Method and system for realizing intelligent deviation correction of central axis of tunnel 3D point cloud
Through three-dimensional point cloud technology, intelligent deviation correction of the central axis of the tunnel is realized, which solves the problem in the existing technology that the central line shape control of tunnel construction relies on manual measurement, and improves construction efficiency and accuracy.
Patent Information
- Application Number
- CN202410927383.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-07-11
AI Technical Summary
Alignment control in existing tunnel construction relies on manual measurement, which consumes a lot of time and human resources and cannot guarantee the accuracy of tunnel alignment control.
Using three-dimensional point cloud technology, by receiving correction instructions, a reference coordinate system is constructed, an initial set of three-dimensional coordinate points is obtained, projected onto the YOZ plane, curve fitting is obtained, fitting functions are obtained, and central axis deviation data is calculated to realize intelligent correction of the tunnel central axis. .
It improves the accuracy and timeliness of deviation correction of the tunnel central axis, reduces manual intervention, and improves construction efficiency.
Smart Images

Figure CN118470098B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of intelligent deviation correction technology, and in particular to a method, system, electronic device and computer-readable storage medium for realizing intelligent deviation correction of a central axis of a three-dimensional point cloud of a tunnel. Background Art
[0002] During tunnel construction, linear control is a key link in ensuring tunnel quality. Therefore, accurate identification of the tunnel centerline is of great significance to ensure its safe and reliable application.
[0003] At present, the linear control of tunnel construction mostly relies on manual measurement.
[0004] Although the above method can realize the linear control of tunnel construction, it requires a lot of time and human resources when performing linear control in the tunnel, and the accuracy of the linear control of the tunnel cannot be guaranteed. Summary of the invention
[0005] The present invention provides a method for realizing intelligent deviation correction of a central axis of a tunnel three-dimensional point cloud and a computer-readable storage medium, the main purpose of which is to improve the accuracy and timeliness of deviation correction of a central axis of a tunnel.
[0006] To achieve the above purpose, the present invention provides a method for realizing intelligent deviation correction of the central axis of a tunnel three-dimensional point cloud, comprising:
[0007] receiving a deviation correction instruction, and confirming a deviation correction environment based on the deviation correction instruction, wherein the deviation correction environment includes: a target tunnel to be corrected and a tunnel feature collector;
[0008] A reference coordinate system is constructed, and an initial three-dimensional coordinate point set is obtained by using a tunnel feature collector, the reference coordinate system, and a target tunnel, wherein the reference coordinate system is composed of an XOY plane, an XOZ plane, and a YOZ plane, and an identification three-dimensional coordinate sequence set is obtained by using the initial three-dimensional coordinate point set, wherein the identification three-dimensional coordinate sequence set includes a plurality of identification three-dimensional coordinate sequences;
[0009] Extracting the identified three-dimensional coordinate sequences from the identified three-dimensional coordinate sequence set in sequence, and performing the following operations on the extracted identified three-dimensional coordinate sequences:
[0010] Projecting the extracted identification three-dimensional coordinate sequence onto a YOZ plane to obtain a plane projection sequence, and obtaining one or more fitting curves based on the plane projection sequence;
[0011] Using the one or more fitting curves to obtain one or more target fitting functions, and using the one or more target fitting functions to obtain a target fitting graph;
[0012] Acquire a target fitting centroid based on the target fitting graph, summarize the target fitting centroids to obtain a target fitting centroid set, and acquire a fitting centroid sequence based on the target fitting centroid set;
[0013] Obtain the target fitting central axis by using the fitting centroid sequence, obtain the central axis division value and the target application axis, and obtain one or more application axis division points based on the central axis division value and the target application axis;
[0014] Based on the central axis division value and the target fitting central axis, one or more fitting central axis division points are obtained, and one or more central axis deviation data are calculated using one or more application axis division points and one or more fitting central axis division points, wherein the central axis deviation data includes a central axis deviation value and a central axis deviation angle, wherein one or more application axis division points and one or more central axis deviation data correspond to one or more fitting central axis division points in a one-to-one manner;
[0015] The one or more central axis deviation data are sent to the initiator of the correction instruction to realize intelligent correction of the central axis of the tunnel.
[0016] Optionally, the obtaining of an initial three-dimensional coordinate point set using a tunnel feature collector, a reference coordinate system and a target tunnel includes:
[0017] An initial displacement set is obtained by using a tunnel feature collector and a target tunnel, wherein a stepping distance, a single acquisition angle, and an average angle acquisition number of the tunnel feature collector are preset, and the initial displacement set includes a plurality of initial displacement values;
[0018] Obtaining an initial displacement variance using the initial displacement set, and comparing the initial displacement variance with a preset variance threshold;
[0019] If the initial displacement variance is greater than the variance threshold, the initial displacement set is discarded, and a repeated test and the number of repeated tests of the repeated test are confirmed, wherein the repeated test refers to: returning to the step of obtaining the initial displacement set using the tunnel feature collector and the target tunnel;
[0020] If the initial displacement variance obtained by repeated tests is greater than the variance threshold within the number of repeated tests, it is indicated that the correction environment is abnormal;
[0021] If the initial displacement variance is less than or equal to the variance threshold, retaining the initial displacement set;
[0022] Obtaining a target displacement using the retained initial displacement set and a pre-constructed target displacement relationship, and obtaining an initial three-dimensional coordinate point based on the target displacement and a reference coordinate system;
[0023] The initial three-dimensional coordinate points are collected to obtain an initial three-dimensional coordinate point set.
[0024] Optionally, the target displacement relationship is as follows:
[0025] ;
[0026] in, represents the target displacement, represents the initial displacement concentration The initial displacement value, Indicates the preset coefficients, Indicates the number of average angle acquisitions.
[0027] Optionally, the obtaining of the identification three-dimensional coordinate sequence set by using the initial three-dimensional coordinate point set includes:
[0028] Initial three-dimensional coordinate points are sequentially extracted from the initial three-dimensional coordinate point set, and the following operations are performed on the extracted initial three-dimensional coordinate points:
[0029] Performing a marking operation on the extracted initial three-dimensional coordinate point based on the stepping distance and the single acquisition angle to obtain a marked three-dimensional coordinate point;
[0030] Summarizing the identified three-dimensional coordinate points to obtain an identified three-dimensional coordinate point set;
[0031] Based on the stepping distances corresponding to the identified three-dimensional coordinate points in the identified three-dimensional coordinate point set, the identified three-dimensional coordinate points are respectively summarized to obtain one or more stepping coordinate point sets;
[0032] Extracting step coordinate point sets in sequence from the one or more step coordinate point sets, and performing the following operations on the extracted step coordinate point sets:
[0033] According to the order of single acquisition angles from small to large, a sorting operation is performed on the identification three-dimensional coordinate points in the extracted stepping coordinate point set to obtain an identification three-dimensional coordinate sequence;
[0034] The identified three-dimensional coordinate sequences are summarized to obtain an identified three-dimensional coordinate sequence set.
[0035] Optionally, acquiring one or more fitting curves based on the plane projection sequence includes:
[0036] The first sequence points are sequentially extracted from the plane projection sequence, and the following operations are performed on the extracted first sequence points:
[0037] Acquire a second sequence point based on the first sequence point, wherein the second sequence point is the next first sequence point adjacent to the first sequence point;
[0038] Using the first sequence point and the second sequence point to obtain a first-second sequence slope, taking the second sequence point as the first sequence point and returning to the step of obtaining the second sequence point based on the first sequence point, until all the identified three-dimensional coordinate points in the plane projection sequence are passed through, if the extracted first sequence point is the last first sequence point, taking the first first sequence point as the second sequence point;
[0039] The obtained one-two sequence slopes are sorted according to the order of time of obtaining the one-two sequence slopes to obtain the one-two sequence slope sequence;
[0040] Extract initial one-two sequence slopes from the one-two sequence slope sequence in sequence, and perform the following operations on the extracted initial one-two sequence slopes:
[0041] The target one-two sequence slope is obtained based on the extracted initial one-two sequence slope, wherein the target one-two sequence slope is the initial one-two sequence slope that is adjacent to the initial one-two sequence slope and is located after the initial one-two sequence slope. If the initial one-two sequence slope is the last one-two sequence slope, the target one-two sequence slope obtained using the initial one-two sequence slope is the first one-two sequence slope in the one-two sequence slope sequence.
[0042] Calculate the absolute difference between the initial one-two sequence slope and the target one-two sequence slope to obtain the reference absolute difference;
[0043] Obtain one or more fitting curves using reference absolute differences.
[0044] Optionally, the obtaining a first-sequence slope and a second-sequence slope by using the first sequence point and the second sequence point includes:
[0045] The slope of a bi-sequence is calculated using the pre-built slope evaluation relationship, the first sequence point, and the second sequence point. The slope evaluation relationship is as follows:
[0046] ;
[0047] ;
[0048] ;
[0049] in, Indicates the coordinate point corresponding to the first sequence point, Indicates the coordinate point corresponding to the second sequence point, represents the slope of a bi-sequence, These are preset coefficients.
[0050] Optionally, the obtaining one or more fitting curves by using the reference absolute difference comprises:
[0051] Comparing the reference absolute difference with a preset difference threshold, if the reference absolute difference is greater than the difference threshold, obtaining a first target mean and a second target mean based on the reference absolute difference and identifying a target abnormal point;
[0052] Obtain a target absolute difference according to the first target mean and the second target mean. If the target absolute difference is less than a preset mean threshold, remove the target outlier. The target absolute difference is the absolute difference between the first target mean and the second target mean.
[0053] Otherwise, keep the target outlier point;
[0054] One or more fitting curves are obtained using the retained target outlier points and target sequence points.
[0055] Optionally, the obtaining the target fitting central axis by using the fitting centroid sequence includes:
[0056] A fitting function set is obtained, wherein the fitting function set includes a plurality of fitting functions, fitting functions are sequentially extracted from the fitting function set, and the following operations are performed on the extracted fitting functions:
[0057] A fitting curve is obtained based on the extracted fitting function, wherein the abscissa of the fitting curve is: the length of the step distance;
[0058] The comprehensive evaluation value is calculated using the pre-built comprehensive evaluation relationship, fitting curve and fitting centroid sequence, where the comprehensive evaluation relationship is as follows:
[0059] ;
[0060] in, Represents the comprehensive evaluation value, Indicates that there are a total of The target fitting centroid, express The first target fitting centroid The Y coordinate value of the target fitting centroid in the reference coordinate system, Indicates that the fitting curve is The step distance corresponding to the fitting centroid of the target, the value of the Y coordinate in the reference coordinate system, express The first target fitting centroid The Z coordinate value of the target fitting centroid in the reference coordinate system, Indicates that the fitting curve is The step distance corresponding to the fitting centroid of each target is the value of the Z coordinate in the reference coordinate system;
[0061] The comprehensive evaluation values are summarized to obtain a comprehensive evaluation value set, and a target fitting central axis is obtained based on the comprehensive evaluation value set, wherein the target fitting central axis is a fitting curve corresponding to the minimum comprehensive evaluation value in the comprehensive evaluation value set.
[0062] Optionally, the calculating one or more central axis deviation data using one or more application central axis division points and one or more fitting central axis division points includes:
[0063] Extract application axis division points from the one or more application axis division points in sequence, and perform the following operations on the extracted application axis division points:
[0064] The central axis deviation value is calculated based on the extracted application axis division points and the fitted central axis division points corresponding to the application axis division points. The calculation formula is as follows:
[0065] ;
[0066] in, Indicates the deviation value of the center axis. Indicates the coordinates corresponding to the axis division points in the application. Represents the coordinates of the fitted central axis division points corresponding to the axis division points in the application;
[0067] The central axis deviation angle is calculated based on the extracted central axis division points in the application and the fitted central axis division points corresponding to the central axis division points in the application. The calculation formula is as follows:
[0068] ;
[0069] in, Indicates the deviation angle of the central axis, Represents the vector formed by the axis division point in the extracted application and the axis division point in the next application, Represents the vector formed by the extracted application axis division points and the fitted central axis division points, represents the dot product operation, Represents the modulus of a vector.
[0070] To achieve the above object, the present invention also provides a system for realizing intelligent deviation correction of the central axis of a tunnel three-dimensional point cloud, comprising:
[0071] A correction environment confirmation module, used for receiving a correction instruction and confirming a correction environment based on the correction instruction, wherein the correction environment includes: a target tunnel to be corrected and a tunnel feature collector;
[0072] A curve fitting module is used to construct a reference coordinate system, and obtain an initial three-dimensional coordinate point set using a tunnel feature collector, the reference coordinate system, and a target tunnel, wherein the reference coordinate system is composed of an XOY plane, an XOZ plane, and a YOZ plane, and obtain an identification three-dimensional coordinate sequence set using the initial three-dimensional coordinate point set, wherein the identification three-dimensional coordinate sequence set includes a plurality of identification three-dimensional coordinate sequences;
[0073] Extracting the identified three-dimensional coordinate sequences from the identified three-dimensional coordinate sequence set in sequence, and performing the following operations on the extracted identified three-dimensional coordinate sequences:
[0074] Projecting the extracted identification three-dimensional coordinate sequence onto a YOZ plane to obtain a plane projection sequence, and obtaining one or more fitting curves based on the plane projection sequence;
[0075] Using the one or more fitting curves to obtain one or more target fitting functions, and using the one or more target fitting functions to obtain a target fitting graph;
[0076] A central axis fitting module, used for obtaining a target fitting centroid based on the target fitting graph, summarizing the target fitting centroids to obtain a target fitting centroid set, and obtaining a fitting centroid sequence based on the target fitting centroid set;
[0077] Obtain the target fitting central axis by using the fitting centroid sequence, obtain the central axis division value and the target application axis, and obtain one or more application axis division points based on the central axis division value and the target application axis;
[0078] A central axis deviation correction module is used to obtain one or more fitting central axis division points based on the central axis division value and the target fitting central axis, and calculate one or more central axis deviation data using one or more application axis division points and one or more fitting central axis division points, wherein the central axis deviation data includes a central axis deviation value and a central axis deviation angle, wherein one or more application axis division points and one or more central axis deviation data correspond to one or more fitting central axis division points in a one-to-one manner;
[0079] The one or more central axis deviation data are sent to the initiator of the correction instruction to realize intelligent correction of the central axis of the tunnel.
[0080] In order to solve the above problem, the present invention further provides an electronic device, the electronic device comprising:
[0081] a memory storing at least one instruction; and
[0082] The processor executes the instructions stored in the memory to implement the above-mentioned method for intelligent deviation correction of the central axis of the three-dimensional point cloud of the tunnel.
[0083] In order to solve the above problems, the present invention also provides a computer-readable storage medium, in which at least one instruction is stored. The at least one instruction is executed by a processor in an electronic device to implement the above-mentioned method for intelligent deviation correction of the central axis of a tunnel three-dimensional point cloud.
[0084] The present invention is to solve the problem described in the background technology. The present invention receives a correction instruction and confirms a correction environment based on the correction instruction, wherein the correction environment includes: a target tunnel to be corrected and a tunnel feature collector. It can be seen that the embodiment of the present invention considers the use of a tunnel feature collector when considering correcting the central axis of the target tunnel, and presets the operation mode of the tunnel feature collector, and on the basis of the preset operation mode, it can be realized that the central axis of the tunnel can be extracted and corrected during tunnel excavation. On this basis, the present invention constructs a reference coordinate system, uses the tunnel feature collector, the reference coordinate system and the target tunnel to obtain an initial three-dimensional coordinate point set, and uses the initial three-dimensional coordinate point set to obtain an identification three-dimensional coordinate sequence set. It can be seen that the embodiment of the present invention converts the extraction of the central axis of the tunnel into fitting the central axis of the tunnel using multiple initial three-dimensional coordinate point sets, and when using the initial three-dimensional coordinate point set, it takes into account the problem that the target displacement point may have errors or inaccuracies due to accidental factors, and timely prompts are given to the correction environment, thereby improving the accuracy of extracting the central axis of the tunnel. Next, the present invention projects the extracted identification three-dimensional coordinate sequence to the YOZ plane to obtain a plane projection sequence, and obtains one or more fitting curves based on the plane projection sequence. It can be seen that the embodiment of the present invention projects the point coordinates in three dimensions into point coordinates in two dimensions, thereby improving the timeliness of the central axis fitting. Further, the present invention uses the one or more fitting curves to obtain one or more target fitting functions, uses one or more target fitting functions to obtain a target fitting graph, obtains a target fitting centroid based on the target fitting graph, summarizes the target fitting centroid to obtain a target fitting centroid set, obtains a fitting centroid sequence based on the target fitting centroid set, and uses the fitting centroid to obtain a fitting centroid sequence. The target fitting central axis is obtained from the central sequence, the central axis division value and the target application central axis are obtained, one or more application axis division points are obtained based on the central axis division value and the target application central axis, one or more fitting central axis division points are obtained based on the central axis division value and the target fitting central axis, and one or more application axis division points and one or more fitting central axis division points are used to calculate one or more central axis deviation data. It can be seen that the embodiment of the present invention fits the central axis of the target tunnel through multiple points that can represent the central axis, and uses the fitted fitting central axis and the target application axis to obtain one or more central axis deviation data, thereby improving the accuracy and timeliness of the central axis deviation correction. Therefore, the present invention can improve the accuracy and timeliness of the tunnel central axis deviation correction. BRIEF DESCRIPTION OF THE DRAWINGS
[0085] Figure 1A schematic diagram of a process for realizing an intelligent deviation correction method for a central axis of a three-dimensional point cloud of a tunnel provided by an embodiment of the present invention;
[0086] Figure 2 A functional module diagram of a system for realizing intelligent deviation correction of the central axis of a tunnel three-dimensional point cloud provided by an embodiment of the present invention;
[0087] Figure 3 A schematic diagram of the structure of an electronic device for implementing the method for intelligently correcting the central axis of a three-dimensional point cloud of a tunnel provided in one embodiment of the present invention.
[0088] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0089] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0090] The embodiment of the present application provides a method for realizing intelligent deviation correction of the central axis of a three-dimensional point cloud of a tunnel. The execution subject of the method for realizing intelligent deviation correction of the central axis of a three-dimensional point cloud of a tunnel includes but is not limited to at least one of the electronic devices such as a server and a terminal that can be configured to execute the method provided by the embodiment of the present application. In other words, the method for realizing intelligent deviation correction of the central axis of a three-dimensional point cloud of a tunnel can be executed by software or hardware installed on a terminal device or a server device, and the software can be a blockchain platform. The server includes but is not limited to: a single server, a server cluster, a cloud server or a cloud server cluster, etc.
[0091] Reference Figure 1 FIG. 1 is a flow chart of a method for realizing intelligent deviation correction of the central axis of a tunnel three-dimensional point cloud provided by an embodiment of the present invention. In this embodiment, the method for realizing intelligent deviation correction of the central axis of a tunnel three-dimensional point cloud includes:
[0092] S1. Receive a correction instruction, and confirm a correction environment based on the correction instruction, wherein the correction environment includes: a target tunnel to be corrected and a tunnel feature collector.
[0093] It should be explained that the target tunnel refers to the tunnel that needs to be intelligently corrected for the central axis, the correction instruction refers to the instruction issued by the tunnel staff to correct the central axis of the tunnel, and the correction environment is the necessary environment for correcting the tunnel, and the correction environment includes: the target tunnel to be corrected and the tunnel feature collector. Optionally, the tunnel feature collector is a displacement sensor, and other technologies can achieve the same effect, which will not be repeated here.
[0094] Furthermore, as the person in charge of a tunnel construction team, Xiao Zhang's main task is to ensure that the central axis of the tunnel can be kept consistent with the position corresponding to the construction drawings under excavation in various terrains and various conditions. Therefore, Xiao Zhang issues correction instructions and confirms the correction environment.
[0095] S2. Construct a reference coordinate system, and use the tunnel feature collector, the reference coordinate system, and the target tunnel to obtain an initial three-dimensional coordinate point set, wherein the reference coordinate system is composed of an XOY plane, an XOZ plane, and a YOZ plane, and use the initial three-dimensional coordinate point set to obtain an identification three-dimensional coordinate sequence set, wherein the identification three-dimensional coordinate sequence set includes multiple identification three-dimensional coordinate sequences.
[0096] It should be understood that, optionally, the reference coordinate system is a geodetic coordinate system, and the XOY plane is a plane consisting of the X-axis, the Y-axis and the coordinate origin O when constituting the reference coordinate system, wherein the X-axis points in the horizontal direction along the tunnel, the Z-axis points in the vertical direction perpendicular to the tunnel, and the Y-axis points in the direction along the cross section of the tunnel and perpendicular to the X-axis and the Z-axis. For example: if the excavation direction of the tunnel is along the due north direction, then the positive direction of the X-axis can be the due north direction or the due south direction, the positive direction of the Y-axis can be the due west direction or the due east direction, and the positive direction of the Y-axis can be perpendicular to the ground upward or perpendicular to the ground downward. The same effect can be achieved by using other technologies, which will not be repeated here.
[0097] Furthermore, the method of obtaining an initial three-dimensional coordinate point set by using a tunnel feature collector, a reference coordinate system and a target tunnel includes:
[0098] An initial displacement set is obtained by using a tunnel feature collector and a target tunnel, wherein a stepping distance, a single acquisition angle, and an average angle acquisition number of the tunnel feature collector are preset, and the initial displacement set includes a plurality of initial displacement values;
[0099] Obtaining an initial displacement variance using the initial displacement set, and comparing the initial displacement variance with a preset variance threshold;
[0100] If the initial displacement variance is greater than the variance threshold, the initial displacement set is discarded, and a repeated test and the number of repeated tests of the repeated test are confirmed, wherein the repeated test refers to: returning to the step of obtaining the initial displacement set using the tunnel feature collector and the target tunnel;
[0101] If the initial displacement variance obtained by repeated tests is greater than the variance threshold within the number of repeated tests, it is indicated that the correction environment is abnormal;
[0102] If the initial displacement variance is less than or equal to the variance threshold, retaining the initial displacement set;
[0103] Obtaining a target displacement using the retained initial displacement set and a pre-constructed target displacement relationship, and obtaining an initial three-dimensional coordinate point based on the target displacement and a reference coordinate system;
[0104] The initial three-dimensional coordinate points are collected to obtain an initial three-dimensional coordinate point set.
[0105] It should be understood that the initial displacement set is a set of displacement values obtained by the tunnel feature collector performing multiple measurements on the same position at a certain position and at the same angle. The step distance is the distance of a single movement of the tunnel feature collector. The single acquisition angle is the angle of a single rotation of the tunnel feature collector when collecting. The average angle acquisition times refers to the number of times the tunnel feature collector needs to measure the displacement value at each single acquisition angle. The initial displacement value refers to the value obtained by measuring a certain position using the tunnel feature collector, and the value is converted into a displacement value. For example: when a displacement sensor is used, when a certain position is measured using the displacement sensor, a time change value will be obtained, and the time change value can be converted into a displacement value, and the technology for converting the time change value into a displacement value is an existing technology and will not be repeated here. The initial displacement variance refers to the variance of multiple initial displacement values in the initial displacement set, and the technology for solving the variance using multiple values is an existing technology. The variance threshold is a preset value for determining whether the obtained initial displacement set is reliable.
[0106] It should be explained that the number of repeated tests refers to the number of cycles of repeated tests. The technology of obtaining the initial three-dimensional coordinate point using angle, reference coordinate system and target displacement is a prior art and will not be described in detail here. The initial three-dimensional coordinate point refers to the point coordinate in the reference coordinate system.
[0107] Furthermore, when the initial displacement set of a certain position is obtained by using a tunnel feature collector, if there are no accidental factors, the initial displacement variance corresponding to the obtained initial displacement set should be less than the variance threshold. Considering that there may be accidental factors in actual situations, such as temperature changes, vibrations, failure or aging of the tunnel feature collector, etc., the initial displacement set obtained by using the tunnel feature collector is not reliable. Therefore, when the initial displacement variance is greater than the variance threshold, it is necessary to obtain a reliable initial displacement set through repeated tests and the number of repeated tests, that is, the retained initial displacement set, and if the initial displacement variance obtained by repeated tests is greater than the variance threshold within the number of repeated tests, it indicates that the correction environment is abnormal, thereby improving the accuracy of the intelligent correction of the tunnel central axis.
[0108] It should be understood that the target displacement relationship is as follows:
[0109] ;
[0110] in, represents the target displacement, represents the initial displacement concentration The initial displacement value, Indicates the preset coefficients, Indicates the number of average angle acquisitions.
[0111] Furthermore, the obtaining of the identification three-dimensional coordinate sequence set by using the initial three-dimensional coordinate point set includes:
[0112] Initial three-dimensional coordinate points are sequentially extracted from the initial three-dimensional coordinate point set, and the following operations are performed on the extracted initial three-dimensional coordinate points:
[0113] Performing a marking operation on the extracted initial three-dimensional coordinate point based on the stepping distance and the single acquisition angle to obtain a marked three-dimensional coordinate point;
[0114] Summarizing the identified three-dimensional coordinate points to obtain an identified three-dimensional coordinate point set;
[0115] Based on the stepping distances corresponding to the identified three-dimensional coordinate points in the identified three-dimensional coordinate point set, the identified three-dimensional coordinate points are respectively summarized to obtain one or more stepping coordinate point sets;
[0116] Extracting step coordinate point sets in sequence from the one or more step coordinate point sets, and performing the following operations on the extracted step coordinate point sets:
[0117] According to the order of single acquisition angles from small to large, a sorting operation is performed on the identification three-dimensional coordinate points in the extracted stepping coordinate point set to obtain an identification three-dimensional coordinate sequence;
[0118] The identified three-dimensional coordinate sequences are summarized to obtain an identified three-dimensional coordinate sequence set.
[0119] Exemplarily, the initial three-dimensional coordinate point set includes 108 initial three-dimensional coordinate points, the preset step distance is 40cm, and the single acquisition angle is 10 degrees. Then, the tunnel feature collector can be used to collect 36 times by rotating one circle, that is, 36 initial three-dimensional coordinate points can be collected in each step distance. Then the initial three-dimensional coordinate point corresponding to the first step distance at the first single acquisition angle is identified as: the identified three-dimensional coordinate point at the first step distance of 40cm and the angle of 10 degrees... and so on, until the initial three-dimensional coordinate points in the initial three-dimensional coordinate point set are all identified. The identified three-dimensional coordinate points are respectively summarized according to the step distances corresponding to the identified three-dimensional coordinate points to obtain three step coordinate point sets, wherein the first step coordinate point set is: 36 identified three-dimensional coordinate points at the first step distance of 40cm, the second step coordinate point set is: 36 identified three-dimensional coordinate points at the second step distance of 40cm, and the third step coordinate point set is: 36 identified three-dimensional coordinate points at the third step distance of 40cm. By sorting the identified three-dimensional coordinate points in each of the three step coordinate point sets in order from small to large according to the single acquisition angle, the position and angle relationship of the point at the tunnel cross section at the step distance corresponding to the step coordinate point set from the tunnel feature collector can be obtained.
[0120] S3. Project the extracted identification three-dimensional coordinate sequence onto a YOZ plane to obtain a plane projection sequence, and obtain one or more fitting curves based on the plane projection sequence.
[0121] It is understandable that after projecting the identified three-dimensional coordinate sequence onto the YOZ surface, the three-dimensional coordinates can be converted into two-dimensional coordinates. Calculation in the two-dimensional coordinate sequence will not lose the shape of the tunnel in the cross section, but can also reduce the parameters required for coordinate calculation, thereby increasing the speed of extracting the center of the cross section, thereby increasing the timeliness of intelligent deviation correction of the central axis of the tunnel. The technology of projecting the identified three-dimensional coordinate sequence onto a certain surface is a prior art and will not be repeated here.
[0122] It should be explained that the step of obtaining one or more fitting curves based on the plane projection sequence includes:
[0123] The first sequence points are sequentially extracted from the plane projection sequence, and the following operations are performed on the extracted first sequence points:
[0124] Acquire a second sequence point based on the first sequence point, wherein the second sequence point is the next first sequence point adjacent to the first sequence point;
[0125] Using the first sequence point and the second sequence point to obtain a first-second sequence slope, taking the second sequence point as the first sequence point and returning to the step of obtaining the second sequence point based on the first sequence point, until all the identified three-dimensional coordinate points in the plane projection sequence are passed through, if the extracted first sequence point is the last first sequence point, taking the first first sequence point as the second sequence point;
[0126] The obtained one-two sequence slopes are sorted according to the order of time of obtaining the one-two sequence slopes to obtain the one-two sequence slope sequence;
[0127] Extract initial one-two sequence slopes from the one-two sequence slope sequence in sequence, and perform the following operations on the extracted initial one-two sequence slopes:
[0128] The target one-two sequence slope is obtained based on the extracted initial one-two sequence slope, wherein the target one-two sequence slope is the initial one-two sequence slope that is adjacent to the initial one-two sequence slope and is located after the initial one-two sequence slope. If the initial one-two sequence slope is the last one-two sequence slope, the target one-two sequence slope obtained using the initial one-two sequence slope is the first one-two sequence slope in the one-two sequence slope sequence.
[0129] Calculate the absolute difference between the initial one-two sequence slope and the target one-two sequence slope to obtain the reference absolute difference;
[0130] Obtain one or more fitting curves using reference absolute differences.
[0131] Furthermore, the first sequence point is a sequence point of coordinates in the YOZ plane after the identified three-dimensional coordinate sequence is projected onto the YOZ plane in the plane projection sequence. For example, if the starting point in the plane projection sequence is the identified three-dimensional coordinate point corresponding to 0 degrees, then the first first sequence point extracted from the plane projection sequence is a coordinate point of 0 degrees in the plane projection sequence point, and the second sequence point is a coordinate point of 10 degrees, wherein the single acquisition angle is 10 degrees.
[0132] It can be understood that the initial one-two sequence slope is the one-two sequence slope in the one-two sequence slope sequence, and the target one-two sequence slope is obtained in the same manner as the initial one-two sequence slope, and can achieve the same effect, which will not be repeated here. The relationship between the initial one-two sequence slope and the target one-two sequence slope is the same as that between the first sequence point and the second sequence point, and can achieve the same effect, which will not be repeated here.
[0133] It should be explained that by calculating the absolute difference between the initial one-two sequence slope and the target one-two sequence slope, the relationship between the two slopes can be expressed, and then the relationship between the three points can be expressed. For example, the three points are located in the same straight line, and the three points are located in the same plane.
[0134] It should be understood that the method of obtaining a two-sequence slope by using the first sequence point and the second sequence point includes:
[0135] The slope of a bi-sequence is calculated using the pre-built slope evaluation relationship, the first sequence point, and the second sequence point. The slope evaluation relationship is as follows:
[0136] ;
[0137] ;
[0138] ;
[0139] in, Indicates the coordinate point corresponding to the first sequence point, Indicates the coordinate point corresponding to the second sequence point, represents the slope of a bi-sequence, These are preset coefficients.
[0140] It should be understood that when calculating the slope of a one-two sequence, the positional relationship of the sequence points may lead to the non-existence of the slope. Therefore, by presetting two coefficients, the non-existence of the slope can be solved, and the plane projection sequence can be divided into one or more fitting curves according to the slope of the one-two sequence. Please refer to the subsequent embodiments for the specific division method.
[0141] It should be explained that the method of obtaining one or more fitting curves by using the reference absolute difference includes:
[0142] Comparing the reference absolute difference with a preset difference threshold, if the reference absolute difference is greater than the difference threshold, obtaining a first target mean and a second target mean based on the reference absolute difference and identifying a target abnormal point;
[0143] Obtain a target absolute difference according to the first target mean and the second target mean. If the target absolute difference is less than a preset mean threshold, remove the target outlier. The target absolute difference is the absolute difference between the first target mean and the second target mean.
[0144] Otherwise, keep the target outlier point;
[0145] One or more fitting curves are obtained using the retained target outlier points and target sequence points.
[0146] It should be understood that when the reference absolute difference is greater than the difference threshold, it can be considered that the two one-two sequence slopes are significantly different, and further, it can be confirmed that the sequence points corresponding to the two one-two sequence slopes may not be located on the same curve. For example: in a tunnel, some cross sections may be rectangular cross sections. If two adjacent one-two sequence slopes are significantly different, the sequence points corresponding to the two one-two sequence slopes may be located on two sides of the rectangle.
[0147] Further, the first target mean and the second target mean are respectively the means corresponding to the multiple reference absolute differences located on both sides of the reference absolute difference. For example, if the reference absolute difference corresponds to the fifth one-two sequence slope and the sixth one-two sequence slope in the one-two sequence slope sequence, then the first target mean is the mean of the reference absolute differences corresponding to the first four one-two sequence slopes before the reference absolute difference, and the first four reference absolute differences are respectively: the absolute difference between the first one-two sequence slope and the second one-two sequence slope, the absolute difference between the second one-two sequence slope and the third one-two sequence slope, the absolute difference between the third one-two sequence slope and the fourth one-two sequence slope, and the absolute difference between the fourth one-two sequence slope and the fifth one-two sequence slope, and the second target mean is the mean of the reference absolute differences corresponding to the four one-two sequence slopes after the reference absolute difference.
[0148] It is understandable that when a target abnormal point appears, it is usually accompanied by two reference absolute differences greater than the difference threshold, for example: the target abnormal point is a point at the corner of the tunnel or a point that is abnormally protruding when the tunnel is excavated. Therefore, when the reference absolute difference is greater than the difference threshold, the second sequence point in the reference absolute difference used to calculate the target one-two sequence slope is the target abnormal point. When the target absolute difference is less than the preset difference threshold, it indicates that the target abnormal point is a point that is abnormally protruding when the tunnel is excavated, otherwise, the target abnormal point is a turning point in the tunnel. For example: the target tunnel is composed of a rectangle and a semicircle, and there are 4 target abnormal points in the tunnel, of which two target abnormal points are two vertices of the rectangular part, and the other two vertices are abnormally protruding points when excavating in the tunnel. Therefore, the abnormally protruding points are eliminated, and the fitting curve is fitted.
[0149] Furthermore, optionally, the retained target anomaly points and target sequence points are used to obtain one or more fitting curves: the retained target anomaly points and target sequence points are divided into one or more point sets using human experience, and each of the one or more point sets is fitted into a fitting curve using a smooth fitting method. Other technologies can achieve the same effect, which will not be repeated here.
[0150] S4. Using the one or more fitting curves to obtain one or more target fitting functions, and using the one or more target fitting functions to obtain a target fitting graph.
[0151] It is understandable that in actual tunnel excavation, the shape of the tunnel cross section is generally a relatively regular shape, such as a circle, an ellipse and a rectangle, and the existing technology and the fitting curve can be used to fit the target fitting function. For example, the dichotomy method and a section of the curve are used to fit the target fitting function corresponding to the curve.
[0152] Furthermore, the target fitting graph refers to a set of curves corresponding to one or more target fitting functions at the tunnel cross section. For example, one or more fitting curves include three straight lines and one semicircular curve, and the shape of the tunnel cross section is fitted through their position relationship: the lower half is a rectangle and the upper half is a semicircular graph.
[0153] S5. Obtain a target fitting centroid based on the target fitting graph, summarize the target fitting centroids to obtain a target fitting centroid set, and obtain a fitting centroid sequence based on the target fitting centroid set.
[0154] Further, the acquiring the target fitting centroid based on the target fitting graph includes:
[0155] The target fitting area is obtained by using the target fitting graph, and the target fitting centroid is calculated based on the target fitting area. The calculation relationship is as follows:
[0156] ;
[0157] ;
[0158] in, represents the target fitting centroid, represents the target fitting area, Represents the independent variable in the target fit graph.
[0159] It should be explained that there may be multiple cross-sections of different shapes in the tunnel. Therefore, by fitting the target fitting centroid through the calculation relationship, the center of the tunnel in the cross-section can be expressed. For example: in a tunnel with a circular cross-section or an elliptical cross-section, the axis should pass through the center of each circle or the center of each ellipse in the cross-section, and in the cross-section where the tunnel cross-section is a rectangle, the center position is the center of the rectangle, that is, the intersection of its diagonals. Optionally, the method for obtaining the target fitting area is: using the one or more target fitting functions and the target fitting graph to calculate the target fitting area.
[0160] It should be explained that the step of obtaining a fitting centroid sequence based on the target fitting centroid set includes:
[0161] The target fitting centroids are sequentially extracted from the target fitting centroid set, and the following operations are performed on the extracted target fitting centroids:
[0162] Using the step distance, performing a marking operation on the extracted target fitting centroid to obtain a marked fitting centroid;
[0163] The identified fitting centroids are summarized to obtain an identified fitting centroid set, and a sorting operation is performed on the identified fitting centroids in the identified fitting centroid set according to the order of the step distance from small to large to obtain a fitting centroid sequence.
[0164] Furthermore, the target fitting centroid is marked by the step distance, that is, the position of the target fitting centroid in the tunnel is marked. For example, after the target fitting centroid with the first step distance of 40 cm is marked, the target fitting centroid can express the center of the cross section corresponding to the tunnel at 40 cm. Therefore, by sorting the target fitting centroid set to obtain the fitting centroid sequence, the position of the center corresponding to the cross section at different positions in the tunnel can be indicated.
[0165] S6. Use the fitted centroid sequence to obtain the target fitting central axis, obtain the central axis division value and the target application central axis, and obtain one or more application axis division points based on the central axis division value and the target application central axis.
[0166] It should be explained that the method of obtaining the target fitting central axis by using the fitting centroid sequence includes:
[0167] A fitting function set is obtained, wherein the fitting function set includes a plurality of fitting functions, fitting functions are sequentially extracted from the fitting function set, and the following operations are performed on the extracted fitting functions:
[0168] A fitting curve is obtained based on the extracted fitting function, wherein the abscissa of the fitting curve is: the length of the step distance;
[0169] The comprehensive evaluation value is calculated using the pre-built comprehensive evaluation relationship, fitting curve and fitting centroid sequence, where the comprehensive evaluation relationship is as follows:
[0170] ;
[0171] in, Represents the comprehensive evaluation value, Indicates that there are a total of The target fitting centroid, express The first target fitting centroid The Y coordinate value of the target fitting centroid in the reference coordinate system, Indicates that the fitting curve is The step distance corresponding to the fitting centroid of the target, the value of the Y coordinate in the reference coordinate system, express The first target fitting centroid The Z coordinate value of the target fitting centroid in the reference coordinate system, Indicates that the fitting curve is The step distance corresponding to the fitting centroid of each target is the value of the Z coordinate in the reference coordinate system;
[0172] The comprehensive evaluation values are summarized to obtain a comprehensive evaluation value set, and a target fitting central axis is obtained based on the comprehensive evaluation value set, wherein the target fitting central axis is a fitting curve corresponding to the minimum comprehensive evaluation value in the comprehensive evaluation value set.
[0173] Furthermore, optionally, the fitting function is a trigonometric function, a linear polynomial function, a quadratic polynomial function, etc. Other technologies can achieve the same effect, which will not be described in detail here.
[0174] It is understood that the central axis division value refers to a preset value for dividing the central axis. For example, if the length of the axis in the target application is 120 cm, the step distance is 40 cm, and the central axis division value is 12 cm, the central axis division value is used to divide the axis in the target application into 10 application axis division points. The axis in the target application refers to the central axis of the tunnel planned before tunnel excavation. The smaller the comprehensive evaluation value, the more accurate the fitting result of the fitting curve.
[0175] S7. Obtain one or more fitting central axis division points based on the central axis division value and the target fitting central axis, wherein one or more application central axis division points correspond one to one with one or more fitting central axis division points, and calculate one or more central axis deviation data using one or more application central axis division points and one or more fitting central axis division points, wherein the central axis deviation data includes a central axis deviation value and a central axis deviation angle.
[0176] It should be explained that the fitting central axis division points and the axis division points in the application are obtained in the same way and can achieve the same effect, so they will not be repeated here. The difference between the fitting central axis division points and the application axis division points is that the fitting central axis division points are points obtained by dividing the target fitting central axis, and the application axis division points are points obtained by dividing the target application axis.
[0177] It is understandable that the calculation of one or more central axis deviation data using one or more application axis division points and one or more fitting central axis division points includes:
[0178] Extract application axis division points from the one or more application axis division points in sequence, and perform the following operations on the extracted application axis division points:
[0179] The central axis deviation value is calculated based on the extracted application axis division points and the fitted central axis division points corresponding to the application axis division points. The calculation formula is as follows:
[0180] ;
[0181] in, Indicates the deviation value of the center axis. Indicates the coordinates corresponding to the axis division points in the application. Represents the coordinates of the fitted central axis division points corresponding to the axis division points in the application;
[0182] The central axis deviation angle is calculated based on the extracted central axis division points in the application and the fitted central axis division points corresponding to the central axis division points in the application. The calculation formula is as follows:
[0183] ;
[0184] in, Indicates the deviation angle of the central axis, Represents the vector formed by the fitting central axis division point corresponding to the extracted application axis division point and the next fitting central axis division point, Represents the vector formed by the fitted central axis division point corresponding to the extracted central axis division point in the application and the next central axis division point in the application after the extracted central axis division point in the application, represents the dot product operation, Represents the modulus of a vector.
[0185] For example, the extracted fitting central axis division point is (1,1), the next fitting central axis division point is (1,2), and the next application axis division point of the application axis division point corresponding to the extracted fitting central axis division point is (1,3). The deviation value is 1, and the central axis deviation angle is calculated using the vector formed by (1,1) (1,2) and the vector formed by (1,1) (1,3).
[0186] S8. Send the one or more central axis deviation data to the initiator of the deviation correction instruction to realize intelligent deviation correction of the central axis of the tunnel.
[0187] For example, Xiao Zhao is responsible for the deviation correction of the central axis of a tunnel. Therefore, Xiao Zhao issues a deviation correction instruction in the target tunnel and confirms each 10cm central axis deviation data in the target tunnel through the deviation correction instruction. Xiao Zhao will guide or correct the tunnel excavation work based on each central axis deviation data.
[0188] The present invention is to solve the problem described in the background technology. The present invention receives a correction instruction and confirms a correction environment based on the correction instruction, wherein the correction environment includes: a target tunnel to be corrected and a tunnel feature collector. It can be seen that the embodiment of the present invention considers the use of a tunnel feature collector when considering correcting the central axis of the target tunnel, and presets the operation mode of the tunnel feature collector, and on the basis of the preset operation mode, it can be realized that the central axis of the tunnel can be extracted and corrected during tunnel excavation. On this basis, the present invention constructs a reference coordinate system, uses the tunnel feature collector, the reference coordinate system and the target tunnel to obtain an initial three-dimensional coordinate point set, and uses the initial three-dimensional coordinate point set to obtain an identification three-dimensional coordinate sequence set. It can be seen that the embodiment of the present invention converts the extraction of the central axis of the tunnel into fitting the central axis of the tunnel using multiple initial three-dimensional coordinate point sets, and when using the initial three-dimensional coordinate point set, it takes into account the problem that the target displacement point may have errors or inaccuracies due to accidental factors, and timely prompts are given to the correction environment, thereby improving the accuracy of extracting the central axis of the tunnel. Next, the present invention projects the extracted identification three-dimensional coordinate sequence to the YOZ plane to obtain a plane projection sequence, and obtains one or more fitting curves based on the plane projection sequence. It can be seen that the embodiment of the present invention projects the point coordinates in three dimensions into point coordinates in two dimensions, thereby improving the timeliness of the central axis fitting. Further, the present invention uses the one or more fitting curves to obtain one or more target fitting functions, uses one or more target fitting functions to obtain a target fitting graph, obtains a target fitting centroid based on the target fitting graph, summarizes the target fitting centroid to obtain a target fitting centroid set, obtains a fitting centroid sequence based on the target fitting centroid set, and uses the fitting centroid to obtain a fitting centroid sequence. The target fitting central axis is obtained from the central sequence, the central axis division value and the target application central axis are obtained, one or more application axis division points are obtained based on the central axis division value and the target application central axis, one or more fitting central axis division points are obtained based on the central axis division value and the target fitting central axis, and one or more application axis division points and one or more fitting central axis division points are used to calculate one or more central axis deviation data. It can be seen that the embodiment of the present invention fits the central axis of the target tunnel through multiple points that can represent the central axis, and uses the fitted fitting central axis and the target application axis to obtain one or more central axis deviation data, thereby improving the accuracy and timeliness of the central axis deviation correction. Therefore, the present invention can improve the accuracy and timeliness of the tunnel central axis deviation correction.
[0189] like Figure 2 The figure shows a functional module diagram of a system for intelligently correcting the central axis of a three-dimensional point cloud of a tunnel provided by an embodiment of the present invention.
[0190] The intelligent deviation correction system 100 for realizing the central axis of a tunnel three-dimensional point cloud according to the present invention can be installed in an electronic device. According to the functions realized, the intelligent deviation correction system 100 for realizing the central axis of a tunnel three-dimensional point cloud can include a deviation correction environment confirmation module 101, a curve fitting module 102, a central axis fitting module 103 and a central axis deviation correction module 104. The module according to the present invention can also be called a unit, which refers to a series of computer program segments that can be executed by a processor of an electronic device and can complete fixed functions, which are stored in the memory of the electronic device.
[0191] The correction environment confirmation module 101 is used to receive a correction instruction and confirm a correction environment based on the correction instruction, wherein the correction environment includes: a target tunnel to be corrected and a tunnel feature collector;
[0192] The curve fitting module 102 is used to construct a reference coordinate system, and obtain an initial three-dimensional coordinate point set using a tunnel feature collector, the reference coordinate system, and a target tunnel, wherein the reference coordinate system is composed of an XOY plane, an XOZ plane, and a YOZ plane, and obtain an identification three-dimensional coordinate sequence set using the initial three-dimensional coordinate point set, wherein the identification three-dimensional coordinate sequence set includes a plurality of identification three-dimensional coordinate sequences;
[0193] Extracting the identified three-dimensional coordinate sequences from the identified three-dimensional coordinate sequence set in sequence, and performing the following operations on the extracted identified three-dimensional coordinate sequences:
[0194] Projecting the extracted identification three-dimensional coordinate sequence onto a YOZ plane to obtain a plane projection sequence, and obtaining one or more fitting curves based on the plane projection sequence;
[0195] Using the one or more fitting curves to obtain one or more target fitting functions, and using the one or more target fitting functions to obtain a target fitting graph;
[0196] The central axis fitting module 103 is used to obtain a target fitting centroid based on the target fitting graph, summarize the target fitting centroids to obtain a target fitting centroid set, and obtain a fitting centroid sequence based on the target fitting centroid set;
[0197] Obtain the target fitting central axis by using the fitting centroid sequence, obtain the central axis division value and the target application axis, and obtain one or more application axis division points based on the central axis division value and the target application axis;
[0198] The central axis deviation correction module 104 is used to obtain one or more fitting central axis division points based on the central axis division value and the target fitting central axis, and calculate one or more central axis deviation data using one or more application axis division points and one or more fitting central axis division points, wherein the central axis deviation data includes a central axis deviation value and a central axis deviation angle, wherein one or more application axis division points and one or more central axis deviation data correspond to one or more fitting central axis division points in a one-to-one manner;
[0199] The one or more central axis deviation data are sent to the initiator of the correction instruction to realize intelligent correction of the central axis of the tunnel.
[0200] In detail, the modules in the intelligent deviation correction system 100 for realizing the central axis of the tunnel three-dimensional point cloud in the embodiment of the present invention are used in the same manner as described above. Figure 1 The same technical means as described in the method for realizing intelligent deviation correction of the central axis of the tunnel three-dimensional point cloud can produce the same technical effects, so I will not go into details here.
[0201] like Figure 3 , is a schematic diagram of the structure of an electronic device for implementing an intelligent deviation correction method for a central axis of a three-dimensional point cloud of a tunnel provided by an embodiment of the present invention.
[0202] The electronic device 1 may include a processor 10, a memory 11 and a bus 12, and may also include a computer program stored in the memory 11 and executable on the processor 10, such as a program for implementing an intelligent deviation correction method for a central axis of a three-dimensional point cloud of a tunnel.
[0203] Among them, the memory 11 includes at least one type of readable storage medium, and the readable storage medium includes flash memory, mobile hard disk, multimedia card, card-type memory (for example: SD or DX memory, etc.), magnetic memory, disk, optical disk, etc. In some embodiments, the memory 11 can be an internal storage unit of the electronic device 1, such as a mobile hard disk of the electronic device 1. In other embodiments, the memory 11 can also be an external storage device of the electronic device 1, such as a plug-in mobile hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (SecureDigital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device 1. Further, the memory 11 also includes an internal storage unit of the electronic device 1 and an external storage device. The memory 11 can not only be used to store application software and various types of data installed in the electronic device 1, such as the code of the program for realizing the intelligent deviation correction method of the central axis of the tunnel three-dimensional point cloud, but also can be used to temporarily store data that has been output or is to be output.
[0204] The processor 10 may be composed of an integrated circuit in some embodiments, for example, a single packaged integrated circuit, or a plurality of packaged integrated circuits with the same or different functions, including one or more central processing units (CPUs), microprocessors, digital processing chips, graphics processors, and combinations of various control chips, etc. The processor 10 is the control core (Control Unit) of the electronic device, and uses various interfaces and lines to connect various components of the entire electronic device, and executes or executes programs or modules stored in the memory 11 (for example, a program for realizing the intelligent deviation correction method of the central axis of a tunnel three-dimensional point cloud, etc.), and calls data stored in the memory 11, so as to execute various functions of the electronic device 1 and process data.
[0205] The bus 12 may be a peripheral component interconnect (PCI) bus or an extended industry standard architecture (EISA) bus, etc. The bus 12 may be divided into an address bus, a data bus, a control bus, etc. The bus 12 is configured to realize connection and communication between the memory 11 and at least one processor 10, etc.
[0206] Figure 3 Only an electronic device with components is shown, and those skilled in the art will understand that Figure 3 The structure shown does not constitute a limitation on the electronic device 1, and may include fewer or more components than shown in the figure, or combine certain components, or arrange the components differently.
[0207] For example, although not shown, the electronic device 1 may also include a power source (such as a battery) for supplying power to various components. Preferably, the power source may be logically connected to the at least one processor 10 through a power management device, so that the power management device can realize functions such as charging management, discharging management, and power consumption management. The power source may also include one or more DC or AC power sources, recharging devices, power failure detection circuits, power converters or inverters, power status indicators, and other arbitrary components. The electronic device 1 may also include a variety of sensors, Bluetooth modules, Wi-Fi modules, etc., which will not be repeated here.
[0208] Furthermore, the electronic device 1 may also include a network interface. Optionally, the network interface may include a wired interface and / or a wireless interface (such as a WI-FI interface, a Bluetooth interface, etc.), which is generally used to establish a communication connection between the electronic device 1 and other electronic devices.
[0209] Optionally, the electronic device 1 may further include a user interface, which may be a display, an input unit (such as a keyboard), or a standard wired interface or a wireless interface. Optionally, in some embodiments, the display may be an LED display, a liquid crystal display, a touch-sensitive liquid crystal display, and an OLED (Organic Light-Emitting Diode) touch device. The display may also be appropriately referred to as a display screen or a display unit, which is used to display information processed in the electronic device 1 and to display a visual user interface.
[0210] It should be understood that the embodiment is for illustration only and the scope of the patent application is not limited to this structure.
[0211] The program for realizing the intelligent deviation correction method for the central axis of the tunnel three-dimensional point cloud stored in the memory 11 of the electronic device 1 is a combination of multiple instructions. When running in the processor 10, it can realize:
[0212] receiving a deviation correction instruction, and confirming a deviation correction environment based on the deviation correction instruction, wherein the deviation correction environment includes: a target tunnel to be corrected and a tunnel feature collector;
[0213] A reference coordinate system is constructed, and an initial three-dimensional coordinate point set is obtained by using a tunnel feature collector, the reference coordinate system, and a target tunnel, wherein the reference coordinate system is composed of an XOY plane, an XOZ plane, and a YOZ plane, and an identification three-dimensional coordinate sequence set is obtained by using the initial three-dimensional coordinate point set, wherein the identification three-dimensional coordinate sequence set includes a plurality of identification three-dimensional coordinate sequences;
[0214] Extracting the identified three-dimensional coordinate sequences from the identified three-dimensional coordinate sequence set in sequence, and performing the following operations on the extracted identified three-dimensional coordinate sequences:
[0215] Projecting the extracted identification three-dimensional coordinate sequence onto a YOZ plane to obtain a plane projection sequence, and obtaining one or more fitting curves based on the plane projection sequence;
[0216] Using the one or more fitting curves to obtain one or more target fitting functions, and using the one or more target fitting functions to obtain a target fitting graph;
[0217] Acquire a target fitting centroid based on the target fitting graph, summarize the target fitting centroids to obtain a target fitting centroid set, and acquire a fitting centroid sequence based on the target fitting centroid set;
[0218] Obtain the target fitting central axis by using the fitting centroid sequence, obtain the central axis division value and the target application axis, and obtain one or more application axis division points based on the central axis division value and the target application axis;
[0219] Based on the central axis division value and the target fitting central axis, one or more fitting central axis division points are obtained, and one or more central axis deviation data are calculated using one or more application axis division points and one or more fitting central axis division points, wherein the central axis deviation data includes a central axis deviation value and a central axis deviation angle, wherein one or more application axis division points and one or more central axis deviation data correspond to one or more fitting central axis division points in a one-to-one manner;
[0220] The one or more central axis deviation data are sent to the initiator of the correction instruction to realize intelligent correction of the central axis of the tunnel.
[0221] Specifically, the specific implementation method of the processor 10 for the above instructions can refer to Figures 1 to 3 The description of the relevant steps in the corresponding embodiments will not be repeated here.
[0222] Furthermore, if the module / unit integrated in the electronic device 1 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. The computer-readable storage medium can be volatile or non-volatile. For example, the computer-readable medium can include: any entity or device capable of carrying the computer program code, a recording medium, a USB flash drive, a mobile hard disk, a magnetic disk, an optical disk, a computer memory, and a read-only memory (ROM).
[0223] The present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor of an electronic device, the computer program can implement:
[0224] receiving a deviation correction instruction, and confirming a deviation correction environment based on the deviation correction instruction, wherein the deviation correction environment includes: a target tunnel to be corrected and a tunnel feature collector;
[0225] A reference coordinate system is constructed, and an initial three-dimensional coordinate point set is obtained by using a tunnel feature collector, the reference coordinate system, and a target tunnel, wherein the reference coordinate system is composed of an XOY plane, an XOZ plane, and a YOZ plane, and an identification three-dimensional coordinate sequence set is obtained by using the initial three-dimensional coordinate point set, wherein the identification three-dimensional coordinate sequence set includes a plurality of identification three-dimensional coordinate sequences;
[0226] Extracting the identified three-dimensional coordinate sequences from the identified three-dimensional coordinate sequence set in sequence, and performing the following operations on the extracted identified three-dimensional coordinate sequences:
[0227] Projecting the extracted identification three-dimensional coordinate sequence onto a YOZ plane to obtain a plane projection sequence, and obtaining one or more fitting curves based on the plane projection sequence;
[0228] Using the one or more fitting curves to obtain one or more target fitting functions, and using the one or more target fitting functions to obtain a target fitting graph;
[0229] Acquire a target fitting centroid based on the target fitting graph, summarize the target fitting centroids to obtain a target fitting centroid set, and acquire a fitting centroid sequence based on the target fitting centroid set;
[0230] Obtain the target fitting central axis by using the fitting centroid sequence, obtain the central axis division value and the target application axis, and obtain one or more application axis division points based on the central axis division value and the target application axis;
[0231] Based on the central axis division value and the target fitting central axis, one or more fitting central axis division points are obtained, and one or more central axis deviation data are calculated using one or more application axis division points and one or more fitting central axis division points, wherein the central axis deviation data includes a central axis deviation value and a central axis deviation angle, wherein one or more application axis division points and one or more central axis deviation data correspond to one or more fitting central axis division points in a one-to-one manner;
[0232] The one or more central axis deviation data are sent to the initiator of the correction instruction to realize intelligent correction of the central axis of the tunnel.
[0233] In the several embodiments provided by the present invention, it should be understood that the disclosed devices, systems and methods can be implemented in other ways. For example, the system embodiments described above are only illustrative, and actual implementation may have other division methods.
[0234] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0235] In addition, each functional module in each embodiment of the present invention may be integrated into one processing unit, each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of hardware plus software functional modules.
[0236] It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention.
[0237] In addition, it is clear that the word "comprising" does not exclude other units or steps, and the singular does not exclude the plural. Multiple units or devices stated in the system claim can also be implemented by one unit or device through software or hardware. The second and other words are used to indicate names, but not to indicate any particular order.
[0238] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.
Claims
1. A method for realizing intelligent deviation correction of the central axis of a tunnel three-dimensional point cloud, characterized in that: The method comprises: receiving a deviation correction instruction, and confirming a deviation correction environment based on the deviation correction instruction, wherein the deviation correction environment includes: a target tunnel to be corrected and a tunnel feature collector; A reference coordinate system is constructed, and an initial three-dimensional coordinate point set is obtained by using a tunnel feature collector, the reference coordinate system, and a target tunnel, wherein the reference coordinate system is composed of an XOY plane, an XOZ plane, and a YOZ plane, and an identification three-dimensional coordinate sequence set is obtained by using the initial three-dimensional coordinate point set, wherein the identification three-dimensional coordinate sequence set includes a plurality of identification three-dimensional coordinate sequences; Extracting the identified three-dimensional coordinate sequences from the identified three-dimensional coordinate sequence set in sequence, and performing the following operations on the extracted identified three-dimensional coordinate sequences: Projecting the extracted identification three-dimensional coordinate sequence onto a YOZ plane to obtain a plane projection sequence, and obtaining one or more fitting curves based on the plane projection sequence; The step of acquiring one or more fitting curves based on the plane projection sequence comprises: The first sequence points are sequentially extracted from the plane projection sequence, and the following operations are performed on the extracted first sequence points: Acquire a second sequence point based on the first sequence point, wherein the second sequence point is the next first sequence point adjacent to the first sequence point; Using the first sequence point and the second sequence point to obtain a first-second sequence slope, taking the second sequence point as the first sequence point and returning to the step of obtaining the second sequence point based on the first sequence point, until all the identified three-dimensional coordinate points in the plane projection sequence are passed through, if the extracted first sequence point is the last first sequence point, taking the first first sequence point as the second sequence point; The obtained one-two sequence slopes are sorted according to the order of time of obtaining the one-two sequence slopes to obtain the one-two sequence slope sequence; Extract initial one-two sequence slopes from the one-two sequence slope sequence in sequence, and perform the following operations on the extracted initial one-two sequence slopes: The target one-two sequence slope is obtained based on the extracted initial one-two sequence slope, wherein the target one-two sequence slope is the initial one-two sequence slope that is adjacent to the initial one-two sequence slope and is located after the initial one-two sequence slope. If the initial one-two sequence slope is the last one-two sequence slope, the target one-two sequence slope obtained using the initial one-two sequence slope is the first one-two sequence slope in the one-two sequence slope sequence. Calculate the absolute difference between the initial one-two sequence slope and the target one-two sequence slope to obtain the reference absolute difference; Obtain one or more fitting curves using reference absolute differences; The method of obtaining a first-sequence slope and a second-sequence slope by using the first-sequence point and the second-sequence point includes: The slope of a bi-sequence is calculated using the pre-built slope evaluation relationship, the first sequence point, and the second sequence point. The slope evaluation relationship is as follows: ; ; ; in, Indicates the coordinate point corresponding to the first sequence point, Indicates the coordinate point corresponding to the second sequence point, represents the slope of a bi-sequence, All are preset coefficients; The step of obtaining one or more fitting curves by using the reference absolute difference comprises: Comparing the reference absolute difference with a preset difference threshold, if the reference absolute difference is greater than the difference threshold, obtaining a first target mean and a second target mean based on the reference absolute difference and identifying a target abnormal point; Obtain a target absolute difference according to the first target mean and the second target mean. If the target absolute difference is less than a preset mean threshold, remove the target outlier. The target absolute difference is the absolute difference between the first target mean and the second target mean. Otherwise, keep the target outlier point; Using the retained target abnormal points and target sequence points to obtain one or more fitting curves; Using the one or more fitting curves to obtain one or more target fitting functions, and using the one or more target fitting functions to obtain a target fitting graph; Acquire a target fitting centroid based on the target fitting graph, summarize the target fitting centroids to obtain a target fitting centroid set, and acquire a fitting centroid sequence based on the target fitting centroid set; Obtain the target fitting central axis by using the fitting centroid sequence, obtain the central axis division value and the target application axis, and obtain one or more application axis division points based on the central axis division value and the target application axis; The method of obtaining the target fitting central axis by using the fitting centroid sequence includes: A fitting function set is obtained, wherein the fitting function set includes a plurality of fitting functions, fitting functions are sequentially extracted from the fitting function set, and the following operations are performed on the extracted fitting functions: A fitting curve is obtained based on the extracted fitting function, wherein the abscissa of the fitting curve is: the length of the step distance; The comprehensive evaluation value is calculated using the pre-built comprehensive evaluation relationship, fitting curve and fitting centroid sequence, where the comprehensive evaluation relationship is as follows: ; in, Represents the comprehensive evaluation value, Indicates that there are a total of The target fitting centroid, express The first target fitting centroid The Y coordinate value of the target fitting centroid in the reference coordinate system, Indicates that the fitting curve is The step distance corresponding to the fitting centroid of the target, the value of the Y coordinate in the reference coordinate system, express The first target fitting centroid The Z coordinate value of the target fitting centroid in the reference coordinate system, Indicates that the fitting curve is The step distance corresponding to the fitting centroid of each target is the value of the Z coordinate in the reference coordinate system; Summarizing the comprehensive evaluation values to obtain a comprehensive evaluation value set, and obtaining a target fitting central axis based on the comprehensive evaluation value set, wherein the target fitting central axis is a fitting curve corresponding to the minimum comprehensive evaluation value in the comprehensive evaluation value set; Based on the central axis division value and the target fitting central axis, one or more fitting central axis division points are obtained, and one or more central axis deviation data are calculated using one or more application axis division points and one or more fitting central axis division points, wherein the central axis deviation data includes a central axis deviation value and a central axis deviation angle, wherein one or more application axis division points and one or more central axis deviation data correspond to one or more fitting central axis division points in a one-to-one manner; The method of calculating one or more central axis deviation data using one or more application axis division points and one or more fitting central axis division points includes: Extract application axis division points from the one or more application axis division points in sequence, and perform the following operations on the extracted application axis division points: The central axis deviation value is calculated based on the extracted application axis division points and the fitted central axis division points corresponding to the application axis division points. The calculation formula is as follows: ; in, Indicates the deviation value of the center axis. Indicates the coordinates corresponding to the axis division points in the application. Represents the coordinates of the fitted central axis division points corresponding to the axis division points in the application; The central axis deviation angle is calculated based on the extracted central axis division points in the application and the fitted central axis division points corresponding to the central axis division points in the application. The calculation formula is as follows: ; in, Indicates the deviation angle of the central axis, Represents the vector formed by the axis division point in the extracted application and the axis division point in the next application, Represents the vector formed by the extracted application axis division points and the fitted central axis division points, represents the dot product operation, Represents vector modulus The one or more central axis deviation data are sent to the initiator of the correction instruction to realize intelligent correction of the central axis of the tunnel.
2. The method for realizing intelligent deviation correction of the central axis of a tunnel three-dimensional point cloud according to claim 1, characterized in that: The method of obtaining an initial three-dimensional coordinate point set by using a tunnel feature collector, a reference coordinate system and a target tunnel includes: An initial displacement set is obtained by using a tunnel feature collector and a target tunnel, wherein a stepping distance, a single acquisition angle, and an average angle acquisition number of the tunnel feature collector are preset, and the initial displacement set includes a plurality of initial displacement values; Obtaining an initial displacement variance using the initial displacement set, and comparing the initial displacement variance with a preset variance threshold; If the initial displacement variance is greater than the variance threshold, the initial displacement set is discarded, and a repeated test and the number of repeated tests of the repeated test are confirmed, wherein the repeated test refers to: returning to the step of obtaining the initial displacement set using the tunnel feature collector and the target tunnel; If the initial displacement variance obtained by repeated tests is greater than the variance threshold within the number of repeated tests, it is indicated that the correction environment is abnormal; If the initial displacement variance is less than or equal to the variance threshold, retaining the initial displacement set; Obtaining a target displacement using the retained initial displacement set and a pre-constructed target displacement relationship, and obtaining an initial three-dimensional coordinate point based on the target displacement and a reference coordinate system; The initial three-dimensional coordinate points are collected to obtain an initial three-dimensional coordinate point set.
3. The method for realizing intelligent deviation correction of the central axis of a tunnel three-dimensional point cloud as claimed in claim 2, characterized in that: The target displacement relationship is as follows: ; in, represents the target displacement, represents the initial displacement concentration The initial displacement value, Indicates the preset coefficients, Indicates the number of average angle acquisitions.
4. The method for realizing intelligent deviation correction of the central axis of a tunnel three-dimensional point cloud as claimed in claim 3, characterized in that: The method of obtaining the identification three-dimensional coordinate sequence set by using the initial three-dimensional coordinate point set includes: Initial three-dimensional coordinate points are sequentially extracted from the initial three-dimensional coordinate point set, and the following operations are performed on the extracted initial three-dimensional coordinate points: Performing a marking operation on the extracted initial three-dimensional coordinate point based on the stepping distance and the single acquisition angle to obtain a marked three-dimensional coordinate point; Summarizing the identified three-dimensional coordinate points to obtain an identified three-dimensional coordinate point set; Based on the stepping distances corresponding to the identified three-dimensional coordinate points in the identified three-dimensional coordinate point set, the identified three-dimensional coordinate points are respectively summarized to obtain one or more stepping coordinate point sets; Extracting step coordinate point sets in sequence from the one or more step coordinate point sets, and performing the following operations on the extracted step coordinate point sets: According to the order of single acquisition angles from small to large, a sorting operation is performed on the identification three-dimensional coordinate points in the extracted stepping coordinate point set to obtain an identification three-dimensional coordinate sequence; The identified three-dimensional coordinate sequences are summarized to obtain an identified three-dimensional coordinate sequence set.
5. A system for realizing intelligent deviation correction of the central axis of a tunnel three-dimensional point cloud, characterized in that: The system comprises: A correction environment confirmation module, used for receiving a correction instruction and confirming a correction environment based on the correction instruction, wherein the correction environment includes: a target tunnel to be corrected and a tunnel feature collector; A curve fitting module is used to construct a reference coordinate system, and obtain an initial three-dimensional coordinate point set using a tunnel feature collector, the reference coordinate system, and a target tunnel, wherein the reference coordinate system is composed of an XOY plane, an XOZ plane, and a YOZ plane, and obtain an identification three-dimensional coordinate sequence set using the initial three-dimensional coordinate point set, wherein the identification three-dimensional coordinate sequence set includes a plurality of identification three-dimensional coordinate sequences; Extracting the identified three-dimensional coordinate sequences from the identified three-dimensional coordinate sequence set in sequence, and performing the following operations on the extracted identified three-dimensional coordinate sequences: Projecting the extracted identification three-dimensional coordinate sequence onto a YOZ plane to obtain a plane projection sequence, and obtaining one or more fitting curves based on the plane projection sequence; The step of acquiring one or more fitting curves based on the plane projection sequence comprises: The first sequence points are sequentially extracted from the plane projection sequence, and the following operations are performed on the extracted first sequence points: Acquire a second sequence point based on the first sequence point, wherein the second sequence point is the next first sequence point adjacent to the first sequence point; Using the first sequence point and the second sequence point to obtain a first-second sequence slope, taking the second sequence point as the first sequence point and returning to the step of obtaining the second sequence point based on the first sequence point, until all the identified three-dimensional coordinate points in the plane projection sequence are passed through, if the extracted first sequence point is the last first sequence point, taking the first first sequence point as the second sequence point; The obtained one-two sequence slopes are sorted according to the order of time of obtaining the one-two sequence slopes to obtain the one-two sequence slope sequence; Extract initial one-two sequence slopes from the one-two sequence slope sequence in sequence, and perform the following operations on the extracted initial one-two sequence slopes: The target one-two sequence slope is obtained based on the extracted initial one-two sequence slope, wherein the target one-two sequence slope is the initial one-two sequence slope that is adjacent to the initial one-two sequence slope and is located after the initial one-two sequence slope. If the initial one-two sequence slope is the last one-two sequence slope, the target one-two sequence slope obtained using the initial one-two sequence slope is the first one-two sequence slope in the one-two sequence slope sequence. Calculate the absolute difference between the initial one-two sequence slope and the target one-two sequence slope to obtain the reference absolute difference; Obtain one or more fitting curves using reference absolute differences; The method of obtaining a first-sequence slope and a second-sequence slope by using the first-sequence point and the second-sequence point includes: The slope of a bi-sequence is calculated using the pre-built slope evaluation relationship, the first sequence point, and the second sequence point. The slope evaluation relationship is as follows: ; ; ; in, Indicates the coordinate point corresponding to the first sequence point, Indicates the coordinate point corresponding to the second sequence point, represents the slope of a bi-sequence, All are preset coefficients; The step of obtaining one or more fitting curves by using the reference absolute difference comprises: Comparing the reference absolute difference with a preset difference threshold, if the reference absolute difference is greater than the difference threshold, obtaining a first target mean and a second target mean based on the reference absolute difference and identifying a target abnormal point; Obtain a target absolute difference according to the first target mean and the second target mean. If the target absolute difference is less than a preset mean threshold, remove the target outlier. The target absolute difference is the absolute difference between the first target mean and the second target mean. Otherwise, keep the target outlier point; Using the retained target abnormal points and target sequence points to obtain one or more fitting curves; Using the one or more fitting curves to obtain one or more target fitting functions, and using the one or more target fitting functions to obtain a target fitting graph; A central axis fitting module, used for obtaining a target fitting centroid based on the target fitting graph, summarizing the target fitting centroids to obtain a target fitting centroid set, and obtaining a fitting centroid sequence based on the target fitting centroid set; Obtain the target fitting central axis by using the fitting centroid sequence, obtain the central axis division value and the target application axis, and obtain one or more application axis division points based on the central axis division value and the target application axis; The method of obtaining the target fitting central axis by using the fitting centroid sequence includes: A fitting function set is obtained, wherein the fitting function set includes a plurality of fitting functions, fitting functions are sequentially extracted from the fitting function set, and the following operations are performed on the extracted fitting functions: A fitting curve is obtained based on the extracted fitting function, wherein the abscissa of the fitting curve is: the length of the step distance; The comprehensive evaluation value is calculated using the pre-built comprehensive evaluation relationship, fitting curve and fitting centroid sequence, where the comprehensive evaluation relationship is as follows: ; in, Represents the comprehensive evaluation value, Indicates that there are a total of The target fitting centroid, express The first target fitting centroid The Y coordinate value of the target fitting centroid in the reference coordinate system, Indicates that the fitting curve is The step distance corresponding to the fitting centroid of the target, the value of the Y coordinate in the reference coordinate system, express The first target fitting centroid The Z coordinate value of the target fitting centroid in the reference coordinate system, Indicates that the fitting curve is The step distance corresponding to the fitting centroid of each target is the value of the Z coordinate in the reference coordinate system; Summarizing the comprehensive evaluation values to obtain a comprehensive evaluation value set, and obtaining a target fitting central axis based on the comprehensive evaluation value set, wherein the target fitting central axis is a fitting curve corresponding to the minimum comprehensive evaluation value in the comprehensive evaluation value set; A central axis deviation correction module is used to obtain one or more fitting central axis division points based on the central axis division value and the target fitting central axis, and calculate one or more central axis deviation data using one or more application axis division points and one or more fitting central axis division points, wherein the central axis deviation data includes a central axis deviation value and a central axis deviation angle, wherein one or more application axis division points and one or more central axis deviation data correspond to one or more fitting central axis division points in a one-to-one manner; The method of calculating one or more central axis deviation data using one or more application axis division points and one or more fitting central axis division points includes: Extract application axis division points from the one or more application axis division points in sequence, and perform the following operations on the extracted application axis division points: The central axis deviation value is calculated based on the extracted application axis division points and the fitted central axis division points corresponding to the application axis division points. The calculation formula is as follows: ; in, Indicates the deviation value of the center axis. Indicates the coordinates corresponding to the axis division points in the application. Represents the coordinates of the fitted central axis division points corresponding to the axis division points in the application; The central axis deviation angle is calculated based on the extracted central axis division points in the application and the fitted central axis division points corresponding to the central axis division points in the application. The calculation formula is as follows: ; in, Indicates the deviation angle of the central axis, Represents the vector formed by the axis division point in the extracted application and the axis division point in the next application, Represents the vector formed by the extracted application axis division points and the fitted central axis division points, represents the dot product operation, Represents vector modulus The one or more central axis deviation data are sent to the initiator of the correction instruction to realize intelligent correction of the central axis of the tunnel.
Citation Information
Patent Citations
Electric automobile and wireless charging automatic aligning device and method thereof
CN108146256A
Method and device for correcting parking space contour, vehicle and storage medium
CN110488280A
