Tunnel construction risk assessment method and system based on multi-source monitoring data fusion

Through multi-source monitoring data fusion and pre-training models, tunnel construction risk assessment is realized, which solves the problems of high labor costs and incomplete assessment, and improves the efficiency and accuracy of tunnel construction risk assessment.

CN118411028BActive Publication Date: 2024-10-22NO 1 ENG CO LTD OF FHEC OF CCCC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410569251.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-09
Publication Date
2024-10-22
Estimated Expiration
2044-05-09

AI Technical Summary

Technical Problem

Manpower costs are high and efficiency is low in tunnel construction risk assessment, and expert on-site inspections may not be comprehensive, resulting in inaccurate assessments.

Method used

Using a method based on multi-source monitoring data fusion, the multi-source monitoring data of tunnel construction is obtained for fusion processing, and combined with the pre-trained construction risk probability assessment model, the construction risk probability is assessed, labor costs are reduced, and the assessment efficiency and comprehensiveness are improved.

Benefits of technology

It eliminates the need for expert on-site inspections, reduces labor costs, improves assessment efficiency and comprehensiveness, and improves the accuracy of tunnel construction risk assessment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118411028B_ABST
    Figure CN118411028B_ABST
Patent Text Reader

Abstract

The present invention provides a tunnel construction risk assessment method and system based on multi-source monitoring data fusion, wherein the method comprises: obtaining multi-source monitoring data of tunnel construction; fusing the multi-source monitoring data; assessing the construction risk probability based on the fused multi-source monitoring data and a pre-trained construction risk probability assessment model; and outputting the construction risk probability. The tunnel construction risk assessment method and system based on multi-source monitoring data fusion of the present invention obtains multi-source monitoring data of tunnel construction, fusing the multi-source monitoring data, and assessing the construction risk probability based on the fused multi-source monitoring data and a pre-trained construction risk probability assessment model, without the need for experts to go to the tunnel site for inspection and analysis, thereby reducing labor costs, improving assessment efficiency, and further improving the comprehensiveness of the assessment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of computer data processing, and in particular to a tunnel construction risk assessment method and system based on multi-source monitoring data fusion. Background Art

[0002] There are many factors that affect the safety of tunnel construction. To ensure the safety of tunnel construction, it is necessary to conduct a risk assessment of tunnel construction before construction. Generally, when conducting a risk assessment of tunnel construction, multiple experts are required to go to the tunnel site for inspection and analysis, which has a high labor cost and low evaluation efficiency. In addition, the inspection and analysis conducted by experts may result in incomplete assessment.

[0003] Therefore, a solution is urgently needed. Summary of the invention

[0004] One of the purposes of the present invention is to provide a tunnel construction risk assessment method based on multi-source monitoring data fusion, obtain multi-source monitoring data of tunnel construction, fuse the multi-source monitoring data, and assess the construction risk probability based on the fused multi-source monitoring data and a pre-trained construction risk probability assessment model. There is no need for experts to go to the tunnel site for inspection and analysis, which reduces labor costs, improves assessment efficiency, and improves the comprehensiveness of the assessment.

[0005] The tunnel construction risk assessment method based on multi-source monitoring data fusion provided by the embodiment of the present invention includes:

[0006] Obtain multi-source monitoring data for tunnel construction;

[0007] Performing fusion processing on the multi-source monitoring data;

[0008] Evaluate the construction risk probability based on the fused multi-source monitoring data and pre-trained construction risk probability assessment model;

[0009] The construction risk probability is output.

[0010] Preferably, the fusing processing of the multi-source monitoring data includes:

[0011] Obtain a large number of tunnel construction risk events;

[0012] Based on each of the tunnel construction risk events, multiple sets of one-to-one corresponding data type tables to be entered and blank sets for fusion are determined; the data type tables to be entered indicate at least one data type of the data to be entered into the blank set for fusion, and each of the data types is a feature type of the occurrence feature of the tunnel construction risk event;

[0013] Based on each of the data type tables to be entered, extract data from the multi-source monitoring data and fill in the corresponding blank set for fusion;

[0014] The blank set of the fusion filled data is used as the fusion processing result.

[0015] Preferably, the tunnel construction risk assessment method based on multi-source monitoring data fusion further includes:

[0016] When the construction risk probability is greater than or equal to a preset probability threshold, obtaining a construction risk event assessed by the construction risk probability assessment model;

[0017] Building a digital twin model of the tunnel based on the construction risk events, the multi-source monitoring data and a preset three-dimensional tunnel model corresponding to the tunnel;

[0018] determining a plurality of construction risk assessment perspectives from the digital twin model;

[0019] Obtaining the assessment priority of each of the construction risk assessment perspectives;

[0020] Traversing each of the construction risk assessment perspectives in order from the largest to the smallest according to the assessment priority;

[0021] Each time the traversal is performed, the traversed construction risk assessment perspective is connected to the expert conference room; each expert in the expert conference room can view the digital twin model through the traversed construction risk assessment perspective;

[0022] Assist the experts in the expert meeting room to conduct in-depth construction risk assessment;

[0023] Obtain and output in-depth construction risk assessment results.

[0024] Preferably, determining multiple construction risk assessment perspectives from the digital twin model includes:

[0025] Based on the event cluster combination condition, the construction risk events are combined into a plurality of event clusters;

[0026] Creating at least one associated common viewing angle for each of the event clusters; in the digital twin model, a digital twin corresponding to each of the construction risk events in the same event cluster will appear under the common viewing angle;

[0027] Based on the perspective screening condition, a target common viewing angle associated with each event cluster is screened out from the common viewing angles associated with each event cluster;

[0028] Using the target shared perspective as the construction risk assessment perspective;

[0029] The event cluster combination conditions include:

[0030] There is an event correlation relationship between any two of the construction risk events in the same event cluster, and a single construction risk event that has no event correlation relationship with any other construction risk event forms a cluster by itself;

[0031] The viewing angle screening conditions include:

[0032] The target common viewing angle comes from the common viewing angle associated with each of the event clusters;

[0033] Furthermore, when the same construction risk event exists in different event clusters at the same time, the overlap between the target co-viewing perspectives associated with the different event clusters in which the same construction risk event exists at the same time is less than or equal to a preset overlap threshold;

[0034] Furthermore, the sum of perspective switching costs between each two of the target co-viewing perspectives associated with different event clusters is less than or equal to a preset cost and a threshold.

[0035] Preferably, the step of assisting the experts in the expert meeting room to conduct in-depth construction risk assessment includes:

[0036] Respectively obtain the conversation records generated by the conversations between the experts in the expert meeting and check the behavior records of the digital twin model;

[0037] Setting the conversation record and the behavior record on a preset time axis;

[0038] Matching each of the behavior records with a trigger behavior record in a preset trigger behavior record library;

[0039] When the match is met, try to obtain the trigger indication direction corresponding to the trigger behavior record that matches the match; the trigger indication direction includes: front and back;

[0040] When the attempt is successful, the conversation record within a preset range of the trigger indication direction of the behavior record that matches the time axis is obtained as the first analysis target;

[0041] When the attempt fails, the matching behavior is recorded as the interval boundary;

[0042] The conversation records within the boundaries of the intervals adjacent to each other on the time axis are taken as second analysis targets;

[0043] Determining a situation to be assisted based on the first analysis target and the second analysis target;

[0044] Determining auxiliary knowledge corresponding to the situation to be assisted from a preset auxiliary knowledge base;

[0045] Based on the auxiliary knowledge, the experts in the expert meeting room are assisted to conduct in-depth construction risk assessment.

[0046] The tunnel construction risk assessment system based on multi-source monitoring data fusion provided by the embodiment of the present invention includes:

[0047] An acquisition module, used to acquire multi-source monitoring data of tunnel construction;

[0048] A processing module, used for fusing the multi-source monitoring data;

[0049] An evaluation module is used to evaluate the construction risk probability based on the fused multi-source monitoring data and the pre-trained construction risk probability evaluation model;

[0050] An output module is used to output the construction risk probability.

[0051] Preferably, the processing module performs fusion processing on the multi-source monitoring data, including:

[0052] Obtain a large number of tunnel construction risk events;

[0053] Based on each of the tunnel construction risk events, multiple sets of one-to-one corresponding data type tables to be entered and blank sets for fusion are determined; the data type tables to be entered indicate at least one data type of the data to be entered into the blank set for fusion, and each of the data types is a feature type of the occurrence feature of the tunnel construction risk event;

[0054] Based on each of the data type tables to be entered, extract data from the multi-source monitoring data and fill in the corresponding blank set for fusion;

[0055] The blank set of the fusion filled data is used as the fusion processing result.

[0056] Preferably, the tunnel construction risk assessment system based on multi-source monitoring data fusion further includes:

[0057] Auxiliary modules for:

[0058] When the construction risk probability is greater than or equal to a preset probability threshold, obtaining a construction risk event assessed by the construction risk probability assessment model;

[0059] Building a digital twin model of the tunnel based on the construction risk events, the multi-source monitoring data and a preset three-dimensional tunnel model corresponding to the tunnel;

[0060] determining a plurality of construction risk assessment perspectives from the digital twin model;

[0061] Obtaining the assessment priority of each of the construction risk assessment perspectives;

[0062] Traversing each of the construction risk assessment perspectives in order from the largest to the smallest according to the assessment priority;

[0063] Each time the traversal is performed, the traversed construction risk assessment perspective is connected to the expert conference room; each expert in the expert conference room can view the digital twin model through the traversed construction risk assessment perspective;

[0064] Assist the experts in the expert meeting room to conduct in-depth construction risk assessment;

[0065] Obtain and output in-depth construction risk assessment results.

[0066] Preferably, the auxiliary module determines multiple construction risk assessment perspectives from the digital twin model, including:

[0067] Based on the event cluster combination condition, the construction risk events are combined into a plurality of event clusters;

[0068] Creating at least one associated common viewing angle for each of the event clusters; in the digital twin model, a digital twin corresponding to each of the construction risk events in the same event cluster will appear under the common viewing angle;

[0069] Based on the perspective screening condition, a target common viewing angle associated with each event cluster is screened out from the common viewing angles associated with each event cluster;

[0070] Using the target shared perspective as the construction risk assessment perspective;

[0071] The event cluster combination conditions include:

[0072] There is an event correlation relationship between any two of the construction risk events in the same event cluster, and a single construction risk event that has no event correlation relationship with any other construction risk event forms a cluster by itself;

[0073] The viewing angle screening conditions include:

[0074] The target common viewing angle comes from the common viewing angle associated with each of the event clusters;

[0075] Furthermore, when the same construction risk event exists in different event clusters at the same time, the overlap between the target co-viewing perspectives associated with the different event clusters in which the same construction risk event exists at the same time is less than or equal to a preset overlap threshold;

[0076] Furthermore, the sum of perspective switching costs between each two of the target co-viewing perspectives associated with different event clusters is less than or equal to a preset cost and a threshold.

[0077] Preferably, the auxiliary module assists the experts in the expert meeting room to conduct in-depth construction risk assessment, including:

[0078] Respectively obtain the conversation records generated by the conversations between the experts in the expert meeting and check the behavior records of the digital twin model;

[0079] Setting the conversation record and the behavior record on a preset time axis;

[0080] Matching each of the behavior records with a trigger behavior record in a preset trigger behavior record library;

[0081] When the match is met, try to obtain the trigger indication direction corresponding to the trigger behavior record that matches the match; the trigger indication direction includes: front and back;

[0082] When the attempt is successful, the conversation record within a preset range of the trigger indication direction of the behavior record that matches the time axis is obtained as the first analysis target;

[0083] When the attempt fails, the matching behavior is recorded as the interval boundary;

[0084] The conversation records within the boundaries of the intervals adjacent to each other on the time axis are taken as second analysis targets;

[0085] Determining a situation to be assisted based on the first analysis target and the second analysis target;

[0086] Determining auxiliary knowledge corresponding to the situation to be assisted from a preset auxiliary knowledge base;

[0087] Based on the auxiliary knowledge, the experts in the expert meeting room are assisted to conduct in-depth construction risk assessment.

[0088] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings.

[0089] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0090] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0091] Figure 1 Schematic diagram of a tunnel construction risk assessment method based on multi-source monitoring data fusion in an embodiment of the present invention;

[0092] Figure 2 Schematic diagram of a tunnel construction risk assessment system based on multi-source monitoring data fusion in an embodiment of the present invention. DETAILED DESCRIPTION

[0093] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0094] The embodiment of the present invention provides a tunnel construction risk assessment method based on multi-source monitoring data fusion, such as Figure 1 As shown, including:

[0095] S1. Obtain multi-source monitoring data of tunnel construction;

[0096] S2, fusing the multi-source monitoring data;

[0097] S3, assessing the construction risk probability based on the fused multi-source monitoring data and the pre-trained construction risk probability assessment model;

[0098] S4. Output the construction risk probability.

[0099] Multi-source monitoring data refers to the data obtained by monitoring the tunnel through multiple monitoring sources set up in the tunnel, such as: terrain information, gas composition information, temperature and humidity information, etc. collected after the AGV vehicle enters the tunnel; after the multi-source monitoring data is fused and processed, it is input into the pre-trained construction risk probability assessment model to evaluate and determine the construction risk probability; the construction risk probability assessment model is an artificial intelligence model obtained by training a neural network model based on a large amount of multi-source monitoring data that is manually marked with construction risk probabilities. It can evaluate the risk probability of this tunnel construction, that is, the construction risk probability, based on the fused multi-source monitoring data; and output the construction risk probability for management personnel to view.

[0100] This application obtains multi-source monitoring data of tunnel construction, fuses the multi-source monitoring data, and evaluates the construction risk probability based on the fused multi-source monitoring data and the pre-trained construction risk probability assessment model. There is no need for experts to go to the tunnel site for inspection and analysis, which reduces labor costs, improves assessment efficiency, and improves the comprehensiveness of the assessment.

[0101] In one embodiment, the fusing of the multi-source monitoring data includes:

[0102] Obtain a large number of tunnel construction risk events;

[0103] Based on each of the tunnel construction risk events, multiple sets of one-to-one corresponding data type tables to be entered and blank sets for fusion are determined; the data type tables to be entered indicate at least one data type of the data to be entered into the blank set for fusion, and each of the data types is a feature type of the occurrence feature of the tunnel construction risk event;

[0104] Based on each of the data type tables to be entered, extract data from the multi-source monitoring data and fill in the corresponding blank set for fusion;

[0105] The blank set of the fusion filled data is used as the fusion processing result.

[0106] Tunnel construction risk events are recorded events of tunnel construction risks in history. First, the characteristics of tunnel construction risk events are extracted, such as abnormal concentration of harmful gases. The data type is determined based on the characteristics of the event, that is, the concentration of harmful gases. The data types are organized into a data type table to be entered. The data type table to be entered reflects the data type that needs to be analyzed when judging whether a tunnel construction risk event occurs. The data of each data type in the data type table from the multi-source monitoring data is extracted and filled into the fusion blank set. The data is fused and the fusion blank set filled with the data is used as the fusion processing result. In this way, each type of data in each fusion blank set can be used to judge whether a tunnel construction risk event will occur in the tunnel, thereby facilitating the construction risk probability assessment model to assess the construction risk probability.

[0107] In one embodiment, the tunnel construction risk assessment method based on multi-source monitoring data fusion further includes:

[0108] When the construction risk probability is greater than or equal to a preset probability threshold, obtaining a construction risk event assessed by the construction risk probability assessment model;

[0109] Building a digital twin model of the tunnel based on the construction risk events, the multi-source monitoring data and a preset three-dimensional tunnel model corresponding to the tunnel;

[0110] determining a plurality of construction risk assessment perspectives from the digital twin model;

[0111] Obtaining the assessment priority of each of the construction risk assessment perspectives;

[0112] Traversing each of the construction risk assessment perspectives in order from the largest to the smallest according to the assessment priority;

[0113] Each time the traversal is performed, the traversed construction risk assessment perspective is connected to the expert conference room; each expert in the expert conference room can view the digital twin model through the traversed construction risk assessment perspective;

[0114] Assist the experts in the expert meeting room to conduct in-depth construction risk assessment;

[0115] Obtain and output in-depth construction risk assessment results.

[0116] The probability threshold can be, for example, 60%; when evaluating the construction risk probability, the construction risk probability assessment model can be set to assess the construction risk events that may occur in the tunnel, such as: supplementing the training of the neural network model based on a large amount of manually marked different multi-source monitoring data of construction risk events that may occur; representing the construction risk events and multi-source monitoring data in the three-dimensional model of the tunnel to obtain a digital twin model of the tunnel; generally, when the construction risk probability assessment model assesses that the risk probability is large, on-site experts need to conduct further in-depth risk assessment of the tunnel construction in order to decide whether to change the construction plan; construction risk assessment perspective To provide experts with a suitable perspective for viewing the digital twin model to facilitate their in-depth risk assessment of tunnel construction; the assessment priority is related to the risk level of the construction risk event from the perspective of construction risk assessment. The greater the risk level of the construction risk event from the perspective of construction risk assessment, the higher the corresponding assessment priority; traverse each construction risk assessment perspective from large to small according to the construction assessment priority, so that the construction risk event with a greater risk level can be handled with priority, and the traversed construction risk assessment perspective is connected to the expert conference room, where each expert can view the digital twin model through the traversed construction risk assessment perspective, assisting each expert in conducting in-depth construction risk assessment of tunnel construction. Experts do not need to operate the digital twin model by themselves, and the system adaptively determines the construction risk assessment perspective, which improves convenience.

[0117] In one embodiment, determining a plurality of construction risk assessment perspectives from the digital twin model includes:

[0118] Based on the event cluster combination condition, the construction risk events are combined into a plurality of event clusters;

[0119] At least one associated co-viewing perspective is created for each of the event clusters; in the digital twin model, a digital twin corresponding to each of the construction risk events in the same event cluster will appear under the co-viewing perspective; the digital twin is a model representing the construction risk event in the digital twin model;

[0120] Based on the perspective screening condition, a target common viewing angle associated with each event cluster is screened out from the common viewing angles associated with each event cluster;

[0121] Using the target shared perspective as the construction risk assessment perspective;

[0122] The event cluster combination conditions include:

[0123] There is an event correlation relationship between any two construction risk events in the same event cluster, and a single construction risk event that has no event correlation relationship with any other construction risk event forms a cluster by itself; the event correlation relationship is that it may occur at the same time, there is a causal relationship, there is a chain effect, etc.; the combination conditions of the event cluster are set, and the construction risk events with event correlation relationships are stored in the same event cluster, so that they can be viewed at the same time through the target co-viewing perspective and jointly analyzed; secondly, if there is no event correlation relationship between a construction risk event and any other construction risk event, it forms an event cluster by itself;

[0124] The viewing angle screening conditions include:

[0125] The target common viewing angle comes from the common viewing angle associated with each of the event clusters;

[0126] Moreover, when the same construction risk event exists in different event clusters at the same time, the overlap between the target co-viewing perspectives associated with the different event clusters in which the same construction risk event exists at the same time is less than or equal to a preset overlap threshold; the overlap threshold may be, for example, 20%; when the same construction risk event exists in different event clusters at the same time, there are at least two target co-viewing perspectives that can view the construction risk event, but in order to avoid confusion among experts due to at least two target co-viewing perspectives that can view the construction risk event, the overlap between them may be set to be less than or equal to the overlap threshold;

[0127] Moreover, the sum of the perspective switching costs between the target co-viewing perspectives associated with different event clusters is less than or equal to the preset cost and threshold. The perspective switching cost is the time required for switching between the target co-viewing perspectives, and the cost and threshold are a time threshold that can be set in advance by the technical staff; setting this perspective screening condition ensures that the target co-viewing perspectives are switched appropriately to reduce switching resources.

[0128] Multi-condition screening of the target co-viewing perspective and using the target co-viewing perspective as the construction risk assessment perspective greatly improves the accuracy of determining the construction risk assessment perspective.

[0129] In one embodiment, assisting the experts in the expert meeting room to conduct in-depth construction risk assessment includes:

[0130] Respectively obtain the conversation records generated by the conversations between the experts in the expert meeting and check the behavior records of the digital twin model;

[0131] The conversation record and the behavior record are set on a preset time axis; when setting, the generation time of the conversation record / behavior record is analyzed, the time node corresponding to the generation time is found on the time axis, and the conversation record / behavior record is set on the corresponding time node;

[0132] Match each of the behavior records with a trigger behavior record in a preset trigger behavior record library; a trigger behavior record is a trigger behavior that represents a conversation record that can reflect how the expert needs the system to assist, such as actively operating a digital twin model (there may be questions that want to be reviewed);

[0133] When the match is met, try to obtain the trigger indication direction corresponding to the trigger behavior record that matches; the trigger indication direction includes: front and back; when the behavior record matches the trigger behavior record, the trigger behavior record can indicate how to obtain the conversation record that can reflect how the expert needs the system to assist, that is, give the trigger indication direction; for example: the expert actively operates the digital twin model, and may have questions that he wants to view. Before that, the expert may have questions in the conversation and then operate the model, so the trigger indication direction is front;

[0134] When the attempt is successful, the conversation record within a preset range of the trigger indication direction of the behavior record that matches the time axis is obtained as the first analysis target; the preset range may be, for example, 5 minutes;

[0135] When the attempt fails, the matching behavior record is used as the interval boundary; when the matching trigger behavior record does not have a trigger indication direction, it means that it is impossible to accurately determine whether the conversation record that can reflect how the expert needs the system to assist is generated before or after, and use it as the interval boundary;

[0136] The conversation records within the boundaries of the intervals adjacent to each other on the time axis are taken as second analysis targets;

[0137] Based on the first analysis target and the second analysis target, determining a situation to be assisted; the first analysis target and the second analysis target reflect how the expert needs the system to assist, that is, the situation to be assisted;

[0138] Determine the auxiliary knowledge corresponding to the situation to be assisted from a preset auxiliary knowledge base; the auxiliary knowledge base contains auxiliary knowledge corresponding to different situations to be assisted, and the auxiliary knowledge indicates how the system should assist the experts;

[0139] Based on the auxiliary knowledge, the experts in the expert meeting room are assisted to conduct in-depth construction risk assessment.

[0140] When assisting experts, the embodiment of the present invention does not obtain and analyze all the conversation records between them, but obtains and analyzes them in a targeted manner, thereby reducing acquisition and analysis resources and improving acquisition and analysis efficiency; in addition, the situation to be assisted is accurately determined, the auxiliary knowledge is determined, and the experts are assisted based on the auxiliary knowledge, thereby improving assistance efficiency and assistance accuracy.

[0141] The embodiment of the present invention provides a tunnel construction risk assessment system based on multi-source monitoring data fusion, such as Figure 2 As shown, including:

[0142] Acquisition module 1, used to acquire multi-source monitoring data of tunnel construction;

[0143] Processing module 2, used for fusing the multi-source monitoring data;

[0144] Evaluation module 3, used to evaluate the construction risk probability based on the fused multi-source monitoring data and the pre-trained construction risk probability evaluation model;

[0145] The output module 4 is used to output the construction risk probability.

[0146] The processing module 2 performs fusion processing on the multi-source monitoring data, including:

[0147] Obtain a large number of tunnel construction risk events;

[0148] Based on each of the tunnel construction risk events, multiple sets of one-to-one corresponding data type tables to be entered and blank sets for fusion are determined; the data type tables to be entered indicate at least one data type of the data to be entered into the blank set for fusion, and each of the data types is a feature type of the occurrence feature of the tunnel construction risk event;

[0149] Based on each of the data type tables to be entered, extract data from the multi-source monitoring data and fill in the corresponding blank set for fusion;

[0150] The blank set of filled data is used as the fusion processing result.

[0151] The tunnel construction risk assessment system based on multi-source monitoring data fusion also includes:

[0152] Auxiliary modules for:

[0153] When the construction risk probability is greater than or equal to a preset probability threshold, obtaining a construction risk event assessed by the construction risk probability assessment model;

[0154] Building a digital twin model of the tunnel based on the construction risk events, the multi-source monitoring data and a preset three-dimensional tunnel model corresponding to the tunnel;

[0155] determining a plurality of construction risk assessment perspectives from the digital twin model;

[0156] Obtaining the assessment priority of each of the construction risk assessment perspectives;

[0157] Traversing each of the construction risk assessment perspectives in order from the largest to the smallest according to the assessment priority;

[0158] Each time the traversal is performed, the traversed construction risk assessment perspective is connected to the expert conference room; each expert in the expert conference room can view the digital twin model through the traversed construction risk assessment perspective;

[0159] Assist the experts in the expert meeting room to conduct in-depth construction risk assessment;

[0160] Obtain and output in-depth construction risk assessment results.

[0161] The auxiliary module determines multiple construction risk assessment perspectives from the digital twin model, including:

[0162] Based on the event cluster combination condition, the construction risk events are combined into a plurality of event clusters;

[0163] Creating at least one associated common viewing angle for each of the event clusters; in the digital twin model, a digital twin corresponding to each of the construction risk events in the same event cluster will appear under the common viewing angle;

[0164] Based on the perspective screening condition, a target common viewing angle associated with each event cluster is screened out from the common viewing angles associated with each event cluster;

[0165] Using the target shared perspective as the construction risk assessment perspective;

[0166] The event cluster combination conditions include:

[0167] There is an event correlation relationship between any two of the construction risk events in the same event cluster, and a single construction risk event that has no event correlation relationship with any other construction risk event forms a cluster by itself;

[0168] The viewing angle screening conditions include:

[0169] The target common viewing angle comes from the common viewing angle associated with each of the event clusters;

[0170] Furthermore, when the same construction risk event exists in different event clusters at the same time, the overlap between the target co-viewing perspectives associated with the different event clusters in which the same construction risk event exists at the same time is less than or equal to a preset overlap threshold;

[0171] Furthermore, the sum of perspective switching costs between each two of the target co-viewing perspectives associated with different event clusters is less than or equal to a preset cost and a threshold.

[0172] The auxiliary module assists the experts in the expert meeting room to conduct in-depth construction risk assessment, including:

[0173] Respectively obtain the conversation records generated by the conversations between the experts in the expert meeting and check the behavior records of the digital twin model;

[0174] Setting the conversation record and the behavior record on a preset time axis;

[0175] Matching each of the behavior records with a trigger behavior record in a preset trigger behavior record library;

[0176] When the match is met, try to obtain the trigger indication direction corresponding to the trigger behavior record that matches the match; the trigger indication direction includes: front and back;

[0177] When the attempt is successful, the conversation record within a preset range of the trigger indication direction of the behavior record that matches the time axis is obtained as the first analysis target;

[0178] When the attempt fails, the matching behavior is recorded as the interval boundary;

[0179] The conversation records within the boundaries of the intervals adjacent to each other on the time axis are taken as second analysis targets;

[0180] Determining a situation to be assisted based on the first analysis target and the second analysis target;

[0181] Determining auxiliary knowledge corresponding to the situation to be assisted from a preset auxiliary knowledge base;

[0182] Based on the auxiliary knowledge, the experts in the expert meeting room are assisted to conduct in-depth construction risk assessment.

[0183] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A tunnel construction risk assessment method based on multi-source monitoring data fusion, characterized in that: include: Obtain multi-source monitoring data for tunnel construction; Performing fusion processing on the multi-source monitoring data; Evaluate the construction risk probability based on the fused multi-source monitoring data and the pre-trained construction risk probability assessment model; Outputting the construction risk probability; Also includes: When the construction risk probability is greater than or equal to a preset probability threshold, obtaining a construction risk event assessed by the construction risk probability assessment model; Building a digital twin model of the tunnel based on the construction risk events, the multi-source monitoring data and a preset three-dimensional tunnel model corresponding to the tunnel; determining a plurality of construction risk assessment perspectives from the digital twin model; Obtaining the assessment priority of each of the construction risk assessment perspectives; Traversing each of the construction risk assessment perspectives in order from the largest to the smallest according to the assessment priority; Each time the traversal is performed, the traversed construction risk assessment perspective is connected to the expert conference room; each expert in the expert conference room can view the digital twin model through the traversed construction risk assessment perspective; Assist the experts in the expert meeting room to conduct in-depth construction risk assessment; Obtain and output in-depth construction risk assessment results; Determining multiple construction risk assessment perspectives from the digital twin model includes: Based on the event cluster combination condition, the construction risk events are combined into a plurality of event clusters; Creating at least one associated common viewing angle for each of the event clusters; in the digital twin model, a digital twin corresponding to each of the construction risk events in the same event cluster will appear under the common viewing angle; Based on the perspective screening condition, a target common viewing angle associated with each event cluster is screened out from the common viewing angles associated with each event cluster; Using the target shared perspective as the construction risk assessment perspective; The event cluster combination conditions include: There is an event correlation relationship between any two of the construction risk events in the same event cluster, and a single construction risk event that has no event correlation relationship with any other construction risk event forms a cluster by itself; The viewing angle screening conditions include: The target common viewing angle comes from the common viewing angle associated with each of the event clusters; Furthermore, when the same construction risk event exists in different event clusters at the same time, the overlap between the target co-viewing perspectives associated with the different event clusters in which the same construction risk event exists at the same time is less than or equal to a preset overlap threshold; Furthermore, the sum of perspective switching costs between each two of the target co-viewing perspectives associated with different event clusters is less than or equal to a preset cost and a threshold.

2. The tunnel construction risk assessment method based on multi-source monitoring data fusion according to claim 1 is characterized in that: The fusing and processing the multi-source monitoring data includes: Obtain a large number of tunnel construction risk events; Based on each of the tunnel construction risk events, multiple sets of one-to-one corresponding data type tables to be entered and blank sets for fusion are determined; the data type tables to be entered indicate at least one data type of the data to be entered into the blank set for fusion, and each of the data types is a feature type of the occurrence feature of the tunnel construction risk event; Based on each of the data type tables to be entered, extract data from the multi-source monitoring data and fill in the corresponding blank set for fusion; The blank set of the fusion filled data is used as the fusion processing result.

3. The tunnel construction risk assessment method based on multi-source monitoring data fusion according to claim 1 is characterized in that: The said assisting the experts in the said expert meeting room to conduct in-depth construction risk assessment includes: Respectively obtain the conversation records generated by the conversations between the experts in the expert meeting and check the behavior records of the digital twin model; Setting the conversation record and the behavior record on a preset time axis; Matching each of the behavior records with a trigger behavior record in a preset trigger behavior record library; When the match is met, try to obtain the trigger indication direction corresponding to the trigger behavior record that matches the match; the trigger indication direction includes: front and back; When the attempt is successful, the conversation record within a preset range of the trigger indication direction of the behavior record that matches the time axis is obtained as the first analysis target; When the attempt fails, the matching behavior is recorded as the interval boundary; The conversation records within the boundaries of the intervals adjacent to each other on the time axis are taken as second analysis targets; Determining a situation to be assisted based on the first analysis target and the second analysis target; Determining auxiliary knowledge corresponding to the situation to be assisted from a preset auxiliary knowledge base; Based on the auxiliary knowledge, the experts in the expert meeting room are assisted to conduct in-depth construction risk assessment.

4. The tunnel construction risk assessment system based on multi-source monitoring data fusion is characterized by: include: An acquisition module, used to acquire multi-source monitoring data of tunnel construction; A processing module, used for fusing the multi-source monitoring data; An evaluation module is used to evaluate the construction risk probability based on the fused multi-source monitoring data and the pre-trained construction risk probability evaluation model; An output module, used for outputting the construction risk probability; Also includes: Auxiliary modules for: When the construction risk probability is greater than or equal to a preset probability threshold, obtaining a construction risk event assessed by the construction risk probability assessment model; Building a digital twin model of the tunnel based on the construction risk events, the multi-source monitoring data and a preset three-dimensional tunnel model corresponding to the tunnel; determining a plurality of construction risk assessment perspectives from the digital twin model; Obtaining the assessment priority of each of the construction risk assessment perspectives; Traversing each of the construction risk assessment perspectives in order from the largest to the smallest according to the assessment priority; Each time the traversal is performed, the traversed construction risk assessment perspective is connected to the expert conference room; each expert in the expert conference room can view the digital twin model through the traversed construction risk assessment perspective; Assist the experts in the expert meeting room to conduct in-depth construction risk assessment; Obtain and output in-depth construction risk assessment results; The auxiliary module determines multiple construction risk assessment perspectives from the digital twin model, including: Based on the event cluster combination condition, the construction risk events are combined into a plurality of event clusters; Creating at least one associated common viewing angle for each of the event clusters; in the digital twin model, a digital twin corresponding to each of the construction risk events in the same event cluster will appear under the common viewing angle; Based on the perspective screening condition, a target common viewing angle associated with each event cluster is screened out from the common viewing angles associated with each event cluster; Using the target shared perspective as the construction risk assessment perspective; The event cluster combination conditions include: There is an event correlation relationship between any two of the construction risk events in the same event cluster, and a single construction risk event that has no event correlation relationship with any other construction risk event forms a cluster by itself; The viewing angle screening conditions include: The target common viewing angle comes from the common viewing angle associated with each of the event clusters; Furthermore, when the same construction risk event exists in different event clusters at the same time, the overlap between the target co-viewing perspectives associated with the different event clusters in which the same construction risk event exists at the same time is less than or equal to a preset overlap threshold; Furthermore, the sum of perspective switching costs between each two of the target co-viewing perspectives associated with different event clusters is less than or equal to a preset cost and a threshold.

5. The tunnel construction risk assessment system based on multi-source monitoring data fusion as claimed in claim 4, characterized in that: The processing module performs fusion processing on the multi-source monitoring data, including: Obtain a large number of tunnel construction risk events; Based on each of the tunnel construction risk events, multiple sets of one-to-one corresponding data type tables to be entered and blank sets for fusion are determined; the data type tables to be entered indicate at least one data type of the data to be entered into the blank set for fusion, and each of the data types is a feature type of the occurrence feature of the tunnel construction risk event; Based on each of the data type tables to be entered, extract data from the multi-source monitoring data and fill in the corresponding blank set for fusion; The blank set of the fusion filled data is used as the fusion processing result.

6. The tunnel construction risk assessment system based on multi-source monitoring data fusion as claimed in claim 4, characterized in that: The auxiliary module assists the experts in the expert meeting room to conduct in-depth construction risk assessment, including: Respectively obtain the conversation records generated by the conversations between the experts in the expert meeting and check the behavior records of the digital twin model; Setting the conversation record and the behavior record on a preset time axis; Matching each of the behavior records with a trigger behavior record in a preset trigger behavior record library; When the match is met, try to obtain the trigger indication direction corresponding to the trigger behavior record that matches the match; the trigger indication direction includes: front and back; When the attempt is successful, the conversation record within a preset range of the trigger indication direction of the behavior record that matches the time axis is obtained as the first analysis target; When the attempt fails, the matching behavior is recorded as the interval boundary; The conversation records within the boundaries of the intervals adjacent to each other on the time axis are taken as second analysis targets; Determining a situation to be assisted based on the first analysis target and the second analysis target; Determining auxiliary knowledge corresponding to the situation to be assisted from a preset auxiliary knowledge base; Based on the auxiliary knowledge, the experts in the expert meeting room are assisted to conduct in-depth construction risk assessment.