A coal recovery device for coal leakage between supports in a fully mechanized longwall mining face

By designing a coal leakage recovery device between the supports in a fully mechanized longwall mining face, the problem of top coal surging into the front of the supports and cable troughs during the support relocation process was solved, achieving efficient coal block collection and transportation, and improving production efficiency and safety.

CN117927287BActive Publication Date: 2026-11-17SHANXI PULONGWAN COAL IND CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410273171.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-11
Publication Date
2026-11-17
Estimated Expiration
2044-03-11

AI Technical Summary

Technical Problem

During the relocation of the existing work frame, a large amount of top coal flows into the front of the support and into the cable trough, causing serious coal dust pollution, increasing the labor intensity of workers, damaging the cables in the cable trough, and affecting production safety.

Method used

Design a coal recovery device for coal leakage between supports in a fully mechanized longwall mining face, including a main base, hydraulic rods, a coal chute, a slide pipe and a flexible cloth. The device achieves automatic collection and transportation of coal blocks through hydraulic control, preventing them from falling into the front of the supports and the cable trough.

Benefits of technology

It achieved a 95% coal leakage recovery rate, reduced the labor intensity of workers, lowered the cable damage rate, improved the coal resource recovery rate, and ensured production safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117927287B_ABST
    Figure CN117927287B_ABST
Patent Text Reader

Abstract

This invention relates to a coal leakage recovery device for fully mechanized longwall mining faces, comprising a main base, with a first hydraulic rod fixedly connected to the inner top of the main base. The top output end of the first hydraulic rod is fixedly connected to a main roof plate, and a front roof plate is hinged to one end of the main roof plate. This invention effectively solves the problem of coal and gangue leakage between supports during support lowering and shifting in fully mechanized longwall mining faces. Through the ingenious design of the device, leaked coal blocks can be effectively collected and guided onto the conveyor, thereby greatly reducing the occurrence of coal blocks falling into the front of the supports and the cable trough, significantly improving the coal recovery rate, reducing production losses, and featuring a simple overall structure and convenient operation, suitable for various production environments in fully mechanized longwall mining faces. Through practical application tests and continuous design optimization, the device's effectiveness and performance can be further improved, making a positive contribution to the sustainable development of the coal industry.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of coal chute collection technology, specifically to a coal recovery device for coal leakage between supports in a fully mechanized longwall mining face. Background Technology

[0002] Coal is a mineral that can be used in the raw material production and energy production industries. The application of coal mining requires its extraction, which necessitates the use of a work frame.

[0003] In production, the top coal above the existing working frame becomes very fragmented under the repeated support of the frame. During the frame relocation process, a large amount of coal flows into the front of the working face frame and the cable trough. Secondly, regarding the frame structure, there is a side guard plate on each side of the top beam of the hydraulic frame to ensure that the hydraulic frame is tightly attached to each other to prevent the top coal from falling into the frame. However, there is no side guard plate on the side of the front beam of the frame, with a gap of 50mm. During production, when the frame is relocated, the frame is lowered by about 100mm to separate it from the top plate. Then, the frame is pulled out by pushing jacks and finally tightened. The whole process takes about 1 minute on average.

[0004] During the relocation process, a large amount of top coal falls from the gaps in the side guard plates and the gaps in the front beam into the front of the support and the cable trough. The coal churn is also caused by the increased gap between the two hydraulic support bodies during the lowering and relocation process, which causes a large amount of coal dust and coal chunks to fall along the gaps. In a ventilated environment, a large amount of coal dust is generated, resulting in a harsh working environment. Furthermore, the falling coal dust and coal chunks land on the hydraulic cylinders between the supports, affecting the operation of the hydraulic cylinders and requiring manual removal, which increases the labor intensity of workers and also poses a great threat to their health.

[0005] To address this, we propose an automated coal chute device for fully mechanized longwall mining faces that collects and guides loose coal to a conveyor, reduces the workload of frontline workers, eliminates the safety risks of loose coal falling between supports and causing injury, reduces damage to cable clamps and cables in cable troughs caused by leaking coal and gangue, and does not affect the normal function of the supports themselves. Summary of the Invention

[0006] In order to solve the problems of the prior art, the present invention provides a coal recovery device for coal leakage between supports in a fully mechanized longwall mining face.

[0007] To solve the above-mentioned technical problems, the present invention is achieved through the following technical solution: a coal leakage resource recovery device between the frames of a fully mechanized longwall mining face, including a main base, a first hydraulic rod fixedly connected to the inner top of the main base, a main top plate fixedly connected to the top output end of the first hydraulic rod, and a front top plate hinged to one end of the main top plate;

[0008] Both sides of the main top plate are fixedly connected to a coal chute frame. The bottom of the coal chute frame is fixedly connected to a crossbeam mounting frame. The bottom of the crossbeam mounting frame is fixedly connected to a hydraulic rod mounting frame. The inner side of the crossbeam mounting frame is rotatably connected to a crossbeam via a pivot. The inner side of the bottom of the hydraulic rod mounting frame is rotatably connected to a fifth hydraulic rod via a pivot. One end of the output end of the fifth hydraulic rod is hinged to one end of the crossbeam.

[0009] A slide tube is welded to one side of the crossbeam. The inner wall of the slide tube is provided with a slide groove. A pulley group is limited and rolled on the inner wall of the slide groove. The number of pulley groups is set to two. A fixing rod is fixedly connected to the bottom end of the pulley group. A sealing block is fixedly connected to both ends of the slide groove for sealing both ends of the inner wall of the slide groove.

[0010] The bottom end of the fixing rod is fixedly connected to a fixing lug by bolts. A bearing plate frame is fixedly connected to one side of the fixing lug by bolts. The number of bearing plate frames is set to two. Flexible cloth is fixedly connected to the inner side of the two bearing plate frames by bolts. The two bearing plate frames are respectively fixedly connected to the two fixing rods.

[0011] A conveyor is placed on one side of the main base for transporting coal blocks. One end of the flexible cloth is located above the conveyor when tilted. The hinged joint between the main top plate and the front top plate is located above the flexible cloth.

[0012] Preferably, the number of the first hydraulic rods is set to be multiple, which are used to adjust and support the height of the main top plate. One end of the main top plate is hinged to the tail top plate, and one end of the main body base is hinged to the second hydraulic rod. One end of the output end of the second hydraulic rod is hinged to the tail top plate to adjust the hinge angle between the tail top plate and the main top plate.

[0013] Preferably, a tail plate is hinged to one end of the tail top plate, and a fourth hydraulic rod is hinged to the inner side of one end of the tail top plate. One end of the output end of the fourth hydraulic rod is hinged to the bottom end of the tail plate, which is used to adjust the rotation angle of the tail plate relative to the tail top plate.

[0014] Preferably, a third hydraulic rod is hinged to one end of the main top plate, and one end of the output end of the third hydraulic rod is hinged to the bottom of the front top plate to adjust the hinge angle between the front top plate and the main top plate.

[0015] Preferably, the bearing plate frame uses two side plates to clamp one side of the flexible cloth, and bolts are used to fix the flexible cloth. The flexible cloth is made of high-strength flexible cloth and is used to support the falling coal blocks.

[0016] Preferably, one end of the crossbeam is arc-shaped and rotates under the extension and retraction of the fifth hydraulic rod, thereby causing the flexible cloth to rotate and tilt the coal block it carries to the output part of the conveyor, preventing the coal block from falling into the interior of the main base and causing damage to vulnerable parts such as cables.

[0017] Preferably, the coal chute, slide pipe and bearing plate frame are integrated into a single structure and applied to the 5105 intelligent working face, achieving full intelligent hydraulic control.

[0018] The beneficial effects of this invention are as follows:

[0019] 1. This invention effectively solves the problem of coal and gangue leakage during the lowering and shifting of the fully mechanized longwall mining face. Through the ingenious design of the device, leaking coal chunks can be effectively collected and guided onto the conveyor, thereby greatly reducing the occurrence of coal chunks falling in front of the supports and into the cable trough, significantly improving the coal resource recovery rate, reducing production losses, and making the overall device simple in structure and easy to operate, suitable for various production environments in fully mechanized longwall mining faces. Through practical application tests and continuous optimization of the design scheme, the effectiveness and performance of the device can be further improved, making a positive contribution to the sustainable development of the coal industry.

[0020] 2. This invention achieves 95% recovery of loose coal between supports and feeds it into the conveyor, greatly reducing the labor intensity of frontline workers cleaning loose coal between supports. Through automation and mechanization, it realizes automatic collection and transportation of coal blocks, significantly reducing the burden on workers and improving work efficiency. The maintenance team can level the coal chute and cover the gap at the front beam between supports, effectively protecting the safety of personnel walking in front of the supports and eliminating the safety risk of loose coal falling between supports and injuring people. At the same time, the installation and use of this device does not change the structure of the support itself, does not affect the normal lowering and moving of supports, and the normal operation of adjacent supports, thereby ensuring safe production at the working face. It also reduces the damage rate of coal mining machine cable clamps and cables in the cable trough by 80%. Attached Figure Description

[0021] Figure 1 This is a schematic diagram of the overall structure of the present invention.

[0022] Figure 2 This is a schematic plan view of the horizontal frame of the present invention in its flat position.

[0023] Figure 3 This is a schematic plan view of the crossbeam in the tilted state of the present invention.

[0024] Figure 4 This is a partial schematic diagram of the overall structure of the present invention.

[0025] Figure 5 This is a schematic diagram of the overall coal chute processing frame of the present invention.

[0026] Figure 6 This is a schematic diagram of the connection of the support plate frame of the present invention.

[0027] Figure 7 This is a schematic diagram of the internal structure of the coal chute processing rack of the present invention.

[0028] Figure 8 This is a schematic diagram of the side structure of the coal chute processing frame of the present invention.

[0029] Figure 9 This is a partial structural diagram of the support plate frame of the present invention.

[0030] Figure 10 This is the invention Figure 5 A schematic diagram of the structure at point A.

[0031] Figures 1-10 In the middle: 1. Main base; 2. Conveyor; 3. First hydraulic rod; 4. Second hydraulic rod; 5. Coal chute processing frame; 6. Slide pipe; 7. Bearing plate frame; 31. Main roof plate; 311. Third hydraulic rod; 312. Front roof plate; 41. Tail roof plate; 411. Fourth hydraulic rod; 412. Tail plate; 51. Crossbeam mounting frame; 52. Hydraulic rod mounting frame; 53. Crossbeam; 54. Fifth hydraulic rod; 61. Slide groove; 62. Pulley block; 621. Fixing rod; 63. Sealing block; 71. Flexible cloth; 72. Fixing lug. Detailed Implementation

[0032] Example 1: As Figures 1-10The illustrated coal recovery device for a fully mechanized longwall face includes a main base 1. A first hydraulic rod 3 is fixedly connected to the top inner side of the main base 1. A main roof plate 31 is fixedly connected to the top output end of the first hydraulic rod 3. A front roof plate 312 is hinged to one end of the main roof plate 31. Coal chute processing frames 5 are fixedly connected to the bottom ends of both sides of the main roof plate 31. A crossbeam mounting frame 51 is fixedly connected to the bottom end of the coal chute processing frame 5. A hydraulic rod mounting frame 52 is fixedly connected to the bottom end of the crossbeam mounting frame 51. A crossbeam 53 is rotatably connected to the inner side of the crossbeam mounting frame 51 via a rotating shaft. A fifth hydraulic rod 54 is rotatably connected to the inner side of the bottom end of the hydraulic rod mounting frame 52 via a rotating shaft. One end of the output end of the fifth hydraulic rod 54 is connected to the crossbeam 53. One end of each is hinged to the other; a slide tube 6 is welded to one side of the crossbeam 53, and a slide groove 61 is provided on the inner wall of the slide tube 6. A pulley group 62 is limited to roll on the inner wall of the slide groove 61. The number of pulley groups 62 is set to two. A fixing rod 621 is fixedly connected to the bottom end of the pulley group 62. A sealing block 63 is fixedly connected to both ends of the slide groove 61 to seal the two ends of the inner wall of the slide groove 61. A fixing ear 72 is fixedly connected to the bottom end of the fixing rod 621 by bolts. A bearing plate frame 7 is fixedly connected to one side of the fixing ear 72 by bolts. The number of bearing plate frames 7 is set to two. A flexible cloth 71 is fixedly connected to the inner side of the two bearing plate frames 7 by bolts. The two bearing plate frames 7 are fixedly connected to the two fixing rods 621 respectively.

[0033] When in use, once the device is assembled, it is operated in the workplace. The conveyor on one side continuously transports coal blocks. During production, when the support is lowered and moved, there is leakage of coal and gangue between the support gaps. The leaked coal blocks fall to the inner top of the flexible cloth 71, effectively reducing the amount of coal blocks falling in front of the support and into the cable trough. After the relocation is completed, the fifth hydraulic rod 54 is extended by controlling it, which in turn pushes the crossbeam 53 to rotate and tilt, causing the coal blocks it carries to tilt to the transport section of the conveyor 2 below for transport. In actual application, 95% of the coal between the supports falls into the scraper conveyor through this device without affecting the coal cutting of the unit, greatly reducing the workload of the workers.

[0034] On the one hand, it reduces the loss and waste of loose coal between supports, achieving 95% recovery of leaked coal into the conveyor. On the other hand, it reduces the labor intensity of front-line workers cleaning loose coal between supports, and the maintenance team levels the coal chute plates, covering the gaps at the front beams of the supports, effectively protecting the safety of personnel walking in front of the supports and eliminating the safety risk of loose coal falling and injuring people. In addition, it reduces the damage of leaked coal and gangue to cable clamps and cables in the cable trough, reducing the damage rate by 80%.

[0035] A conveyor 2 is placed on one side of the main base 1 for transporting coal blocks. One end of the flexible cloth 71 is located above the conveyor 2 when tilted. The main top plate 31 and the front top plate 312 are hinged to each other above the flexible cloth 71. The number of first hydraulic rods 3 is set to multiple. One end of the main top plate 31 is hinged to the tail top plate 41. One end of the main base 1 is hinged to the second hydraulic rod 4. One end of the output end of the second hydraulic rod 4 is hinged to the tail top plate 41. One end of the tail top plate 41 is hinged to the tail plate 412. One end of the tail top plate 41 is hinged to the inner side of the tail top plate 41. One end of the output end of the fourth hydraulic rod 411 is hinged to the bottom end of the tail plate 412. One end of the main top plate 31 is hinged to the bottom of the third hydraulic rod 311. One end of the output end of the third hydraulic rod 311 is hinged to the bottom of the front top plate 312.

[0036] The bearing plate frame 7 uses two side plates to clamp one side of the flexible cloth 71, and bolts to fix the flexible cloth 71. One end of the crossbeam 53 is set in an arc shape, and rotates under the extension and retraction of the fifth hydraulic rod 54. The coal chute processing frame 5, the slide pipe 6 and the bearing plate frame 7 are integrated into the 5105 intelligent working face, and all are fully intelligent hydraulically controlled.

[0037] Based on a comprehensive analysis of the actual conditions during production at the fully mechanized mining face, and considering factors such as ease of operation, not affecting the coal mining machine operator's line of sight during production, geological conditions of the working face, and mining height, a design scheme for the inter-frame coal chute device, along with coal chute fabrication and construction drawings, were developed.

[0038] The installation of the coal chute does not change the structure of the support itself, does not affect the normal lowering and moving of the support, does not affect the normal lowering and moving of adjacent supports, and does not affect normal personnel passage in daily life.

[0039] The installation of coal chutes must be accompanied by fall protection devices to prevent the risk of injury from the coal chutes falling due to broken wire ropes. Specific safety technical measures must be formulated before implementation.

[0040] Three sets were manufactured in the early stage for application testing. Three sets were installed continuously in the area where the roof of the working face was broken. During production, the feasibility of the coal chute design scheme was verified, data on the application of the coal chute angle were collected, and other problems that occurred during operation were identified. The design scheme was optimized based on the operation and management conditions.

[0041] The coal was manufactured according to the optimized design scheme, installed on all supports and put into operation, ensuring that 95% of the coal leakage between the supports falls onto the coal chute and enters the conveyor, achieving the expected results.

[0042] Example 2: Figure 1-10As shown, the labor intensity of front-line workers in fully mechanized mining is expected to decrease when cleaning loose coal. Our company recovered 12,282 tons of coal leaking between the supports through coal chutes, saving 25,920 yuan. According to the fully mechanized mining team in 2022, the daily wear and tear of coal mining machine cable clamps is 120 meters per year, costing 32,400 yuan. The damage rate decreased by 80%, reducing material costs by 25,920 yuan. (Currently, mining is underway on the No. 5 coal seam, with the 5110 working face having a dip length of 163.5m and a mineable length of 600m, supported by 112 supports. The 5111 working face has a dip length of 169.5m and a mineable length of approximately 80m, supported by 117 supports. Daily production observations show that 0.2m-0.5m of loose coal falls in front of each coal support cut, resulting in a coal float of 169.5m * 0.6m * 0.2m * 1.55 = 31t. Drilling data for the No. 8 coal seam shows a fragmented and banded structure. During the mining of the 8101 and 8103 working faces, 0.5m-1m of loose coal fell in front of each coal support cut.)

[0043] The amount of loose coal that falls during production is calculated using the formula (working face dip length * height * mineable length * coal bulk density = amount of loose coal recovered) based on a minimum depth of 0.2m. For example, working face 5110 produces 163.5 * 0.2 * 600 * 0.55 = 10791 tons of loose coal, and working face 5111 produces 169.5 * 0.2 * 80 * 0.55 = 1491.6 tons of loose coal, for a total of 12282.6 tons of recovered coal. At a raw coal price of 300 yuan per ton, the economic value is 12282.6 * 300 = 3,684,780 yuan.

[0044] This significantly improves the coal resource recovery rate. Through its ingenious design, the device effectively collects and recovers coal leaking during the lowering and shifting of the longwall mining face. Calculations show that this device can recover a large amount of loose coal; for example, a total of 12,282.6 tons of coal can be recovered from the 5110 and 5111 working faces. This not only avoids the waste of coal resources but also increases the economic benefits of coal enterprises, making a positive contribution to their sustainable development.

Claims

1. A kind of between frame coal resource recovery device of leakage of fully mechanized caving face, including main base (1), it is characterized in that: The inner top of the main base (1) is fixedly connected to a first hydraulic rod (3), and the top output end of the first hydraulic rod (3) is fixedly connected to a main top plate (31). One end of the main top plate (31) is hinged to a front top plate (312). Both sides of the main top plate (31) are fixedly connected to a coal chute (5). The bottom of the coal chute (5) is fixedly connected to a crossbeam mounting frame (51). The bottom of the crossbeam mounting frame (51) is fixedly connected to a hydraulic rod mounting frame (52). The inner side of the crossbeam mounting frame (51) is rotatably connected to a crossbeam (53) via a rotating shaft. The inner side of the bottom of the hydraulic rod mounting frame (52) is rotatably connected to a fifth hydraulic rod (54) via a rotating shaft. One end of the output end of the fifth hydraulic rod (54) is hinged to one end of the crossbeam (53). A slide tube (6) is welded to one side of the crossbeam (53). The inner wall of the slide tube (6) is provided with a slide groove (61). A pulley group (62) is limited to roll on the inner wall of the slide groove (61). The number of pulley groups (62) is set to two. A fixing rod (621) is fixedly connected to the bottom end of the pulley group (62). A sealing block (63) is fixedly connected to both ends of the slide groove (61) for sealing both ends of the inner wall of the slide groove (61). The bottom end of the fixing rod (621) is fixedly connected to a fixing lug (72) by bolts. A bearing plate frame (7) is fixedly connected to one side of the fixing lug (72) by bolts. The number of bearing plate frames (7) is set to two. Flexible cloth (71) is fixedly connected to the inner side of the two bearing plate frames (7) by bolts. The two bearing plate frames (7) are respectively fixedly connected to the two fixing rods (621). A conveyor (2) is placed on one side of the main base (1) for transporting coal blocks. One end of the flexible cloth (71) is located above the conveyor (2) when it is tilted. The hinged position of the main top plate (31) and the front top plate (312) is located above the flexible cloth (71). One end of the crossbeam (53) is set in an arc shape and rotates under the extension and retraction of the fifth hydraulic rod (54).

2. The device for recovering the coal resources leaked between the frames in the fully mechanized caving face according to claim 1, characterized in that: The number of the first hydraulic rods (3) is set to be multiple. One end of the main top plate (31) is hinged to the tail top plate (41), and one end of the main body base (1) is hinged to the second hydraulic rod (4). One end of the output end of the second hydraulic rod (4) is hinged to the tail top plate (41).

3. The device for recovering the coal resources leaked between the frames in the fully mechanized caving face according to claim 2, characterized in that: One end of the tail plate (41) is hinged to a tail plate (412), and a fourth hydraulic rod (411) is hinged to the inner side of one end of the tail plate (41). One end of the output end of the fourth hydraulic rod (411) is hinged to the bottom end of the tail plate (412).

4. The device for recovering the coal resources leaked between the frames of the fully mechanized caving face according to claim 1, characterized in that: A third hydraulic rod (311) is hinged to one end of the main top plate (31), and one end of the output end of the third hydraulic rod (311) is hinged to the bottom of the front top plate (312).

5. A coal recovery device for coal leakage between supports in a fully mechanized longwall mining face according to claim 1, characterized in that: The support plate frame (7) uses two side plates to clamp one side of the flexible cloth (71) and bolts to fix the flexible cloth (71) in place.

6. A coal recovery device for coal leakage between supports in a fully mechanized longwall mining face according to claim 1, characterized in that: The coal chute (5), slide pipe (6) and bearing plate frame (7) are integrated into an intelligent working face, and all are fully intelligently controlled by hydraulic system.

Citation Information

Patent Citations

  • Sublevel caving hydraulic support back scraper conveyor coal collecting device

    CN107676130A

  • Leak protection coal device between mine hydraulic support frame

    CN205135684U

  • Coal leakage collecting device for mining hydraulic support

    CN209385162U

  • Slidable separation and control device for coal and gangue leakage between fully-mechanized face frames

    CN218347412U