An assembled cofferdam structure for high pile cap of bridge
By using the bottom plate components, side plate components and support connectors of the prefabricated cofferdam structure in the construction of the high pile cap of the bridge, the problem of insufficient coordination and sealing with the pile foundation is solved, and higher construction stability and Sealing performance avoids water seepage and construction instability.
Patent Information
- Application Number
- CN202411000728.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-25
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing prefabricated cofferdam structure does not have a high degree of coordination with the pile foundation and insufficient sealing during the construction of high pile caps for bridges, resulting in unstable construction of the caps and problems of water seepage in gaps.
Adopt an assembled cofferdam structure including bottom plate components, side plate components and support connectors that are detachably connected to each other. The fit and sealing with the pile foundation are improved through snap-in grooves and sealing structures, and the support connectors are used to resist seawater. pressure.
It improves the fit between the pile foundation and the cofferdam structure, enhances the sealing of the prefabricated cofferdam, avoids water seepage problems, and provides stable anti-hydraulic support through support connectors, improving the stability and efficiency of construction. .
Smart Images

Figure CN118517009B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of bridge engineering construction, and in particular to an assembled cofferdam structure of a bridge high pile cap. Background Art
[0002] High pile cap refers to a pile cap with the bottom surface above the foundation surface. All high-pile docks belong to high pile caps. The cap distributes the load on it to the pile foundation, and the pile foundation then transfers the load to the foundation. Its pile foundation is different from the pile foundation in the low pile cap. It is not only a foundation, but also participates in the work of the entire building as a component because of its free height, becoming a major load-bearing component in the high pile cap.
[0003] A cofferdam is a temporary retaining structure built for permanent water conservancy facilities in water conservancy project construction. Its function is to prevent water and soil from entering the construction site of the building so that drainage can be done in the cofferdam, foundation pits can be excavated, and buildings can be built. It is generally used in hydraulic structures. Except as part of a formal building, the cofferdam is generally dismantled after use. The height of the cofferdam is higher than the highest water level that may occur during the construction period.
[0004] Regarding the construction technology of the lower structure of the bridge, it can be specifically divided into above-water high pile caps, underwater high pile caps and low pile caps. The basis for determining the high pile caps and low pile caps is mainly the distance between the caps and the riverbed. The caps are higher in height from the riverbed and are called high pile caps, and vice versa, they are called low pile caps. The basis for determining the above-water high pile caps and underwater high pile caps is whether the caps are above or below the water surface. If it is an underwater high pile cap, a construction space, i.e., a cofferdam, needs to be provided in the water during the construction process. The construction of underwater high pile caps mainly adopts a casing cofferdam structure, but the existing casing cofferdam structure generally adopts an integrated structure, i.e., it is prefabricated and directly casing on the pile foundation for cooperation when used. This construction method has the following disadvantages: it needs to be accurately positioned before casing and then lowered, and it needs to be ensured that the original pile foundation is not damaged or displaced during casing installation. The positioning operation is different from that on the land plane, and the positioning operation in water is much more difficult than that on land.
[0005] The invention patent with Chinese patent application number 201810505316.4 discloses an assembled cofferdam structure, including a water retaining structure located on the water-facing side, a weir body connected to the water retaining structure, and a passage structure located on the top of the weir body; the weir body is a frame structure; the water retaining structure includes a plurality of columns arranged side by side, a water retaining plate and a horizontal support beam are arranged between two adjacent columns, the horizontal support beam abuts against the rear side of the water retaining plate, and the bottom ends of the columns and the bottom ends of the water retaining plate are respectively inserted into the mud surface of the riverbed. The present invention is assembled by steel structure, which is convenient and fast to construct and occupies a small space; at the same time, the steel structure can be recycled and reused, which is convenient for assembly and disassembly, has high construction efficiency, and can speed up the progress of engineering construction; it has the advantages of convenient storage and transportation, less pollution, and low cost; compared with the traditional earth-rock cofferdam, it has the remarkable characteristics of small cross-section, no influence on the flood flow of the river channel, convenient construction and dismantling, high reuse rate of steel structure, and little pollution to the environment and water body. The technical solution proposed in the above invention only provides an assembled cofferdam different from the traditional earth-rock cofferdam, which cannot be used in the construction of bridges in the sea because the coordination with the pile foundation and its own waterproof sealing performance have not been improved. Summary of the invention
[0006] Therefore, in order to solve the above problems, the present invention proposes an assembled cofferdam structure for a high-pile foundation of a bridge, which solves the technical problems that the existing assembled cofferdam has a low degree of fit with the pile foundation and the assembly structure itself has insufficient sealing, which easily leads to instability in the foundation construction process and water seepage in the gaps that affects the construction.
[0007] To achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a bridge high pile cap assembled cofferdam structure, comprising a pile foundation, a cap arranged on the pile foundation, and a cofferdam structure arranged on the pile foundation at the bottom of the cap and surrounding the cap, the pile foundation is placed in a natural seawater environment, the pile foundation is fixedly inserted into the seabed, the cap and the cofferdam structure are placed above the seabed and partially below the sea level, the cofferdam structure is movably connected to the pile foundation, and the cofferdam structure adopts an assembled structure;
[0008] The cofferdam structure includes a bottom plate assembly, a side plate assembly and a supporting connector that are detachably connected to each other. The bottom plate assembly and the side plate assembly are spliced together to form an overall frame of the cofferdam structure. The supporting connector is mounted on the side plate assembly to resist the pressure of seawater through movable adjustment.
[0009] Furthermore, the base plate assembly includes a first base plate and a second base plate spliced to each other, the first base plate and the second base plate structures are symmetrical to each other, a first clamping groove is provided on the first base plate, and a second clamping groove is provided on the second base plate, the first clamping groove and the second clamping groove are arranged opposite to each other, and when the first base plate and the second base plate are spliced to each other, the first clamping groove and the second clamping groove cooperate to form a fully enclosed clamping hole for connecting to a pile foundation, and a first sealing structure is provided between the first base plate and the second base plate.
[0010] Furthermore, the first sealing structure includes a first sealing groove arranged on the first bottom plate close to a side surface of the second bottom plate and a first sealing protrusion on the second bottom plate close to a side surface of the first bottom plate, the first sealing protrusion and the first sealing groove are embedded in each other, and second sealing grooves are arranged on the inner sides of the first clamping groove and the second clamping groove, and a second sealing protrusion is arranged around the outer surface of the pile foundation and is clamped with the second sealing groove.
[0011] Furthermore, the side panel assembly includes a first side panel and a second side panel, the structures of the first side panel and the second side panel are symmetrical to each other, the first side panel includes a first supporting portion and a first extending portion, the second side panel includes a second supporting portion and a second extending portion, a second sealing structure and a third sealing structure are arranged between the first side panel and the first bottom panel, the second sealing structure includes a strip sealing protrusion arranged on the first bottom panel and a strip sealing groove arranged on the first extending portion, the strip sealing protrusion and the strip sealing groove are plugged into and matched with each other, the third sealing structure includes a third sealing protrusion arranged on the first bottom panel and a third sealing groove arranged on the first side panel, and the second bottom panel and the second side panel are spliced in the same way.
[0012] Furthermore, the structures of the first sealing structure and the third sealing structure are the same, the vertical cross-section of the first sealing protrusion is three isosceles triangles arranged in sequence, and the size of the three isosceles triangles gradually increases from the end to the root, and the shape of the first sealing groove is adapted to the shape of the first sealing protrusion.
[0013] Furthermore, the angle between the first supporting portion and the first extending portion is 100°-120°, and the vertical cross-section of the first side panel and the second side panel after being spliced together is an inverted isosceles trapezoid, and the supporting connecting member is erected between the first supporting portion and the second supporting portion.
[0014] Furthermore, two first supporting holes are arranged in parallel on the first supporting portion, and two second supporting holes are arranged in parallel on the second supporting portion. The two first supporting holes and the two second supporting holes correspond to each other and are at the same horizontal height. The supporting connecting member is erected between the first supporting portion and the second supporting portion through the first supporting hole and the second supporting hole.
[0015] Furthermore, the supporting connecting member includes a supporting connecting main pipe, a connecting sub-pipe and a connecting main pipe sleeved on both ends of the supporting connecting main pipe, and a spacing adjustment structure arranged in the supporting connecting main pipe for controlling the displacement of the connecting sub-pipe and the connecting main pipe. Through the adjustment of the spacing adjustment structure, the connecting sub-pipe and the connecting main pipe can be close to the supporting connecting main pipe at the same time or away from the supporting connecting main pipe at the same time, and will not produce self-displacement under the action of external force.
[0016] Furthermore, a receiving cavity is provided in the supporting connecting main pipe, the spacing adjustment structure is provided in the receiving cavity, a first extension strip is provided on the connecting sub-tube, and a second extension strip is provided on the connecting main pipe, the first extension strip and the second extension strip both extend into the receiving cavity, a first rack is provided on the first extension strip, and a second rack is provided on the second extension strip, and the spacing adjustment structure includes a first transmission wheel and a second transmission wheel which are arranged concentrically, the first transmission wheel and the second transmission wheel rotate along the same rotation center, the first transmission wheel wraps the second transmission wheel, and the outer side surface of the first transmission wheel A first transmission tooth is arranged on the upper surface, a second transmission tooth is arranged on the inner side surface of the first transmission wheel, a locking hook is arranged on the disk surface of the second transmission wheel, and an elastic sheet for controlling the locking hook to always abut against the second transmission tooth is arranged on the disk surface of the second transmission wheel, and the first transmission tooth is respectively meshed with the first rack and the second rack; an adjustment hole for rotating the second transmission wheel is arranged on the outer circumferential surface of the supporting connecting main pipe; when the second transmission wheel rotates clockwise, it drives the first transmission wheel to rotate, and when the second transmission wheel rotates counterclockwise or remains stationary, the first transmission wheel is in a locked state.
[0017] Furthermore, the free ends of the connecting sub-tube and the connecting mother tube are both provided with flexible buffer layers.
[0018] By adopting the above technical solution, the beneficial effects of the present invention are:
[0019] 1. Compared with the existing cofferdam structure of the high pile foundation, the technical solution proposed by the present invention improves the matching relationship between the cofferdam structure and the pile foundation and the matching relationship of the components of the prefabricated cofferdam itself, thereby improving the matching degree between the pile foundation and the cofferdam structure and improving the sealing of the prefabricated cofferdam itself, thereby avoiding the water seepage that may occur during the foundation construction. Specifically, a first sealing structure is provided between the cofferdam structure and the pile foundation to improve the matching relationship between the cofferdam structure and the pile foundation, thereby avoiding the situation where a gap is generated between the two and water seepage occurs. At the same time, a second sealing structure and a third sealing structure are provided in the assembly of the prefabricated cofferdam itself to improve the sealing of its own structure, and then a support connector is provided to provide water pressure resistance support for the top position of the cofferdam structure.
[0020] 2. The bottom plate assembly includes a first bottom plate and a second bottom plate which are spliced with each other. Before installation, the first bottom plate and the second bottom plate are separated from each other and can be directly spliced and installed around the pile foundation, thereby avoiding the need to pre-position the pile foundation. After installation, the first sealing groove on the first bottom plate and the first sealing protrusion on the second bottom plate are snap-fitted with each other, and at the same time, the second sealing grooves on the first snap-fitting groove and the second snap-fitting groove are snap-fitted with the second sealing protrusion pre-arranged on the pile foundation. The materials used are all hard sealing rubber materials. Since the bottom plate assembly serves as the bottom of the cofferdam structure and is subjected to seawater pressure greater than the seawater pressure on the sea surface, the seawater pressure at this position further assists the mutual cooperation between the first bottom plate and the second bottom plate while ensuring that the snap-fitting holes formed by the two and the pile foundation can also cooperate more stably. It is only necessary to place the first bottom plate and the second bottom plate parallel to the horizontal plane.
[0021] 3. The side panel assembly in the present invention comprises a first side panel and a second side panel which are symmetrical to each other. By performing separate assembly of the bottom panel assembly and the side panel assembly on the cofferdam structure, it is ensured that the side panel assembly will not generate excessive buoyancy resistance when it sinks into the seawater, thereby reducing the energy consumption generated during the installation process. The bottom panel assembly and the side panel assembly can cooperate directly in the water. On the one hand, the side panel assembly can reduce its own gravity when it sinks into the water, and on the other hand, it is easier and more convenient to adjust the position in the water than in the air. After the side panel assembly and the bottom panel assembly cooperate with each other, the accumulated water in the cofferdam structure is evacuated. In addition, according to the above principle, after the side panel assembly and the bottom panel assembly cooperate with each other, the pressure in the water can exert a force on the two, so that the force between the second sealing structure and the third sealing structure is stronger. The second sealing structure and the third sealing structure are also made of hard rubber material, which ensures that the structure will not be greatly deformed under the action of external force and improves the tightness of the cooperation between them.
[0022] 4. The first sealing structure and the third sealing structure in the present invention have the same structure. The first sealing protrusion and the third sealing protrusion both have vertical cross-sections of three isosceles triangles arranged in sequence. This structure ensures that the first sealing protrusion realizes three sealing procedures when embedded in the first sealing groove. At the same time, the three sealing procedures are all triangular plug-in structures. Under the action of seawater pressure, the wide side of the triangle continuously moves toward the narrow side. The greater the seawater pressure, the higher the degree of fit, and the stronger the mutual extrusion force. The sealing will become better and better with the triangular structural parts with increasing specifications.
[0023] 5. The angle between the first supporting portion and the first extending portion in the present invention is 100°-120°. On the one hand, the obtuse-angled outward-turned structure can resist a part of the seawater pressure through its own structural characteristics, meeting the different pressure characteristics brought about by the different depths of seawater. On the other hand, the structure can increase the open area of the construction opening, facilitating the transportation of equipment and materials.
[0024] 6. In the present invention, supporting connectors are provided, wherein the portion in the seawater is provided with natural seawater pressure, which is converted into an external force on the bottom of the cofferdam structure, and corresponding supporting connectors must be provided above the cofferdam structure to ensure that the cofferdam structure forms a complete force-bearing body from top to bottom. Otherwise, local uneven force may occur at any time during the surging or fluctuation of seawater, which may easily lead to misalignment of the matching positions. In severe cases, the bottom plate assembly and the side plate assembly may be deformed and the connection positions between them may be misaligned, resulting in seawater infiltration and construction accidents.
[0025] 7. A accommodating cavity is provided in the supporting connector, and a spacing adjustment structure is provided in the accommodating cavity. The spacing adjustment structure is used to adjust according to the actual height of the cofferdam structure and its position in the sea water. When the cofferdam structure is high and most of it is placed below the sea level, the spacing adjustment structure must be appropriately expanded outward to make the supporting connector have stronger external support performance to ensure the overall stability of the cofferdam structure. Otherwise, it needs to be retracted to avoid a large external tension on the top of the cofferdam structure, which causes the cofferdam structure to be unevenly stressed and stretched outward.
[0026] 8. The advantage of the spacing adjustment structure is that it adjusts the relative displacement between the connecting sub-tube and the connecting mother tube from the outside, and achieves synchronization of adjustment, keeps the supporting connecting tube always in the center position and thus ensures force balance. At the same time, the first transmission wheel and the second transmission wheel are mutually sleeved and meshed with each other, so that when a force is applied from the outside to rotate the second transmission wheel, the first transmission wheel follows the rotation and drives the connecting mother tube and the connecting sub-tube to perform fine adjustment of displacement through gear meshing, and expands outward to both ends to a reasonable pressure position. The reason why the first transmission wheel can rotate with the second transmission wheel is that the second transmission wheel is provided with a locking hook and an elastic sheet used in conjunction with the locking hook, which ensures that the second transmission wheel drives the first transmission wheel to rotate when it rotates clockwise, and when the second transmission wheel rotates counterclockwise or is stationary, it can lock the first transmission wheel, killing two birds with one stone, and avoiding the support connecting tube from retracting itself under the action of external force. At the same time, the flexible buffer layer at the free ends of the connecting sub-pipe and the connecting main pipe ensures that when the connecting pipe is supported against the side plate assembly after fine-tuning the spacing, it is not a rigid connection but has a certain degree of flexible buffering, which can also offset the vibration of the cofferdam structure caused by the surging sea or waves hitting the periphery of the cofferdam structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:
[0028] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0029] Figure 2 It is a schematic diagram of the coordination of the pile foundation and the cofferdam structure in the present invention;
[0030] Figure 3 It is an exploded view of the pile foundation and the base plate assembly in the present invention (the second sealing structure and the third sealing structure are not shown);
[0031] Figure 4 for Figure 3 Enlarged view of point A in the middle;
[0032] Figure 5 for Figure 3 Enlarged view of point B in the middle;
[0033] Figure 6 It is a schematic diagram of the top view structure of the present invention;
[0034] Figure 7 for Figure 6 Sectional view at CC (second sealing structure);
[0035] Figure 8 It is a schematic diagram of the three-dimensional structure of the supporting connecting member of the present invention;
[0036] Fig. 9 It is a schematic diagram of the internal structure of the supporting connecting member in the present invention;
[0037] Fig.10 This is a schematic diagram of the spacing adjustment structure force structure of the present invention;
[0038] Explanation of reference numerals: 1 pile foundation, 2 cofferdam structure, 3 seabed, 4 seawater environment, 5 support connector, 6 first sealing structure, 7 spacing adjustment structure, 8 flexible buffer layer, 11 second sealing protrusion, 12 second sealing groove, 21 bottom plate assembly, 22 side plate assembly, 211 first bottom plate, 212 second bottom plate, 221 first side plate, 222 second side plate, 2111 first clamping groove, 2121 second clamping groove, 2212 first support portion, 2211 first extension portion, 2222 second support portion , 2221 second extension portion, 2112 strip sealing protrusion, 2212 strip sealing groove, 61 first sealing protrusion, 62 first sealing groove, 51 connecting sub-tube, 52 connecting mother tube, 53 accommodating cavity, 511 first extension strip, 521 second extension strip, 512 first rack, 522 second rack, 71 first transmission wheel, 72 second transmission wheel, 711 first transmission tooth, 712 second transmission tooth, 73 adjustment hole, 74 locking hook, 75 elastic sheet; Note: D and E are both position indicators. DETAILED DESCRIPTION
[0039] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0040] See also Figure 1-Figure 10 The present invention provides an assembled cofferdam structure of a high-pile cap for a bridge, comprising a pile foundation 1, a cap arranged on the pile foundation 1, and a cofferdam structure 2 arranged on the pile foundation 1 at the bottom of the cap and surrounding the cap, the pile foundation 1 being placed in a natural seawater environment 4, the pile foundation 1 being fixedly inserted into a seabed 3, the cap and the cofferdam structure 2 being placed above the seabed 3 and partially below the sea level, the cofferdam structure 2 being movably connected to the pile foundation 1, and the cofferdam structure 2 being an assembled structure; wherein, in the entire scheme, the cap may be already completed and fixedly arranged on the pile foundation 1, or the cap may not yet be constructed, the cap structure is not the key point of protection of the present invention, it is only used as a building structure that already exists or does not yet exist in the cofferdam structure 2.
[0041] The cofferdam structure 2 includes a bottom plate assembly 21, a side plate assembly 22 and a supporting connector 5 that are detachably connected to each other. The bottom plate assembly 21 and the side plate assembly 22 are spliced together to form an overall frame of the cofferdam structure 2. The supporting connector 5 is mounted on the side plate assembly to resist the pressure of seawater through movable adjustment.
[0042] The base plate assembly 21 includes a first base plate 211 and a second base plate 212 spliced together. The first base plate 211 and the second base plate 212 are symmetrical in structure. The first base plate 211 is provided with a first clamping groove 2111, and the second base plate 212 is provided with a second clamping groove 2121. The first clamping groove 2111 and the second clamping groove 2121 are arranged opposite to each other. When the first base plate 211 and the second base plate 212 are spliced together, the first clamping groove 2111 and the second clamping groove 2121 cooperate to form a fully enclosed clamping hole for connecting with the pile foundation 1. The first base plate 211 and A first sealing structure 6 is provided between the second bottom plates 212, the first sealing structure 6 comprises a first sealing groove 62 provided on the first bottom plate 211 close to a side surface of the second bottom plate 212 and a first sealing protrusion 61 provided on the second bottom plate 212 close to a side surface of the first bottom plate 211, the first sealing protrusion 61 and the first sealing groove 62 are mutually embedded, the inner side surfaces of the first clamping groove 2111 and the second clamping groove 2121 are both provided with a second sealing groove 12, and a second sealing protrusion 11 is provided on the outer surface of the pile foundation 1 to be mutually clamped with the second sealing groove 12;
[0043] The side panel assembly 22 includes a first side panel 221 and a second side panel 222. The structures of the first side panel 221 and the second side panel 222 are symmetrical to each other. The first side panel 221 includes a first supporting portion 2212 and a first extending portion 2211. The second side panel 222 includes a second supporting portion 2222 and a second extending portion 2221. A second sealing structure and a third sealing structure are provided between the first side panel 221 and the first bottom panel 211. The second sealing structure includes a strip sealing protrusion 2112 provided on the first bottom panel 211 and a strip sealing groove 2213 provided on the first extending portion 2211. The strip sealing protrusion 2112 and the strip sealing groove 2213 are plugged into and matched with each other. The second sealing structure is provided at Figure 6 The third sealing structure includes a third sealing protrusion provided on the first bottom plate 211 and a third sealing groove provided on the first side plate 221. The second bottom plate 212 and the second side plate 222 are spliced in the same manner. The third sealing structure is provided at Figure 6 At D and E in the figure.
[0044] The structure of the first sealing structure 6 is the same as that of the third sealing structure. The vertical section of the first sealing protrusion 61 is three isosceles triangles arranged in sequence, and the size of the three isosceles triangles gradually increases from the end to the root. The shape of the first sealing groove 62 is compatible with the shape of the first sealing protrusion 61. The angle α between the first supporting portion 2212 and the first extending portion 2222 is 100°. After the first side panel 221 and the second side panel 222 are spliced together, their vertical section is an inverted isosceles trapezoid. The supporting connector 5 is erected between the first supporting portion 2212 and the second supporting portion 2222. The first sealing protrusion, the strip sealing protrusion and the third sealing protrusion are all made of hard rubber to ensure sealing performance.
[0045] The first supporting portion 2212 is provided with two first supporting holes in parallel, and the second supporting portion 2222 is provided with two second supporting holes in parallel. The two first supporting holes and the two second supporting holes are located in correspondence with each other and are at the same level. The supporting connector 5 is mounted between the first supporting portion 2212 and the second supporting portion 2222 through the first supporting holes and the second supporting holes.
[0046] The supporting connecting member 5 includes a supporting connecting main pipe, a connecting sub-pipe 51 and a connecting main pipe 52 sleeved on both ends of the supporting connecting main pipe, and a spacing adjustment structure 7 arranged in the supporting connecting main pipe for controlling the displacement of the connecting sub-pipe 51 and the connecting main pipe 52. Through the adjustment of the spacing adjustment structure 7, the connecting sub-pipe 51 and the connecting main pipe 52 can be close to the supporting connecting main pipe at the same time or away from the supporting connecting main pipe at the same time, and will not produce self-displacement under the action of external force.
[0047] The supporting connecting main pipe is provided with a receiving cavity 53, the spacing adjustment structure 7 is provided in the receiving cavity 53, the connecting sub-pipe 51 is fixedly provided with a first extension bar 511, the connecting main pipe 52 is provided with a second extension bar 521, the first extension bar 511 and the second extension bar 521 both extend into the receiving cavity 53, the first extension bar 511 is provided with a first rack 512, the second extension bar 521 is provided with a second rack 522, the spacing adjustment structure 7 comprises a first transmission wheel 71 and a second transmission wheel 72 which are arranged concentrically, the first transmission wheel 71 and the second transmission wheel 72 rotate along the same rotation center, the first transmission wheel 71 wraps the second transmission wheel 72, and the outer surface of the first transmission wheel 71 is provided with a first transmission tooth 711, A second transmission tooth 712 is provided on the inner side surface of the first transmission wheel 71, a locking hook 74 is provided on the disk surface of the second transmission wheel 72, and an elastic sheet 75 for controlling the locking hook 74 to always abut against the second transmission tooth 712 is provided on the disk surface of the second transmission wheel 72. The first transmission tooth 711 is respectively meshed with the first rack 512 and the second rack 522; an adjustment hole 73 for rotating the second transmission wheel 72 is provided on the outer circumferential surface of the supporting connecting main pipe, and the adjustment hole 73 passes through the accommodating cavity 53 and realizes the adjustment of the second transmission wheel 72 from the outside; when the second transmission wheel 72 rotates clockwise, it drives the first transmission wheel 71 to rotate, and when the second transmission wheel 72 rotates counterclockwise or remains stationary, the first transmission wheel 71 is in a locked state.
[0048] The free ends of the connecting sub-tube 51 and the connecting main tube 52 are both provided with a flexible buffer layer 8, and the flexible buffer layer 8 is a hard rubber layer.
[0049] There are two supporting connectors 5 in the present invention, which are installed in the same direction. In practice, two connectors can be installed vertically on a horizontal plane, or a single group of two or two groups of four connectors can be installed vertically on a horizontal plane according to the on-site construction conditions.
[0050] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved.
[0051] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A bridge high pile cap assembled cofferdam structure, comprising a pile foundation, a cap disposed on the pile foundation, and a cofferdam structure disposed on the pile foundation at the bottom of the cap and surrounding the cap, wherein the pile foundation is placed in a natural seawater environment, the pile foundation is fixedly inserted into the seabed, the cap and the cofferdam structure are placed above the seabed and partially below the sea level, and characterized in that: The cofferdam structure is movably connected to the pile foundation, and the cofferdam structure adopts an assembled structure; The cofferdam structure comprises a bottom plate assembly, a side plate assembly and a supporting connector that are detachably connected to each other. The bottom plate assembly and the side plate assembly are spliced to each other to form an overall frame of the cofferdam structure. The supporting connector is mounted on the side plate assembly to resist the pressure of seawater through movable adjustment. The base plate assembly comprises a first base plate and a second base plate spliced to each other, the first base plate and the second base plate structures are symmetrical to each other, a first clamping groove is provided on the first base plate, a second clamping groove is provided on the second base plate, the first clamping groove and the second clamping groove are arranged opposite to each other, when the first base plate and the second base plate are spliced to each other, the first clamping groove and the second clamping groove cooperate to form a fully enclosed clamping hole for connecting with a pile foundation, and a first sealing structure is provided between the first base plate and the second base plate; The first sealing structure comprises a first sealing groove arranged on the first bottom plate close to a side surface of the second bottom plate and a first sealing protrusion on the second bottom plate close to a side surface of the first bottom plate, the first sealing protrusion and the first sealing groove are mutually embedded, the inner side surfaces of the first clamping groove and the second clamping groove are both provided with a second sealing groove, and the outer surface of the pile foundation is surrounded by a second sealing protrusion mutually clamped with the second sealing groove; The side panel assembly comprises a first side panel and a second side panel, the structures of the first side panel and the second side panel are symmetrical to each other, the first side panel comprises a first supporting portion and a first extending portion, the second side panel comprises a second supporting portion and a second extending portion, a second sealing structure and a third sealing structure are arranged between the first side panel and the first bottom panel, the second sealing structure comprises a strip sealing protrusion arranged on the first bottom panel and a strip sealing groove arranged on the first extending portion, the strip sealing protrusion and the strip sealing groove are plugged and matched with each other, the third sealing structure comprises a third sealing protrusion arranged on the first bottom panel and a third sealing groove arranged on the first side panel, and the second bottom panel and the second side panel are spliced in the same way; The first sealing structure and the third sealing structure have the same structure, the vertical cross-section of the first sealing protrusion is three isosceles triangles arranged in sequence, and the sizes of the three isosceles triangles gradually increase from the end to the root, and the shape of the first sealing groove is adapted to the shape of the first sealing protrusion; The angle between the first supporting portion and the first extending portion is 100°-120°, the vertical cross-section of the first side panel and the second side panel after being spliced and matched is an inverted isosceles trapezoid, and the supporting connector is arranged between the first supporting portion and the second supporting portion; The first supporting portion is provided with two first supporting holes in parallel, and the second supporting portion is provided with two second supporting holes in parallel, the two first supporting holes and the two second supporting holes are located in correspondence with each other and are at the same level, and the supporting connecting member is mounted between the first supporting portion and the second supporting portion through the first supporting holes and the second supporting holes; The supporting connection member comprises a supporting connection main pipe, a connecting sub-pipe and a connecting main pipe sleeved at both ends of the supporting connection main pipe, and a spacing adjustment structure arranged in the supporting connection main pipe for controlling the displacement of the connecting sub-pipe and the connecting main pipe. Through the adjustment of the spacing adjustment structure, the connecting sub-pipe and the connecting main pipe can simultaneously approach the supporting connection main pipe or simultaneously move away from the supporting connection main pipe, and will not generate self-displacement under the action of external force; The supporting connecting main pipe is provided with an accommodating cavity, the spacing adjustment structure is arranged in the accommodating cavity, the connecting sub-pipe is provided with a first extension bar, the connecting mother pipe is provided with a second extension bar, the first extension bar and the second extension bar both extend into the accommodating cavity, the first extension bar is provided with a first rack, and the second extension bar is provided with a second rack, the spacing adjustment structure comprises a first transmission wheel and a second transmission wheel which are arranged concentrically, the first transmission wheel and the second transmission wheel rotate along the same rotation center, the first transmission wheel wraps the second transmission wheel, the outer side surface of the first transmission wheel is provided with a first transmission tooth, the inner side surface of the first transmission wheel is provided with a second transmission tooth, a locking hook is provided on the disk surface of the second transmission wheel, and an elastic sheet for controlling the locking hook to always abut against the second transmission tooth is provided on the disk surface of the second transmission wheel, and the first transmission tooth is respectively meshed with the first rack and the second rack; An adjustment hole for rotating the second transmission wheel is arranged on the outer circumferential surface of the supporting connecting main pipe; when the second transmission wheel rotates clockwise, the first transmission wheel is driven to rotate; when the second transmission wheel rotates counterclockwise or remains stationary, the first transmission wheel is in a locked state.