A rail transit industrial control network security supervision method and system

By deploying data collectors at rail transit stations and using group models and dynamic word embedding models to process data, the problems of low resource utilization and data loss in the rail transit communication system are solved, efficient data processing and safety supervision are achieved, and the cost is reduced Maintenance costs are reduced and the level of intelligence is improved.

CN118529101BActive Publication Date: 2024-10-18JIANGSU ZHITONG INFORMATION SYSTEM CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411006350.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-10-18
Estimated Expiration
2044-07-25

AI Technical Summary

Technical Problem

In the existing rail transit communication system, the equipment configuration is too full-featured, resulting in low resource utilization, high maintenance costs, and prone to data loss in high passenger flow environments.

Method used

By deploying data collectors at rail transit stations, we can obtain passenger flow threshold information and operation and maintenance information in real time, and use group models and dynamic word embedding models for data processing, dynamically adjust data processing methods, create data interfaces, and process entry and exit information and operation and maintenance information. Segmentation processing, using UCG network for information identification and data compression, timely detection of abnormal situations and taking measures, judging equipment operation rate to predict maintenance needs.

Benefits of technology

It effectively avoids data congestion and loss, improves data processing efficiency, enhances system security, accurately predicts equipment maintenance needs, reduces maintenance costs, improves the intelligence level of rail transit, and provides passengers with convenient, efficient, and safe services. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118529101B_ABST
    Figure CN118529101B_ABST
Patent Text Reader

Abstract

The present invention relates to a method and system for secure supervision of rail transit industrial control network, which acquires site data in real time, including passenger flow threshold, access information and operation and maintenance information, and compares it with the pre-configured personnel redundancy threshold, so as to efficiently process passenger flow data. When the passenger flow exceeds the threshold, the group model and the dynamic word embedding model are used to process the access information and operation and maintenance information respectively, so as to ensure the accuracy and efficiency of data processing. The group model processes the access information through the UCG network to generate node binary coding; the dynamic word embedding model analyzes the operation and maintenance information to determine the equipment operation rate and maintenance requirements. If the passenger flow is lower than the threshold, the auxiliary data processing unit is used to process the access information. The present invention effectively improves the data processing capability and system security of the rail transit industrial control network, reduces maintenance costs, and provides strong support for the intelligent and safe management of rail transit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of rail transit communication technology, and in particular to a rail transit industrial control network security supervision method and system. Background Art

[0002] In the current rail transit, such as the traditional subway, due to the large station size and passenger flow, each subsystem in the rail transit communication system is equipped with full-function equipment at each station. Each station is equipped with a management workstation, communication network equipment, control equipment, server cluster and application terminal. This configuration method has low resource utilization of equipment and serious waste of resources due to the configuration of full-function equipment at each station, and the subsequent maintenance cost increases and the maintenance workload is large.

[0003] Referring to patent technology CN110316228A, it proposes a rail transit communication system technology, which uses a central management station to avoid configuring full-function equipment at each station. Only communication network equipment and application terminals are set up at non-centralized stations. The operation control center controls the application terminals of the equipment at non-centralized stations, thereby improving the resource utilization of the equipment and reducing maintenance costs and workload.

[0004] It is understandable that the use of the above patented technology can reduce the supplier's resource investment in the station. It only needs to collect relevant station data to the central management station for processing, which effectively reduces the supplier's field inspection and maintenance costs. However, in the opposite direction, the station data processing is also removed. In the current social background where the passenger flow of stations is extremely large, data loss is prone to occur. For example, when a person gets on the train at station A and gets off at station B, the fee cannot be calculated due to data loss, causing inconvenience;

[0005] Therefore, how to reduce operation and maintenance costs and solve the problems of data congestion and data loss caused by large data volumes are the issues that need to be addressed at present. Summary of the invention

[0006] The main purpose of the present invention is to provide a rail transit industrial control network security supervision method and system to solve the problems of low data processing efficiency, easy loss and high system maintenance cost in the prior art.

[0007] To achieve the above object, the present invention provides a rail transit industrial control network security supervision method, comprising the following steps:

[0008] Acquire station data input in real time by a first station data collector, the station data including passenger flow threshold information, entry and exit information, and operation and maintenance information, the first station data collector being deployed at a corresponding rail transit station;

[0009] Using the pre-configured personnel redundancy threshold to compare with the passenger flow threshold information to determine whether the passenger flow threshold information is higher than the personnel redundancy threshold;

[0010] If yes, the site data is segmented to create two data interfaces, receiving the input and output information and the operation and maintenance information respectively;

[0011] Inputting the entry and exit information into a pre-deployed group model, and simultaneously inputting the operation and maintenance information into a pre-deployed dynamic word embedding model;

[0012] The UCG network permanently generated by the group model is used to process the input and output information, and the processed node binary code is fed back to the first site data collector and / or the second site data collector;

[0013] The operation and maintenance information is processed by the transformer decoder through the dynamic word embedding model to obtain the operation rate of each unit module of the first site data collector, and to determine whether field maintenance is required and whether data migration processing is required.

[0014] Further, after the step of comparing the preconfigured personnel redundancy threshold with the passenger flow threshold information to determine whether the passenger flow threshold information is higher than the personnel redundancy threshold, the method further includes:

[0015] If the passenger flow threshold information is lower than the set personnel redundancy threshold, the auxiliary data processing unit configured on the data collector of the first site is used to process the access information;

[0016] The input and output information is processed through the UCG network preconfigured on the auxiliary data processing unit to feed back the processed node binary code to the first site data collector and / or the second site data collector.

[0017] Furthermore, in the step of providing a permanently generated UCG network through the group model to process the in-and-out information and feeding back the processed node binary code to the first site data collector and / or the second site data collector, the group model processes the in-and-out information in the following manner:

[0018] Use the API interface to connect the acquired access information to the UCG network;

[0019] Performing information recognition on the incoming and outgoing information through the text recognition layer of the UCG network to recognize the incoming and outgoing information and / or the outgoing information and the user QR code in the incoming and outgoing information;

[0020] Associating the user's online wallet according to the user's QR code, and retrieving a site map set in the UCG network according to the inbound information and / or outbound information;

[0021] Then, the network graph layer of the UCG network is used to determine the user's transit information from the site map using the inbound information and the outbound information, thereby determining the corresponding charging information according to the corresponding charging rules based on the transit information;

[0022] The data compression layer of the UCG network compresses the charging information to form a node binary code, where the data compression method is:

[0023] Binarize the specific value of the charging information according to the binary digital standard of the computer equipment;

[0024] Generate a binary text code corresponding to the station passing information, and simultaneously generate a corresponding charging instruction protocol according to the station passing information;

[0025] The charging instruction protocol, text code and binarized node binary code are output to the auxiliary data processing unit on the first site data collector, so as to decode the node binary code through the corresponding UCG network on the auxiliary data processing unit.

[0026] Furthermore, the step of decoding the node binary code through the corresponding UCG network on the auxiliary data processing unit includes:

[0027] The auxiliary data processing unit obtains the node binary code input by the central management station and performs reverse decoding. The reverse decoding method is:

[0028] Importing the node binary code into the UCG network arranged in the auxiliary data processing unit;

[0029] Through the UCG network, the node binary code is gradually decoded by the data compression layer, network graph layer, and text recognition layer to obtain the charging instructions and station passing information.

[0030] Further, the operation and maintenance information is processed by the transformer decoder through the dynamic word embedding model to obtain the operation rate of each unit module of the first site data collector, and determine whether field maintenance is required, and determine whether data migration processing is required, including:

[0031] Creating a plurality of LSTM models according to the types of the processing units of the first site data collector involved in the operation and maintenance information, so as to construct an ELMo model from the plurality of LSTM models;

[0032] The operation and maintenance information corresponding to each of the processing units is identified one by one through a plurality of LSTM models, and the information token is vectorized to obtain the operation and maintenance vector corresponding to the operation and maintenance information of each of the processing units;

[0033] Bidirectionally communicate several LSTM models and their corresponding operation vectors to make each of the operation vectors bidirectional, and output the overlapping parts of the communication from the LEMo model to the transformer decoder;

[0034] The transformer decoder uses the GPT rule to mask the overlapping vectors using MASK to obtain the length information of the operation vector;

[0035] The operation rate of each processing unit is determined by obtaining the operation and maintenance vector of each processing unit and its length information.

[0036] Further, the operation and maintenance information is processed by the transformer decoder through the dynamic word embedding model to obtain the operation rate of each unit module of the first site data collector, and determine whether field maintenance is required, and determine whether data migration processing is required, including:

[0037] By comparing the preset operation rate coefficient with the actual operation rate, if the actual operation rate is lower than the operation rate coefficient, the ground maintenance information is generated and sent to the central management station.

[0038] The present invention proposes a rail transit industrial control network security supervision system, comprising:

[0039] An acquisition unit, used to acquire station data input in real time by a first station data collector, the station data including passenger flow threshold information, entry and exit information, and operation and maintenance information, wherein the first station data collector is deployed at a corresponding rail transit station;

[0040] A comparison unit, used to compare the pre-configured personnel redundancy threshold with the passenger flow threshold information to determine whether the passenger flow threshold information is higher than the personnel redundancy threshold;

[0041] An interface unit, used for segmenting the site data to create two data interfaces for receiving input and output information and operation and maintenance information respectively;

[0042] A model unit, configured to input the input and output information into a pre-deployed group model, and simultaneously input the operation and maintenance information into a pre-deployed dynamic word embedding model;

[0043] A first processing module is used to process the input and output information through the UCG network permanently generated by the group model, and feed back the processed node binary code to the first site data collector and / or the second site data collector;

[0044] The second processing module is used to perform transformer decoder processing on the operation and maintenance information through the dynamic word embedding model, obtain the operation rate of each unit module of the first site data collector, and determine whether field maintenance is required and whether data migration processing is required.

[0045] The present invention also provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above-mentioned rail transit industrial control network security supervision method when executing the computer program.

[0046] The present invention also provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the above-mentioned rail transit industrial control network security supervision method are implemented.

[0047] The rail transit industrial control network security supervision method and system provided by the present invention have the following beneficial effects:

[0048] (1) By acquiring station data in real time and dynamically adjusting the data processing method according to passenger flow conditions, data congestion and loss problems can be effectively avoided, thereby improving data processing efficiency.

[0049] (2) By processing input and output information and operation and maintenance information through the group model and dynamic word embedding model, abnormal situations can be discovered in a timely manner and corresponding measures can be taken, thereby enhancing the security of the system.

[0050] (3) By judging the equipment operation rate, the maintenance needs of the equipment can be accurately predicted, thus avoiding unnecessary maintenance operations and reducing maintenance costs.

[0051] (4) The present invention improves the intelligence level of rail transit through advanced data processing technology and model application, providing passengers with more convenient, efficient and safe services. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] Figure 1 It is a flow chart of a method for monitoring the security of a rail transit industrial control network in one embodiment of the present invention;

[0053] Figure 2 It is a structural block diagram of a rail transit industrial control network security supervision system in one embodiment of the present invention;

[0054] Figure 3 It is a schematic block diagram of the structure of a computer device according to an embodiment of the present invention.

[0055] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0056] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0057] Reference Figure 1 , which is a flow chart of a rail transit industrial control network security supervision method proposed by the present invention, comprising the following steps:

[0058] S1, obtaining station data input in real time by a first station data collector, wherein the station data includes passenger flow threshold information, entry and exit information, and operation and maintenance information, and the first station data collector is deployed at a corresponding rail transit station;

[0059] S2, using a pre-configured personnel redundancy threshold to compare with the passenger flow threshold information to determine whether the passenger flow threshold information is higher than the personnel redundancy threshold;

[0060] S3, if yes, the site data is segmented to create two data interfaces to receive the input and output information and the operation and maintenance information respectively;

[0061] S4, inputting the entry and exit information into a pre-deployed group model, and simultaneously inputting the operation and maintenance information into a pre-deployed dynamic word embedding model;

[0062] S5, processing the input and output information through the permanently generated UCG network provided by the group model, and feeding back the processed node binary code to the first site data collector and / or the second site data collector;

[0063] S6, performing transformer decoder processing on the operation and maintenance information through the dynamic word embedding model to obtain the operation rate of each unit module of the first site data collector, and determine whether field maintenance is required and whether data migration processing is required.

[0064] in,

[0065] For S1, in the rail transit network, each station is an important node for data transmission and processing. In order to achieve efficient network security supervision, the present invention first deploys the first station data collector at each rail transit station. These collectors are designed to capture station data in real time, including passenger flow threshold information, access information and operation and maintenance information. Passenger flow threshold information reflects the current passenger flow status of the station, which is an important basis for judging whether the station is crowded and whether flow limiting measures need to be taken. Access information records the entry and exit of passengers in detail, including time, number of people, number of gates, etc., and provides basic data for subsequent ticket settlement and passenger flow statistics. The operation and maintenance information covers the operating status, fault alarm and other information of various equipment in the station, which is the key to ensure the normal operation of the station equipment and timely troubleshooting. Through the real-time input of the first station data collector, the present invention can continuously obtain the latest and most accurate station data, which provides a solid foundation for subsequent data processing and safety supervision. At the same time, this real-time data acquisition method also ensures that the present invention can respond quickly to changes in rail transit stations, improving the flexibility and real-time performance of the entire system.

[0066] For S2, after obtaining the site data input by the first site data collector in real time, the present invention will further use the pre-configured personnel redundancy threshold and passenger flow threshold information for judgment and comparison. The core purpose of this step is to evaluate whether the passenger flow condition of the current site exceeds the safe or comfortable range. The personnel redundancy threshold is a threshold pre-set based on factors such as the design capacity of the site, historical passenger flow data, and safety standards. When the passenger flow threshold information is higher than the pre-configured personnel redundancy threshold, it indicates that the site may be in a crowded state, and there is a risk of safety hazards or reduced service quality. By comparing the passenger flow threshold information and the personnel redundancy threshold in real time, the present invention can timely discover abnormal passenger flow and trigger the corresponding data processing process and safety supervision mechanism. This dynamic comparison method not only improves the response speed to passenger flow changes, but also helps to achieve refined passenger flow management and safety supervision. If the passenger flow threshold information is higher than the personnel redundancy threshold, the system will enter the next stage of the data processing process to cope with the challenges brought by high passenger flow; if the passenger flow threshold information is lower than or equal to the personnel redundancy threshold, it indicates that the current passenger flow is within a safe or acceptable range, and the system will continue to perform data processing and safety supervision according to the conventional process.

[0067] For S3, after determining that the passenger flow threshold information is higher than the personnel redundancy threshold, the present invention enters the next key step: segmenting the site data. Since the site data contains multiple types of information, such as access information and operation and maintenance information, these information have different requirements and paths in subsequent processing. Therefore, in order to improve the efficiency and accuracy of data processing, the present invention divides the site data into two parts and creates independent data interfaces for them respectively. First, the access information is segmented and received through a dedicated data interface. Access information refers to data related to passenger entry and exit, including passenger entry and exit time, gate number, ticket type, etc. These data are crucial for subsequent processing such as passenger flow statistics and ticket settlement. Through an independent data interface, access information can be efficiently transmitted to the corresponding processing module to ensure its real-time and accuracy. At the same time, operation and maintenance information is also segmented and received through another data interface. Operation and maintenance information covers key data such as the operating status and fault alarm of various types of equipment in the site. This information is of great significance for timely detection of equipment failures and ensuring the normal operation of the site. Through independent data interfaces, operation and maintenance information can be quickly transmitted to a dedicated monitoring system to achieve real-time equipment status monitoring and fault warning. The segmentation of site data not only improves the parallelism and efficiency of data processing, but also provides a clearer and more accurate data basis for subsequent data analysis and safety supervision. Through reasonable data segmentation and interface design, the present invention can ensure that various types of site data are processed and applied in a timely and effective manner.

[0068] For S4, after completing the segmentation of the site data and creating the corresponding data interface, the present invention continues to perform the next step: input the entry and exit information into the pre-deployed group model, and input the operation and maintenance information into the pre-deployed dynamic word embedding model. The group model is an algorithm model specially designed to process and analyze a large number of individual behaviors (in this case, the entry and exit behaviors of passengers). It can identify key information such as the behavior patterns and flow changes of passenger groups by analyzing the entry and exit data of passengers. This information has important guiding significance for passenger flow management, safety supervision and emergency response of rail transit stations. By inputting the entry and exit information into the group model, the present invention can realize real-time monitoring and prediction of passenger group behavior, providing strong support for the safe operation of the site. At the same time, the operation and maintenance information is input into the dynamic word embedding model. The dynamic word embedding model is an advanced natural language processing technology that can convert text data (in this case, text information related to equipment operation and maintenance) into a numerical vector representation that can be understood by a computer. In this way, the dynamic word embedding model can capture the semantic relationships and patterns in the equipment operation and maintenance information, thereby realizing intelligent monitoring of the equipment status and fault warning. By inputting operation and maintenance information into the model, the present invention can timely discover abnormal conditions of equipment and take corresponding measures to repair or adjust them to ensure the normal operation of the site.

[0069] Regarding S5, in step S4, the entry and exit information has been input into the pre-deployed group model. This step S5 will describe in detail how the group model processes the entry and exit information and feedback the processing results. A permanently generated UCG (Undirected Connected Graph) network runs inside the group model. This UCG network is constructed based on information such as the historical entry and exit data of the station, passenger behavior patterns, and station topology. It can effectively represent the passenger's movement path, flow distribution, and mutual relationship within the station. When new entry and exit information is input into the group model, the UCG network will immediately process this information. The processing process includes but is not limited to: identifying passenger entry and exit events, calculating the passenger's stay time in the station, updating the passenger flow distribution, etc. Through these processes, the UCG network can reflect the dynamic changes of passengers in the station in real time. After the processing is completed, the group model will feedback the processed node binary code to the first station data collector and / or the second station data collector. These node binary codes are the result of encoding the status of each node in the UCG network. They can concisely represent information such as passenger flow, density, and movement trends in each area of ​​the station. By feeding back these codes, the first station data collector and / or the second station data collector can timely obtain the latest status of passengers in the station, providing accurate basic data for subsequent data analysis and safety supervision.

[0070] With respect to S6, after step S5 is completed, the present invention continues to execute step S6, that is, to deeply process and analyze the operation and maintenance information through the dynamic word embedding model. The dynamic word embedding model exerts its powerful natural language processing capabilities here, especially for the understanding and parsing of unstructured text data. First, the operation and maintenance information is input into the dynamic word embedding model. This information may include text data such as equipment status reports, fault logs, and maintenance history records. The dynamic word embedding model uses pre-trained word embedding vectors to convert these text data into numerical forms that can be understood by computers, while capturing the semantic relationships and contextual information in the text. Then, the model uses the Transformer decoder to process the converted numerical data. The Transformer decoder is an advanced neural network structure that can capture long-term dependencies in sequence data through techniques such as self-attention mechanisms and position encoding, and generate context-relevant outputs. In this process, the model analyzes key indicators such as equipment status, fault type, fault frequency, and the relationship and trend between them in the operation and maintenance information. Through the processing of the Transformer decoder, the dynamic word embedding model can output the operation rate of each unit module of the data collector at the first site. These operating rates reflect the working status and performance of each unit module, and are an important basis for evaluating whether the equipment needs maintenance. At the same time, the model will also determine whether underground maintenance is required based on the operating rate and preset thresholds or rules, that is, whether the equipment needs to be inspected, repaired or replaced on site. In addition, the dynamic word embedding model will also determine whether data migration processing is required based on the processing results of the operation and maintenance information. This may be because the failure of certain equipment has caused data loss or damage, or because the data needs to be migrated to a new device or system due to equipment upgrades, replacements, etc. Through timely data migration processing, the present invention can ensure the integrity and availability of the data, and provide continuous data support for the safety supervision and intelligent management of rail transit.

[0071] In one embodiment, after the step of comparing the preconfigured personnel redundancy threshold with the passenger flow threshold information to determine whether the passenger flow threshold information is higher than the personnel redundancy threshold, the method further includes:

[0072] If the passenger flow threshold information is lower than the set personnel redundancy threshold, the auxiliary data processing unit configured on the data collector of the first site is used to process the access information;

[0073] The input and output information is processed through the UCG network preconfigured on the auxiliary data processing unit to feed back the processed node binary code to the first site data collector and / or the second site data collector.

[0074] In one embodiment, the group model is used to provide a permanently generated UCG network to process the input and output information, and in the step of feeding back the processed node binary code to the first site data collector and / or the second site data collector, the group model processes the input and output information in the following manner:

[0075] Use the API interface to connect the acquired access information to the UCG network;

[0076] Performing information recognition on the incoming and outgoing information through the text recognition layer of the UCG network to recognize the incoming and outgoing information and / or the outgoing information and the user QR code in the incoming and outgoing information;

[0077] Associating the user's online wallet according to the user's QR code, and retrieving a site map set in the UCG network according to the inbound information and / or outbound information;

[0078] Then, the network graph layer of the UCG network is used to determine the user's transit information from the site map using the inbound information and the outbound information, thereby determining the corresponding charging information according to the corresponding charging rules based on the transit information;

[0079] The data compression layer of the UCG network compresses the charging information to form a node binary code, where the data compression method is:

[0080] Binarize the specific value of the charging information according to the binary digital standard of the computer equipment;

[0081] Generate a binary text code corresponding to the station passing information, and simultaneously generate a corresponding charging instruction protocol according to the station passing information;

[0082] The charging instruction protocol, text code and binarized node binary code are output to the auxiliary data processing unit on the first site data collector, so as to decode the node binary code through the corresponding UCG network on the auxiliary data processing unit.

[0083] In the specific implementation process, the first step of data compression is to convert the specific values ​​of the charging information into binary format. Binary is the basic format for storing and processing data inside computers. It uses two numbers, 0 and 1, to represent all information. In this step, the specific values ​​of the charging information (such as amount, discount, etc.) are converted into binary numbers according to the binary digital standard of the computer equipment. This conversion is to ensure the accuracy and efficiency of the data, because binary data takes up less space when stored and transmitted, and is processed faster.

[0084] In addition to binarizing the numerical values ​​of the toll information, the data compression layer also generates a binary text code corresponding to the station passing information. This text code is a binary representation of the station passing information (such as the entry station, exit station, boarding time, etc.), which helps to quickly identify and restore the original information in subsequent processing. At the same time, based on the station passing information, the data compression layer will generate the corresponding charging instruction protocol. This protocol contains all the instructions and information required to perform the charging operation, such as the deduction amount, account information, etc. The charging instruction protocol also exists in binary form so that it can be transmitted and processed together with the binary charging information and text code.

[0085] After completing the above processing, the data compression layer will output the charging instruction protocol, the binary text code, and the binary node binary code to the auxiliary data processing unit on the data collector of the first site. The auxiliary data processing unit is a component dedicated to processing these compressed data and instructions. The data it receives is highly compressed binary data, which helps to reduce the time and bandwidth required for data transmission. On the auxiliary data processing unit, these data will be decoded by the corresponding UCG network. Decoding is the process of converting binary data back to its original format (such as decimal numbers, text, etc.) for subsequent analysis and processing.

[0086] In one embodiment, the step of decoding the node binary code through the corresponding UCG network on the auxiliary data processing unit includes:

[0087] The auxiliary data processing unit obtains the node binary code input by the central management station and performs reverse decoding. The reverse decoding method is:

[0088] Importing the node binary code into the UCG network arranged in the auxiliary data processing unit;

[0089] Through the UCG network, the node binary code is gradually decoded by the data compression layer, network graph layer, and text recognition layer to obtain the charging instructions and station passing information.

[0090] In one embodiment, the operation and maintenance information is processed by the transformer decoder through the dynamic word embedding model to obtain the operation rate of each unit module of the first site data collector, and determine whether field maintenance is required, and determine whether data migration processing is required, including:

[0091] Creating a plurality of LSTM models according to the types of the processing units of the first site data collector involved in the operation and maintenance information, so as to construct an ELMo model from the plurality of LSTM models;

[0092] The operation and maintenance information corresponding to each of the processing units is identified one by one through a plurality of LSTM models, and the information token is vectorized to obtain the operation and maintenance vector corresponding to the operation and maintenance information of each of the processing units;

[0093] Bidirectionally communicate several LSTM models and their corresponding operation vectors to make each of the operation vectors bidirectional, and output the overlapping parts of the communication from the LEMo model to the transformer decoder;

[0094] The transformer decoder uses the GPT rule to mask the overlapping vectors using MASK to obtain the length information of the operation vector;

[0095] The operation rate of each processing unit is determined by obtaining the operation and maintenance vector of each processing unit and its length information.

[0096] In actual operation, the dynamic word embedding model is used to process operation and maintenance information to obtain the operation rate of each unit module of the data collector at the first site, and to determine whether on-site maintenance and data migration are required.

[0097] First, several long short-term memory (LSTM) models are created based on the types of processing units of the first site data collector involved in the operation and maintenance information. LSTM is a special recurrent neural network (RNN) that is suitable for processing long-term dependencies in time series data or text data. These LSTM models are then used to build ELMo (Embeddings from Language Models) models. The ELMo model is a deep bidirectional language model that can capture the complex features and contextual information of words.

[0098] Next, the operation and maintenance information corresponding to each processing unit is identified one by one using the several LSTM models created. This information may include device status, error logs, performance data, etc. During the identification process, the LSTM model converts the operation and maintenance information into tokens (i.e., the basic units of text, such as words or punctuation marks), and vectorizes these tokens to obtain the operation and maintenance vectors corresponding to the operation and maintenance information of each processing unit. Vectorization is the process of converting text data into numerical vectors for easy computer processing and calculation.

[0099] Then, several LSTM models and their corresponding operation vectors are bidirectionally interconnected. This means that the operation vectors of different processing units can exchange and share information. Through bidirectional interconnection, each operation vector can be bidirectional, that is, each vector contains information from other vectors. The overlapping parts of the interconnection (that is, the operation information that multiple processing units pay attention to) are output by the ELMo model to the Transformer decoder.

[0100] The Transformer decoder receives the overlapping operation vectors from the ELMo model and processes them using the GPT (Generative Pre-trained Transformer) rule. GPT is a Transformer-based autoregressive language model that can generate text by predicting the next token in a text sequence. In this step, the Transformer decoder uses MASK to mask the overlapping vectors to obtain the length information of the operation vector. Masking is to ignore certain parts of the information during processing in order to focus on other important features.

[0101] Finally, the operation rate of each processing unit can be determined by obtaining the operation vector and its length information of each processing unit. The operation rate is an indicator to measure the normal operation degree of a device or module, and is usually calculated based on the status, performance data and other relevant information of the device. In this embodiment, the operation rate may be calculated based on certain characteristics of the operation vector (such as the length of the vector, the value of a specific element in the vector, etc.).

[0102] Through the above steps, the dynamic word embedding model can effectively process operation and maintenance information, obtain the operation rate of each unit module of the data collector at the first site, and provide decision support for subsequent field maintenance and data migration processing.

[0103] In one embodiment, the operation and maintenance information is processed by the transformer decoder through the dynamic word embedding model to obtain the operation rate of each unit module of the first site data collector, and determine whether field maintenance is required, and determine whether data migration processing is required, including:

[0104] By comparing the preset operation rate coefficient with the actual operation rate, if the actual operation rate is lower than the operation rate coefficient, the ground maintenance information is generated and sent to the central management station.

[0105] Reference Figure 2 This is a structural block diagram of a rail transit industrial control network security supervision system proposed by the present invention, the structure includes:

[0106] An acquisition unit 1 is used to acquire station data input in real time by a first station data collector, wherein the station data includes passenger flow threshold information, entry and exit information, and operation and maintenance information, and the first station data collector is deployed at a corresponding rail transit station;

[0107] Comparison unit 2, used for comparing the pre-configured personnel redundancy threshold with the passenger flow threshold information to determine whether the passenger flow threshold information is higher than the personnel redundancy threshold;

[0108] Interface unit 3, used for segmenting the site data to create two data interfaces, receiving the input and output information and the operation and maintenance information respectively;

[0109] Model unit 4, used for inputting the access information into the pre-deployed group model, and at the same time inputting the operation and maintenance information into the pre-deployed dynamic word embedding model;

[0110] The first processing module 5 is used to process the input and output information through the UCG network permanently generated by the group model, and feed back the processed node binary code to the first site data collector and / or the second site data collector;

[0111] The second processing module 6 is used to perform transformer decoder processing on the operation and maintenance information through the dynamic word embedding model, obtain the operation rate of each unit module of the first site data collector, and determine whether field maintenance is required and whether data migration processing is required.

[0112] Reference Figure 3 In an embodiment of the present invention, a computer device is also provided. The computer device may be a server, and its internal structure may be as follows: Figure 3 As shown. The computer device includes a processor, a memory, a display screen, an input device, a network interface and a database connected through a system bus. Among them, the processor designed by the computer is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store the corresponding data in this embodiment. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, the above method is implemented.

[0113] Those skilled in the art will understand that Figure 3 The structure shown in the figure is merely a block diagram of a portion of the structure related to the solution of the present invention, and does not constitute a limitation on the computer device to which the solution of the present invention is applied.

[0114] An embodiment of the present invention further provides a computer-readable storage medium on which a computer program is stored, and when the computer program is executed by a processor, the above method is implemented. It can be understood that the computer-readable storage medium in this embodiment can be a volatile readable storage medium or a non-volatile readable storage medium.

[0115] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media provided by the present invention and used in the embodiments may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in a variety of forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double-speed data rate SDRAM (SSRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM.

[0116] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, device, article or method including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, device, article or method. In the absence of further restrictions, an element defined by the sentence "includes a ..." does not exclude the presence of other identical elements in the process, device, article or method including the element.

[0117] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A rail transit industrial control network security supervision method, It is characterized in that The following steps are involved: Acquire station data input in real time by a first station data collector, the station data including passenger flow threshold information, entry and exit information, and operation and maintenance information, the first station data collector being deployed at a corresponding rail transit station; Using the pre-configured personnel redundancy threshold to compare with the passenger flow threshold information to determine whether the passenger flow threshold information is higher than the personnel redundancy threshold; If the passenger flow threshold information is lower than the set personnel redundancy threshold, the auxiliary data processing unit configured on the first site data collector is used to process the access information; Processing the input and output information through the UCG network preconfigured on the auxiliary data processing unit to feed back the processed node binary code to the first site data collector and / or the second site data collector; If the passenger flow threshold information is higher than the set personnel redundancy threshold, the site data is segmented to create two data interfaces to receive entry and exit information and operation and maintenance information respectively; Inputting the input and output information into a pre-deployed group model, and simultaneously inputting the operation and maintenance information into a pre-deployed dynamic word embedding model; The group model provides a permanently generated UCG network to process the in-and-out information, and feeds back the processed node binary code to the first site data collector and / or the second site data collector. The group model processes the in-and-out information in the following manners: Use the API interface to connect the acquired access information to the UCG network; Performing information recognition on the incoming and outgoing information through the text recognition layer of the UCG network to recognize the incoming and outgoing information and / or the outgoing information and the user QR code in the incoming and outgoing information; Associating the user's online wallet according to the user's QR code, and retrieving a site map set in the UCG network according to the inbound information and / or outbound information; Then, the network graph layer of the UCG network is used to determine the user's transit information from the site map using the inbound information and the outbound information, thereby determining the corresponding charging information according to the corresponding charging rules based on the transit information; The data compression layer of the UCG network compresses the charging information to form a node binary code, where the data compression method is: Binarize the specific value of the charging information according to the binary digital standard of the computer equipment; Generate a binary text code corresponding to the station passing information, and simultaneously generate a corresponding charging instruction protocol according to the station passing information; Outputting the charging instruction protocol, text code and binarized node binary code to the auxiliary data processing unit on the data collector of the first site, so as to decode the node binary code through the corresponding UCG network on the auxiliary data processing unit; The operation and maintenance information is processed by the transformer decoder through the dynamic word embedding model to obtain the operation rate of each unit module of the first site data collector, and determine whether field maintenance is required and whether data migration processing is required, including: Creating a plurality of LSTM models according to the types of the processing units of the first site data collector involved in the operation and maintenance information, so as to construct an ELMo model from the plurality of LSTM models; The operation and maintenance information corresponding to each of the processing units is identified one by one through a plurality of LSTM models, and the information token is vectorized to obtain the operation and maintenance vector corresponding to the operation and maintenance information of each of the processing units; Bidirectionally communicate several LSTM models and their corresponding operation vectors to make each of the operation vectors bidirectional, and output the overlapping parts of the communication from the LEMo model to the transformer decoder; The transformer decoder uses the GPT rule to mask the overlapping vectors using MASK to obtain the length information of the operation vector; The operation rate of each processing unit is determined by obtaining the operation and maintenance vector of each processing unit and its length information.

2. The rail transit industrial control network security supervision method according to claim 1, It is characterized in that The step of decoding the node binary code through the corresponding UCG network on the auxiliary data processing unit includes: The auxiliary data processing unit obtains the node binary code input by the central management station and performs reverse decoding. The reverse decoding method is: Importing the node binary code into the UCG network arranged in the auxiliary data processing unit; Through the UCG network, the node binary code is gradually decoded by the data compression layer, network graph layer, and text recognition layer to obtain the charging instructions and station passing information.

3. The rail transit industrial control network security supervision method according to claim 1, It is characterized in that The steps of performing transformer decoder processing on the operation and maintenance information through the dynamic word embedding model to obtain the operation rate of each unit module of the first site data collector, and determining whether field maintenance is required and whether data migration processing is required include: By comparing the preset operation rate coefficient with the actual operation rate, if the actual operation rate is lower than the operation rate coefficient, the ground maintenance information is generated and sent to the central management station.

4. A rail transit industrial control network security supervision system, using the rail transit industrial control network security supervision method according to any one of claims 1 to 3, It is characterized in that include: An acquisition unit, used to acquire station data input in real time by a first station data collector, the station data including passenger flow threshold information, entry and exit information, and operation and maintenance information, wherein the first station data collector is deployed at a corresponding rail transit station; A comparison unit, used to compare the pre-configured personnel redundancy threshold with the passenger flow threshold information to determine whether the passenger flow threshold information is higher than the personnel redundancy threshold; An interface unit, used for segmenting the site data to create two data interfaces for receiving input and output information and operation and maintenance information respectively; A model unit, configured to input the input and output information into a pre-deployed group model, and simultaneously input the operation and maintenance information into a pre-deployed dynamic word embedding model; A first processing module is used to process the input and output information through the UCG network permanently generated by the group model, and feed back the processed node binary code to the first site data collector and / or the second site data collector; The second processing module is used to perform transformer decoder processing on the operation and maintenance information through the dynamic word embedding model, obtain the operation rate of each unit module of the first site data collector, and determine whether field maintenance is required and whether data migration processing is required.

5. A computer device comprising a memory and a processor, wherein the memory stores a computer program, It is characterized in that When the processor executes the computer program, the steps of the rail transit industrial control network security supervision method described in any one of claims 1 to 3 are implemented.

6. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the rail transit industrial control network security supervision method described in any one of claims 1 to 3 are implemented.

Citation Information

Patent Citations

  • Rail transit communication system

    CN110316228A

  • Passenger flow monitoring method of urban rail traffic network

    CN102700576A

  • Bus stop passenger flow volume counting system and method based on RFID (Radio Frequency Identification)

    CN103971432A