Refrigeration system and control method for automatically adjusting the amount of refrigerant

By setting up sensors and electronic expansion valves in the compressor and condenser units, the refrigerant amount is dynamically adjusted, which solves the problem of refrigerant demand for different types of power batteries, realizes automatic recovery and replenishment of refrigerant, and ensures refrigeration performance and thermal management detection. accuracy.

CN117968284BActive Publication Date: 2024-10-11DONGGUAN SIXIANG CONVERGENCE TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410066034.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-17
Publication Date
2024-10-11
Estimated Expiration
2044-01-17

AI Technical Summary

Technical Problem

The existing automatic refrigerant replenishing system cannot adapt to the refrigerant volume requirements of different types of power batteries, resulting in refrigerant leakage, accumulation and reduction when replacing power batteries, affecting the accuracy of refrigeration performance and thermal management detection.

Method used

A refrigeration system that automatically adjusts the refrigerant amount is designed. By setting temperature and pressure sensors in the compressor and condenser units, combined with electronic expansion valves and valve control, the refrigerant amount is dynamically adjusted to realize refrigerant recovery and replenishment, ensuring that the system operates at different times. Provide the required amount of refrigerant under the conditions.

Benefits of technology

It effectively solves the problem of unstable refrigerant amount, ensures the stability of refrigeration performance and the accuracy of thermal management detection. It is suitable for different types of power batteries, avoids leakage and accumulation of refrigerant, and improves the operational reliability of the detection platform.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117968284B_ABST
    Figure CN117968284B_ABST
Patent Text Reader

Abstract

The present invention discloses a refrigeration system and control method for automatically adjusting the amount of refrigerant, the system comprises a refrigeration branch and a heating branch coupled with a compressor as a common driving source, the input end of the refrigerant regulating branch is connected to the output end of the compressor, the output end of the refrigerant regulating branch is connected to the coupling part of the refrigeration branch and the heating branch, the input end of the compressor is provided with a first temperature sensor and a first pressure sensor, the output end of the compressor is provided with a second temperature sensor and a second pressure sensor, the refrigeration branch at least comprises a condenser unit, the output end of the condenser unit is provided with a third temperature sensor and a third pressure sensor, and the refrigeration branch at least comprises a first electronic expansion valve installed on its own circulation trunk and including an opening detection function. The beneficial effect of the present invention is: according to a plurality of temperature values ​​and pressure values, the refrigerant regulating branch is jointly controlled to dynamically adjust the amount of refrigerant in the refrigeration branch, so as to provide the required amount of refrigerant for system testing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of air conditioners, and in particular to a refrigeration system and a control method for automatically adjusting the amount of refrigerant. Background Art

[0002] After adopting a new cooling system, automotive power batteries need to be verified through experiments. According to regulations, this verification task requires the use of power battery thermal management testing equipment to simulate the vehicle structure design, and to perform preliminary debugging and pre-installation safety assessment for the vehicle thermal management control matching. In order to simulate the accuracy of the vehicle thermal management, some parameters of the refrigeration system need to be precisely controlled. As a power battery thermal management testing equipment, the direct cooling and direct heating test bench needs to meet the thermal management tests of power batteries of different models. When replacing the power battery, the rubber connecting hose connecting the direct cooling and direct heating test bench to the power battery needs to be disassembled and installed. This inevitably causes the refrigerant in the direct cooling and direct heating test bench system to leak, resulting in errors in the refrigeration performance and test results. In addition, when replacing different power batteries, the sizes of direct cooling plates corresponding to different power batteries may be different, which will lead to different optimal refrigerant amounts for different power batteries. When replacing power batteries, since the refrigerant and lubricating oil are miscible, a small amount of lubricating oil will accumulate in the battery cold plate during operation. Therefore, the refrigeration system will inevitably have the problem of gradual reduction of refrigerant, resulting in the system refrigerant amount being within an unreasonable range, which will lead to unstable parameters of the test platform during operation, reduced refrigeration performance or protection alarms, causing large fluctuations in the parameter data required for the test, exceeding the test requirement range, and thus making it impossible to simulate the same state as different automotive thermal management systems.

[0003] CN116449206A discloses a battery testing system for automatically replenishing refrigerant and a method for automatically replenishing refrigerant. When the refrigerant needs to be recovered to the refrigerant weighing unit, the first switch is closed, that is, the compressor and the condenser are disconnected. At the same time, the second switch is turned on and the third switch is closed, that is, the refrigerant in the refrigerant storage tank is prevented from flowing out. In this way, the compressor can only transport the refrigerant in the system to the refrigerant storage tank. When the refrigerant needs to be replenished, the third switch is turned on and the second switch is closed. At this time, the pressure in the refrigerant storage tank is higher than the pressure of the refrigeration unit, and the refrigerant in the refrigerant storage tank is sucked into the refrigeration unit to realize automatic replenishment of the refrigerant.

[0004] Although the above system can realize automatic recharge / recycling of refrigerant, this solution is only applicable to a single power battery test and does not take into account that different power batteries require different amounts of refrigerant. Therefore, it is not suitable for simulating the test state of a specified system under different conditions. Summary of the invention

[0005] In view of the above problems, the present invention proposes a refrigeration system and a control method for automatically adjusting the amount of refrigerant, which mainly solve the problems of the background technology.

[0006] To solve the above technical problems, the first aspect of the present invention proposes a refrigeration system for automatically adjusting the amount of refrigerant, comprising a refrigeration branch and a heating branch coupled with a compressor as a common driving source, and the input end of the refrigerant regulating branch is connected to the output end of the compressor, and the output end of the refrigerant regulating branch is connected to the coupling part of the refrigeration branch and the heating branch, the input end of the compressor is provided with a first temperature sensor and a first pressure sensor, the output end of the compressor is provided with a second temperature sensor and a second pressure sensor, the refrigeration branch at least includes a condenser unit, the output end of the condenser unit is provided with a third temperature sensor and a third pressure sensor, and the refrigeration branch includes at least one first electronic expansion valve installed on its own circulation main line and including an opening detection function.

[0007] In some embodiments, the refrigeration branch includes the compressor, the first one-way valve, the first solenoid valve, the condenser unit, the high-pressure liquid storage tank, the sight glass, the first electronic expansion valve, the second solenoid valve, the first manual valve, the cold plate of the battery to be tested, the second manual valve, the third solenoid valve, the second electronic expansion valve and the gas-liquid separator that are cyclically connected.

[0008] In some embodiments, the condenser unit includes at least two parallel cooling branches, one of which includes a first condenser and a second one-way valve, and the other cooling branch includes a fourth solenoid valve, a second condenser and a third one-way valve, and the first condenser and the second condenser share a fan.

[0009] In some embodiments, the heating branch includes the compressor, the fifth solenoid valve, the second manual valve, the cold plate of the battery to be tested, the first manual valve, the sixth solenoid valve, the high-pressure liquid storage tank, the sight glass, the first electronic expansion valve, the seventh solenoid valve, the heat exchanger, the second electronic expansion valve, and the gas-liquid separator, wherein another heat exchange channel of the heat exchanger is coupled to the water cooling unit.

[0010] In some embodiments, the water cooling unit includes a water tank, a water pump, a heater, and a fourth temperature sensor that are cyclically connected.

[0011] In some embodiments, the refrigerant regulating branch includes an eighth solenoid valve, a third electronic expansion valve, a high-pressure connecting hose, a refrigerant storage tank, a fourth electronic expansion valve and a ninth solenoid valve connected in sequence, wherein a weighing assembly is installed at the bottom of the refrigerant storage tank.

[0012] The first aspect of the present invention provides a control method for the above-mentioned refrigeration system which automatically adjusts the amount of refrigerant. During the operation of the refrigeration branch, the control method includes an operation parameter acquisition procedure, a refrigerant recovery detection procedure and a refrigerant supplement detection procedure.

[0013] The operating parameter acquisition procedure includes: obtaining the real-time speed R of the compressor Y , obtain the real-time speed R of the fan in the condenser unit F , obtain the opening degree B of the first electronic expansion valve 12 The first temperature sensor obtains the real-time intake air temperature T 吸 The first pressure sensor obtains the real-time inspiratory pressure P 吸 , according to the suction pressure P 吸 The corresponding saturated suction temperature is queried to obtain the real-time suction superheat ΔT 吸 =T 吸 -T E吸 The second temperature sensor obtains the saturated exhaust temperature T E排 The second pressure sensor obtains the real-time exhaust pressure P 排 , according to the exhaust pressure P 排 The corresponding saturated exhaust temperature query obtains the real-time exhaust temperature T 排 , calculate the real-time exhaust superheat ΔT 排 =T 排 -T E排 The third temperature sensor obtains the real-time condensation temperature value T 凝 The third pressure sensor obtains the real-time condensation pressure P 凝 , according to the condensation pressure P 凝 The corresponding saturated condensing temperature is queried to obtain the real-time subcooling ΔT 凝 =T E凝 -T 凝 ;

[0014] The refrigerant recovery detection procedure includes: setting judgment conditions ① real-time suction superheat ΔT 吸 ≤Preset value ΔT 吸1 , and the opening degree of the first electronic expansion valve is B 12 <200P,②Real-time exhaust superheat ΔT 排 ≤Preset value ΔT 排1 , and the real-time speed of the compressor R Y <Default value R Y1 , ③ Real-time supercooling ΔT 凝 >Preset value ΔT 凝1 , when any two determination conditions are met, it is determined that there is too much refrigerant in the system, and the refrigerant regulating branch performs a refrigerant recovery operation;

[0015] The refrigerant supplement detection procedure includes: setting judgment conditions ① real-time suction superheat ΔT 吸 >Preset value ΔT 吸1 The opening degree of the first electronic expansion valve is B 12 >400P,②Real-time exhaust superheat ΔT 排 >Preset value ΔT 排1 And the real-time speed of the compressor R Y <Default value R Y2 , ③The real-time speed of the fan R F <Default value R F1 , and the real-time condensation pressure P 凝 <Set value P 凝设 When any two of the determination conditions are met, it is determined that the system is short of refrigerant, and the refrigerant regulating branch performs a refrigerant replenishment operation.

[0016] During the refrigerant replenishment or recycle operation, if the compressor receives a shutdown command, the refrigerant adjustment branch enters a refrigerant calibration mode, which includes:

[0017] In some embodiments, all the refrigerant contained in the refrigeration branch is first recovered into the refrigerant storage tank, all the valves in the refrigeration branch are opened, the compressor is turned on, and the input end of the refrigerant regulating branch is turned on. The first pressure sensor obtains the real-time suction pressure P 吸 The pressure P corresponding to the completion of recovery 回 , calculate the real-time suction pressure P 吸 With the pressure P 回 The openings of all valves in the refrigerant regulating branch are feedback-regulated according to the difference ΔP.

[0018] In some embodiments, a valve opening comparison table is further included, in which the valve opening comparison table pre-stores the corresponding adjusted openings of all valves in the refrigerant regulating branch under the difference ΔP.

[0019] The beneficial effects of the present invention are as follows: by respectively arranging temperature and pressure sensors at the input and output ends of the compressor, and arranging temperature and pressure sensors at the output end of the condenser unit, the refrigerant regulating branch is jointly controlled according to multiple temperature values ​​and pressure values ​​to dynamically adjust the refrigerant amount of the refrigeration branch, thereby providing the required refrigerant amount for system testing. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the structure of a refrigeration system for automatically adjusting the amount of refrigerant disclosed in Embodiment 1 of the present invention. DETAILED DESCRIPTION

[0021] In order to make the purpose, technical solution and advantages of the present invention clearer and more specific, the content of the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. It is understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for the convenience of description, only the parts related to the present invention are shown in the accompanying drawings, rather than all the contents.

[0022] Embodiment 1

[0023] This embodiment proposes a refrigeration system that automatically adjusts the amount of refrigerant. Figure 1 As shown, it includes a refrigeration branch and a heating branch coupled with the compressor 1 as a common driving source, and the input end of the refrigerant regulating branch is connected to the output end of the compressor 1, and the output end of the refrigerant regulating branch is connected to the coupling part of the refrigeration branch and the heating branch. The input end of the compressor 1 is provided with a first temperature sensor 27-1 and a first pressure sensor 28-1, and the output end of the compressor 1 is provided with a second temperature sensor 27-2 and a second pressure sensor 28-2. The refrigeration branch includes at least a condenser unit, and the output end of the condenser unit is provided with a third temperature sensor 27-3 and a third pressure sensor 28-3. The refrigeration branch includes at least one first electronic expansion valve 12 installed on its own circulation trunk and including an opening detection function.

[0024] In this embodiment, by respectively setting temperature and pressure sensors at the input and output ends of the compressor 1, and setting a temperature and pressure sensor at the output end of the condenser unit, the refrigerant regulation branch is jointly controlled according to multiple temperature values ​​and pressure values ​​to dynamically adjust the refrigerant in the refrigeration branch, thereby providing a hardware foundation for the control method disclosed in Example 2 and being able to provide the required amount of refrigerant for system testing.

[0025] by Figure 1 Taking the structure shown as an example, the refrigeration branch includes a cyclically connected compressor 1, a first one-way valve 2, a first solenoid valve 3, a condenser unit, a high-pressure liquid storage tank 10, a sight glass 11, a first electronic expansion valve 12, a second solenoid valve 20, a first manual valve 21, a cold plate 22 of the battery to be tested, a second manual valve 23, a third solenoid valve 24, a second electronic expansion valve 25 and a gas-liquid separator 26. In this example, the coupling sequence of the components in the refrigeration branch is the flow direction of the refrigerant in the refrigeration mode. It should be noted that in this embodiment, all the one-way valves are arranged in the order of the text description, such as the first one-way valve 2, which only allows the refrigerant to flow from the compressor 1 to the first solenoid valve 3. The arrangement of the remaining one-way valves is similar and will not be repeated here. In addition, all the solenoid valves in this embodiment are of the normally closed type, which will not be repeated later.

[0026] Optionally, the condenser unit includes at least two parallel cooling branches, one of which includes a first condenser 5 and a second one-way valve 9, and the other cooling branch includes a fourth solenoid valve 4, a second condenser 7 and a third one-way valve 8. The first condenser 5 and the second condenser 7 share a fan 6. The third one-way valve 8 and the second one-way valve 9 are provided to prevent the refrigerant from entering the condenser unit from the high-pressure liquid storage tank 10 in the heating mode, causing the retention of the refrigerant.

[0027] The heating branch includes a circularly connected compressor 1, a fifth solenoid valve 29, a second manual valve 23, a battery cold plate 22 to be tested, a first manual valve 21, a sixth solenoid valve 19, a high-pressure liquid storage tank 10, a sight glass 11, a first electronic expansion valve 12, a seventh solenoid valve 35, a heat exchanger 30, a second electronic expansion valve 25, and a gas-liquid separator 26, wherein another heat exchange channel of the heat exchanger 30 is coupled to the water cooling unit. In this example, the coupling sequence of the components in the heating branch is the refrigerant flow direction in the heating mode. This embodiment utilizes the heat exchanger 30 in the heating mode to ensure that the system quickly fills the refrigerant when calibrating the refrigerant, so that the suction superheat is within a reasonable range and the compressor 1 is prevented from sucking liquid. At the same time, after the power battery thermal management test is stopped, the refrigerant does not need to pass through the battery cold plate 22 to be tested during the refrigerant calibration to complete the refrigerant filling, so as to avoid affecting the test.

[0028] Obviously, in the above example, the cooling branch and the heating branch are partially coupled, and some components are reused in cooling and heating modes, so that when the system is in heating mode, the refrigerant outflow path from the condenser is the same as that in cooling mode (i.e., high-pressure liquid storage tank 10-sight glass 11-first electronic expansion valve 12-evaporator, the evaporator depends on the specific working conditions. In cooling mode, the first condenser 5 and / or the second condenser 7 act as condensers, and in heating mode, the heat exchanger 30 acts as an evaporator).

[0029] In the above scheme, the heat exchanger 30 is used for heat exchange between the refrigeration branch and the water flow path, and acts as an evaporator in the heating mode and the calibration refrigerant mode. Specifically, the water cooling unit includes a circularly connected water tank 31, a water pump 32, a heater 33 and a fourth temperature sensor 34.

[0030] The refrigerant regulating branch includes an eighth solenoid valve 13, a third electronic expansion valve 14, a high-pressure connecting hose 15, a refrigerant storage tank 16, a fourth electronic expansion valve 17 and a ninth solenoid valve 18 which are connected in sequence, wherein a weighing assembly 36 is installed at the bottom of the refrigerant storage tank 16.

[0031] The components not described in detail in this embodiment are considered to be easily understood by those skilled in the art. Figure 1 The structure shown derives its specific function.

[0032] Embodiment 2

[0033] This embodiment proposes a control method for the refrigeration system for automatically adjusting the amount of refrigerant as described in the first embodiment. During the operation of the refrigeration branch, the control method includes an operation parameter acquisition procedure, a refrigerant recovery detection procedure, and a refrigerant supplement detection procedure.

[0034] The operating parameter acquisition procedure includes: obtaining the real-time speed R of the compressor 1 Y , obtain the real-time speed R of fan 6 in the condenser unit F , obtain the opening degree B of the first electronic expansion valve 12 12 The first temperature sensor 27-1 obtains the real-time intake air temperature T 吸 The first pressure sensor 28-1 obtains the real-time suction pressure P 吸 , according to the suction pressure P 吸 The corresponding saturated suction temperature is queried to obtain the real-time suction superheat ΔT 吸 =T 吸 -T E吸 The second temperature sensor 27-2 obtains the saturated exhaust temperature T E排 The second pressure sensor 28-2 obtains the real-time exhaust pressure P 排 , according to the exhaust pressure P 排 The corresponding saturated exhaust temperature query obtains the real-time exhaust temperature T 排 , calculate the real-time exhaust superheat ΔT 排 =T 排 -T E排 The third temperature sensor 27-3 obtains the real-time condensation temperature value T 凝 The third pressure sensor 28-3 obtains the real-time condensing pressure P 凝 , according to the condensation pressure P 凝 The corresponding saturated condensing temperature is queried to obtain the real-time subcooling ΔT 凝 =T E凝 -T 凝 ;

[0035] When the direct cooling and direct heating test bench is running, each electrical device operates according to the corresponding control logic, and when the opening time meets Xmin, a judgment is made. The refrigerant recovery detection program includes: Setting judgment conditions ① Real-time suction superheat ΔT 吸 ≤Preset value ΔT 吸1 , and the opening degree B of the first electronic expansion valve 12 12 <200P,②Real-time exhaust superheat ΔT 排 ≤Preset value ΔT 排1 , and the real-time speed of compressor 1 is R Y <Default value R Y1 , ③ Real-time supercooling ΔT 凝 >Preset value ΔT 凝1, when any two judgment conditions are met, it is determined that there is too much refrigerant in the system, and the refrigerant adjustment branch performs the refrigerant recovery operation;

[0036] When the rack receives an instruction to recover part of the refrigerant in the refrigeration mode, the eighth solenoid valve 13 opens, and the third electronic expansion valve 14 opens to B14=75 steps. When the value of the weighing component increases by ΔG1, the eighth solenoid valve 13 closes, and the third electronic expansion valve 14 opens to B14=0 steps. After the rack runs for X1min, the system refrigerant excess judgment is executed again.

[0037] When the direct cooling and direct heating test bench is running, each electrical device operates according to the corresponding control logic, and when the opening time meets Xmin, a judgment is made. The refrigerant supplement detection procedure includes: Setting judgment conditions ① Real-time suction superheat ΔT 吸 >Preset value ΔT 吸1 The opening degree B of the first electronic expansion valve 12 is 12 >400P,②Real-time exhaust superheat ΔT 排 >Preset value ΔT 排1 And the real-time speed R of compressor 1 Y <Default value R Y2 , ③ The real-time speed of fan 6 R F <Default value R F1 , and the real-time condensation pressure P 凝 <Set value P 凝设 When any two judgment conditions are met, the system is judged to be insufficient in refrigerant, and the refrigerant regulating branch performs the refrigerant replenishment operation.

[0038] When the rack receives an instruction to replenish some refrigerant during refrigeration operation, the ninth solenoid valve 18 opens, and the fourth electronic expansion valve 17 opens to B17=75 steps. When the value of the weighing component decreases by ΔG1, the ninth solenoid valve 18 closes, and the fourth electronic expansion valve 17 opens to B17=0 steps. After the rack runs for X1min, the system refrigerant shortage judgment is executed again.

[0039] According to the above test data, the corresponding refrigerant amount of the refrigeration system is automatically calibrated to meet the testing requirements of different power batteries, ensuring that the test bench is closer to the power battery thermal management system, while solving the problem of insufficient refrigerant caused by leakage of refrigerant in the refrigeration system due to disassembly and assembly operations.

[0040] During the refrigerant replenishment or recycle operation, if compressor 1 receives a shutdown command, the refrigerant calibration mode is entered. The refrigerant calibration mode includes:

[0041] First, all the refrigerant contained in the refrigeration branch is recovered into the refrigerant storage tank 16, all valves in the refrigeration branch are opened, the compressor 1 is turned on, and the input end of the refrigerant regulating branch is turned on. The first pressure sensor obtains the real-time suction pressure P吸 The pressure P corresponding to the completion of recovery 回 , calculate the real-time suction pressure P 吸 With pressure P 回 The opening of all valves in the refrigerant regulating branch is adjusted according to the difference ΔP. It should be noted that the pressure P in this embodiment is 回 It is the preset pressure when the refrigerant recovery is completed, which can be understood as a fixed absolute pressure of 1 bar.

[0042] by Figure 1 As an example, the system shown in FIG. 1 is used, the first manual valve 21 and the second manual valve 23 are in a fully open state, the compressor 1, the eighth solenoid valve 13, the second solenoid valve 20 and the third solenoid valve 24 are opened, and the opening degree of the third electronic expansion valve 14 and the second electronic expansion valve 25 is determined according to the actual suction pressure P1 and the pressure P1 corresponding to the completion of the recovery. 回 The valve opening comparison table (see Table 1) stores the corresponding adjustment openings of all valves in the refrigerant regulation branch under the difference ΔP of bar, and the judgment is executed once every set time interval.

[0043] Table 1 Valve opening comparison table

[0044]

[0045] When ΔP≤0bar, the refrigerant in the refrigeration system is recovered into the refrigerant storage tank 16. At this time, the compressor 1, the eighth solenoid valve 13, the second solenoid valve 20, and the third solenoid valve 24 are all closed, and the opening of the third electronic expansion valve 14 and the second electronic expansion valve 25 are closed to 0 steps.

[0046] Exhaust part: After the compressor 1 starts running, the refrigerant is compressed and transported to the refrigerant storage tank 16 for storage and weighing. Suction end: At this time, all pipe sections or components in the refrigeration system that can store refrigerant are connected to the suction pipe. Due to the pressure difference, the refrigerant in the system is sucked into the compressor 1 and compressed and discharged.

[0047] Refrigerant is added to the refrigeration system. The weight of the refrigerant storage tank 16 is recorded, the first solenoid valve 3, the fourth solenoid valve 4, the ninth solenoid valve 18, and the seventh solenoid valve 35 are opened, and the fourth electronic expansion valve 17 and the second electronic expansion valve 25 are opened to the maximum. At this time, the refrigerant in the refrigerant storage tank begins to be added.

[0048] The amount of refrigerant added is X1 g (this value is based on the initial recorded weight of the refrigerant storage tank minus the real-time weight of the refrigerant storage tank), the rated refrigerant amount of the equipment is Y g, and the opening degree of the fourth electronic expansion valve 17 is β.

[0049] When the amount of refrigerant X1 / Y≥0.5, the opening degree β of the fourth electronic expansion valve 17 is β=(Y-X1) / Y*P最大 +P 最小 Regulation. 最大 is the maximum opening of the electronic expansion valve, P 最小 It is the minimum flow opening of the electronic expansion valve.

[0050] When the amount of refrigerant X1 / Y≥0.5 and the refrigerant filling rate≤3g / s, the fan 6 starts and runs at the set speed, the opening of the first electronic expansion valve 12 is opened to B12=300 steps, the water pump 32 is turned on, and the heater 33 adjusts the water temperature according to the suction superheat (when the suction superheat ΔT 吸 ≥ the set target range, the heater 33 is turned off; when the suction superheat ΔT 吸 (When the target interval is set, the heater 33 is turned on). 10 seconds after the fan 6 is started, the compressor 1 starts to run at the set speed.

[0051] When the amount of refrigerant added is X1 / Y≥1, the automatic refrigerant replenishment is completed. At this time, the compressor 1 stops running, the opening β of the fourth electronic expansion valve 17 is closed to 0 steps, the ninth solenoid valve 18, the heater 33, and the water pump 32 are turned off, and the fan 6 and the remaining solenoid valves are turned off after 15 seconds, and the opening of the first electronic expansion valve 12 and the second electronic expansion valve 25 is closed to 0 steps, completing the refrigerant calibration.

[0052] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable ordinary technicians in the field to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the protection scope of the present invention. Any equivalent changes or modifications made based on the essence of the content of the present invention should be included in the protection scope of the present invention.

Claims

1. A refrigeration system that automatically adjusts the amount of refrigerant. It is characterized in that It includes a refrigeration branch and a heating branch coupled with a compressor as a common driving source, and the input end of the refrigerant regulating branch is connected to the output end of the compressor, and the output end of the refrigerant regulating branch is connected to the coupling part of the refrigeration branch and the heating branch. The input end of the compressor is provided with a first temperature sensor and a first pressure sensor, and the output end of the compressor is provided with a second temperature sensor and a second pressure sensor. The refrigeration branch at least includes a condenser unit, and the output end of the condenser unit is provided with a third temperature sensor and a third pressure sensor. The refrigeration branch at least includes a first electronic expansion valve installed on its own circulation trunk and including an opening detection function; The refrigeration branch includes the compressor, the first one-way valve, the first solenoid valve, the condenser unit, the high-pressure liquid storage tank, the sight glass, the first electronic expansion valve, the second solenoid valve, the first manual valve, the cold plate of the battery to be tested, the second manual valve, the third solenoid valve, the second electronic expansion valve and the gas-liquid separator which are cyclically connected; The heating branch includes the compressor, the fifth solenoid valve, the second manual valve, the cold plate of the battery to be tested, the first manual valve, the sixth solenoid valve, the high-pressure liquid storage tank, the sight glass, the first electronic expansion valve, the seventh solenoid valve, the heat exchanger, the second electronic expansion valve, and the gas-liquid separator, wherein another heat exchange channel of the heat exchanger is coupled to the water cooling unit; The refrigerant regulating branch includes an eighth solenoid valve, a third electronic expansion valve, a high-pressure connecting hose, a refrigerant storage tank, a fourth electronic expansion valve and a ninth solenoid valve which are connected in sequence, wherein a weighing assembly is installed at the bottom of the refrigerant storage tank.

2. The refrigeration system for automatically adjusting the amount of refrigerant according to claim 1, It is characterized in that The condenser unit includes at least two parallel cooling branches, one of which includes a first condenser and a second one-way valve, and the other cooling branch includes a fourth solenoid valve, a second condenser and a third one-way valve, and the first condenser and the second condenser share a fan.

3. The refrigeration system for automatically adjusting the amount of refrigerant according to claim 1, It is characterized in that The water cooling unit includes a water tank, a water pump, a heater and a fourth temperature sensor which are cyclically connected.

4. A control method for a refrigeration system for automatically adjusting the amount of refrigerant according to any one of claims 1 to 3, It is characterized in that During the operation of the refrigeration branch, the following procedures are included: an operation parameter acquisition procedure, a refrigerant recovery detection procedure, and a refrigerant supplement detection procedure. The operating parameter acquisition procedure includes: obtaining the real-time speed R of the compressor Y , obtain the real-time speed R of the fan in the condenser unit F , obtain the opening degree B of the first electronic expansion valve 12 The first temperature sensor obtains the real-time intake air temperature T 吸 The first pressure sensor obtains the real-time inspiratory pressure P 吸 , according to the suction pressure P 吸 The corresponding saturated suction temperature is queried to obtain the real-time suction superheat ΔT 吸 =T 吸 -T E吸 The second temperature sensor obtains the saturated exhaust temperature T E排 The second pressure sensor obtains the real-time exhaust pressure P 排 , according to the exhaust pressure P 排 The corresponding saturated exhaust temperature query obtains the real-time exhaust temperature T 排 , calculate the real-time exhaust superheat ΔT 排 =T 排 -T E排 The third temperature sensor obtains the real-time condensation temperature value T 凝 The third pressure sensor obtains the real-time condensation pressure P 凝 , according to the condensation pressure P 凝 The corresponding saturated condensing temperature is queried to obtain the real-time subcooling ΔT 凝 =T E凝 -T 凝 ; The refrigerant recovery detection procedure includes: setting judgment conditions ① real-time suction superheat ΔT 吸 ≤ preset value ΔT 吸1 , and the opening degree of the first electronic expansion valve is B 12 <200P,②Real-time exhaust superheat ΔT 排 ≤ preset value ΔT 排1 , and the real-time speed of the compressor R Y <Default value R Y1 , ③ Real-time supercooling ΔT 凝 >Preset value ΔT 凝1 When any two of the judgment conditions are met, it is determined that there is too much refrigerant in the system, and the refrigerant regulating branch performs a refrigerant recovery operation; when the rack receives an instruction to recover part of the refrigerant in the refrigeration mode, the eighth solenoid valve is opened, and the opening of the third electronic expansion valve is opened to B14 = 75 steps. When the value of the weighing component increases by ΔG 1 When the eighth solenoid valve is closed, the third electronic expansion valve is opened to step B14 = 0, and the bench runs X 1 min later, the system refrigerant excess determination is executed again; The refrigerant supplement detection procedure includes: setting judgment conditions ① real-time suction superheat ΔT 吸 >Preset value ΔT 吸1 The opening degree of the first electronic expansion valve is B 12 >400P,②Real-time exhaust superheat ΔT 排 >Preset value ΔT 排1 And the real-time speed of the compressor R Y <Default value R Y2 , ③The real-time speed of the fan R F <Default value R F1 , and the real-time condensation pressure P 凝 <Set value P 凝设 When any two of the judgment conditions are met, it is determined that the system refrigerant is insufficient, and the refrigerant regulation branch performs the refrigerant replenishment operation; when the rack receives an instruction to replenish part of the refrigerant during refrigeration operation, the ninth solenoid valve is opened, and the fourth electronic expansion valve is opened to B17 = 75 steps. When the weighing component value decreases by ΔG 1 When the ninth solenoid valve is closed, the fourth electronic expansion valve is opened to B17 = 0, and the bench runs X 1 min later, the system refrigerant shortage judgment is executed again.

5. The control method according to claim 4, It is characterized in that During the refrigerant replenishment or recycle operation, if the compressor receives a shutdown command, the refrigerant adjustment branch enters a refrigerant calibration mode, which includes: First, all the refrigerant contained in the refrigeration branch is recovered into the refrigerant storage tank, all valves in the refrigeration branch are opened, the compressor is turned on, and the input end of the refrigerant regulating branch is opened, and the first pressure sensor is used to obtain the real-time suction pressure P 吸 The pressure P corresponding to the completion of recovery 回 , calculate the real-time suction pressure P 吸 With the pressure P 回 The openings of all valves in the refrigerant regulating branch are feedback-regulated according to the difference ΔP.

6. The control method according to claim 5, It is characterized in that It also includes a valve opening comparison table, in which the corresponding adjustment openings of all valves in the refrigerant regulating branch under the difference ΔP are pre-stored.