A high-efficiency, energy-saving and intelligently controllable transformer and operation and maintenance method

By introducing intelligent control technology and operation and maintenance methods into the transformer, and using sensors and AI algorithms for real-time data analysis and automatic adjustment, the problems of low efficiency and high energy consumption of traditional transformers have been solved, and high-efficiency energy saving and intelligent operation and maintenance have been achieved, improving ensure the stability and sustainable development of the power system.

CN118503727BActive Publication Date: 2024-10-11FOSHAN OULI ELECTRONICS
View PDF 13 Cites 0 Cited by

Patent Information

Application Number
CN202410950969.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-10-11
Estimated Expiration
2044-07-16

AI Technical Summary

Technical Problem

Traditional transformers rely on manual monitoring and manual adjustment, which are inefficient and consume a lot of energy, making it difficult to achieve intelligent and green energy transformation.

Method used

Design a high-efficiency, energy-saving and intelligently regulated transformer that collects data in real time through built-in sensors, uses big data analysis and AI algorithms for deep learning, and realizes automatic adjustment. It also combines wireless communication technology for remote monitoring and maintenance, and adopts specific operation and maintenance methods. Fault identification and control processing.

Benefits of technology

It achieves precise voltage and current control, reduces no-load losses, reduces reactive current, improves energy efficiency, saves energy, and improves operation and maintenance efficiency through remote monitoring and automatic regulation, reduces operation and maintenance costs, and promotes the intelligence of the power industry Operation and maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118503727B_ABST
    Figure CN118503727B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of transformer technology, and in particular to an efficient, energy-saving, intelligently controllable transformer and operation and maintenance method. The target real-time operation data is imported into a fault feature database for matching analysis; if the operation state of the target transformer within a preset time period is a fault state, a fault feature text regarded as a fault occurring in the target transformer within a preset time period is obtained, and the fault type information of the target transformer is obtained according to the fault feature text; if it is the preset fault type information, the target transformer is controlled to stop running, and a fault report is generated according to the fault feature text; if it is not the preset fault type information, an optimal control scheme is generated based on the fault feature text, and the target transformer is controlled according to the optimal control scheme; it can monitor and optimize the equipment operation state in real time, make scientific decisions, and thus promote the green transformation and sustainable development of the power industry.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of transformers, and in particular to a high-efficiency, energy-saving and intelligently controllable transformer and an operation and maintenance method thereof. Background Art

[0002] With the growth of global energy demand and the increasing pressure on environmental protection, the operational efficiency and sustainability of traditional power facilities have become the focus of attention. In this context, smart transformers with high efficiency, energy saving and intelligent regulation have emerged. This technology stems from the pursuit of intelligent power system and green energy transformation. It integrates advanced power electronics technology, Internet of Things, cloud computing, machine learning and other modern information technologies.

[0003] Traditional transformers often rely on manual monitoring and manual adjustment, which is inefficient and consumes a lot of energy. The new intelligent transformer introduces a real-time monitoring system, which collects operating data such as temperature, voltage, current, etc. in real time through built-in sensors, and automatically identifies and predicts load changes through deep learning through big data analysis and AI algorithms, thereby achieving precise voltage and current control. This intelligent control mechanism can effectively reduce no-load losses, reduce reactive current, improve energy efficiency, and save energy.

[0004] In addition, smart transformers can also be remotely monitored and maintained through wireless communication technology, which greatly improves operation and maintenance efficiency, reduces manual intervention, and reduces operation and maintenance costs. Therefore, developing an operation and maintenance method that can be used in conjunction with energy-efficient and intelligently controlled transformers can not only effectively improve the stability of the power system, but also has important significance for promoting the power industry to move towards intelligent operation and maintenance. Summary of the invention

[0005] The present invention overcomes the deficiencies of the prior art and provides an efficient, energy-saving, intelligently controllable transformer and an operation and maintenance method.

[0006] To achieve the above object, the present invention discloses an operation and maintenance method of a transformer with high efficiency, energy saving and intelligent control, comprising the following steps:

[0007] Obtain the fault feature text and fault feature data of each fault event occurring in the target transformer, and build a fault feature database according to the fault feature text and fault feature data of each fault event occurring in the target transformer;

[0008] Collecting real-time operating data of the target transformer within a preset time period, and performing data cleaning processing on the collected real-time operating data to obtain target real-time operating data;

[0009] Import the target real-time operation data into the fault feature database for matching analysis, and obtain the operation status of the target transformer within a preset time period;

[0010] If the operating state of the target transformer within the preset time period is a fault state, a fault feature text regarded as a fault occurring in the target transformer within the preset time period is obtained, and fault type information of the target transformer is obtained according to the fault feature text;

[0011] Determine whether the fault type information is preset fault type information; if it is preset fault type information, control the target transformer to stop running, generate a fault report according to the fault feature text, and send the fault report to the user terminal for display;

[0012] If it is not the preset fault type information, an optimal control scheme is generated based on the fault feature text, and the target transformer is controlled according to the optimal control scheme.

[0013] Furthermore, the fault feature text and fault feature data of each fault event occurring in the target transformer are obtained, and a fault feature database is constructed according to the fault feature text and fault feature data of each fault event occurring in the target transformer, specifically:

[0014] Obtain work log information of the target transformer, extract fault events of the target transformer according to the work log information, and obtain fault feature text of each fault event; wherein the fault feature text includes fault description, fault type, fault impact range, fault cause and fault device location;

[0015] Based on the fault feature text of each fault event, the similarity between the fault events is analyzed, and the fault events with similarity greater than a preset similarity threshold are grouped together to group the fault events with the same fault features together to obtain several fault event clusters;

[0016] Obtain the historical operating data of the target transformer during the time period of each fault event in each fault event cluster; import the historical operating data of the target transformer during the time period of each fault event in each fault event cluster into the feature pyramid network for feature extraction and analysis, and obtain the fault feature data corresponding to each fault event cluster; wherein the operating data includes voltage, current, temperature, load rate, oil level and oil temperature;

[0017] A database is constructed, and the fault database is divided into a plurality of subspaces, and the fault feature data and fault feature text corresponding to each fault event cluster are respectively stored in the corresponding subspace to obtain a fault feature database.

[0018] Furthermore, the collected real-time operation data is cleaned to obtain the target real-time operation data, specifically:

[0019] Based on the LDA algorithm, the collected real-time operation data is subjected to dimensionality reduction processing to map the collected real-time operation data into a low-dimensional space; the Euclidean distance between each real-time operation data in the low-dimensional space is calculated, and the two real-time operation data with the shortest Euclidean distance are merged to obtain a plurality of real-time operation data sets after one-time merger;

[0020] Acquire the real-time operation data in each real-time operation data set after the first merger, perform weighted average processing on the real-time operation data in each real-time operation data set after the first merger to obtain a corresponding weighted average value, obtain a position node of the corresponding weighted average value in the corresponding real-time operation data set after the first merger, and mark the position node as the data set center of the real-time operation data set after the first merger;

[0021] The Euclidean distance between each of the real-time running data sets after the first merger is calculated according to the corresponding data set centers, and the two real-time running data sets after the first merger with the shortest Euclidean distance are merged to obtain a plurality of real-time running data sets after the second merger, and the data set centers of each real-time running data set after the second merger are obtained;

[0022] Similarly, the real-time operation data collected are continuously merged and iterated to obtain a number of real-time operation data sets merged N times; the silhouette coefficient of each real-time operation data set merged N times is obtained until the silhouette coefficient of the real-time operation data set merged N times is greater than the preset coefficient threshold, then the iteration is stopped, and a number of final real-time operation data sets are output;

[0023] A real-time operation data is randomly extracted from each final real-time operation data set, and data features of the extracted real-time operation data are analyzed. If the data features of the extracted real-time operation data are abnormal, the corresponding final real-time operation data set is marked as a noise data set, and all real-time operation data in the final real-time operation data set marked as a noise data set are completely deleted;

[0024] The real-time operation data in the remaining final real-time operation data set is obtained to obtain the target real-time operation data.

[0025] Furthermore, the target real-time operation data is imported into the fault feature database for matching analysis, and the operation status of the target transformer within a preset time period is obtained by analysis, specifically:

[0026] Importing the target real-time operation data into the fault feature database, and respectively calculating the Spearman rank correlation coefficient between the target real-time operation data and the fault feature data in each subspace;

[0027] Comparing the Spearman rank correlation coefficient between the target real-time operation data and the fault feature data in each subspace with a preset threshold;

[0028] If the Spearman rank correlation coefficients between the target real-time operation data and the fault feature data in each subspace are not greater than the preset threshold, it means that the operation state of the target transformer within the preset time period is normal;

[0029] If the Spearman rank correlation coefficient between the target real-time operation data and the fault feature data in a certain subspace is greater than a preset threshold, it means that the operation state of the target transformer within the preset time period is a fault state;

[0030] If the operating state of the target transformer within the preset time period is a fault state, the corresponding fault feature text is extracted in the corresponding subspace, and the extracted fault feature text is regarded as the fault feature text of the fault occurring in the target transformer within the preset time period.

[0031] Furthermore, if the fault type information is not preset, an optimal control scheme is generated based on the fault feature text, and the target transformer is controlled according to the optimal control scheme, specifically:

[0032] Obtaining work log information of the target transformer, and obtaining various historical control schemes executed on the target transformer when a fault occurs according to the work log information;

[0033] And obtaining historical operation data, historical environmental characteristic data and historical work task information of the target transformer when executing various historical control schemes on the transformer according to the work log information;

[0034] Generate a historical relevance text based on the historical operation data, historical environmental characteristic data, and historical work task information to obtain a historical relevance text when various historical control schemes are executed on the transformer;

[0035] If it is not the preset fault type information, then the real-time operation data, real-time environmental characteristic data and real-time work task information of the target transformer are obtained, and a real-time relevance text is generated according to the real-time operation data, real-time environmental characteristic data and real-time work task information;

[0036] Calculating the text similarity between the real-time related text and each historical related text, and using the historical control schemes whose text similarity is greater than a preset text similarity threshold;

[0037] According to the work log information, the stability and effectiveness of the target transformer after the target transformer is regulated by the historical regulation scheme whose text similarity is greater than a preset text similarity threshold value;

[0038] The historical control scheme corresponding to the maximum values ​​of stability and effectiveness is output as the optimal control scheme, and the target transformer is controlled according to the optimal control scheme.

[0039] The following steps are also included:

[0040] If it is preset fault type information, the location information of the target transformer is obtained, and maintenance resources within a preset range are searched according to the location information of the target transformer to obtain a number of candidate maintenance personnel;

[0041] Obtain the specialty information of each candidate maintenance personnel, obtain the fault feature text of the target transformer, and analyze the attention score between the fault feature text and the specialty information of each candidate maintenance personnel based on the attention mechanism algorithm;

[0042] Obtain candidate maintenance personnel whose attention scores are greater than a preset score value, and obtain distance value information between the candidate maintenance personnel whose attention scores are greater than the preset score value and the target transformer, and sort the distance value information from small to large to obtain a sorting result;

[0043] A maintenance personnel recommendation sequence table is generated based on the ranking results, and the fault reports are sent to user terminals of corresponding candidate maintenance personnel in sequence according to the maintenance personnel recommendation sequence table for display.

[0044] The second aspect of the present invention discloses a high-efficiency, energy-saving and intelligently controllable transformer, and the operation and maintenance method of the high-efficiency, energy-saving and intelligently controllable transformer according to any one of the above items comprises:

[0045] Transformer body;

[0046] Intelligent control module, used to receive and process signals from the power grid and automatically adjust the operating parameters of the transformer according to the set algorithms and strategies;

[0047] Energy management system module, used to monitor and analyze transformer operation data in real time, predict load changes, and optimize operating modes;

[0048] Sensors and monitoring modules are installed inside or outside the transformer to detect the operating data of the transformer and ensure that the transformer operates within a safe range;

[0049] Variable frequency drive, used to adjust the output frequency of the transformer to suit different load requirements;

[0050] Fault diagnosis and early warning module, which detects and reports potential problems of transformers through built-in operation and maintenance diagnosis algorithms;

[0051] The remote communication module is used to communicate with the central control system or operation and maintenance personnel in real time to achieve remote monitoring and operation.

[0052] The present invention solves the technical defects existing in the background technology, and has the following beneficial effects: collecting the real-time operation data of the target transformer within a preset time period, and performing data cleaning processing on the collected real-time operation data to obtain the target real-time operation data; importing the target real-time operation data into the fault feature database for matching analysis, and analyzing to obtain the operation state of the target transformer within the preset time period; if the operation state of the target transformer within the preset time period is a fault state, obtaining the fault feature text regarded as the fault occurred in the target transformer within the preset time period, and obtaining the fault type information of the target transformer according to the fault feature text; judging whether the fault type information is the preset fault type information; if it is the preset fault type information, controlling the target transformer to stop running, and generating a fault report according to the fault feature text, and sending the fault report to the user terminal for display; if it is not the preset fault type information, generating the optimal control scheme based on the fault feature text, and controlling the target transformer according to the optimal control scheme. The system has remote monitoring and data analysis functions, can monitor and optimize the operation state of the equipment in real time, make scientific decisions, and thus promote the green transformation and sustainable development of the power industry. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, drawings of other embodiments can be obtained based on these drawings without paying creative work.

[0054] Figure 1 It is a flow chart of the overall method of an operation and maintenance method of an efficient, energy-saving and intelligently controllable transformer;

[0055] Figure 2 A partial method flow chart of an operation and maintenance method for an efficient, energy-saving and intelligently controllable transformer;

[0056] Figure 3 This is a structural diagram of a highly efficient, energy-saving, intelligently controllable transformer. DETAILED DESCRIPTION

[0057] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0058] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

[0059] like Figure 1 As shown, the present invention discloses an operation and maintenance method of a high-efficiency, energy-saving and intelligently controllable transformer, comprising the following steps:

[0060] S102: Acquire the fault feature text and fault feature data of each fault event occurring in the target transformer, and construct a fault feature database according to the fault feature text and fault feature data of each fault event occurring in the target transformer;

[0061] S104: collecting real-time operation data of the target transformer within a preset time period, and performing data cleaning processing on the collected real-time operation data to obtain target real-time operation data;

[0062] S106: Importing the target real-time operation data into the fault feature database for matching analysis, and analyzing to obtain the operation status of the target transformer within a preset time period;

[0063] S108: If the operating state of the target transformer within the preset time period is a fault state, a fault feature text regarded as a fault occurring in the target transformer within the preset time period is obtained, and fault type information of the target transformer is obtained according to the fault feature text;

[0064] S110: Determine whether the fault type information is preset fault type information; if it is preset fault type information, control the target transformer to stop running, generate a fault report according to the fault feature text, and send the fault report to the user terminal for display;

[0065] S112: If the fault type information is not preset, an optimal control scheme is generated based on the fault feature text, and the target transformer is controlled according to the optimal control scheme.

[0066] like Figure 2 As shown, further, the fault feature text and fault feature data of each fault event occurring in the target transformer are obtained, and a fault feature database is constructed according to the fault feature text and fault feature data of each fault event occurring in the target transformer, specifically:

[0067] S202: Obtain work log information of the target transformer, extract fault events of the target transformer according to the work log information, and obtain fault feature text of each fault event; wherein the fault feature text includes fault description, fault type, fault impact range, fault cause, and fault device location;

[0068] Transformer work log information refers to data records of all relevant activities and status of the transformer during daily operation and maintenance. This information reflects key data such as the transformer's operating status, maintenance history, fault events, performance indicators, etc. These logs usually include the transformer's start and stop times, load conditions, temperature monitoring records, oil level and oil quality inspection results, electrical parameter readings, detailed records of maintenance and repair activities, abnormal event or fault reports, and countermeasures taken, etc.;

[0069] S204: analyzing the similarity between the fault events based on the fault feature texts of the fault events, and categorizing the fault events whose similarity is greater than a preset similarity threshold, so as to classify the fault events with the same fault features together, and obtain a plurality of fault event clusters;

[0070] S206: Obtain historical operating data of the target transformer during the time period of each fault event in each fault event cluster; import the historical operating data of the target transformer during the time period of each fault event in each fault event cluster into the feature pyramid network for feature extraction and analysis, and obtain fault feature data corresponding to each fault event cluster; wherein the operating data includes voltage, current, temperature, load rate, oil level and oil temperature;

[0071] S208: construct a database, and divide the fault database into several subspaces, and store the fault feature data and fault feature text corresponding to each fault event cluster in the corresponding subspace to obtain a fault feature database.

[0072] It should be noted that the fault events are identified and fault features are extracted by analyzing the transformer work log. Similar fault events are classified to obtain fault events with the same characteristic attributes to simplify the subsequent identification process. Then, combined with the historical operation data of the transformer, the feature pyramid network is used for in-depth feature extraction analysis, and finally a fault feature database is constructed to support fault diagnosis and prevention. By constructing a fault feature database in advance, the efficiency of subsequent fault diagnosis and identification of the transformer can be effectively improved, the accuracy of fault detection can be improved, the maintenance process can be optimized, downtime can be reduced, and the reliability and safety of transformer operation can be enhanced.

[0073] Furthermore, the collected real-time operation data is cleaned to obtain the target real-time operation data, specifically:

[0074] Based on the LDA algorithm, the collected real-time operation data is subjected to dimensionality reduction processing to map the collected real-time operation data into a low-dimensional space; the Euclidean distance between each real-time operation data in the low-dimensional space is calculated, and the two real-time operation data with the shortest Euclidean distance are merged to obtain a plurality of real-time operation data sets after one-time merger;

[0075] Among them, the principle of dimensionality reduction processing of real-time running data based on the LDA (Linear Discriminant Analysis) algorithm is to project the original high-dimensional data into a low-dimensional space through mathematical transformation, while maintaining the separability of data between different categories. The LDA algorithm finds the best projection direction by maximizing the distance between categories and minimizing the distance within categories, that is, by optimizing a discriminant function. In the scenario of real-time running data, this means mapping the data from the original high-dimensional space to a low-dimensional space that can highlight the differences in data categories, thereby simplifying the data structure, reducing computational complexity, and facilitating subsequent tasks such as pattern recognition and anomaly detection;

[0076] Acquire the real-time operation data in each real-time operation data set after the first merger, perform weighted average processing on the real-time operation data in each real-time operation data set after the first merger to obtain a corresponding weighted average value, obtain a position node of the corresponding weighted average value in the corresponding real-time operation data set after the first merger, and mark the position node as the data set center of the real-time operation data set after the first merger;

[0077] The Euclidean distance between each of the real-time running data sets after the first merger is calculated according to the corresponding data set centers, and the two real-time running data sets after the first merger with the shortest Euclidean distance are merged to obtain a plurality of real-time running data sets after the second merger, and the data set centers of each real-time running data set after the second merger are obtained;

[0078] Similarly, the real-time operation data collected are continuously merged and iterated to obtain a number of real-time operation data sets merged N times; the silhouette coefficient of each real-time operation data set merged N times is obtained until the silhouette coefficient of the real-time operation data set merged N times is greater than the preset coefficient threshold, then the iteration is stopped, and a number of final real-time operation data sets are output;

[0079] A real-time operation data is randomly extracted from each final real-time operation data set, and data features of the extracted real-time operation data are analyzed. If the data features of the extracted real-time operation data are abnormal, the corresponding final real-time operation data set is marked as a noise data set, and all real-time operation data in the final real-time operation data set marked as a noise data set are completely deleted;

[0080] The real-time operation data in the remaining final real-time operation data set is obtained to obtain the target real-time operation data.

[0081] It should be noted that by mapping high-dimensional data to low-dimensional space, then merging data by calculating the Euclidean distance between data points, and iteratively merging until the contour coefficient meets the preset threshold, abnormal data is finally identified and deleted, thereby obtaining a high-quality target real-time operation data set. This method can effectively reduce the complexity of data, improve the efficiency and accuracy of data processing, and at the same time, by identifying and excluding noise data, enhance the reliability and accuracy of data, further improve the subsequent fault diagnosis results of the target transformer, and effectively avoid the occurrence of "misdiagnosis".

[0082] Furthermore, the target real-time operation data is imported into the fault feature database for matching analysis, and the operation status of the target transformer within a preset time period is obtained by analysis, specifically:

[0083] Importing the target real-time operation data into the fault feature database, and respectively calculating the Spearman rank correlation coefficient between the target real-time operation data and the fault feature data in each subspace;

[0084] Comparing the Spearman rank correlation coefficient between the target real-time operation data and the fault feature data in each subspace with a preset threshold;

[0085] If the Spearman rank correlation coefficients between the target real-time operation data and the fault feature data in each subspace are not greater than the preset threshold, it means that the operation state of the target transformer within the preset time period is normal;

[0086] If the Spearman rank correlation coefficient between the target real-time operation data and the fault feature data in a certain subspace is greater than a preset threshold, it means that the operation state of the target transformer within the preset time period is a fault state;

[0087] If the operating state of the target transformer within the preset time period is a fault state, the corresponding fault feature text is extracted in the corresponding subspace, and the extracted fault feature text is regarded as the fault feature text of the fault occurring in the target transformer within the preset time period.

[0088] It should be noted that the real-time operation data is compared with the subspace data in the fault feature database, and the correlation coefficient is calculated and compared with the preset threshold to determine whether the transformer is in a normal or faulty state. If a fault is detected, the system will automatically extract the fault feature text to provide a basis for fault analysis and diagnosis. This method can automatically monitor the operating status of the transformer in real time, detect potential problems in a timely manner, and diagnose the fault status quickly and accurately. The automated fault feature extraction reduces the need for manual analysis, improves efficiency, provides a scientific basis for fault handling, and improves the accuracy of decision-making.

[0089] Furthermore, if the fault type information is not preset, an optimal control scheme is generated based on the fault feature text, and the target transformer is controlled according to the optimal control scheme, specifically:

[0090] Obtaining work log information of the target transformer, and obtaining various historical control schemes executed on the target transformer when a fault occurs according to the work log information;

[0091] Transformer work log information refers to various detailed records collected during the operation and maintenance of the transformer, including but not limited to equipment start and stop times, operating parameters, load data, temperature monitoring, oil level and oil quality inspection results, fault alarm records, maintenance operation records, and detailed descriptions of any abnormal conditions. The purpose of this information is to systematically track the health of the transformer, evaluate its performance, predict potential problems, optimize maintenance plans, and ensure the safe operation of the equipment;

[0092] And obtaining historical operation data, historical environmental characteristic data and historical work task information of the target transformer when executing various historical control schemes on the transformer according to the work log information;

[0093] Generate a historical relevance text based on the historical operation data, historical environmental characteristic data, and historical work task information to obtain a historical relevance text when various historical control schemes are executed on the transformer;

[0094] If it is not the preset fault type information, then the real-time operation data, real-time environmental characteristic data and real-time work task information of the target transformer are obtained, and a real-time relevance text is generated according to the real-time operation data, real-time environmental characteristic data and real-time work task information;

[0095] Calculating the text similarity between the real-time related text and each historical related text, and using the historical control schemes whose text similarity is greater than a preset text similarity threshold;

[0096] According to the work log information, the stability and effectiveness of the target transformer after the target transformer is regulated by the historical regulation scheme whose text similarity is greater than a preset text similarity threshold value;

[0097] The historical control scheme corresponding to the maximum values ​​of stability and effectiveness is output as the optimal control scheme, and the target transformer is controlled according to the optimal control scheme.

[0098] Among them, the preset fault type information is a serious fault. A serious fault of a transformer usually refers to a fault that will cause significant damage to the equipment, may cause the equipment to stop operating, or even threaten the safety of the power grid. For example, a broken or short-circuited winding will cause excessive current and cause a fire; serious instability of the core magnetic circuit may cause power transmission interruption; damage to the insulating material or abnormal oil level may cause electrical breakdown; failure of the cooling system may cause the transformer to overheat and endanger the life of the equipment. In contrast, a minor fault (that is, the non-preset fault type information mentioned above) is usually manifested as a slight decrease in equipment performance or a minor abnormality in the operating status. It will not immediately cause shutdown, but if it is not promptly regulated and handled, it may gradually deteriorate into a serious fault. For example, the temperature is slightly higher than the normal range, the operating noise increases, the voltage or current fluctuates, the oil quality is slightly deteriorated, and the components are loose.

[0099] It should be noted that it is determined whether the fault type information of the target transformer is preset fault type information. If it is preset fault type information, the target transformer is controlled to stop running, and a fault report is generated according to the fault feature text, and the fault report is sent to the user terminal for display.

[0100] If the fault type information is not preset, historical control schemes, historical operation data, environmental characteristic data and work task information are collected and analyzed by analyzing the work log information of the transformer. Using these data, historical correlation text is generated to provide a reference for the control scheme when the fault occurs. When the transformer fails, real-time operation data, environmental characteristic data and work task information are obtained to generate real-time correlation text, which is compared with historical data. The text similarity is calculated to identify possible effective historical control schemes. Further, by evaluating the performance of these schemes in terms of stability and effectiveness, the optimal control scheme is selected to control the transformer. By using text similarity calculation, effective historical control schemes can be quickly identified to provide a basis for fault handling. By evaluating the stability and effectiveness of the control scheme, the optimal scheme is selected to improve the operating stability of the transformer. Through automated fault diagnosis and control processing, manual intervention is reduced, maintenance costs are reduced, preventive maintenance is achieved, potential faults are avoided, and the scientificity and rationality of decision-making are enhanced.

[0101] The following steps are also included:

[0102] If it is preset fault type information, the location information of the target transformer is obtained, and maintenance resources within a preset range are searched according to the location information of the target transformer to obtain a number of candidate maintenance personnel;

[0103] Obtain the specialty information of each candidate maintenance personnel, obtain the fault feature text of the target transformer, and analyze the attention score between the fault feature text and the specialty information of each candidate maintenance personnel based on the attention mechanism algorithm;

[0104] Obtain candidate maintenance personnel whose attention scores are greater than a preset score value, and obtain distance value information between the candidate maintenance personnel whose attention scores are greater than the preset score value and the target transformer, and sort the distance value information from small to large to obtain a sorting result;

[0105] A maintenance personnel recommendation sequence table is generated based on the ranking results, and the fault reports are sent to user terminals of corresponding candidate maintenance personnel in sequence according to the maintenance personnel recommendation sequence table for display.

[0106] It should be noted that first, candidate maintenance resources within the preset range are retrieved based on the location information of the transformer, and then the expertise information of these maintenance personnel is obtained. Using the attention mechanism algorithm, the system analyzes the correlation between the fault feature text and the maintenance personnel's expertise and calculates the attention score. The system screens out maintenance personnel whose scores exceed the preset threshold, and sorts them according to their distance from the target transformer to generate a maintenance personnel recommendation sequence table. Finally, the system sends the fault report to the terminal of the corresponding maintenance personnel in sequence according to this recommendation sequence table. By quickly locating the fault and recommending suitable maintenance personnel, the fault response time is shortened, and the system makes intelligent recommendations based on the maintenance personnel's expertise and geographical location. The system makes recommendations based on data analysis, making maintenance decisions more scientific and accurate, optimizing the allocation of maintenance resources, and improving the professionalism and success rate of maintenance work.

[0107] In addition, the method further comprises the following steps:

[0108] Obtain a real-time state image of a preset area in the target transformer, and for each pixel in the real-time state image, compare it with other pixels in a preset neighborhood. If the pixel is greater than or equal to a pixel in the preset neighborhood, the corresponding position is recorded as 0, otherwise it is recorded as 1; and obtain a comparison result;

[0109] Connect the comparison results to form a binary number to obtain the LBP code of the pixel; and so on to obtain the LBP codes of all pixels in the real-time state image;

[0110] Construct a blank matrix, fill the LBP codes of all pixels into the blank matrix to form a two-dimensional LBP feature matrix, and obtain the LBP feature matrix of the real-time state image; wherein the rows of the LBP feature matrix represent pixel rows, the columns represent pixel columns, and each element of the matrix is ​​the corresponding LBP code;

[0111] Obtain a standard state image of a preset area in the target transformer. Similarly, obtain an LBP feature matrix of the standard state image.

[0112] Subtracting the elements at the same matrix position in the LBP feature matrix of the real-time state image and the LBP feature matrix of the standard state image to obtain a number of element differences; constructing a difference matrix according to the number of element differences;

[0113] Analyzing the difference matrix to obtain the total number of zero elements and the total number of non-zero elements in the difference matrix; performing ratio processing on the total number of zero elements and the total number of non-zero elements in the difference matrix to obtain the similarity between the real-time state image and the standard state image;

[0114] If the similarity is greater than the preset similarity, a first analysis result is generated; if the similarity is not greater than the preset similarity, a second analysis result is generated;

[0115] If it is the second analysis result, it means that there is an abnormal defect in the preset area, then the device type and location information corresponding to the preset area are obtained, and the device type and location information corresponding to the preset area are sent to the user terminal for display.

[0116] Among them, the preset areas include oil tanks and seals, windings and coils, connectors and fasteners and other area locations.

[0117] Among them, the Chinese name of the LBP feature matrix is ​​"local binary pattern feature matrix".

[0118] It should be noted that the real-time status image of the transformer is analyzed through image processing and pattern recognition methods to identify and monitor potential anomalies and defects. The specific process includes: obtaining the real-time status image of the preset area of ​​the transformer, using the LBP algorithm to compare the neighborhood of each pixel point, and generating an LBP code; constructing an LBP feature matrix, integrating the LBP codes of all pixels into a two-dimensional matrix; comparing with the LBP feature matrix of the standard state image, and obtaining the similarity through difference matrix analysis; judging the transformer state according to the similarity, if the similarity is lower than the preset threshold, further locating the abnormal area and notifying the user. The LBP algorithm can effectively capture the local texture changes of the image, improve the accuracy of defect recognition, and improve the intelligent level of transformer status monitoring through image analysis. It can accurately identify whether there are defects (such as cracks, cracks, corrosion, rust spots, etc.) in important areas of the transformer, which helps to improve the reliability and safety of the power system.

[0119] In addition, the method further comprises the following steps:

[0120] During the operation of the target transformer, real-time temperature information of the target transformer at several preset position nodes is obtained, and a real-time temperature distribution map is constructed according to the temperature information;

[0121] Performing singular value decomposition processing on the real-time temperature distribution graph to obtain a left singular matrix, a right singular matrix and a singular value matrix;

[0122] Select the first k singular values ​​and their corresponding singular vectors in the singular value matrix, and reconstruct a low-rank approximate temperature distribution map according to the left singular matrix and the right singular matrix;

[0123] A temperature value is preset as the threshold of the isotherm. For each threshold, the temperature distribution map is binarized, and the area greater than the threshold is marked as 1, and the area less than the threshold is marked as 0, so as to binarize the low-rank approximation temperature distribution map to obtain a real-time isotherm map;

[0124] Discretize the real-time isotherm diagram to obtain a plurality of discrete points, and obtain coordinate information of each discrete point; introduce a LOF algorithm, and calculate the LOF value of each discrete point based on the coordinate information of each discrete point in combination with the LOF algorithm;

[0125] The discrete points whose LOF values ​​are greater than the preset value are marked as redundant points, and the isotherm areas corresponding to the redundant points are deleted to obtain a real-time isotherm map after redundancy reduction;

[0126] Performing difference processing on the reduced-redundancy real-time isotherm map based on linear interpolation to obtain a corrected real-time isotherm map;

[0127] Comparing and analyzing the corrected real-time isotherm diagram with the preset isotherm diagram to obtain the degree of overlap between the corrected real-time isotherm diagram and the preset isotherm diagram;

[0128] If the overlap between the corrected real-time isotherm diagram and the preset isotherm diagram is not greater than the preset overlap, a temperature fault warning message is generated and sent to the user terminal for display.

[0129] It should be noted that first, real-time temperature information is collected at multiple preset nodes of the transformer, and then the real-time temperature distribution map is constructed using these data. Then, the temperature distribution map is converted into a left singular matrix, a right singular matrix and a singular value matrix through singular value decomposition technology, and the first k singular values ​​and their corresponding singular vectors are selected to reconstruct a low-rank approximate temperature distribution map. The system further binarizes this low-rank approximate map to obtain a real-time isotherm map, obtains the coordinates of discrete points through discretization, and introduces the local outlier factor (LOF) algorithm to identify and delete redundant points, thereby obtaining a real-time isotherm map after redundancy reduction, which can eliminate the drift data caused by the acquisition equipment, acquisition environment and data transmission, thereby obtaining a real-time isotherm map with high reliability.

[0130] Afterwards, the system uses the linear interpolation method to perform difference processing on the reduced-redundancy isotherm map to correct the isotherm map, and compares it with the preset isotherm map to calculate the overlap between the two. If the overlap is lower than the preset threshold, the system will generate and send temperature fault warning information to the user terminal. Through singular value decomposition and binarization processing, the complexity of data processing is effectively reduced, while the accuracy of fault detection is improved. The introduction of the LOF algorithm further optimizes the fault detection process, and improves the robustness of the system by identifying redundant points and deleting them. Finally, by comparing with the preset isotherm map, the system can detect temperature anomalies in time and issue warnings in time, thereby preventing faults caused by transformer overheating and ensuring the stable operation of the power system. This data-driven fault warning method not only improves the efficiency of fault detection and the reliability of fault diagnosis, but also reduces maintenance costs.

[0131] like Figure 3 As shown, the second aspect of the present invention discloses a high-efficiency, energy-saving and intelligently controllable transformer, and the operation and maintenance method of the high-efficiency, energy-saving and intelligently controllable transformer according to any one of the above items includes:

[0132] Transformer body 101;

[0133] Intelligent control module, used to receive and process signals from the power grid and automatically adjust the operating parameters of the transformer according to the set algorithms and strategies;

[0134] Energy management system module, used to monitor and analyze transformer operation data in real time, predict load changes, and optimize operating modes;

[0135] Sensors and monitoring modules are installed inside or outside the transformer to detect the operating data of the transformer and ensure that the transformer operates within a safe range;

[0136] Variable frequency drive, used to adjust the output frequency of the transformer to suit different load requirements;

[0137] Fault diagnosis and early warning module, which detects and reports potential problems of transformers through built-in operation and maintenance diagnosis algorithms;

[0138] The remote communication module is used to communicate with the central control system or operation and maintenance personnel in real time to achieve remote monitoring and operation.

[0139] To sum up, through the intelligent operation and maintenance system, the target transformer can adjust and optimize the operating parameters in real time according to the load demand, realizing precise operation and maintenance management; it can automatically monitor and diagnose faults and give early warnings, greatly reducing the operation and maintenance costs and downtime, and improving the stability and reliability of the power system; at the same time, the system has remote monitoring and data analysis functions, enabling operation and maintenance personnel to grasp the equipment status in real time and make scientific decisions, thereby promoting the green transformation and sustainable development of the power industry.

[0140] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. The device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as: multiple units or components can be combined, or can be integrated into another system, or some features can be ignored or not executed. In addition, the coupling, direct coupling, or communication connection between the components shown or discussed can be through some interfaces, and the indirect coupling or communication connection of the devices or units can be electrical, mechanical or other forms.

[0141] The units described above as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units; they may be located in one place or distributed on multiple network units; some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0142] In addition, all functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may be separately used as a unit, or two or more units may be integrated into one unit; the above-mentioned integrated units may be implemented in the form of hardware or in the form of hardware plus software functional units.

[0143] A person of ordinary skill in the art can understand that: all or part of the steps of implementing the above method embodiment can be completed by hardware related to program instructions, and the aforementioned program can be stored in a computer-readable storage medium. When the program is executed, it executes the steps of the above method embodiment; and the aforementioned storage medium includes: a mobile storage device, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.

[0144] Alternatively, if the above-mentioned integrated unit of the present invention is implemented in the form of a software function module and sold or used as an independent product, it can also be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the embodiment of the present invention can be essentially or partly reflected in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the methods of each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as mobile storage devices, ROM, RAM, magnetic disks or optical disks.

[0145] The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. An efficient, energy-saving and intelligently controllable transformer operation and maintenance method, characterized in that: The following steps are involved: Obtain the fault feature text and fault feature data of each fault event occurring in the target transformer, and build a fault feature database according to the fault feature text and fault feature data of each fault event occurring in the target transformer; Collecting real-time operation data of the target transformer within a preset time period, and performing data cleaning processing on the collected real-time operation data to obtain target real-time operation data; Import the target real-time operation data into the fault feature database for matching analysis, and obtain the operation status of the target transformer within a preset time period; If the operating state of the target transformer within the preset time period is a fault state, a fault feature text regarded as a fault occurring in the target transformer within the preset time period is obtained, and fault type information of the target transformer is obtained according to the fault feature text; Determining whether the fault type information is preset fault type information; If it is preset fault type information, the target transformer is controlled to stop running, and a fault report is generated according to the fault feature text, and the fault report is sent to the user terminal for display; If it is not the preset fault type information, an optimal control scheme is generated based on the fault feature text, and the target transformer is controlled according to the optimal control scheme; Among them, the collected real-time operation data is cleaned to obtain the target real-time operation data, specifically: Based on the LDA algorithm, the collected real-time operation data is subjected to dimensionality reduction processing to map the collected real-time operation data into a low-dimensional space; the Euclidean distance between each real-time operation data in the low-dimensional space is calculated, and the two real-time operation data with the shortest Euclidean distance are merged to obtain a plurality of real-time operation data sets after one-time merger; Acquire the real-time operation data in each real-time operation data set after the first merger, perform weighted average processing on the real-time operation data in each real-time operation data set after the first merger to obtain a corresponding weighted average value, obtain a position node of the corresponding weighted average value in the corresponding real-time operation data set after the first merger, and mark the position node as the data set center of the real-time operation data set after the first merger; The Euclidean distance between each of the real-time running data sets after the first merger is calculated according to the corresponding data set centers, and the two real-time running data sets after the first merger with the shortest Euclidean distance are merged to obtain a plurality of real-time running data sets after the second merger, and the data set centers of each real-time running data set after the second merger are obtained; Similarly, the real-time operation data collected are continuously merged and iterated to obtain a number of real-time operation data sets merged N times; the silhouette coefficient of each real-time operation data set merged N times is obtained until the silhouette coefficient of the real-time operation data set merged N times is greater than the preset coefficient threshold, then the iteration is stopped, and a number of final real-time operation data sets are output; A real-time operation data is randomly extracted from each final real-time operation data set, and data features of the extracted real-time operation data are analyzed. If the data features of the extracted real-time operation data are abnormal, the corresponding final real-time operation data set is marked as a noise data set, and all real-time operation data in the final real-time operation data set marked as a noise data set are completely deleted; Acquire the remaining real-time operation data in the final real-time operation data set to obtain the target real-time operation data; The following steps are also included: If it is preset fault type information, the location information of the target transformer is obtained, and maintenance resources within a preset range are searched according to the location information of the target transformer to obtain a number of candidate maintenance personnel; Obtain the specialty information of each candidate maintenance personnel, obtain the fault feature text of the target transformer, and analyze the attention score between the fault feature text and the specialty information of each candidate maintenance personnel based on the attention mechanism algorithm; Obtain candidate maintenance personnel whose attention scores are greater than a preset score value, and obtain distance value information between the candidate maintenance personnel whose attention scores are greater than the preset score value and the target transformer, and sort the distance value information from small to large to obtain a sorting result; Generate a maintenance personnel recommendation sequence table based on the ranking result, and send the fault report to the user terminal of the corresponding candidate maintenance personnel for display in sequence according to the maintenance personnel recommendation sequence table; The following steps are also included: Obtain a real-time state image of a preset area in the target transformer, and for each pixel in the real-time state image, compare it with other pixels in a preset neighborhood. If the pixel is greater than or equal to a pixel in the preset neighborhood, the corresponding position is recorded as 0, otherwise it is recorded as 1; and obtain a comparison result; Connect the comparison results to form a binary number to obtain the LBP code of the pixel; and so on to obtain the LBP codes of all pixels in the real-time state image; Construct a blank matrix, fill the LBP codes of all pixels into the blank matrix to form a two-dimensional LBP feature matrix, and obtain the LBP feature matrix of the real-time state image; wherein the rows of the LBP feature matrix represent pixel rows, the columns represent pixel columns, and each element of the matrix is ​​the corresponding LBP code; Obtain a standard state image of a preset area in a target transformer, and obtain an LBP feature matrix of the standard state image; Subtracting the elements at the same matrix position in the LBP feature matrix of the real-time state image and the LBP feature matrix of the standard state image to obtain a number of element differences; constructing a difference matrix according to the number of element differences; Analyzing the difference matrix to obtain the total number of zero elements and the total number of non-zero elements in the difference matrix; performing ratio processing on the total number of zero elements and the total number of non-zero elements in the difference matrix to obtain the similarity between the real-time state image and the standard state image; If the similarity is greater than the preset similarity, a first analysis result is generated; if the similarity is not greater than the preset similarity, a second analysis result is generated; If it is the second analysis result, it means that there is an abnormal defect in the preset area, then the device type and location information corresponding to the preset area are obtained, and the device type and location information corresponding to the preset area are sent to the user terminal for display; Among them, the preset areas include oil tanks and seals, windings and coils, connectors and fasteners and other area locations.

2. The operation and maintenance method of a high-efficiency, energy-saving and intelligently controllable transformer according to claim 1 is characterized in that: Obtain the fault feature text and fault feature data of each fault event of the target transformer, and build a fault feature database based on the fault feature text and fault feature data of each fault event of the target transformer, specifically: Obtain work log information of the target transformer, extract fault events of the target transformer according to the work log information, and obtain fault feature text of each fault event; wherein the fault feature text includes fault description, fault type, fault impact range, fault cause and fault device location; Based on the fault feature text of each fault event, the similarity between the fault events is analyzed, and the fault events with similarity greater than a preset similarity threshold are grouped together to group the fault events with the same fault features together to obtain several fault event clusters; Obtain the historical operating data of the target transformer during the time period of each fault event in each fault event cluster; import the historical operating data of the target transformer during the time period of each fault event in each fault event cluster into the feature pyramid network for feature extraction and analysis, and obtain the fault feature data corresponding to each fault event cluster; wherein the operating data includes voltage, current, temperature, load rate, oil level and oil temperature; A fault database is constructed and divided into a plurality of subspaces, and the fault feature data and the fault feature text corresponding to each fault event cluster are respectively stored in the corresponding subspace to obtain a fault feature database.

3. The operation and maintenance method of a high-efficiency, energy-saving and intelligently controllable transformer according to claim 1 is characterized in that: The target real-time operation data is imported into the fault feature database for matching analysis, and the operation status of the target transformer within the preset time period is obtained by analysis, specifically: Importing the target real-time operation data into the fault feature database, and respectively calculating the Spearman rank correlation coefficient between the target real-time operation data and the fault feature data in each subspace; Comparing the Spearman rank correlation coefficient between the target real-time operation data and the fault feature data in each subspace with a preset threshold; If the Spearman rank correlation coefficients between the target real-time operation data and the fault feature data in each subspace are not greater than the preset threshold, it means that the operation state of the target transformer within the preset time period is normal; If the Spearman rank correlation coefficient between the target real-time operation data and the fault feature data in a certain subspace is greater than a preset threshold, it means that the operation state of the target transformer within the preset time period is a fault state; If the operating state of the target transformer within the preset time period is a fault state, the corresponding fault feature text is extracted in the corresponding subspace, and the extracted fault feature text is regarded as the fault feature text of the fault occurring in the target transformer within the preset time period.

4. The operation and maintenance method of a high-efficiency, energy-saving and intelligently controllable transformer according to claim 1 is characterized in that: If the fault type information is not preset, an optimal control scheme is generated based on the fault feature text, and the target transformer is controlled according to the optimal control scheme, specifically: Obtaining work log information of the target transformer, and obtaining various historical control schemes executed on the target transformer when a fault occurs according to the work log information; And obtaining historical operation data, historical environmental characteristic data and historical work task information of the target transformer when executing various historical control schemes on the transformer according to the work log information; Generate a historical relevance text based on the historical operation data, historical environmental characteristic data, and historical work task information to obtain a historical relevance text when various historical control schemes are executed on the transformer; If it is not the preset fault type information, then the real-time operation data, real-time environmental characteristic data and real-time work task information of the target transformer are obtained, and a real-time relevance text is generated according to the real-time operation data, real-time environmental characteristic data and real-time work task information; Calculating the text similarity between the real-time related text and each historical related text, and using the historical control schemes whose text similarity is greater than a preset text similarity threshold; According to the work log information, the stability and effectiveness of the target transformer after the target transformer is regulated by the historical regulation scheme whose text similarity is greater than a preset text similarity threshold value; The historical control scheme corresponding to the maximum values ​​of stability and effectiveness is output as the optimal control scheme, and the target transformer is controlled according to the optimal control scheme.

5. A high-efficiency, energy-saving and intelligently controllable transformer, applied to the operation and maintenance method of the high-efficiency, energy-saving and intelligently controllable transformer according to any one of claims 1 to 4, characterized in that: include: Transformer body; Intelligent control module, used to receive and process signals from the power grid and automatically adjust the operating parameters of the transformer according to the set algorithms and strategies; Energy management system module, used to monitor and analyze transformer operation data in real time, predict load changes, and optimize operating modes; Sensors and monitoring modules are installed inside or outside the transformer to detect the operating data of the transformer and ensure that the transformer operates within a safe range; Variable frequency drive, used to adjust the output frequency of the transformer to suit different load requirements; Fault diagnosis and early warning module, which detects and reports potential problems of transformers through built-in operation and maintenance diagnosis algorithms; The remote communication module is used to communicate with the central control system or operation and maintenance personnel in real time to achieve remote monitoring and operation.

Citation Information

Patent Citations

  • Microgrid for direct load control by frequency-variable transformer and operation method of microgrid

    CN106887847A

  • Intelligent monitoring and operation and maintenance system for transformer

    CN113689013A

  • User subdivision method based on dimension iterative segmentation and contour coefficient clustering

    CN116992318A

  • Fault diagnosis and prediction method for running state of fan generator and gearbox

    CN117272110A

  • Face recognition method and system based on differential quantization local binary pattern

    CN117373100A