinguishing gas is filled in the sealing bag, and the outer wall of the sealing bag is communicated with a plurality of pressure jet units. One end of the pressure jet unit extends out of the fireproof wallboard; the sealing bag is installed in the fireproof wallboard and filled with the fire extinguishing gas, so that after the fireproof wallboard on the heated side is burnt through by continuous flames, the flames make contact with the sealing bag, the sealing bag is damaged, and the fire extinguishing gas can be sprayed out to extinguish the flames; therefore, the phenomenon of flame spreading caused by burning through the fireproof wallboard due to continuous flame combustion is avoided, and the safety and the fireproof performance are improved.
Owner:GUANGZHOU CONSTR DESIGNING INST CO LTD

Assembling method for prefabricated firewall of transformer substation

The invention relates to the field of assembly automation and flexible manufacturing, and discloses an assembly method for a prefabricated firewall of a transformer substation, and the method comprises the following steps: setting a plurality of space positioning reference points at the edge of a wallboard; acquiring three-dimensional coordinate data to form a first point set and a second point set; calculating an initial rigid body transformation parameter between the wallboards according to the first point set and the second point set; establishing an energy functional for describing a total error; carrying out minimization solution on the energy functional by adopting a variational method to obtain an optimal disturbance vector field; according to the optimal disturbance vector field, a plurality of fine adjustment actuators of the wallboard are controlled, posture fine adjustment is conducted, and physical assembly connection of the wallboard and the target wallboard is completed. According to the invention, accurate attitude estimation and error correction in the wallboard assembly process are realized; the robustness and geometric fitting capability of the assembly process are improved; the assembly precision and efficiency are remarkably improved, and the problem that traditional redundancy control distribution is unstable is solved.
Owner:SHANDONG ELECTRIC POWER TRANSMISSION & SUBSTATION ENG CO

Mineral wool product

A method of bonding together surfaces of two or more elements, whereby at least one of the two or more elements is a mineral wool element, said mineral wool element(s) being bound by a mineral wool binder, comprises the steps of providing two or more elements; applying an adhesive to one or more of the surfaces to be bonded together before, during or after contacting the surfaces to be bonded together with each other, curing the adhesive, wherein the adhesive comprises at least one protein; at least one phenol and / or quinone containing compound, and / or at least one enzyme.
Owner:ROCKWOOL AS

Fireproof structure and method for constructing fireproof structure

PendingJP2024174635AStrutsPillarsAir layer
To provide a fireproof structure having high workability and a method for constructing the fireproof structure.SOLUTION: A fireproof structure 30 has a steel material 31, an air layer 32 surrounding the steel material 31, a woody fireproof covering material 33 surrounding the air layer 32, and a connecting material 34 connecting the steel material 31 and the woody fireproof covering material 33 in the air layer 32. The woody fireproof covering material 33 is formed of a plurality of wood plate parts arranged to surround the steel material 31 and joined to each other. The connecting material 34 has a steel material-side connecting part 55 fixed to the steel material 31 and a woody fireproof covering material-side connecting part 60 fixed to the woody fireproof covering material 33. In the connecting material 34, the steel material-side connecting part 55 and the woody fireproof covering material-side connecting part 60 are engaged.SELECTED DRAWING: Figure 1
Owner:OHBAYASHI GUMI LTD

A brushed aluminum veneer

The present invention belongs to the technical field of brushed aluminum veneer, and discloses a brushed aluminum veneer, including an aluminum veneer frame, a reinforcing component is provided on the top of the aluminum veneer frame, hanging ears are provided on both sides of the aluminum veneer frame, and a closed component is movably installed on the top of the hanging ears. The present invention uses a reinforcing frame and an elastic airbag, so that a certain amount of inert gas is filled in the reinforcing frame and the elastic airbag, and the high-pressure environment under the inert filling is utilized, and at the same time, the inert gas with a low thermal conductivity is used to achieve heat insulation reinforcement inside the aluminum veneer frame, and the polyurethane foam and mineral wool in the filling layer are used to achieve heat insulation on both sides of the inside and outside during the installation and use of the brushed aluminum plate on the building wall, and has a better warming and heat preservation effect in the cold winter climate, effectively avoiding heat loss, and at the same time, in the hot summer environment, the insulation against external heat is enhanced, and the influence of external environmental heat on the indoor is reduced, and the comprehensive heat insulation capacity is greatly improved, and the use effect is good.
Owner:FOSHAN ZHAOYU METAL CO LTD

Flame-retardant water-resistant magnesium oxysulfate board and manufacturing process thereof

ActiveCN119797881ASolid waste managementBuilding insulationsEpoxyMagnesium sulfide
The invention relates to the technical field of building materials, in particular to a flame-retardant water-resistant magnesium oxysulfate board and a manufacturing process thereof. The invention discloses the following scheme: mixing light calcined magnesia powder, magnesium sulfate heptahydrate, water, fly ash, citric acid and iminodiacetic acid type chelate resin to obtain magnesium oxysulfate mixed slurry; the preparation method comprises the following steps: by taking hydrogen-terminated polydimethylsiloxane and 10-undecenal as raw materials, reacting, then grafting 9, 10-dihydro-9-oxa-10-phosphaphenanthrene-10-oxide, and then carrying out termination by adopting isophorone diisocyanate, so as to obtain an isocyanate-terminated silicon-containing flame retardant; the preparation method comprises the following steps: modifying epoxy resin by using an isocyanate-terminated silicon-containing flame retardant, and mixing with an epoxy flexibilizer and tetraethylenepentamine to prepare an epoxy resin glue solution; and immersing glass fiber cloth into the epoxy resin glue solution, combining with the magnesium oxysulfate mixed slurry, and curing to obtain the magnesium oxysulfate board. The magnesium oxysulfate board prepared by the invention is high in strength and has good flame retardance and water resistance at the same time.
Owner:JIANGSU JINPENG FIREPROOF BOARD CO LTD

Rubber shock insulation support

The utility model relates to the technical field of shock insulation supports, in particular to a rubber shock insulation support which comprises an upper steel plate, a lower steel plate and a rubber shock insulation column body, the upper end of the rubber shock insulation column body is connected with the middle of the lower side of the upper steel plate, and the lower end of the rubber shock insulation column body is connected with the middle of the upper side of the lower steel plate. The upper end of the telescopic pull rod is movably connected with the upper half ring through an upper circular ring, and the lower end of the telescopic pull rod is movably connected with the lower half ring through a lower circular ring. And the telescopic pull rod can be stretched when the upper steel plate and the lower steel plate are staggered, and the displacement limit between the upper steel plate and the lower steel plate is limited by means of the stretching limit of the telescopic pull rod, so that the rubber shock insulation column body is prevented from being damaged due to excessive displacement. The upper semi-ring, the lower semi-ring, the upper circular ring and the lower circular ring can enable the joints of the telescopic pull rods and the upper steel plate and the lower steel plate to be relatively movable, so that the telescopic pull rods can be stretched in any direction along with the upper steel plate and the lower steel plate.
Owner:CHENGDU ZHENXING TECHNOLOGY CO LTD

Supporting structure for underground pipeline around foundation pit

The utility model discloses a supporting structure for underground pipelines around a foundation pit, and relates to the technical field of constructional engineering. The supporting protection structure comprises a stand column pile, a supporting piece and an anti-vibration piece, and the supporting piece provides supporting for the underground pipeline. The overhead layer structure comprises a foundation, a vertical supporting foundation and a covering layer, an overhead area is formed among the vertical supporting foundation, the covering layer and the slope body, and the underground pipeline is enclosed in the overhead area; the power generation and heating system comprises a photovoltaic power generation system, a constant-temperature heating controller and a heat supply pipe; the slope of the foundation pit is supported in a sloping mode, the manufacturing cost is reduced, the construction period is shortened, pollution to the environment is reduced, underground pipelines are isolated from the outside under vertical steel pipe pile supporting and horizontal structural layer overhead, disturbance of foreign objects and external force and vibration interference are prevented, and the horizontal space obtained after sloping supporting is fully utilized; the heat supply pipe provides heat for a closed space defined by the vertical supporting foundation and the covering layer, and underground pipelines are prevented from being frozen and exposed to be on fire.
Owner:POWER CHINA KUNMING ENG CORP LTD

Prefabricated cabin

The invention relates to the field of transformer substation devices with waterproof shells, in particular to a prefabricated cabin. The prefabricated cabin comprises a side wall framework and an outer wall plate arranged on the side wall framework, the outer wall plate comprises a plurality of sealing plate modules which are sequentially spliced, a stand column and the adjacent sealing plate modules are connected in a sealed mode through a sealing butt joint structure, and every two adjacent sealing plate modules are connected in a sealed mode through a sealing butt joint structure. The sealing butt joint structure comprises a U-shaped butt joint groove or a side edge L-shaped butt joint folding edge which is arranged on the stand column and the sealing plate module, the side edge L-shaped butt joint folding edge comprises a first attaching edge and a second attaching edge, and the first attaching edge and the second attaching edge which are in butt joint are fixedly connected through the first attaching edge or the second attaching edge. The stand columns and the sealing plate modules are connected in a sealed mode through the sealing butt joint structures, and the adjacent sealing plate modules are connected in a sealed mode through the sealing butt joint structures, so that the sealing performance of the external wall panel is better. And the outer sealing plate module deforms due to the influence of environmental factors, so that the sealing performance of the prefabricated cabin is influenced.
Owner:HENAN XUJI ELECTRICAL EQUIPMENT CO LTD +1

Fabricated disassembly-free heat preservation bottom die reinforcement cage floor support plate

The invention relates to the field of assembly type floor support plates, and particularly discloses an assembly type disassembly-free heat preservation bottom die reinforcement cage floor support plate which comprises a heat preservation bottom die, a plurality of connecting parts used for being connected with prefabricated reinforcement cages are arranged at the top of the heat preservation bottom die, and a heat preservation core layer is arranged in the heat preservation bottom die. A first cavity with adjustable cavity volume and a second cavity communicated with the first cavity are formed in the heat preservation core layer, the first cavity is located above the second cavity, the volume of the second cavity is larger than that of the first cavity, the first cavity and the second cavity form a sound absorption resonance structure, and the sound absorption resonance structure is arrayed in the heat preservation core layer. The bottom formwork integrates the functions of heat preservation, sound insulation, flame retardance and the formwork, the construction procedure of secondary heat preservation and sound insulation and the formwork dismantling procedure are reduced, and the building efficiency is improved.
Owner:SICHUAN PROVINCIAL ARCHITECTURAL DESIGN & RES INST

Fabricated telescopic partition wall plugging system between glass curtain wall and inner partition wall

The utility model belongs to the field of curtain wall decoration, and relates to an assembly type telescopic partition wall plugging system between a glass curtain wall and an inner partition wall, which comprises a concrete partition wall, a stand column, and a partition wall plugging system and a plugging clamping system which are arranged between the concrete partition wall and the stand column, the partition wall plugging system comprises two partition wall section bars, and a buckle smoothing mechanism used for stretching and retracting is arranged at the connecting position of the two partition wall section bars. The blocking and clamping system comprises buckle bases fixed to the concrete partition wall and the stand column correspondingly, and the ends, away from the buckle smoothing mechanism, of the two partition wall sectional materials are assembled with the two buckle bases in a clamped mode correspondingly. The energy-saving curtain wall is simple in structure and easy to construct, the cost of later maintenance is greatly saved, the performance of the curtain wall in the aspect of green building energy conservation is ensured to the maximum extent, and the use energy consumption of a building is reduced.
Owner:CHONGQING LUNENG DEV GRP CO LTD