A centerline control method for small waterplane area catamaran
By setting a unified reference ground line during the closing process of the small waterplane area catamaran, and adjusting the position and attitude of the submersible body and the L-shaped section, the problem of the deviated center distance of the body and the non-parallel longitudinal center line of the body was solved, and improved Improve construction efficiency and hull performance.
Patent Information
- Application Number
- CN202410782299.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-06-18
AI Technical Summary
During the construction process of a small waterplane area catamaran, due to its complex centerline structure, it is easy for the body to deviate from the center spacing and the longitudinal centerline to be non-parallel, which affects the completed main dimensions and performance of the hull.
Set up a superstructure center reference ground line on the ground of the closed site, and set the left and right body center reference ground lines based on this ground line. By hoisting and adjusting the submersible body segments and the L-shaped total segment, ensure that each segment reaches Equipped with target position and attitude to reduce the relative position error between center lines.
By unifying the reference positioning basis, the plane position and attitude errors during the segmented loading process are reduced, the construction efficiency is improved, the relative position errors between the six center lines of the small waterplane area catamaran are reduced, and the overall performance of the hull is ensured.
Smart Images

Figure CN118358714B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of shipbuilding, and in particular to a centerline control method for a small waterplane area catamaran. Background Art
[0002] A catamaran is simply a ship type formed by connecting two thin and long single-hull ships (also called sheet ships) horizontally with a connecting bridge structure. A small waterplane area catamaran is a type of conventional catamaran ship type, consisting of a submerged body, pillars, a connecting bridge, and a superstructure. The submerged body completely immersed in water provides most of the buoyancy, a box-type platform (connecting bridge) is set above the water surface, and the submerged body and the platform are connected by a streamlined pillar body. Generally, there are two engines, two propellers, and two rudders. Therefore, the catamaran waterplane area makes the lateral inertia moment of its longitudinal center axis have good lateral stability; the smaller small waterplane area makes its wave-making resistance small, and it has good seakeeping and seaworthiness; the lateral distance between the two propellers and two rudders is large, and the turning performance is good.
[0003] In the modern shipbuilding model, the hull is divided into several sections for production according to the site conditions. After the sections are completed, they are loaded and assembled in the slipway (dock). The hull of a monohull has only two center lines (longitudinal center line and vertical center line). During construction, the main hull will only be warped, drooped and deformed by waves, and the main impact is only on the axis. The small waterplane area catamaran has six center lines (longitudinal center line of the superstructure, vertical center line of the superstructure, longitudinal center line of the left hull, vertical center line of the left hull, longitudinal center line of the right hull and vertical center line of the right hull). The center line situation is much more complicated than that of a monohull. In addition to the problems that will occur in the construction of a monohull, the following may also occur:
[0004] 1) The longitudinal center lines of the left and right panels are parallel, but the overall spacing is too large or too small, that is, the left and right panels deviate from the original center spacing, and the entire hull presents an "inward-facing eight" or "outward-facing eight" shape (the vertical center lines are not parallel);
[0005] 2) The longitudinal center lines of the left hull, the right hull and the superstructure are not parallel, especially the longitudinal center lines of the left and right hulls that affect the axis of the ship's power system are not parallel.
[0006] The above phenomenon has a negative impact on the completed main dimensions and the overall performance of the ship.
[0007] Therefore, there is an urgent need for a centerline control method for a small waterplane area catamaran to solve the above problems. Summary of the invention
[0008] The purpose of the present invention is to provide a centerline control method for a small waterplane area catamaran to reduce the relative position error between six centerlines of the small waterplane area catamaran.
[0009] In order to achieve the above object, the present invention provides a centerline control method for a small waterplane area catamaran, comprising the following steps:
[0010] S1. A superstructure center reference ground line is set on the ground of the closure site, and a left sheet center reference ground line and a right sheet center reference ground line are set on both sides of the superstructure center reference ground line based on the superstructure center reference ground line;
[0011] S2, with the left sheet center reference ground line as the benchmark, hoist and adjust the left submersible body segment, so that the left submersible body segment reaches its target loading position and target loading posture, with the right sheet center reference ground line as the benchmark, hoist and adjust the right submersible body segment, so that the right submersible body segment reaches its target loading position and target loading posture;
[0012] S3, with the top joint position of the left submersible segment as a reference, hoist the left L-shaped overall segment, with the center of the left sheet body as a reference to the ground line, adjust the posture of the left L-shaped overall segment so that the left L-shaped overall segment reaches its target loading posture, with the top joint position of the right submersible segment as a reference, hoist the right L-shaped overall segment, with the center of the right sheet body as a reference to the ground line, adjust the posture of the right L-shaped overall segment so that the right L-shaped overall segment reaches its target loading posture, the left L-shaped overall segment includes a left pillar segment and a left connecting bridge segment fixedly arranged on the left pillar segment, and the right L-shaped overall segment includes a right pillar segment and a right connecting bridge segment fixedly arranged on the right pillar segment;
[0013] S4. With reference to the ground line at the center of the superstructure, hoist the superstructure segment so that the superstructure segment reaches its target loading position. The superstructure segment includes a plurality of superstructure segments which are sequentially spliced and fixed along the height direction of the superstructure segment.
[0014] As an improvement of the above technical solution, step M is also included between step S2 and step S3, placing the left connecting bridge segment on an operating platform on the ground, overlapping and fixing the left supporting body segment on the left connecting bridge segment to form a left L-shaped overall section, using the left supporting body segment longitudinal center line of the left supporting body segment as the left L-shaped overall section longitudinal center line of the left L-shaped overall section, using the left supporting body segment vertical center line of the left supporting body segment of the left supporting body segment as the left L-shaped overall section vertical center line of the left L-shaped overall section of the left L-shaped overall section, placing the right connecting bridge segment on a carrying plane, overlapping and fixing the right supporting body segment on the right connecting bridge segment to form a right L-shaped overall section, using the right supporting body segment longitudinal center line of the right supporting body segment as the right L-shaped overall section longitudinal center line of the right L-shaped overall section, using the right supporting body segment vertical center line of the right supporting body segment as the right L-shaped overall section vertical center line of the right supporting body segment of the right supporting body segment as the right L-shaped overall section vertical center line of the right L-shaped overall section.
[0015] As an improvement of the above technical solution, the method of hoisting and adjusting the left submerged body segment with the center of the left sheet body as a reference ground line includes:
[0016] A1. Taking the left sheet center reference ground line as a reference, and according to the carrying target position and carrying target posture of the left submersible body segment, a plurality of submersible body segment supporting tooling for supporting the left submersible body segment is arranged on the ground of the closure site;
[0017] A2. Using the center of the left sheet as a reference ground line, hoist the left submerged body segment onto the submerged body segment support tooling;
[0018] A3. Using the center of the left sheet body as a reference ground line, use a three-dimensional adjustment machine to adjust the position and posture of the left submersible body segment until the left submersible body segment reaches its target loading position and target loading posture.
[0019] As an improvement of the above technical solution, the hoisting of the left L-shaped overall section, taking the left sheet center reference ground line as a reference, adjusts the posture of the left L-shaped overall section, including:
[0020] B1. Taking the left sheet center reference ground line as a reference, according to the loading target position and loading target posture of the left submersible segment, and the loading target posture of the left L-shaped overall segment, a plurality of L-shaped overall segment supporting toolings for supporting the left L-shaped overall segment are arranged on the ground of the closure site;
[0021] B2. Using the top joint of the left submerged body segment as a reference, hoist the left L-shaped overall segment onto the left submerged body segment and the L-shaped overall segment support fixture;
[0022] B3. With the center of the left sheet body as a reference to the ground line, the posture of the left L-shaped overall section is adjusted by the L-shaped overall section supporting tooling until the left L-shaped overall section reaches its target loading posture.
[0023] As an improvement of the above technical solution, when the left submerged body segment reaches its target loading position and target loading posture, the midpoint of the bottom ends of the end surfaces at both ends of the left submerged body segment is located between the central reference ground line of the left sheet body and the central reference ground line of the superstructure, and the horizontal distance between the midpoint of the bottom ends of the end surfaces at both ends of the left submerged body segment and the central reference ground line of the left sheet body is a first preset distance, the midpoint of the top ends of the end surfaces at both ends of the left submerged body segment is located between the central reference ground line of the left sheet body and the central reference ground line of the superstructure, and the horizontal distance between the midpoint of the top ends of the end surfaces at both ends of the left submerged body segment and the central reference ground line of the left sheet body is a second preset distance;
[0024] When the left L-shaped overall section reaches its target loading posture, the intersection between the vertical center line of the left L-shaped overall section and the top surface of the left connecting bridge segment is located directly above the left sheet body center reference ground line.
[0025] As an improvement of the above technical solution, the method of hoisting and adjusting the right submerged body segment with the center of the right sheet body as a reference ground line includes:
[0026] C1. Using the center of the right sheet as a reference ground line, and according to the loading target position and loading target posture of the right submersible body segment, a plurality of submersible body segment supporting tooling for supporting the right submersible body segment is arranged on the ground of the closure site;
[0027] C2. Using the center of the right sheet body as a reference ground line, hoist the right submerged body segment onto the submerged body segment support tooling;
[0028] C3. Using the center of the right sheet body as a reference ground line, use a three-dimensional adjustment machine to adjust the position and posture of the right submersible body segment until the right submersible body segment reaches its target loading position and target loading posture.
[0029] As an improvement of the above technical solution, the hoisting of the right L-shaped overall section and adjusting the posture of the right L-shaped overall section include:
[0030] D1. Taking the center of the right sheet body as a reference ground line, according to the target position and target posture of the right submersible body segment, and the target posture of the right L-shaped overall segment, a plurality of L-shaped overall segment support fixtures for supporting the right L-shaped overall segment are arranged on the ground of the closure site;
[0031] D2. Using the top joint of the right submerged body segment as a reference, hoist the right L-shaped overall segment onto the right submerged body segment and the L-shaped overall segment support fixture;
[0032] D3. With the center of the right sheet body as a reference to the ground line, the posture of the right L-shaped overall segment is adjusted by the L-shaped overall segment supporting tooling until the right L-shaped overall segment reaches its target loading posture.
[0033] As an improvement of the above technical solution, when the right submerged body segment reaches its target loading position and target loading posture, the midpoint of the bottom end of the end surface at both ends of the right submerged body segment is located between the center reference ground line of the right sheet body and the center reference ground line of the superstructure, and the horizontal distance between the midpoint of the bottom end of the end surface at both ends of the right submerged body segment and the center reference ground line of the right sheet body is a first preset distance, the midpoint of the top end of the end surface at both ends of the right submerged body segment is located between the center reference ground line of the right sheet body and the center reference ground line of the superstructure, and the horizontal distance between the midpoint of the top end of the end surface at both ends of the right submerged body segment and the center reference ground line of the right sheet body is a second preset distance;
[0034] When the right L-shaped overall segment reaches its target loading posture, the intersection between the vertical center line of the right L-shaped overall segment and the top surface of the right connecting bridge segment is located directly above the center reference ground line of the right sheet body.
[0035] As an improvement of the above technical solution, the submerged body segmented supporting tooling includes a first steel pier and sleepers, and the sleepers are arranged on the first steel pier.
[0036] As an improvement of the above technical solution, the L-shaped overall section supporting tooling includes a second steel pier and a jacking device, and the bottom end of the jacking device is fixedly arranged on the top end of the second steel pier.
[0037] As an improvement of the above technical solution, the method of setting a left sheet body center reference ground line and a right sheet body center reference ground line on both sides of the superstructure center reference ground line based on the superstructure center reference ground line includes:
[0038] E1. Select three reference points on the central reference ground line of the superstructure, and open three cross-section ground lines perpendicular to the central reference ground line of the superstructure through the three reference points respectively;
[0039] E2. Taking the three reference points as reference, determine the left sheet center reference ground line position point and the right sheet center reference ground line position point on each of the cross-section ground lines respectively;
[0040] E3. Open a left sheet center reference ground line through each of the left sheet center reference ground line position points, and open a right sheet center reference ground line through each of the right sheet center reference ground line position points.
[0041] As an improvement of the above technical solution, the three reference points are respectively located at a position corresponding to the bow on the center reference ground line of the superstructure, a position corresponding to the swell on the center reference ground line of the superstructure, and a position corresponding to the stern on the center reference ground line of the superstructure.
[0042] Compared with the prior art, the present invention has the following beneficial effects:
[0043] The centerline control method of the small waterplane area catamaran of the present invention is to open a superstructure center reference ground line on the ground of the folding site, and to open a left-side sheet center reference ground line and a right-side sheet center reference ground line respectively based on the superstructure center reference ground line. The superstructure center reference ground line, the left-side sheet center reference ground line and the right-side sheet center reference ground line are used as a unified and unchanged reference positioning basis during the folding process of the small waterplane area catamaran, so as to reduce the plane position and attitude errors during the loading process of each segment, and further reduce the relative position errors between the six centerlines of the small waterplane area catamaran. In addition, by connecting the left side supporting column segment and the left side connecting bridge segment into a left side L-shaped overall segment, and connecting the right side supporting column segment and the right side connecting bridge segment into a right side L-shaped overall segment, the left side supporting column segment, the left side connecting bridge segment, the right side supporting column segment and the right side connecting bridge segment are hoisted and adjusted in the form of the left side L-shaped overall segment and the right side L-shaped overall segment, and by fixing and connecting multiple superstructure segments in the height direction into a superstructure overall segment, multiple superstructure segments are hoisted in the form of the superstructure overall segment, thereby reducing the number of high-altitude hoisting and adjustments, improving construction efficiency, and reducing cumulative errors, thereby further reducing the relative position error between the six center lines of the small waterplane area catamaran. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 is a flow chart of a small waterplane area catamaran centerline control method provided by an embodiment of the present invention;
[0045] Figure 2 The structure diagram of the small waterplane area catamaran provided by the embodiment of the present invention is Figure 1 ;
[0046] Figure 3 The structure diagram of the small waterplane area catamaran provided by the embodiment of the present invention is Figure 2 ;
[0047] Figure 4 It is a schematic diagram of a superstructure center reference ground line, a left sheet center reference ground line, and a right sheet center reference ground line provided by an embodiment of the present invention;
[0048] Figure 5 It is a schematic diagram of the hoisting and adjustment process of the left submerged body segment provided by an embodiment of the present invention;
[0049] Figure 6 It is a schematic diagram of the left L-shaped overall section and the right L-shaped overall section after hoisting and adjustment provided by an embodiment of the present invention;
[0050] Figure 7 It is a schematic diagram of the process of splicing the left pillar body segment and the left connecting bridge segment provided by an embodiment of the present invention;
[0051] Figure 8 It is a schematic diagram of the left supporting column segment and the left connecting bridge segment provided by an embodiment of the present invention after being spliced together;
[0052] Fig. 9 It is a schematic diagram of the lateral anti-deformation margin of the left submerged body segment and the left L-shaped overall segment when being carried provided by an embodiment of the present invention.
[0053] In the figure:
[0054] 1. The left submerged body segment; 11. The vertical centerline of the left submerged body segment;
[0055] 2. The right submerged body is segmented;
[0056] 3. Left L-shaped total section; 31. Left pillar body section; 311. Left pillar body section vertical centerline; 32. Left connecting bridge section; 321. Left connecting bridge section vertical centerline; 33. Left L-shaped total section vertical centerline;
[0057] 4. Right L-shaped total section; 41. Right pillar section; 42. Right connecting bridge section;
[0058] 10, left sheet; 101, left submersible body; 102, left pillar; 103, left connecting bridge; 104, longitudinal center line of left sheet; 105, vertical center line of left sheet;
[0059] 20, right sheet; 201, right submerged body; 202, right pillar; 203, right connecting bridge; 204, longitudinal centerline of right sheet; 205, vertical centerline of right sheet;
[0060] 30. superstructure; 301. longitudinal centerline of superstructure; 302. vertical centerline of superstructure;
[0061] 100. Reference ground line at the center of the superstructure; 1001. Reference point;
[0062] 200, the center of the left sheet is referenced to the ground line; 300, the center of the right sheet is referenced to the ground line;
[0063] 400, cross-section ground line; 4001, left side slice center reference ground line position point; 4002, right side slice center reference ground line position point;
[0064] 500, submerged body segment support tooling; 5001, first steel pier; 5002, sleepers;
[0065] 600, three-dimensional adjustment machine;
[0066] 700. L-shaped section support tooling; 7001. Second steel pier; 7002. Lifting device. DETAILED DESCRIPTION
[0067] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0068] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, fixed connection, detachable connection, or integration; mechanical connection, electrical connection; direct connection, or indirect connection through an intermediate medium, internal communication between two elements, or interaction between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0069] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0070] In the description of this embodiment, the terms "upper", "lower", "right" and other directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplified operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0071] like Figure 1 As shown, this embodiment provides a small waterplane area catamaran centerline control method for Figure 2 and Figure 3The control of each center line during the closing process of the small waterplane area catamaran shown in the figure, the small waterplane area catamaran includes a left hull 10, a right hull 20 and a superstructure 30, the left hull 10 includes a left submerged body 101, a left pillar 102 and a left connecting bridge 103, the left pillar 102 is fixedly arranged above the left submerged body 101, and the left connecting bridge 103 is fixedly arranged above the left pillar 102, the right hull 20 includes a right submerged body 201, a right pillar 202 and a right connecting bridge 203, the right pillar 202 is fixedly arranged above the right submerged body 201, and the right connecting bridge 203 is fixedly arranged above the right pillar 202, and the center line control method of the small waterplane area catamaran includes the following steps:
[0072] S1. A superstructure center reference ground line 100 (which is also the hull center reference ground line) is opened on the ground of the assembly site. Based on the superstructure center reference ground line 100, a left sheet center reference ground line 200 and a right sheet center reference ground line 300 are opened on both sides of the superstructure center reference ground line 100 respectively;
[0073] S2, with the left sheet center reference ground line 200 as the benchmark, hoist and adjust the left submersible body segment 1, so that the left submersible body segment 1 reaches its target loading position and target loading posture, with the right sheet center reference ground line 300 as the benchmark, hoist and adjust the right submersible body segment 2, so that the right submersible body segment 2 reaches its target loading position and target loading posture;
[0074] S3, with the top joint position of the left submersible segment 1 as a reference, hoist the left L-shaped total segment 3, with the left sheet center reference ground line 200 as a reference, adjust the posture of the left L-shaped total segment 3, so that the left L-shaped total segment 3 reaches its target loading posture, with the top joint position of the right submersible segment 2 as a reference, hoist the right L-shaped total segment 4, with the right sheet center reference ground line 300 as a reference, adjust the posture of the right L-shaped total segment 4, so that the right L-shaped total segment 4 reaches its target loading posture, the left L-shaped total segment 3 includes a left pillar segment 31 and a left connecting bridge segment 32 fixedly arranged on the left pillar segment 31, and the right L-shaped total segment 4 includes a right pillar segment 41 and a right connecting bridge segment 42 fixedly arranged on the right pillar segment 41;
[0075] S4. With reference to the ground line 100 at the center of the superstructure as a reference, hoist the superstructure section so that the superstructure section reaches its target loading position. The superstructure section includes a plurality of superstructure segments which are sequentially spliced and fixed along the height direction of the superstructure section.
[0076] The centerline control method of the small waterplane area catamaran provided in this embodiment is to open a superstructure center reference ground line 100 on the ground of the folding site, and to open a left sheet center reference ground line 200 and a right sheet center reference ground line 300 respectively based on the superstructure center reference ground line 100. The superstructure center reference ground line 100, the left sheet center reference ground line 200 and the right sheet center reference ground line 300 are used as a unified and unchanging reference positioning basis during the folding process of the small waterplane area catamaran, so as to reduce the plane position and attitude errors during the loading process of each segment, and further reduce the relative position errors among the six centerlines of the small waterplane area catamaran, especially the errors of parallelism and spacing between the longitudinal centerline 104 of the left sheet and the longitudinal centerline 204 of the right sheet. In addition, by connecting the left side pillar body segment 31 and the left side connecting bridge segment 32 into the left side L-shaped total segment 3, and connecting the right side pillar body segment 41 and the right side connecting bridge segment 42 into the right side L-shaped total segment 4, the left side pillar body segment 31, the left side connecting bridge segment 32, the right side pillar body segment 41 and the right side connecting bridge segment 42 are hoisted and adjusted in the form of the left side L-shaped total segment 3 and the right side L-shaped total segment 4, and by fixing and connecting multiple superstructure segments in the height direction into a superstructure total segment, multiple superstructure segments are hoisted in the form of the superstructure total segment, thereby reducing the number of high-altitude hoisting and adjustment, improving construction efficiency, and reducing cumulative errors, thereby further reducing the relative position errors between the six center lines of the small waterplane area catamaran, especially the error of parallelism between the vertical center line 105 of the left sheet body and the vertical center line 205 of the right sheet body.
[0077] Among them, those skilled in the art can understand that, for the left L-shaped total section 3 and the right L-shaped total section 4, their planar positions are determined by the positions of the top splicing interfaces of the left submerged body section 1 and the right submerged body section 2, respectively. Therefore, when hoisting the left L-shaped total section 3 and the right L-shaped total section 4, it is necessary to use the top splicing interface of the left submerged body section 1 and the top splicing interface of the right submerged body section 2 as a reference so that the left submerged body section 1 and the left L-shaped total section 3, as well as the right submerged body section 2 and the right L-shaped total section 4 can be spliced smoothly.
[0078] It should be noted that the reference ground line refers to the reference positioning line surveyed on the ground of the ship construction site (specifically, the assembly site in this embodiment), which is used for segment positioning and adjustment during the ship loading process to ensure that the reference positioning during the segment loading process is unified and unchanged. There are three reference ground lines in this embodiment, namely, the superstructure center reference ground line 100, the left sheet center reference ground line 200 and the right sheet center reference ground line 300.
[0079] Alternatively, if Figure 4As shown, based on the superstructure center reference ground line 100, a left sheet center reference ground line 200 and a right sheet center reference ground line 300 are respectively opened on both sides of the superstructure center reference ground line 100, including:
[0080] E1. Select three reference points 1001 on the superstructure center reference ground line 100, and open three cross-section ground lines 400 perpendicular to the superstructure center reference ground line 100 through the three reference points 1001. The three reference points 1001 are respectively located at the position corresponding to the bow of the superstructure center reference ground line 100, the position corresponding to the swell of the superstructure center reference ground line 100, and the position corresponding to the stern of the superstructure center reference ground line 100;
[0081] E2. Using the three reference points 1001 as references, determine the left sheet center reference ground line position point 4001 and the right sheet center reference ground line position point 4002 on each cross-section ground line 400;
[0082] E3. Open the left sheet body center reference ground line 200 through each left sheet body center reference ground line position point 4001, and open the right sheet body center reference ground line 300 through each right sheet body center reference ground line position point 4002. When the left sheet body center reference ground line 200 is opened, set up the laser theodolite at the left sheet body center reference ground line position point 4001 located at the corresponding position of the midship, and open the left sheet body center reference ground line position point 4001 located at the corresponding position of the bow and the left sheet body center reference ground line position point 4001 located at the corresponding position of the stern as the reference. The right sheet body center reference ground line 200, similarly, when the right sheet body center reference ground line 300 is opened, the laser theodolite is set up at the right sheet body center reference ground line position point 4002 located at the corresponding position of the midship, and the right sheet body center reference ground line position point 4002 located at the corresponding position of the bow and the right sheet body center reference ground line position point 4002 located at the corresponding position of the stern are used as references to open the right sheet body center reference ground line 300 to ensure that the left sheet body center reference ground line 200, the right sheet body center reference ground line 300 and the superstructure center reference ground line 100 are parallel.
[0083] Alternatively, if Figure 6 and Figure 7As shown, step M is also included between step S2 and step S3, placing the left connecting bridge segment 32 on an operating platform on the ground, and overlapping and fixing the left supporting body segment 31 on the left connecting bridge segment 32 to form a left L-shaped total segment 3. During the overlapping process, the vertical center line 311 of the left supporting body segment located on the end faces of the left supporting body segment 31 at both ends are made to be collinear with the vertical center line 321 of the left connecting bridge segment located on the end faces of the left connecting bridge segment 32 at both ends. The longitudinal center line of the left side pillar body segment 31 is used as the longitudinal center line of the left side L-shaped overall segment 3, and the vertical center line 311 of the left side pillar body segment 31 is used as the vertical center line 33 of the left side L-shaped overall segment 3. The right side connecting bridge segment 42 is placed on the mounting plane, and the right side pillar body segment 41 is overlapped and fixed on the right side connecting bridge segment 42 to form the right side L-shaped overall segment 4. During the overlapping process, the vertical center lines of the right side pillar body segment on the end faces of the right side pillar body segment 41 are respectively collinear with the vertical center lines of the right side connecting bridge segment on the end faces of the right side connecting bridge segment 42. The longitudinal center line of the right side pillar body segment 41 is used as the longitudinal center line of the right side L-shaped overall segment 4, and the vertical center line of the right side pillar body segment 41 is used as the vertical center line of the right side L-shaped overall segment 4. The splicing between the left connecting bridge segment 32 and the left supporting body segment 31, as well as the splicing between the right connecting bridge segment 42 and the right supporting body segment 41, is performed on the carrying plane on the ground. Compared with splicing at high altitude (above the left submersible segment 1 and the right submersible segment 2), the ground splicing operation is simpler and has a smaller error.
[0084] Optionally, between step S3 and step S4, step N is further included, in which a plurality of superstructure segments are sequentially spliced and fixedly connected in the height direction on an operating platform on the ground to form a superstructure total segment. Compared with splicing at high altitude (above the connecting bridge), ground splicing operation is simpler and has a smaller error.
[0085] Optionally, when the superstructure segment reaches its target loading position, the top midpoint and the bottom midpoint of the end faces at both ends of the superstructure segment are both located in a vertical plane passing through a reference ground line 100 at the center of the superstructure.
[0086] Alternatively, if Figure 5 As shown, with the left sheet center reference ground line 200 as the reference, the left submerged body segment 1 is hoisted and adjusted, including:
[0087] A1. Taking the left sheet center reference ground line 200 as a reference, and according to the loading target position and loading target posture of the left submersible body segment 1, a plurality of submersible body segment support tools 500 for supporting the left submersible body segment 1 are arranged on the ground of the closure site;
[0088] A2. With the left sheet center reference ground line 200 as the reference, hoist the left submerged body segment 1 onto the submerged body segment support tooling 500;
[0089] A3. Using the left sheet center reference ground line 200 as a reference, use the three-dimensional adjustment machine 600 to adjust the position and posture of the left submersible body segment 1 until the left submersible body segment 1 reaches its target loading position and target loading posture.
[0090] In this embodiment, the submerged body segment supporting tooling 500 includes a first steel pier 5001 and a sleeper 5002. The sleeper 5002 is arranged on the first steel pier 5001. When using the three-dimensional adjustment machine 600 to adjust the posture of the left submerged body segment 1, the height of the submerged body segment supporting tooling 500 at certain positions can be adjusted by replacing sleepers 5002 of different heights, or by adding or reducing thin sleepers 5002, so that the submerged body segment supporting tooling 500 can support the changed posture of the left submerged body segment 1.
[0091] Alternatively, if Figure 6 As shown, the left L-shaped total section 3 is hoisted, and the posture of the left L-shaped total section 3 is adjusted based on the left sheet center reference ground line 200, including:
[0092] B1. Taking the left sheet center reference ground line 200 as a reference, according to the loading target position and loading target posture of the left submersible segment 1, and the loading target posture of the left L-shaped total segment 3, a plurality of L-shaped total segment supporting fixtures 700 for supporting the left L-shaped total segment 3 are arranged on the ground of the closure site;
[0093] B2. Using the top joint of the left submerged body segment 1 as a reference, hoist the left L-shaped segment 3 onto the left submerged body segment 1 and the L-shaped segment support fixture 700;
[0094] B3. With the left sheet center reference ground line 200 as a reference, the posture of the left L-shaped overall section 3 is adjusted by the L-shaped overall section supporting tool 700 until the left L-shaped overall section 3 reaches its target loading posture.
[0095] The center of gravity of the left L-shaped section 3 of the small waterplane area catamaran deviates far from the vertical centerline 105 of the left body and the longitudinal centerline 104 of the left body. In the process of closing with the left submerged body section 1, the positioning support provided by the top joint of the left submerged body section 1 is insufficient, and the relative position between the vertical centerline 105 of the left body and the vertical centerline 302 of the superstructure and the relative position between the longitudinal centerline 104 of the left body and the longitudinal centerline 301 of the superstructure will be greatly deviated due to the gravity of the left L-shaped section 3. Therefore, in this embodiment, when the left L-shaped section 3 is hoisted and adjusted, the L-shaped section support tool 700 is set to support the end of the left L-shaped section 3 close to the reference ground line 100 of the center of the superstructure, which effectively solves the problem of insufficient positioning landing force points during the loading and closing process of the left L-shaped section 3.
[0096] Alternatively, if Figure 6 As shown, the L-shaped overall section support tool 700 includes a second steel pier 7001 and a jacking device 7002. The bottom end of the jacking device 7002 is fixed to the top of the second steel pier 7001. The posture of the left L-shaped overall section 3 is adjusted by the jacking device 7002, thereby reducing the error value of the left sheet body vertical center line 105 and the left sheet body longitudinal center line 104 during the loading and closing process. In this embodiment, the jacking device 7002 is a jack.
[0097] Alternatively, if Fig. 9 As shown, when the left submerged body segment 1 reaches its target loading position and target loading posture, the midpoints of the bottom ends of the end surfaces of the left submerged body segment 1 at both ends are located between the left sheet center reference ground line 200 and the superstructure center reference ground line 100, and the horizontal distance between the midpoints of the bottom ends of the end surfaces of the left submerged body segment 1 at both ends and the left sheet center reference ground line 200 is the first preset distance d1, and the midpoints of the top ends of the end surfaces of the left submerged body segment 1 at both ends are located between the left sheet center reference ground line 200 and the superstructure center reference ground line 100. The horizontal distance between the midpoint of the top end surfaces of both ends of the left submerged body segment 1 and the central reference ground line 200 of the left sheet body is a second preset distance d2, and the midpoint of the bottom end of the end surfaces of both ends of the left submerged body segment 1 and the midpoint of the top end surfaces of both ends of the left submerged body segment 1 are both located on the vertical center line 11 of the left submerged body segment; when the left L-shaped total section 3 reaches its target loading posture, the intersection between the vertical center line of the left L-shaped total section 3 and the top surface of the left connecting bridge segment 32 is located directly above the central reference ground line 200 of the left sheet body.
[0098] It can be understood by those skilled in the art that the accumulated weight during the installation of the sections, equipment and materials above the connecting bridge may cause deformation of the structure below the connecting bridge. In view of the requirement that the shape of the entire ship should be a theoretical linear shape (with the error within the allowable range) after the hull of the small waterline catamaran is formed, in this embodiment, when the left submerged body section 1 and the left L-shaped total section 3 are loaded and closed, a lateral anti-deformation margin is added in the horizontal direction toward the center reference ground line 100 of the superstructure with the vertical plane where the center reference ground line 200 of the left sheet body is located (the vertical plane passing through the center reference ground line 200 of the left sheet body) as the reference. The lateral anti-deformation margin is also: the midpoint position of the bottom end of the end surface of the left submerged body section 1 at both ends is Between the left-side sheet center reference ground line 200 and the superstructure center reference ground line 100, the horizontal distance between the midpoint of the bottom end of the end surface of the left-side submerged body segment 1 and the left-side sheet center reference ground line 200 is a first preset distance d1, the midpoint of the top end of the end surface of the left-side submerged body segment 1 is located between the left-side sheet center reference ground line 200 and the superstructure center reference ground line 100, the horizontal distance between the midpoint of the top end of the end surface of the left-side submerged body segment 1 and the left-side sheet center reference ground line 200 is a second preset distance d2, and the intersection between the vertical center line of the left L-shaped total section 3 and the top surface of the left connecting bridge segment 32 is located directly above the left-side sheet center reference ground line 200. At the same time, the transverse anti-deformation allowance makes the deck surface of the left connecting bridge segment 32 produce a height difference allowance that is higher than the theoretical shape. The transverse deformation of the structure below the connecting bridge (including the connecting bridge) is compensated by the transverse anti-deformation allowance and the height difference allowance, so that after the structure below the connecting bridge is transversely deformed, the actual positions of the left submerged body segment 1, the left supporting body segment 31 and the left connecting bridge segment 32 are basically the same as their designed theoretical positions, solving the problem that the weight accumulation during the installation of the segments above the connecting bridge, equipment and materials causes the transverse deformation of the structure below the connecting bridge, resulting in the hull of the waterplane catamaran after closing not conforming to the theoretical line shape. The specific values of the first preset distance d1 and the second preset distance d2 are the values accumulated from the empirical data, and there are differences due to the main dimensions of the ship construction, the level of process organization and management, etc.
[0099] Optionally, hoisting and adjusting the right submerged body segment 2 with reference to the ground line 300 at the center of the right sheet as a reference includes:
[0100] C1. Taking the right sheet center reference ground line 300 as a reference, and according to the loading target position and loading target posture of the right submerged body segment 2, a plurality of submerged body segment support tooling 500 for supporting the right submerged body segment 2 are arranged on the ground of the closure site;
[0101] C2. With the center of the right sheet body as reference to the ground line 300, hoist the right submerged body segment 2 onto the submerged body segment support tooling 500;
[0102] C3. With reference to the ground line 300 at the center of the right sheet body, use the three-dimensional adjustment machine 600 to adjust the position and posture of the right submersible body segment 2 until the right submersible body segment 2 reaches its target loading position and target loading posture.
[0103] In this embodiment, when using the three-dimensional adjustment machine 600 to adjust the posture of the right submerged body segment 2, the height of the submerged body segment supporting tooling 500 at certain positions can be adjusted by replacing sleepers 5002 of different heights, or by adding or reducing thin sleepers 5002, so that the submerged body segment supporting tooling 500 can support the changed posture of the right submerged body segment 2.
[0104] Alternatively, if Figure 6 As shown, hoisting the right L-shaped overall section 4 and adjusting the posture of the right L-shaped overall section 4 include:
[0105] D1. Taking the right sheet center reference ground line 300 as a reference, according to the loading target position and loading target posture of the right submerged body segment 2, and the loading target posture of the right L-shaped total segment 4, a plurality of L-shaped total segment supporting fixtures 700 for supporting the right L-shaped total segment 4 are arranged on the ground of the closure site;
[0106] D2. Using the top joint of the right submerged body segment 2 as a reference, hoist the right L-shaped segment 4 onto the right submerged body segment 2 and the L-shaped segment support fixture 700;
[0107] D3. With the right sheet center reference ground line 300 as a reference, the posture of the right L-shaped overall segment 4 is adjusted by the L-shaped overall segment supporting tool 700 until the right L-shaped overall segment 4 reaches its target loading posture.
[0108] The center of gravity of the right L-shaped section 4 of the small waterplane area catamaran deviates far from the right vertical centerline 205 and the right longitudinal centerline 204 of the right body. In the process of closing with the right submerged body section 2, the positioning support provided by the top joint of the right submerged body section 2 is insufficient, and the relative position between the vertical centerline 205 of the right body and the vertical centerline 302 of the superstructure and the relative position between the longitudinal centerline 204 of the right body and the longitudinal centerline 301 of the superstructure will be greatly deviated due to the gravity of the right L-shaped section 4. Therefore, when the right L-shaped section 4 is hoisted and adjusted, the present embodiment effectively solves the problem of insufficient positioning landing force points during the loading and closing process of the right L-shaped section 4 by setting an L-shaped section support tool 700 to support the end of the right L-shaped section 4 close to the reference ground line 100 of the center of the superstructure. The posture of the right L-shaped total section 4 is adjusted by the lifting device 7002, so as to reduce the error value of the right sheet body vertical center line 205 and the right sheet body longitudinal center line 204 during the loading and closing process.
[0109] Optionally, when the right submerged body segment 2 reaches its target loading position and target loading posture, the midpoint of the bottom end of the end surface of the right submerged body segment 2 is located between the right sheet center reference ground line 300 and the superstructure center reference ground line 100, the horizontal distance between the midpoint of the bottom end of the end surface of the right submerged body segment 2 and the right sheet center reference ground line 300 is a first preset distance d1, and the midpoint of the top end of the end surface of the right submerged body segment 2 is located between the right sheet center reference ground line 300 and the superstructure center reference ground line 100. 0, the horizontal distance between the midpoint of the top of the end surface at both ends of the right submerged body segment 2 and the center reference ground line 300 of the right sheet body is a second preset distance d2, the midpoint of the bottom of the end surface at both ends of the right submerged body segment 2 and the midpoint of the top of the end surface at both ends of the right submerged body segment 2 are both located on the vertical center line of the right submerged body segment; when the right L-shaped total section 4 reaches its target loading posture, the intersection between the vertical center line of the right L-shaped total section 4 and the top surface of the right connecting bridge segment 42 is located directly above the center reference ground line 300 of the right sheet body.
[0110] In this embodiment, when the right submerged body segment 2 and the right L-shaped total segment 4 are loaded and closed, a lateral anti-deformation margin is added in the horizontal direction toward the superstructure center reference ground line 100 with the vertical plane where the right sheet center reference ground line 300 is located (the vertical plane passing through the right sheet center reference ground line 300) as the reference. The lateral anti-deformation margin is that: the midpoint of the bottom end of the end surface of the right submerged body segment 2 is located between the right sheet center reference ground line 300 and the superstructure center reference ground line 100, and the midpoint of the bottom end of the end surface of the right submerged body segment 2 is located between the right sheet center reference ground line 300 and the superstructure center reference ground line 100. The horizontal distance between the point and the right-side sheet center reference ground line 300 is the first preset distance d1, the midpoint of the top of the end surface at both ends of the right-side submerged body segment 2 is located between the right-side sheet center reference ground line 300 and the superstructure center reference ground line 100, the horizontal distance between the midpoint of the top of the end surface at both ends of the right-side submerged body segment 2 and the right-side sheet center reference ground line 300 is the second preset distance d2, and the intersection between the vertical center line of the right-side L-shaped total section 4 and the top surface of the right-side connecting bridge segment 42 is located directly above the right-side sheet center reference ground line 300. At the same time, the lateral anti-deformation allowance makes the deck surface of the right connecting bridge section 42 produce a height difference allowance d3 that is higher than the theoretical shape. The lateral deformation of the structure below the connecting bridge (including the connecting bridge) is compensated by the lateral anti-deformation allowance and the height difference allowance. After the structure below the connecting bridge is transversely deformed, the actual positions of the right submerged body section 2, the right supporting body section 41 and the right connecting bridge section 42 are basically the same as their designed theoretical positions, which solves the problem that the accumulated weight during the installation of sections above the connecting bridge, equipment and materials causes lateral deformation of the structure below the connecting bridge, resulting in the hull of the waterplane area catamaran not conforming to the theoretical line shape after closing.
[0111] It can be understood by those skilled in the art that the small waterplane area catamaran comprises a plurality of left submerged body segments 1, a plurality of right submerged body segments 2, a plurality of left L-shaped total segments 3, a plurality of right L-shaped total segments 4 and a plurality of superstructure total segments. When each left submerged body segment 1 and each right submerged body segment 2 are loaded and closed, a lateral anti-deformation margin needs to be set.
[0112] In addition, when the left submerged hull section 1 and the right submerged hull section 2 are loaded and closed, longitudinal anti-deformation allowances should be set for part of the left submerged hull section 1 and part of the right submerged hull section 2. The longitudinal anti-deformation allowance is to cause longitudinal deformation of the structure below the connecting bridge due to the accumulated weight during the loading of sections above the connecting bridge, the installation of equipment and materials (mainly manifested in the deformation and upward warping of both ends of the hull under the action of the accumulated weight during the loading of sections above the connecting bridge, the installation of equipment and materials), resulting in the problem that the hull of the waterplane area catamaran after closing does not conform to the theoretical line shape.
[0113] Specifically, when a left submerged body segment 1 located in the midship position reaches its target loading posture, its left submerged body segment longitudinal centerline remains horizontal, and when the remaining left submerged body segments 1 reach their own target loading posture, their left submerged body segment longitudinal centerlines are all tilted downward in the direction away from the midship position, and the degree of inclination is that for every 1m of the left submerged body segment longitudinal centerline of the left submerged body segment 1 extending, the height of the left submerged body segment 1 sinks uniformly by 0.5mm. Moreover, when the last left submerged body segment 1 located at the stern of the ship reaches its target loading posture, in addition to the longitudinal centerline of its left submerged body segment tilting downward in the direction away from the midship position, its left submerged body segment longitudinal centerline also sinks as a whole by a third preset distance compared with the longitudinal centerline of the left submerged body segment of the adjacent left submerged body segment 1. The specific value of the third preset distance is a value accumulated from empirical data, which varies due to the main dimensions of the ship construction, the level of process organization and management, etc.
[0114] Similarly, when a right submerged body segment 2 located in the midship position reaches its target loading posture, its right submerged body segment longitudinal centerline remains horizontal, and when the remaining right submerged body segments 2 reach their own target loading posture, their right submerged body segment longitudinal centerlines are all tilted downward in the direction away from the midship position, and the degree of inclination is that for every 1m of the right submerged body segment longitudinal centerline of the right submerged body segment 2, the height of the right submerged body segment 2 sinks uniformly by 0.5mm. Moreover, when the last right submerged body segment 2 located at the stern of the ship reaches its target loading posture, in addition to the longitudinal centerline of its right submerged body segment tilting downward in the direction away from the midship position, its right submerged body segment longitudinal centerline also sinks as a whole by a third preset distance compared to the longitudinal centerline of the right submerged body segment of the adjacent right submerged body segment 2.
[0115] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.
Claims
1. A method for controlling the centerline of a small waterplane area catamaran, characterized in that: The small waterplane area catamaran comprises a plurality of left submerged body sections (1), a plurality of right submerged body sections (2), a plurality of left L-shaped sections (3), a plurality of right L-shaped sections (4) and a plurality of superstructure sections. The left L-shaped section (3) comprises a left pillar section (31) and a left connecting bridge section (32) fixedly arranged on the left pillar section (31). The right L-shaped section (4) comprises a right pillar section (41) and a right connecting bridge section (42) fixedly arranged on the right pillar section (41). The superstructure section comprises a plurality of superstructure sections which are sequentially spliced and fixed along the height direction of the superstructure section. The centerline control method of the small waterplane area catamaran comprises the following steps: S1. A superstructure center reference ground line (100) is set on the ground of the closure site, and a left sheet center reference ground line (200) and a right sheet center reference ground line (300) are respectively set on both sides of the superstructure center reference ground line (100) based on the superstructure center reference ground line (100); S2, using the left sheet center reference ground line (200) as a reference, hoisting and adjusting the left submersible body segment (1) so that the left submersible body segment (1) reaches its target loading position and target loading posture; using the right sheet center reference ground line (300) as a reference, hoisting and adjusting the right submersible body segment (2) so that the right submersible body segment (2) reaches its target loading position and target loading posture; S3, taking the top joint position of the left submersible body segment (1) as a reference, hoisting the left L-shaped total segment (3), taking the center reference ground line (200) of the left sheet body as a reference, adjusting the posture of the left L-shaped total segment (3) so that the left L-shaped total segment (3) reaches its target loading posture, taking the top joint position of the right submersible body segment (2) as a reference, hoisting the right L-shaped total segment (4), taking the center reference ground line (300) of the right sheet body as a reference, adjusting the posture of the right L-shaped total segment (4) so that the right L-shaped total segment (4) reaches its target loading posture; S4. Using the center of the superstructure as a reference ground line (100), hoist the superstructure segment so that the superstructure segment reaches its target loading position.
2. The method for controlling the centerline of a small waterplane area catamaran according to claim 1, characterized in that: The method further comprises step M between step S2 and step S3, placing the left connecting bridge segment (32) on an operating platform on the ground, overlapping and fixing the left supporting column segment (31) on the left connecting bridge segment (32) to form a left L-shaped overall segment (3), using the left supporting column segment longitudinal center line of the left supporting column segment (31) as the left L-shaped overall segment longitudinal center line of the left L-shaped overall segment (3), and using the left supporting column segment vertical center line (311) of the left supporting column segment (31) as the left L-shaped overall segment (3). ), the right connecting bridge segment (42) is placed on the mounting plane, and the right supporting column segment (41) is overlapped and fixed on the right connecting bridge segment (42) to form the right L-shaped overall segment (4), and the right supporting column segment longitudinal center line of the right supporting column segment (41) is used as the right L-shaped overall segment longitudinal center line of the right L-shaped overall segment (4), and the right supporting column segment vertical center line of the right supporting column segment (41) is used as the right L-shaped overall segment vertical center line of the right L-shaped overall segment (4).
3. The centerline control method of a small waterplane area catamaran according to claim 2, characterized in that: The method of hoisting and adjusting the left submerged body segment (1) based on the left sheet body center reference ground line (200) comprises: A1. Using the left sheet center reference ground line (200) as a reference, and according to the loading target position and loading target posture of the left submersible body segment (1), a plurality of submersible body segment supporting tools (500) for supporting the left submersible body segment (1) are arranged on the ground of the closure site; A2. Using the left sheet center reference ground line (200) as a reference, hoist the left submerged body segment (1) onto the submerged body segment support tooling (500); A3. Using the left sheet center reference ground line (200) as a reference, use a three-dimensional adjustment machine (600) to adjust the position and posture of the left submersible body segment (1) until the left submersible body segment (1) reaches its target loading position and target loading posture.
4. The method for controlling the centerline of a small waterplane area catamaran according to claim 3, characterized in that: The hoisting of the left L-shaped overall section (3) is performed by adjusting the posture of the left L-shaped overall section (3) based on the left sheet center reference ground line (200) and comprising: B1, taking the left sheet center reference ground line (200) as a reference, arranging a plurality of L-shaped overall section supporting tools (700) for supporting the left L-shaped overall section (3) on the ground of the closure site according to the loading target position and loading target posture of the left submersible body segment (1) and the loading target posture of the left L-shaped overall section (3); B2. Using the top joint of the left submersible body segment (1) as a reference, hoist the left L-shaped overall segment (3) onto the left submersible body segment (1) and the L-shaped overall segment supporting tooling (700); B3. Using the left sheet center reference ground line (200) as a reference, the posture of the left L-shaped overall section (3) is adjusted by the L-shaped overall section supporting tool (700) until the left L-shaped overall section (3) reaches its target loading posture.
5. The method for controlling the centerline of a small waterplane area catamaran according to claim 4, characterized in that: When the left submerged body segment (1) reaches its target loading position and target loading posture, the midpoints of the bottom ends of the end surfaces at both ends of the left submerged body segment (1) are located between the left sheet body center reference ground line (200) and the superstructure center reference ground line (100), and the horizontal distance between the midpoints of the bottom ends of the end surfaces at both ends of the left submerged body segment (1) and the left sheet body center reference ground line (200) is a first preset distance, the midpoints of the top ends of the end surfaces at both ends of the left submerged body segment (1) are located between the left sheet body center reference ground line (200) and the superstructure center reference ground line (100), and the horizontal distance between the midpoints of the top ends of the end surfaces at both ends of the left submerged body segment (1) and the left sheet body center reference ground line (200) is a second preset distance; When the left L-shaped overall section (3) reaches its target loading posture, the intersection between the vertical center line of the left L-shaped overall section (3) and the top surface of the left connecting bridge section (32) is located directly above the left sheet center reference ground line (200).
6. The method for controlling the centerline of a small waterplane area catamaran according to claim 2, characterized in that: The method of hoisting and adjusting the right submerged body segment (2) based on the right sheet body center reference ground line (300) comprises: C1. Using the right sheet center reference ground line (300) as a reference, and according to the loading target position and loading target posture of the right submersible body segment (2), a plurality of submersible body segment supporting tools (500) for supporting the right submersible body segment (2) are arranged on the ground of the closure site; C2. Using the center of the right sheet body as a reference ground line (300), hoist the right submerged body segment (2) onto the submerged body segment supporting tooling (500); C3. Using the center reference ground line (300) of the right sheet body as a reference, use a three-dimensional adjustment machine (600) to adjust the position and posture of the right submersible body segment (2) until the right submersible body segment (2) reaches its target loading position and target loading posture.
7. The method for controlling the centerline of a small waterplane area catamaran according to claim 6, characterized in that: The hoisting of the right L-shaped overall section (4) and adjusting the posture of the right L-shaped overall section (4) include: D1, using the right sheet center reference ground line (300) as a reference, arranging a plurality of L-shaped overall section support fixtures (700) for supporting the right L-shaped overall section (4) on the ground of the closure site according to the loading target position and loading target posture of the right submerged body segment (2) and the loading target posture of the right L-shaped overall section (4); D2. Using the top joint of the right submerged body segment (2) as a reference, hoist the right L-shaped overall segment (4) onto the right submerged body segment (2) and the L-shaped overall segment supporting tooling (700); D3. Using the center of the right sheet body as a reference ground line (300), the posture of the right L-shaped overall section (4) is adjusted by the L-shaped overall section supporting tool (700) until the right L-shaped overall section (4) reaches its target loading posture.
8. The method for controlling the centerline of a small waterplane area catamaran according to claim 7, characterized in that: When the right submerged body segment (2) reaches its target loading position and target loading posture, the midpoints of the bottom ends of the end surfaces at both ends of the right submerged body segment (2) are located between the right sheet body center reference ground line (300) and the superstructure center reference ground line (100), and the horizontal distance between the midpoints of the bottom ends of the end surfaces at both ends of the right submerged body segment (2) and the right sheet body center reference ground line (300) is a first preset distance, the midpoints of the top ends of the end surfaces at both ends of the right submerged body segment (2) are located between the right sheet body center reference ground line (300) and the superstructure center reference ground line (100), and the horizontal distance between the midpoints of the top ends of the end surfaces at both ends of the right submerged body segment (2) and the right sheet body center reference ground line (300) is a second preset distance; When the right L-shaped overall section (4) reaches its target loading posture, the intersection between the vertical center line of the right L-shaped overall section (4) and the top surface of the right connecting bridge segment (42) is located directly above the right sheet center reference ground line (300).
9. The method for controlling the centerline of a small waterplane area catamaran according to any one of claims 3 to 8, characterized in that: The submerged body segmented support tooling (500) comprises a first steel pier (5001) and a sleeper (5002), wherein the sleeper (5002) is arranged on the first steel pier (5001).
10. The method for controlling the centerline of a small waterplane area catamaran according to claim 4 or 7, characterized in that: The L-shaped overall section supporting tool (700) comprises a second steel pier (7001) and a jacking device (7002), wherein the bottom end of the jacking device (7002) is fixedly arranged on the top end of the second steel pier (7001).
11. The method for controlling the centerline of a small waterplane area catamaran according to any one of claims 1 to 8, characterized in that: The method of setting a left sheet body center reference ground line (200) and a right sheet body center reference ground line (300) on both sides of the superstructure center reference ground line (100) based on the superstructure center reference ground line (100) comprises: E1. Select three reference points (1001) on the central reference ground line (100) of the superstructure, and open three cross-section ground lines (400) perpendicular to the central reference ground line (100) of the superstructure through the three reference points (1001); E2. Using the three reference points (1001) as references, determine the left sheet center reference ground line position point (4001) and the right sheet center reference ground line position point (4002) on each of the cross-section ground lines (400); E3. A left sheet center reference ground line (200) is opened through each of the left sheet center reference ground line position points (4001), and a right sheet center reference ground line (300) is opened through each of the right sheet center reference ground line position points (4002).
12. The method for controlling the centerline of a small waterplane area catamaran according to claim 11, characterized in that: The three reference points (1001) are respectively located at a position corresponding to the bow on the superstructure center reference ground line (100), a position corresponding to the swell on the superstructure center reference ground line (100), and a position corresponding to the stern on the superstructure center reference ground line (100).
Citation Information
Patent Citations
Small hybrid power self-control conversion device of unmanned ship
CN115123511A
Semi-submersible salvage engineering ship and segmented assembly and working method thereof
CN117163253A