A modular bus route layout method for urban trunk road passenger flow corridors
By adopting the modular bus route method of interweaving main lines and auxiliary lines on urban arterial passenger flow corridors, the problems of low bus transportation efficiency and insufficient capacity matching are solved, and more efficient transportation and lower operating costs are achieved.
Patent Information
- Application Number
- CN202410965076.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-07-18
AI Technical Summary
The efficiency of bus transportation on urban arterial passenger flow corridors is low, passenger transfer times are long, and the matching between bus capacity and passenger demand is low, resulting in high operating costs.
This paper proposes a modular bus line layout method for urban arterial passenger flow corridors. It adopts the interweaving layout strategy of main lines and auxiliary lines. The main lines cover all bus stations and the auxiliary lines cover areas where passenger flow is concentrated. The route layout is optimized through a multi-objective module bus line planning model to achieve Improve transportation efficiency and matching.
It improves the efficiency of bus transportation, reduces passenger transfer delays, reduces operating costs, and enhances the flexibility and adaptability of the bus system.
Smart Images

Figure CN118504952B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of urban public transportation control, and specifically relates to a modular bus line layout method for urban trunk road passenger flow corridors. Background Art
[0002] The operation of buses on the main roads of cities meets the daily travel needs of a large number of citizens, which is of great significance for reducing private car travel, alleviating urban traffic congestion, and promoting the sustainable development of the transportation system. However, the traditional main road bus operation model still has some defects, such as the type of bus, departure interval, and transportation capacity of the route are generally fixed in a given period (such as the morning peak), lacking real-time and flexibility, and unable to adapt to the random fluctuations of passenger flow, resulting in long waiting time for passengers and high operating costs of the bus system.
[0003] As a new type of public transportation, modular buses provide a new idea for solving the above problems. It is highly flexible. During operation, multiple modular buses on the same route or different routes can be teamed or split to adapt to the random fluctuations of passenger flow. In particular, modular buses on different routes can be temporarily teamed on some sections of the road. The carriages of the buses after teaming can be connected. Passengers who need to transfer can go from their own carriage to the carriage of the destination route, and complete the transfer directly after the team is split, which greatly improves the transfer efficiency of passengers.
[0004] From the above description, it can be seen that the operating characteristics of modular buses are significantly different from those of traditional buses. Bus route layout is the premise of modular bus operation. The existing technology still uses the route layout method for traditional buses to layout routes for modular buses, which obviously cannot give full play to the flexibility advantage of modular buses. Therefore, it is urgent to establish a bus route layout method that is adapted to the operating characteristics of modular bus systems. Summary of the invention
[0005] The purpose of the present invention is to solve the problems of uneven distribution of bus passenger flow on existing urban trunk roads, low matching between bus capacity and passenger demand on various sections, resulting in low bus transportation efficiency and long passenger transfer time, and to propose a modular bus route layout method for urban trunk road passenger flow corridors.
[0006] A modular bus route layout method for urban trunk road passenger flow corridors has the following specific processes:
[0007] Step 1. Parameter definition and expression:
[0008] There are a total of bus stops, Indicates the bus stop number. ;
[0009] There is only one main bus line on the trunk road. express;
[0010] There are a total of Bus auxiliary lines, Indicates the number of the auxiliary line. ;
[0011] Defining optimization variables , when the site Located on the auxiliary line On time ,otherwise ;
[0012] Auxiliary line Each station along the way is marked with express;
[0013] in Indicates auxiliary line Previous sites, Auxiliary line The number of stations passed through;
[0014] Step 2. Calculate the modular bus passenger travel time of different categories of passengers based on step 1;
[0015] Step 3. Calculate the enterprise operating costs based on step 1;
[0016] Step 4. Construct a multi-objective modular bus route planning model based on the modular bus passenger travel time and enterprise operating costs of different categories of passengers;
[0017] Step 5. Solve the multi-objective module bus route planning model.
[0018] Aiming at the passenger flow corridors of urban trunk roads, the present invention proposes a modular bus route layout method in which main lines and auxiliary lines are interwoven to output a set of passing stations of the main line and each auxiliary line; wherein the main line covers all bus stations on the trunk road to meet the travel needs of passengers between any stations, while each auxiliary line only passes through a small number of stations and covers areas with concentrated passenger flow, and is responsible for completing the rapid transportation of the main passenger flow.
[0019] The modular bus route layout method based on the main and auxiliary line interweaving layout strategy proposed in the present invention can adapt to the non-balanced distribution characteristics of urban trunk road bus passenger flow and improve bus transportation efficiency;
[0020] The present invention can provide passengers who need to transfer with opportunities to transfer within the vehicle as much as possible, thereby reducing travel delays caused by getting off the vehicle and transferring;
[0021] The present invention improves the matching degree between the public transport capacity of each section on the trunk road and the passenger demand, and reduces the operating cost of the public transport enterprise. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a flow chart of the present invention;
[0023] Figure 2 This is a schematic diagram of a feasible decoding method of the present invention. DETAILED DESCRIPTION
[0024] Specific implementation method 1: This implementation method is a modular bus line layout method for urban trunk road passenger flow corridors. The specific process is as follows:
[0025] Step 1. Parameter definition and expression:
[0026] There are a total of bus stops, Indicates the bus stop number. ;
[0027] There is only one main bus line on the trunk road. express;
[0028] There are a total of Bus auxiliary lines, Indicates the number of the auxiliary line. ;
[0029] Defining optimization variables , when the site Located on the auxiliary line On time ,otherwise ;
[0030] Auxiliary line Each station along the way is marked with express;
[0031] in Indicates auxiliary line Previous sites, Auxiliary line The number of stations passed through;
[0032] Step 2. Calculate the modular bus passenger travel time of different categories of passengers based on step 1;
[0033] Step 3. Calculate the enterprise operating costs based on step 1;
[0034] Step 4. Construct a multi-objective modular bus route planning model based on the modular bus passenger travel time and enterprise operating costs of different categories of passengers;
[0035] Step 5. Solve the multi-objective module bus route planning model.
[0036] Specific implementation method 2: This implementation method is different from specific implementation method 1 in that the module public transportation passenger travel time of different categories of passengers is calculated based on step 1 in step 2;
[0037] The specific process is:
[0038] The travel time of module bus passengers is composed of waiting time at the station and travel time in the bus;
[0039] According to the distribution of passenger travel volume OD on the main corridor, modular bus passengers are divided into five categories, and the travel time of modular bus passengers is calculated as follows:
[0040] Step 2.1. Calculate the module bus passenger travel time of the first type of passengers; the specific process is:
[0041] Travel origin of first category passengers and travel destination All of them are main line stations except mixed stations. Main line stations are stations that the main line passes through, and mixed stations are stations that both the main line and the auxiliary line pass through. Therefore, the first type of passengers take the main line module bus to complete their trip;
[0042] Module bus passenger travel time for the first category of passengers It is expressed as:
[0043] T 1 = q ij ⋅ [ 1 2 f l + d ij v 1 + ∑ s = i j max( q b s ⋅ t b , q a s ⋅ t a ) ] (1)
[0044] In the formula, is the travel time of the first category of passengers, in h; Indicates the starting point of the trip To the destination The number of passengers, in persons; Indicates the starting point of the trip and travel destination The distance in km; The frequency of bus departures in the main line module, in units of vehicles / h; is the average speed of the module bus on the main line, in km / h; Indicates that the module bus is at the station The number of people on board, in persons; is the average boarding time of passengers, in hours; Indicates that the module bus is at the station The number of people getting off the bus, in persons; is the average time for passengers to get off the bus, in hours; module bus at the station The stop time is the maximum value of the time for boarding passengers and the time for getting off passengers, that is, , unit is h; Indicates the multiplication sign;
[0045] Step 2.2. Calculate the module bus passenger travel time of the second type of passengers; the specific process is:
[0046] Travel origin of Category 2 passengers Main line stations and travel destinations other than mixed stations For mixed sites;
[0047] The second type of passengers can choose to take the main line modular bus for the entire journey, or take the main line modular bus first and then transfer to the auxiliary line modular bus;
[0048] Modular bus passenger travel time for the second category of passengers The calculation is as follows:
[0049] T 2 = q ij ⋅ [ y ij ⋅ [ P 21 q ⋅ ( 1 2 f l + d ij v 1 + ∑ s = i j max( q b s ⋅ t b , q a s ⋅ t a ) ) + P 22 q ⋅ ( 1 2 f l + d is 1 r v 1 + d s 1 r j v 2 + ∑ s = i s 1 r max( q b s ⋅ t b , q a s ⋅ t a ) + ∑ s = s 1 r j x s r ⋅ max( q b s ⋅ t b , q a s ⋅ t a ) )] + ( 1 − y ij ) ⋅ ( 1 2 f l + d ij v 1 + ∑ s = i j max( q b s ⋅ t b , q a s ⋅ t a ) )] (2)
[0050] In the formula, is the travel time of the second category of passengers, in h; is a binary variable, when site On the auxiliary line On time, ,otherwise ; is an auxiliary variable. On the auxiliary line Starting station Upstream, that is hour, , indicating that passengers have the opportunity to transfer to auxiliary line vehicles, otherwise , indicating that passengers can only travel on the main line; is the average speed of the module bus on the auxiliary line, in km / h; Indicates the starting point of the trip With auxiliary line starting point The distance in km; Indicates auxiliary line starting point and travel destination The distance in km; The probability that a passenger chooses to take the mainline module bus for the entire journey; represents the probability that a passenger chooses to take the main line module bus first and then transfer to the auxiliary line module bus;
[0051] Step 2.3. Calculate the module bus passenger travel time of the third type of passengers; the specific process is:
[0052] The starting point of the third category of passengers It is a mixed station, the end point of the trip It is a mainline station other than a mixed station, so the trip is completed by taking a mainline modular bus;
[0053] Module bus passenger travel time for the third category of passengers It is expressed as:
[0054] T 3 = q ij ⋅ [ 1 2 f l + d ij v 1 + ∑ s = i j max( q b s ⋅ t b , q a s ⋅ t a ) ] (3)
[0055] In the formula, is the travel time of the third category of passengers, in h;
[0056] Step 2.4. Calculate the travel time of the fourth type of passengers; the specific process is:
[0057] Travel origin of the fourth category of passengers and travel destination At different stops on the same auxiliary line, passengers can choose to take the main line module bus or the auxiliary line module bus to complete their trip;
[0058] Module bus passenger travel time for the fourth category of passengers The calculation is as follows:
[0059] T 4 = q ij ⋅ [ P 41 q ⋅ ( 1 2 f l + d ij v 1 + ∑ s = i j max( q b s ⋅ t b , q a s ⋅ t a ) ) + P 42 q ⋅ ( 1 2 f r + d ij v 2 + ∑ s = i j x s r ⋅ max( q b s ⋅ t b , q a s ⋅ t a ) )] (4)
[0060] In the formula, is the travel time of the fourth category of passengers, in h; Auxiliary line The frequency of bus departures in the upper module, in units of vehicles / h; The probability that a passenger chooses to take the mainline module bus for the entire journey; The probability of choosing to take the auxiliary module bus for the entire journey;
[0061] Step 2.5. Calculate the module bus passenger travel time of the fifth category of passengers; the specific process is:
[0062] Travel origin of the fifth category of passengers and travel destination These are stations belonging to different auxiliary lines. Passengers can choose to take the main line modular bus for the entire journey, or take a modular bus on one auxiliary line first, and then transfer to a modular bus on another auxiliary line to complete the trip;
[0063] Module bus passenger travel time for the fifth category of passengers The calculation is as follows:
[0064] T 5 = q ij ⋅ [ P 51 q ⋅ ( 1 2 f l + d ij v 1 + ∑ s = i j max( q b s ⋅ t b , q a s ⋅ t a ) ) + P 52 q ⋅ ( ∑ γ = r r ' 1 2 f γ + d ij v 2 + ∑ s = i j x s r ⋅ max( q b s ⋅ t b , q a s ⋅ t a ) )] (5)
[0065] In the formula, is the travel time of the fifth category of passengers, in h; Represent different auxiliary lines, and the auxiliary lines On the auxiliary line Downstream of Indicates that passengers take the auxiliary line module bus from the line To line The numbers of the auxiliary lines along the way; The probability that a passenger chooses to take the mainline module bus for the entire journey; The probability that a passenger chooses to take a modular bus on one auxiliary line first and then transfer to a modular bus on another auxiliary line to complete the trip;
[0066] Step 2.6. Travel time based on the first category of passengers , Travel time of the second category of passengers , Travel time of the third category of passengers , Travel time of the fourth category of passengers , Travel time for the fifth category of passengers , calculate the travel time cost of all passengers.
[0067] The other steps and parameters are the same as those in the first embodiment.
[0068] Specific implementation method three: This implementation method is different from specific implementation methods one or two in that the travel time of the first type of passengers in step 2.6 is based on , Travel time of the second category of passengers , Travel time of the third category of passengers , Travel time of the fourth category of passengers , Travel time for the fifth category of passengers , calculate the travel time cost of all passengers; the specific process is:
[0069] The travel time cost of all passengers in the urban trunk road passenger flow corridor is calculated as follows:
[0070] (6)
[0071] In the formula, is the travel time cost of passengers, in yuan; It is the time value cost, which is generally related to local wages and working hours, and the unit is RMB / h; is a binary variable. On the auxiliary line On time, ,otherwise ; is a binary variable. On the auxiliary line On time, ,otherwise ; is a binary variable. On the auxiliary line On time, ,otherwise .
[0072] The other steps and parameters are the same as those in the first or second embodiment.
[0073] Specific implementation method 4: This implementation method is different from one of the specific implementation methods 1 to 3 in that the enterprise operating cost is calculated based on step 1 in step 3; the specific process is:
[0074] Step 3.1. Calculate the bus operation mileage of the module; the specific process is:
[0075] The operating mileage of modular buses is affected by the route layout and scheduling plan. The calculation of the operating mileage of modular buses during the study period is as follows:
[0076] (7)
[0077] In the formula, is the operating mileage of the modular bus during the study period, in km; Indicates the main line schedule. , is the total number of main line flights; Main line The number of modular units of the modular bus fleet dispatched by the shift, in units of vehicles; Indicates auxiliary line Flights, Auxiliary line Total number of shifts; For auxiliary line The number of module units of the module bus fleet dispatched on a shift, in units of vehicles; The mileage traveled by the mainline module bus to complete one trip, in km; Auxiliary line The mileage that a module bus travels to complete a trip, in km;
[0078] Step 3.2. Calculate business operating costs based on mileage.
[0079] The other steps and parameters are the same as those in Specific Embodiments 1 to 3.
[0080] Specific implementation method 5: This implementation method is different from the specific implementation methods 1 to 4 in that the enterprise operating cost based on mileage is calculated in step 3.2; the specific process is:
[0081] The operating costs of public transport enterprises are mainly related to the total mileage of vehicles and the value coefficient of vehicle operating mileage. The enterprise operating costs based on mileage are calculated as follows:
[0082] (8)
[0083] In the formula, is the operating cost of the public transportation enterprise, in Yuan; It is the module bus operation mileage value coefficient, and the unit is Yuan / km.
[0084] The other steps and parameters are the same as those in Specific Embodiments 1 to 4.
[0085] Specific implementation method 6: This implementation method is different from the specific implementation methods 1 to 5 in that in step 4, a multi-objective modular bus route planning model is constructed based on the modular bus passenger travel time of different categories of passengers and the enterprise operating cost; the specific process is:
[0086] Step 4.1. Construct the optimization objective function; the specific process is:
[0087] Passenger travel time cost and business operating costs The route planning model of urban trunk road module bus is established with the minimum optimization goal as shown in the formula:
[0088] (9)
[0089] in, is the total cost of the module bus system, yuan; is the weight coefficient, and its value reflects the decision maker's weighing of the overall interests;
[0090] Step 4.2. Set constraints; the specific process is:
[0091] The layout of modular bus routes under urban trunk corridors needs to meet the constraints of length, number of stations, and passenger flow, as shown in equations (10)-(12). At the same time, constraint (13) ensures that there is no intersection between the auxiliary lines:
[0092] (10)
[0093] (11)
[0094] ∑ i , j ∈ S q ij ⋅ [( 1 − x i r ) ⋅ x j r ⋅ P 22 q + x i r ⋅ x j r ⋅ P 42 q + x i r ⋅ x j r ' ⋅ P 52 q ] Q v ⋅ G r ⋅ k g r ≥ φ , ∀ r , r ' (12)
[0095] (13)
[0096] In the formula, , are the minimum and maximum length limits of the auxiliary line, km; is the capacity of a single module vehicle, persons; , The main lines in the research period are , Auxiliary line The total number of departures; Auxiliary line The size of the modular bus fleet sent out; is the average cross-section passenger load rate of the line; Indicates auxiliary line Previous sites.
[0097] The other steps and parameters are the same as those in Specific Implementation Methods 1 to 5.
[0098] Specific implementation method 7: This implementation method is different from any one of the specific implementation methods 1 to 6 in that the multi-objective module bus route planning model is solved in step 5; the specific process is:
[0099] The artificial bee colony algorithm is used to solve the bus route planning model established in step 4;
[0100] Step 5.1. Input parameters:
[0101] Set the initial swarm size to N, where N is an even number, and the number of leading bees is , the number of following bees is ,in ;
[0102] The current number of times each nectar source is collected , the maximum number of mining times is limit, the maximum number of iterations is maxt, and the initial number of iterations is t=0;
[0103] Step 5.2. Encoding:
[0104] There are a total of The main line passes through all the stations, so there is no need to consider the encoding settings;
[0105] Set up on the main passenger corridor Auxiliary lines, each auxiliary line has no crossing interval; when the decision variable When On the auxiliary line On, and Auxiliary line through sites;
[0106] Since the proposed modular bus route layout model has many dimensions, it is encoded in real number form for the convenience of solving. The encoding of a feasible solution is:
[0107]
[0108] For auxiliary line 1, For auxiliary line 2, is the auxiliary line r, is the auxiliary line R;
[0109] like Figure 2 As shown:
[0110] in, Indicates The first station on the auxiliary line, Indicates The first sites, and , that is, there is no intersection between the two auxiliary lines;
[0111] The stations that each auxiliary line passes through are regarded as a subset and are arranged in order to form a coding of a feasible solution;
[0112] Step 5.3. Initialize the population:
[0113] Randomly generate the code in the form of step 5.2 The initial solutions that meet the constraints of the modular bus route layout model in step 4.2 are used as the initial honey source, that is, the initial modular bus auxiliary line solution set ;
[0114] A honey source represents a feasible solution that includes all auxiliary line layout plans. is a set of N feasible solutions;
[0115] Calculate the total cost of the modular bus system for each auxiliary line layout plan based on the model objective function (Total cost is the total cost of the module bus system ), sort the initial nectar sources in order of total cost from small to large, and select the first half of the nectar sources as the initial nectar source set searched by the leading bee ;
[0116] Step 5.4. Leading bee operation; the specific process is as follows:
[0117] Step 5.4.1. The leading bee searches the neighborhood according to the process of steps 5.4.1.1-5.4.4 to find a new nectar source; the specific process is as follows:
[0118] Step 5.4.1.1. Honey source crossover:
[0119] In the initial nectar source collection Random selection and auxiliary line layout scheme Different other solutions , , with auxiliary line layout plan (honey source) And auxiliary line layout plan (honey source) As the parent, according to the probability Perform segment crossover to generate a new modular bus auxiliary line layout plan and ;
[0120] Step 5.4.1.2. Nectar source variation:
[0121] New modular bus auxiliary line layout plan and According to probability Perform point mutation to generate the sub-module bus auxiliary line layout plan and ;
[0122] Step 5.4.1.3. Selection of nectar source:
[0123] Calculate the layout plan of the bus auxiliary line of the child module and The total cost of the bus system under the module is selected as the new honey source searched by the leading bee neighborhood. ;
[0124] Step 5.4.2. Use the greedy rule to retain high-quality nectar sources:
[0125] Calculate the new nectar source found by the bee neighborhood in 5.4.1 Total Cost ,Will Compare with the original plan; if , it leads the bees to abandon the original nectar source and go to the new nectar source. Otherwise, the bees will stay at the original nectar source. ;
[0126] Execute step 5.5;
[0127] Step 5.5. Follow the bee operation:
[0128] The roulette method is used to calculate the nectar source as shown in formula (14). Probability of being followed :
[0129] (14)
[0130] If you follow the bees, follow the nectar Then follow the bees to the nectar source according to step 5.4.1 Continue to search for new auxiliary line layout plans in the neighborhood , calculate the total cost of the new solution and compare it with the original solution; if , then the new solution Replacement of the original auxiliary line layout solution ,make Otherwise, keep the original auxiliary line layout plan. ;
[0131] Execute step 5.6;
[0132] Step 5.6. Scout bee operation:
[0133] Compare step 5.5 The size of the mining limit;
[0134] If in step 5.5 If the number of mining times is less than the limit, execute step 5.4;
[0135] If in step 5.5 If the number of mining times is greater than or equal to the limit, to prevent falling into the local optimum, the leading bee is transformed into a scout bee, and a new auxiliary line layout plan is randomly generated according to the coding form of step 5.2 to replace the original plan. , and reset , execute step 5.4;
[0136] Step 5.7. Repeat From step 5.4 to step 5.6, record schemes, compare The total cost of the solutions, and the solution corresponding to the minimum total cost is selected as the optimal solution of the current algebraic population ;
[0137] Step 5.8. Termination condition determination:
[0138] If the current number of iterations is equal to the maximum number of iterations maxt, go to step 5.9; otherwise, set the number of iterations to , return to step 5.4;
[0139] Step 5.9. Output the optimal solution for the route layout of modular buses in the urban trunk road passenger flow corridor ;
[0140] in Each subset of represents a subsidiary line, and the numbers in the subset represent the stations that the subsidiary line passes through.
[0141] The other steps and parameters are the same as those in Specific Embodiments 1 to 6.
[0142] The present invention may also have many other embodiments. Without departing from the spirit and essence of the present invention, those skilled in the art may make various corresponding changes and modifications based on the present invention, but these corresponding changes and modifications should all fall within the scope of protection of the claims attached to the present invention.
Claims
1. A method for laying out modular bus routes for urban trunk road passenger flow corridors, characterized in that: The specific process of the method is: Step 1. Parameter definition and expression: There are S bus stops arranged on the main passenger flow corridor, s represents the number of the bus stop, 1≤s≤S; There is only one main bus line on the trunk road, represented by l; There are R bus auxiliary lines on the main road, r represents the number of the auxiliary line, 1≤r≤R; Defining optimization variables When site s is on auxiliary line r otherwise Each station along the auxiliary line r is marked with express; in represents the nth station on the auxiliary line r, n r is the number of stations that the auxiliary line r passes through; Step 2. Calculate the module bus passenger travel time of different categories of passengers based on step 1; Step 3. Calculate the enterprise operating costs based on step 1; Step 4. Construct a multi-objective modular bus route planning model based on the modular bus passenger travel time of different categories of passengers and the enterprise operating cost; Step 5. Solve the multi-objective module bus route planning model based on the artificial bee colony algorithm; In step 2, the module bus passenger travel time of different categories of passengers is calculated based on step 1; The specific process is: The travel time of module bus passengers is composed of waiting time at the station and travel time in the bus; According to the distribution of passenger travel volume OD on the main corridor, modular bus passengers are divided into five categories, and the travel time of modular bus passengers is calculated as follows: Step 2.
1. Calculate the module bus passenger travel time of the first type of passengers; the specific process is: The first type of passengers' starting point i and destination j are both main line stations except mixed stations. Main line stations are stations that the main line passes through, and mixed stations are stations that both the main line and the auxiliary line pass through. Therefore, the first type of passengers take the main line module bus to complete their trip; The module bus passenger travel time T1 of the first type of passengers is expressed as: Where T1 is the travel time of the first type of passengers, in h; q ij It represents the number of passengers from the trip starting point i to the trip end point j, in units of people; d ij represents the distance between the starting point i and the end point j, in km; f l is the departure frequency of the main line module bus, in units of vehicles / h; v1 is the average speed of the module bus on the main line, in units of km / h; Indicates the number of people boarding the module bus at station s, in units of people; t b is the average boarding time of passengers, in h; Indicates the number of passengers getting off the bus at station s, in units of people; t a is the average time for passengers to get off the bus, in hours; the stop time of the module bus at station s is the maximum value of the time for passengers to get on the bus and the time for passengers to get off the bus, that is, The unit is h; · represents the multiplication sign; Step 2.
2. Calculate the module bus passenger travel time of the second type of passengers; the specific process is: The second type of passengers have a trip starting point i that is a mainline station other than a mixed station, and a trip end point j that is a mixed station; The second type of passengers can choose to take the main line modular bus for the entire journey, or take the main line modular bus first and then transfer to the auxiliary line modular bus; The modular bus passenger travel time T2 of the second category of passengers is calculated as follows: Where T2 is the travel time of the second type of passengers, in h; is a binary variable. When site s is on the auxiliary line r, otherwise y ij ∈{0,1} is an auxiliary variable. When the passenger's starting station i is at the starting station of the auxiliary line r Upstream, that is When ij =1, indicating that the passenger has the opportunity to transfer to the auxiliary line vehicle, otherwise y ij =0, indicating that passengers can only travel on the main line; v2 is the average speed of the module bus on the auxiliary line, in km / h; Indicates the starting point of the trip i and the starting point of the auxiliary line r The distance in km; Indicates the starting point of auxiliary line r The distance to the trip destination j, in km; P 21q P is the probability that the passenger chooses to take the main line module bus for the entire journey; 22q represents the probability that a passenger chooses to take the main line module bus first and then transfer to the auxiliary line module bus; Step 2.
3. Calculate the module bus passenger travel time of the third category of passengers; The specific process is: The third type of passengers have a trip starting point i as a mixed station, and a trip end point j as a main line station other than the mixed station, so they take the main line module bus to complete the trip; The module bus passenger travel time T3 of the third type of passengers is expressed as: Where T3 is the travel time of the third category of passengers, in h; Step 2.
4. Calculate the module bus passenger travel time of the fourth category of passengers; The specific process is: The fourth type of passengers have their starting point i and destination j at different stations on the same auxiliary line. The passengers choose to take the main line module bus or the auxiliary line module bus to complete their trip. The modular bus passenger travel time T4 for the fourth category of passengers is calculated as follows: Where T4 is the travel time of the fourth type of passengers, in hours; f r is the frequency of bus departures on auxiliary line r, in units of vehicles / h; P 41q P is the probability that the passenger chooses to take the main line module bus for the entire journey; 42q The probability of choosing to take the auxiliary module bus for the entire journey; Step 2.
5. Calculate the module bus passenger travel time of the fifth category of passengers; The specific process is: The starting point i and the destination j of the fifth type of passengers are stations belonging to different auxiliary lines. Passengers can choose to take the main line modular bus for the whole journey, or take a modular bus of one auxiliary line first and then transfer to a modular bus of another auxiliary line to complete the trip; The modular bus passenger travel time T5 for the fifth category of passengers is calculated as follows: Where T5 is the travel time of the fifth type of passengers, in hours; r and r' represent different auxiliary lines, and auxiliary line r' is downstream of auxiliary line r, where γ represents the auxiliary line number that the passenger passes through when taking the auxiliary line module bus from line r to line r'; P 51q P is the probability that the passenger chooses to take the main line module bus for the entire journey; 52q The probability that a passenger chooses to take a modular bus on one auxiliary line first and then transfer to a modular bus on another auxiliary line to complete the trip; Step 2.
6. Calculate the travel time cost of all passengers based on the travel time T1 of the first category of passengers, the travel time T2 of the second category of passengers, the travel time T3 of the third category of passengers, the travel time T4 of the fourth category of passengers, and the travel time T5 of the fifth category of passengers; In step 2.6, the travel time cost of all passengers is calculated based on the travel time T1 of the first category of passengers, the travel time T2 of the second category of passengers, the travel time T3 of the third category of passengers, the travel time T4 of the fourth category of passengers, and the travel time T5 of the fifth category of passengers. The specific process is: The travel time cost of all passengers in the urban trunk road passenger flow corridor is calculated as follows: In the formula, C T is the passenger travel time cost, in yuan; c t is the time value cost, in yuan / h; is a binary variable. When the passenger's starting point i is on the auxiliary line r, otherwise is a binary variable. When the passenger's destination j is on the auxiliary line r, otherwise is a binary variable. When the passenger's destination station j is on the auxiliary line r', otherwise In step 3, the enterprise operating cost is calculated based on step 1; the specific process is: Step 3.
1. Calculate the bus operation mileage of the module; the specific process is: The calculation of module bus operating mileage during the study period is as follows: Where, d v is the operating mileage of the modular bus during the study period, in km; g l Indicates the main line frequency, g l =1,L,G l , G l is the total number of main line flights; Main line g l The number of modular units of the modular bus fleet dispatched by the bus, in units of vehicles; g r =1,...,G r Indicates auxiliary line r shift, G r is the total number of shifts on auxiliary line r; The auxiliary line g r The number of module units of the module bus fleet dispatched on the shift, in units of vehicles; d l The mileage traveled by the main line module bus to complete one trip, in km; d r The mileage traveled by the auxiliary line r module bus to complete one trip, in km; Step 3.
2. Calculate the business operating costs based on mileage; In step 3.2, the enterprise operating costs based on mileage are calculated; the specific process is: The business operating costs based on mileage are calculated as follows: C V =c v ·d v (8) In the formula, C V is the operating cost of the public transportation enterprise, in yuan; c v is the module bus operation mileage value coefficient, in yuan / km; In step 4, a multi-objective modular bus route planning model is constructed based on the modular bus passenger travel time of different categories of passengers and the enterprise operating cost; the specific process is: Step 4.
1. Construct the optimization objective function; the specific process is: The passenger travel time cost C T and enterprise operating costs C V The minimum optimization goal is to establish a route planning model for urban trunk road module buses, as shown in the following formula minC=μ1·C T +μ2·C V (9) Among them, C is the total cost of the module public transportation system, yuan; μ1 and μ2 are weight coefficients; Step 4.
2. Set constraints; the specific process is: The layout of modular bus routes under urban trunk corridors needs to meet the constraints of length, number of stations, and passenger flow, as shown in equations (10)-(12). At the same time, constraint (13) ensures that there is no intersection between the auxiliary lines: Where, d min ,d max are the minimum and maximum length limits of the auxiliary line, km; Q v is the capacity of a single module vehicle, persons; The size of the modular bus group issued by auxiliary line r; is the average cross-section passenger load rate of the line; Indicates the nth station on auxiliary line r+1.
2. A method for laying out modular bus routes for urban trunk road passenger flow corridors according to claim 1, characterized in that: In step 5, the multi-objective module bus route planning model is solved; the specific process is: Step 5.
1. Input parameters: Set the initial swarm size to N, where N is an even number and the number of leading bees is N. l , the number of follower bees is N f ,in The current number of times each nectar source has been collected is trial(i), the maximum number of collections is limit, the maximum number of iterations is maxt, and the initial number of iterations is t=0; Step 5.
2. Coding: There are S stations in total set up on the trunk passenger flow corridor, and the main line passes through all the stations; R auxiliary lines are set on the main road passenger flow corridor, and each auxiliary line has no crossing section; when the decision variable When , it means that station s is on auxiliary line r, and the rth auxiliary line passes through n r sites; The encoding is performed in real number form, and the encoding of a feasible solution is For auxiliary line 1, For auxiliary line 2, is the auxiliary line r, is the auxiliary line R; in, represents the first station on the rth auxiliary line, Indicates the nth r sites, and That is, there is no intersection between the two auxiliary lines; Step 5.
3. Initialize the population: According to the coding form of step 5.2, N initial solutions that meet the constraints of the modular bus line layout model in step 4.2 are randomly generated as the initial honey source, that is, the initial modular bus auxiliary line solution set Calculate the total cost of the modular bus system for each auxiliary line layout plan based on the model objective function Arrange the initial nectar sources in order of total cost from small to large, and select the first half of the nectar sources as the initial nectar source set Φ searched by the leading bee; Step 5.
4. Leading bee operation; the specific process is: Step 5.4.
1. The leading bee conducts a neighborhood search to find a new nectar source. The specific process is as follows: Step 5.4.1.
1. Honey source crossover: Randomly select and arrange auxiliary line scheme X in the initial honey source set Φ i Different other solutions X j , i≠j, auxiliary line layout scheme X i And auxiliary line layout plan X j As the parent, according to probability p c Perform segment crossover to generate a new module bus auxiliary line layout plan cross_X i and cross_X j ; Step 5.4.1.
2. Nectar source variation: New modular bus auxiliary line layout plan cross_X i and cross_X j According to the probability p m Perform point mutation to generate the sub-module bus auxiliary line layout plan X i ′ and X j ′; Step 5.4.1.
3. Selection of nectar source: Calculate the bus auxiliary line layout plan of the child module X i ′ and X j ′, the total cost of the module bus system is selected as the new honey source new_X searched by the leading bee neighborhood. i ; Step 5.4.
2. Use the greedy rule to retain high-quality nectar sources: Calculate the new nectar source new_X found by the leading bee neighborhood in 5.4.1 i Total cost fitness(new_X i ), fitness(new_X i ) is compared with the original solution; if fitness(new_X i )<fitness(X i ), the leader bee abandons the original nectar source and goes to the new nectar source, and let trial(i) = 0; otherwise, the leader bee stays at the original nectar source, and let trial(i) = trial(i) + 1; Execute step 5.5; Step 5.
5. Follow the bee operation: The roulette method is used as formula (14) to calculate the nectar source X i The probability of being followed is P i : If you follow the bees, follow the nectar source i Then follow the bees to the nectar source X according to step 5.4.1 i Continue to search for new auxiliary line layout solutions in the neighborhood new_X i , calculate the total cost of the new solution fitness(new_X i ) and compare it with the original solution; if fitness(new_X i )<fitness(X i ), then the new solution new_X i Replace the original auxiliary line layout plan X i , let trial(i)=0; otherwise, keep the original auxiliary line layout plan, let trial(i)=trial(i)+1; Execute step 5.6; Step 5.
6. Scout bee operation: Compare trial(i) in step 5.5 with the mining limit; If trial(i) in step 5.5 is less than the mining times limit, execute step 5.4; If trial(i) in step 5.5 is greater than or equal to the mining times limit, the leading bee is transformed into a scout bee, and a new auxiliary line layout plan is randomly generated according to the coding form of step 5.2 to replace the original plan X i , and reset trial(i)=0, and execute step 5.4; Step 5.
7. Repeat From step 5.4 to step 5.6, record schemes, compare The total cost of the solutions, the solution corresponding to the minimum total cost is selected as the optimal solution X* of the current algebraic population; Step 5.
8. Termination condition determination: If the current number of iterations is equal to the maximum number of iterations maxt, go to step 5.9; otherwise, set the number of iterations t = t + 1 and return to step 5.4; Step 5.
9. Output the optimal solution X* for the route layout of the modular bus in the urban trunk road passenger flow corridor; Each subset of X* represents a subsidiary line, and the numbers in the subset indicate the stations that the subsidiary line passes through.
Citation Information
Patent Citations
Operation coordination optimizing method of common public transit connecting with urban rail transit and system thereof
CN101630440A
Dynamic common bus scheduling method based on bus station informatization
CN106485912A