A smart hydrological tower
Through the design of the smart hydrological tower, the integration of hydrological and meteorological monitoring and drone data collection solves the problem of hydrological monitoring relying on manual operation in the existing technology, realizes real-time online monitoring and efficient early warning of hydrological data, and promotes the digitalization of the water conservancy industry. develop.
Patent Information
- Application Number
- CN202410877545.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-07-02
AI Technical Summary
Existing hydrological monitoring technology relies on manual operation, has low efficiency and high cost, and fails to fully realize digital construction, especially in real-time monitoring and early warning of hydrological data.
Design a smart hydrological tower that integrates multiple hydrological and meteorological monitoring and drone data collection. Through the platform, lifting device, network communication device, meteorological monitoring device, wind and solar hybrid power generation system and other components on the tower, real-time hydrological data can be realized Online monitoring and convenient operation of drones.
It realizes real-time online monitoring of hydrological data, reduces labor costs, improves work efficiency, enhances response capabilities to water conditions and emergency warning processing efficiency, and promotes the digital development of the hydrology and water conservancy industry.
Smart Images

Figure CN118422934B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of hydrological monitoring, and in particular to a smart hydrological tower. Background Art
[0002] Hydrological monitoring refers to a complex and comprehensive system project in which the hydrological department uses scientific methods to monitor, measure, analyze and warn of the temporal and spatial distribution and changing patterns of rivers, lakes, reservoirs, channels and groundwater. The monitoring content includes: water level, flow, flow rate, rainfall (snow), evaporation, sediment, ice, soil moisture, water quality, etc.
[0003] At present, the digital construction of hydrology in my country has taken shape, such as drone data collection, information platform management, etc. However, the digital construction of hydrology is not comprehensive, and many hydrological operations still need to be completed manually. Based on this problem, it is particularly important to build full-factor and intelligent hydrological facilities. Summary of the invention
[0004] In order to overcome the above-mentioned defects of the prior art, the present invention provides a smart hydrological tower, which integrates multiple hydrological and meteorological monitoring and drone data collection on the hydrological tower to achieve real-time online monitoring of hydrological data, effectively save labor costs, improve work efficiency, and promote the digital development of the hydrological and water conservancy industries.
[0005] In order to solve the above technical problems, the technical solution of the present invention is:
[0006] A smart hydrological tower comprises a first tower body, a second tower body and a third tower body connected in sequence, wherein one end of the first tower body away from the second tower body is connected to a pre-buried base, a first platform for placing a drone is provided between the first tower body and the second tower body, a second platform for sightseeing and maintenance is provided between the second tower body and the third tower body, the second platform and the first platform are arranged opposite to each other along the central axis of the smart hydrological tower, a network communication device and a support frame are installed at one end of the third tower body away from the second tower body, an antenna arm is installed on the support frame, a meteorological monitoring device is installed on the antenna arm, a lightning rod and a rainfall monitoring device are connected to one end of the support frame away from the third tower body, and a weather vane is installed at one end of the lightning rod away from the support frame.
[0007] As an improved technical solution, a first entrance and exit is provided on the first tower body and close to the embedded base, and a second entrance and exit is provided on the third tower body and close to the second platform;
[0008] A lifting device is installed in the first tower body, the second tower body and the third tower body, and two ends of the lifting device are respectively connected to the first entrance and the second entrance.
[0009] As an improved technical solution, the lifting device includes an automatic ladder and a manual ladder;
[0010] The automatic ladder comprises an automatic ladder frame, on which an automatic climbing-free device driven by a motor is installed;
[0011] The manual ladder comprises a manual ladder frame. The manual ladder frame and the automatic ladder frame are both fixedly installed in the first tower body, the second tower body and the third tower body. A ladder guard ring is installed on the manual ladder frame.
[0012] As an improved technical solution, a storage compartment for storing the drone is provided on the first platform, and a closed door that can be opened and closed automatically is installed on the storage compartment;
[0013] A fence is arranged on the outer peripheral edge of the second platform, a sunshade device is arranged on the top of the second platform, the sunshade device is installed on the third tower body, a suspension is installed on the bottom of the second platform, and a water level detection device is installed on the suspension.
[0014] As an improved technical solution, a plurality of first decorative wings are arranged and installed on the outer circumference of the first tower body, and the plurality of first decorative wings are all arranged in an arc-shaped structure;
[0015] The first decorative wing includes an upper connecting part, a middle connecting part and a lower connecting part, the upper connecting part is connected to the first platform, the middle connecting part is connected to the first tower body, and the lower connecting part is connected to the embedded base.
[0016] As an improved technical solution, a plurality of second decorative wings are arranged and installed on the outer periphery of the second tower body, and the plurality of second decorative wings are arranged in a trumpet-shaped structure, and a plurality of decorative lamps are arranged and installed on the first decorative wings and the second decorative wings;
[0017] The second decorative wing includes a wing body and a trumpet-shaped opening portion, the wing body is arranged and installed on the second tower body, and the trumpet-shaped opening portion is connected to the second platform.
[0018] As an improved technical solution, the first tower body, the second tower body, the third tower body and the support frame are coaxially arranged.
[0019] As an improved technical solution, the smart hydrological tower is also provided with a wind-solar complementary power generation system and a drone cruise system.
[0020] As an improved technical solution, the wind-solar complementary power generation system includes a wind power generation device, an energy storage device and a solar power generation device;
[0021] The wind power generation device is installed at one end of the lightning rod away from the support frame, the energy storage device is installed at one end of the third tower body close to the support frame, and the solar power generation device is installed on the outer periphery of the second platform.
[0022] As an improved technical solution, the UAV cruise system includes a UAV placed on the first platform, the UAV is equipped with a non-contact hydrological detection device, and the non-contact hydrological detection device is connected to the UAV data platform via a wireless transmission system signal.
[0023] After adopting the above technical solution, the beneficial effects of the present invention are:
[0024] By setting the first tower body, the second tower body and the third tower body, the end of the first tower body away from the second tower body is connected to the embedded base, and the stability of the smart hydrological tower is enhanced by the embedded base. A first platform for placing drones is provided between the first tower body and the second tower body. The first platform can be used to place drones. The drones are flexible and convenient, and can perform accurate and real-time hydrological and video monitoring of the test area under harsh environmental conditions, thereby safely and accurately reflecting the water condition and providing water flow information, improving the efficiency of handling emergency warnings, emergencies and disasters, improving work efficiency and reducing the risk factor. A second platform for sightseeing and maintenance is provided between the second tower body and the third tower body. The second platform can be used for sightseeing. At the same time, it is also convenient for staff to inspect various equipment on the smart hydrological tower. The second platform and the first platform are arranged opposite to each other along the central axis of the smart hydrological tower, and are located on both sides of the central axis. By arranging the first platform and the second platform opposite to each other, the second platform can be avoided. In order to avoid affecting the take-off and landing of the drone on the first platform, a network communication device and a support frame are installed at one end of the third tower body away from the second tower body. The network communication device can realize rapid data transmission, which is convenient for real-time monitoring and information sharing. An antenna support arm is installed on the support frame, and a meteorological monitoring device is installed on the antenna support arm. Through the meteorological monitoring device, data of various meteorological elements such as wind speed, wind direction, air temperature, humidity, atmospheric pressure, and light can be captured through sensors, and the collected data is transmitted in real time through the communication interface. A lightning rod and a rainfall monitoring device are connected to the end of the support frame away from the third tower body. Real-time rainfall measurement can be realized through the rainfall monitoring device. A wind vane is installed at the end of the lightning rod away from the support frame, and the wind direction can be detected through the wind vane. In summary, through the above-mentioned devices, multiple hydrological and meteorological monitoring and drone data collection are integrated into one on the hydrological tower, so as to realize real-time online monitoring of hydrological data, effectively save labor costs, improve work efficiency, and promote the digital development of the hydrological and water conservancy industries;
[0025] By arranging a first entrance and exit on the first tower body and a second entrance and exit on the third tower body, a lifting device is installed in the first tower body, the second tower body and the third tower body, and the two ends of the lifting device are respectively connected to the first entrance and exit and the second entrance and exit, so that people can easily board the second platform;
[0026] By arranging and installing the first decorative wing on the periphery of the first tower body and arranging and installing the second decorative wing on the periphery of the second tower body, decorative lamps are installed on both the first decorative wing and the second decorative wing, thereby improving the aesthetics and technological sense of the hydrological tower.
[0027] In summary, the present invention provides a smart hydrological tower, which integrates multiple hydrological and meteorological monitoring and drone data collection on the hydrological tower to achieve real-time online monitoring of hydrological data, effectively save labor costs, improve work efficiency, and promote the digital development of the hydrological and water conservancy industries. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without creative work. In addition, in the drawings, the components or parts are not necessarily drawn according to the actual scale.
[0029] Figure 1 It is a structural schematic diagram of the present invention;
[0030] Figure 2 It is a schematic diagram of the structure of the body of the smart hydrological tower of the present invention;
[0031] Figure 3 It is a structural schematic diagram of the first platform and the tower body in the present invention;
[0032] Figure 4 It is a structural schematic diagram of the second platform and the tower body in the present invention;
[0033] Figure 5 It is a structural schematic diagram of the automatic ladder in the present invention;
[0034] Figure 6 It is a structural schematic diagram of the manual ladder in the present invention;
[0035] Figure 7 is a schematic structural diagram of the first decorative wing in the present invention;
[0036] Figure 8 is a schematic structural diagram of the second decorative wing in the present invention;
[0037] Reference numerals:
[0038] 1. The first tower body, 2. The second tower body, 3. The third tower body, 4. The embedded base, 5. The first platform, 6. The second platform, 7. The network communication device, 8. The support frame, 9. The antenna arm, 10. The meteorological monitoring device, 11. The lightning rod, 12. The rainfall monitoring device, 13. The wind vane, 14. The first entrance and exit, 15. The second entrance and exit, 16. The automatic ladder frame, 17. The automatic climbing-free device, 18. The manual ladder frame, 19. The ladder guard ring, 20. The storage bin, 21. closed door, 22. fence, 23. sunshade, 24. suspension, 25. water level detection device, 26. first decorative wing, 2601. upper connecting part, 2602. middle connecting part, 2603. lower connecting part, 27. second decorative wing, 2701. wing body, 2702. trumpet-shaped opening, 28. wind power generation device, 29. energy storage device, 30. solar power generation device, 31. drone, 32. non-contact hydrological detection device. DETAILED DESCRIPTION
[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] It should be noted that all directional indications (such as up, down, left, right, front, back, etc.) in the embodiments of the present invention are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0041] At the same time, the meaning of "and / or" or "and / or" appearing in the full text includes three options. Taking "A and / or B" as an example, it includes option A, or option B, or a option in which both A and B are satisfied.
[0042] In addition, in the present invention, descriptions such as "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0043] like Figure 1-Figure 2As shown, a smart hydrological tower comprises a first tower body 1, a second tower body 2 and a third tower body 3 connected in sequence. The first tower body 1, the second tower body 2 and the third tower body 3 can be fixed by bolts and flanges. The end of the first tower body 1 away from the second tower body 2 is connected to the embedded base 4. The embedded base 4 enhances the stability of the smart hydrological tower. A first platform 5 for placing a drone 31 is provided between the first tower body 1 and the second tower body 2. The first platform 5 can be used to place the drone 31. The drone 31 has the characteristics of flexibility and convenience, and can accurately and real-timely measure the water quality of the area to be measured under harsh environmental conditions. Text and video monitoring can safely and accurately reflect the water situation and provide water flow information, improve the efficiency of handling emergency warnings, emergencies and disasters, improve work efficiency and reduce the risk factor. A second platform 6 for sightseeing and maintenance is provided between the second tower body 2 and the third tower body 3. The second platform 6 can be used for sightseeing. At the same time, it is also convenient for staff to repair various equipment on the smart hydrological tower. The second platform 6 and the first platform 5 are arranged relative to each other along the central axis of the smart hydrological tower, so that the second platform 6 and the first platform 5 are respectively located on both sides of the central axis. By relative positioning of the first platform 5 and the second platform 6 The second platform 6 is set to reduce the impact of the take-off and landing of the drone 31 on the first platform 5. A network communication device 7 and a support frame 8 are installed at one end of the third tower body 3 away from the second tower body 2. The network communication device 7 can realize rapid data transmission, which is convenient for real-time monitoring and information sharing. An antenna support arm 9 is installed on the support frame 8. A meteorological monitoring device 10 is installed on the antenna support arm 9. Through the meteorological monitoring device 10, data of various meteorological elements such as wind speed, wind direction, air temperature, humidity, atmospheric pressure, and light can be captured through sensors. The collected data is transmitted in real time through the communication interface. The support frame 8 is away from the third One end of the tower body 3 is connected to a lightning rod 11 and a rainfall monitoring device 12. Real-time rainfall measurement can be achieved through the rainfall monitoring device 12. By setting up the lightning rod 11, lightning strikes can be avoided on rainy days, thereby avoiding damage to the equipment on the smart hydrological tower. A wind vane 13 is installed at the end of the lightning rod 11 away from the support frame 8, and the wind direction can be detected by the wind vane 13. In summary, through the above-mentioned devices, multiple hydrological and meteorological monitoring and drone 31 data collection are integrated into one on the hydrological tower, so as to realize real-time online monitoring of hydrological data, effectively save labor costs, improve work efficiency, and promote the digital development of the hydrological and water conservancy industries.
[0044] like Figure 2 , Figure 5 and Figure 6 As shown, in some embodiments of the present invention, a first entrance 14 is provided on the first tower body 1 and near the embedded base 4, through which one can enter the tower body of the smart hydrological tower, and a second entrance 15 is provided on the third tower body 3 and near the second platform 6, through which one can enter the second platform 6 from the tower body;
[0045] Lifting devices are installed in the first tower body 1 , the second tower body 2 and the third tower body 3 , and both ends of the lifting devices are respectively connected to the first entrance 14 and the second entrance 15 . The lifting devices are provided to facilitate personnel to board the second platform 6 .
[0046] like Figure 5-Figure 6 As shown, in the embodiment of the present invention, the lifting device includes an automatic ladder and a manual ladder. By combining the automatic ladder and the manual ladder, double protection is adopted to improve work efficiency and improve the working environment, ensuring that the smart hydrological tower can be accessed with or without electricity.
[0047] The automatic ladder comprises an automatic ladder frame 16, on which an automatic climbing-free device 17 driven by a motor is installed. The automatic climbing-free device 17 is common in daily life and belongs to the common knowledge of technicians in the technical field, and will not be described in detail here;
[0048] The manual ladder includes a manual ladder frame 18. The manual ladder frame 18 and the automatic ladder frame 16 are fixedly installed in the first tower body 1, the second tower body 2 and the third tower body 3. The automatic ladder frame 16 and the manual ladder frame 18 can be made of aluminum alloy and are connected to the main structure inside the tower body. The structure has good stability and meets the requirements of daily maintenance and visiting and learning. A ladder guard ring 19 is installed on the manual ladder frame 18. The ladder guard ring 19 is set to ensure the personal safety of the climbers. During actual installation, the ladder guard ring 19 is cancelled below a certain distance from the ground.
[0049] In addition, the automatic free-climbing device 17 can achieve overspeed locking and provide stall safety protection. It can be controlled by a double-handle switch and has an independent guidance and anti-fall system. It is also equipped with a dual control system and can be operated manually or wirelessly. It has overload protection and upper and lower limit devices to ensure the safety of equipment and personnel. At the same time, it provides power failure protection. When power is lost or outage, the operation will be stopped immediately. The bottom of the tower can be manually lowered, and the traction automatic balance guarantee system can ensure the reliability and stability of the equipment operation.
[0050] like Figure 1 , Figure 2 As shown, in some embodiments of the present invention, a storage bin 20 for storing a drone 31 is provided on the first platform 5, and a closed door 21 that can be opened and closed automatically is installed on the storage bin 20. Specifically, a sliding rod and a lead screw are respectively provided on both sides of the closed door 21 along the movement direction. The closed door 21 slides with the sliding rod and is threadedly connected with the lead screw. One end of the lead screw is connected to a driving motor, and the lead screw is driven to rotate by the driving motor, and the lead screw drives the closed door 21 to move axially along the sliding rod. The automatic release and recovery of the drone 31 is achieved by setting the storage bin 20 and the closed door 21 that can be opened and closed automatically.
[0051] A fence 22 is provided on the outer periphery of the second platform 6, and the fence 22 is provided to protect the personnel on the second platform 6. A sunshade device 23 is provided on the top of the second platform 6, and the sunshade device 23 is installed on the third tower body 3. The second platform 6 is shaded by the sunshade device 23 for sightseeing. A suspension 24 is installed at the bottom of the second platform 6, and a water level detection device 25 is installed on the suspension 24. The water level detection device 25 can use a radar water level meter. The radar water level meter can detect the water level in real time. The radar water level meter is an electronic device that uses electromagnetic waves to detect targets. Radar pulses are emitted from the sensor antenna of the radar water level meter. After that, The antenna receives the pulse reflected from the water surface and records the time. Knowing the propagation speed of the electromagnetic wave, the distance to the water surface is calculated. Compared with traditional pulses, the radar water level meter has higher measurement accuracy, lower power consumption and smaller size. During measurement, it is not affected by temperature gradient, air pressure, water vapor on the water surface, pollutants and sediment in the water. It is often used for non-contact level measurement of surface water and is suitable for smart hydrological towers. In addition, the radar water level meter adopts pulse coherent radar technology and uses 60G millimeter radar waves as carrier signals. The signal recognition algorithm achieves millimeter-level measurement accuracy and the optimized wave elimination filter design makes the measurement results more stable.
[0052] like Figure 1 and Figure 7 As shown, in the embodiment of the present invention, a plurality of first decorative wings 26 are arranged and installed on the outer periphery of the first tower body 1, and the plurality of first decorative wings 26 are all arranged in an arc-shaped structure;
[0053] The first decorative wing 26 includes an upper connection part 2601, a middle connection part 2602 and a lower connection part 2603. The upper connection part 2601 is connected to the first platform 5, the middle connection part 2602 is connected to the first tower body 1, and the lower connection part 2603 is connected to the embedded base 4. The specific connection method can be bolt connection.
[0054] like Figure 1 and Figure 8 As shown, in some embodiments of the present invention, a plurality of second decorative wings 27 are arranged and installed on the outer periphery of the second tower body 2, and the plurality of second decorative wings 27 are arranged in a trumpet-shaped structure. A plurality of decorative lamps are arranged and installed on the first decorative wing 26 and the second decorative wing 27, and the decorative lamps can be any one or a combination of decorative lamps, decorative belts, and flowing water lamps.
[0055] The second decorative wing 27 includes a wing body 2701 and a trumpet-shaped opening 2702. The wing body 2701 is arranged and installed on the second tower body 2. The trumpet-shaped opening 2702 is connected to the second platform 6. By arranging the first decorative wing 26, the second decorative wing 27 and decorative lamps, the aesthetics and technological sense of the hydrological tower are improved.
[0056] like Figure 1 and Figure 2 As shown, in an embodiment of the present invention, the first tower body 1, the second tower body 2, the third tower body 3 and the support frame 8 are coaxially arranged. The coaxial arrangement ensures the verticality of the smart hydrological tower and avoids structural deviation, which affects the structural strength of the smart hydrological tower.
[0057] like Figure 1 and Figure 2 As shown, in an embodiment of the present invention, a wind-solar complementary power generation system and a UAV 31 cruise system are also provided on the smart hydrological tower. The wind-solar complementary power generation system can provide partial driving energy for various instruments and equipment, lighting, etc. for hydrological monitoring, thereby realizing low-carbon operation of hydrological monitoring of the smart hydrological tower. The UAV 31 cruise system can perform all-round and large-area image acquisition, making full use of the flight advantages of the UAV 31 and the high-pixel camera, greatly improving the staff's ability to judge water level, environment and other information.
[0058] like Figure 1 Figure 2 As shown, in an embodiment of the present invention, the wind-solar complementary power generation system includes a wind power generation device 28, an energy storage device 29 and a solar power generation device 30;
[0059] The wind power generation device 28 is installed at one end of the lightning rod 11 away from the support frame 8 , the energy storage device 29 is installed at one end of the third tower body 3 close to the support frame 8 , and the solar power generation device 30 is installed on the outer periphery of the second platform 6 .
[0060] The wind power generation device 28 may be a wind turbine generator set, which may be a vertical axis wind turbine generator set or a horizontal axis wind turbine generator set. The horizontal axis wind turbine generator set adopts a three-blade structure, which has a better effect at low wind speeds; the vertical axis wind turbine generator set adopts magnetic levitation technology, has low noise, and has high reliability and stability.
[0061] The energy storage device 29 can use a lead-acid battery, and the solar power generation device 30 can use a high-efficiency photovoltaic power generation component with high-quality silicon wafers. The power generation efficiency of the silicon wafer can reach 17%, and the power generation efficiency of the component can reach 14%.
[0062] The electric energy generated by the wind power generation device 28 and the solar power generation device 30 are connected to the input end of the energy storage device 29 through a rectifier filter. The output end of the energy storage device 29 is connected to the inverter. The alternating current output by the inverter is used to power each monitoring device.
[0063] like Figure 1 and Figure 2As shown, in an embodiment of the present invention, the UAV 31 cruise system includes a UAV 31 placed on the first platform 5, and the UAV 31 is equipped with a non-contact hydrological detection device 32. The non-contact hydrological detection device 32 can adopt a hydrological monitor, and the hydrological monitor includes a speed measuring radar, a visible light camera, a high-magnification zoom lens, etc. The non-contact hydrological detection device 32 is connected to the UAV 31 data platform through a wireless transmission system signal. The non-contact hydrological detection device 32 is rigidly connected to the UAV 31, and can accurately monitor the area to be tested in the air, collect and summarize the collected parameters, and upload them to the UAV 31 data platform through the wireless transmission system, so as to realize real-time hydrological and video monitoring, thereby safely and accurately reflecting the water body conditions and providing water flow information, improving the efficiency of handling emergency warnings, emergencies and disasters, improving work efficiency, and reducing the risk factor. At the same time, by using the UAV 31 for image acquisition, the flight advantages of the UAV 31 and the high-pixel camera are fully utilized to greatly improve the staff's ability to judge information such as water level and environment.
[0064] Among them, the drone data platform includes:
[0065] The regional map module is used to mark the collection points and take-off and landing points in the three-dimensional map, determine the working range according to the collection points and take-off and landing points, and cut the three-dimensional map according to the working range to obtain a three-dimensional working map;
[0066] Determining the working range according to the collection point and the take-off and landing point includes:
[0067] Establish a three-dimensional rectangular coordinate system at any collection point in the three-dimensional map, obtain the coordinates of the collection point and the take-off and landing points, and form a coordinate set;
[0068] Get the maximum value of the horizontal coordinate in the coordinate set , the minimum value of the horizontal axis , the maximum value of the vertical axis , the minimum value of the vertical axis , the maximum value of the vertical coordinate and the minimum value of the vertical coordinate ;
[0069] Preset coordinate correction value , connect the maximum point to the minimum point to get the indicator line;
[0070] The coordinates of the maximum point are , the coordinates of the minimum point are ;
[0071] Construct a cuboid using the indicated lines as diagonals;
[0072] Use the range covered by the constructed cuboid as the working range.
[0073] In this embodiment, the three-dimensional map can be a three-dimensional map of the vicinity of an existing hydrological tower, or a newly drawn three-dimensional map through on-site measurement using equipment such as a total station, GPS, and RTK; the collection point refers to a geographical location point predetermined for collecting hydrological data in the work mission of the hydrological tower, and the take-off and landing point is the placement point of the extensionless platform, which is usually located at the water level tower and its vicinity. The staff of the hydrological tower mark these points on the map based on actual conditions, and then the operating range of the drone of the hydrological tower can be determined based on these points, thereby obtaining a three-dimensional working map. In this embodiment, the specific steps for obtaining the three-dimensional working map are: collecting the three-dimensional coordinate information of all collection points and take-off and landing points, and integrating these coordinate information into a set; the set includes the horizontal coordinate, vertical coordinate, and vertical coordinate of each point, so as to determine the spatial position range of the flight area.
[0074] Determine the extreme coordinates, that is, the maximum and minimum values of the horizontal coordinate, the maximum and minimum values of the vertical coordinate, and the maximum and minimum values of the vertical coordinate. These extreme coordinates mark the boundaries of the working range. In order to ensure that the flight area has an appropriate edge margin, we have also introduced a coordinate correction value, which can be set to a specific value by the staff. After the correction of the coordinate correction value, the maximum and minimum points are obtained. Connect these two points to form a diagonal line, and then construct a cuboid based on this diagonal line so that this cuboid can cover the range of all flight-related points. Define this cuboid as the actual working range of the drone, and crop the three-dimensional map within this range. In this way, the cropped three-dimensional working map will only contain the area required for the drone to perform the mission as much as possible, reducing the system burden and improving the system efficiency.
[0075] A management module is used to manage collection tasks, including collection points and corresponding task information, including collection targets and collection time; and is also used to manage the numbers and evaluation information corresponding to the drones;
[0076] The collection target corresponds to the collection device information, and the collection device information includes the device weight, the device power usage identification and the device power consumption. The device power usage identification is self-powered or externally powered. The evaluation information includes the maximum load, maximum range, model, available energy and maximum energy of the corresponding drone.
[0077] In this embodiment, the collection task is set by the staff according to the actual work needs. Each collection task includes multiple specific collection points, and each collection point has a clear collection target, such as measuring the flow of a river or the humidity of a certain point. In order to achieve these collection goals, we will select corresponding professional collection equipment, such as using a flow radar to collect the flow data of a river, or using a humidity sensor to collect humidity information at a specific location, and set the corresponding collection time, that is, the time the drone needs to hover at the collection point. At the same time, in order to perform these collection tasks, we have systematically managed the existing drone resources of the hydrological tower. Each drone is assigned a unique number, which not only facilitates our precise management of drones, but also facilitates us to track and record the performance evaluation information of each drone. Before performing a collection task, we will preliminarily select the most suitable drone for the task based on the specific needs of the task and the performance evaluation information of the drone. This management method aims to improve the execution efficiency and data accuracy of the collection task.
[0078] The route generation module is used to generate the corresponding preliminary route according to the collection points in the collection task;
[0079] The generating of the corresponding preliminary route comprises: selecting each collection point included in the collection task in the three-dimensional working map; selecting a take-off and landing point in the three-dimensional working map and setting it as the starting point and end point of the path, using the path planning software to plan the shortest path passing through all the selected collection points and avoiding terrain obstacles as the initial path; obtaining the collection time corresponding to each collection point in the collection task, using these collection times as the hovering time of the corresponding collection point, setting them in the initial path, and obtaining the preliminary route.
[0080] In this embodiment, the initial path can be generated using a route planning system provided by the drone manufacturer, and the collection time of each collection point is added to the initial path to obtain a preliminary route including the hovering point and time.
[0081] The analysis and processing module is used to perform a feasibility analysis on the preliminary route, wherein the feasibility analysis includes: determining whether the UAV can complete the preliminary route; if the UAV can complete the preliminary route, marking the number corresponding to the UAV on the preliminary route; if the UAV cannot complete the preliminary route, splitting the collection tasks corresponding to the preliminary route to obtain several new collection tasks;
[0082] The determination of whether the UAV can complete the initial route includes:
[0083] Obtain all collection targets in the collection task corresponding to the preliminary route, and obtain corresponding collection equipment information according to the collection targets;
[0084] Obtain the sum of the equipment weights in the collected equipment information, and use the sum of the equipment weights as the UAV load;
[0085] Select a drone based on the preliminary route and drone payload and record it as the target drone;
[0086] Determine whether the target drone is empty;
[0087] If so, it is determined that the drone cannot complete the initial route;
[0088] If not, an energy judgment is made;
[0089] The energy judgment includes: obtaining the model of the target UAV, inputting the model of the target UAV, the UAV load and the preliminary route into the energy consumption model, and obtaining the estimated energy consumption of the preliminary route;
[0090] Correct the estimated energy consumption according to the collected equipment information to obtain the corrected energy consumption;
[0091] Get the available energy of the drone ;
[0092] judge ,in, is the preset safety factor, and ;
[0093] If so, it is judged that the drone can complete the initial route;
[0094] If not, it is determined that the drone cannot complete the initial route.
[0095] The step of acquiring the target UAV includes:
[0096] Get the total mileage of the preliminary route , get the drone payload ;
[0097] Get the judgment information and record the maximum load as , the maximum range is recorded as The available energy is recorded as , the maximum energy is recorded as ;
[0098] The theoretical range corresponding to the evaluation information is calculated, and the calculation formula of the theoretical range is as follows:
[0099] ,
[0100] in, Indicates theoretical range;
[0101] Get the maximum value of the theoretical range corresponding to the judgment information without using the mark ;
[0102] judge ;
[0103] If so, then The drone corresponding to the corresponding evaluation information is used as the target drone, and a use mark is added to the drone use information, and the use mark is deleted after the corresponding drone completes the cruise route;
[0104] If not, a null message is used as the target drone.
[0105] The step of obtaining the corrected energy consumption comprises:
[0106] Extract the collection device information whose power usage mark is external power supply from the collection device information to obtain the collection device information set ;
[0107] Judgment collection device information set Is it empty?
[0108] If empty, use the estimated energy consumption as the corrected energy consumption ;
[0109] If it is not empty, the corrected energy consumption is calculated using the following formula:
[0110] ,
[0111] In the formula, represents the estimated energy consumption, Indicates the collection device information set Middle The power consumption of the device collecting device information represents the collection of device information set Middle The total collection time corresponding to each collection device information.
[0112] In this embodiment, in order to evaluate whether the drone can successfully execute the scheduled route, all the collection targets in the collection task corresponding to the route are obtained in detail, and the information of the relevant collection equipment is accurately obtained based on these targets. Because different collection targets require different collection equipment, and the weight of the equipment is the load of the drone. Only by understanding the load of the drone can we more accurately judge whether the drone can successfully execute the scheduled route.
[0113] Next, the theoretical range of the drone is calculated using a simple proportional relationship based on the maximum load, maximum range, available energy, maximum energy and drone load. The available energy and drone load are obtained in real time, and the others are fixed parameters. Based on the theoretical range and the total mileage of the preliminary route, a drone that may be able to execute this route is selected. The selected drone model, drone load and preliminary route are then input into the energy consumption model provided by the drone manufacturer or developed by a third party to obtain a more accurate estimate of energy consumption.
[0114] Since some data collection equipment such as flow measurement radars require external power supply, drones are required to provide them with energy, which increases the energy consumption of drones. Therefore, in order to more accurately evaluate the mission execution capability of drones, we performed a correction calculation of energy consumption, which enables us to more accurately predict the energy consumption of drones during mission execution.
[0115] Finally, by comparing the corrected energy consumption with the available energy of the UAV and presetting a safety factor such as 0.8, that is, the energy consumption is less than or equal to 0.8 times the available energy of the UAV, the mission UAV can complete the mission, ensuring the safety of UAV operation and avoiding risks caused by energy depletion.
[0116] In this embodiment, if it is determined that the drone can complete the preliminary route, the preliminary route is assigned to the corresponding drone. If the judgment result is that the drone cannot complete the preliminary route, it means that the corresponding collection task cannot be completed by one drone, so the collection task needs to be split.
[0117] The scheduling module is used to call the analysis and processing module to perform feasibility analysis on the preliminary routes, and when the analysis and processing module generates a new collection task, call the route generation module to generate corresponding preliminary routes for all new collection tasks, and call the processing module again to perform feasibility analysis on all newly generated preliminary routes until no new collection task is generated after feasibility analysis of all preliminary routes;
[0118] In this embodiment, the scheduling module first calls the analysis and processing module to conduct an in-depth feasibility analysis of the pre-planned preliminary routes. This analysis process comprehensively considers multiple factors such as the drone's load capacity and energy consumption, aiming to accurately determine whether the drone has the actual ability to complete these routes. This is the first step in the entire scheduling process, and its core goal is to identify those collection tasks that exceed the drone's current capabilities.
[0119] Once the feasibility analysis finds that some routes are not feasible, that is, the corresponding collection tasks cannot be completed, the analysis and processing module will quickly split the collection tasks corresponding to these routes and break them down into a series of smaller and easier to complete collection tasks.
[0120] Next, the scheduling module will instruct the route generation module to formulate corresponding preliminary routes for these newly generated collection tasks. This process aims to ensure that each collection task is capable of being completed by the existing drone by refining the complex original collection tasks and replanning the routes.
[0121] After that, the analysis and processing module will once again conduct a rigorous feasibility analysis on all newly generated preliminary routes. This iterative evaluation mechanism ensures that all newly planned routes are carefully considered to verify that the drone can successfully perform these tasks.
[0122] This cycle will continue until the analysis and processing module completes the feasibility analysis of all preliminary routes and no new collection tasks are generated. This means that all collection tasks have been reasonably decomposed into the scale that the drone can perform, achieving the maximum utilization of existing resources. Through this refined task allocation and management method, the scheduling module can flexibly adjust task allocation according to the actual situation and the actual capabilities of the drone, thereby significantly improving the efficiency and success rate of task execution.
[0123] The cruise module is used to set all preliminary routes marked with numbers as cruise routes, and control the UAVs corresponding to the numbers to cruise along the cruise routes.
[0124] In this embodiment, the cruise module matches the UAV with the cruise route by numbering, and then controls the UAV to fly along the cruise route through the flight control software.
[0125] In addition, the smart hydrological tower can also be equipped with an underwater robot monitoring system and a real-time online sediment monitoring system;
[0126] The underwater robot monitoring system includes an underwater robot and a track pre-laid in the water. The underwater robot runs on the track. The underwater robot is equipped with two horizontal thrusters, one vertical thruster, one transverse thruster and a cable. Through the above settings, the underwater robot has a strong mobility in the water. The underwater robot is also equipped with a water flow velocity sensor. After receiving the water flow velocity information, the water flow velocity sensor transmits the data to the background through wireless data transmission, which is recorded and fed back by the background. Among them:
[0127] The underwater robot monitoring system includes:
[0128] The data acquisition module is used to collect multi-dimensional data of the river to be tested, wherein the multi-dimensional data of the river to be tested includes river data, meteorological data and river network topology; the river data includes water level data, flow rate data, water temperature data and riverbed scouring data; the riverbed scouring data includes riverbed elevation change data, riverbed profile distribution data and riverbed average scouring depth data; the meteorological data includes temperature data, humidity data, wind speed data, solar radiation data and soil moisture data;
[0129] The data processing module is used to pre-process the multi-dimensional data of the river to be measured to obtain a comprehensive spatiotemporal data cube;
[0130] The multi-dimensional hydrological prediction output module is used to construct a hydrological prediction model based on a graph convolutional neural network, input the comprehensive spatiotemporal data cube into the hydrological prediction model, and predict the multi-dimensional hydrological data within the future T time period; output the multi-dimensional hydrological data within the future T time period to the flow measurement and warning terminal; each module is connected by wired and / or wireless means;
[0131] In this embodiment, the method of obtaining the comprehensive spatiotemporal data cube includes:
[0132] Perform quality check on the collected multi-dimensional data of the river to be tested; obtain perfect multi-dimensional data of the river;
[0133] The quality inspection methods include:
[0134] Collect u groups of river data and meteorological data within a fixed period of time in history; use u groups of river data and meteorological data within a fixed period of time in history as a preliminary training set; label the data in the preliminary training set; the label is whether it is an outlier; use the labeled preliminary training set as a data sample; divide the data sample into a training set and a test set;
[0135] Extract training features from the data sample, where the training features are the data mean, standard deviation, maximum value and minimum value; process the training features to be of the same order of magnitude;
[0136] A random forest model is constructed based on the training set. The random forest model consists of M decision trees. For the b-th decision tree, b is an integer in the interval [1, M]. The construction method includes:
[0137] Extract k samples with replacement from the training set to construct a new training subset; randomly select c training features from the training features; the value of c is less than the total number of training features;
[0138] Among the selected c training features, the information gain index of each of the c training features is calculated, and the c training features with the smallest information gain index are selected as split features; according to the split features, the node is split into two child nodes;
[0139] The information gain index is calculated by:
[0140] Calculate the entropy of the training set ;in, is the training set; is the number of categories of data in the training set; It belongs to The proportion of data of the class to the total data in the training set; is the index of the data category;
[0141] Repeat the splitting process until the stopping condition is met, that is, a complete decision tree is constructed; repeatedly construct M decision trees to form a random forest model; calculate the performance indicators of the random forest model on the test set;
[0142] The performance index is calculated as follows: ;in, is a performance indicator; is the accuracy index; is the recall rate indicator;
[0143] in, ; ; In the formula, The number of samples correctly predicted as positive by the random forest model; The number of samples that the random forest model incorrectly predicts as positive; The number of samples that the random forest model incorrectly predicts as negative classes;
[0144] According to the calculation results of the performance indicators, the number of decision trees, the maximum tree depth, and the number of training features in the random forest model are adjusted in real time; when the calculation results of the performance indicators are infinitely close to 1 and no longer increase, the random forest model at this time is retained as the basic model for quality inspection;
[0145] The collected multidimensional data of the river to be tested are processed into the same order of magnitude; the processed multidimensional data of the river to be tested are input into the basic model, and the basic model outputs the abnormal values in the multidimensional data of the river to be tested; the abnormal values are repaired by using the difference resampling and interpolation methods; and the perfect river multidimensional data are obtained;
[0146] The four-dimensional data modeling method is used to integrate the multi-dimensional river data into time and space to generate a comprehensive time and space data cube.
[0147] Ways to generate a comprehensive spatiotemporal data cube include:
[0148] Construct a three-dimensional spatial data model based on the river network topology; map the river data to the corresponding nodes in the three-dimensional spatial data model; determine the representation of the time dimension based on the time resolution of the river data; the time dimension is continuous (such as date timestamp) or discrete (such as time steps such as hours and days); determine the time range and time step, such as hourly, daily or monthly;
[0149] According to the determined time range and time step, a time series is constructed; a time series is an ordered set of time points used to represent the temporal changes of river data and meteorological data; for example, if the time step is every hour, the time series is {t1, t2, t3, ..., tH}, where tH represents the Hth time point;
[0150] Map the river data and meteorological data of the river at the corresponding time point into the three-dimensional spatial data model; store the river data and meteorological data as attribute fields of the three-dimensional spatial model, or establish an independent attribute table and associate it with the spatial model; that is, combine the time series with the three-dimensional spatial data model to form a comprehensive spatiotemporal data cube.
[0151] Ways to construct a three-dimensional spatial data model include:
[0152] Obtain river vector data according to the river network topology, where the river vector data is the linear element of the river; obtain elevation data of the river area to be measured, such as digital elevation model or contour data; convert the river vector data and elevation data into a unified coordinate system;
[0153] Extract nodes from linear features, including the starting point, end point and intersection of rivers; extract coordinates of nodes to obtain plane coordinates and elevation values of nodes;
[0154] According to the extracted nodes, the Delaunay triangulation algorithm is used to construct a triangular patch data structure; the triangular patch data structure consists of a series of non-intersecting triangular patches, each of which consists of three nodes; each triangular patch consists of three nodes and their coordinates.
[0155] The construction methods of the triangle patch data structure include:
[0156] All nodes form a node set, create a super triangle, and the super triangle can contain all nodes; the coordinates of the three vertices of the super triangle are far away from the range of the node set; define an initial triangle set; add the super triangle to the initial triangle set;
[0157] Traverse each node in the node set; for the current node, find the triangle where it is located in the existing triangle set; if the node is inside or on the boundary of the triangle, perform edge splitting operation;
[0158] The edge splitting operation is to delete the original triangle and create a new triangle; the newly created triangle satisfies that its circumscribed circle does not contain other nodes;
[0159] After the edge splitting operation, check whether the newly created triangle satisfies the condition that its circumscribed circle does not contain other nodes; if not, swap the common edges of adjacent triangles; recursively perform the edge swap operation until all triangles satisfy the condition that their corresponding circumscribed circles do not contain other nodes;
[0160] Add the newly created triangle to the triangle set; delete the old triangles that are no longer needed; repeat until all nodes are inserted; after all nodes are inserted, delete the super triangle; the remaining triangle set is the final triangulated network; that is, the triangle patch data structure; store the triangle patch data structure in an appropriate data format, such as a file or database.
[0161] It should be noted that, based on the comprehensive spatiotemporal data cube, multi-dimensional and multi-scale spatiotemporal analysis and mining can be easily carried out; for example, the spatiotemporal distribution and evolution of a certain geographical element at different times and in different regions can be analyzed to discover valuable information and knowledge hidden in the data.
[0162] On this basis, the construction methods of the hydrological prediction model based on graph convolutional neural network include:
[0163] Collect data within a fixed historical time period and construct a comprehensive spatiotemporal data cube; record it as a historical spatiotemporal data cube;
[0164] Define the basic architecture of the hydrological prediction model; the basic architecture includes a data preliminary construction layer, a graph convolution layer, a pooling layer, and a fully connected layer; stack the graph convolution layer, the pooling layer, and the fully connected layer in a set order to construct a preliminary hydrological prediction model; the setting order and the number of graph convolution layers and pooling layers are determined according to actual conditions;
[0165] The data preliminary construction layer is used to construct a feature vector for each node in the historical spatiotemporal data cube, representing the historical time series data of the observation point; construct a feature matrix based on the feature vector, each row of the feature matrix corresponds to the feature vector of a node, and the dimension is (number of nodes, feature dimension); the feature dimension is the data dimension of river data and meteorological data;
[0166] Construct a river network topology graph G=(V, E) based on the historical spatiotemporal data cube, where V is the set of nodes and E is the connection relationship between nodes;
[0167] The input data of the hydrological prediction model is defined as a tuple R = (G, X); the input data is passed to the graph convolution layer and the GCN graph convolution operation is used for feature extraction and conversion;
[0168] The expression of the GCN graph convolution operation is:
[0169] ;in, For the The feature matrix of the layer; For the The feature matrix of the layer; is the adjacency matrix; is the degree matrix, used for normalization ; It is The trainable weight matrix of the layer; is a nonlinear activation function; the output of the graph convolutional layer is the transformed feature matrix ;
[0170] The adjacency matrix encodes the structural information of the tuple and is used to aggregate and propagate node features in the GCN graph convolution operation; the degree matrix is a diagonal matrix, and the diagonal elements in the diagonal matrix represent the degree of the node, that is, the number of edges connected to the node;
[0171] The function of the trainable weight matrix is to linearly transform the feature matrix of the layer to obtain a new node feature representation; this linear transformation can be regarded as a projection of the node features to capture higher-level and more abstract feature patterns;
[0172] The pooling layer is used to reduce the resolution of the feature matrix and extract higher-level feature representations. The output of the pooling layer is the feature matrix after dimensionality reduction. The graph convolutional layer and the pooling layer are stacked in a certain order. The output of each layer is used as the input of the next layer to achieve end-to-end feature extraction and conversion.
[0173] The feature matrix of the last layer is used as input and passed to the fully connected layer; the output of the fully connected layer is defined as a three-dimensional tensor, which includes the first dimension, the second dimension and the third dimension; the first dimension corresponds to the time step, and the second dimension and the third dimension correspond to the node and the variable respectively; the variable refers to the river data; the three-dimensional tensor constitutes the multidimensional hydrological data in the future T time period required for the output; the network width of the fully connected layer is adjusted according to the three-dimensional tensor;
[0174] Defining the comprehensive loss function of the hydrological prediction model ;in, is the time-dependent loss function; is the spatial correlation loss function; is a trade-off coefficient used to balance temporal smoothing and spatial smoothing;
[0175] ;in, is the number of nodes; is the time step; it refers to the number of independent time points in the total time period considered in the time dimension; It is Nodes at time The true value of the data at that time; It is Nodes at time The predicted value of the data at that time; is the index of the node; is the time index;
[0176] ;in, Different from The node index of For Node The set of neighbor nodes of node groups of nodes that are spatially adjacent or related; For Node and nodes The weight between nodes and nodes It is defined by the spatial similarity, connection strength or other relationships between them; It is Nodes at time The predicted value of the data at that time;
[0177] Adam is used as an optimization algorithm for the hydrological prediction model to iteratively update the parameters of the hydrological prediction model; input data and the corresponding pre-labeled labels are input into the model; the labels are multidimensional hydrological data in the future T time period;
[0178] The historical spatiotemporal data cube is used to train the hydrological prediction model, and the value of the comprehensive loss function is calculated during the training process; when the value of the comprehensive loss function drops to a point where it no longer changes, the parameters of the hydrological prediction model at this time are saved, and the construction of the hydrological prediction model is completed.
[0179] Among them, the underwater robot monitoring system can comprehensively characterize the spatiotemporal dynamic changes of rivers and improve the accuracy and reliability of predictions; it has introduced advanced data collection and processing methods to achieve efficient acquisition and fusion of multidimensional river data, providing high-quality data support for subsequent analysis; it uses a random forest model to perform quality checks and outlier repair on multidimensional data, which improves the integrity and accuracy of the data and enhances the robustness of the system; it constructs a comprehensive spatiotemporal data cube, fully considering the spatiotemporal correlation characteristics of the river system, laying the foundation for subsequent predictions; it builds a hydrological prediction model based on a graph convolutional neural network, which can effectively learn and mine the complex nonlinear relationships inherent in the river system, has strong feature extraction and generalization capabilities, and can be applied to different river sections and regions; it realizes real-time online monitoring and future prediction of multidimensional hydrological elements, which can provide scientific decision-making support for flood prevention and warning, water resources optimization and scheduling, etc.
[0180] The real-time online sediment monitoring system consists of a data acquisition communication host, a high-precision rain gauge, a weir flow meter, a weighing sediment monitoring cabinet, a photoelectric sediment monitor, and a multi-functional camera. The above equipment can realize real-time dynamic monitoring of rainfall, runoff flow, sediment content, etc. in the runoff area.
[0181] In addition, the real-time online sediment monitoring system also includes a soil moisture monitor and a vegetation cover measurement system, through which real-time dynamic monitoring of vegetation cover / canopy density and soil moisture can be achieved.
[0182] In summary, the present invention provides a smart hydrological tower, which integrates multiple hydrological and meteorological monitoring and drone data collection on the hydrological tower, realizes real-time online monitoring of hydrological data, effectively saves labor costs, improves work efficiency, and promotes the digital development of the hydrological and water conservancy industries.
[0183] It should be understood that the purpose of these embodiments is only to illustrate the present invention and is not intended to limit the protection scope of the present invention. In addition, it should also be understood that after reading the technical content of the present invention, those skilled in the art can make various changes, modifications and / or variations to the present invention, and all of these equivalent forms also fall within the protection scope defined by the appended claims of this application.
Claims
1. A smart hydrological tower, characterized in that: It comprises a first tower body, a second tower body and a third tower body connected in sequence, wherein one end of the first tower body away from the second tower body is connected to a pre-buried base, a first platform for placing a drone is provided between the first tower body and the second tower body, a second platform for sightseeing and maintenance is provided between the second tower body and the third tower body, the second platform and the first platform are arranged oppositely along the central axis of the smart hydrological tower, and are respectively located on both sides of the central axis, and by arranging the first platform and the second platform oppositely, the take-off and landing of the drone on the first platform is avoided, a network communication device and a support frame are installed at one end of the third tower body away from the second tower body, an antenna arm is installed on the support frame, a meteorological monitoring device is installed on the antenna arm, a lightning rod and a rainfall monitoring device are connected to one end of the support frame away from the third tower body, and a weather vane is installed at one end of the lightning rod away from the support frame; The smart hydrological tower is also equipped with a wind-solar hybrid power generation system, a drone cruise system, an underwater robot monitoring system, and a real-time online sediment monitoring system; The UAV cruise system includes a UAV placed on the first platform, the UAV is equipped with a non-contact hydrological detection device, and the non-contact hydrological detection device is connected to the UAV data platform via a wireless transmission system signal; The drone data platform includes: The regional map module is used to mark the collection points and take-off and landing points in the three-dimensional map, determine the working range according to the collection points and take-off and landing points, and cut the three-dimensional map according to the working range to obtain a three-dimensional working map; A management module is used to manage collection tasks, including collection points and corresponding task information, including collection targets and collection time; and is also used to manage the numbers and evaluation information corresponding to the drones; The route generation module is used to generate the corresponding preliminary route according to the collection points in the collection task; The analysis and processing module is used to perform a feasibility analysis on the preliminary route, wherein the feasibility analysis includes: determining whether the UAV can complete the preliminary route; if the UAV can complete the preliminary route, marking the number corresponding to the UAV on the preliminary route; if the UAV cannot complete the preliminary route, splitting the collection tasks corresponding to the preliminary route to obtain several new collection tasks; The scheduling module is used to call the analysis and processing module to perform feasibility analysis on the preliminary routes, and when the analysis and processing module generates a new collection task, call the route generation module to generate corresponding preliminary routes for all new collection tasks, and call the processing module again to perform feasibility analysis on all newly generated preliminary routes until no new collection task is generated after feasibility analysis of all preliminary routes; The cruise module is used to set all the preliminary routes marked with numbers as cruise routes, and control the drones corresponding to the numbers to cruise along the cruise routes; The underwater robot monitoring system includes an underwater robot and a track pre-laid in the water. The underwater robot runs on the track. The underwater robot is provided with two horizontal thrusters, one vertical thruster, one transverse thruster and a cable. Through the above arrangement, the underwater robot has a strong mobility in the water. The underwater robot is also equipped with a water flow velocity sensor. After receiving the water flow velocity information, the water flow velocity sensor transmits the data to the background through wireless data transmission, which is recorded and fed back by the background. Among them: The underwater robot monitoring system comprises: The data acquisition module is used to collect multi-dimensional data of the river to be tested, wherein the multi-dimensional data of the river to be tested includes river data, meteorological data and river network topology; the river data includes water level data, flow rate data, water temperature data and riverbed scouring data; the riverbed scouring data includes riverbed elevation change data, riverbed profile distribution data and riverbed average scouring depth data; the meteorological data includes temperature data, humidity data, wind speed data, solar radiation data and soil moisture data; The data processing module is used to pre-process the multi-dimensional data of the river to be measured to obtain a comprehensive spatiotemporal data cube; The multi-dimensional hydrological prediction output module is used to construct a hydrological prediction model based on a graph convolutional neural network, input the comprehensive spatiotemporal data cube into the hydrological prediction model, and predict the multi-dimensional hydrological data within the future T time period; output the multi-dimensional hydrological data within the future T time period to the flow measurement and warning terminal; each module is connected by wired and / or wireless means; The real-time online sediment monitoring system comprises a data acquisition communication host, a high-precision rain gauge, a weir flow meter, a weighing sediment monitoring cabinet, a photoelectric sediment monitor and a multifunctional camera.
2. The smart hydrological tower according to claim 1, characterized in that: A first entrance and exit is provided on the first tower body and close to the embedded base, and a second entrance and exit is provided on the third tower body and close to the second platform; A lifting device is installed in the first tower body, the second tower body and the third tower body, and two ends of the lifting device are respectively connected to the first entrance and the second entrance.
3. A smart hydrological tower as claimed in claim 2, characterized in that: The lifting device includes an automatic ladder and a manual ladder; The automatic ladder comprises an automatic ladder frame, on which an automatic climbing-free device driven by a motor is installed; The manual ladder comprises a manual ladder frame. The manual ladder frame and the automatic ladder frame are both fixedly installed in the first tower body, the second tower body and the third tower body. A ladder guard ring is installed on the manual ladder frame.
4. The smart hydrological tower according to claim 1, characterized in that: The first platform is provided with a storage compartment for storing the drone, and the storage compartment is provided with a closed door that can be opened and closed automatically; A fence is arranged on the outer peripheral edge of the second platform, a sunshade device is arranged on the top of the second platform, the sunshade device is installed on the third tower body, a suspension is installed on the bottom of the second platform, and a water level detection device is installed on the suspension.
5. The smart hydrological tower according to claim 1, characterized in that: A plurality of first decorative wings are arranged and installed on the outer circumference of the first tower body, and the plurality of first decorative wings are all arranged in an arc-shaped structure; The first decorative wing includes an upper connecting part, a middle connecting part and a lower connecting part, the upper connecting part is connected to the first platform, the middle connecting part is connected to the first tower body, and the lower connecting part is connected to the embedded base.
6. The smart hydrological tower according to claim 5, characterized in that: A plurality of second decorative wings are arranged and installed on the outer periphery of the second tower body, and the plurality of second decorative wings are arranged in a trumpet-shaped structure, and a plurality of decorative lamps are arranged and installed on the first decorative wings and the second decorative wings; The second decorative wing includes a wing body and a trumpet-shaped opening portion, the wing body is arranged and installed on the second tower body, and the trumpet-shaped opening portion is connected to the second platform.
7. The smart hydrological tower according to claim 1, characterized in that: The first tower body, the second tower body, the third tower body and the support frame are coaxially arranged.
8. The smart hydrological tower according to claim 1, characterized in that: The wind-solar complementary power generation system includes a wind power generation device, an energy storage device and a solar power generation device; The wind power generation device is installed at one end of the lightning rod away from the support frame, the energy storage device is installed at one end of the third tower body close to the support frame, and the solar power generation device is installed on the outer periphery of the second platform.
