New energy vehicle dispatching method and device, computer equipment and readable storage medium

Through risk assessment of transmission line nodes in the power system and particle swarm algorithm optimization, a reasonable number of new energy vehicles is determined, which solves the problem of limit overload and overload in power grid dispatching, and improves the stability of the power system and the utilization efficiency of new energy vehicles. .

CN117937491BActive Publication Date: 2024-10-08EAST CHINA BRANCH OF STATE GRID CORP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202311727120.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-14
Publication Date
2024-10-08
Estimated Expiration
2043-12-14

AI Technical Summary

Technical Problem

Existing technology is difficult to optimize the dispatch of new energy vehicles while fully considering the risks of the power system, resulting in possible overruns and overloading of the power grid, which affects the satisfaction of power regulation needs.

Method used

By analyzing the risk value of transmission line nodes in the power system, combined with the node's geographical location, importance and power supply of the associated transmission line, the particle swarm algorithm is used to determine the total load of the node with the lowest risk within the load adjustment range, and The target new energy vehicle load is determined based on the difference between the initial load and the target load, and a reasonable number of new energy vehicles is finally evaluated and dispatched.

Benefits of technology

Effectively evaluate and optimize the dispatch of new energy vehicles to avoid over-limit and overload risks in the power system due to the unreasonable number of new energy vehicles, improve the stability and reliability of the power system, and fully tap the role of new energy vehicles in the power system. role.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117937491B_ABST
    Figure CN117937491B_ABST
Patent Text Reader

Abstract

The present application proposes a new energy vehicle scheduling method and device, computer equipment and readable storage medium, the method comprising: for the transmission line nodes in the target geographical area, based on the information value of the transmission line nodes, determining the risk factor of the transmission line nodes; according to the initial load of the transmission line nodes and the load of new energy vehicles that can be introduced into the transmission line nodes, determining the load adjustment range of the transmission line nodes; within the load adjustment range, based on the risk factor of the transmission line nodes, determining the total load of the nodes with the lowest transmission line risk value; based on the initial load and the total load of the nodes with the lowest transmission line risk value, determining the target new energy vehicle load corresponding to the transmission line node; based on the target new energy vehicle load, determining the number of new energy vehicles introduced into the transmission line node. This technical solution fully taps the role of new energy vehicles in the power system and improves the stability and reliability of the entire power system.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present application relates to the field of power deployment technology, and in particular to a new energy vehicle scheduling method and device, computer equipment and readable storage medium. [Background technology]

[0002] The over-limit and overload phenomena of the power grid directly affect the stability and safe operation of the power system. In actual operation, due to the continuous changes in the load of the power grid and the estimation errors of the power supply party on the power demand, the transmission lines or equipment in the power system often experience over-limit and overload phenomena. How to effectively adjust the power flow of the power grid and reduce the risk of over-limit and overload is a major problem in the operation and control of the power system.

[0003] In this regard, with the transformation of the global energy structure and the increasing maturity of new energy vehicle technology, new energy vehicles have become an indispensable flexibility resource and are increasingly being incorporated into the demand response of the power system. As a flexible resource, new energy vehicles can adjust the power flow of the power grid while ensuring that the driving needs of the vehicles are met. During periods of low power grid load, such as at night, new energy vehicles are charged to absorb the surplus power of the power grid; during periods of high power grid load, such as peak hours in the morning and evening, new energy vehicles can be allowed to participate in the peak-shaving and valley-filling work of the power grid, releasing part of the power of new energy vehicles, thereby reducing the load on the power grid.

[0004] However, this method of dispatching new energy vehicles for the power grid is too simple. Once too many new energy vehicles are added to the power grid, it is easy to cause the power grid to exceed the limit and be overloaded, bringing safety risks. If the number of new energy vehicles added to the power grid is simply reduced, the power regulation level will be affected and the actual power regulation needs cannot be met.

[0005] Therefore, how to optimize the dispatch of new energy vehicles while fully considering the risks of the power system has become a technical problem that needs to be solved urgently. [Summary of the invention]

[0006] The embodiments of the present application provide a new energy vehicle scheduling method and apparatus, a computer device and a readable storage medium, aiming to solve the technical problem in the related art that unreasonable scheduling of new energy vehicles causes the power system to have the risk of over-limit and overload.

[0007] In a first aspect, an embodiment of the present application provides a new energy vehicle scheduling method, comprising:

[0008] For a power transmission line node in a target geographical area, determining a risk factor of the power transmission line node based on an information value of the power transmission line node;

[0009] Determining a load adjustment range of the transmission line node according to the initial load of the transmission line node and the load of new energy vehicles that can be introduced into the transmission line node;

[0010] Determining the total load of the node with the lowest transmission line risk value based on the risk factor of the transmission line node within the load regulation range;

[0011] Determining a target new energy vehicle load corresponding to the transmission line node based on the initial load and the total load of the node with the lowest transmission line risk value;

[0012] Based on the target new energy vehicle load, the number of new energy vehicles introduced into the transmission line node is determined.

[0013] In one embodiment of the present application, optionally, determining the risk factor of the transmission line node based on the information value of the transmission line node includes:

[0014] Normalizing the information value of all power transmission line nodes in the target geographical area;

[0015] For each of the transmission line nodes, a risk factor of the transmission line node is determined based on the importance of the transmission line node among all nodes in the target geographical area, the node type and the normalized information value.

[0016] In one embodiment of the present application, optionally, the risk factor of the transmission line node is:

[0017]

[0018] Wherein, η represents the risk coefficient of the transmission line node, α represents the importance of the transmission line node among all nodes in the target geographical area, β represents the node type of the transmission line node, and when β=1, 2, 3, the transmission line node is a PQ node, a PV node, and a balance node, respectively. 1 Represents the normalized information value of the transmission line node.

[0019] In one embodiment of the present application, optionally, determining the load adjustment range of the transmission line node according to the initial load of the transmission line node and the load of new energy vehicles that can be introduced into the transmission line node includes:

[0020] Obtaining the number of new energy vehicles that can be introduced into the transmission line node;

[0021] Determining the load of the new energy vehicles that can be introduced based on the number of new energy vehicles that can be introduced;

[0022] The initial load of the transmission line node is determined as the lower limit of the load regulation range of the transmission line node, and the union of the introducible new energy vehicle load and the initial load is determined as the upper limit of the load regulation range.

[0023] In one embodiment of the present application, optionally, determining the total load of the node with the lowest transmission line risk value within the load regulation range based on the risk coefficient of the transmission line node includes:

[0024] The load regulation range is used as a particle optimization space, and the total node load with the lowest transmission line risk value is determined within the load regulation range based on the particle swarm algorithm, wherein the transmission line risk value is determined based on the danger coefficient of the transmission line node and the active power of the transmission line associated with the transmission line node, and is used to reflect the comprehensive risk of over-limit and overload of the transmission line associated with the transmission line node.

[0025] In one embodiment of the present application, optionally, the transmission line risk value is:

[0026]

[0027] Where F represents the risk value of the transmission line, P k represents the active power of the kth associated transmission line of the transmission line node, P k,max represents the upper limit of the active power of the kth associated transmission line, and η represents the risk coefficient of the transmission line node.

[0028] In one embodiment of the present application, optionally, determining the target new energy vehicle load corresponding to the transmission line node based on the initial load and the total load of the node with the lowest transmission line risk value includes:

[0029] The difference between the total load of the node with the lowest transmission line risk value and the initial load is determined as the target new energy vehicle load corresponding to the transmission line node.

[0030] In a second aspect, an embodiment of the present application provides a new energy vehicle dispatching device, including:

[0031] A risk factor determination unit, for determining a risk factor of a transmission line node in a target geographical area based on an information value of the transmission line node;

[0032] A load regulation range determining unit, configured to determine a load regulation range of the transmission line node according to an initial load of the transmission line node and a load of new energy vehicles that can be introduced into the transmission line node;

[0033] A node total load determination unit, configured to determine the node total load having the lowest transmission line risk value within the load regulation range based on the risk factor of the transmission line node;

[0034] A new energy vehicle load determination unit, configured to determine a target new energy vehicle load corresponding to the transmission line node based on the initial load and the total load of the node with the lowest transmission line risk value;

[0035] The new energy vehicle quantity determination unit is used to determine the quantity of new energy vehicles introduced into the transmission line node based on the target new energy vehicle load.

[0036] In one embodiment of the present application, optionally, the risk factor determination unit is used to:

[0037] The information value of all transmission line nodes in the target geographical area is normalized; for each transmission line node, the risk factor of the transmission line node is determined based on the importance of the transmission line node among all nodes in the target geographical area, the node type and the normalized information value.

[0038] In one embodiment of the present application, optionally, the risk factor of the transmission line node is:

[0039]

[0040] Wherein, η represents the risk coefficient of the transmission line node, α represents the importance of the transmission line node among all nodes in the target geographical area, β represents the node type of the transmission line node, and when β=1, 2, 3, the transmission line node is a PQ node, a PV node, and a balance node, respectively. 1 Represents the normalized information value of the transmission line node.

[0041] In one embodiment of the present application, optionally, the load adjustment range determination unit is used to:

[0042] Obtain the number of new energy vehicles that can be introduced into the transmission line node; determine the load of the new energy vehicles that can be introduced based on the number of new energy vehicles that can be introduced; determine the initial load of the transmission line node as the lower limit of the load adjustment range of the transmission line node, and determine the union of the load of the new energy vehicles that can be introduced and the initial load as the upper limit of the load adjustment range.

[0043] In one embodiment of the present application, optionally, the node total load determination unit is used to:

[0044] The load regulation range is used as a particle optimization space, and the total node load with the lowest transmission line risk value is determined within the load regulation range based on the particle swarm algorithm, wherein the transmission line risk value is determined based on the danger coefficient of the transmission line node and the active power of the transmission line associated with the transmission line node, and is used to reflect the comprehensive risk of over-limit and overload of the transmission line associated with the transmission line node.

[0045] In one embodiment of the present application, optionally, the transmission line risk value is:

[0046]

[0047] Where F represents the risk value of the transmission line, P k represents the active power of the kth associated transmission line of the transmission line node, P k,max represents the upper limit of the active power of the kth associated transmission line, and η represents the risk coefficient of the transmission line node.

[0048] In one embodiment of the present application, optionally, the new energy vehicle load determination unit is used to:

[0049] The difference between the total load of the node with the lowest transmission line risk value and the initial load is determined as the target new energy vehicle load corresponding to the transmission line node.

[0050] In a third aspect, an embodiment of the present application provides a computer device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are configured to execute the method described in the first aspect above.

[0051] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium storing computer-executable instructions, wherein the computer-executable instructions are used to execute the method described in the first aspect above.

[0052] The above technical scheme aims at the technical problem that the unreasonable scheduling of new energy vehicles in the relevant technology leads to the risk of over-limit and overload in the power system. By analyzing the risk value of the transmission line nodes in the power system, an effective risk assessment of the transmission line nodes is realized. According to the variables in multiple dimensions such as the geographical location and environment of the node, the importance of the node in the power system and the power supply conditions of the related transmission lines, a reasonable number of new energy vehicles is allocated to the power system. While supplementing and extending the power generation capacity of the power system, the power system is prevented from encountering dangerous situations such as over-limit and overload due to the unreasonable number of new energy vehicles. The rationality of the deployment of new energy vehicles in the power system is improved, the role of new energy vehicles in the power system is fully explored, and the stability and reliability of the entire power system are improved.

Brief Description of the Drawings

[0053] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0054] Figure 1 A flow chart showing a new energy vehicle dispatching method according to an embodiment of the present application is shown;

[0055] Figure 2 A schematic diagram of a New England electric vehicle optimization method according to an embodiment of the present application is shown;

[0056] Figure 3 A schematic diagram showing a topological structure of a power grid in the New England region according to an embodiment of the present application is shown;

[0057] Figure 4 A schematic diagram showing summer peak demand data for electric vehicles in the New England region according to an embodiment of the present application;

[0058] Figure 5 A schematic diagram showing peak distribution data of electric vehicles in summer in the New England region according to an embodiment of the present application is shown;

[0059] Figure 6 A schematic diagram showing load adjustment amounts of nodes in the New England region according to an embodiment of the present application is shown;

[0060] Figure 7 and Figure 8 Schematic diagrams showing the line crossing conditions in the New England region before and after the application of the technical solution of the present application;

[0061] Fig. 9A block diagram of a computer device according to an embodiment of the present application is shown;

[0062] Fig.10 A block diagram of a computer device according to an embodiment of the present application is shown. [Specific implementation method]

[0063] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0064] Figure 1 A flow chart of a new energy vehicle dispatching method according to an embodiment of the present application is shown.

[0065] like Figure 1 As shown, a new energy vehicle dispatching method according to an embodiment of the present application includes:

[0066] Step 102: for a power transmission line node in a target geographical area, determine a risk factor of the power transmission line node based on an information value of the power transmission line node.

[0067] The target geographical area refers to the area where the power system is located, and the transmission line node refers to the node in the transmission line topology of the power grid of the power system, and each node has a corresponding geographical location. The information value of the transmission line node is related to the disaster risk map of the geographical location of the transmission line node. It can be said that the information value of the transmission line node reflects the impact of the geographical location environment of the transmission line node on power transmission.

[0068] Specifically, the information value of all transmission line nodes in the target geographical area can be normalized so that the information value of all transmission line nodes belongs to the same order of magnitude, the difference between data dimensions is eliminated, and the information value of different geographical locations has more reasonable comparability. Then, for each transmission line node, the risk factor of the transmission line node is determined based on the importance of the transmission line node in all nodes in the target geographical area, the node type and the normalized information value.

[0069] The risk factor of the transmission line node is:

[0070]

[0071] Wherein, η represents the risk coefficient of the transmission line node, α represents the importance of the transmission line node among all nodes in the target geographical area, β represents the node type of the transmission line node, and when β=1, 2, 3, the transmission line node is a PQ node, a PV node, and a balance node, respectively. 1 Represents the normalized information value of the transmission line node.

[0072] Optionally, α is the number of neighboring nodes of the transmission line node, wherein the transmission line node and the neighboring nodes are nodes in the power system of the target geographical area. Therefore, the more neighboring nodes of the transmission line node, the more important the transmission line node is, and the more critical it is to the power system in which it is located.

[0073] It can be said that the risk factor of the transmission line node incorporates the impact of multiple dimensions of information on power transmission, such as the node type of the transmission line node, the importance of the node in the power system, and the geographical location and environmental conditions of the transmission line node.

[0074] Step 104: Determine the load adjustment range of the transmission line node according to the initial load of the transmission line node and the load of new energy vehicles that can be introduced into the transmission line node.

[0075] Specifically, the number of new energy vehicles that can be introduced into the transmission line node can be obtained; based on the number of new energy vehicles that can be introduced, the load of the new energy vehicles that can be introduced is determined; the initial load of the transmission line node is determined as the lower limit of the load adjustment range of the transmission line node, and the union of the load of the new energy vehicles that can be introduced and the initial load is determined as the upper limit of the load adjustment range.

[0076] The load regulation range of the transmission line node contains the reasonable load of the transmission line node. Therefore, the load regulation range may be determined first and then the reasonable load of the transmission line node may be determined therein.

[0077] Step 106: Determine the total load of the node with the lowest transmission line risk value based on the risk factor of the transmission line node within the load regulation range.

[0078] Specifically, the load regulation range is used as the particle optimization space, and the total node load with the lowest transmission line risk value is determined within the load regulation range based on the particle swarm algorithm, wherein the transmission line risk value is determined based on the danger coefficient of the transmission line node and the active power of the associated transmission line of the transmission line node, and is used to reflect the comprehensive risk of over-limit and overload of the associated transmission line of the transmission line node.

[0079] The transmission line risk value is:

[0080]

[0081] Where F represents the risk value of the transmission line, P k represents the active power of the kth associated transmission line of the transmission line node, P k,max represents the upper limit of the active power of the kth associated transmission line, and η represents the risk coefficient of the transmission line node.

[0082] That is to say, for each possible load condition of a transmission line node, the active power and the upper limit of the active power of the associated transmission line of the transmission line node can be determined based on the load condition, and the active power and the upper limit of the active power of the associated transmission line reflect the power supply condition of the associated transmission line. At this point, based on the power supply condition of the associated transmission line and the risk factor of the transmission line node, the transmission line risk value faced by the transmission line node under the load condition is determined.

[0083] It can be said that the transmission line risk value of a transmission line node reflects the possibility of dangerous situations such as over-limit and overload occurring under the multiple influences of the node's own node type, including the geographical location and environment of the node, the importance of the node in the power system, and the power supply conditions of the associated transmission lines.

[0084] The influence of multiple dimensions of information on transmission line node types and the geographical location and environmental conditions of transmission line nodes on power transmission is also included.

[0085] The lower the transmission line risk value, the safer the transmission line node, and the more reasonable the current load situation of the transmission line node. Therefore, the total node load with the lowest transmission line risk value can be determined as the total node load that the transmission line node should have.

[0086] Step 108: Determine the target new energy vehicle load corresponding to the transmission line node based on the initial load and the total load of the node with the lowest transmission line risk value.

[0087] At this point, the difference between the total load of the node with the lowest transmission line risk value and the initial load can be determined as the target new energy vehicle load corresponding to the transmission line node.

[0088] Step 110: Determine the number of new energy vehicles introduced into the transmission line node based on the target new energy vehicle load.

[0089] The target new energy vehicle load reflects the total load of new energy vehicles that can be introduced. Finally, based on the calculated target new energy vehicle load, the number of new energy vehicles that can be introduced at the transmission line node is evaluated, and then the new energy vehicles at the transmission line node are dispatched according to the number to avoid excessive new energy vehicles at the transmission line node causing dangerous situations such as over-limit and overload at the transmission line node and its associated transmission lines, and to avoid insufficient new energy vehicles at the transmission line node affecting the power supply capacity of the transmission line node and its associated transmission lines.

[0090] The above technical scheme realizes effective risk assessment of transmission line nodes by analyzing the risk values ​​of transmission line nodes in the power system. It allocates a reasonable number of new energy vehicles to the power system by combining variables in multiple dimensions such as the geographical location and environment of the nodes, the importance of the nodes in the power system, and the power supply conditions of the related transmission lines. While supplementing and extending the power generation capacity of the power system, it avoids dangerous situations such as over-limit and overloading due to the unreasonable number of new energy vehicles in the power system, improves the rationality of the deployment of new energy vehicles in the power system, fully taps the role of new energy vehicles in the power system, and thus improves the stability and reliability of the entire power system.

[0091] The following example uses a 10-machine 39-node system in the New England region. Figure 2 The technical solution of this application is simulated.

[0092] According to the wiring diagram of the New England 10-machine 39-node standard test system and the transmission lines in the study area, and referring to the length of the actual transmission lines, we can get the following: Figure 3 The transmission line topology shown in Figure 1 can be used to find the geographical location corresponding to the node. The distribution of each node in each state is shown in Table 1.

[0093] Table 1

[0094] State Classification Corresponding Node CT 4,5,6,7,8,9,10,11,12,13,14,15,31,32 MA 1,2,3,16,17,18,19,21,22,23,24,27,33,35,36,39 ME 28,29,38 NH 26,30 RJ 20,34 VT 37,25

[0095] Next, construct the risk model for each node.

[0096] First, according to the information volume model of the New England region, the information volume value of each node in the New England region is calculated.

[0097] Next, the calculated information value is normalized. Normalization is a commonly used data preprocessing method that scales the data to a specific range, usually between 0 and 1, to make the data easier to process and analyze. This step can eliminate the differences between data dimensions and make the information values ​​at different locations comparable.

[0098] Third, determine the relationship between the node's hazard coefficient and information content. After obtaining the information value of each location in the study area based on the New England region's information content model, the relationship between the hazard coefficient and information content of the nodes in the study area is obtained through normalization and fitting functions as shown below:

[0099]

[0100] Where η represents the risk factor of the node; α represents the importance of the node in the power system of the New England region, which can be selected as the number of adjacent nodes connected to the node; β represents the type of node, β = 1, 2, 3 represent PQ node, PV node and balance node respectively; I 1 Indicates the value after the information value is normalized.

[0101] Next, the electric vehicle regulation model is constructed.

[0102] Based on the electric vehicle distribution data of each state in the New England region and the danger of each location, an electric vehicle regulation model is constructed. According to the relationship between the distribution of electric vehicles and the danger of the location, the distribution of electric vehicles is optimized, and the transmission line flow is changed by connecting electric vehicle resources to each node to reduce the over-limit and overload phenomenon of the transmission line. This means that if some nodes have a higher risk, by connecting more electric vehicles to these nodes, the load of the transmission line can be balanced, thereby reducing the overall risk of the system.

[0103] The specific steps of building the electric vehicle regulation model are:

[0104] First, analyze the load data P of each node before introducing electric vehicle resources. i0 .

[0105] P i =P i0

[0106] Where P i represents the load data of node i; P i0 Represents the load data of node i when electric vehicles are not introduced.

[0107] Then, the electric vehicle data of each node is determined, and the load regulation range of each node after the introduction of electric vehicles is obtained.

[0108] P i =P i0 +ΔP i

[0109] In the formula, ΔP i It represents the load regulation of node i, that is, the electric vehicle load data of node i.

[0110] Finally, a risk model is constructed and an optimization algorithm is used to determine the optimal electric vehicle regulation, with the goal of minimizing the risk of over-limit and overload of the transmission line.

[0111]

[0112] Where F represents the risk value of the transmission line, that is, the comprehensive risk of over-limit and overload of the transmission line; P k represents the active power transmitted on the kth transmission line; P k,max Represents the limit value of active power on the kth transmission line.

[0113] Specifically, if Figure 4 As shown in Table 2, electric vehicles will develop rapidly in New England from 2023 to 2032. Using electric vehicles as a means of regulating the power grid will mitigate the impact of disasters on the power grid. Table 2 below shows the peak demand data in summer in New England.

[0114] Table 2

[0115] Year CT MA ME NH RI VT NE 2023 9 23 2 1 2 2 39 2024 28 73 8 4 7 6 126 2025 52 142 18 9 13 11 245 2026 94 264 36 19 24 19 456 2027 134 386 57 30 34 27 669 2028 180 529 84 45 47 37 922 2029 233 693 118 63 61 49 1216 2030 293 877 157 84 78 62 1551 2031 361 1084 201 108 96 78 1927 2032 438 1311 249 136 117 96 2346

[0116] Taking the data of 2032 as an example, the load regulation of electric vehicles at each node in each state is obtained through the peak demand data of electric vehicles in summer in New England, as shown in Table 3 and Figure 5 shown.

[0117] Table 3

[0118]

[0119] The transmission line map is combined with the risk prediction map to obtain the information value of the New England region. Through normalization and fitting functions, the relationship between the risk factor and the information value of the study area is obtained.

[0120] I 1 =0.26e 0.16I

[0121] η=αβ0.26e 0.16I

[0122] In the formula, α represents the degree of the node; β represents the type of the node; I represents the information value of the node; I 1 It represents the normalized value of the information value; η represents the risk coefficient of the node.

[0123] Using the electric vehicle regulation model, it is possible to calculate Figure 6 The electric vehicle regulation amount for each node is shown in Figure 1. This amount is determined based on the resource situation of the electric vehicle and the load demand of the power grid.

[0124] Furthermore, the electric vehicle regulation model can also be used to obtain the corresponding over-limit and overload risks of each node. This risk assessment is based on the power transmission capacity of the power system, the load of the power grid, and the regulation capacity and number of electric vehicles. Determining the regulation amount of electric vehicles helps us manage and control over-limit and overload risks, effectively adjust the configuration of power resources, and ensure the stable and safe operation of the power system. Figure 7 and Figure 8 As shown, after applying the technical solution of the present application, the line over-limit situation in the New England region has been significantly reduced, and the stability of the power system has been improved. Further, the following Table 4 shows a comparative analysis of line over-limit and overload in different scenarios in the New England region.

[0125] Table 4

[0126] Scenario Number of entries exceeding the limit Overload number Number of limit violations in the first 20 working conditions Number of heavy loads in the first 20 working conditions Before adjustment 22 63 6 20 2023 18 55 4 18 2026 12 43 3 16 2032 9 20 2 8

[0127] In summary, this technical solution is mainly to optimize the scheduling of electric vehicles according to the risks of the power system to solve the over-limit and overload phenomena in the power grid.

[0128] Among them, unlike the power grid flow regulation method for a single electric vehicle or a fixed area, this technical solution performs global optimization from a larger perspective. This technical solution evaluates each section and generates a risk factor. According to the risk of the grid node and the deployment of electric vehicles, an optimized electric vehicle regulation model is established to achieve the goal of balancing the grid load and reducing the overall operational risk. In addition, this technical solution aims to minimize the over-limit and overload phenomena of transmission lines by constructing a risk model, thereby improving the stability and safety of the grid. Therefore, electric vehicle resources can be better utilized to meet the challenges of increasingly complex and dynamic grids.

[0129] Among them, accurate risk assessment of power system nodes can be carried out. By constructing the distribution model and the hazard model of each node, a more accurate risk assessment of power system nodes can be carried out, which helps to understand the problems in the system and take preventive or response measures in advance.

[0130] At the same time, the load on the transmission line can be reduced. This technical solution introduces electric vehicle resources to specific nodes, changes the power flow distribution, reduces the over-limit and overload phenomena of the transmission line, and improves the operation safety and stability of the transmission line.

[0131] Furthermore, the optimization of electric vehicle distribution and dispatch is achieved. This technical solution uses the electric vehicle regulation model, combined with the risk model and optimization algorithm, to determine the optimal electric vehicle regulation amount, thereby achieving the optimized distribution and dispatch of electric vehicles and improving the stability and reliability of the entire power system.

[0132] In addition, it can also improve the overall risk management capabilities of the system and promote the integration of electric vehicles and power grids. This technical solution helps to improve the overall risk management capabilities of the system and reduce the grid operation risks caused by large-scale access of electric vehicles by studying the relationship between the distribution of electric vehicles and the risks of the power system. Furthermore, through this optimized scheduling strategy, the development of electric vehicles can be guided on the premise of ensuring the safety and stability of the power grid, and the deep integration of electric vehicles and the power system can be achieved, fully tapping the potential of electric vehicles and their role in the power system.

[0133] This technical solution can also construct an appropriate topological structure to match the actual study area, so as to more accurately analyze the location corresponding to each node and the subsequent allocation of electric vehicle resources. At the same time, a method is proposed to obtain the relationship between the risk coefficient and the amount of information of each node based on the information volume model of the study area, which provides a basis for studying the risk of each node. In addition, based on the electric vehicle distribution data of each region and the danger of each location, an electric vehicle regulation model is constructed. Therefore, the focus is on optimizing the distribution of electric vehicles and changing the power transmission line flow, thereby reducing the overall risk of the power system. Finally, the optimization algorithm is used to determine the optimal electric vehicle resource regulation amount, aiming to minimize the transmission line over-limit and overload phenomenon and improve the load condition of the transmission line.

[0134] The embodiment of the present application provides a new energy vehicle dispatching device, including:

[0135] A risk factor determination unit, for determining a risk factor of a transmission line node in a target geographical area based on an information value of the transmission line node;

[0136] A load regulation range determining unit, configured to determine a load regulation range of the transmission line node according to an initial load of the transmission line node and a load of new energy vehicles that can be introduced into the transmission line node;

[0137] A node total load determination unit, configured to determine the node total load having the lowest transmission line risk value within the load regulation range based on the risk factor of the transmission line node;

[0138] A new energy vehicle load determination unit, configured to determine a target new energy vehicle load corresponding to the transmission line node based on the initial load and the total load of the node with the lowest transmission line risk value;

[0139] The new energy vehicle quantity determination unit is used to determine the quantity of new energy vehicles introduced into the transmission line node based on the target new energy vehicle load.

[0140] In one embodiment of the present application, optionally, the risk factor determination unit is used to:

[0141] The information value of all transmission line nodes in the target geographical area is normalized; for each transmission line node, the risk factor of the transmission line node is determined based on the importance of the transmission line node among all nodes in the target geographical area, the node type and the normalized information value.

[0142] In one embodiment of the present application, optionally, the risk factor of the transmission line node is:

[0143]

[0144] Wherein, η represents the risk coefficient of the transmission line node, α represents the importance of the transmission line node among all nodes in the target geographical area, β represents the node type of the transmission line node, and when β=1, 2, 3, the transmission line node is a PQ node, a PV node, and a balance node, respectively. 1 Represents the normalized information value of the transmission line node.

[0145] In one embodiment of the present application, optionally, the load adjustment range determination unit is used to:

[0146] Obtain the number of new energy vehicles that can be introduced into the transmission line node; determine the load of the new energy vehicles that can be introduced based on the number of new energy vehicles that can be introduced; determine the initial load of the transmission line node as the lower limit of the load adjustment range of the transmission line node, and determine the union of the load of the new energy vehicles that can be introduced and the initial load as the upper limit of the load adjustment range.

[0147] In one embodiment of the present application, optionally, the node total load determination unit is used to:

[0148] The load regulation range is used as a particle optimization space, and the total node load with the lowest transmission line risk value is determined within the load regulation range based on the particle swarm algorithm, wherein the transmission line risk value is determined based on the danger coefficient of the transmission line node and the active power of the transmission line associated with the transmission line node, and is used to reflect the comprehensive risk of over-limit and overload of the transmission line associated with the transmission line node.

[0149] In one embodiment of the present application, optionally, the transmission line risk value is:

[0150]

[0151] Where F represents the risk value of the transmission line, P k represents the active power of the kth associated transmission line of the transmission line node, Pk,max represents the upper limit of the active power of the kth associated transmission line, and η represents the risk coefficient of the transmission line node.

[0152] In one embodiment of the present application, optionally, the new energy vehicle load determination unit is used to:

[0153] The difference between the total load of the node with the lowest transmission line risk value and the initial load is determined as the target new energy vehicle load corresponding to the transmission line node.

[0154] The new energy vehicle dispatching device uses any of the solutions described in the above embodiments, and therefore has all the above technical effects, which will not be repeated here.

[0155] In addition, in one embodiment, the present application provides a computer device, which may be a server, and its internal structure diagram may be as follows: Fig. 9 As shown. The computer device includes a processor, a memory, a network interface and a database connected via a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile and / or volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external client through a network connection. When the computer program is executed by the processor, the new energy vehicle scheduling method described in any of the above embodiments can be implemented.

[0156] In one embodiment, the present application further provides a computer device, which may be a client, and its internal structure diagram may be as follows: Fig.10 As shown. The computer device includes a processor, a memory, a network interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external server through a network connection. When the computer program is executed by the processor, the new energy vehicle scheduling method described in any of the above embodiments can be implemented.

[0157] Any of the above-mentioned computer devices in the embodiments of the present application may exist in various forms, including but not limited to:

[0158] (1) Mobile communication devices: These devices are characterized by their mobile communication functions and their main purpose is to provide voice and data communications. These terminals include: smart phones (such as iPhone), multimedia phones, functional phones, and low-end phones.

[0159] (2) Ultra-mobile personal computer devices: These devices fall into the category of personal computers, have computing and processing capabilities, and generally also have mobile Internet access features. These terminals include: PDA, MID and UMPC devices, such as iPad.

[0160] (3) Portable entertainment devices: These devices can display and play multimedia content. They include audio and video players (such as iPods), handheld game consoles, e-books, as well as smart toys, wearable devices, and portable car navigation devices.

[0161] (4) Server: A device that provides computing services. The server consists of a processor, hard disk, memory, system bus, etc. The server is similar to a general computer architecture, but because it needs to provide highly reliable services, it has higher requirements in terms of processing power, stability, reliability, security, scalability, and manageability.

[0162] (5) Other electronic devices with data interaction functions.

[0163] In addition, an embodiment of the present application provides a computer-readable storage medium storing computer-executable instructions, wherein the computer-executable instructions are used to perform the following steps:

[0164] For a power transmission line node in a target geographical area, determining a risk factor of the power transmission line node based on an information value of the power transmission line node;

[0165] Determining a load adjustment range of the transmission line node according to the initial load of the transmission line node and the load of new energy vehicles that can be introduced into the transmission line node;

[0166] Determining the total load of the node with the lowest transmission line risk value based on the risk factor of the transmission line node within the load regulation range;

[0167] Determining a target new energy vehicle load corresponding to the transmission line node based on the initial load and the total load of the node with the lowest transmission line risk value;

[0168] Based on the target new energy vehicle load, the number of new energy vehicles introduced into the transmission line node is determined.

[0169] It should be noted that the above functions or steps that can be implemented by the computer-readable storage medium or computer device can refer to the relevant description in the aforementioned method embodiment. In order to avoid repetition, they will not be described one by one here.

[0170] The above describes in detail the technical scheme of the present application in combination with the accompanying drawings. Through the technical scheme of the present application, by analyzing the risk values ​​of the transmission line nodes in the power system, an effective risk assessment of the transmission line nodes is achieved. Combined with variables in multiple dimensions such as the geographical location and environment of the nodes, the importance of the nodes in the power system, and the power supply conditions of the associated transmission lines, a reasonable number of new energy vehicles is allocated to the power system. While supplementing and extending the power generation capacity of the power system, the power system avoids dangerous situations such as over-limit and overloading due to an unreasonable number of new energy vehicles, thereby improving the rationality of the deployment of new energy vehicles in the power system, fully tapping the role of new energy vehicles in the power system, and thereby improving the stability and reliability of the entire power system.

[0171] The word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrases "if it is determined" or "if (stated condition or event) is detected" may be interpreted as "when it is determined" or "in response to determining" or "when detecting (stated condition or event)" or "in response to detecting (stated condition or event)", depending on the context.

[0172] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.

[0173] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0174] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of hardware plus software functional units.

[0175] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0176] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.

Claims

1. A new energy vehicle dispatching method, characterized in that: include: For a power transmission line node in a target geographical area, determining a risk factor of the power transmission line node based on an information value of the power transmission line node; Determining a load adjustment range of the transmission line node according to the initial load of the transmission line node and the load of new energy vehicles that can be introduced into the transmission line node; Determining the total load of the node with the lowest transmission line risk value based on the risk factor of the transmission line node within the load regulation range; Determining a target new energy vehicle load corresponding to the transmission line node based on the initial load and the total load of the node with the lowest transmission line risk value; Based on the target new energy vehicle load, determining the number of new energy vehicles introduced into the transmission line node; The step of determining the risk factor of the transmission line node based on the information value of the transmission line node comprises: Normalizing the information value of all power transmission line nodes in the target geographical area; For each of the transmission line nodes, determining a risk factor of the transmission line node based on the importance of the transmission line node among all nodes in the target geographical area, the node type and the normalized information value; The step of determining the total load of a node having a lowest transmission line risk value within the load regulation range based on the risk factor of the transmission line node comprises: Taking the load regulation range as the particle optimization space, determining the total load of the node with the lowest transmission line risk value within the load regulation range based on the particle swarm algorithm, wherein the transmission line risk value is determined based on the risk factor of the transmission line node and the active power of the transmission line associated with the transmission line node, and is used to reflect the comprehensive risk of over-limit and overload of the transmission line associated with the transmission line node; The transmission line risk value is: Where F represents the risk value of the transmission line, P k represents the active power of the kth associated transmission line of the transmission line node, P k,max represents the upper limit of the active power of the kth associated transmission line, and η represents the risk coefficient of the transmission line node.

2. The new energy vehicle dispatching method according to claim 1, characterized in that: The risk factor of the transmission line node is: Among them, η represents the danger coefficient of the transmission line node, α represents the importance of the transmission line node among all the nodes in the target geographical area, β represents the node type of the transmission line node, when β=1, 2, 3, the transmission line node is a PQ node, a PV node and a balance node respectively, and I1 represents the normalized information value of the transmission line node.

3. The new energy vehicle dispatching method according to claim 1 or 2, characterized in that: The step of determining the load adjustment range of the transmission line node according to the initial load of the transmission line node and the load of new energy vehicles that can be introduced into the transmission line node comprises: Obtaining the number of new energy vehicles that can be introduced into the transmission line node; Determining the load of the new energy vehicles that can be introduced based on the number of new energy vehicles that can be introduced; The initial load of the transmission line node is determined as the lower limit of the load regulation range of the transmission line node, and the union of the introducible new energy vehicle load and the initial load is determined as the upper limit of the load regulation range.

4. The new energy vehicle dispatching method according to claim 1, characterized in that: The determining, based on the initial load and the total load of the node with the lowest transmission line risk value, a target new energy vehicle load corresponding to the transmission line node comprises: The difference between the total load of the node with the lowest transmission line risk value and the initial load is determined as the target new energy vehicle load corresponding to the transmission line node.

5. A new energy vehicle dispatching device, characterized in that: include: A risk factor determination unit, for determining a risk factor of a transmission line node in a target geographical area based on an information value of the transmission line node; A load regulation range determining unit, configured to determine a load regulation range of the transmission line node according to an initial load of the transmission line node and a load of new energy vehicles that can be introduced into the transmission line node; A node total load determination unit, configured to determine the node total load having the lowest transmission line risk value within the load regulation range based on the risk factor of the transmission line node; A new energy vehicle load determination unit, configured to determine a target new energy vehicle load corresponding to the transmission line node based on the initial load and the total load of the node with the lowest transmission line risk value; A new energy vehicle quantity determination unit, configured to determine the quantity of new energy vehicles introduced into the transmission line node based on the target new energy vehicle load; The risk factor determination unit is used for: Normalizing the information value of all power transmission line nodes in the target geographical area; For each of the transmission line nodes, determining a risk factor of the transmission line node based on the importance of the transmission line node among all nodes in the target geographical area, the node type and the normalized information value; The node total load determination unit is used for: Taking the load regulation range as the particle optimization space, determining the total load of the node with the lowest transmission line risk value within the load regulation range based on the particle swarm algorithm, wherein the transmission line risk value is determined based on the risk factor of the transmission line node and the active power of the transmission line associated with the transmission line node, and is used to reflect the comprehensive risk of over-limit and overload of the transmission line associated with the transmission line node; The transmission line risk value is: Where F represents the risk value of the transmission line, P k represents the active power of the kth associated transmission line of the transmission line node, P k,max represents the upper limit of the active power of the kth associated transmission line, and η represents the risk coefficient of the transmission line node.

6. A computer device, characterized in that: include: at least one processor; and, a memory communicatively coupled to the at least one processor; The memory stores instructions executable by the at least one processor, wherein the instructions are configured to execute the method according to any one of claims 1 to 4.

7. A computer-readable storage medium, characterized in that: Computer executable instructions are stored, and the computer executable instructions are used to execute the method according to any one of claims 1 to 4.

Citation Information

Patent Citations

  • Electric vehicle demand response potential assessment method and system and computer equipment

    CN109034878A

  • Multivariate complex urban power grid urban power grid multi-source data driven fault prediction method and system

    CN112149877A

  • Power grid risk assessment and advanced scheduling method and system considering electric vehicle access

    CN116029468A