A seasonal water vapor measurement method, system, device and storage medium
By constructing a seasonally weighted average temperature prediction model and an improved gray prediction algorithm, and combining real-time data to calculate atmospheric precipitable water, the problem that the BP neural network fails to consider the timing and seasonality of meteorological parameters is solved, and the accuracy of rainfall forecast is improved. .
Patent Information
- Application Number
- CN202410972068.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-19
AI Technical Summary
The existing BP neural network fails to fully consider the timing and seasonality of meteorological parameters in rainfall forecasting, resulting in insufficient forecast accuracy.
By obtaining the multivariate time series parameters and real-time collection parameters over the years, a seasonal weighted average temperature prediction model is constructed, and an improved gray prediction algorithm is used to consider the timing and seasonality of the zenith wet delay, and the real-time weighted average temperature and zenith wet delay are calculated Precipitable water content of the atmosphere.
It improves the prediction accuracy of zenith wet delay and atmospheric precipitable water, and is suitable for prediction in different climate zones and different seasons.
Smart Images

Figure CN118501987B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of atmospheric measurement technology, and in particular to a seasonal water vapor measurement method, system, device and storage medium. Background Art
[0002] Water vapor in the atmosphere, that is, water vapor, can absorb a large amount of solar thermal radiation and long-wave radiation from the ground, causing the atmospheric temperature to rise and slowing down the escape of heat from the ground. The fluctuation of water vapor content is closely related to the formation of precipitation. By analyzing the changes in water vapor content in the atmosphere, weather forecasts can be achieved. At present, the combination of neural network technology and GNSS water vapor monitoring provides a new way for weather forecasting. However, research in this area mainly uses BP neural networks. Although it takes into account multivariate meteorological parameters, BP neural networks can only use meteorological parameters of a single epoch as input data for rainfall forecasting, and fail to fully consider the temporal and seasonal nature of meteorological parameters. Summary of the invention
[0003] The purpose of the present invention is to provide a seasonal water vapor measurement method, system, device and storage medium to solve the above problems. In order to achieve the above purpose, the technical solution adopted by the present invention is as follows:
[0004] In a first aspect, the present application provides a seasonal water vapor measurement method, comprising:
[0005] Acquire first information, second information, third information and fourth information; the first information includes multivariate time series parameters of each day over the years, the multivariate time series parameters include surface temperature and physical parameters of different pressure layers; the second information is the weighted average temperature of each day over the years; the third information includes multivariate time series parameters collected in real time; the fourth information is the zenith wet delay of each day over the years;
[0006] Constructing a prediction model, training the prediction model according to the first information and the second information, and obtaining a weighted average temperature prediction model;
[0007] Inputting the third information into the weighted average temperature prediction model to obtain the real-time weighted average temperature;
[0008] The fourth information is calculated according to the improved grey prediction algorithm to obtain the real-time zenith wet delay;
[0009] The atmospheric precipitable water is calculated based on the real-time weighted average temperature and the real-time zenith wet delay.
[0010] In a second aspect, the present application also provides a seasonal water vapor measurement system, comprising:
[0011] An acquisition unit is used to acquire first information, second information, third information and fourth information; the first information includes multivariate time series parameters of each day over the years, and the multivariate time series parameters include surface temperature and physical parameters of different pressure layers; the second information is the weighted average temperature of each day over the years; the third information includes multivariate time series parameters collected in real time; the fourth information is the zenith wet delay of each day over the years;
[0012] A modeling unit, used for constructing a prediction model, training the prediction model according to the first information and the second information, and obtaining a weighted average temperature prediction model;
[0013] An input unit, used for inputting the third information into the weighted average temperature prediction model to obtain a real-time weighted average temperature;
[0014] A first calculation unit is used to calculate the fourth information according to an improved grey prediction algorithm to obtain a real-time zenith wet delay;
[0015] The second calculation unit is used to calculate according to the real-time weighted average temperature and the real-time zenith wet delay to obtain the atmospheric precipitable water.
[0016] In a third aspect, the present application also provides a seasonal water vapor measurement device, comprising:
[0017] Memory for storing computer programs;
[0018] A processor is used to implement the steps of the seasonal water vapor measurement method when executing the computer program.
[0019] In a fourth aspect, the present application further provides a storage medium, including: the storage medium is a readable storage medium, and a computer program is stored on the readable storage medium, and when the computer program is executed by a processor, the steps of the seasonal water vapor measurement method are implemented.
[0020] The beneficial effects of the present invention are:
[0021] The present invention, by establishing a weighted average temperature prediction model for different seasons, can not only automatically identify the synergistic mechanism of multivariate time series parameters and weighted average temperature, but is also applicable to different climate zones, and the prediction accuracy of seasonal modeling is higher than that of annual modeling. The present invention introduces seasonal factors through an improved grey prediction algorithm, takes into account the temporal and seasonal nature of zenith wet delay, effectively predicts the overall trend of zenith wet delay, and improves the prediction accuracy of zenith wet delay.
[0022] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or be understood by implementing the embodiments of the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0024] Figure 1 It is a schematic diagram of the flow chart of the seasonal water vapor measurement method of the present invention.
[0025] Figure 2 It is a schematic diagram of the structure of the prediction model of the present invention;
[0026] Figure 3 It is a structural schematic diagram of the seasonal water vapor measurement system of the present invention;
[0027] Figure 4 It is a schematic diagram of the structure of the seasonal water vapor measurement device of the present invention.
[0028] Markings in the figure:
[0029] 700, water vapor measurement system; 710, acquisition unit; 720, modeling unit; 730, input unit; 740, first calculation unit; 750, second calculation unit; 800, water vapor measurement device; 801, processor; 802, memory; 803, instruction input port; 804, I / O interface; 805, communication component. DETAILED DESCRIPTION
[0030] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings herein can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0031] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0032] Embodiment 1:
[0033] like Figure 1 As shown, this embodiment provides a seasonal water vapor measurement method, including step S1, step S2, step S3, step S4 and step S5.
[0034] S1. Obtain first information, second information, third information and fourth information; the first information includes multivariate time series parameters for each day over the years, and the multivariate time series parameters include surface temperature and physical parameters of different pressure layers; the second information is the weighted average temperature for each day over the years; the third information includes multivariate time series parameters collected in real time; the fourth information is the zenith wet delay for each day over the years.
[0035] The physical parameters of the different air pressure layers include water vapor pressure, temperature and height of the different air pressure layers. In this embodiment, the first information and the second information are obtained through ERA5. The third information and the fourth information are obtained through the CORS station of the location to be measured.
[0036] S2. Construct a prediction model, train the prediction model according to the first information and the second information, and obtain a weighted average temperature prediction model.
[0037] Step S2 specifically includes:
[0038] S21, preprocessing the first information and the second information to obtain four training sets and four test sets;
[0039] S22, establishing four prediction models, and setting different season labels for the four prediction models;
[0040] S23, inputting the four training sets into the prediction models of the corresponding seasons for training, and obtaining preliminary models of different seasons;
[0041] S24. Input the four test sets into the prediction models of the corresponding seasons for testing respectively, optimize the preliminary training model according to the test results, and obtain the weighted average temperature prediction models of different seasons.
[0042] This embodiment uses the Adam algorithm to optimize parameters such as weights and thresholds in the prediction model. Compared with the common gradient descent algorithm, Adam is more efficient in updating the prediction model parameters.
[0043] Set the loss function of the prediction model to:
[0044] ;
[0045] In the formula, represents the loss value, represents the number of samples, Indicates The expected value of a sample, Represents the output of the prediction model; Represents the Sigmoid activation function.
[0046] The weighted average temperature is a parameter that reflects the characteristics of atmospheric temperature distribution, obtained through weighted calculation using atmospheric temperature profile data on the path from the ground to the satellite signal. Seasonal changes will affect the atmospheric water vapor content, because changes in ground temperature and solar radiation in different seasons will cause changes in the evaporation and condensation process of water vapor, which in turn affects the distribution of water vapor in the atmosphere. In summer, due to the high temperature and strong evaporation, the water vapor content in the atmosphere is relatively high; in winter, on the contrary, the water vapor content is less, so it also affects the weighted average temperature in different seasons. It is not difficult to understand that the weighted average temperature has seasonality. The purpose of step S2 is to establish a weighted average temperature prediction model for different seasons so that the prediction model learns the data characteristics of the weighted average temperature in different seasons.
[0047] S3. Input the third information into a weighted average temperature prediction model to obtain a real-time weighted average temperature.
[0048] Step S3 specifically includes:
[0049] S31, determining the season to which the third information belongs;
[0050] S32. According to the season to which the third information belongs, the third information is input into a weighted average temperature prediction model of the corresponding season to obtain a real-time weighted average temperature.
[0051] S4. Calculate the fourth information according to the improved grey prediction algorithm to obtain the real-time zenith wet delay.
[0052] Step S4 specifically includes:
[0053] S41, adding the fourth information in units of years to obtain an annual data sequence;
[0054] ;
[0055] In the formula, represents an annual data series; , represents the sum of the zenith wet delays in the first year of the fourth information; , represents the sum of the zenith wet delays in the second year in the fourth information; , indicating that the fourth information The total annual zenith wet delay; Indicates the number of days in the past years Zenith wet delay; Indicates the length of the cycle, and this application takes the value 365; It represents the total number of zenith wet delays per day over the years; Indicates the number of cycles, that is, the number of years of the fourth information. For example, in this embodiment, the zenith wet delay of the location to be measured is collected every day from 2018 to 2023, then .
[0056] S42, performing fractional order accumulation on the annual data sequence according to the first preset formula to obtain a fractional order accumulation sequence;
[0057] The first preset formula is:
[0058] ;
[0059] ;
[0060] In the formula, express Order cumulative sequence; express Order accumulation operator; ; , indicating the Year; Indicates Zenith wet delay.
[0061] In this embodiment The value is 0.01.
[0062] S43, solving the parameter vector of the fractional order cumulative sequence according to the least square method;
[0063] The calculation formula is:
[0064] ;
[0065] in:
[0066] ;
[0067] ;
[0068] In the formula, represents the parameter vector, and Represents the values in the parameter vector matrix; ; Represents the matrix transpose symbol.
[0069] S44, substituting the parameter vector into the second preset formula to calculate and obtain a predicted sequence;
[0070] The second preset formula is:
[0071] ;
[0072] ;
[0073] In the formula, represents the prediction sequence, express of Power; .
[0074] S45, using the fractional order cumulative reduction operator to restore the forecast sequence to obtain the forecast value of the annual data sequence;
[0075] The calculation formula is:
[0076] ;
[0077] ;
[0078] In the formula, Represents the forecast value of the annual data series; express Order cumulative reduction operator; ; .
[0079] In this embodiment The value is 0.01.
[0080] S46, substituting the fourth information into the third preset formula to calculate and obtain the seasonal factor of the annual data series;
[0081] The third preset formula:
[0082] ;
[0083] In the formula, Indicates Season factor of the year; Indicated in At the same time point in the cycle The average value of all data; Indicates the average value of the fourth information.
[0084] S47, substituting the predicted value of the annual data series and the seasonal factor into the fourth preset formula to calculate and obtain the real-time zenith wet delay;
[0085] The fourth preset formula:
[0086] ;
[0087] In the formula, Indicates the real-time zenith wet delay; Indicates the forecast value of the annual data series Values; Indicates the forecast value of the annual data series Values; Indicates Season factor of the year; express commerce; express The remainder of represents the modulo operator; .
[0088] Step S4 introduces the seasonal factor, which not only takes into account the timing and seasonality of the zenith wet delay, but also predicts the changing trend of the zenith wet delay under the environment of global warming, thereby improving the prediction accuracy of the zenith wet delay.
[0089] S5. Calculate the atmospheric precipitable water based on the real-time weighted average temperature and the real-time zenith wet delay.
[0090] The calculation formula for atmospheric precipitable water is:
[0091] ;
[0092] in, It represents the atmospheric precipitable water in mm; is the density of liquid water, ; is the gas constant for water vapor, ; is the gas constant for dry air, ; Indicates the real-time weighted average temperature in units of ; Indicates the real-time zenith wet delay in mm; is a physical constant, and its value is ; is a physical constant, and its value is ; is a physical constant, and its value is .
[0093] In some specific embodiments, step S21 includes:
[0094] S211, deleting outliers from the first information;
[0095] S212, performing missing value filling on the first information after deleting the abnormal value to obtain optimized first information;
[0096] S213, performing standard deviation standardization on the optimized first information to obtain standardized first information;
[0097] S214, dividing the standardized first information according to seasons along the time axis to obtain input parameter sets of different seasons;
[0098] S215, randomly dividing each input parameter set into training input parameters and test input parameters in a ratio of 8:2;
[0099] S216: Use the training input parameters and the second information of the time corresponding to the training input parameters as a training set, and use the test input parameters and the second information of the time corresponding to the test input parameters as a test set, to obtain four training sets and four test sets respectively.
[0100] In some specific embodiments, step S22 further includes:
[0101] Modeling: Splice two LSTM networks with opposite directions to obtain a bidirectional LSTM network; connect the input layer of the bidirectional LSTM network to the output layer of the convolutional neural network through a connection layer; connect the output layer of the bidirectional LSTM network to a conversion layer, and set the ELU activation function in the conversion layer to obtain a prediction model. The structure of the prediction model is as follows: Figure 2 As shown in the figure, LSTM represents long short-term memory network, BiLSTM represents bidirectional long short-term memory network, and CNN represents convolutional neural network. The convolutional neural network uses ReLU activation function, the bidirectional long short-term memory network uses Sigmoid activation function, and the connection layer uses simple linear function for connection.
[0102] The purpose of step S22 is that the convolutional neural network converts the first information into a high-dimensional space feature vector for extracting the data features of the first information; the bidirectional long short-term memory network can simultaneously consider past and future information, better capture the temporal nature of the first information, and improve the accuracy of prediction, which is used to mine the data information of the first information; the connection layer plays a role in dimensionality reduction and transition; the conversion layer is used to integrate and output the prediction results.
[0103] The modeling steps were repeated three more times to obtain four prediction models.
[0104] Embodiment 2:
[0105] The difference between this embodiment and embodiment 1 is that the step of deleting outliers from the first information includes:
[0106] S2111, arranging the data of different categories in the first information in ascending order to obtain multiple arrangement sequences;
[0107] S2112, for each arrangement sequence, respectively: obtain data located at one quarter and three quarters of the arrangement sequence, and record them as the first value and the second value, respectively;
[0108] S2113, subtract the first value from the second value and multiply the result by a preset value to obtain a third value;
[0109] S2114, adding the second value to the third value to obtain an upper threshold value of the category data;
[0110] S2115, subtract the third value from the first value to obtain the lower limit of the threshold of the category data;
[0111] S2116. The data in the category that exceeds the upper threshold or the lower threshold is regarded as an outlier and deleted.
[0112] It should be noted that the preset value in this embodiment is 1.5. The beneficial effect of step S2111 to step S2116 is that the steps are based on statistical principles, are not affected by extreme outliers, can better reflect the middle 50% distribution of the data, and are also applicable to skewed data, with strong robustness. Outliers caused by equipment failure, extreme weather, and manual operation errors in the first information can be effectively excluded, providing more universal training data for the prediction model.
[0113] Embodiment 3:
[0114] The difference between this embodiment and embodiment 1 or embodiment 2 is that the first information after deleting the abnormal value is filled with missing values to obtain the optimized first information, including:
[0115] S2121, dividing the different categories of data in the first information according to seasons, obtaining data sets of different years and seasons for each category of data, and calculating the mean of each data set respectively;
[0116] S2122, obtaining the data set where the missing values are located;
[0117] S2123, splitting the data set containing the missing values into two subsets, one of which has no missing values and the other has missing values;
[0118] S2124. Calculate the mean of the subset without missing values;
[0119] S2125. Use the mean value as a filling value to fill in missing values of the first information to obtain optimized first information.
[0120] In this embodiment, the specific method of splitting the data set where the missing value is located into two subsets is: divide the data with an even date into one subset, and divide the data with an odd date into another subset. It should be noted that this embodiment is applicable to the case where there is only one missing value in a data set. However, when there are two or more cases in a data set, calculate the mean of the data in the subset without missing values, and randomly fill the missing value position in the subset with missing values with the mean; then calculate the mean of each of the two data before and after the filling position, and randomly fill the missing value position with the mean as another filling value; repeat the calculation of the mean of each of the two data before and after the filling position until all missing value positions are filled.
[0121] The purpose of steps S2121 to S2125 is to improve the integrity of the data, enhance the reliability and accuracy of data analysis, provide a more sufficient information source for subsequent prediction models, avoid deviations in analysis results due to missing data, and improve the prediction accuracy of the prediction model. Moreover, since the first information is time-series, filling in missing values can help maintain the internal consistency of the first information.
[0122] Embodiment 4:
[0123] like Figure 3 As shown, this embodiment provides a seasonal water vapor measurement system 700, including:
[0124] The acquisition unit 710 is used to acquire first information, second information, third information and fourth information; the first information includes multivariate time series parameters of each day over the years, and the multivariate time series parameters include surface temperature and physical parameters of different pressure layers; the second information is the weighted average temperature of each day over the years; the third information includes multivariate time series parameters collected in real time; the fourth information is the zenith wet delay of each day over the years;
[0125] A modeling unit 720 is used to construct a first prediction model, train the first prediction model according to the first information and the second information, and obtain a weighted average temperature prediction model;
[0126] An input unit 730, used to input the third information into the weighted average temperature prediction model to obtain a real-time weighted average temperature;
[0127] A first calculation unit 740 is used to calculate the fourth information according to an improved grey prediction algorithm to obtain a real-time zenith wet delay;
[0128] The second calculation unit 750 is used to calculate according to the real-time weighted average temperature and the real-time zenith wet delay to obtain the atmospheric precipitable water.
[0129] This embodiment is used to implement the steps of the seasonal water vapor measurement method. Existing studies have shown that weighted average temperature and zenith wet delay are key parameters for converting tropospheric wet delay into atmospheric precipitable water, which is crucial to GNSS meteorological research. This application can better capture the seasonal variation characteristics of weighted average temperature and zenith wet delay by predicting the weighted average temperature and zenith wet delay respectively, thereby improving the conversion accuracy. In addition, different atmospheric water vapor detection methods (such as microwave radiation detection, lidar detection, and satellite remote sensing, etc.) have different requirements for weighted average temperature and zenith wet delay. The prediction results of the weighted average temperature and zenith wet delay of this application can be applied to different atmospheric water vapor detection methods, expanding the scope of application of this application.
[0130] Embodiment 5:
[0131] Corresponding to the above method embodiment, this embodiment further provides a seasonal water vapor measurement device. The seasonal water vapor measurement device described below and the seasonal water vapor measurement method described above can refer to each other.
[0132] Figure 4 800 is a block diagram of a seasonal water vapor measurement device according to an exemplary embodiment. The water vapor measurement device 800 includes: a processor 801 and a memory 802. The water vapor measurement device may also include one or more of an instruction input port 803, an I / O interface 804, and a communication component 805.
[0133] The processor 801 is used to control the overall operation of the water vapor measurement device to complete all or part of the steps in the above-mentioned seasonal water vapor measurement method. The memory 802 is used to store various types of data to support the operation of the water vapor measurement device, and these data may include, for example, instructions for any application or method used to operate on the water vapor measurement device, and application-related data. The memory 802 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, referred to as SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, referred to as EEPROM), erasable programmable read-only memory (Erasable Programmable Read-Only Memory, referred to as EPROM), programmable read-only memory (Programmable Read-Only Memory, referred to as PROM), read-only memory (Read-Only Memory, referred to as ROM), magnetic memory, flash memory, disk or optical disk. The instruction input port 803 may include a screen and a keyboard. The screen may be, for example, a touch screen, and the keyboard is used to output and / or input program instructions. The received program instructions may be further stored in the memory 802 or sent through the communication component 805. The I / O interface 804 provides an interface between the processor 801 and other interface modules, and the above-mentioned other interface modules may be a mouse, a button, etc. These buttons may be virtual buttons or physical buttons. The communication component 805 is used for wired or wireless communication between the water vapor measurement device and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G or 4G, or a combination of one or more of them, so the corresponding communication component 805 may include: a Wi-Fi module, a Bluetooth module, an NFC module.
[0134] In an exemplary embodiment, the water vapor measurement device 800 may be implemented by one or more application specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), controllers, microcontrollers, microprocessors or other electronic components to perform the above-mentioned seasonal water vapor measurement method.
[0135] Embodiment 6:
[0136] Corresponding to the above method embodiment, this embodiment further provides a readable storage medium, and the readable storage medium described below and the seasonal water vapor measurement method described above can refer to each other.
[0137] A storage medium is a readable storage medium having a computer program stored thereon. When the computer program is executed by the processor 801, the steps of the seasonal water vapor measurement method of the above method embodiment are implemented.
[0138] The readable storage medium may specifically be a U disk, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, or other readable storage medium that can store program codes.
[0139] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
[0140] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A seasonal water vapor measurement method, characterized in that: include: Acquire first information, second information, third information and fourth information; the first information includes multivariate time series parameters of each day over the years, the multivariate time series parameters include surface temperature and physical parameters of different pressure layers; the second information is the weighted average temperature of each day over the years; the third information includes multivariate time series parameters collected in real time; the fourth information is the zenith wet delay of each day over the years; Constructing a prediction model, training the prediction model according to the first information and the second information, and obtaining a weighted average temperature prediction model; Inputting the third information into the weighted average temperature prediction model to obtain the real-time weighted average temperature; The fourth information is calculated according to the improved grey prediction algorithm to obtain the real-time zenith wet delay; The atmospheric precipitable water is calculated based on the real-time weighted average temperature and the real-time zenith wet delay; The weighted average temperature prediction model is a weighted average temperature prediction model for different seasons, including: Preprocessing the first information and the second information to obtain four training sets and four test sets; Establish four forecasting models and set different season labels for the four forecasting models; The four training sets are input into the prediction models of the corresponding seasons for training, and preliminary models of different seasons are obtained; The four test sets were input into the prediction models of the corresponding seasons for testing. The preliminary training model was optimized according to the test results to obtain the weighted average temperature prediction models of different seasons. The first information and the second information are preprocessed to obtain four training sets and four test sets, including: Deleting outliers from the first information; Filling missing values in the first information after deleting outliers to obtain optimized first information; Performing standard deviation standardization on the optimized first information to obtain standardized first information; Divide the standardized first information according to seasons along the time axis to obtain input parameter sets for different seasons; Each input parameter set is randomly divided into training input parameters and test input parameters in a ratio of 8:2; The training input parameters and the second information of the time corresponding to the training input parameters are used as a training set, and the test input parameters and the second information of the time corresponding to the test input parameters are used as a test set, so as to obtain four training sets and four test sets respectively.
2. The seasonal water vapor measurement method according to claim 1, characterized in that: Inputting the third information into the weighted average temperature prediction model to obtain the real-time weighted average temperature includes: Determine the season to which the third information belongs; According to the season to which the third information belongs, the third information is input into a weighted average temperature prediction model of the corresponding season to obtain a real-time weighted average temperature.
3. The seasonal water vapor measurement method according to claim 1, characterized in that: The fourth information is calculated according to the improved grey prediction algorithm to obtain the real-time zenith wet delay, including: Add the fourth information in units of years to obtain an annual data series; According to the first preset formula, the annual data series is subjected to fractional order accumulation to obtain a fractional order accumulation series; Solve the parameter vector of the fractional order cumulative sequence using the least squares method; Substitute the parameter vector into the second preset formula to calculate and obtain the predicted sequence; Use the fractional order cumulative reduction operator to restore the forecast sequence and obtain the forecast value of the annual data sequence; Substituting the fourth information into the third preset formula to calculate, the seasonal factor of the annual data series is obtained; Substitute the predicted value of the annual data series and the seasonal factor into the fourth preset formula to calculate and obtain the real-time zenith wet delay.
4. The seasonal water vapor measurement method according to claim 1, characterized in that: Four prediction models were built, including: Modeling: splicing two long short-term memory networks in opposite directions to obtain a bidirectional long short-term memory network; connecting the input layer of the bidirectional long short-term memory network to the output layer of the convolutional neural network through a connection layer; connecting the output layer of the bidirectional long short-term memory network to a conversion layer, setting the ELU activation function on the conversion layer, and obtaining a prediction model; The modeling steps were repeated three more times to obtain four prediction models.
5. The seasonal water vapor measurement method according to claim 1, characterized in that: The atmospheric precipitable water is calculated based on the real-time weighted average temperature and the real-time zenith wet delay, including: The calculation formula for atmospheric precipitable water is: Where PWV is the atmospheric precipitable water volume, in mm; ρ1 is the density of liquid water, 10 3 kg / m 3 ; R W The gas constant for water vapor is 461.5 J / kg·K; R d represents the gas constant of dry air, 287 J / kg·K; T m represents the real-time weighted average temperature in K; ZWD represents the real-time zenith wet delay in mm; k1 is a physical constant with a value of 77.604±0.014K / hPa; k2 is a physical constant with a value of 64.76±0.08K / hPa; k3 is a physical constant with a value of (3.776±0.014)×10 5 K / hPa.
6. A seasonal water vapor measurement device, characterized in that: include: Memory for storing computer programs; A processor, configured to implement the steps of the seasonal water vapor measurement method according to any one of claims 1 to 5 when executing the computer program.
7. A storage medium, characterized in that: include: The storage medium is a readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the steps of the seasonal water vapor measurement method according to any one of claims 1 to 5 are implemented.
Citation Information
Patent Citations
Construction method of air pollutant concentration seasonal prediction model
CN114741972A
Atmospheric precipitable water obtaining method, system and device and storage medium
CN115728842A
Water level prediction method based on AutoFormer multi-feature space-time fusion
CN116151411A
Heavy rainfall prediction method based on GNSS-PWV linear and nonlinear characteristics
CN117744353A
KR20220164198A