A switching method between interlocking stations with different signal systems
By adding double-acting switches and virtual signal machines between the two signal systems of CTCS-2 and CBTC, cross-line operation is achieved, solving the compatibility problem between different signal systems, improving resource utilization and reducing costs.
Patent Information
- Application Number
- CN202410691324.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-30
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-05-30
AI Technical Summary
The existing technology cannot achieve cross-line operation between two different signal systems of CTCS-2 and CBTC, and it is difficult to meet the needs of integrated connection between urban (suburban) railways, trunk railways, intercity railways, and urban rail transit.
By adding double-acting switches and virtual signal machines between the two lines and establishing a cross-standard interface station, the information interaction and approach integration between CBTC and CTCS-2 signal systems is realized, allowing trains to operate across lines within the co-management area.
The cross-line operation of trains between different signal systems is achieved without downgrading and running, which improves line resource utilization, reduces investment and operation costs, and reduces the number of passenger transfers.
Smart Images

Figure CN118457679B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of high-speed railway train operation control, and in particular relates to a switching method between station interlockings of different signal systems. Background Art
[0002] In order to realize the integrated development of various rail transit systems in the province and the seamless interconnection of different rail lines, it is necessary to install a cross-system ground signal system in the interface area or interface station of different ground signal systems, so as to realize the cross-line operation of trains without degradation. The cross-system ground signal system is mainly used for cross-line operations between two different train control lines, CTCS-2 and CBTC. The CTCS-2 system is mainly used in high-speed and intercity railways, and the CBTC system is mainly used in urban rail transit. The ground equipment of CTCS-2 standard stations mainly includes the dispatching center CTC, station interlocking, train control center TCC and track circuits, and the ground equipment of CBTC standard stations mainly includes automatic train supervision ATS, station interlocking, zone controller ZC and axle counters.
[0003] The CTCS-2 and CBTC signal systems are currently incompatible and cannot be operated across lines during operation. Figure 1 As shown in the figure, the existing two types of lines are independent of each other, the ground equipment and trackside equipment of the station are also independent of each other, and the station interlocking automatically triggers the corresponding train route according to the operation plan of the dispatching center. In response to the development requirements of key urban agglomerations, it is necessary to strengthen the integrated connection between urban (suburban) railways and trunk railways, intercity railways, and urban rail transit, encourage multi-line and multi-point transfers, coordinate system standards, and promote cross-line direct operation where conditions permit.
[0004] To sum up, the current system cannot support cross-line operation between different signal systems, and it is difficult to meet the needs of cross-line direct operation for the integrated connection between urban (suburban) railways and trunk railways, intercity railways, and urban rail transit. Summary of the invention
[0005] In view of this, the present invention provides a switching method between station interlockings with different signal systems, which realizes the through-operation of trains without degradation between different signal systems of intercity railways and urban rail transit lines.
[0006] The present invention provides a switching method between station interlockings of different signal systems, comprising the following steps:
[0007] The CBTC line is outsourced to the CTCS-2 line to establish a cross-standard interface station, and a double-action turnout is added between the two lines. The two lines are separated at the double-action turnout insulation joint. The CBTC yard and the CTCS yard handle the train routes within their jurisdiction respectively. At the same time, a virtual signal is set at the boundary. The virtual signal has the function of switching lights to meet the display requirements of both CBTC and CTCS-2 signal standards.
[0008] During the switching process of the train route from CBTC downline to 3G and from CBTC line to CTCS-2 line, when the train enters the co-managed area, it drives according to the movement authorization issued by the CBTC yard area controller ZC, runs to 3G and stops to complete the passenger transfer. At the same time, the CTCS yard station train control center TCC controls 3G to send HU code according to the route information sent by the interlocking of this yard, and sends the movement authorization to the exit signal X3 to the train after the train arrives at the platform and switches to the CTCS-2 vehicle and after X3 is opened; the CBTC yard interlocking establishes the route from X3 to F2, and the CTCS yard interlocking establishes the route from F1 to SN. After the X3 exit signal is opened, the CTCS yard interlocking merges the route information of the two yards and sends it to TCC. TCC updates the 3G code to UU according to the received information, and extends the movement authorization to allow the train to enter the SN exit section of the CTCS-2 downline, completing the cross-line operation from CBTC to CTCS-2 line;
[0009] During the process of switching the route from CTCS-2 line to CBTC line from S exit of CTCS-2 upline to IIG, the train operates according to the movement authorization issued by TCC of CTCS yard when entering the co-managed area, and stops at IIG to complete the passenger transfer. At the same time, ZC of CBTC yard establishes connection with the vehicle and sends the movement authorization to the exit signal SII to the vehicle; CTCS yard interlocking establishes the route from SII to F4, and CBTC yard interlocking establishes the route from F3 to CBTC upline. After the SII exit signal is opened, CBTC yard interlocking merges the route information of the two yards and sends it to ZC. ZC extends the movement authorization according to the interlocking route and the current position of the train, and the train enters the CBTC upline section to complete the cross-line operation from CTCS-2 to CBTC line.
[0010] Furthermore, the starting position of the co-managed area is calculated during the project implementation phase based on the train running speed, vehicle parameters, civil engineering parameters, braking distance and train-ground communication call time during switching, and the end position is the location of the exit signal of the cross-line platform.
[0011] Furthermore, the CTCS field interlocking fuses the route information of the two fields, specifically: combining the route information from X3 to F2 and from F1 to SN into the complete route information from X3 to SN.
[0012] Furthermore, the switching process of the train from the CBTC downline to the 3G from the CBTC line to the CTCS-2 line route includes:
[0013] Step 2.1: The driving permit calculated by the ZC of the CBTC yard allows the train to enter the co-management area of CBTC and CTCS. The movement authorization sent by the ZC to the train extends to the exit signal X3; the CBTC yard interlocking sends the status of X3 to the CTCS yard. The TCC of the CTCS yard controls 3G to send codes according to the received status, X3 is closed, 3G sends HU code, and the train runs with the CBTC signal system until 3G stops, completing the passenger transfer;
[0014] Step 2.2, the CTCS interlocking establishes the route from F1 to SN, and sends the first interlocking condition to the CBTC interlocking as the inspection condition for the CBTC interlocking to establish the route from X3 to F2. If the interlocking condition is met, the X3 exit signal is opened; at the same time, the CBTC interlocking sends the second interlocking condition to the CTCS interlocking as the condition for unlocking the CTCS route;
[0015] Step 2.3, after the X3 outbound signal is opened, the CBTC interlocking will send the route information from X3 to F2 to the CTCS interlocking. The CTCS interlocking will integrate the route information from X3 to F2 and from F1 to SN and send the complete route information to the TCC of this field. The TCC will update the 3G code to UU and extend the mobile authorization according to the occupancy of the SN port section of the CTCS-2 downlink line.
[0016] Step 2.4: After receiving the UU code, the vehicle enters the route from X3 to SN, unlocks the route section by section, and completes the cross-line operation from the CBTC line to the CTCS-2 line according to the mobile authorization driving.
[0017] Furthermore, the first field connection condition in the step 2.2 includes the display of virtual signal F1, the status of connecting switch 2#, the status of connecting switch section 2DG and the inspection status.
[0018] Furthermore, the second field connection condition in the step 2.2 includes X3 signal display, connecting switch 4# status, connecting switch section 4DG status and inspection status.
[0019] Furthermore, the route information from X3 to F2 in step 2.3 includes route number, signal display and section status.
[0020] Furthermore, the switching process of the train from the CTCS-2 upline S exit to the IIG from the CTCS-2 line to the CBTC line route includes:
[0021] Step 3.1: After the train enters the co-management area of CBTC and CTCS, it runs according to the movement authorization sent by TCC. At the same time, the CBTC yard ZC establishes a connection with the vehicle in advance, and the CTCS yard interlocking sends the track section status in the co-management area to the CBTC yard interlocking. The CBTC yard interlocking integrates the axle counting section status and sends it to the ZC. The ZC confirms the train position based on the received information.
[0022] Step 3.2: CTCS yard interlocking sends the route information from SII to F4 to CBTC yard interlocking as a condition for CBTC yard ZC to calculate movement authorization. The train runs to IIG to stop and complete passenger transfer.
[0023] Step 3.3, CBTC interlocking establishes the route from F3 to S1, and sends the third interlocking condition to CTCS interlocking as the inspection condition for CTCS interlocking to establish the route from SII to F4. When the interlocking condition is met, the SII exit signal is opened; at the same time, CTCS interlocking sends the fourth interlocking condition to CTCS interlocking as the condition for unlocking the CTCS route;
[0024] Step 3.4: After the SII exit signal is opened, the CTCS yard interlocking sends the route information from SII to F4 to the CBTC yard interlocking, and the CBTC yard interlocking sends the routes from SII to F4 and from F3 to S1 to the ZC. The ZC extends the movement authorization according to the position of the train ahead in the CBTC upline section.
[0025] Step 3.5: The train enters the route from SII to S1, unlocks the route section by section, and completes the cross-line operation from the CTCS-2 line to the CBTC line according to the mobile authorization of the CBTC yard ZC.
[0026] Furthermore, the route information from SII to F4 in step 3.2 includes section length, turnout direction and turnout position.
[0027] Furthermore, the third field connection condition in the step 3.3 includes the display of virtual signal F3, the status of connecting switch 1#, the status of connecting switch section 1DG and the inspection status; the fourth field connection condition includes the display of SII signal, the status of connecting switch 3#, the status of connecting switch section 3DG and the inspection status.
[0028] Beneficial effects:
[0029] The present invention enables each line to independently control the connecting turnouts of the two lines, respectively handle the train routes within the jurisdiction, and set up virtual signals at the boundaries. Through the information interaction between the CBTC field interlocking and the CTCS field interlocking, the cross-line operation of trains on the CBTC line and the CTCS-2 line is realized, which can improve the utilization rate of line resources, greatly streamline train resources and civil engineering scale, reduce investment and operating costs, and reduce the number of passenger transfers, providing a solution for the network operation of urban agglomerations. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 This is a schematic diagram of the existing CTCS-2 and CBTC line stations.
[0031] Figure 2 A schematic diagram of the structure of an interface station established in a switching method between station interlockings of different signaling systems provided by the present invention.
[0032] Figure 3 A schematic diagram of the route from the CBTC line to the CTCS-2 line in a switching method between station interlockings of different signal systems provided by the present invention.
[0033] Figure 4 A schematic diagram of MA extension when switching from the CBTC signaling standard to the CTCS-2 signaling standard in a switching method between station interlockings across signaling standards provided by the present invention.
[0034] Figure 5 A schematic diagram of the transmission of field interlocking conditions when switching from the CBTC signaling standard to the CTCS-2 signaling standard in a switching method between station interlockings across signaling standards provided by the present invention.
[0035] Figure 6 A schematic diagram of route information transmission when switching from the CBTC signaling format to the CTCS-2 signaling format in a switching method between station interlockings across signaling formats provided by the present invention.
[0036] Figure 7 A schematic diagram of cross-line route unlocking when the CBTC signaling system is switched to the CTCS-2 signaling system in a switching method between station interlocking systems provided by the present invention.
[0037] Figure 8 A schematic diagram of the route from the CTCS-2 line to the CBTC line in a switching method between station interlockings of different signal systems provided by the present invention.
[0038] Fig. 9 A schematic diagram of MA extension when switching from the CTCS signaling format to the CBTC signaling format in a switching method between station interlockings across signaling formats provided by the present invention.
[0039] Fig.10A schematic diagram of route information transmission when switching from the CTCS signaling format to the CBTC signaling format in a switching method between station interlockings across signaling formats provided by the present invention.
[0040] Fig.11 A schematic diagram of the transmission of field interlocking conditions when switching from the CTCS signaling format to the CBTC signaling format in a switching method between station interlockings across signaling formats provided by the present invention.
[0041] Fig.12 A schematic diagram of ZC extended movement authorization when switching from the CTCS signaling format to the CBTC signaling format in a switching method between station interlockings across signaling formats provided by the present invention.
[0042] Fig.13 A schematic diagram of cross-line route unlocking when switching from the CTCS signaling format to the CBTC signaling format in a switching method between station interlockings across signaling formats provided by the present invention. DETAILED DESCRIPTION
[0043] The present invention is described in detail with reference to the following embodiments.
[0044] The present invention mainly relates to the following terms:
[0045] Cross-system operation refers to the operation of trains between track lines with different signal systems;
[0046] The co-managed area refers to an area composed of ground signal equipment of different systems installed on the trackside in the overlapping area of the lines in order to realize cross-line operation of trains on lines of two different systems.
[0047] The present invention provides a switching method between station interlockings of different signal systems, which specifically includes the following steps:
[0048] Step 1: Establish a cross-standard interface station. The structure of the interface station is as follows: Figure 2 As shown in the figure, the CBTC line is outsourced to the CTCS-2 line, and a double-action turnout is added between the two lines. The boundary between the two lines is at the double-action turnout insulation joint. The CBTC yard and the CTCS yard handle the train routes within their jurisdiction respectively. At the same time, a virtual signal is set at the boundary. The virtual signal has the function of switching lights to meet the display requirements of the two signal systems of CBTC and CTCS-2. The starting position of the co-management area is calculated during the project implementation phase based on information such as train speed, vehicle parameters, civil engineering parameters, braking distance, and vehicle-ground communication call time during switching. The end position is the location of the exit signal of the cross-line platform.
[0049] Specifically, the cross-standard interface station has four tracks: IG, IIG, 3G and 4G. IG is used to connect the downline of the CTCS-2 line, IIG is used to connect the upline of the CTCS-2 line, 3G is used to connect the downline of the CBTC line, and 4G is used to connect the upline of the CBTC line. Among them, the area inside the station connected to IG and IIG is the CTCS field, which is controlled by computer interlocking; the area inside the station connected to 3G and 4G is the CBTC field, which is controlled by full electronic interlocking.
[0050] A 2 / 4 double-moving turnout is added between the CBTC downline and the CTCS-2 downline. Trains from the CBTC downline to 3G pass through the 2 / 4 turnout and run in reverse to the SN section of the CTCS-2 downline. The 2 / 4 turnout contains two virtual signal points, F1 and F2. Specifically, F1 is the location of the CTCS-2 yard virtual signal, and F2 is the location of the CBTC yard virtual signal. A 1 / 3 double-moving turnout is added between the CBTC upline and the CTCS-2 upline. Trains from the S exit of the CTCS-2 upline to IIG pass through the 1 / 3 turnout and run in reverse to the CBTC upline. The 1 / 3 turnout contains two virtual signal points, F3 and F4. Specifically, F4 is the location of the CTCS-2 yard virtual signal, and F3 is the location of the CBTC yard virtual signal.
[0051] Since most of the stations on the CBTC line are non-centralized stations and have no switch connections, based on this feature, the present invention adopts the method of outsourcing the CBTC line to the CTCS-2 line, adding double-action switches between the two lines, so that it has the basic conditions for running cross-line trains between the two lines.
[0052] Step 2: Switch the route from CBTC line to CTCS-2 line.
[0053] The switching process of the train from the CBTC down line to the 3G from the CBTC line to the CTCS-2 line approach, such as Figure 3 As shown, when the train enters the co-managed area, it drives according to the movement authorization issued by the regional controller ZC of the CBTC yard, and stops at 3G to complete the passenger transfer. At the same time, the station train control center TCC of the CTCS yard controls 3G to send HU code according to the route information sent by the interlocking of this yard, and sends the movement authorization to the exit signal X3 to the train after the train arrives at the platform and switches to the CTCS-2 onboard and X3 is opened; the CBTC yard interlocking establishes the route from X3 to F2, and the CTCS yard interlocking establishes the route from F1 to SN. After the X3 exit signal is opened, the CTCS yard interlocking merges the route information of the two yards and sends it to TCC. TCC updates the 3G code to UU according to the received information, and extends the movement authorization to allow the train to enter the SN exit section of the CTCS-2 downline, completing the cross-line operation from CBTC to CTCS-2 line.
[0054] Among them, the HU code is the track circuit code of 3G, which is used for trains to stop at 3G to complete passenger transfers before they can depart. The CTCS field interlocking integrates the two field route information, specifically: combining the X3->F2 and F1->SN routes into a complete route of X3->SN, and then sending it to TCC in accordance with the requirements of the "Interface between Train Control Center and Computer Interlocking (QCR864.2-2021)". TCC updates the 3G code to UU based on the received information. In addition, if the turnouts on the departure route are all No. 18, UUS can be sent, otherwise they are all UU.
[0055] The above-mentioned switching process from the CBTC line to the CTCS-2 line route specifically includes:
[0056] Step 2.1: The CBTC yard area controller ZC calculates the driving permit for the train, allowing the train to enter the co-management area of CBTC and CTCS. Figure 4 The shaded part of the figure shows that the movement authority sent by ZC to the train will be extended to the exit signal X3; the CBTC interlocking sends the status of X3 to the CTCS field, and the TCC of the CTCS field controls the 3G code according to the received status of X3. At this time, X3 is closed, 3G sends HU code, and the train runs to 3G with CBTC signal system to complete the passenger transfer. When the CBTC signal system switches to the CTCS-2 signal system, the movement authority (MA) extension process is as follows: Figure 4 shown.
[0057] Step 2.2, CTCS interlocking establishes the route from F1 to SN, and sends the interlocking conditions to CBTC interlocking, and uses the interlocking conditions as the inspection conditions for CBTC interlocking to establish the route from X3 to F2. If the interlocking conditions are met, the X3 exit signal is open, where the interlocking conditions include the virtual signal F1 display, the connecting turnout 2# status, the connecting turnout section 2DG status and the inspection status; at the same time, CBTC interlocking sends the interlocking conditions of this field to CTCS interlocking, and uses the interlocking conditions as the conditions for unlocking the CTCS field route, where the interlocking conditions include the X3 signal display, the connecting turnout 4# status, the connecting turnout section 4DG status and the inspection status. The process is as follows Figure 5 shown.
[0058] Step 2.3: After the X3 outbound signal is opened, the CBTC interlocking will send the route information from X3 to F2 to the CTCS interlocking. The route information includes the route number, signal display, and section status. The CTCS interlocking will integrate the route information from X3 to F2 with the route information from F1 to SN and send the complete route information to the TCC of this field. The TCC will update the 3G code to UU and extend the mobile authorization according to the occupancy of the SN port section of the CTCS-2 downlink line. The process is as follows: Figure 6shown.
[0059] Step 2.4: After receiving the UU code, the vehicle enters the route from X3 to SN. The process is as follows: Figure 7 As shown, as the train's running route is unlocked section by section, the train drives according to the mobile authorization and completes the cross-line operation from the CBTC line to the CTCS-2 line.
[0060] Step 3: Switch the route from CTCS-2 line to CBTC line.
[0061] The train switches from the CTCS-2 upline S exit to the IIG from the CTCS-2 line to the CBTC line approach, such as Figure 8 As shown, when the train enters the co-managed area, it drives according to the movement authorization issued by the CTCS yard TCC, runs to IIG and stops to complete the passenger transfer. At the same time, the CBTC yard ZC establishes a connection with the vehicle and sends the movement authorization to the exit signal SII to the vehicle; the CTCS yard interlocking establishes the route from SII to F4, and the CBTC yard interlocking establishes the route from F3 to the CBTC upline. After the SII exit signal is opened, the CBTC yard interlocking merges the route information of the two yards and sends it to the ZC. The ZC extends the movement authorization according to the interlocking route and the current position of the train, and the train enters the CBTC upline section to complete the cross-line operation from CTCS-2 to the CBTC line.
[0062] The above-mentioned switching process from the CTCS-2 line to the CBTC line route specifically includes:
[0063] Step 3.1: After the train enters the co-management area of CBTC and CTCS, it runs according to the movement authorization sent by TCC. At the same time, the CBTC yard ZC establishes a connection with the vehicle in advance, and the CTCS yard interlocking sends the track section status in the co-management area to the CBTC yard interlocking. The CBTC yard interlocking merges the axle counting section status and sends it to the ZC. The ZC confirms the train position based on the received information. The process is as follows: Fig. 9 shown.
[0064] Step 3.2: CTCS interlocking sends the route information from SII to F4 to CBTC interlocking. The route information includes the section length, turnout direction and turnout position, etc. The route information is used as the condition for CBTC ZC to calculate the movement authorization. The train runs to IIG to stop and complete the passenger transfer. The process is as follows: Fig.10 shown.
[0065] Step 3.3, CBTC interlocking establishes the route from F3 to S1, and sends the interlocking conditions to CTCS interlocking as the inspection conditions for CTCS interlocking to establish the route from SII to F4. When the interlocking conditions are met, the SII exit signal is open, where the interlocking conditions include the display of virtual signal F3, the state of connecting turnout 1#, the state of connecting turnout section 1DG and the inspection state; at the same time, CTCS interlocking sends the interlocking conditions of this field to CTCS interlocking as the conditions for unlocking the CTCS field route, where the interlocking conditions include the display of SII signal, the state of connecting turnout 3#, the state of connecting turnout section 3DG and the inspection state. The process is as follows: Fig.11 shown.
[0066] Step 3.4: After the SII exit signal is opened, the CTCS yard interlocking will send the route information from SII to F4 to the CBTC yard interlocking. The CBTC yard interlocking will send the routes from SII to F4 and from F3 to S1 to the ZC according to the interface requirements of each manufacturer's interlocking and ZC. The ZC will extend the movement authorization according to the position of the train ahead in the CBTC upline section. The route information includes the section length, turnout direction, turnout position, etc. The process is as follows: Fig.12 shown.
[0067] Step 3.5: The train enters the route from SII to S1. As the train runs, the route is unlocked section by section. The train completes the cross-line operation from CTCS-2 line to CBTC line according to the mobile authorization of CBTC yard ZC. The process is as follows: Fig.13 shown.
[0068] This method is proposed based on the interlocking method of the interface station. The area where the interface station connects to the CTCS-2 line adopts computer interlocking that meets the "TB / T 3027-2015 Technical Conditions for Computer Interlocking of Railway Stations", and the area connected to the CBTC line adopts full electronic interlocking of the urban rail system. The two interlockings transmit the interactive information of the co-managed area through network communication, specifically using the Ethernet communication interface method. The co-managed area of the cross-standard interface station should simultaneously arrange trackside equipment of different signal systems, which are respectively connected to their respective interlocking interfaces, and are used to pre-start the ground equipment to establish communication with the vehicle. The display of the CBTC yard exit signal needs to establish a connection with the first approach and the second approach start signal in front of it.
[0069] Finally, it should be noted that it is obvious that those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
[0070] The above is only an example of implementation of the present invention, but it cannot be used to limit the scope of the present invention. Any structural changes made according to the present invention, as long as they do not lose the essence of the present invention, should be regarded as falling within the scope of protection of the present invention and being restricted. Those skilled in the art can clearly understand that for the convenience and simplicity of description, the specific working process and related instructions of the method described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0071] The term "comprise" or any other similar term is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus / method that comprises a list of elements includes not only those elements but also other elements not expressly listed or inherent to such process, method, article, or apparatus / method.
[0072] So far, the technical solutions of the present invention have been described in conjunction with the further embodiments shown in the accompanying drawings, but it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
[0073] In summary, the above are only preferred embodiments of the present invention and are not intended to limit the protection scope of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A switching method between interlocking stations with different signal systems, characterized in that: The following steps are involved: The CBTC line is outsourced to the CTCS-2 line to establish a cross-standard interface station, and a double-action turnout is added between the two lines. The two lines are separated at the double-action turnout insulation joint. The CBTC yard and the CTCS yard handle the train routes within their jurisdiction respectively. At the same time, a virtual signal is set at the boundary. The virtual signal has the function of switching lights to meet the display requirements of both CBTC and CTCS-2 signal standards. During the switching process of the train route from CBTC downline to 3G and from CBTC line to CTCS-2 line, when the train enters the co-managed area, it drives according to the movement authorization issued by the CBTC yard area controller ZC, runs to 3G and stops to complete the passenger transfer. At the same time, the CTCS yard station train control center TCC controls 3G to send HU code according to the route information sent by the interlocking of this yard, and sends the movement authorization to the exit signal X3 to the train after the train arrives at the platform and switches to the CTCS-2 vehicle and after X3 is opened; the CBTC yard interlocking establishes the route from X3 to F2, and the CTCS yard interlocking establishes the route from F1 to SN. After the X3 exit signal is opened, the CTCS yard interlocking merges the route information of the two yards and sends it to TCC. TCC updates the 3G code to UU according to the received information, and extends the movement authorization to allow the train to enter the SN exit section of the CTCS-2 downline, completing the cross-line operation from CBTC to CTCS-2 line; During the process of switching the route from CTCS-2 line to CBTC line from S exit of CTCS-2 upline to IIG, the train operates according to the movement authorization issued by TCC of CTCS yard when entering the co-managed area, and stops at IIG to complete the passenger transfer. At the same time, ZC of CBTC yard establishes connection with the vehicle and sends the movement authorization to the exit signal SII to the vehicle; CTCS yard interlocking establishes the route from SII to F4, and CBTC yard interlocking establishes the route from F3 to CBTC upline. After the SII exit signal is opened, CBTC yard interlocking merges the route information of the two yards and sends it to ZC. ZC extends the movement authorization according to the interlocking route and the current position of the train, and the train enters the CBTC upline section to complete the cross-line operation from CTCS-2 to CBTC line.
2. The switching method according to claim 1, characterized in that: The starting position of the co-managed area is calculated during the project implementation phase based on the train speed, vehicle parameters, civil engineering parameters, braking distance and train-to-ground communication call time during switching, and the end position is the location of the exit signal of the cross-line platform.
3. The switching method according to claim 1, characterized in that: The CTCS field interlocking fuses the route information of the two fields, specifically: combining the route information from X3 to F2 and from F1 to SN into the complete route information from X3 to SN.
4. The switching method according to claim 1, characterized in that: The switching process of the train from the CBTC down line to the 3G from the CBTC line to the CTCS-2 line route includes: Step 2.1: The driving permit calculated by the ZC of the CBTC yard allows the train to enter the co-management area of CBTC and CTCS. The movement authorization sent by the ZC to the train extends to the exit signal X3; the CBTC yard interlocking sends the status of X3 to the CTCS yard. The TCC of the CTCS yard controls 3G to send codes according to the received status, X3 is closed, 3G sends HU code, and the train runs with the CBTC signal system until 3G stops, completing the passenger transfer; Step 2.2, the CTCS interlocking establishes the route from F1 to SN, and sends the first interlocking condition to the CBTC interlocking as the inspection condition for the CBTC interlocking to establish the route from X3 to F2. If the interlocking condition is met, the X3 exit signal is opened; at the same time, the CBTC interlocking sends the second interlocking condition to the CTCS interlocking as the condition for unlocking the CTCS route; Step 2.3, after the X3 outbound signal is opened, the CBTC interlocking will send the route information from X3 to F2 to the CTCS interlocking. The CTCS interlocking will integrate the route information from X3 to F2 and from F1 to SN and send the complete route information to the TCC of this field. The TCC will update the 3G code to UU and extend the mobile authorization according to the occupancy of the SN port section of the CTCS-2 downlink line. Step 2.4: After receiving the UU code, the vehicle enters the route from X3 to SN, unlocks the route section by section, and completes the cross-line operation from the CBTC line to the CTCS-2 line according to the mobile authorization driving.
5. The switching method according to claim 4, characterized in that: The first field connection condition in the step 2.2 includes the display of virtual signal F1, the status of connecting switch 2#, the status of connecting switch section 2DG and the inspection status.
6. The switching method according to claim 4, characterized in that: The second field connection condition in the step 2.2 includes X3 signal display, connecting switch 4# status, connecting switch section 4DG status and inspection status.
7. The switching method according to claim 4, characterized in that: The route information from X3 to F2 in step 2.3 includes the route number, signal display and section status.
8. The switching method according to claim 1, characterized in that: The switching process of the train from the CTCS-2 up line S exit to the IIG from the CTCS-2 line to the CBTC line route includes: Step 3.1: After the train enters the co-management area of CBTC and CTCS, it runs according to the movement authorization sent by TCC. At the same time, the CBTC yard ZC establishes a connection with the vehicle in advance, and the CTCS yard interlocking sends the track section status in the co-management area to the CBTC yard interlocking. The CBTC yard interlocking integrates the axle counting section status and sends it to the ZC. The ZC confirms the train position based on the received information. Step 3.2: CTCS yard interlocking sends the route information from SII to F4 to CBTC yard interlocking as a condition for CBTC yard ZC to calculate movement authorization. The train runs to IIG to stop and complete passenger transfer. Step 3.3, CBTC interlocking establishes the route from F3 to S1, and sends the third interlocking condition to CTCS interlocking as the inspection condition for CTCS interlocking to establish the route from SII to F4. When the interlocking condition is met, the SII exit signal is opened; at the same time, CTCS interlocking sends the fourth interlocking condition to CTCS interlocking as the condition for unlocking the CTCS route; Step 3.4: After the SII exit signal is opened, the CTCS yard interlocking sends the route information from SII to F4 to the CBTC yard interlocking, and the CBTC yard interlocking sends the routes from SII to F4 and from F3 to S1 to the ZC. The ZC extends the movement authorization according to the position of the train ahead in the CBTC upline section. Step 3.5: The train enters the route from SII to S1, unlocks the route section by section, and completes the cross-line operation from the CTCS-2 line to the CBTC line according to the mobile authorization of the CBTC yard ZC.
9. The switching method according to claim 8, characterized in that: The route information from SII to F4 in step 3.2 includes section length, turnout direction and turnout position.
10. The switching method according to claim 8, characterized in that: The third field connection condition in the step 3.3 includes the display of virtual signal F3, the status of connecting switch 1#, the status of connecting switch section 1DG and the inspection status; the fourth field connection condition includes the display of SII signal, the status of connecting switch 3#, the status of connecting switch section 3DG and the inspection status.
