A method and device for predicting cast-in-place section elevation for long-span bridge construction
Through periodic polling of bridge construction design drawings and construction information monitoring and processing, combined with the virtual construction model of the bridge, the problem of elevation prediction in long-span bridge construction is solved, and the intuitive monitoring of the overall condition of the bridge deck and the convenience of elevation detection are realized. and accuracy.
Patent Information
- Application Number
- CN202410941664.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-07-15
AI Technical Summary
In the construction of long-span bridges, it is difficult to achieve intuitive and convenient detection and alarm of the overall condition of the bridge deck and the elevation of the cast-in-place section with existing technology. In particular, due to the different positions and angles of different cameras, it is difficult to integrate video images and cannot be effective. Monitor the operation of long-span bridges.
Through periodic polling and construction information monitoring and processing based on bridge construction design drawings, the design drawing polling processing information is input into the bridge virtual construction model to determine the actual construction pouring section and realize the elevation prediction of the cast-in-place section for long-span bridge construction.
It improves the detection accuracy and alarm efficiency of the overall operation of the long-span bridge deck and the elevation of the cast-in-place section, provides a more intuitive and convenient monitoring method, and enhances the comprehensiveness and rationality of the construction data.
Smart Images

Figure CN118468617B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of bridge engineering, and in particular to a method and device for predicting the elevation of a cast-in-place section in the construction of a large-span bridge. Background Art
[0002] From the perspective of modern control theory, the bridge construction system is a complex control system with internal and external disturbances and uncertain information. Many scholars have introduced Kalman filtering, neural network and grey model prediction methods into bridge construction control and health monitoring. However, it is difficult for the Kalman filtering and neural network methods based on big data to obtain good elevation prediction accuracy in the construction monitoring of cantilever bridges with a limited number of segments. In recent years, the grey model prediction technology with "small data", "poor information" and uncertain systems as research objects has been widely used in the construction monitoring of long-span bridges and has achieved many results.
[0003] Under the existing technology, when monitoring the bridge deck of a large-span bridge, multiple different cameras are often used to collect images in sections for regional monitoring. However, the positions and angles of different camera settings are different. It is difficult to monitor the overall situation of the bridge deck through the collected video images. It is often necessary to combine multiple areas appropriately, which is not intuitive and convenient. It is difficult to perform limited detection and alarm on the overall operation of the bridge deck of a large-span bridge and the elevation of the cast-in-place section. Summary of the invention
[0004] To achieve the above objectives, this application provides the following technical solutions:
[0005] According to the first invention of the present invention, the present invention claims protection for a method for predicting the elevation of a cast-in-place section for long-span bridge construction, the method comprising:
[0006] Based on the collected construction period information associated with the bridge construction design drawing, periodically polling and construction information monitoring processing are performed on the bridge construction design drawing, and design drawing polling processing information is output;
[0007] Inputting the design drawing polling processing information into the bridge virtual construction model, and outputting bridge support data information;
[0008] Based on the bridge support data information, the design drawing polling processing information and the preset first predicted construction scenario, the actual construction pouring section associated with the bridge construction design drawing is determined, and the actual construction pouring section is used to realize the elevation prediction of the cast-in-place section for the construction of large-span bridges.
[0009] Furthermore, based on the construction period information associated with the collected bridge construction design drawings, periodic polling and construction information monitoring processing are performed on the bridge construction design drawings, and the design drawing polling processing information is output, including:
[0010] Determine access cycle information associated with candidate polling frequencies based on preset polling frequency determination conditions and the collected construction cycle information associated with the bridge construction design drawing;
[0011] Based on the access cycle information and the preset periodic polling construction scenario, determining the design drawing log information associated with the bridge construction design drawing; the design drawing log information includes a plurality of candidate polling design drawings associated with the bridge construction design drawing;
[0012] For each of the candidate polling design drawings, based on a preset multi-scale construction scene, multiple candidate scale-processed design drawings associated with the candidate polling design drawing are determined, and based on all the candidate scale-processed design drawings and the preset change fusion construction scene, the design drawing scale processing information associated with the candidate polling design drawing is determined;
[0013] Based on the design drawing log information and all the design drawing scale processing information, the design drawing polling processing information associated with the bridge construction design drawing is determined.
[0014] Furthermore, the design drawing polling processing information is input into the bridge virtual construction model, and the bridge support data information is output, including:
[0015] For each candidate polling design drawing, each candidate scale-processed design drawing associated with the candidate polling design drawing is input into the bridge virtual construction model, and the sub-design drawing bridge support data associated with each candidate scale-processed design drawing is output; based on all the sub-design drawing bridge support data and the preset second predicted construction scenario, the sub-vector prediction information associated with the candidate polling design drawing is determined;
[0016] Based on the sub-vector prediction information associated with all the candidate polling design drawings, the bridge support data information is determined.
[0017] Furthermore, before performing periodic polling and construction information monitoring processing on the bridge construction design drawing based on the construction period information associated with the collected bridge construction design drawing and outputting the design drawing polling processing information, the method further includes:
[0018] Read the design drawing information associated with the bridge construction design drawing;
[0019] Based on the design drawing information, determine whether the bridge construction design drawing meets the preset design drawing safety conditions; when the determination information is no, perform the periodic polling and construction information monitoring processing on the bridge construction design drawing based on the construction cycle information associated with the collected bridge construction design drawing, and output the design drawing polling processing information;
[0020] And, the method further comprises:
[0021] When it is determined that the bridge construction design drawing meets the design drawing safety conditions, the bridge construction design drawing is subjected to design drawing correction processing based on the design drawing information, and the bridge construction design drawing after the correction is output. The bridge construction design drawing is subjected to periodic polling and construction information monitoring processing based on the construction cycle information associated with the collected bridge construction design drawing, and the design drawing polling processing information is output.
[0022] Further, judging whether the bridge construction design drawing meets the preset design drawing safety conditions based on the design drawing information includes:
[0023] Analyze the design drawing information and output the design drawing distortion associated with the bridge construction design drawing; the design drawing distortion includes the degree of design drawing distortion and / or the area of the design drawing distortion region;
[0024] Determining whether the design drawing distortion meets a preset design drawing distortion construction scenario;
[0025] When it is determined that the design drawing distortion meets the design drawing distortion construction scenario, determining that the bridge construction design drawing meets the preset design drawing safety conditions;
[0026] When it is determined that the design drawing distortion does not conform to the design drawing distortion construction scenario, it is determined that the bridge construction design drawing does not conform to the preset design drawing safety conditions.
[0027] Furthermore, the method further comprises:
[0028] Based on the received design drawing polling instruction, multiple candidate polling design drawings are determined, all the candidate polling design drawings are input into the bridge virtual construction model, and the support data information of the bridge to be polled is output;
[0029] Based on the bridge support data information to be polled and the pre-constructed actual construction pouring section set, the formwork elevation associated with the candidate polling design drawing vector and each panoramic design drawing vector is calculated; the actual construction pouring section set includes the actual construction pouring section of the sub-design drawing associated with the bridge construction design drawing;
[0030] Based on all the formwork elevations, candidate actual construction sections that meet preset polling conditions are screened out from the actual construction section set, and the panoramic design drawings associated with the candidate actual construction sections are determined as polling information matching the candidate polling design drawings.
[0031] Furthermore, the step of inputting all the candidate polling design drawings into the virtual bridge construction model and outputting the supporting data information of the bridge to be polled includes:
[0032] Calculate the number of design drawings associated with all the candidate polling design drawings;
[0033] When the number of design drawings is greater than or equal to a preset design drawing number threshold, all the candidate polling design drawings are respectively input into the bridge virtual construction model, and the sub-bridge support data to be polled associated with each candidate polling design drawing is output; based on all the sub-bridge support data to be polled and the preset vector fusion construction scene, the bridge support data information to be polled is determined;
[0034] When the number of the design drawings is less than a preset design drawing number threshold, all the candidate polling design drawings are input into the bridge virtual construction model, and the support data information of the bridge to be polled is output.
[0035] According to a second aspect of the present invention, the present invention claims protection for a cast-in-place section elevation prediction device for long-span bridge construction, the device comprising:
[0036] A design drawing polling processing unit is used to perform periodic polling and construction information monitoring processing on the bridge construction design drawing based on the collected construction period information associated with the bridge construction design drawing, and output design drawing polling processing information;
[0037] A bridge support data determination unit inputs the design drawing polling processing information into a bridge virtual construction model and outputs bridge support data information;
[0038] A data prediction unit, used to determine the actual construction pouring section associated with the bridge construction design drawing based on the bridge support data information, the design drawing polling processing information and a preset first prediction construction scenario, wherein the actual construction pouring section is used to realize the cast-in-place section elevation prediction for the construction of a large-span bridge;
[0039] The device for predicting the elevation of a cast-in-place section for large-span bridge construction is used to execute the method for predicting the elevation of a cast-in-place section for large-span bridge construction.
[0040] The present application relates to the technical field of bridge engineering, and in particular to a method and device for predicting the elevation of a cast-in-place section for long-span bridge construction. Based on the construction cycle information associated with the collected bridge construction design drawing, the bridge construction design drawing is periodically polled and the construction information is monitored and processed, and the design drawing polling processing information is output; the design drawing polling processing information is input into a virtual bridge construction model, and bridge support data information is output; based on the bridge support data information, the design drawing polling processing information and a preset first predicted construction scenario, the actual construction pouring section associated with the bridge construction design drawing is determined, and the actual construction pouring section is used to realize the cast-in-place section elevation prediction for long-span bridge construction. The present invention can intuitively and conveniently perform limited detection and alarm on the overall operation of the bridge deck of a long-span bridge and the elevation of the cast-in-place section. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 A schematic diagram of a flow chart of a method for predicting the elevation of a cast-in-place section in the construction of a long-span bridge, as claimed in an embodiment of the present application;
[0042] Figure 2 A second flow chart of a method for predicting the elevation of a cast-in-place section in the construction of a long-span bridge as claimed in an embodiment of the present application;
[0043] Figure 3 A structural module diagram of a cast-in-place section elevation prediction device for long-span bridge construction as claimed in an embodiment of the present application;
[0044] Figure 4 This is a second structural module diagram of a cast-in-place section elevation prediction device for long-span bridge construction, which is requested to be protected by an embodiment of the present application. DETAILED DESCRIPTION
[0045] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0046] The terms "first", "second" and "third" in this application are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features. Thus, the features defined as "first", "second" and "third" can explicitly or implicitly include multiple features. In the description of this application, the meaning of "multiple" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined. All directional indications (such as up, down, left, right, front, back...) in the embodiments of this application are only used to explain the relative position relationship, movement, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication also changes accordingly. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally also includes steps or units that are not listed, or optionally also includes other steps or units inherent to these processes, methods, products or devices.
[0047] Reference to "embodiments" herein means that the specific features, structures, or characteristics described in conjunction with the embodiments may be included in multiple embodiments of the present application. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0048] The present invention discloses a method and device for predicting the elevation of cast-in-place sections for large-span bridge construction, which can perform periodic polling and construction information monitoring processing, bridge support data determination processing and data prediction processing on bridge construction design drawings, and output characteristic actual construction pouring sections associated with bridge construction design drawings, which is conducive to improving the comprehensiveness and rationality of the actual construction pouring section determination method of the panoramic design drawing, and further conducive to improving the accuracy, reliability and simplicity of the actual construction pouring section of the determined panoramic design drawing, so as to improve the design drawing polling accuracy and design drawing polling efficiency based on the actual construction pouring section of the predetermined panoramic design drawing. The following are detailed descriptions respectively.
[0049] Example 1: Please refer to Figure 1 , Figure 1 The figure is a flow chart of a method for predicting the elevation of a cast-in-place section in a large-span bridge construction disclosed in an embodiment of the present invention. Figure 1 The described method can be applied to a cast-in-place section elevation prediction device for long-span bridge construction, wherein the device may include a server, wherein the server includes a local server or a cloud server, which is not limited in the embodiments of the present invention. Figure 1 As shown, the cast-in-place section elevation prediction method for long-span bridge construction includes the following processing:
[0050] 101. Based on the collected construction period information associated with the bridge construction design drawings, periodic polling and construction information monitoring processing are performed on the bridge construction design drawings, and the design drawing polling processing information is output.
[0051] Optionally, the periodic polling process may be a one-dimensional sliding (eg, height / width) log process, which is not limited in the embodiment of the present invention.
[0052] Optionally, the bridge construction design drawing is periodically polled and the construction information is monitored. For example: set the same access as the construction, log the entire panoramic view at the polling frequency and monitor the construction information to ensure that the polled design drawing can still be queried and matched when it is too close or too far away. The embodiment of the present invention is not limited to this.
[0053] Optionally, the construction period information associated with the bridge construction design drawing may include one or more of the design drawing side length period information associated with the bridge construction design drawing, the design drawing side length beam section information, the design drawing overall perimeter area information, the design drawing overall beam section information and other construction information that can output a panoramic design drawing, etc., which is not limited to the embodiments of the present invention.
[0054] Optionally, the construction information monitoring processing may include one or more of design drawing periodic scaling transformation processing, design drawing mirroring transformation processing, design drawing rotation transformation processing, design drawing truncation and excision transformation processing, design drawing blur and clarity transformation processing, design drawing color transformation processing, design drawing effect processing transformation processing, etc., which is not limited to the embodiments of the present invention.
[0055] Optionally, the design drawing polling processing information includes a polling design drawing set associated with multiple bridge construction design drawings, the polling design drawing set includes multiple scale-transformed design drawings, and all polling design drawing sets are associated with bridge construction design drawings, which is not limited by the embodiments of the present invention; for example: a panoramic design drawing is associated with multiple polling design drawings, and each polling design drawing is associated with multiple scale-transformed design drawings (such as a design drawing that has undergone periodic scaling changes based on the polling design drawing, wherein the periodic scaling changes can be maintained as is or can be changed), which is not limited by the embodiments of the present invention.
[0056] 102. Input the design drawing polling processing information into the bridge virtual construction model, and output the bridge support data information.
[0057] Optionally, the virtual construction model of the bridge may be a GEM global description network, which is not limited in the embodiment of the present invention.
[0058] Optionally, the bridge support data information includes bridge support data associated with the bridge construction design drawing and / or sub-bridge support data information of each polled design drawing set associated with the design drawing polling processing information, each sub-bridge support data information includes sub-bridge support data of each scale transformation design drawing associated with the polled design drawing set, and all sub-bridge support data information of all polled design drawing sets are associated with bridge support data of the bridge construction design drawing, which is not limited to the embodiments of the present invention.
[0059] 103. Based on the bridge support data information, design drawing polling processing information and the preset first predicted construction scenario, the actual construction pouring section associated with the bridge construction design drawing is determined. The actual construction pouring section is used to realize the elevation prediction of the cast-in-place section for the construction of large-span bridges.
[0060] Optionally, the first predicted construction scenario may be one or more of a prediction of bridge support data and corresponding design drawings, a prediction between bridge support data, a prediction between design drawings, etc., and the embodiment of the present invention is not limited thereto.
[0061] Optionally, the actual construction pouring section associated with the bridge construction design drawing may include different sub-design drawings associated with the bridge construction design drawing and bridge support data associated with the different sub-design drawings, which is not limited in this embodiment of the present invention.
[0062] Optionally, the determined actual construction pouring sections are stored in a database, which is not limited in the embodiment of the present invention.
[0063] It should be noted that there is no rigid requirement for the order of processing specific design drawings associated with periodic polling processing, construction information monitoring processing and bridge support data determination processing. Specifically, after all polling design drawings associated with the bridge construction design drawing are determined, multi-scale change processing is performed on each polling design drawing to output the scale-processed design drawing associated with the polling design drawing, and bridge support data determination prediction processing is further performed on all scale-processed design drawings associated with each polling design drawing. Finally, the actual construction pouring section associated with the bridge construction design drawing is determined in combination with the first predicted construction scenario; or each time a polling design drawing is determined, multi-scale change processing is performed on the polling design drawing to output the polling design drawing. A scale-processed design drawing associated with the polling design drawing is further processed for bridge support data determination and prediction processing for all scale-processed design drawings associated with the polling design drawing. After completing the multi-scale change processing and bridge support data determination and prediction processing associated with the polling design drawing, the next polling design drawing is determined and the corresponding multi-scale change processing and bridge support data determination and prediction processing are performed on the next polling design drawing. Finally, the actual construction section associated with the bridge construction design drawing is determined in combination with the first predicted construction scenario; it can also be other design drawing processing that can accurately determine the actual construction section associated with the bridge construction design drawing on the basis of the sub-step scheme mentioned in this scheme, and the embodiment of the present invention is not limited to this.
[0064] It can be seen that the implementation of the method for predicting the elevation of cast-in-place sections for large-span bridge construction described in the embodiment of the present invention can perform periodic polling and construction information monitoring processing, bridge support data determination processing and data prediction processing on the bridge construction design drawings, and output characteristic actual construction sections associated with the bridge construction design drawings, which is beneficial to improving the comprehensiveness and rationality of the method for determining the actual construction sections of the panoramic design drawings, and further beneficial to improving the accuracy, reliability and simplicity of the actual construction sections of the determined panoramic design drawings, thereby facilitating improving the design drawing polling accuracy and design drawing polling efficiency based on the actual construction sections predetermined in the panoramic design drawings.
[0065] In an optional embodiment, the above-mentioned periodic polling and construction information monitoring processing of the bridge construction design drawing based on the collected construction period information associated with the bridge construction design drawing, and outputting the design drawing polling processing information may include:
[0066] Determine access cycle information associated with candidate polling frequencies based on preset polling frequency determination conditions and the collected construction cycle information associated with the bridge construction design drawing;
[0067] Based on the access cycle information and the preset periodic polling construction scenario, the design drawing log information associated with the bridge construction design drawing is determined; the design drawing log information includes a plurality of candidate polling design drawings associated with the bridge construction design drawing;
[0068] For each candidate polling design drawing, based on a preset multi-scale construction scene, multiple candidate scale processing design drawings associated with the candidate polling design drawing are determined, and based on all candidate scale processing design drawings and the preset change fusion construction scene, the design drawing scale processing information associated with the candidate polling design drawing is determined;
[0069] Based on the design drawing log information and all design drawing scale processing information, the design drawing polling processing information associated with the bridge construction design drawing is determined.
[0070] Optionally, the relationship between the construction period information associated with the bridge construction design drawing and the access period information associated with the candidate polling frequency may be that the construction of the candidate polling frequency is the same as the construction of the bridge construction design drawing, which is not limited in the embodiment of the present invention.
[0071] Optionally, the candidate polling design drawing may be a design drawing of a bridge construction design drawing displayed when the candidate polling frequency is in a periodic polling process, which is not limited in the embodiment of the present invention.
[0072] Optionally, the specific scale change type associated with the multi-scale construction scene can refer to but not be limited to the specific processing method associated with the construction information monitoring processing mentioned above, which is not limited in the embodiment of the present invention. Further, the multi-scale change construction scene can preset a suitable multi-scale change type and preset a suitable multi-scale change number based on actual needs, which is not limited in the embodiment of the present invention.
[0073] Optionally, the design drawing scale processing information associated with each candidate polling design drawing includes at least one multi-scale change processed design drawing associated with the candidate polling design drawing, which is not limited in this embodiment of the present invention.
[0074] It can be seen that this optional embodiment can output the design drawing log information of the panoramic design drawing based on the access cycle information of the polling frequency and the periodic polling construction scene, and output the design drawing scale processing information based on the multi-scale construction scene and the change fusion construction scene, and further output the design drawing polling processing information of the panoramic design drawing, which is conducive to improving the comprehensiveness and rationality of the method for determining the design drawing polling processing information of the panoramic design drawing, and further conducive to improving the diversity and flexibility of the determined design drawing polling processing information, so as to improve the comprehensiveness of the design drawing transformation processing of the panoramic design drawing, and further conducive to improving the accuracy of design drawing polling and the reliability of design drawing polling for the panoramic design drawing.
[0075] In another optional embodiment, the above-mentioned inputting the design drawing polling processing information into the bridge virtual construction model and outputting the bridge support data information may include:
[0076] For each candidate polling design drawing, each candidate scale-processed design drawing associated with the candidate polling design drawing is input into the bridge virtual construction model, and the sub-design drawing bridge support data associated with each candidate scale-processed design drawing is output; based on all the sub-design drawing bridge support data and the preset second predicted construction scenario, the sub-vector prediction information associated with the candidate polling design drawing is determined;
[0077] Based on the sub-vector prediction information associated with all candidate polling design drawings, the bridge support data information is determined.
[0078] Optionally, the second predicted construction scenario may be a prediction between bridge support data, which is not limited in the embodiment of the present invention.
[0079] Optionally, the above-mentioned determination of bridge support data information based on sub-vector prediction information associated with all candidate polling design drawings can be based on sub-vector prediction information associated with all candidate polling design drawings and a preset third prediction construction scenario to determine bridge support data information associated with design drawing polling processing information, wherein the third prediction construction scenario can be a prediction between bridge support data and / or a prediction between bridge support data and design drawings, which is not limited to the embodiments of the present invention.
[0080] It can be seen that this optional embodiment can determine the sub-design drawing bridge support data of each candidate scale processing design drawing and determine the sub-vector prediction information of each candidate polling design drawing based on the second predicted construction scenario, and then determine the bridge support data information associated with the panoramic design drawing, which is beneficial to improving the comprehensiveness and rationality of the method for determining the bridge support data information of the panoramic design drawing, and then is beneficial to improving the integrity and predictability of the sub-bridge support data associated with the panoramic design drawing, thereby helping to improve the accuracy and reliability of the determined bridge support data information, so as to improve the accuracy and reliability of the actual construction pouring section of the subsequent panoramic design drawing generated based on the bridge support data information.
[0081] Example 2: Please refer to Figure 2 , Figure 2 1 is a flow chart of another method for predicting the elevation of a cast-in-place section in a large-span bridge construction disclosed in an embodiment of the present invention. Figure 2 The described method can be applied to a cast-in-place section elevation prediction device for long-span bridge construction, wherein the device may include a server, wherein the server includes a local server or a cloud server, which is not limited in the embodiments of the present invention. Figure 2 As shown, the cast-in-place section elevation prediction method for long-span bridge construction includes the following processing:
[0082] 201. Read the design drawing information associated with the bridge construction design drawing.
[0083] Optionally, the design drawing information associated with the bridge construction design drawing may include one or more of the design drawing effective beam section information associated with the bridge construction design drawing, design drawing resolution information, design drawing actual beam section information, design drawing attribute information and other information that can reflect the bridge construction design drawing, etc., which is not limited to the embodiments of the present invention.
[0084] 202. Based on the design drawing information, determine whether the bridge construction design drawing meets the preset design drawing safety conditions. When the judgment information is no, proceed to step 204; when the judgment information is yes, proceed to step 203.
[0085] 203. Based on the design drawing information, the bridge construction design drawing is subjected to design drawing correction processing, the bridge construction design drawing after the correction is completed is output, and step 204 is performed.
[0086] Optionally, the design drawing finishing process may be to finish the candidate area of the bridge construction design drawing. Specifically, the candidate area may be an area in the bridge construction design drawing that is distorted to a large extent. For example, the candidate area may be the upper and lower 1 / 3 areas of the bridge construction design drawing, which is not limited in the embodiments of the present invention.
[0087] 204. Based on the collected construction period information associated with the bridge construction design drawing, periodic polling and construction information monitoring processing are performed on the bridge construction design drawing, and the design drawing polling processing information is output.
[0088] 205. Input the design drawing polling processing information into the bridge virtual construction model, and output the bridge support data information.
[0089] 206. Based on the bridge support data information, the design drawing polling processing information and the preset first predicted construction scenario, the actual construction pouring section associated with the bridge construction design drawing is determined. The actual construction pouring section is used to realize the elevation prediction of the cast-in-place section for the construction of a large-span bridge.
[0090] In the embodiment of the present invention, for other descriptions of step 204 to step 206, please refer to the detailed description of step 101 to step 103 in the first embodiment, and the embodiment of the present invention will not be repeated.
[0091] It can be seen that the embodiment of the present invention can perform periodic polling and construction information monitoring processing, bridge support data determination processing and data prediction processing on the bridge construction design drawing, and output the characteristic actual construction pouring section associated with the bridge construction design drawing, which is conducive to improving the comprehensiveness and rationality of the actual construction pouring section determination method of the panoramic design drawing, and then it is conducive to improving the accuracy, reliability and simplicity of the actual construction pouring section of the determined panoramic design drawing, so as to improve the design drawing polling accuracy and design drawing polling efficiency based on the actual construction pouring section of the predetermined panoramic design drawing; and, it can also provide a design drawing repair processing method, enrich the intelligent and diverse design drawing processing functions, and improve the comprehensiveness and integrity of a cast-in-place section elevation prediction method for large-span bridge construction. In addition, when the design drawing safety conditions are met, the corresponding design drawing repair processing is performed based on the design drawing information, which is conducive to improving the rationality and comprehensiveness of the design drawing repair processing method of the panoramic design drawing, and then it is conducive to improving the accuracy, reliability, rationality and timeliness of the design drawing repair of the panoramic design drawing, so as to improve the design drawing processing efficiency and convenience of the panoramic design drawing, and further improve the determination efficiency and reliability of the actual construction pouring section of the panoramic design drawing.
[0092] In an optional embodiment, judging whether the bridge construction design drawing meets the preset design drawing safety conditions based on the design drawing information may include:
[0093] Analyze the design drawing information and output the design drawing distortion associated with the bridge construction design drawing; the design drawing distortion includes the degree of design drawing distortion and / or the area of the design drawing distortion region;
[0094] Determine whether the design drawing distortion meets the preset design drawing distortion construction scenario;
[0095] When it is determined that the design drawing distortion meets the design drawing distortion construction scenario, it is determined that the bridge construction design drawing meets the preset design drawing safety conditions;
[0096] When it is determined that the design drawing distortion does not conform to the design drawing distortion construction scenario, it is determined that the bridge construction design drawing does not conform to the preset design drawing safety conditions.
[0097] Further optionally, the above-mentioned performing design drawing trimming processing on the bridge construction design drawing based on the design drawing information and outputting the bridge construction design drawing after the trimming of the design drawing is completed may include:
[0098] Based on the design drawing information and the design drawing distortion, the repair processing area associated with the bridge construction design drawing is determined; and based on the repair processing area, the bridge construction design drawing is repaired and processed, and the bridge construction design drawing after the repair is completed is output.
[0099] It can be seen that this optional embodiment can determine the design drawing distortion of the panoramic design drawing, and determine the design drawing safety condition compliance of the panoramic design drawing based on the compliance of the design drawing distortion and the design drawing distortion construction scene, which is conducive to improving the rationality of the method for determining the design drawing safety condition compliance, and then is conducive to improving the accuracy and reliability of the determined design drawing safety compliance, so as to improve the timeliness and reliability of the design drawing processing based on the design drawing safety compliance.
[0100] In another optional embodiment, the above-mentioned determination of whether the design drawing distortion meets the preset design drawing distortion construction scenario may include:
[0101] Based on the distortion of the design drawings, determine the degree of modification required for the bridge construction design drawings;
[0102] Determine whether the repair requirement is greater than or equal to a preset repair requirement threshold;
[0103] When it is determined that the degree of need for repair is greater than or equal to the threshold value of the degree of need for repair, it is determined that the distortion of the design drawing meets the preset construction scenario of distortion of the design drawing;
[0104] When it is determined that the degree of need for repair is less than the threshold value of the degree of need for repair, it is determined that the distortion of the design drawing does not conform to the preset construction scenario of the distortion of the design drawing.
[0105] It can be seen that this optional embodiment can determine the degree of revision of the panoramic design drawing, and determine the compliance of the design drawing distorted construction scene based on the comparison relationship between the revision requirement and the revision requirement threshold, which is beneficial to improving the rationality of the method for determining the compliance of the design drawing distorted construction scene, and further helps to improve the accuracy and reliability of the determined compliance of the design drawing distorted construction scene.
[0106] In yet another optional embodiment, the method may further include the following processing:
[0107] Based on the received design drawing polling instruction, multiple candidate polling design drawings are determined, all candidate polling design drawings are input into the bridge virtual construction model, and the support data information of the bridge to be polled is output;
[0108] Based on the bridge support data information to be polled and the pre-built actual construction pouring section set, the formwork elevation associated with the candidate polling design drawing and each panoramic design drawing is calculated; the actual construction pouring section set includes the actual construction pouring section associated with the bridge construction design drawing;
[0109] Based on all formwork elevations, candidate actual construction sections that meet preset polling conditions are screened out from the actual construction section set, and the panoramic design drawings associated with the candidate actual construction sections are determined as polling information matching the candidate polling design drawings.
[0110] Optionally, the pre-built actual construction pouring section set can be stored in the database to shorten the design drawing polling application process, which is not limited in the embodiment of the present invention.
[0111] Optionally, the formwork elevation associated with the candidate polling design drawing and the panoramic design drawing may be the formwork elevation between the bridge support data of the candidate polling design drawing and the bridge support data of the panoramic design drawing, which is not limited in the embodiment of the present invention.
[0112] Optionally, the candidate actual construction pouring section that meets the preset polling conditions may be an actual construction pouring section associated with (one or more) candidate formwork elevations with the smallest median value among all formwork elevations, or may be an actual construction pouring section associated with a candidate formwork elevation with a formwork elevation value less than or equal to a preset formwork elevation threshold among all formwork elevations, and the embodiment of the present invention is not limited to this.
[0113] Optionally, when at least two candidate actual construction sections that meet the preset polling conditions are determined, combined with one or more of the location attribute information of the design drawing display scene associated with the candidate actual construction section and the candidate polling design drawing, the functional information of the design drawing display scene, the user information associated with the design drawing, the associated information of the design drawing display content, etc., the final candidate actual construction section is screened out from the at least two candidate actual construction sections that meet the preset polling conditions, and the panoramic design drawing associated with the final candidate actual construction section is determined as the polling information that matches the candidate polling design drawing. The embodiments of the present invention are not limited to this.
[0114] Further optionally, before inputting all candidate polling design drawings into the virtual bridge construction model and outputting the bridge support data information to be polled, the method may further include the following processing:
[0115] Based on the collected basic cycle information associated with all candidate polling design drawings, determine whether all candidate polling design drawings meet the preset polling cycle requirements;
[0116] When the judgment information is yes, the above-mentioned process of inputting all candidate polling design drawings into the bridge virtual construction model and outputting the supporting data information of the bridge to be polled is performed;
[0117] When the judgment information is no, the candidate polling design drawings that do not meet the polling cycle requirements are screened out from all candidate polling design drawings; based on the basic cycle information and polling cycle requirements associated with the candidate polling design drawings that do not meet the polling cycle requirements, the candidate polling design drawings that do not meet the polling cycle requirements are trimmed, and the trimmed candidate polling design drawings are output, and the above-mentioned processing of inputting all candidate polling design drawings into the bridge virtual construction model and outputting the support data information of the bridge to be polled is performed.
[0118] Optionally, the polling cycle requirement is preset based on the access cycle information associated with the candidate polling frequency. For example, the candidate polling design diagram is trimmed into a square and adjusted to a cycle size that matches the candidate polling frequency. This embodiment of the present invention is not limited thereto.
[0119] It can be seen that this optional embodiment can provide a design drawing polling application method, enrich the intelligent function of a cast-in-place section elevation prediction method for large-span bridge construction, determine the formwork elevations of the candidate polling design drawing and the panoramic design drawing, and screen out the polling information associated with the candidate polling design drawing based on all formwork elevations, which is conducive to improving the comprehensiveness and rationality of the design drawing polling method, and then it is conducive to improving the accuracy and reliability of the determined design drawing polling information, so as to improve the accuracy and reliability of the design drawing polling. In addition, the design drawing polling is completed based on the pre-constructed actual construction casting section set, which simplifies the design drawing polling processing, and is conducive to improving the design drawing polling efficiency and the convenience of design drawing polling; and, it can also perform polling cycle analysis and processing on the candidate polling design drawing. When the candidate polling design drawing does not meet the polling cycle requirements, the candidate polling design drawing is adjusted to a cycle size that meets the polling requirements, which is conducive to improving the cycle matching between the candidate polling design drawing and the safe panoramic design drawing, and then it is conducive to improving the polling convenience and polling efficiency of the candidate polling design drawing, and it is also conducive to improving the accuracy and reliability of the determined polling information.
[0120] In yet another optional embodiment, the above-mentioned inputting all candidate polling design drawings into the bridge virtual construction model and outputting the support data information of the bridge to be polled may include:
[0121] Calculate the number of design drawings associated with all candidate polling design drawings;
[0122] When the number of design drawings is greater than or equal to the preset design drawing number threshold, all candidate polling design drawings are respectively input into the bridge virtual construction model, and the sub-bridge support data to be polled associated with each candidate polling design drawing is output; based on all the sub-bridge support data to be polled and the preset vector fusion construction scenario, the bridge support data information to be polled is determined;
[0123] When the number of design drawings is less than a preset design drawing number threshold, all candidate polling design drawings are input into the bridge virtual construction model, and the support data information of the bridge to be polled is output.
[0124] Optionally, for example: if it is a single candidate polling design drawing, the GEM bridge virtual construction is input to directly generate bridge support data; if it is multiple candidate polling design drawings, the GEM bridge virtual construction is input respectively to generate related bridge support data respectively, and finally they are merged together as the final query input, which is not limited in the embodiment of the present invention.
[0125] It can be seen that this optional embodiment can match the corresponding method of determining the bridge support data information to be polled based on the number of design drawings of the candidate polling design drawings, which is conducive to improving the diversity and selectivity of the method of determining the bridge support data information to be polled, and thus is conducive to improving the efficiency and convenience of determining the bridge support data information to be polled, and is also conducive to improving the pertinence and flexibility of the method of determining the bridge support data information to be polled, and thus is conducive to improving the accuracy and reliability of the determined bridge support data information to be polled.
[0126] Example 3: Please refer to Figure 3 , Figure 3 The present invention discloses a structural schematic diagram of a cast-in-place section elevation prediction device for long-span bridge construction. Figure 3 The described device may include a server, wherein the server includes a local server or a cloud server, which is not limited in the embodiment of the present invention. Figure 3 As shown, the cast-in-place section elevation prediction device for long-span bridge construction may include:
[0127] The design drawing polling processing unit 301 is used to perform periodic polling and construction information monitoring processing on the bridge construction design drawing based on the collected construction period information associated with the bridge construction design drawing, and output the design drawing polling processing information.
[0128] The bridge support data determining unit 302 inputs the design drawing polling processing information into the bridge virtual construction model, and outputs the bridge support data information.
[0129] The data prediction unit 303 is used to determine the actual construction pouring section associated with the bridge construction design drawing based on the bridge support data information, the design drawing polling processing information and the preset first prediction construction scenario. The actual construction pouring section is used to realize the elevation prediction of the cast-in-place section for the construction of large-span bridges.
[0130] It can be seen that implementation Figure 3The described device for predicting the elevation of cast-in-place sections for large-span bridge construction can perform periodic polling and construction information monitoring processing, bridge support data determination processing and data prediction processing on bridge construction design drawings, and output characteristic actual construction sections associated with bridge construction design drawings, which is beneficial to improving the comprehensiveness and rationality of the method for determining the actual construction sections of panoramic design drawings, and further beneficial to improving the accuracy, reliability and simplicity of the actual construction sections of the determined panoramic design drawings, thereby facilitating improving the accuracy and efficiency of design drawing polling based on the actual construction sections of the predetermined panoramic design drawings.
[0131] In an optional embodiment, the design drawing polling processing unit 301 performs periodic polling and construction information monitoring processing on the bridge construction design drawing based on the collected construction period information associated with the bridge construction design drawing, and the method of outputting the design drawing polling processing information specifically includes:
[0132] Determine access cycle information associated with candidate polling frequencies based on preset polling frequency determination conditions and the collected construction cycle information associated with the bridge construction design drawing;
[0133] Based on the access cycle information and the preset periodic polling construction scenario, the design drawing log information associated with the bridge construction design drawing is determined; the design drawing log information includes a plurality of candidate polling design drawings associated with the bridge construction design drawing;
[0134] For each candidate polling design drawing, based on a preset multi-scale construction scene, multiple candidate scale processing design drawings associated with the candidate polling design drawing are determined, and based on all candidate scale processing design drawings and the preset change fusion construction scene, the design drawing scale processing information associated with the candidate polling design drawing is determined;
[0135] Based on the design drawing log information and all design drawing scale processing information, the design drawing polling processing information associated with the bridge construction design drawing is determined.
[0136] It can be seen that the device can output the design drawing log information of the panoramic design drawing based on the access cycle information of the polling frequency and the periodic polling construction scene, and output the design drawing scale processing information based on the multi-scale construction scene and the change fusion construction scene, and further output the design drawing polling processing information of the panoramic design drawing, which is conducive to improving the comprehensiveness and rationality of the method for determining the design drawing polling processing information of the panoramic design drawing, and then is conducive to improving the diversity and flexibility of the determined design drawing polling processing information, so as to improve the comprehensiveness of the design drawing transformation processing of the panoramic design drawing, and further is conducive to improving the accuracy of design drawing polling and the reliability of design drawing polling for the panoramic design drawing.
[0137] In another optional embodiment, the bridge support data determination unit 302 inputs the design drawing polling processing information into the bridge virtual construction model, and the way of outputting the bridge support data information specifically includes:
[0138] For each candidate polling design drawing, each candidate scale-processed design drawing associated with the candidate polling design drawing is input into the bridge virtual construction model, and the sub-design drawing bridge support data associated with each candidate scale-processed design drawing is output; based on all the sub-design drawing bridge support data and the preset second predicted construction scenario, the sub-vector prediction information associated with the candidate polling design drawing is determined;
[0139] Based on the sub-vector prediction information associated with all candidate polling design drawings, the bridge support data information is determined.
[0140] It can be seen that the device can also determine the sub-design drawing bridge support data of each candidate scale processing design drawing and determine the sub-vector prediction information of each candidate polling design drawing based on the second predicted construction scenario, and then determine the bridge support data information associated with the panoramic design drawing, which is conducive to improving the comprehensiveness and rationality of the method for determining the bridge support data information of the panoramic design drawing, and then it is conducive to improving the integrity and predictability of the sub-bridge support data associated with the panoramic design drawing, so as to improve the accuracy and reliability of the determined bridge support data information, so as to improve the accuracy and reliability of the actual construction pouring section of the subsequent panoramic design drawing generated based on the bridge support data information.
[0141] In yet another optional embodiment, Figure 4 As shown, the device may also include:
[0142] The information reading unit 304 is used to perform periodic polling and construction information monitoring processing on the bridge construction design drawing based on the construction cycle information associated with the bridge construction design drawing collected by the design drawing polling processing unit 301, and read the design drawing information associated with the bridge construction design drawing before outputting the design drawing polling processing information.
[0143] The judgment unit 305 is used to judge whether the bridge construction design drawing meets the preset design drawing safety conditions based on the design drawing information. When the judgment information is no, the design drawing polling processing unit 301 performs the above-mentioned periodic polling and construction information monitoring processing on the bridge construction design drawing based on the collected construction cycle information associated with the bridge construction design drawing, and outputs the design drawing polling processing information.
[0144] The design drawing finishing processing unit 306 is used to perform design drawing finishing processing on the bridge construction design drawing based on the design drawing information when the judgment unit 305 determines that the bridge construction design drawing meets the design drawing safety conditions, and output the bridge construction design drawing after the finishing; and trigger the design drawing polling processing unit 301 to perform the above-mentioned periodic polling and construction information monitoring processing on the bridge construction design drawing based on the collected construction cycle information associated with the bridge construction design drawing, and output the design drawing polling processing information.
[0145] It can be seen that the device can also provide a design drawing trimming processing method, enrich the intelligent and diverse design drawing processing functions, and improve the comprehensiveness and integrity of a method for predicting the elevation of cast-in-place sections for large-span bridge construction. In addition, when the design drawing safety conditions are met, corresponding design drawing trimming processing is performed based on the design drawing information, which is beneficial to improving the rationality and comprehensiveness of the design drawing trimming processing method for panoramic design drawings, and thus is beneficial to improving the accuracy, reliability, rationality and timeliness of design drawing trimming of panoramic design drawings, thereby helping to improve the design drawing processing efficiency and convenience of panoramic design drawings, and further improve the efficiency and reliability of determining the actual construction casting sections of panoramic design drawings.
[0146] In another optional embodiment, the judgment unit 305 judges whether the bridge construction design drawing meets the preset design drawing safety conditions based on the design drawing information in a manner specifically including:
[0147] Analyze the design drawing information and output the design drawing distortion associated with the bridge construction design drawing; the design drawing distortion includes the degree of design drawing distortion and / or the area of the design drawing distortion region;
[0148] Determine whether the design drawing distortion meets the preset design drawing distortion construction scenario;
[0149] When it is determined that the design drawing distortion meets the design drawing distortion construction scenario, it is determined that the bridge construction design drawing meets the preset design drawing safety conditions;
[0150] When it is determined that the design drawing distortion does not conform to the design drawing distortion construction scenario, it is determined that the bridge construction design drawing does not conform to the preset design drawing safety conditions.
[0151] It can be seen that implementation Figure 4 The described device can also determine the design distortion of the panoramic design drawing, and determine the design safety condition compliance of the panoramic design drawing based on the compliance of the design distortion and the design distortion construction scene, which is conducive to improving the rationality of the method for determining the design safety condition compliance, and then it is conducive to improving the accuracy and reliability of the determined design safety compliance, so as to improve the timeliness and reliability of the design drawing processing based on the design safety compliance.
[0152] In yet another optional embodiment, Figure 4 As shown, the device may also include:
[0153] The design drawing polling unit 307 is used to determine a plurality of candidate polling design drawings based on the received design drawing polling instruction, input all candidate polling design drawings into the bridge virtual construction model, and output the bridge support data information to be polled;
[0154] Based on the bridge support data information to be polled and the pre-built actual construction pouring section set, the formwork elevation associated with the candidate polling design drawing and each panoramic design drawing is calculated; the actual construction pouring section set includes the actual construction pouring section associated with the bridge construction design drawing;
[0155] Based on all formwork elevations, candidate actual construction sections that meet preset polling conditions are screened out from the actual construction section set, and the panoramic design drawings associated with the candidate actual construction sections are determined as polling information matching the candidate polling design drawings.
[0156] It can be seen that implementation Figure 4 The described device can also provide a design drawing polling application method, enriching the intelligent function of a cast-in-place section elevation prediction method for large-span bridge construction, determining the formwork elevations of candidate polling design drawings and panoramic design drawings, and screening out polling information associated with candidate polling design drawings based on all formwork elevations, which is conducive to improving the comprehensiveness and rationality of the design drawing polling method, and then conducive to improving the accuracy and reliability of the determined design drawing polling information, thereby facilitating improving the accuracy and reliability of design drawing polling. In addition, design drawing polling is completed based on a pre-constructed actual construction casting section set, which simplifies the design drawing polling process and is conducive to improving the efficiency and convenience of design drawing polling.
[0157] In another optional embodiment, the design drawing polling unit 307 inputs all candidate polling design drawings into the bridge virtual construction model, and the method of outputting the bridge support data information to be polled specifically includes:
[0158] Calculate the number of design drawings associated with all candidate polling design drawings;
[0159] When the number of design drawings is greater than or equal to the preset design drawing number threshold, all candidate polling design drawings are respectively input into the bridge virtual construction model, and the sub-bridge support data to be polled associated with each candidate polling design drawing is output; based on all the sub-bridge support data to be polled and the preset vector fusion construction scenario, the bridge support data information to be polled is determined;
[0160] When the number of design drawings is less than a preset design drawing number threshold, all candidate polling design drawings are input into the bridge virtual construction model, and the support data information of the bridge to be polled is output.
[0161] It can be seen that implementation Figure 4 The described device can also match the corresponding method of determining the bridge support data information to be polled based on the number of design drawings of the candidate polling design drawings, which is conducive to improving the diversity and selectivity of the method of determining the bridge support data information to be polled, and thus is conducive to improving the efficiency and convenience of determining the bridge support data information to be polled, and is also conducive to improving the pertinence and flexibility of the method of determining the bridge support data information to be polled, and thus is conducive to improving the accuracy and reliability of the determined bridge support data information to be polled.
[0162] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the polling of units is only a kind of logical function polling. There may be other polling methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not performed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.
[0163] In addition, each functional unit in each embodiment of the present application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above integrated unit can be implemented in the form of hardware or in the form of software functional units. The above is only an implementation method of the present application, and does not limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the specification and drawings of this application, or directly or indirectly used in other related technical fields, is also included in the patent protection scope of the present application.
[0164] The specific implementation methods of the invention are described in detail above, but they are only examples, and the present application is not limited to the specific implementation methods described above. For those skilled in the art, any equivalent modification or substitution of the invention is also within the scope of the present application, and therefore, the equalization, modification, and improvement made without departing from the spirit and principle of the present application should be included in the scope of the present application.
Claims
1. A method for predicting the elevation of a cast-in-place section for long-span bridge construction, characterized in that: The method comprises: Based on the collected construction period information associated with the bridge construction design drawing, periodic polling and construction information monitoring processing are performed on the bridge construction design drawing, and the design drawing polling processing information is output; Inputting the design drawing polling processing information into the bridge virtual construction model, and outputting bridge support data information; Based on the bridge support data information, the design drawing polling processing information and the preset first predicted construction scenario, determining the actual construction pouring section associated with the bridge construction design drawing, wherein the actual construction pouring section is used to realize the cast-in-place section elevation prediction for the construction of a large-span bridge; The method of performing periodic polling and construction information monitoring processing on the bridge construction design drawing based on the collected construction period information associated with the bridge construction design drawing, and outputting design drawing polling processing information, includes: Determine access cycle information associated with candidate polling frequencies based on preset polling frequency determination conditions and the collected construction cycle information associated with the bridge construction design drawings; Based on the access cycle information and the preset periodic polling construction scenario, determining the design drawing log information associated with the bridge construction design drawing; the design drawing log information includes a plurality of candidate polling design drawings associated with the bridge construction design drawing; For each of the candidate polling design drawings, based on a preset multi-scale construction scene, multiple candidate scale-processed design drawings associated with the candidate polling design drawing are determined, and based on all the candidate scale-processed design drawings and the preset change fusion construction scene, the design drawing scale processing information associated with the candidate polling design drawing is determined; Determine the design drawing polling processing information associated with the bridge construction design drawing based on the design drawing log information and all the design drawing scale processing information; The step of inputting the design drawing polling processing information into the bridge virtual construction model and outputting bridge support data information includes: For each candidate polling design drawing, each candidate scale-processed design drawing associated with the candidate polling design drawing is input into the bridge virtual construction model, and the sub-design drawing bridge support data associated with each candidate scale-processed design drawing is output; based on all the sub-design drawing bridge support data and the preset second predicted construction scenario, the sub-vector prediction information associated with the candidate polling design drawing is determined; Determining bridge support data information based on sub-vector prediction information associated with all of the candidate polling design drawings; Before performing periodic polling and construction information monitoring processing on the bridge construction design drawing based on the construction period information associated with the collected bridge construction design drawing and outputting the design drawing polling processing information, the method further includes: Read the design drawing information associated with the bridge construction design drawing; Based on the design drawing information, determine whether the bridge construction design drawing meets the preset design drawing safety conditions; when the determination information is no, perform the periodic polling and construction information monitoring processing on the bridge construction design drawing based on the construction cycle information associated with the collected bridge construction design drawing, and output the design drawing polling processing information; And, the method further comprises: When it is determined that the bridge construction design drawing meets the design drawing safety condition, the bridge construction design drawing is subjected to design drawing trimming processing based on the design drawing information, the bridge construction design drawing after the design drawing trimming is output, and the bridge construction design drawing is subjected to periodic polling and construction information monitoring processing based on the construction cycle information associated with the collected bridge construction design drawing, and the design drawing polling processing information is output; The determining, based on the design drawing information, whether the bridge construction design drawing meets a preset design drawing safety condition includes: Analyze the design drawing information and output the design drawing distortion associated with the bridge construction design drawing; the design drawing distortion includes the degree of design drawing distortion and / or the area of the design drawing distortion region; Determining whether the design drawing distortion meets a preset design drawing distortion construction scenario; When it is determined that the design drawing distortion meets the design drawing distortion construction scenario, determining that the bridge construction design drawing meets the preset design drawing safety conditions; When it is determined that the design drawing distortion does not conform to the design drawing distortion construction scenario, determining that the bridge construction design drawing does not conform to the preset design drawing safety condition; The method further comprises: Based on the received design drawing polling instruction, multiple candidate polling design drawings are determined, all the candidate polling design drawings are input into the bridge virtual construction model, and the support data information of the bridge to be polled is output; Based on the bridge support data information to be polled and the pre-constructed actual construction pouring section set, the formwork elevation associated with the candidate polling design drawing vector and each panoramic design drawing vector is calculated; the actual construction pouring section set includes the actual construction pouring section of the sub-design drawing associated with the bridge construction design drawing; Based on all the formwork elevations, candidate actual construction pouring sections that meet the preset polling conditions are screened out from the actual construction pouring section set, and a panoramic design drawing associated with the candidate actual construction pouring section is determined as polling information matching the candidate polling design drawing; The step of inputting all the candidate polling design drawings into the virtual bridge construction model and outputting the supporting data information of the bridge to be polled includes: Calculate the number of design drawings associated with all the candidate polling design drawings; When the number of design drawings is greater than or equal to a preset design drawing number threshold, all the candidate polling design drawings are respectively input into the bridge virtual construction model, and the sub-bridge support data to be polled associated with each candidate polling design drawing is output; based on all the sub-bridge support data to be polled and the preset vector fusion construction scene, the bridge support data information to be polled is determined; When the number of design drawings is less than a preset design drawing number threshold, all the candidate polling design drawings are input into the bridge virtual construction model, and the support data information of the bridge to be polled is output; The first predicted construction scenario is one or more of a prediction of bridge support data and corresponding design drawings, a prediction between bridge support data, and a prediction between design drawings; The second predicted construction scenario is the prediction between bridge support data.
2. A cast-in-place section elevation prediction device for long-span bridge construction, characterized in that: The device comprises: A design drawing polling processing unit is used to perform periodic polling and construction information monitoring processing on the bridge construction design drawing based on the collected construction period information associated with the bridge construction design drawing, and output design drawing polling processing information; A bridge support data determination unit inputs the design drawing polling processing information into a bridge virtual construction model and outputs bridge support data information; A data prediction unit, for determining an actual construction pouring section associated with the bridge construction design drawing based on the bridge support data information, the design drawing polling processing information and a preset first prediction construction scenario, wherein the actual construction pouring section is used to realize the cast-in-place section elevation prediction for the construction of a large-span bridge; The device for predicting the elevation of a cast-in-place section for long-span bridge construction is used to execute the method for predicting the elevation of a cast-in-place section for long-span bridge construction as described in claim 1.