A UPS uninterruptible power supply status monitoring and early warning system
By calculating the current output data points and historical data of the modular UPS power supply, the degree of target abnormality is evaluated, which solves the problem in the existing technology that it is difficult to timely monitor and warn the UPS power supply of gradual abnormal changes, and achieves reliable and timely monitoring of the status of the modular UPS power supply. Monitor and warn.
Patent Information
- Application Number
- CN202410626301.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-20
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-05-20
AI Technical Summary
Existing technology is difficult to timely and reliably monitor and warn of gradual changes in modular UPS power status abnormalities, such as battery aging, resulting in short-term delays or instability in power supply, which may cause damage to equipment.
By obtaining the current output data points of the independent UPS power modules in the modular UPS, calculating the target neighborhood radius, determining core and non-core data points, performing feature clustering, evaluating the degree of abnormality, and calculating the degree of target abnormality combined with historical data to perform Monitor and warn.
It realizes reliable and timely monitoring and early warning of the status of modular UPS power supply, and can accurately identify and provide early warning of abnormal conditions of UPS power supply to prevent equipment damage.
Smart Images

Figure CN118468063B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of uninterruptible power supply, and in particular to a UPS uninterruptible power supply state monitoring and early warning system. Background Art
[0002] A modular UPS system is usually composed of multiple independent UPS power modules, which can operate independently and be connected together in parallel or in parallel to provide the required power capacity and redundancy. Because modular UPS has the advantages of flexibility, reliability, maintainability and energy efficiency, the application field and scope of modular UPS are becoming more and more extensive, and modular UPS has the function of switching power supply in time when the main power supply is cut off; however, when the UPS power supply is abnormal or fails, it may cause a short delay in power supply or unstable power supply of the UPS power supply. For example, aging or damage of the UPS battery, failure of the UPS inverter, etc. may cause a short delay in power supply or unstable power supply of the UPS power supply. When the UPS power supply has a short delay in power supply or unstable power supply, it may cause great damage to the object equipment of the power supply. Therefore, real-time monitoring and early warning of the status of the UPS power supply are very important.
[0003] In the prior art, the operating data of each independent UPS power module in the modular UPS at the current operating moment is usually collected in real time, and the data collected at the current operating moment is analyzed to realize the monitoring and early warning of the modular UPS state at the current operating moment; however, for some gradually changing UPS power anomalies, if only the operating data of the modular UPS collected at one operating moment is referred to each time the UPS state is monitored, it cannot be timely and reliably monitored and identified, and further, the state of the modular UPS uninterruptible power supply cannot be reliably and timely monitored and early warned. The gradually changing UPS power anomaly refers to a UPS abnormal phenomenon that gradually intensifies as the operating process proceeds, such as the aging of the UPS power battery, that is, the aging of the UPS power battery will gradually intensify as the operating process proceeds. Therefore, reliable and timely monitoring and early warning of the state of the modular UPS uninterruptible power supply has become an urgent problem to be solved. Summary of the invention
[0004] In order to solve the above problems, the present invention provides a UPS uninterruptible power supply status monitoring and early warning system, and the technical solutions adopted are as follows:
[0005] An embodiment of the present invention provides a UPS uninterruptible power supply status monitoring and early warning system, comprising a processor and a memory, wherein the processor executes a computer program stored in the memory to implement the following steps:
[0006] Obtain current output data points corresponding to W independent UPS power modules in a modular UPS at a current operating time; the modular UPS is composed of W independent UPS power modules, and W is a positive integer and greater than 0;
[0007] Obtaining a target neighborhood radius according to the distance between the current output data points;
[0008] According to the target neighborhood radius, each core current output data point and each non-core current output data point are obtained;
[0009] Obtaining each feature clustering category according to the non-core current output data point and the target neighborhood radius;
[0010] Obtaining the abnormality degree of the UPS modularization corresponding to the current operating moment according to each current output data point in each feature clustering category and the distance between the central data point of each feature clustering cluster and the core current output data point;
[0011] Obtaining abnormality levels of UPS modularization corresponding to a preset number of historical operating moments, and obtaining a target abnormality level of UPS modularization corresponding to the current operating moment according to the abnormality level of UPS modularization corresponding to the current operating moment and the abnormality level of UPS modularization corresponding to the historical operating moments;
[0012] The UPS module at the current operating moment is monitored and warned according to the target abnormality degree.
[0013] Preferably, the method for obtaining the target neighborhood radius includes:
[0014] The set constructed by all current output data points is recorded as the current output data point set corresponding to the current running time;
[0015] For any current output data point in the current output data point set: all other current output data points in the current output data point set except the current output data point are recorded as first data points; the first data point corresponding to the minimum Euclidean distance between the current output data point and each first data point is recorded as the nearest neighbor data point corresponding to the current output data point; the Euclidean distance between the current output data point and its corresponding nearest neighbor data point is recorded as the nearest neighbor distance corresponding to the current output data point;
[0016] The minimum value and the maximum value among the nearest neighbor distances corresponding to all current output data points in the current output data point set are recorded as the minimum nearest neighbor distance and the maximum nearest neighbor distance respectively;
[0017] Recording a set constructed by the nearest neighbor distances corresponding to all current output data points in the current output data point set as a nearest neighbor distance set;
[0018] The nearest neighbor distance that does not appear repeatedly in the nearest neighbor distance set is recorded as the first nearest neighbor distance; the number of all nearest neighbor distances remaining after removing all first nearest neighbor distances from the nearest neighbor distance set is recorded as the first representation value corresponding to the current output data point set;
[0019] Recording the variance of the nearest neighbor distance set as a second characterization value corresponding to the current output data point set;
[0020] The normalized value obtained by adding the reciprocal of the first characterization value corresponding to the current output data point set plus the constant 1 to the second characterization value corresponding to the first characterization value is recorded as the abnormality possibility index corresponding to the current output data point set;
[0021] The difference between the maximum nearest neighbor distance and the minimum nearest neighbor distance is recorded as the feature difference;
[0022] The abnormality probability index is multiplied by the feature difference value, and then the value of the minimum nearest neighbor distance is added, which is recorded as the target neighborhood radius R.
[0023] Preferably, the method for obtaining each core current output data point and each non-core current output data point includes:
[0024] Get the minimum number of sample points M;
[0025] For any current output data point in the current output data point set:
[0026] Count the number of current output data points in the R neighborhood of the current output data point, and record it as the total number of adjacent data points corresponding to the current output data point;
[0027] Determine whether the total number of adjacent data points corresponding to the current output data point is greater than or equal to the minimum number of sample points M. If so, record the current output data point as a core current output data point; otherwise, record the current output data point as a non-core current output data point.
[0028] Preferably, the method for obtaining each feature clustering category includes:
[0029] For the hth non-core current output data point:
[0030] It is determined whether there is a core current output data point in the R neighborhood of the non-core current output data point. If not, all current output data points in the R neighborhood of the non-core current output data point are recorded as current output data points corresponding to the feature clustering category h.
[0031] Preferably, the method for obtaining the abnormality degree of the UPS modularization corresponding to the current operating moment includes:
[0032] Recording a set constructed by all core current output data points in the current output data point set as a core current output data point set;
[0033] For any feature clustering category:
[0034] The cumulative sum of the Euclidean distances between the central data point of the feature cluster category and all the core current output data points in the core current output data point set is recorded as the first eigenvalue corresponding to the feature cluster category;
[0035] The reciprocal of the Euclidean distance between the current output data point and its corresponding nearest neighbor data point in the feature clustering category is recorded as the concentration degree corresponding to the current output data point; the cumulative sum of the concentration degrees corresponding to all current output data points in the feature clustering category is recorded as the second eigenvalue corresponding to the feature clustering category;
[0036] The abnormality degree of UPS modularization corresponding to the current operating moment is obtained according to the first eigenvalue, the second eigenvalue and the central data point of each feature clustering category.
[0037] Preferably, the method for obtaining the abnormality degree of UPS modularization corresponding to the current operating moment according to the first eigenvalue, the second eigenvalue and the central data point of each feature clustering category includes:
[0038] The cumulative sum of the first eigenvalues corresponding to all feature clustering categories is recorded as the first target eigenvalue of UPS modularization corresponding to the current operating moment;
[0039] The cumulative sum of the second eigenvalues corresponding to all feature clustering categories is recorded as the second target eigenvalue of the UPS modularization corresponding to the current operating moment;
[0040] Obtain the first distance set corresponding to the current running time;
[0041] Recording the sum of the maximum first distance and the minimum first distance in the first distance set as the third target characteristic value of the UPS modularization corresponding to the current operating moment;
[0042] The cumulative sum of the first target characteristic value, the second target characteristic value and the third target characteristic value is recorded as the abnormality degree of the UPS modularization corresponding to the current operating moment.
[0043] Preferably, the method for obtaining the first distance set corresponding to the current running time includes:
[0044] The set of central data points of all feature clustering categories is recorded as the central data point set;
[0045] Combining the central data points in the central data point set in pairs to obtain various combinations, which are recorded as various combinations corresponding to the central data point set;
[0046] The Euclidean distance between the two central data points in each combination corresponding to the central data point set is recorded as the first distance corresponding to the corresponding combination, and the set constructed by the first distances corresponding to all combinations corresponding to the central data point set is recorded as the first distance set corresponding to the current running time.
[0047] Preferably, the method for obtaining the target abnormality degree of the UPS module corresponding to the current operating moment includes:
[0048] Sorting the abnormality levels of the UPS modules corresponding to a preset number of historical operating moments in chronological order, and recording the sorted sequence as an abnormality level sequence;
[0049] Calculate and obtain the difference sequence corresponding to the abnormal degree sequence, and record the inverse of the variance of the difference sequence as the weight value;
[0050] The product of the cumulative sum of all abnormality levels in the abnormality level sequence and the weight value is recorded as an adjustment value;
[0051] A normalized value obtained by adding the adjustment value to the abnormality degree of the UPS modularization corresponding to the current operating moment is recorded as the target abnormality degree of the UPS modularization corresponding to the current operating moment.
[0052] Preferably, the method for monitoring and warning the UPS module at the current operating moment according to the target abnormality degree includes:
[0053] It is determined whether the target abnormality degree of the UPS module corresponding to the current operating moment is greater than or equal to the preset abnormality degree threshold. If so, it is determined that the UPS module corresponding to the current operating moment is abnormal, and an early warning is issued.
[0054] Beneficial effects: The present invention can obtain the abnormal degree of UPS modularization corresponding to the current operating moment by analyzing the current output data points corresponding to all independent UPS power modules in the modular UPS at the current operating moment; then based on the abnormal degree of UPS modularization corresponding to the current operating moment and the abnormal degree of UPS modularization corresponding to the historical operating moment, the target abnormal degree of UPS modularization corresponding to the current operating moment can be obtained more accurately; finally, according to the target abnormal degree, the UPS modularization at the current operating moment can be monitored and warned more reliably and timely. Therefore, the present invention can monitor and warn UPS modularization more reliably and timely. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0056] Figure 1 The present invention is a flow chart of a UPS uninterruptible power supply status monitoring and early warning method. DETAILED DESCRIPTION
[0057] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the embodiments of the present invention.
[0058] Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains.
[0059] This embodiment provides a UPS uninterruptible power supply status monitoring and early warning system, including a processor and a memory, wherein the processor executes a computer program stored in the memory to implement a UPS uninterruptible power supply status monitoring and early warning method, such as Figure 1 As shown, a UPS uninterruptible power supply status monitoring and early warning method comprises the following steps:
[0060] Step S001, obtaining current output data points corresponding to W independent UPS power modules in the modular UPS at the current operating time.
[0061] The main purpose of this embodiment is to perform reliable and timely real-time monitoring and early warning of the status of the UPS uninterruptible power supply. Since the modular UPS has the advantages of flexibility, reliability, maintainability and energy efficiency, the application field and scope of the modular UPS are becoming more and more extensive. Therefore, this embodiment mainly realizes reliable and timely monitoring and early warning of the modular UPS uninterruptible power supply.
[0062] This embodiment analyzes any modular UPS system, and since a modular UPS is usually composed of multiple independent UPS power modules or multiple independent UPS units, this embodiment records the number of independent UPS power modules that constitute the modular UPS as W, that is, the modular UPS is composed of W independent UPS power modules, and W is a positive integer and greater than 0.
[0063] And because each UPS power module in the modular UPS is independent, generally, all independent UPS power modules in the modular UPS will not have abnormalities or failures at the same time. However, there may be some independent UPS power modules in the modular UPS that transmit power to one device. If there is an abnormal or failed independent UPS power module among the independent UPS power modules that transmit power to the same device, then there will be differences between the current or voltage output during operation of the independent UPS power modules that transmit power to the same device and the current or voltage output by the remaining independent UPS power modules that have not had abnormalities or failures. Therefore, this embodiment will collect the current and voltage output by each UPS power module in the modular UPS during operation, and will subsequently use the collected current and voltage data to reliably and timely monitor and warn the status of the modular UPS.
[0064] In this embodiment, the output current data and output voltage data of each independent UPS power module in the modular UPS at the current operating moment are first obtained, and recorded as the current output current data and current output voltage data of each independent UPS power module in the modular UPS at the current operating moment, that is, an independent UPS power module can collect an output current data and an output voltage data at the current operating moment; and in this embodiment, the collection of output voltage data and output current data is achieved through voltage sensors and current sensors. In addition, in this embodiment, a voltage sensor and a current sensor are respectively installed on the output circuit of each independent UPS power module.
[0065] Then a two-dimensional coordinate system is constructed, wherein the horizontal axis of the two-dimensional coordinate system is the output voltage data, and the vertical axis is the output current data; then the current output current data and the current output voltage data corresponding to each independent UPS power module in the modular UPS at the current operating moment are mapped to the constructed two-dimensional coordinate system, and the data points obtained after mapping are recorded as the current output data points corresponding to each independent UPS power module in the modular UPS at the current operating moment, and for any independent UPS power module in the modular UPS, the horizontal coordinate value of the current output data point corresponding to the independent UPS power module at the current operating moment is the current output voltage data of the independent UPS power module at the current operating moment, and the vertical coordinate value is the current output current data of the independent UPS power module at the current operating moment.
[0066] Therefore, through the above process, the current output data point corresponding to each independent UPS power module in the modular UPS at the current operating time can be obtained.
[0067] Step S002, obtaining a target neighborhood radius according to the distance between the current output data points; obtaining each core current output data point and each non-core current output data point according to the target neighborhood radius; obtaining each feature clustering category according to the non-core current output data point and the target neighborhood radius.
[0068] Since the present embodiment requires a high accuracy in monitoring and warning the status of the modular UPS, that is, the present embodiment requires a short time interval for monitoring and warning the status of the modular UPS. For example, the present embodiment is set to monitor and evaluate the status of the running modular UPS once every 0.001 seconds, and determine whether to issue an early warning based on the evaluation result. Therefore, it is necessary to reduce the amount of calculation as much as possible to perform monitoring and early warning in a timely manner; therefore, the present embodiment will next determine the target neighborhood radius based on all current output data points in the two-dimensional coordinate system, determine the core current output data points and the non-core current output data points based on the target neighborhood radius, and then determine each feature clustering category based on the non-core current output data points. This method of obtaining feature clustering categories has a relatively small amount of calculation compared to the method of obtaining clustering categories through traditional clustering algorithms. Therefore, the specific process of obtaining each feature clustering category in the present embodiment is as follows:
[0069] Since the subsequent implementation of this embodiment is mainly based on the reverse DBSCAN density clustering algorithm to obtain each feature clustering category, it is necessary to first set the neighborhood radius and the minimum number of sample points M in the clustering process, and the minimum number of sample points M is set to 3 based on empirical values; since a smaller neighborhood radius will cause the neighborhood to contain more data points, thereby increasing the amount of calculation, it may also cause more points to be misidentified as noise points, and a larger neighborhood radius will reduce the number of data points in the neighborhood, which can reduce the computational complexity, but it may also cause more points to be misidentified as noise points. Therefore, in order to reduce the amount of calculation and to achieve better clustering effect, the neighborhood radius cannot be set based on empirical values. It is necessary to obtain a more appropriate neighborhood radius by analyzing the current output data points, that is, to obtain the target neighborhood radius by analyzing the current output data points. The specific process is:
[0070] The set constructed by all current output data points in the two-dimensional coordinate system is recorded as the current output data point set corresponding to the current running time; for any current output data point in the current output data point set:
[0071] All other current output data points in the current output data point set except the current output data point are recorded as first data points, and the Euclidean distances between the current output data point and each first data point are calculated. The first data point corresponding to the minimum Euclidean distance among the Euclidean distances between the current output data point and each first data point is recorded as the nearest neighbor data point corresponding to the current output data point, and the Euclidean distance between the current output data point and its corresponding nearest neighbor data point is recorded as the nearest neighbor distance corresponding to the current output data point.
[0072] Therefore, the above method can be used to obtain the nearest neighbor distance corresponding to each current output data point in the current output data point set; then the minimum and maximum values of the nearest neighbor distances corresponding to all current output data points in the current output data point set are recorded as the minimum nearest neighbor distance and the maximum nearest neighbor distance, respectively; and the minimum nearest neighbor distance and the maximum nearest neighbor distance are the basis for subsequently determining the target neighborhood radius.
[0073] When the modular UPS does not have an abnormality or failure, that is, when all independent UPS power modules in the modular UPS do not have an abnormality or failure, the collected output current data and output voltage data of each independent UPS power module in the modular UPS are normal data and will fluctuate within a smaller range, that is, when the modular UPS does not have an abnormality or failure, the interval between the current output data points in the two-dimensional coordinate system is small; and when the modular UPS does not have an abnormality or failure, if the neighborhood radius is close to the maximum nearest neighbor distance, more normal data points in the current output data point set will be divided into outliers and edge points, and if the neighborhood radius is close to the minimum nearest neighbor distance, the clustering effect will be better; but when the modular UPS power supply has an abnormality or failure, that is, when there is an abnormality or failure in the modular UPS When an independent UPS power module is selected, there are some abnormal current output data points among all the current output data points collected, and the distance between the abnormal current output data points is relatively large, and the distance between the abnormal current output data points and the current output data points that are not abnormal is also relatively large. At this time, if the neighborhood radius is between the minimum nearest neighbor distance and the maximum nearest neighbor distance and is close to the maximum nearest neighbor distance, the clustering effect will be better. The abnormal current output data point refers to the current output data point corresponding to the independent UPS power module when an abnormality or failure occurs, and the normal current output data point refers to the current output data point corresponding to the normal independent UPS power module; therefore, this embodiment will next determine the target neighborhood radius based on the possibility that there are abnormal current output data points in the current output data point set, specifically:
[0074] For normal current output data points in the current output data point set, the data floating degree of these normal current output data points is small, and the density of these normal current output data points in the two-dimensional coordinate system is large, the corresponding nearest neighbor distance is small, and there are more repetitions in the nearest neighbor distances corresponding to these normal current output data points; for abnormal current output data points in the current output data point set, the data floating degree of these abnormal current output data points is large, and the density of these abnormal current output data points in the two-dimensional coordinate system is small, the corresponding nearest neighbor distance is large, and there are relatively few repetitions in the nearest neighbor distances corresponding to these abnormal current output data points; therefore, this embodiment will analyze the possibility of obtaining abnormal current output data points in the current output data point set through the repetition degree and concentration degree of the nearest neighbor distances corresponding to all current output data points in the current output data point set, specifically:
[0075] The set constructed by the nearest neighbor distances corresponding to all current output data points in the current output data point set is recorded as the nearest neighbor distance set; the nearest neighbor distance that appears only once in the nearest neighbor distance set is recorded as the first nearest neighbor distance; the number of all nearest neighbor distances remaining after removing all first nearest neighbor distances in the nearest neighbor distance set is recorded as the first characterization value corresponding to the current output data point set; the first characterization value corresponding to the current output data point set can reflect the degree of repetition of the nearest neighbor distances corresponding to all current output data points in the current output data point set, and if the first characterization value corresponding to the current output data point set is larger, it indicates that the degree of repetition of the nearest neighbor distances corresponding to all current output data points in the current output data point set is higher, and further indicates that the possibility that there are abnormal current output data points in the current output data point set is smaller, and conversely, if the first characterization value corresponding to the current output data point set is smaller, it indicates that the degree of repetition of the nearest neighbor distances corresponding to all current output data points in the current output data point set is lower, and further indicates that the possibility that there are abnormal current output data points in the current output data point set is greater.
[0076] Then, the variance of the nearest neighbor distance set is calculated and recorded as the second characterization value corresponding to the current output data point set. The second characterization value corresponding to the current output data point set can reflect the concentration degree of the nearest neighbor distances corresponding to all current output data points in the current output data point set, and can also reflect the concentration degree of all current output data points in the current output data point set; and if the second characterization value corresponding to the current output data point set is larger, it indicates that the concentration degree of the nearest neighbor distances corresponding to all current output data points in the current output data point set is lower, and thus it also indicates that the possibility that there are abnormal current output data points in the current output data point set is greater; conversely, if the second characterization value corresponding to the current output data point set is smaller, it indicates that the concentration degree of the nearest neighbor distances corresponding to all current output data points in the current output data point set is higher, and thus it also indicates that the possibility that there are abnormal current output data points in the current output data point set is smaller.
[0077] Then, the normalized value after adding the reciprocal of the constant 1 to the first characterization value corresponding to the current output data point set and the corresponding second characterization value is recorded as the abnormality degree possibility index corresponding to the current output data point set, and the constant 1 is added to the first characterization value to prevent the denominator from being 0; the difference between the maximum nearest neighbor distance and the minimum nearest neighbor distance is calculated and recorded as the feature difference; the abnormality degree possibility index corresponding to the current output data point set is multiplied by the feature difference and then added with the value of the minimum nearest neighbor distance, which is recorded as the target neighborhood radius R; in addition, if the abnormality degree possibility index corresponding to the current output data point set is larger, it indicates that the possibility of the current output data point having an abnormality in the current output data point set is greater, and it also indicates that the target neighborhood radius is closer to the maximum nearest neighbor distance; on the contrary, if the abnormality degree possibility index corresponding to the current output data point set is smaller, it indicates that the possibility of the current output data point having an abnormality in the current output data point set is smaller, and it also indicates that the target neighborhood radius is closer to the minimum nearest neighbor distance; and the target neighborhood radius obtained by the above method in this embodiment can not only reduce the amount of calculation but also make the subsequent clustering effect better.
[0078] Therefore, this embodiment obtains the target neighborhood radius R through the above process; next, this embodiment will obtain the feature clustering category based on the target neighborhood radius and the set minimum number of sample points M, specifically:
[0079] For any current output data point in the current output data point set: count the number of current output data points in the R neighborhood of the current output data point, and record it as the total number of adjacent data points corresponding to the current output data point, and determine whether the total number of adjacent data points corresponding to the current output data point is greater than or equal to the minimum number of sample points M. If so, record the current output data point as a core current output data point, otherwise, record the current output data point as a non-core current output data point; in addition, the core current output data point is the core object in the DBSCAN clustering algorithm, and the non-core current output data point is the non-core object in the DBSCAN clustering algorithm.
[0080] Therefore, through the above process, each core current output data point and each non-core current output data point in the current output data point set can be obtained; for the hth non-core current output data point:
[0081] Then, the connection relationship within the R neighborhood of the non-core current output data point is tracked. If there is no core current output data point in the R neighborhood of the non-core current output data point, the non-current output data point is considered to be density-unreachable. Therefore, this embodiment determines whether there is a core current output data point in the R neighborhood of the non-core current output data point, that is, all data points in the R neighborhood of the non-core current output data point are non-core current output data points. If not, all current output data points in the R neighborhood of the non-core current output data point are classified into one category and recorded as feature clustering category h, that is, when there is no core current output data point in the R neighborhood of the hth non-core current output data point, all current output data points in the R neighborhood of the non-core current output data point are recorded as current output data points corresponding to feature clustering category h.
[0082] Since the normal data in the collected data is generally much larger than the abnormal data, the amount of calculation for traversing the neighborhood radius of the non-core current output data points is much smaller than the amount of calculation for traversing the core current output data points. This embodiment can not only reduce the amount of calculation through the above process but also obtain various feature clustering categories. Subsequently, based on the feature clustering categories, the abnormal degree of UPS modularization corresponding to the current operating moment can be more reliably analyzed and obtained.
[0083] Step S003, obtaining the abnormality degree of the UPS modularization corresponding to the current operating moment according to each current output data point in each feature clustering category and the distance between the central data point of each feature clustering cluster and the core current output data point.
[0084] When the feature clustering category is farther away from the core current output data point, it means that the feature clustering category is farther away from the high-density area, which also indicates that the UPS modularization at the current operating moment is more likely to have an abnormality or fault; when the distribution range of all feature clustering categories in the two-dimensional coordinate system is wider and more discrete, it indicates that the UPS modularization at the current operating moment is more likely to have an abnormality or fault; and because there may be several independent UPS power modules in the modular UPS to transmit power to one device, if there is an abnormal or faulty independent UPS power module among the several independent UPS power modules that transmit power to the same device, then there are similar abnormalities in the several independent UPS power supplies that transmit power to the same device, that is, at the current operating moment, if there is an abnormal or faulty independent UPS power module among the several independent UPS power modules that transmit power to the same device, then the several independent UPS power supplies that transmit power to the same device are at the same time. The distribution of the current output data points corresponding to the previous operating moment is relatively concentrated. Therefore, when the distribution of the current output data points in the feature clustering category is more concentrated, it indicates that the UPS modularization at the current operating moment is more likely to be abnormal or faulty; on the contrary, when the feature clustering category is closer to the core current output data point, the distribution range of all feature clustering categories in the two-dimensional coordinate system is smaller and more concentrated, and the distribution of the current output data points in the feature clustering category is more discrete, it indicates that the possibility of abnormality or fault in the UPS modularization at the current operating moment is smaller; therefore, this embodiment will next obtain the abnormality degree of the UPS modularization corresponding to the current operating moment based on each current output data point in each feature clustering cluster and the distance between the central data point of each feature clustering cluster and the core current output data point. The abnormality degree of the UPS modularization corresponding to the current operating moment is an important indicator for realizing reliable and timely monitoring and early warning of the UPS modularization at the current operating moment. The specific process is:
[0085] The set constructed by all core current output data points in the current output data point set is recorded as the core current output data point set.
[0086] For any feature clustering category:
[0087] The central data point of the feature clustering category is obtained, and the Euclidean distance between the central data point of the feature clustering category and each core current output data point in the core current output data point set is calculated. Then, the cumulative sum of the Euclidean distances between the central data point of the feature clustering category and all the core current output data points in the core current output data point set is recorded as the first eigenvalue corresponding to the feature clustering category; and when the first eigenvalue corresponding to the feature clustering category is larger, it indicates that the distance between the feature clustering category and the core current output data point is farther, which also indicates that the possibility that the UPS modularization corresponding to the current operating moment has an abnormality or a fault is higher; conversely, when the first eigenvalue corresponding to the feature clustering category is smaller, it indicates that the distance between the feature clustering category and the core current output data point is closer, which also indicates that the possibility that the UPS modularization corresponding to the current operating moment has an abnormality or a fault is lower.
[0088] For any current output data point in the feature clustering category, the calculated Euclidean distance between the current output data point and its corresponding nearest neighbor data point in the feature clustering category is recorded as the discrete degree corresponding to the current output data point, and the inverse of the discrete degree corresponding to the current output data point is recorded as the concentration degree corresponding to the current output data point; the cumulative sum of the concentration degrees corresponding to all current output data points in the feature clustering category is recorded as the second eigenvalue corresponding to the feature clustering category, and when the second eigenvalue corresponding to the feature clustering category is larger, it indicates that the data points in the feature clustering category are more concentrated, which also indicates that the possibility of abnormality or failure of the UPS modularization corresponding to the current operating moment is higher; conversely, when the second eigenvalue corresponding to the feature clustering category is smaller, it indicates that the data points in the feature clustering category are more discrete, which also indicates that the possibility of abnormality or failure of the UPS modularization corresponding to the current operating moment is lower.
[0089] Therefore, through the above process, the first eigenvalue and the corresponding second eigenvalue corresponding to the feature clustering category can be obtained; the cumulative sum of the first eigenvalues corresponding to all feature clustering categories is recorded as the first target eigenvalue of the UPS modularization corresponding to the current operating moment; the cumulative sum of the second eigenvalues corresponding to all feature clustering categories is recorded as the second target eigenvalue of the UPS modularization corresponding to the current operating moment; and the larger the first target eigenvalue of the UPS modularization corresponding to the current operating moment and the corresponding second target eigenvalue of the UPS modularization are, the greater the possibility that the UPS modularization corresponding to the current operating moment has an abnormality or fault, and vice versa, the smaller the possibility that the UPS modularization corresponding to the current operating moment has an abnormality or fault.
[0090] Then, the first distance set corresponding to the current running time is obtained, and the obtaining method is as follows: a set constructed by the central data points of all feature clustering categories is recorded as the central data point set; the central data points in the central data point set are combined in pairs to obtain each combination and the two central data points in each combination, and are recorded as each combination corresponding to the central data point set, and the number of combinations obtained by combining the central data points in the central data point set in pairs is C(N1,2), where N1 is the number of central data points in the central data point set, and C(N1,2) is the number of combinations of 2 central data points taken from the N1 central data points in the central data point set; then the Euclidean distance between the two central data points in each combination corresponding to the central data point set is calculated, and recorded as the first distance corresponding to the corresponding combination, and the set constructed by the first distances corresponding to all combinations corresponding to the central data point set is recorded as the first distance set corresponding to the current running time.
[0091] Then, the sum of the maximum first distance and the minimum first distance in the first distance set is recorded as the third target eigenvalue of the UPS modularization corresponding to the current operating time; and if the third target eigenvalue of the UPS modularization corresponding to the current operating time is larger, it indicates that the distribution range of all feature clustering categories in the two-dimensional coordinate system is wider and more discrete, and it also indicates that the possibility of abnormality or failure of the UPS modularization corresponding to the current operating time is greater, otherwise it indicates that the distribution range of all feature clustering categories in the two-dimensional coordinate system is smaller and more concentrated, and it also indicates that the possibility of abnormality or failure of the UPS modularization corresponding to the current operating time is smaller; then, the cumulative sum of the first target eigenvalue, the second target eigenvalue and the third target eigenvalue of the UPS modularization corresponding to the current operating time is recorded as the abnormality degree of the UPS modularization corresponding to the current operating time, and if the abnormality degree of the UPS modularization corresponding to the current operating time is larger, it indicates that the possibility of abnormality or failure of the UPS modularization corresponding to the current operating time is greater; the abnormality degree of the UPS modularization corresponding to the current operating time is calculated according to the following formula:
[0092]
[0093] in, is the abnormal degree of UPS modularization corresponding to the current operating moment, is the number of feature clustering categories, is the number of core current output data points in the core current output data point set, is the number of current output data points in the i-th feature clustering category, is the central data point of the i-th feature clustering category, is the jth core current output data point in the core current output data point set, is the Euclidean distance between the central data point of the i-th feature cluster category and the j-th core current output data point in the core current output data point set, is the maximum first distance in the first distance set corresponding to the current running time, is the minimum first distance in the first distance set corresponding to the current running time, is the zth current output data point in the i-th feature cluster category, is the nearest neighbor data point corresponding to the zth current output data point in the i-th feature cluster category, is the Euclidean distance between the zth current output data point in the ith feature cluster category and its corresponding nearest neighbor data point, is the first target characteristic value of UPS modularization corresponding to the current operating moment, is the second target characteristic value of UPS modularization corresponding to the current operating time, It is the third target characteristic value of UPS modularization corresponding to the current operating moment.
[0094] In addition, when The bigger, The bigger and The larger the The bigger, The larger the value, the greater the possibility that the UPS module corresponding to the current operating time is abnormal or faulty; on the contrary, The smaller, The smaller and The smaller the time, the The smaller, The smaller the value, the less likely it is that the UPS module corresponding to the current operating moment has an abnormality or failure.
[0095] Therefore, this embodiment can obtain the abnormality degree of the UPS modularization corresponding to the current operating moment through the above process.
[0096] Step S004, obtaining abnormality levels of UPS modularization corresponding to a preset number of historical operating moments, and obtaining a target abnormality level of UPS modularization corresponding to the current operating moment according to the abnormality level of UPS modularization corresponding to the current operating moment and the abnormality level of UPS modularization corresponding to the historical operating moments.
[0097] The abnormal degree of UPS modularization corresponding to the current running moment obtained in step S003 of this embodiment only refers to the current output data points corresponding to all independent UPS power modules in the modular UPS at the current running moment, which is relatively one-sided in terms of the time dimension, that is, for the abnormal degree of UPS modularization corresponding to the current running moment, it can be relatively reliably and timely monitored to identify whether there is a sudden abnormality or fault in the UPS modularization at the current running moment, such as battery damage, inverter failure or input power interruption, which are all sudden abnormalities or faults; however, some UPS power abnormalities are not sudden changes but gradually change, that is, some UPS power abnormalities will gradually increase with the progress of the operation process, such as the aging process of the UPS power battery, that is, the aging of the UPS power battery gradually increases with the progress of the operation process, but the difference between the abnormal degree of UPS modularization obtained at the early stage of aging of the UPS power battery and the abnormal degree of UPS modularization obtained when the UPS power battery has not entered the aging stage is relatively insignificant. Therefore, for some UPS power abnormalities that gradually increase with the progress of the operation process, if only based on the abnormal degree of UPS modularization corresponding to a single running moment, it cannot be relatively reliably and timely monitored and identified, and thus the status of the modular UPS uninterruptible power supply cannot be reliably and timely monitored and warned; but Furthermore, when there is a UPS power supply abnormality that gradually intensifies as the operation process proceeds, the abnormality degree of the UPS modularization obtained at each operation moment in the operation process will show a gradually intensified feature as the operation process proceeds, and the abnormality degree of the UPS modularization increases more evenly as the operation process proceeds. When there is no UPS power supply abnormality that gradually intensifies as the operation process proceeds, the value of the abnormality degree of the UPS modularization obtained at each operation moment in the operation process is relatively random, that is, there is no relatively even feature of the abnormality degree of the UPS modularization increasing as the operation process proceeds; therefore, this embodiment will subsequently obtain the target abnormality degree of the UPS modularization corresponding to the current operation moment based on the change characteristics of the abnormality degree of the UPS modularization obtained as the operation process proceeds when there is a UPS power supply abnormality that gradually intensifies as the operation process proceeds, the abnormality degree of the UPS modularization corresponding to the current operation moment, and the abnormality degree of the UPS modularization corresponding to the historical operation moment before the current operation moment, and based on the target abnormality degree of the UPS modularization corresponding to the current operation moment, the state of the modular UPS uninterruptible power supply at the current operation moment can be reliably and timely monitored and warned, so the specific process of obtaining the target abnormality degree of the UPS modularization corresponding to the current operation moment in this embodiment is:
[0098] First, according to the method for obtaining the abnormal degree of UPS modularization corresponding to the current operating moment, the abnormal degree of UPS modularization corresponding to a preset number of historical operating moments that are located before the current operating moment in time and adjacent to the current operating moment is obtained; and in a specific application, the implementer can set the value of the preset number, for example, the preset number is set to 10 in this embodiment, and the intervals between adjacent operating moments are set to 0.001 seconds in this embodiment.
[0099] Then, the abnormality degrees of the UPS modules corresponding to each historical operating moment are sorted in chronological order, and the sorted sequence is recorded as the abnormality degree sequence; the differential sequence corresponding to the abnormality degree sequence is calculated, and the differential sequence is obtained by subtracting the g-1th abnormality degree from the gth abnormality degree in the abnormality degree sequence.
[0100] Then the variance of the difference sequence is calculated, and the inverse of the variance of the difference sequence is recorded as the weight value. The smaller the variance value is, the more obvious the trend of uniform and continuous growth of the abnormal degree sequence is. On the contrary, the larger the variance value is, the less obvious the trend of uniform and continuous growth of the abnormal degree sequence is. The product of the cumulative sum of all abnormal degrees in the abnormal degree sequence and the weight value is recorded as the adjustment value, and multiplying the cumulative sum of all abnormal degrees in the abnormal degree sequence by the weight value is equivalent to multiplying each abnormal degree in the abnormal degree sequence by the weight value and then accumulating them. This processing can make the abnormal degree of the UPS modular corresponding to the current operating moment increase more when the trend of uniform and continuous growth of the abnormal degree sequence is more obvious.
[0101] Then, the normalized value obtained by adding the adjustment value to the abnormality degree of the UPS modularization corresponding to the current operating moment is recorded as the target abnormality degree of the UPS modularization corresponding to the current operating moment; and based on the target abnormality degree of the UPS modularization corresponding to the current operating moment, the status of the modular UPS uninterruptible power supply can be reliably and timely monitored and warned.
[0102] Step S005: monitor and warn the UPS module at the current operating moment according to the target abnormality level.
[0103] Next, it is determined whether the target abnormality level of the UPS module corresponding to the current running time is greater than or equal to the preset abnormality level threshold. If so, it is determined that the UPS module corresponding to the current running time has an abnormality or fault, and an early warning is issued; otherwise, it is determined that the UPS module corresponding to the current running time has no abnormality or fault, and no early warning is required. In specific applications, the preset abnormality level threshold needs to be set according to the actual situation, and in this embodiment, it is set to 0.6.
[0104] In summary, this embodiment can obtain the abnormality degree of UPS modularization corresponding to the current operating moment by analyzing the current output data points corresponding to all independent UPS power modules in the modular UPS at the current operating moment; then based on the abnormality degree of UPS modularization corresponding to the current operating moment and the abnormality degree of UPS modularization corresponding to the historical operating moment, it can more accurately obtain the target abnormality degree of UPS modularization corresponding to the current operating moment; finally, according to the target abnormality degree, it can more reliably and timely monitor and warn the UPS modularization at the current operating moment. Therefore, this embodiment can more reliably and timely monitor and warn the UPS modularization.
[0105] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A UPS uninterruptible power supply status monitoring and early warning system, comprising a processor and a memory, characterized in that: The processor executes the computer program stored in the memory to implement the following steps: Obtain current output data points corresponding to W independent UPS power modules in a modular UPS at a current operating time; the modular UPS is composed of W independent UPS power modules, and W is a positive integer and greater than 0; Obtaining a target neighborhood radius according to the distance between the current output data points; According to the target neighborhood radius, each core current output data point and each non-core current output data point are obtained; Obtaining each feature clustering category according to the non-core current output data point and the target neighborhood radius; Obtaining the abnormality degree of the UPS modularization corresponding to the current operating moment according to each current output data point in each feature clustering category and the distance between the central data point of each feature clustering category and the core current output data point; Obtaining abnormality levels of UPS modularization corresponding to a preset number of historical operating moments, and obtaining a target abnormality level of UPS modularization corresponding to the current operating moment according to the abnormality level of UPS modularization corresponding to the current operating moment and the abnormality level of UPS modularization corresponding to the historical operating moments; Monitor and warn the UPS module at the current operating moment according to the target abnormality level; Methods for obtaining the target neighborhood radius include: The set constructed by all current output data points is recorded as the current output data point set corresponding to the current running time; For any current output data point in the current output data point set: all other current output data points in the current output data point set except the current output data point are recorded as first data points; the first data point corresponding to the minimum Euclidean distance between the current output data point and each first data point is recorded as the nearest neighbor data point corresponding to the current output data point; the Euclidean distance between the current output data point and its corresponding nearest neighbor data point is recorded as the nearest neighbor distance corresponding to the current output data point; The minimum value and the maximum value among the nearest neighbor distances corresponding to all current output data points in the current output data point set are recorded as the minimum nearest neighbor distance and the maximum nearest neighbor distance respectively; Recording a set constructed by the nearest neighbor distances corresponding to all current output data points in the current output data point set as a nearest neighbor distance set; The nearest neighbor distance that does not appear repeatedly in the nearest neighbor distance set is recorded as the first nearest neighbor distance; the number of all nearest neighbor distances remaining after removing all first nearest neighbor distances from the nearest neighbor distance set is recorded as the first representation value corresponding to the current output data point set; Recording the variance of the nearest neighbor distance set as a second characterization value corresponding to the current output data point set; The normalized value obtained by adding the reciprocal of the first characterization value corresponding to the current output data point set plus the constant 1 to the second characterization value corresponding to the first characterization value is recorded as the abnormality possibility index corresponding to the current output data point set; The difference between the maximum nearest neighbor distance and the minimum nearest neighbor distance is recorded as the feature difference; The abnormality probability index is multiplied by the feature difference value, and then the value of the minimum nearest neighbor distance is added, which is recorded as the target neighborhood radius R.
2. A UPS uninterruptible power supply status monitoring and early warning system as claimed in claim 1, characterized in that: The method of obtaining the current output data point of each core and the current output data point of each non-core includes: Get the minimum number of sample points M; For any current output data point in the current output data point set: Count the number of current output data points in the R neighborhood of the current output data point, and record it as the total number of adjacent data points corresponding to the current output data point; Determine whether the total number of adjacent data points corresponding to the current output data point is greater than or equal to the minimum number of sample points M. If so, record the current output data point as a core current output data point; otherwise, record the current output data point as a non-core current output data point.
3. A UPS uninterruptible power supply status monitoring and early warning system as claimed in claim 1, characterized in that: Methods for obtaining clustering categories of each feature include: For the hth non-core current output data point: It is determined whether there is a core current output data point in the R neighborhood of the non-core current output data point. If not, all current output data points in the R neighborhood of the non-core current output data point are recorded as current output data points corresponding to the feature clustering category h.
4. A UPS uninterruptible power supply status monitoring and early warning system as claimed in claim 2, characterized in that: The method for obtaining the abnormality degree of the UPS module corresponding to the current operating moment includes: Recording a set constructed by all core current output data points in the current output data point set as a core current output data point set; For any feature clustering category: The cumulative sum of the Euclidean distances between the central data point of the feature cluster category and all the core current output data points in the core current output data point set is recorded as the first eigenvalue corresponding to the feature cluster category; The reciprocal of the Euclidean distance between the current output data point and its corresponding nearest neighbor data point in the feature clustering category is recorded as the concentration degree corresponding to the current output data point; the cumulative sum of the concentration degrees corresponding to all current output data points in the feature clustering category is recorded as the second eigenvalue corresponding to the feature clustering category; The abnormality degree of UPS modularization corresponding to the current operating moment is obtained according to the first eigenvalue, the second eigenvalue and the central data point of each feature clustering category.
5. A UPS uninterruptible power supply status monitoring and early warning system as claimed in claim 4, characterized in that: The method for obtaining the abnormality degree of UPS modularization corresponding to the current operating moment according to the first eigenvalue, the second eigenvalue and the central data point of each feature clustering category includes: The cumulative sum of the first eigenvalues corresponding to all feature clustering categories is recorded as the first target eigenvalue of UPS modularization corresponding to the current operating moment; The cumulative sum of the second eigenvalues corresponding to all feature clustering categories is recorded as the second target eigenvalue of the UPS modularization corresponding to the current operating moment; Obtain the first distance set corresponding to the current running time; Recording the sum of the maximum first distance and the minimum first distance in the first distance set as the third target characteristic value of the UPS modularization corresponding to the current operating moment; The cumulative sum of the first target characteristic value, the second target characteristic value and the third target characteristic value is recorded as the abnormality degree of the UPS modularization corresponding to the current operating moment.
6. A UPS uninterruptible power supply status monitoring and early warning system as claimed in claim 5, characterized in that: The method for obtaining the first distance set corresponding to the current running time includes: The set of central data points of all feature clustering categories is recorded as the central data point set; Combining the central data points in the central data point set in pairs to obtain various combinations, which are recorded as various combinations corresponding to the central data point set; The Euclidean distance between the two central data points in each combination corresponding to the central data point set is recorded as the first distance corresponding to the corresponding combination, and the set constructed by the first distances corresponding to all combinations corresponding to the central data point set is recorded as the first distance set corresponding to the current running time.
7. A UPS status monitoring and early warning system as claimed in claim 1, characterized in that: The method for obtaining the target abnormality degree of the UPS module corresponding to the current operating moment includes: Sorting the abnormality levels of the UPS modules corresponding to a preset number of historical operating moments in chronological order, and recording the sorted sequence as an abnormality level sequence; Calculate and obtain the difference sequence corresponding to the abnormal degree sequence, and record the inverse of the variance of the difference sequence as the weight value; The product of the cumulative sum of all abnormality levels in the abnormality level sequence and the weight value is recorded as an adjustment value; A normalized value obtained by adding the adjustment value to the abnormality degree of the UPS modularization corresponding to the current operating moment is recorded as the target abnormality degree of the UPS modularization corresponding to the current operating moment.
8. A UPS status monitoring and early warning system as claimed in claim 1, characterized in that: The method for monitoring and warning the UPS module at the current operating moment according to the target abnormality degree includes: It is determined whether the target abnormality degree of the UPS module corresponding to the current operating moment is greater than or equal to the preset abnormality degree threshold. If so, it is determined that the UPS module corresponding to the current operating moment is abnormal, and an early warning is issued.
Citation Information
Patent Citations
Host power supply operation monitoring method based on data processing
CN117290802A
Distributed ups system consistency evaluation system and method based on DBSCAN clustering
CN117540225A