Methods for simulating the flexible structure of the bottom of a surface reservoir using ultra-large diameter shield tunneling models

By laying a layer of test sand on test paper to form a weakly permeable structural layer, the simulation problem of ultra-large diameter shield tunnels crossing the bottom of flexible reservoirs was solved, realizing the need for accurate simulation of shield tunnel crossing reservoir model tests and construction technology research.

CN118361247BActive Publication Date: 2026-11-10CHINA RAILWAY 14TH BUREAU GRP LARGE SHIELD ENG CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410565580.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-09
Publication Date
2026-11-10
Estimated Expiration
2044-05-09

AI Technical Summary

Technical Problem

Existing technologies cannot effectively simulate the passage of ultra-large diameter shield tunnels through flexible reservoir bottom structures, resulting in a lack of relevant experimental methods and failing to meet the needs of construction technology research.

Method used

A layer of test sand was laid on the test paper to form a weakly permeable structure layer. The flexible reservoir bottom structure was simulated by adjusting the material parameters. Suitable materials were selected by combining permeability and shear tests to ensure the smooth progress of the shield tunneling model test through the reservoir.

Benefits of technology

It achieved accurate simulation of the bottom structure of the flexible reservoir, ensuring the successful implementation of the shield tunneling model test through the reservoir and meeting the needs of construction technology research.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118361247B_ABST
    Figure CN118361247B_ABST
Patent Text Reader

Abstract

The technical problem to be solved by this invention is to provide a method for simulating the flexible structure of the bottom of a surface reservoir using a model of an ultra-large diameter shield tunnel. This involves investigating and collecting construction parameters of the flexible structure of the surface reservoir bottom traversed by the shield tunnel, and measuring the permeability coefficient of the impermeable clay layer laid at the bottom of the reservoir through geotechnical tests. k ,strength E and thickness h The geometric similarity ratio of the model test was determined based on the dimensions of the shield tunneling model test machine and the model box. C l The target parameters of the weakly permeable structural layer are calculated, including the permeability coefficient. k m ,strength E m and thickness h m A layer of test sand is laid on the surface of the weak permeability test paper to form a weak permeability structural layer. This simulates the reservoir's existence state with a flexible reservoir bottom structure. By adjusting the parameters of the constituent materials, permeability and structural strength are modified to simulate the reservoir, thus ensuring the smooth implementation of the shield tunneling model test and meeting the needs of research on related construction technologies.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of tunnel boring machine (TBM) technology, and in particular to simulation tests of ultra-large diameter TBMs, specifically to a method for simulating the flexible structure of the bottom of a surface reservoir using an ultra-large diameter TBM model. Background Technology

[0002] In recent years, numerous engineering projects have involved shield tunnels crossing artificial reservoirs. The artificial structure of the reservoirs presents higher demands on shield tunnel construction control technology. Studying shield tunneling through reservoirs using model tests is a crucial means of improving related technologies. The reservoir bottom structure generally falls into two categories: a rigid structure formed by hardened concrete and a flexible structure formed by lining with low-permeability materials such as clay. Small reservoirs typically use concrete structures for their bottoms, while large reservoirs often employ low-permeability clay as the seepage prevention structure. Currently, it is impossible to simulate the flexible reservoir structure on the ground surface in model tests of ultra-large diameter shield tunnels crossing reservoirs, and there are no corresponding testing devices. This makes model tests of shield tunnels crossing existing reservoirs impossible, and related testing methods are lacking. Summary of the Invention

[0003] The technical problem this invention aims to solve is to provide a method for simulating the flexible structure of a surface reservoir bottom using a large-diameter shield tunneling model. This method involves laying a layer of test sand on the surface of a low-permeability test paper to form a low-permeability structural layer. This simulates the reservoir's condition with a flexible bottom structure. By adjusting the parameters of the constituent materials, permeability and structural strength are modified to simulate the reservoir, thereby ensuring the smooth implementation of shield tunneling model tests through the reservoir and meeting the needs of research on related construction technologies.

[0004] This invention is achieved through the following technical solution:

[0005] A method for simulating the flexible structure of the bottom of a surface reservoir using a large-diameter shield tunneling model includes the following steps:

[0006] S01. Investigate and collect construction parameters of the flexible structure at the bottom of the surface reservoir through which the tunnel boring machine will pass, and measure the permeability coefficient of the impermeable clay layer laid at the bottom of the reservoir through geotechnical tests. k ,strength E and thickness h .

[0007] S02. Select the shield tunneling model testing machine and model box, and determine the geometric similarity ratio of the model test based on the dimensions of the shield tunneling model testing machine and model box. C l The target parameters of the weakly permeable structural layer are calculated, including the permeability coefficient. k m ,strength Em and thickness h m The formula for calculating the target parameter is as follows:

[0008]

[0009]

[0010] ;

[0011] S03. Using indoor permeability tests and shear tests, orthogonal experiments were conducted to select suitable low-permeability test paper material and test sand gradation, and to determine the preparation materials of low-permeability test paper and test sand.

[0012] S04. Fill the lower part of the model box with test soil to form a test soil layer for the shield tunneling model test machine to pass through;

[0013] S05. Lay a weak permeability test paper on the top surface of the test soil layer, and lay a test sand layer on the upper surface of the weak permeability test paper to form a weak permeability structure layer with the weak permeability test paper.

[0014] S06. Fill the model box with clean water to simulate the flexible structure of the bottom of the surface reservoir.

[0015] Furthermore, in step S05, a rectangular bearing frame is installed on the top surface of the test soil layer. The length and width of the outer dimensions of the rectangular bearing frame steel plate are smaller than the dimensions of the model box.

[0016] Furthermore, the rectangular support frame is composed of three layers of rectangular hollow steel plates: upper, middle, and lower. The four sides of the rectangular hollow steel plates are provided with multiple screw holes for threading long bolts for connection.

[0017] Furthermore, a single sheet of weak permeability test paper is made according to the dimensions of the rectangular bearing frame, and the weak permeability test paper is fixed between the middle and upper rectangular hollow steel plates through bolt holes. Waterproof sealant is then used to seal the middle and upper rectangular hollow steel plate layers.

[0018] Furthermore, a flexible waterproof enclosure is made according to the size of the model box. First, the bottom of the flexible waterproof enclosure and the rectangular hollow steel plate of the rectangular support frame are connected with bolts, and waterproof sealant is used between the layers. The flexible waterproof enclosure is laid vertically on the upper side wall of the model box.

[0019] Furthermore, the lower end of the long bolt of the rectangular bearing frame extends downward and inserts into the test soil layer.

[0020] The beneficial effects achieved by this invention compared with the prior art are as follows:

[0021] 1. A layer of test sand is laid on the surface of the weak permeability test paper to form a weak permeability structural layer. This simulates the reservoir's condition with a flexible bottom structure. Indoor permeability and shear tests are used, and orthogonal experiments are employed to select suitable materials for the weak permeability test paper and the gradation of the test sand. The preparation materials for the weak permeability test paper and test sand are determined, and the permeability and structural strength are adjusted by modifying the component material parameters to simulate the reservoir. This ensures the smooth implementation of the shield tunneling model test through the reservoir and meets the needs for research on related construction technologies.

[0022] 2. Determine the geometric similarity ratio of the model test based on the dimensions of the shield tunneling model testing machine and the model box. C l The target parameters of the weakly permeable structural layer are calculated, including the permeability coefficient. k m ,strength E m and thickness h m By using geometric similarity ratios to determine each parameter, the accuracy of the simulation experiment is ensured, making this method more accurate. Attached Figure Description

[0023] Figure 1 This is a front view of the device used in this embodiment to simulate the flexible structure of the bottom of a surface reservoir using a shield tunneling model.

[0024] Figure 2 This is a top view of the rectangular force-bearing frame described in this embodiment;

[0025] Figure 3 This is a top view of the flexible waterproof enclosure described in this embodiment;

[0026] Figure 4 This is a top view of the weak permeability test paper described in this embodiment.

[0027] In the diagram: 1. Model box, 2. Test soil layer, 3. Weak permeability test paper, 4. Test sand layer, 5. Rectangular bearing frame, 6. Flexible waterproof enclosure, 7. Shield tunnel model test machine, 8. Clear water. Detailed Implementation

[0028] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.

[0029] Those skilled in the art will understand that, unless specifically stated otherwise, the singular forms “a,” “an,” “the,” and “the” used herein may also include the plural forms. It should be further understood that the term “comprising” as used in this specification means the presence of the stated features, integers, steps, operations, elements, and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and / or groups thereof. It should be understood that when we say an element is “connected” or “coupled” to another element, it can be directly connected or coupled to the other element, or there may be intermediate elements. Furthermore, “connected” or “coupled” as used herein can include wireless connections or couplings. The term “and / or” as used herein includes any and all combinations of one or more of the associated listed items.

[0030] This implementation discloses a device for simulating the flexible structure of the bottom of a surface reservoir using a shield tunneling model, such as... Figure 1-4 As shown, it mainly includes a model box 1, a test soil layer 2 located inside the model box 1, a weak permeability test paper 3 and a test sand layer 4 located on the surface of the test soil layer 2, and a rectangular bearing frame 5 for fixing the weak permeability test paper 3. A flexible water-proof enclosure 6 is vertically laid on the upper part of the inner side wall of the model box 1 to hold clean water.

[0031] Based on the aforementioned device for simulating the flexible structure of a surface reservoir bottom using a shield tunneling model, this embodiment also discloses a method for simulating the flexible structure of a surface reservoir bottom using an ultra-large diameter shield tunneling model, comprising the following steps:

[0032] S01. Investigate and collect construction parameters of the flexible structure at the bottom of the surface reservoir through which the tunnel boring machine will pass, and measure the permeability coefficient of the impermeable clay layer laid at the bottom of the reservoir through geotechnical tests. k ,strength E and thickness h ;

[0033] In this embodiment, taking the following construction parameters of the reservoir bottom structure through which the shield tunnel passes as an example, the permeability coefficient k of the impermeable clay layer laid at the bottom of the reservoir is 2×10-5cm / s, the strength E is 50kPa and the thickness h is 0.5m, obtained by geotechnical test measurement.

[0034] S02. Select the shield tunneling model testing machine 7 and the model box 1, and determine the geometric similarity ratio of the model test based on the dimensions of the shield tunneling model testing machine and the model box 1. C l The target parameters of the weakly permeable structural layer are calculated, including the permeability coefficient. k m ,strength E m and thickness h m The formula for calculating the target parameter is:

[0035]

[0036]

[0037] ;

[0038] In this embodiment, the selected shield tunneling model test machine has a diameter of 600mm, and the length, width, and height of model box 1 are 5m, 3m, and 4m, respectively. The geometric similarity ratio of the model test is determined. C l The target parameter is set to 10, and the calculation results are as follows:

[0039]

[0040]

[0041] ;

[0042] S03. Using indoor permeability tests and shear tests, orthogonal experiments were used to select suitable materials for weak permeability test paper 3 and test sand gradation, and to determine the preparation materials for weak permeability test paper 3 and test sand.

[0043] In this embodiment, the weak permeability test paper 3 uses 80g / m 2 Fiber pulp paper was used to prepare test sand according to the test results.

[0044] S04. Fill the lower part of the model box 1 with test soil to form a test soil layer 2 for the shield tunneling model test machine to pass through;

[0045] S05. Construct a rectangular support frame 5 according to the dimensions of model box 1. The outer dimensions of the rectangular support frame 5 are 4900mm in length, 2900mm in width, and 5mm in thickness, with a frame width of 100mm. Construct a flexible waterproof enclosure 6 according to the dimensions of model box 1. The dimensions of the flexible waterproof enclosure 6 are 5000mm in length, 3000mm in width, and 1500mm in height. Construct a single sheet of weak permeability test paper 3 according to the dimensions of the rectangular support frame 5. The dimensions of the weak permeability test paper 3 are 4900mm in length and 2900mm in width.

[0046] The rectangular support frame 5 consists of three layers of rectangular hollow steel plates: upper, middle, and lower. Multiple screw holes are provided on the four sides of each rectangular hollow steel plate for connecting with long bolts. First, the bottom of the flexible waterproof enclosure 6 is connected to the middle and lower rectangular hollow steel plates of the rectangular support frame 5 using bolts, and waterproof sealant is applied between the layers. Then, the weak permeability test paper 3 is fixed between the middle and upper rectangular hollow steel plates through the bolt holes, and waterproof sealant is applied between the layers.

[0047] The assembled rectangular bearing frame 5 is hoisted and placed on the surface of the test soil layer 2 in the model box 1. The long bolts protruding from the lower surface of the rectangular bearing frame 5 are inserted into the test soil layer 2 to fix the position. The flexible waterproof enclosure 6 is laid vertically on the upper side wall of the model box 1 and fixed to the upper edge of the model box 1 with screws.

[0048] Finally, the prepared test sand layer 4 with a thickness of 5 mm is laid on the upper surface of the weak permeability test paper 3 to form the weak permeability structure layer.

[0049] S06. Pour 1.2m deep clean water 8 into model box 1 to simulate the flexible structure of the bottom of the surface reservoir.

[0050] In summary, the device of this embodiment can realistically simulate the actual situation of shield tunnel engineering crossing reservoirs in model tests. Based on the test device involved in this invention, a relatively complete method for simulating the flexible structure of surface reservoirs in shield tunnel model tests is provided, offering simulation test conditions and new ideas for the research on shield tunnel crossing reservoir model tests and the development of related technologies.

Claims

1. A method for simulating the flexible structure of the bottom of a surface reservoir using a large-diameter shield tunneling model, characterized in that, Includes the following steps: S01. Investigate and collect construction parameters of the flexible structure at the bottom of the surface reservoir through which the tunnel boring machine will pass, and measure the permeability coefficient of the impermeable clay layer laid at the bottom of the reservoir through geotechnical tests. k ,strength E and thickness h; S02. Select the shield tunneling model testing machine and model box, and determine the geometric similarity ratio of the model test based on the dimensions of the shield tunneling model testing machine and model box. C l The target parameters of the weakly permeable structural layer are calculated, including the permeability coefficient. k m ,strength E m and thickness h m The formula for calculating the target parameter is as follows: ; S03. Using indoor permeability tests and shear tests, orthogonal experiments were conducted to select suitable low-permeability test paper material and test sand gradation, and to determine the preparation materials of low-permeability test paper and test sand. S04. Fill the lower part of the model box with test soil to form a test soil layer for the shield tunneling model test machine to pass through; S05. Lay a weak permeability test paper on the top surface of the test soil layer, and lay a test sand layer on the upper surface of the weak permeability test paper to form a weak permeability structure layer with the weak permeability test paper. S06. Fill the model box with clean water to simulate the flexible structure of the bottom of the surface reservoir.

2. The method for simulating the flexible structure of the bottom of a surface reservoir using a large-diameter shield tunneling model according to claim 1, characterized in that, In step S05, a rectangular bearing frame is installed on the top surface of the test soil layer. The length and width of the outer dimensions of the rectangular bearing frame steel plate are smaller than the dimensions of the model box.

3. The method for simulating the flexible structure of the bottom of a surface reservoir using a large-diameter shield tunneling model according to claim 2, characterized in that, The rectangular support frame is composed of three layers of rectangular hollow steel plates: upper, middle, and lower. The four sides of the rectangular hollow steel plates are provided with multiple screw holes for threading long bolts for connection.

4. The method for simulating the flexible structure of the bottom of a surface reservoir using a large-diameter shield tunneling model according to claim 3, characterized in that, Prepare a single sheet of weak permeability test paper according to the dimensions of the rectangular bearing frame, and fix the weak permeability test paper between the middle and upper rectangular hollow steel plates through bolt holes. Use waterproof adhesive to perform waterproof sealing treatment between the middle and upper rectangular hollow steel plate layers.

5. The method for simulating the flexible structure of the bottom of a surface reservoir using a large-diameter shield tunneling model according to claim 3, characterized in that, According to the size of the model box, a flexible waterproof enclosure is made. First, the bottom of the flexible waterproof enclosure is connected to the rectangular hollow steel plate in the rectangular support frame and the lower layer with bolts. Waterproof sealant is then used to seal the layers. The flexible waterproof enclosure is laid vertically on the upper side wall of the model box.

6. The method for simulating the flexible structure of the bottom of a surface reservoir using a large-diameter shield tunneling model according to any one of claims 3-5, characterized in that, The long bolts of the rectangular bearing frame extend downwards and are inserted into the test soil layer.

Citation Information

Patent Citations

  • Centrifugal test device and test method simulating multi-line shield to penetrate through existing structure

    CN108198504A

  • Method for building fluid-structure interaction test based on post-peak rock stress and permeability characteristic

    CN108375535A