An arch-mounted crane device for installing on the bridge deck of an arch bridge

By designing an arch-mounted crane device for the arch bridge deck, and utilizing a traveling locking mechanism and clamping system, the main beam structure can be stably moved axially on the arch. This solves the problem of the significant impact of track laying on the chord tube in existing technologies, and improves the operability and safety of construction.

CN118183482BActive Publication Date: 2026-11-10GUANGXI ROAD & BRIDGE ENG GRP CO LTD +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410542300.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2026-11-10
Estimated Expiration
2044-04-30

AI Technical Summary

Technical Problem

Existing arch-mounted cranes require the installation of tracks on the arch's chord tubes, which significantly impacts the chord tubes and results in poor guiding and limiting capabilities, leading to uncontrollable construction and poor safety.

Method used

Design an arch bridge deck installation crane device, including a lifting mechanism, a traction mechanism, a main beam structure and a traveling mechanism. The traveling locking mechanism hooks the transverse duct of the arch, and the axial movement and hoisting of the main beam structure are realized through a clamping system and a traction winch mechanism, avoiding the need to lay tracks on the chord tube.

Benefits of technology

It enables stable and safe axial movement and hoisting of the main beam structure on the arch, reduces scratches and damage to the chord tubes, improves the operability and safety of construction, and allows the entire length of the arch bridge to be constructed with a single piece of equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118183482B_ABST
    Figure CN118183482B_ABST
Patent Text Reader

Abstract

This invention relates to an arch bridge deck installation crane device, comprising a lifting mechanism, a traction mechanism, a main beam structure, a traveling mechanism, and a lifting device. The arch bridge deck installation crane device eliminates the need for guide rails and limiters on the chord tubes. Under the traction of the traction winch mechanism of the traction mechanism, the main beam structure travels using the traveling mechanism, with a clamping system providing lateral limit and guidance. This allows the main beam structure to advance axially within the arch. The traveling mechanism, traveling locking mechanism, and clamping system ensure the safety of the lifting operation. Furthermore, the traveling locking mechanism and traction locking mechanism enable a force transfer between the forward movement of the front and rear support beams and the forward movement of the main beam structure. The entire forward movement is stable and safe, with minimal impact on the chord tubes. The main beam structure has symmetrically arranged traction mechanisms at both ends along the traveling direction, allowing construction from one end of the arch to the other without requiring multiple devices, and when using a single device, there is no need to change positions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to arch hoisting equipment, and more particularly to an arch hoisting device for installing on the deck of an arch bridge. Background Technology

[0002] In highway bridge engineering, especially in the construction of steel-concrete composite arch bridges, choosing a suitable method for lifting and installing grid beams is a key challenge that needs to be addressed in many arch bridge construction projects. Limited lifting space, complex lifting conditions, difficulties in cost control, cumbersome installation procedures, and other factors contributing to the difficulty in lifting grid beams are all thorny problems faced by arch bridge builders. This is related to the extremely strict deformation control requirements for highway bridges. A suitable grid beam installation method can not only provide reliable safety assurance during the construction process but also bring positive impacts to the project's progress, economy, and scientific research.

[0003] Currently, the construction methods used for hoisting lattice beams in arch bridge construction generally include cable system hoisting, pulley block swing method, and ordinary arch cranes, etc. While these methods can effectively complete the hoisting of lattice beams in some large arch bridge projects, they all have their own shortcomings in terms of overall adaptability. Specifically:

[0004] Cable-stayed bridge system: It has strong spanning capacity and adaptability, and the construction process is convenient and stable. However, this system requires a lot of auxiliary facilities to be set up around the bridge site, resulting in higher costs. After occupying the site, it will also affect the construction period of the sub-projects in this area. It is usually suitable for the construction of large-span arch bridges with relatively wide construction sites.

[0005] Pulley block swing method: This process is relatively mature, but because it involves multiple pulley blocks and winches, the equipment layout is easily restricted by the site, and the system transformation is complicated and the cableway layout is dense, which has certain dangers.

[0006] Conventional arch-mounted cranes: There are many types of such equipment in the field of grid beam hoisting. The structure has no fixed frame and needs to be customized according to the actual arch bridge. The stress state itself is also difficult to determine. At the same time, the movement and positioning are relatively difficult. In addition, it is necessary to set the track on the chord tube of the arch, which is complicated to operate. The setting of the track has a significant impact on the chord tube. Moreover, the poor ability of the track to guide and limit the fixation results in poor operability and safety, which leads to a certain degree of uncontrollability in actual construction and cannot guarantee the construction requirements of grid beam hoisting. Summary of the Invention

[0007] The purpose of this invention is to address the problems of existing arch-mounted cranes, which require the installation of tracks on the chord tubes of the arch. These tracks have a significant impact on the chord tubes, and the poor guiding and limiting capabilities of the tracks result in poor operability and safety, leading to a certain degree of uncontrollability in actual construction. The invention provides an arch-mounted crane device for installation on the arch bridge deck, which can achieve guiding movement, limiting, and fixing on the arch without laying tracks on the chord tubes of the arch.

[0008] To achieve the above objectives, the technical solution adopted by the present invention is as follows:

[0009] An arch bridge deck mounting device for an arch crane includes a lifting mechanism, a traction mechanism, a main beam structure, a traveling mechanism, and a lifting device;

[0010] The lifting mechanism is fixedly connected to the main beam structure, the lifting mechanism is connected to the lifting device, the lifting device is located below the main beam structure, and the lifting mechanism is capable of lifting and lowering the lifting device;

[0011] The traveling mechanism is connected to the bottom of the main beam structure. The traveling mechanism is equipped with wheels, which can be placed directly on the chord tube of the arch. The traveling mechanism can move along the axial direction of the corresponding chord tube.

[0012] The traction mechanism is located at at least one end of the main beam structure along the traveling direction. The traction mechanism is provided on both the left and right sides of the main beam structure. The traction mechanism includes a front support beam, a rear support beam, a traction winch mechanism, a clamping mechanism, a traction locking mechanism, and the supporting traveling mechanism.

[0013] The front support beam and the rear support beam are spaced apart along the walking direction. Both the front support beam and the rear support beam are arranged in the left and right direction. The front support beam and the rear support beam are connected by a movable hydraulic cylinder, which can change the distance between the front support beam and the rear support beam.

[0014] The rear support beam is located between the front support beam and the main beam structure;

[0015] The traction winch mechanism includes a traction movable pulley block, a traction fixed pulley block, and a traction winch. The traction movable pulley block and the traction fixed pulley block are respectively disposed on the rear support beam and the main beam structure. The traction wire rope of the traction winch is wound between the traction movable pulley block and the traction fixed pulley block. The traction winch mechanism can change the distance between the rear support beam and the main beam structure.

[0016] The clamping mechanism and the supporting traveling mechanism are both connected to the rear support beam and the front support beam. The traction locking mechanism is connected to the rear support beam and can lock onto the transverse chord tube of the arch. The clamping mechanism is located on the left and right sides and can clamp or release the chord tubes on the left and right sides of the arch. The supporting traveling mechanism has supporting wheels that can be placed directly on the chord tube and can move along the axial direction of the corresponding chord tube.

[0017] The main beam structure is equipped with a walking locking mechanism and a clamping system. The walking locking mechanism can lock onto the transverse chord tube of the arch. The clamping system is located on the left and right sides of the main beam structure. The clamping system has clamping support wheels. The clamping support wheels support the outer side of the chord tube on the corresponding transverse side inward. The clamping support wheels can move axially along the outer side of the chord tube on the corresponding side.

[0018] In this design, the traveling locking mechanism hooks onto the transverse connecting tubes of the arch. These transverse connecting tubes are the connecting rods between the chord tubes on the left and right sides of the arch. By hooking onto these connecting tubes, the traveling locking mechanism generates an upward pulling force, holding the main beam structure in place. Furthermore, the wheels of the traveling mechanism are mounted on the corresponding chord tubes, providing upward support to the main beam structure. The main beam structure also has clamping systems on both sides, located on the outer sides of the chord tubes, clamping the arch and thus limiting its lateral movement. Simultaneously, the arch guides the main beam structure's direction of travel, ensuring that its forward direction is always aligned with the arch's axis. In other words, by hooking onto the transverse connecting tubes of the arch, the main beam structure remains stationary, ensuring that all six degrees of freedom of the main beam structure are immobile. This allows the lifting mechanism to raise and lower the lifting device to complete the hoisting operation.

[0019] When the arch crane installation on the arch bridge deck needs to move axially on the arch, the traveling locking mechanism hooks onto the transverse chord of the arch to ensure the main beam structure remains stationary. The clamping mechanism at the rear support beam clamps the chord, while the clamping mechanism at the front support beam releases, ensuring the rear support beam remains stationary. By extending the moving cylinder, the front support beam can be pushed forward. Then, the clamping mechanism at the rear support beam is released, and the clamping mechanism at the front support beam clamps the chord. The moving cylinder shortens, simultaneously lengthening the traction wire rope of the traction winch mechanism, thus pulling the rear support beam and... The traction locking mechanism moves forward as a whole, thereby completing the forward movement of the rear support beam and the front support beam. During the movement of the rear support beam and the front support beam, the corresponding support traveling mechanism moves the support traveling wheels on the string tube, resulting in low friction, easier movement, and reduced scratches on the string tube. When the stroke of the moving cylinder is sufficient, the rear support beam and the front support beam can be moved forward to the next working position in just one stroke. When the stroke of the moving cylinder is insufficient, the movement can be repeated to move to the next working position.

[0020] After the rear and front support beams are moved into place, they are locked to the transverse chord tube of the arch by the traction locking mechanism to ensure that the rear support beam will not move. Then, the locking mechanism of the travel locking mechanism is released, and the main beam structure is dragged forward to the working position by shortening the length of the traction steel wire rope. During the movement of the main beam structure, the clamping support wheel of the clamping system guides the main beam structure while ensuring the transverse limitation of the main beam structure. The clamping support wheel can roll on the outside of the chord tube without affecting the movement of the main beam structure, reducing the scraping of the chord tube. The wheels of the traveling mechanism can roll on the top of the chord tube, ensuring the rapid and stable movement of the main beam structure and reducing the scraping of the chord tube.

[0021] After the main beam structure moves to the next working position, the travel locking mechanism hooks the transverse duct of the arch to ensure that the main beam structure does not move. At this time, the six degrees of freedom of the main beam structure can be guaranteed to remain stationary, and the hoisting mechanism can then lift and lower the lifting device to complete the hoisting work.

[0022] Preferably, the traction locking mechanism includes a traction telescopic cylinder and a traction locking hook. The traction telescopic cylinder is arranged in the front-rear direction. One end of the traction telescopic cylinder is connected to the rear support beam, and the other end is hinged to two different points of the traction locking hook. The extension and retraction of the traction telescopic cylinder can drive the traction locking hook to change its angle. The opening of the traction locking hook faces the middle of the main beam structure in the front-rear direction. A traction support pad is provided in the opening of the traction locking hook. The traction support pad is used to abut against the arc shape of one side of the duct and adapt to the arc shape of the outer side of the duct.

[0023] The walking locking mechanism includes a walking locking telescopic cylinder and a walking locking hook. One end of the walking locking telescopic cylinder is fixed to the main beam structure and the other end is fixed to the walking locking hook. The opening of the walking locking hook faces the same direction as the opening of the traction locking hook. A walking locking pad is provided inside the opening of the walking locking hook. The walking locking pad is used to abut against the arc shape of one side of the pipe and adapt to the arc shape of the outer side of the pipe.

[0024] The walking locking mechanism and the traction locking mechanism adopt the form of hooks that can be hung on the pipe. They are automatically controlled by hydraulic cylinders and are easy to operate. The opening of the hook is equipped with a gasket that fits the pipe, which can improve the friction and avoid damage to the pipe.

[0025] Preferably, the travel locking hook includes two bending areas in the same direction, the bending area at the end of the travel locking hook is open, and travel pin holes are provided at different positions of the bending area near the end of the travel locking telescopic cylinder. The travel locking telescopic cylinder is connected to the travel locking hook by inserting a pin into the travel pin hole.

[0026] The travel locking telescopic cylinder can change the angle and length of the travel locking hook by connecting different travel pin holes.

[0027] Preferably, the clamping system further includes a cantilever support, a vertical support, a bending portion, and a clamping support base;

[0028] The cantilever support is connected to the side of the main beam structure. The upper end of the vertical support is fixedly connected to the cantilever support, and the lower end has the bent portion. The bent portion bends along the vertical support toward the middle of the main beam structure. A clamping support seat is fixed on the side of the bent portion toward the middle of the main beam structure. The clamping support wheel is rotatably mounted on the clamping support seat. The clamping support wheel is inclined upward and supported on the outside of the corresponding chord tube.

[0029] The clamping support wheel is inclined upward and supports the outside of the corresponding chord tube, which provides better lateral positioning and guidance for the main beam structure, making it safer to use and preventing tipping.

[0030] Preferably, the clamping mechanism includes a clamping vertical beam, a clamping transverse telescopic cylinder, and a clamping limiting head. The upper end of the clamping vertical beam is connected to the ends of the rear support beam and the front support beam, and the lower end of the clamping vertical beam is connected to the clamping transverse telescopic cylinder. The axial direction of the clamping transverse telescopic cylinder is left-right. The clamping limiting head is hinged to one end of the clamping transverse telescopic cylinder near the string tube. The axial direction of the hinge shaft corresponding to the clamping limiting head is front-back. The surface of the clamping limiting head that abuts against the string tube is adapted to the arc surface of the string tube.

[0031] The clamping limiting head is used to abut against the chord tube, and its surface is adapted to the arc surface of the chord tube to ensure the stability of the support. The clamping lateral telescopic cylinder is hinged to a clamping limiting head at one end near the chord tube. This allows the clamping limiting head to move in the left and right directions, thereby enabling the clamping mechanisms on both sides to clamp or release the chord tubes on the left and right sides of the arch. Secondly, the hinged design allows the clamping limiting head to rotate, which can better adapt to the clamping direction, forming a buffer and preventing excessive force from causing clamping damage.

[0032] Preferably, the traction mechanism is symmetrically provided at both ends of the main beam structure along the walking direction, so that it can both go uphill and downhill along the axial direction of the arch, that is, it can be constructed from one end of the arch to the other end of the arch without the need for multiple devices, and when using a single device, there is no need to change positions.

[0033] Preferably, the traction winch mechanism further includes a support limiting mechanism, which is disposed at the location of the rear support beam and the front support beam;

[0034] The support limiting mechanism includes a height telescopic cylinder and a support limiting head. The height telescopic cylinder is vertically arranged, and its upper end is fixed to the rear support beam and the front support beam. The lower end of the height telescopic cylinder is connected to the support limiting head. The bottom of the support limiting head is adapted to the arc shape of the top surface of the corresponding string tube. The height telescopic cylinder can adjust the height of the support limiting head.

[0035] When the rear support beam and / or front support beam need to be fixed, the support is supported by a support limiting mechanism to ensure the stability of the support. The bottom of the support limiting head is adapted to the arc shape of the top surface of the corresponding string tube, which provides better support and can form left and right limits. When the rear support beam or front support beam needs to be fixed, the position of the support limiting head is raised by a height telescopic cylinder to cancel the support, so as to avoid affecting the movement and avoid excessive scratching of the string tube.

[0036] Preferably, the support limiting mechanism and the support traveling mechanism are respectively located on two equal-height string tubes on the same side, which provides higher support stability. Moreover, selecting one support limiting mechanism and one support traveling mechanism for support provides better support effect and less impact on the string tubes compared to selecting two support traveling mechanisms.

[0037] Preferably, the wheels, supporting wheels, and clamping supporting wheels are all adapted to the arc shape of the chord tube, which can increase the supporting area, make the support more stable, and form a limit, thus providing a guiding effect.

[0038] Preferably, the lifting device includes a lifting pulley block and a lifting beam, the lifting pulley block is connected to the lifting beam, and the lifting beam is used to connect to the lifting lugs on the beam;

[0039] The lifting mechanism includes a lifting winch, a guide wheel assembly, and a lifting fixed pulley assembly mounted on the main beam structure. The axial direction of the guide wheel assembly is the radial direction of the arch, and the axial direction of the lifting fixed pulley assembly is horizontal. The lifting wire rope of the lifting winch passes around the guide wheel assembly and then turns and winds around between the lifting fixed pulley assembly and the lifting movable pulley assembly.

[0040] And / or,

[0041] The traveling mechanism includes a wheel set, a distribution beam, and wheel beams. The distribution beam is connected to the bottom of the main beam structure. Two wheel beams are located at the bottom of the left and right sides of the distribution beam. Two wheel sets are provided at the bottom of the front and rear ends of each wheel beam. The axial direction of the wheel set is left and right.

[0042] And / or,

[0043] The main beam structure includes two main beam box steels spaced apart along the walking direction and two main beam H steels spaced apart along the left and right directions. The main beam box steels are arranged along the left and right directions, and the main beam H steels are arranged along the walking direction. The main beam box steels are located above the main beam H steels. The two main beam box steels and the two main beam H steels are connected by flanges to form a frame structure.

[0044] The lifting mechanism includes four lifting winches arranged in a rectangular array and a fixed platform. The fixed platform is fixedly installed on the two main beam box steel sections and located in the middle of the main beam structure in the left-right direction. The lifting winches are installed on the fixed platform.

[0045] The traction mechanism is connected to the end of the main beam H-section steel;

[0046] The traveling mechanism is located at the bottom of the main beam H-section steel.

[0047] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0048] 1. The arch-mounted crane device for arch bridge deck installation described in this invention does not require the setting of track guides and limiters on the chord tubes. Under the traction of the traction winch mechanism of the traction mechanism, the main beam structure moves using the traveling mechanism, and the clamping system is used for left and right direction limit and guidance. This enables the main beam structure to move forward axially in the arch. The traveling mechanism, traveling locking mechanism and clamping system can ensure the safety of the hoisting operation. Furthermore, the traveling locking mechanism and traction locking mechanism can form a force conversion between the overall forward movement of the front support beam and the rear support beam and the forward movement of the main beam structure. The entire forward movement process is stable and safe, and has little impact on the chord tubes.

[0049] 2. The arch bridge deck installation crane device of the present invention features a travel locking mechanism and a traction locking mechanism in the form of hooks that can be attached to the siding pipe. It utilizes hydraulic cylinders for automated control, making operation simple. Furthermore, the opening of the hook is equipped with a gasket adapted to the siding pipe, which improves friction and prevents damage to the siding pipe. The travel locking telescopic cylinder can change the angle and length of the travel locking hook by connecting to different travel pin holes.

[0050] 3. The arch bridge deck installation crane device of the present invention has the clamping support wheel tilted upwards and supporting the outer side of the corresponding chord tube, which provides better lateral positioning and guidance for the main beam structure, making it safer to use and preventing overturning. The clamping limiting head is used to abut against the chord tube, and its surface is adapted to the arc surface of the chord tube, ensuring the stability of the support. The clamping lateral telescopic cylinder is hinged to the clamping limiting head at one end near the chord tube. This allows the clamping limiting head to move in the left and right directions, enabling the clamping mechanisms on both sides to clamp or release the chord tubes on the left and right sides of the arch. The hinged design also allows the clamping limiting head to rotate, better adapting to the clamping direction, forming a buffer, and preventing excessive force from causing clamping damage.

[0051] 4. The arch bridge deck installation arch crane device of the present invention has the traction mechanism symmetrically provided at both ends of the main beam structure along the travel direction, so that it can both go uphill along the axial direction of the arch and downhill along the axial direction of the arch, that is, it can be constructed from one end of the arch to the other end of the arch without the need for multiple devices, and when using a single device, there is no need to change the position.

[0052] 5. The arch-mounted crane device for arch bridge deck installation described in this invention provides support through a support limiting mechanism when the rear support beam and / or front support beam need to be fixed, ensuring the stability of the support. The bottom of the support limiting head is adapted to the arc shape of the top surface of the corresponding chord tube, resulting in better support and the ability to form left and right limits. When the rear support beam or front support beam needs to be fixed, the position of the support limiting head is raised by a height telescopic cylinder, canceling the support and avoiding affecting the movement, as well as avoiding excessive scratching of the chord tube. Attached Figure Description

[0053] Figure 1 This is a schematic diagram of the arch crane device installed on the bridge deck of the arch bridge according to the present invention, showing its front and rear directions.

[0054] Figure 2 This is a partial plan view of the arch crane device installed on the arch bridge deck according to the present invention;

[0055] Figure 3 This is a schematic diagram of the left-right structure of the arch bridge deck mounting arch crane device described in this invention;

[0056] Figure 4 yes Figure 3 A magnified view of a portion of circle A in the middle;

[0057] Figure 5 This is a schematic diagram of the left and right directions of the front support beam;

[0058] Figure 6 yes Figure 5 A magnified view of a portion of circle B in the middle;

[0059] Figure 7 This is a schematic diagram of the traction locking mechanism;

[0060] Figure 8 This is a schematic diagram of the walking locking mechanism;

[0061] Figure 9 This is a schematic diagram of the process of the arch crane device installed on the arch bridge deck climbing the slope on the arch as described in this invention;

[0062] Figure 10 This is a schematic diagram of the arch crane device installed on the arch of the arch bridge deck according to the present invention;

[0063] Figure 11 This is a schematic diagram of a lifting device used to hoist a grid beam.

[0064] Icons: 1. Lifting mechanism; 11. Lifting winch; 101. Fixed platform; 2. Traction mechanism; 211. Front support beam; 212. Rear support beam; 22. Traction winch mechanism; 221. Traction pulley block; 222. Traction fixed pulley block; 223. Traction winch; 224. Traction wire rope; 23. Clamping mechanism; 231. Clamping vertical beam; 232. Clamping lateral telescopic cylinder; 233. Clamping limit head; 24. Moving cylinder; 25. Support limit mechanism; 251. Support limit head; 252. Height telescopic cylinder; 26. Traction locking mechanism; 261. Traction telescopic cylinder; 262. Traction locking hook; 263. Traction support pad; 27. Support traveling mechanism; 271. Support traveling seat; 272. Support traveling wheel; 273. Traction... 3. Main beam structure; 31. Traveling locking mechanism; 311. Traveling locking telescopic cylinder; 312. Traveling locking hook; 313. Traveling pin hole; 314. Traveling locking gasket; 32. Guide wheel assembly; 33. Main beam box steel; 334. Flange; 34. Main beam H-beam; 35. Clamping system; 351. Cantilever support; 352. Vertical support; 353. Bending part; 354. Clamping support seat; 355. Clamping support wheel; 36. Cantilever beam; 4. Traveling mechanism; 41. Wheel assembly; 42. Distribution beam; 43. Wheel beam; 5. Lifting device; 51. Lifting moving pulley assembly; 52. Lifting device beam; 53. Lifting lug on beam; 54. Lifting wire rope; 55. Lifting fixed pulley assembly; 8. Grid beam; 9. Arch; 91. Chord tube; 92. Connecting tube. Detailed Implementation

[0065] The present invention will be further described in detail below with reference to experimental examples and specific embodiments. However, this should not be construed as limiting the scope of the above-mentioned subject matter of the present invention to the following embodiments; all technologies implemented based on the content of the present invention fall within the scope of the present invention.

[0066] Unless otherwise specified, the use of terms such as "upper," "lower," "left," "right," "center," "inner," and "outer" to indicate orientation or positional relationships in the description of specific embodiments of the present invention is based on the orientation or positional relationships shown in the accompanying drawings, or the orientation or positional relationship in which the product / equipment / device is typically placed during use. These terms are merely for the purpose of facilitating the description of the present invention or simplifying the description in specific embodiments, enabling those skilled in the art to quickly understand the solution, and do not indicate or imply that a particular device / component / element must have a specific orientation, or be constructed and operated in a specific positional relationship. Therefore, they should not be construed as limitations on the present invention.

[0067] Furthermore, the use of terms such as "horizontal," "vertical," "suspended," and "parallel" does not imply that the corresponding device / component / element must be absolutely horizontal, vertical, suspended, or parallel, but rather that it can be slightly tilted or have a deviation. For example, "horizontal" merely means that its direction is more horizontal relative to "vertical," not that the structure must be completely horizontal, but that it can be slightly tilted. Alternatively, it can be simplified to mean that the corresponding device / component / element, when set in a "horizontal," "vertical," "suspended," or "parallel" direction, can have an error / deviation of ±10% relative to the corresponding direction, more preferably within ±8%, more preferably within ±6%, more preferably within ±5%, and more preferably within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its function in the present invention.

[0068] Furthermore, the use of terms such as "first," "second," "third," etc. in terminology is merely for distinguishing identical or similar components and should not be interpreted as emphasizing or implying the relative importance of a particular component.

[0069] Furthermore, in the description of the embodiments of the present invention, "several", "more than", and "a number of" represent at least two. The number can be any number, such as 2, 3, 4, 5, 6, 7, 8, or 9, and can even exceed nine.

[0070] Furthermore, in the description of the technical solution of this invention, unless otherwise explicitly specified / limited / restricted, the terms "set up," "install," "connect," "link," "provided with," "laid out," and "arranged" should be interpreted broadly. For example, they can refer to fixed connections, detachable connections, or integral connections; they can refer to common connection methods in the art, such as welding, riveting, bolting, and threaded connections. Such connections can be mechanical, electrical, or communication connections; they can be direct connections or indirect connections through an intermediate medium; and they can refer to the internal communication between two components.

[0071] Example 1

[0072] This embodiment provides a device for installing an arch-mounted crane on the bridge deck of an arch bridge, see reference. Figures 1-6 It includes a hoisting mechanism 1, a traction mechanism 2, a main beam structure 3, a traveling mechanism 4, and a lifting device 5;

[0073] In this embodiment, the main beam structure 3 can be a combination of multiple components, such as a frame structure, which can reduce the self-weight while ensuring structural stability. As a preferred option, such as... Figures 1-3 As shown, the main beam structure 3 includes two main beam box sections 33 spaced apart along the travel direction and two main beam H sections 34 spaced apart along the left and right directions. The main beam box sections 33 are arranged along the left and right directions, which is the transverse direction of the bridge. That is, the main beam H sections 34 are related to the positions of the left and right chords of the arch. The main beam H sections 34 are arranged along the travel direction, which is the axial direction of the arch. The main beam box sections 33 are located above the main beam H sections 34. The two main beam box sections 33 and the two main beam H sections 34 are connected by flanges 334 to form a frame structure, ensuring the structural stability in the transverse direction of the bridge and the axial direction of the arch, and providing a position for the installation or connection of the lifting mechanism 1, the traction mechanism 2 and the traveling mechanism 4.

[0074] The lifting mechanism 1 is fixedly connected to the main beam structure 3. The lifting mechanism 1 is connected to the lifting device 5. The lifting device 5 is located below the main beam structure 3. The lifting mechanism 1 is capable of lifting and lowering the lifting device 5.

[0075] Specifically, there are many ways to configure the hoisting mechanism 1 and the lifting device. This embodiment provides a preferred method, such as... Figure 2As shown, the lifting mechanism 1 includes four lifting winches 11 arranged in a rectangular array and a fixed platform 101. The fixed platform 101 is fixedly mounted on the two main beam box-section steels 33 and located in the middle of the main beam structure 3 in the left-right direction. The lifting winches 11 are mounted on the fixed platform 101 to provide counterweight to the main beam structure and ensure the balance of the structure, preventing imbalance on the left and right sides of the arch. The lifting mechanism 1 includes four lifting winches 11 arranged in a rectangular array, which can correspond to the four lifting points of the four parts of the lifting device, and thus the four lifting points of the bridge deck such as the grid beam 8, ensuring the stability and safety of the lifting. Of course, the number of lifting winches 11 can be greater than four, but four are generally sufficient to meet the lifting requirements, saving costs and avoiding excessive weight. Figures 1-3 As shown, the lifting device 5 includes a lifting movable pulley block 51 and a lifting beam 52. The lifting movable pulley block 51 is connected to the lifting beam 52, and the lifting beam 52 is used to connect to the beam lifting lugs 53 on the grid beam 8. The lifting mechanism 1 also includes a guide wheel block 32 and a lifting fixed pulley block 55 disposed on the main beam structure 3. The axial direction of the guide wheel block 32 is the radial direction of the arch 9, and the axial direction of the lifting fixed pulley block 55 is the horizontal direction. The lifting wire rope 54 of the lifting winch 11 passes around the guide wheel block 32 and then turns and wraps around the lifting fixed pulley block 55 and the lifting fixed pulley block 55. Between the movable pulley blocks 51; specifically, cantilever supports 351 are set on the left and right sides of the main beam structure 3. The cantilever supports 351 have cantilever beams along the arch axis and cantilever beams 36 along the left and right directions. Guide wheel blocks 32 are set at the front and rear ends of the cantilever beams respectively to guide the lifting wire ropes 54 in the corresponding front and rear directions, so that the lifting wire ropes 54 can ensure the vertical setting of the lifting equipment. This guide wheel block 32 can increase the lifting length of the grid beam 8. That is to say, under the premise of the same lifting length of the grid beam 8, the size of the main beam structure 3 in the front and rear directions can be reduced.

[0076] The traveling mechanism 4 is connected to the bottom of the main beam structure 3. The traveling mechanism 4 is equipped with wheels that can be directly placed on the chord tubes 91 of the arch 9. The traveling mechanism 4 can move along the axial direction of the corresponding chord tube 91. The wheels adapt to the arc shape of the chord tube 91, increasing the support area and making the support more stable. It also provides a limiting and guiding effect. The traveling mechanism 4 is located at the bottom of the main beam H-beam 34, making connection more convenient and the force transmission path clearer and more reliable. Specifically, the traveling mechanism 4 includes wheel sets 41, distribution beams 42, and wheel beams 43. The distribution beams 42 are connected to the bottom of the main beam H-beam 34. Two wheel beams 43 are located at the bottom of the left and right sides of the distribution beams 42. Each wheel beam 43 has two wheel sets 41 at its front and rear ends. The axial direction of each wheel set 41 is left-right, resulting in a total of eight wheel sets. This ensures that the traveling mechanism can simultaneously move on two chord tubes of equal height on the same side of the arch, thus making movement safer.

[0077] The traction mechanism 2 is located at at least one end of the main beam structure 3 along the traveling direction, that is, the traction mechanism 2 can be installed at one end of the main beam structure 3 in the traveling direction. Figure 2 As shown; alternatively, traction mechanisms 2 can be installed at both ends of the walking direction, such as... Figure 1 As shown. As a preferred option, the traction mechanism 2 is connected to the end of the main beam H-beam 34, which makes the connection more convenient and the force transmission path clearer and more reliable.

[0078] In this embodiment, the traction mechanism 2 is provided on both the left and right sides of the main beam structure 3, corresponding to the chord tubes 91 on the left and right sides of the arch. The traction mechanism 2 includes a front support beam 211, a rear support beam 212, a traction winch mechanism 22, a clamping mechanism 23, a traction locking mechanism 26, and the support traveling mechanism 27.

[0079] like Figure 1 and Figure 2 As shown, the front support beam 211 and the rear support beam 212 are spaced apart along the walking direction. Both the front support beam 211 and the rear support beam 212 are arranged in the left-right direction. The front support beam 211 and the rear support beam 212 are connected by a moving hydraulic cylinder 24. The moving hydraulic cylinder 24 can change the distance between the front support beam 211 and the rear support beam 212.

[0080] The rear support beam 212 is located between the front support beam 211 and the main beam structure 3;

[0081] The traction winch mechanism 22 includes a traction movable pulley block 221, a traction fixed pulley block 222, and a traction winch 223. The traction movable pulley block 221 and the traction fixed pulley block 222 are respectively disposed on the rear support beam 212 and the main beam structure 3. Specifically, the traction movable pulley block 221 is disposed on the rear support beam 212, and the traction fixed pulley block 222 is disposed on the main beam structure 3. The traction wire rope 224 of the traction winch 223 is wound between the traction movable pulley block 221 and the traction fixed pulley block 222. The traction winch 223 is fixedly disposed on the main beam structure 3. The traction winch mechanism 22 can change the distance between the rear support beam 212 and the main beam structure 3.

[0082] The clamping mechanism 23 and the supporting traveling mechanism 27 are both connected to the rear support beam 212 and the front support beam 211. The traction locking mechanism 26 is connected to the rear support beam 212. The traction locking mechanism 26 can lock onto the transverse duct 92 of the arch 9.

[0083] In this embodiment, as Figure 1 , Figure 7 , Figure 9 and Figure 10 As shown, the traction locking mechanism 26 includes a traction telescopic cylinder 261 and a traction locking hook 262. The traction telescopic cylinder 261 is arranged in the front-rear direction. One end of the traction telescopic cylinder 261 is connected to the rear support beam 212, and the other end is hinged to two different points of the traction locking hook 262. The extension and retraction of the traction telescopic cylinder 261 can drive the traction locking hook 262 to change its angle. The opening of the traction locking hook 262 faces the middle of the main beam structure 3 in the front-rear direction. A traction support pad 263 is provided in the opening of the traction locking hook 262. The traction support pad 263 is used to abut against the arc shape of one side of the duct 92 and adapt to the arc shape of the outer side of the duct 92. The traction locking mechanism 26 adopts a hook form and can be hung on the duct 92. It is automatically controlled by a hydraulic cylinder and is easy to operate. Moreover, the pad adapted to the duct 92 is provided in the opening of the hook, which can improve the friction and avoid damage to the duct 92.

[0084] The clamping mechanisms 23 are located on the left and right sides, and the clamping mechanisms 23 on the left and right sides can clamp or release the string tubes 91 on the left and right sides of the arch 9; for example Figure 5 and Figure 6As shown, the clamping mechanism 23 includes a clamping vertical beam 231, a clamping transverse telescopic cylinder 232, and a clamping limiting head 233. The upper end of the clamping vertical beam 231 is connected to the ends of the rear support beam 212 and the front support beam 211, and the lower end of the clamping vertical beam 231 is connected to the clamping transverse telescopic cylinder 232. The axial direction of the clamping transverse telescopic cylinder 232 is left-right. The clamping limiting head 233 is hinged to one end of the clamping transverse telescopic cylinder 232 near the chord tube 91. The axial direction of the hinge axis corresponding to the clamping limiting head 233 is front-back. The surface of the clamping limiting head 233 that abuts against the chord tube 91 is adapted to the arc surface of the chord tube 91. The adaptation of the surface of the clamping limiting head 233 that abuts against the chord tube 91 to the arc surface of the chord tube 91 ensures the stability of the support. The clamping transverse telescopic cylinder 232 is hinged to a clamping limiting head 233 at one end near the chord tube 91. This allows the clamping limiting head 233 to move in the left and right directions, thereby enabling the clamping mechanisms 23 on both sides to clamp or release the chord tubes 91 on both sides of the arch 9. The hinged design allows the clamping limiting head 233 to rotate, which can better adapt to the clamping direction, forming a buffer and preventing excessive force from causing clamping damage.

[0085] like Figure 6 As shown, the supporting traveling mechanism 27 has supporting traveling wheels 272, which can be directly placed on the chord tube 91. The supporting traveling mechanism 27 can move along the axial direction of the corresponding chord tube 91. The supporting traveling mechanism 27 includes a supporting traveling seat 271, supporting traveling wheels 272, and a traction rotating shaft 273. The supporting traveling wheels 272 are rotatably connected to the supporting traveling seat 271 via the traction rotating shaft 273. The upper end of the supporting traveling seat 271 is fixedly connected to the bottom of the front support beam 211 or the bottom of the rear support beam 212. The supporting traveling wheels 272 are adapted to the arc shape of the chord tube 91, which can increase the support area, make the support more stable, and also form a limiting position, thus providing a guiding effect.

[0086] In this embodiment, as a preferred choice, such as Figure 6As shown, the traction mechanism 2 also includes a support limiting mechanism 25, which is located at the rear support beam 212 and the front support beam 211. The support limiting mechanism includes a height telescopic cylinder 252 and a support limiting head 251. The height telescopic cylinder 252 is vertically arranged, and its upper end is fixed to the rear support beam 212 and the front support beam 211. The lower end of the height telescopic cylinder 252 is connected to the support limiting head 251. The bottom of the support limiting head 251 is adapted to the arc shape of the top surface of the corresponding chord tube 91. The height telescopic cylinder 252 can adjust the height of the support limiting head 251. When the rear support beam 212 and / or the front support beam 211 need to be fixed, the support limiting mechanism 25 provides support to ensure stability. The bottom of the support limiting head 251 is adapted to the arc shape of the top surface of the corresponding chord tube 91, resulting in better support and providing lateral limiting. When the rear support beam 212 or the front support beam 211 needs to be fixed, the height telescopic cylinder 252 raises the position of the support limiting head 251, canceling the support and avoiding any impact on movement or excessive scratching of the chord tube. Furthermore, as... Figure 6 As shown, the support limiting mechanism 25 and the support traveling mechanism 27 are respectively provided on two equal-height string tubes 91 on the same side, which provides higher support stability. Moreover, choosing one support limiting mechanism 25 and one support traveling mechanism 27 for support is more effective and has less impact on the string tubes than choosing two support traveling mechanisms 27 for support.

[0087] The main beam structure 3 is equipped with a travel locking mechanism 31 and a clamping system 35. The travel locking mechanism 31 can lock onto the transverse connecting tube 92 of the arch 9. As a preferred embodiment, such as... Figure 1 and Figure 8As shown, the walking locking mechanism 31 includes a walking locking telescopic cylinder 311 and a walking locking hook 312. One end of the walking locking telescopic cylinder 311 is fixed to the main beam structure 3, and the other end is fixed to the walking locking hook 312. The opening of the walking locking hook 312 faces the same direction as the opening of the traction locking hook 262. A walking locking pad 314 is provided inside the opening of the walking locking hook 312. The walking locking pad 314 is used to abut against the arc shape of one side of the duct 92 and adapts to the arc shape of the outer side of the duct 92. The walking locking mechanism 31 adopts a hook form that can be hung on the duct 92. It is automatically controlled by a hydraulic cylinder, which is simple to operate. Moreover, the pad adapted to the duct 92 is provided inside the opening of the hook, which can improve the friction and avoid damage to the duct 92. Furthermore, the travel locking hook 312 includes two bending areas in the same direction. The bending area at the end of the travel locking hook 312 is open. Travel pin holes 313 are provided at different positions on the bending area near the end of the travel locking telescopic cylinder 311. The travel locking telescopic cylinder 311 is connected to the travel locking hook 312 by inserting a pin into the travel pin hole 313. The travel locking telescopic cylinder 311 can change the angle and length of the travel locking hook 312 by connecting to different travel pin holes 313 of the travel locking hook 312.

[0088] like Figure 3 As shown, the clamping system 35 is located on the left and right sides of the main beam structure 3. The clamping system 35 has clamping support wheels 355, which are inwardly supported on the outer side of the chord tube 91 on the corresponding lateral side. The clamping support wheels 355 can move axially along the outer side of the chord tube 91 on the corresponding side. In this embodiment, as... Figure 3 and Figure 4 As shown, the clamping system 35 further includes a cantilever support 351, a vertical support 352, a bending portion 353, and a clamping support seat 354. The cantilever support 351 is connected to the side of the main beam structure 3. Specifically, the cantilever support 351 has a cantilever beam 36 along the left-right direction, connected to the main beam box steel 33. The upper end of the vertical support 352 is fixedly connected to the cantilever support 351, and the lower end has the bending portion 353. The bending portion 353 bends along the vertical support 352 toward the middle of the main beam structure 3. A clamping support seat 354 is fixed on the side of the bending portion 353 toward the middle of the main beam structure 3. The clamping support wheel 355 rolls on the clamping support seat 354, and the clamping support wheel 355 is inclined upward and supported on the outside of the corresponding chord tube 91. The clamping support wheel 355 is adapted to the arc shape of the string tube 91, which can increase the support area, make the support more stable, and form a limit, thus having a guiding effect.

[0089] In this embodiment, the walking locking mechanism 31 hooks onto the transverse connecting tube 92 of the arch 9. The transverse connecting tube 92 of the arch 9 refers to the connecting rod between the chord tubes 91 on the left and right sides of the arch 9. By hooking onto the transverse connecting tube 92 of the arch 9 using the walking locking mechanism 31, an upward pulling force can be generated by the transverse connecting tube 92 to hold the main beam structure 3 in place. Furthermore, the wheels of the traveling mechanism 4 are mounted on the corresponding chord tubes 91, which can provide upward support for the main beam structure 3. In addition, the main beam structure 3 also has clamping systems 35 on both the left and right sides. The outer sides of the chord tubes 91 on the left and right sides respectively form a clamp to the arch, thereby limiting the main beam structure 3 in the left and right directions. At the same time, the arch guides the main beam structure 3 in its direction of movement, ensuring that the forward direction of the main beam structure 3 is always along the axis of the arch. That is, by hooking the transverse duct 92 of the arch 9 with the traveling locking mechanism 31, the main beam structure 3 can be kept still. At this time, the six degrees of freedom of the main beam structure 3 can be kept still, so that the hoisting mechanism 1 can lift and lower the lifting device 5 to complete the hoisting work. Figures 9-11 As shown.

[0090] When the arch crane device installed on the arch bridge deck needs to move axially on the arch, the traveling locking mechanism 31 hooks the transverse duct 92 of the arch 9, ensuring that the main beam structure 3 remains stationary. The clamping mechanism 23 at the rear support beam 212 clamps the chord tube, and the support limiting mechanism 25 at the rear support beam 212 provides support. The clamping mechanism 23 at the front support beam 211 is released, and the support limiting mechanism 25 at the front support beam 211 is no longer supporting, ensuring that the rear support beam 212 remains stationary. The extension of the moving cylinder 24 allows the front support beam 211 to be pushed forward. Then, the clamping mechanism 23 of the rear support beam 212 is released, and the clamping mechanism 23 at the front support beam 211 clamps the chord tube. The support limiting mechanism 25 at the rear support beam 212 is no longer supporting, and the support limiting mechanism 25 at the front support beam 211 provides support. Using the support beam 211 as a base, the moving cylinder 24 shortens and simultaneously lengthens the traction wire rope 224 of the traction winch mechanism 22, causing the rear support beam 212 and the traction locking mechanism 26 to move forward as a whole. After this, the rear support beam 212 and the front support beam 211 move forward completely. During the movement of the rear support beam 212 and the front support beam 211, the corresponding support traveling mechanism 27 is used. The support traveling wheel 272 of the support traveling mechanism 27 moves on the string tube 91, resulting in low friction, easier movement, and reduced scratches on the string tube. When the stroke of the moving cylinder 24 is sufficient, the rear support beam 212 and the front support beam 211 can be moved forward to the next working position in one go. When the stroke of the moving cylinder 24 is insufficient, the movement can be repeated to move to the next working position.

[0091] After the rear support beam 212 and the front support beam 211 are moved into place, they are locked to the transverse duct 92 of the arch 9 by the traction locking mechanism 26, ensuring that the rear support beam 212 will not move. The clamping mechanism 23 at the rear support beam 212 can clamp the chord tube, and the support limiting mechanism 25 at the rear support beam 212 can form support. Then, the locking mechanism 31 is released. Using the rear support beam 212 as the base point, the main beam structure 3 is dragged forward to the working position by shortening the length of the traction steel wire rope 224. During the movement of the main beam structure 3, the clamping support wheel 355 of the clamping system 35 guides the main beam structure 3 while ensuring the transverse limitation of the main beam structure 3. The clamping support wheel 355 can roll on the outside of the chord tube 91 without affecting the movement of the main beam structure 3, reducing the scraping of the chord tube 91. The wheels of the traveling mechanism 4 can roll on the top of the chord tube 91, ensuring the fast and stable movement of the main beam structure 3 and reducing the scraping of the chord tube 91.

[0092] After the main beam structure 3 moves to the next working position, the traveling locking mechanism 31 hooks onto the transverse connecting pipe 92 of the arch 9, ensuring that the main beam structure 3 does not move. At this time, it can be ensured that the six degrees of freedom of the main beam structure 3 cannot move, and thus the hoisting mechanism 1 can be used to lift and lower the lifting device 5 to complete the hoisting work. Figures 9-11 As shown.

[0093] Using the arch-mounted crane device on the arch bridge deck described in this embodiment, there is no need to set up track guides and limiters on the chord tube. Under the traction of the traction winch mechanism 22 of the traction mechanism 2, the main beam structure 3 moves using the traveling mechanism 4. The clamping system 35 is used for left and right direction limit and guidance, which can realize the axial movement of the main beam structure 3 in the arch. The traveling mechanism 4, the traveling locking mechanism 31 and the clamping system 35 can ensure the safety of the hoisting operation. The traveling locking mechanism 31 and the traction locking mechanism 26 can form a force conversion between the overall forward movement of the front support beam 211 and the rear support beam 212 and the forward movement of the main beam structure 3. The entire forward movement process is stable and safe, and has little impact on the chord tube.

[0094] Example 2

[0095] This embodiment provides a device for installing an arch-mounted crane on the bridge deck of an arch bridge. See [link / reference] Figures 1-11 The main beam structure 3 is symmetrically provided with the traction mechanism 2 at both ends along the walking direction, so that it can both go uphill along the axial direction of the arch and downhill along the axial direction of the arch, that is, it can be constructed from one end of the arch to the other end of the arch without the need for multiple equipment, and when using a single equipment, there is no need to change positions.

[0096] Specifically, the arch crane installation device on the arch bridge deck includes a lifting mechanism 1, a traction mechanism 2, a main beam structure 3, a traveling mechanism 4, a lifting device 5, an electrical system, and a hydraulic system;

[0097] In this embodiment, the main beam structure 3 is located in the middle of the front and rear direction of the arch bridge deck where the arch crane device is installed. When the arch crane device is used, the front and rear direction of the arch crane device is consistent with the axis of the arch. Traction mechanisms 2 are provided at both ends of the front and rear direction of the arch crane device, and the traction mechanisms 2 at both ends are symmetrically arranged.

[0098] The main girder structure 3 includes a walking locking mechanism 31, a guide wheel assembly 32, a main girder box section steel 33, a main girder H section steel 34, and a clamping system 35. The main girder structure 3 has two main girder H section steels 34, located on the left and right sides of the arch bridge deck where the arch-mounted cranes are installed, and arranged along the front-to-back direction. The main girder box section steel 33 is erected above the main girder H section steels 34 on both sides. The front and back ends of the main girder box section steel 33 on both sides are connected to the main girder H section steels 34 by flange bolts. A lifting mechanism 1 is placed on the upper part of the beam structure 3. The lifting mechanism 1 includes at least four lifting winches 11. In a preferred embodiment, the lifting mechanism 1 is equipped with four lifting winches 11, which are located in the middle of the left and right directions of the main beam structure 3. The four lifting winches 11 are arranged symmetrically in a rectangular array, which can meet the hoisting requirements of the grid beam. At the same time, it will not cause excessive waste of hoisting equipment, and it will reduce the overall weight, which is conducive to the stable movement of the arch crane device installed on the arch bridge deck.

[0099] Guide wheel sets 32 are installed at the front and rear ends of the left and right sides of the main beam structure 3, respectively. The axial direction of the guide wheel sets 32 is perpendicular to the left and right and front and back directions of the main beam structure 3. Specifically, the guide wheel sets 32 are installed on the cantilever supports 351 on the outer side of the two main beam box steels 33.

[0100] A travel locking mechanism 31 is installed at the lower front and rear ends of both sides of the main beam structure 3 in the left and right directions. The travel locking mechanism 31 is hook-shaped, and the travel locking mechanisms 31 at the front and rear ends of the main beam structure 3 are arranged opposite each other. The opening of the hook faces downward and is equipped with a gasket. The gasket can be adapted to the shape of the arch duct. One end of the hook is hinged to the main beam structure 3, and the hinge axis is in the left and right direction. Specifically, a connecting seat for the travel locking mechanism 31 is provided at the corresponding positions at the front and rear ends of the main beam H-beam 34. One end of a hydraulic cylinder is hinged to the connecting seat and the other end is hinged to the travel locking mechanism 31, so that the travel locking mechanism 31 can rotate and the hooking distance of the travel locking mechanism 31 can be adjusted. This ensures that even if the position is not ideal, the travel locking mechanism 31 can still hook the arch duct and achieve front and rear direction limiting and fixing.

[0101] The main beam structure 3 is equipped with clamping systems 35 at its front and rear ends on both sides in the left and right directions. The clamping systems 35 can clamp onto the chords of the arch, forming left and right direction limits with the help of the chords. Specifically, the clamping system 35 includes a cantilever support, which is cantilevered and fixed to the outside of the main beam H-beam 34. The bottom end of the cantilever support has an upward bend, and the bend is equipped with a support roller. The support roller can abut against the chord of the arch, and the part of the support roller abutting against the chord is adapted to the shape of the chord to ensure the stability of the limit and avoid stress concentration that could damage the chord. When the arch crane device is installed on the arch bridge deck and moves along the arch axis, the support roller rolls on the chord, resulting in low friction and preventing axial limit of the chord, thus avoiding damage to the chord.

[0102] The front and rear ends of the main beam structure 3 in the left and right directions are also provided with guide wheel sets 32. Each guide wheel set 32 ​​corresponds to a lifting winch 11. The wire rope of the lifting winch 11 passes around the corresponding guide wheel set 32 ​​and connects downward to the upper end of the lifting device 5. The lower end of the lifting device 5 has a lifting sliding wheel set 51. The lifting sliding wheel set 51 is connected to the lifting lug 53 on the beam surface located on the grid beam by the lifting device beam 52.

[0103] Simultaneously, a traveling mechanism 4 is installed on the lower front and rear ends of both sides of the main beam structure 3 in the left and right directions. The traveling mechanism 4 consists of eight sets of wheel sets 41, such as... Figure 4 As shown, each pair of wheel sets at the front and rear corresponds to one wheel beam 43, and one wheel beam 43 corresponds to one string tube. Each pair of wheel beams 43 on the left and right sides corresponds to one distribution beam 42. That is, one distribution beam 42 is composed of two wheel beams 43 and four wheel sets 41.

[0104] The traction mechanism 2 includes a support beam, a traction winch mechanism 22, a clamping mechanism 23, a moving cylinder 24, a support limiting mechanism 25, and a traction locking mechanism 26. Each end of the traction mechanism 2 has a support beam at the front and rear, arranged along the left-right direction. The two support beams are connected by the moving cylinder 24. The support limiting mechanism 25 is installed on the left and right sides and located at the lower part of the support beam. The bottom of the support limiting mechanism 25 can support the chord tube of the arch, and the bottom of the support limiting mechanism 25 is adapted to the curvature of the chord tube, allowing for better support on the chord tube, providing left-right limiting, and enabling stable movement along the axial direction of the chord tube. Support wheels 272 are provided on the lower part of the support beam and on both sides in the left and right directions. These wheels support the chord tubes of the arch, and their axial direction is left and right. The bottom of each wheel adapts to the curvature of the adjacent chord tube, allowing for better support and left-right limiting, and stable movement along the axial direction of the chord tube. Clamping mechanisms 23 are installed on the left and right sides at the bottom of the support beam. Each clamping mechanism includes left-right clamping supports that can abut against the chord tube or not, allowing for extension and retraction. The part of the clamping support abutting against the chord tube adapts to its curvature, and the part is hinged to the clamping support with the hinge axis in the front-back direction. A traction locking mechanism 26 is installed on the rear support beam, which is closer to the main beam structure 3 than the front support beam. The traction locking mechanism 26 can hook onto the tassel tube of the arch to form a lock. Each of the left and right sides has a traction winch mechanism 22 at both the front and rear ends. Each traction winch mechanism 22 is arranged in the front-rear direction. Each traction winch mechanism 22 has a traction pulley block 221 at both the front and rear ends. Each traction winch mechanism 22 also has a traction winch 223. One of the traction pulley blocks 221 of the traction winch mechanism 22 is installed at the rear of the rear support beam. The traction pulley block 221 is hinged to the rear support beam with the hinge axis in the left-right direction. The other traction fixed pulley block 222 and the traction winch 223 of the traction winch mechanism 22 are installed on the main beam structure 3. The other traction fixed pulley block 222 is hinged to the main beam H-beam 34 of the main beam structure 3 with the hinge axis in the left-right direction.

[0105] In this embodiment, the working principle is as follows: the lifting mechanism 1 controls the raising and lowering of the grid beam by pulling the lifting device 5 through the lifting winch 11. During this process, the lifting wire rope 54 is guided by the guide wheel group 32. The front and rear support beams of the traction mechanism 2 are fixed to the arch rib chord tube by the clamping mechanism 23 and supported by the support limiting mechanism 25. When the traction mechanism 2 moves forward, the moving cylinder 24 pushes the front support beam or pulls the rear support beam. The traction locking mechanism 26 on the rear support locks the arch rib chord tube to prevent the traction mechanism 2 from slipping backward. The traveling mechanism 4 supports the entire main beam structure 3 and is pulled forward by the traction mechanism 2. After moving forward to the position, the traveling locking mechanism 31 locks the arch rib chord tube to fix the entire system.

[0106] This embodiment also provides an installation method for installing an arch crane device on the bridge deck of an arch bridge and a construction method for installing an arch crane device on the bridge deck of the arch bridge.

[0107] Step 1: Complete the installation of the arch crane device on the arch bridge deck in conjunction with the truck crane.

[0108] Step Two: The entire machine begins the arch-climbing operation. The traveling locking mechanism 31 on the main beam structure 3 locks onto the Nth stage of the boom pipe. The moving cylinder 24 of the traction mechanism 2 pushes the front support beam forward 1.5m. The clamping mechanism 23 on the front support beam clamps the arch rib chord pipes at both ends. Then, the moving cylinder 24 returns oil and pulls the rear support beam forward 1.5m. The clamping mechanism 23 on the rear support beam clamps the steel arches at both ends. After proceeding to the N+2th section, the traction locking mechanism 26 on the rear support beam locks the boom pipe. Then, the traveling locking mechanism 31 on the main beam structure 3 is opened, and the rear traction winch 223 is started to stretch it, moving the entire machine forward to the planned installation position.

[0109] Step 3: After the entire machine is stretched to the hoisting position by the traction mechanism 2, the traveling locking mechanism 31 of the main beam structure 3 is locked onto the duct, such as... Figure 9 As shown, the hoisting mechanism 1 is activated, and the entire machine is connected to the grid beam via wire rope and lifting device 5 to carry out the grid beam hoisting operation.

[0110] Step 4: After the grid beam is hoisted into place and the lifting rod is installed, disassemble the lifting beam 52 and the lifting lug 53 on the beam, keep the travel locking mechanism 31 of the main beam structure 3 locked to the duct, and repeat Step 2 to carry out the crane climbing operation again.

[0111] Step 5: Repeat steps 2, 3, and 4 until the crane climbs to the top of the arch to prepare for the hoisting of the closure section of the grid beam. When the entire machine is in place and the travel locking mechanism 31 is anchored, operate the tail traction mechanism 2 to anchor the traction locking mechanisms 26 of both the head and tail traction mechanisms 2. The closure section is then lifted, completing the grid beam hoisting construction. Figure 10 As shown.

[0112] Step Six: Use the traction mechanism 2 at the tail end to lower the entire machine and hoist the grid beams 8 until all grid beams 8 are hoisted. At this point, the entire machine is located at the bottom of the other end of the arch and can be dismantled. If there is only one traction mechanism 2, loosen all anchoring devices except for the traction mechanism 2 at the head end. The traction winch 223 of the traction mechanism 2 lowers the entire machine by one section, locks the entire machine, then the traction mechanism 2 moves down again and locks again until the entire machine is reversed to the dismantling position to cooperate with the truck crane for dismantling operations.

[0113] The arch bridge deck installation crane device described in this embodiment adopts a bidirectional symmetrical design, with traction systems at both ends of the crane. This allows the crane to move back and forth on the arch while completing the hoisting of the entire bridge grid beam using only a single crane. In addition, a new type of guiding, clamping, and hook anchoring device is designed to restrict all six degrees of freedom of the crane, providing good stability and achieving the goals of flexibility, safety, and economy.

[0114] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A device for installing an arch-mounted crane on the deck of an arch bridge, characterized in that, It includes a hoisting mechanism (1), a traction mechanism (2), a main beam structure (3), a traveling mechanism (4), and a lifting device (5); The lifting mechanism (1) is fixedly connected to the main beam structure (3). The lifting mechanism (1) is connected to the lifting device (5). The lifting device (5) is located below the main beam structure (3). The lifting mechanism (1) can lift and lower the lifting device (5). The traveling mechanism (4) is connected to the bottom of the main beam structure (3). The traveling mechanism (4) is equipped with wheels. The wheels can be placed directly on the chord tube (91) of the arch (9). The traveling mechanism (4) can move along the axial direction of the corresponding chord tube (91). The traction mechanism (2) is located at at least one end of the main beam structure (3) along the walking direction. The traction mechanism (2) is provided on both the left and right sides of the main beam structure (3). The traction mechanism (2) includes a front support beam (211), a rear support beam (212), a traction winch mechanism (22), a clamping mechanism (23), a traction locking mechanism (26), and a support traveling mechanism (27). The front support beam (211) and the rear support beam (212) are spaced apart along the walking direction. Both the front support beam (211) and the rear support beam (212) are arranged in the left-right direction. The front support beam (211) and the rear support beam (212) are connected by a moving hydraulic cylinder (24). The moving hydraulic cylinder (24) can change the distance between the front support beam (211) and the rear support beam (212). The rear support beam (212) is located between the front support beam (211) and the main beam structure (3); The traction winch mechanism (22) includes a traction movable pulley block (221), a traction fixed pulley block (222), and a traction winch (223). The traction movable pulley block (221) and the traction fixed pulley block (222) are respectively disposed on the rear support beam (212) and the main beam structure (3). The traction wire rope (224) of the traction winch (223) is wound between the traction movable pulley block (221) and the traction fixed pulley block (222). The traction winch mechanism (22) can change the distance between the rear support beam (212) and the main beam structure (3). The clamping mechanism (23) and the supporting traveling mechanism (27) are both connected to the rear support beam (212) and the front support beam (211). The traction locking mechanism (26) is connected to the rear support beam (212). The traction locking mechanism (26) can lock onto the transverse chord tube (92) of the arch (9). The clamping mechanism (23) is located on the left and right sides. The clamping mechanisms (23) on the left and right sides can clamp or release the chord tubes (91) on the left and right sides of the arch (9). The supporting traveling mechanism (27) has supporting traveling wheels (272). The supporting traveling wheels (272) can be placed directly on the chord tube (91). The supporting traveling mechanism (27) can move along the axial direction of the corresponding chord tube (91). The main beam structure (3) is provided with a walking locking mechanism (31) and a clamping system (35). The walking locking mechanism (31) can be locked to the transverse chord tube (92) of the arch (9). The clamping system (35) is located on the left and right sides of the main beam structure (3). The clamping system (35) has a clamping support wheel (355). The clamping support wheel (355) is supported inward on the outer side of the chord tube (91) on the corresponding transverse side. The clamping support wheel (355) can move axially along the outer side of the chord tube (91) on the corresponding side.

2. The arch bridge deck installation crane device according to claim 1, characterized in that, The traction locking mechanism (26) includes a traction telescopic cylinder (261) and a traction locking hook (262). The traction telescopic cylinder (261) is arranged in the front-rear direction. One end of the traction telescopic cylinder (261) is connected to the rear support beam (212), and the other end is hinged to two different points of the traction locking hook (262). The extension and retraction of the traction telescopic cylinder (261) can drive the traction locking hook (262) to change its angle. The opening of the traction locking hook (262) faces the middle of the main beam structure (3) in the front-rear direction. A traction support pad (263) is provided in the opening of the traction locking hook (262). The traction support pad (263) is used to abut against the arc shape of one side of the duct (92) and match the arc shape of the outer side of the duct (92). The walking locking mechanism (31) includes a walking locking telescopic cylinder (311) and a walking locking hook (312). One end of the walking locking telescopic cylinder (311) is fixed to the main beam structure (3) and the other end is fixed to the walking locking hook (312). The opening orientation of the walking locking hook (312) is the same as the opening orientation of the traction locking hook (262). A walking locking pad (314) is provided in the opening of the walking locking hook (312). The walking locking pad (314) is used to abut against the arc shape on one side of the duct (92) and match the arc shape on the outer side of the duct (92).

3. The arch bridge deck installation crane device according to claim 2, characterized in that, The walking locking hook (312) includes two bending areas in the same direction. The bending area at the end of the walking locking hook (312) is open. The walking locking hook (312) has walking pin holes (313) at different positions of the bending area near the end of the walking locking telescopic cylinder (311). The walking locking telescopic cylinder (311) is connected to the walking locking hook (312) by inserting a pin into the walking pin hole (313).

4. The arch bridge deck installation crane device according to claim 1, characterized in that, The clamping system (35) also includes a cantilever support (351), a vertical support (352), a bend (353), and a clamping support base (354). The cantilever support (351) is connected to the side of the main beam structure (3). The upper end of the vertical support (352) is fixedly connected to the cantilever support (351), and the lower end has the bending part (353). The bending part (353) bends along the vertical support (352) toward the middle of the main beam structure (3). A clamping support seat (354) is fixed on the side of the bending part (353) toward the middle of the main beam structure (3). The clamping support wheel (355) is rolled on the clamping support seat (354). The clamping support wheel (355) is inclined upward and supported on the outside of the corresponding chord tube (91).

5. The arch bridge deck installation crane device according to claim 4, characterized in that, The clamping mechanism (23) includes a clamping vertical beam (231), a clamping transverse telescopic cylinder (232), and a clamping limiting head (233). The upper end of the clamping vertical beam (231) is connected to the ends of the rear support beam (212) and the front support beam (211). The lower end of the clamping vertical beam (231) is connected to the clamping transverse telescopic cylinder (232). The axial direction of the clamping transverse telescopic cylinder (232) is left and right. The clamping transverse telescopic cylinder (232) is hinged to the end near the string tube (91) with the clamping limiting head (233). The axial direction of the hinge shaft corresponding to the clamping limiting head (233) is front and back. The surface of the clamping limiting head (233) used to abut against the string tube (91) is adapted to the arc surface of the string tube (91).

6. The arch bridge deck installation crane device according to claim 1, characterized in that, The main beam structure (3) is symmetrically provided with the traction mechanism (2) at both ends along the walking direction.

7. The arch bridge deck installation crane device according to claim 1, characterized in that, The traction mechanism (2) further includes a support limiting mechanism (25), which is located at the rear support beam (212) and the front support beam (211); The support limiting mechanism includes a height telescopic cylinder (252) and a support limiting head (251). The height telescopic cylinder (252) is vertically arranged. The upper end of the height telescopic cylinder (252) is fixed to the rear support beam (212) and the front support beam (211). The lower end of the height telescopic cylinder (252) is connected to the support limiting head (251). The bottom of the support limiting head (251) is adapted to the arc shape of the top surface of the corresponding chord tube (91). The height telescopic cylinder (252) can adjust the height of the support limiting head (251).

8. The arch bridge deck installation crane device according to claim 7, characterized in that, The support limiting mechanism (25) and the support traveling mechanism (27) are respectively located on two equal-height chord tubes (91) on the same side.

9. The arch bridge deck installation crane device according to any one of claims 1-8, characterized in that, The wheels, the supporting wheels (272), and the clamping supporting wheels (355) are all adapted to the arc shape of the string tube (91).

10. The arch bridge deck installation crane device according to any one of claims 1-8, characterized in that, The lifting device (5) includes a lifting pulley block (51) and a lifting beam (52). The lifting pulley block (51) is connected to the lifting beam (52), and the lifting beam (52) is used to connect to the lifting lugs (53) on the beam. The lifting mechanism (1) includes a lifting winch (11), a guide wheel assembly (32), and a lifting fixed pulley assembly (55) mounted on the main beam structure (3). The axial direction of the guide wheel assembly (32) is the radial direction of the arch (9), and the axial direction of the lifting fixed pulley assembly (55) is horizontal. The lifting wire rope (54) of the lifting winch (11) passes around the guide wheel assembly (32) and then turns and is wound between the lifting fixed pulley assembly (55) and the lifting movable pulley assembly (51). And / or, The traveling mechanism (4) includes a wheel set (41), a distribution beam (42) and a wheel beam (43). The distribution beam (42) is connected to the bottom of the main beam structure (3). Two wheel beams (43) are located at the bottom of the left and right sides of the distribution beam (42). Two wheel sets (41) are provided at the bottom of the front and rear ends of each wheel beam (43). The axial direction of the wheel set (41) is left and right. And / or, The main beam structure (3) includes two main beam box steels (33) spaced apart along the walking direction and two main beam H steels (34) spaced apart along the left and right directions. The main beam box steels (33) are arranged along the left and right directions, and the main beam H steels (34) are arranged along the walking direction. The main beam box steels (33) are located above the main beam H steels (34). The two main beam box steels (33) and the two main beam H steels (34) are connected by flanges (334) to form a frame structure. The lifting mechanism (1) includes four lifting winches (11) arranged in a rectangular array and a fixed platform (101). The fixed platform (101) is fixedly installed on two main beam box steels (33) and located in the middle of the main beam structure (3) in the left-right direction. The lifting winches (11) are installed on the fixed platform (101). The traction mechanism (2) is connected to the end of the main beam H-beam (34); The traveling mechanism (4) is located at the bottom of the main beam H-beam (34).

Citation Information

Patent Citations

  • Novel lower trolley system

    CN104261253A

  • Traction anchoring system of arch climbing crane

    CN217708820U