A data center power supply control system and control method

By using the regression model screening and matching module in the data center power supply control system to determine the appropriate power supply partition, dynamic allocation of power resources is achieved, which solves the problems of low intelligence and lag in power dispatching in the existing technology, and improves the efficiency of the data center. Operational stability.

CN118554449BActive Publication Date: 2024-10-22杭州富阳中恒电气有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411012479.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-10-22
Estimated Expiration
2044-07-26

AI Technical Summary

Technical Problem

The existing data center power supply control system has a low degree of intelligence and cannot predict the power load demand of the power zone, which makes it difficult to dynamically allocate power resources and affects the continuity and stability of the data center.

Method used

A preconfigured regression model is used to screen out power consumption zones that may be overloaded or underloaded in the future, and the matching module is used to determine the appropriate power supply zone to achieve power dispatch and dynamically adjust power resource allocation.

Benefits of technology

By dynamically allocating power resources, we can avoid overload or excess power in power zones and ensure the continuity and stable operation of the data center.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118554449B_ABST
    Figure CN118554449B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of power supply control, and discloses a data center power supply control system and a control method, comprising: obtaining the power load demand of each power consumption partition in a future time period, and screening out M overloaded power consumption partitions and N underloaded power consumption partitions in a future abnormal time period; obtaining the power load demand of the ith overloaded power consumption partition, and calling the power supply partition corresponding to the jth underloaded power consumption partition, taking the power supply partition corresponding to the jth underloaded power consumption partition as a candidate power supply partition, and predicting the stability of the candidate power supply partition in the future time period; judging whether the ith overloaded power consumption partition is compatible with the candidate power supply partition; repeating the above analysis module to the matching module until a matching result is obtained; when in a future abnormal time period, controlling the adapted power supply partition to perform power dispatching according to the matching result; the present invention is conducive to completing the dynamic allocation of power resources and avoiding power overload.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power supply control technology, and more specifically, to a data center power supply control system and control method. Background Art

[0002] As the core infrastructure for information storage, processing and transmission, data centers are becoming increasingly important. Data centers contain a large number of servers, storage devices, network equipment and cooling systems. With the continuous development of technologies such as artificial intelligence and cloud computing, the number and performance of computing devices in data centers are constantly improving to meet the growing computing needs, which has led to a sharp increase in power consumption in data centers. In order to ensure the efficient and stable operation of data centers, power management has become one of the key issues.

[0003] At present, traditional data center power supply control systems usually adopt centralized power supply mode and rely on uninterruptible power supply or backup power supply mode to ensure the stable operation of the data center. For example, the patent with authorization announcement number CN109687569B discloses a data center power supply system, but the centralized power supply mode has a high risk of single point failure, resulting in low power supply reliability and flexibility of the data center. To address such defects, the existing method overcomes them by adopting a power partition management method. For example, the patent with authorization announcement number CN102842936B discloses a distributed battery power supply device and method. However, research and practical application of the above method and the prior art have found that the above method and the prior art have at least the following defects:

[0004] (1) The level of intelligence is low and there is a lag in regulation. It is impossible to predict the power load demand of each power consumption zone in the future period, and it is impossible to screen out overloaded power consumption zones and underloaded power consumption zones based on power load demand;

[0005] (2) Under different load conditions, the traditional zoned power supply system is difficult to achieve dynamic allocation of power resources, resulting in power overload in some zones and surplus power in other zones. Furthermore, it is impossible to quickly respond to overloaded power zones and underloaded power zones and automatically dispatch power, which can easily affect the continuity and stability of data center operations. Summary of the invention

[0006] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a data center power supply control system and a control method.

[0007] To achieve the above object, the present invention provides the following technical solutions:

[0008] A data center power supply control system, wherein the data center includes Q independent power consumption partitions, each independent power consumption partition is associated with an independent power supply partition, Q is an integer greater than zero, and the system includes:

[0009] A screening module, used to obtain the power load demand of each power consumption partition in a future period by using a preconfigured first regression model, and screen out M overloaded power consumption partitions and N underloaded power consumption partitions in a future abnormal period based on the power load demand, where M and N are integers greater than zero;

[0010] An analysis module, used to obtain the power load demand of the i-th overload power consumption partition, and call the power supply partition corresponding to the j-th underload power consumption partition, use the power supply partition corresponding to the j-th underload power consumption partition as a candidate power supply partition, and use the preconfigured second regression model to predict the stability of the candidate power supply partition in the future period, where i and j are integers greater than zero;

[0011] A matching module is used to determine whether the i-th overload power consumption partition is compatible with the candidate power supply partition based on the power load demand of the i-th overload power consumption partition and the stability of the candidate power supply partition in the future period. If compatible, the corresponding candidate power supply partition is used as the adaptive power supply partition of the i-th overload power consumption partition, and the number K of adaptive power supply partitions is recorded, and N=NK, i=i+1 is set, and the analysis module is triggered; if not compatible, j=j+1 is set, and the analysis module is triggered, and K is an integer greater than zero;

[0012] A loop module is used to repeat the above analysis module to the matching module until i=M, then the loop ends and the matching result is obtained;

[0013] The power supply control module is used to control the adaptive power supply partition to perform power dispatch according to the matching results when in the future abnormal period.

[0014] Furthermore, obtaining the power load demand of each power consumption partition in the future period includes:

[0015] a1: Obtain the device status data of the i-th power supply partition within a predetermined collection period [TU, T], wherein the device status data includes the device utilization rate, network traffic and device temperature at each moment, where T and U are integers greater than zero;

[0016] a2: Obtain the number and type of devices in the i-th power supply partition, and use the number of devices, device temperature, and device status data within a predetermined collection period [TU, T] as power load demand characteristics;

[0017] a3: Input the power load demand characteristics into the preconfigured first regression model to obtain the power load demand of the i-th power consumption area in the future period, and set i=i+1, and return to step a1;

[0018] a4: Repeat steps a1 to a3 until i=Q, then end the loop and obtain the power load demand of each power supply partition in the future time period [T+U, T+2U].

[0019] Furthermore, the generation logic of the preconfigured first regression model is as follows:

[0020] Acquire historical power load demand training data, and divide the historical power load demand training data into a load demand training set and a load demand test set; the historical power load demand training data includes power load demand characteristics and their corresponding power load demands; the power load demand is power consumption;

[0021] Constructing a first regression network, taking the electric load demand characteristics in the load demand training set as input data of the electric load demand characteristics, and taking the electric load demand in the load demand training set as output data of the electric load demand characteristics, training the first regression network, and obtaining an initial first regression model;

[0022] The initial first regression model is validated using the load demand test set, and an initial first regression model that is less than or equal to a preset first test error threshold is output as the preconfigured first regression model.

[0023] Furthermore, the screening out of M overloaded power consumption partitions and N underloaded power consumption partitions in the future abnormal period includes:

[0024] b1: Extract the power load demand of the i-th power consumption partition in the future period;

[0025] b2: Compare the power load demand of the ith power supply partition with the preset power load demand threshold. If the power load demand of the ith power supply partition is greater than the preset first power load demand threshold, mark the corresponding ith power supply partition as an overload power consumption partition, and mark the corresponding future period as a future abnormal period, let i=i+1, and return to step b1; if the power load demand of the ith power supply partition is less than the preset second power load demand threshold, mark the corresponding ith power supply partition as an underload power consumption partition, and mark the corresponding future period as a future abnormal period, let i=i+1, and return to step b1;

[0026] b3: Repeat the above steps b1 to b2 until i=Q, then end the loop and obtain M overload power consumption partitions and N underload power consumption partitions.

[0027] Further, the first power load demand threshold is greater than the second power load demand threshold.

[0028] Furthermore, the predicting of the stability of the candidate power supply partition in the future period includes:

[0029] Obtain the power supply stability characteristics of the candidate power supply partitions within a given acquisition period [TU, T];

[0030] The power supply stability characteristics include battery temperature, battery current, battery resistance, charging efficiency and discharging efficiency at each moment;

[0031] The power supply stability characteristics are input into the pre-configured second regression model to obtain the stability of the candidate power supply partitions in the future period.

[0032] Furthermore, the generation logic of the preconfigured second regression model is as follows:

[0033] Acquire historical power supply stability training data, and divide the historical power supply stability training data into a power supply stability training set and a power supply stability test set; the historical power supply stability training data includes power supply stability characteristics and corresponding failure rates reflecting stability;

[0034] Constructing a second regression network, taking the power supply stability training set in the power supply stability training set as input data of the second regression network, taking the failure rate in the power supply stability training set as output data of the second regression network, training the second regression network, and obtaining an initial second regression model;

[0035] The initial second regression model is verified by using the power supply stability test set, and an initial second regression model that is less than or equal to a preset second test error threshold is output as the preconfigured second regression model.

[0036] Furthermore, before determining whether the i-th overloaded power consumption partition is compatible with the candidate power supply partition, the method includes:

[0037] Retrieve the power load demand of the i-th overloaded power consumption partition in the future period, as well as the failure rate and energy storage capacity of the candidate power supply partitions;

[0038] The power load demand, failure rate and energy storage are input into the pre-constructed objective function to obtain the adaptability of the i-th overload power consumption partition and the candidate power supply partition; wherein the expression of the objective function is: ; Where: is the adaptability between the i-th overload power consumption partition and the candidate power supply partition, is the power load demand of the i-th overload power consumption partition in the future period, is the first power load demand threshold, is the power output of the candidate power supply zone in the future period, is the failure rate of the candidate power supply partition.

[0039] Further, the determining whether the i-th overloaded power consumption partition is compatible with the candidate power supply partition includes:

[0040] Extracting the compatibility between the i-th overloaded power consumption partition and the candidate power supply partition, and comparing the compatibility with a preset compatibility threshold;

[0041] If the adaptability is greater than or equal to the preset adaptability threshold, it is determined that the i-th overloaded power consumption partition is adapted to the candidate power supply partition;

[0042] If the adaptability is less than a preset adaptability threshold, it is determined that the i-th overloaded power consumption partition is not compatible with the candidate power supply partition.

[0043] A data center power supply control method, comprising:

[0044] S21: using the preconfigured first regression model, obtaining the power load demand of each power consumption partition in the future period, and screening out M overloaded power consumption partitions and N underloaded power consumption partitions in the future abnormal period based on the power load demand, where M and N are integers greater than zero;

[0045] S22: Obtain the power load demand of the i-th overload power consumption partition, and call the power supply partition corresponding to the j-th underload power consumption partition, take the power supply partition corresponding to the j-th underload power consumption partition as a candidate power supply partition, and use the pre-configured second regression model to predict the stability of the candidate power supply partition in the future period, where i and j are integers greater than zero;

[0046] S23: Based on the power load demand of the i-th overload power consumption partition and the stability of the candidate power supply partition in the future period, determine whether the i-th overload power consumption partition is compatible with the candidate power supply partition. If compatible, use the corresponding candidate power supply partition as the adaptive power supply partition of the i-th overload power consumption partition, and record the number K of adaptive power supply partitions, set N=NK, i=i+1, and return to step S22; if not compatible, set j=j+1, and return to step S22, K is an integer greater than zero;

[0047] S24: Repeat the above steps S22 to S23 until i=M, then end the loop and obtain the matching result;

[0048] S25: When in the future abnormal period, control the adaptive power supply partition to perform power dispatch according to the matching result.

[0049] Compared with the prior art, the present invention has the following beneficial effects:

[0050] 1. The present application discloses a data center power supply control system and control method, including: obtaining the power load demand of each power consumption partition in a future time period, and screening out M overloaded power consumption partitions and N underloaded power consumption partitions in the future abnormal time period; obtaining the power load demand of the ith overloaded power consumption partition, and retrieving the power supply partition corresponding to the jth underloaded power consumption partition, taking the power supply partition corresponding to the jth underloaded power consumption partition as a candidate power supply partition, and predicting the stability of the candidate power supply partition in the future time period; judging whether the ith overloaded power consumption partition is compatible with the candidate power supply partition; repeating the above analysis module to the matching module until a matching result is obtained; when in a future abnormal time period, controlling the adapted power supply partition to perform power dispatching according to the matching result; based on the above process, the present invention can realize dynamic allocation of power resources. Furthermore, by distinguishing overloaded power consumption partitions from underloaded power consumption partitions, and performing rapid response and automated power dispatching processing, the present invention is conducive to avoiding power overload in some power consumption partitions while other power supply partitions have surplus power.

[0051] 2. The present application discloses a data center power supply control system and control method. By predicting the power load demand of each power consumption partition in a future period and screening out overloaded power consumption partitions and underloaded power consumption partitions based on the power load demand, the present invention is conducive to providing important data support for the dynamic allocation of power resources, and further, is conducive to ensuring the continuous operation and operational stability of the data center. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] Figure 1 A schematic diagram of the module structure of a data center power supply control system provided by the present invention;

[0053] Figure 2 A schematic diagram of a flow chart of a data center power supply control method provided by the present invention. DETAILED DESCRIPTION

[0054] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Embodiment 1

[0055] See also Figure 1 As shown, this embodiment discloses a data center power supply control system, wherein the data center includes Q independent power consumption partitions, each independent power consumption partition is associated with an independent power supply partition, Q is an integer greater than zero, and the system includes:

[0056] The screening module 11 is used to use the preconfigured first regression model to obtain the power load demand of each power consumption partition in the future time period, and based on the power load demand, screen out M overloaded power consumption partitions and N underloaded power consumption partitions in the future abnormal time period, where M and N are integers greater than zero.

[0057] It should be understood that: the data center of the present invention supplies electricity through a zoned power supply method. In this method, the data center is divided into multiple independent power consumption zones, and each independent power consumption zone is associated with an independent power supply zone, and each independent power supply zone is used to supply electricity to the associated power consumption zone; each independent power consumption zone has a number of power-consuming devices, and the power-consuming devices include but are not limited to servers, data gateways, cooling devices, switches and routers, etc.; the power supply zone has a number of battery packs or backup power supplies.

[0058] It is worth noting that: each independent power supply partition is electrically connected to the associated independent power consumption partition through the main power supply line; at the same time, each independent power supply partition is also electrically connected to other power consumption partitions through the secondary power supply line; when there is no abnormal period, the secondary power supply line is in a cut-off state, and the main power supply line is responsible for power transmission; when an abnormal period occurs, the secondary power supply line selectively connects the power according to the subsequent analysis content.

[0059] In implementation, obtaining the power load demand of each power consumption zone in the future period includes:

[0060] a1: Obtain the device status data of the ith power supply partition within a predetermined collection period [TU, T], wherein the device status data includes device utilization, network traffic and device temperature at each moment, where T and U are integers greater than zero.

[0061] a2: Obtain the number and type of devices in the i-th power supply partition, and use the number of devices, device temperature, and device status data within a predetermined collection period [TU, T] as power load demand characteristics;

[0062] It is understandable that the number and type of devices are important factors affecting power load. For example, more servers mean higher power consumption, and different types of devices have different power consumption. For example, high-performance computing servers, GPU servers, etc. consume more power than ordinary servers. In addition, high-utilization CPUs and GPUs will significantly increase power consumption, and network devices with high data traffic (such as switches and routers) have higher power consumption. In addition, the higher the temperature of the device, the more power the cooling system needs to consume to maintain the normal operating temperature of the device.

[0063] a3: Input the power load demand characteristics into the preconfigured first regression model to obtain the power load demand of the i-th power consumption partition in the future period, set i=i+1, and return to step a1.

[0064] Specifically, the generation logic of the preconfigured first regression model is as follows:

[0065] Acquire historical power load demand training data, and divide the historical power load demand training data into a load demand training set and a load demand test set; the historical power load demand training data includes power load demand characteristics and their corresponding power load demands; the power load demand is power consumption;

[0066] It should be noted that: in the historical power load demand training data, the power load demand characteristics are obtained by retrieving server logs, or by using monitors, and the monitors include but are not limited to flow monitors and temperature sensors, etc.; the power load demand is obtained by technicians based on experimental data or historical data records;

[0067] Constructing a first regression network, taking the electric load demand characteristics in the load demand training set as input data of the electric load demand characteristics, and taking the electric load demand in the load demand training set as output data of the electric load demand characteristics, training the first regression network, and obtaining an initial first regression model;

[0068] The initial first regression model is verified by using the load demand test set, and the initial first regression model whose error is less than or equal to the preset first test error threshold is output as the preconfigured first regression model;

[0069] It should be noted that: the first regression network is one of the regression models such as neural network, random forest, polynomial regression, decision tree, support vector machine, linear regression or Bayesian.

[0070] a4: Repeat steps a1 to a3 until i=Q, then end the loop and obtain the power load demand of each power supply partition in the future time period [T+U, T+2U].

[0071] In implementation, the screening out of M overloaded power consumption partitions and N underloaded power consumption partitions in the future abnormal period includes:

[0072] b1: Extract the power load demand of the i-th power consumption partition in the future period;

[0073] b2: Compare the power load demand of the i-th power supply partition with the preset power load demand threshold. If the power load demand of the i-th power supply partition is greater than the preset first power load demand threshold, the corresponding i-th power supply partition is marked as an overloaded power consumption partition, and the corresponding future time period is marked as a future abnormal time period, let i=i+1, and return to step b1; if the power load demand of the i-th power supply partition is less than the preset second power load demand threshold, the corresponding i-th power supply partition is marked as an underloaded power consumption partition, and the corresponding future time period is marked as a future abnormal time period, let i=i+1, and return to step b1.

[0074] The first power load demand threshold is greater than the second power load demand threshold.

[0075] In a specific implementation step, if the power load demand of the i-th power supply partition is less than or equal to a preset first power load demand threshold, and greater than or equal to a preset second power load demand threshold, then the load demand corresponding to the i-th power supply partition is determined to be normal, and i=i+1 is set, and the process returns to step b1.

[0076] It can be understood that: when the power load demand of the i-th power supply partition is less than or equal to the preset first power load demand threshold, and greater than or equal to the preset second power load demand threshold, it means that the independent power supply partition associated with the corresponding power supply partition can just meet the power consumption required by the corresponding power supply partition in the future.

[0077] Similarly, when the power load demand of the i-th power supply partition is greater than the preset first power load demand threshold, it means that the independent power supply partition associated with the corresponding power supply partition cannot meet the power consumption required by the corresponding power supply partition in the future; on the contrary, when the power load demand of the i-th power supply partition is less than the preset second power load demand threshold, it means that the independent power supply partition associated with the corresponding power supply partition can meet the power consumption required by the corresponding power supply partition in the future and have a large surplus of electric energy.

[0078] It should also be understood that the batteries or backup power supplies of the data center are usually enabled when power fluctuates and are charged by setting up a diesel generator set in the data center. If the power demand of the power consumption partition cannot be met after charging, it will easily cause service stability of the data center; and if there is still a large amount of surplus electricity in the power supply partition after charging, it will lead to energy waste; at the same time, during the next stage of energy storage, the battery or backup power supply will be overcharged, affecting the energy storage performance of the battery or backup power supply.

[0079] b3: Repeat the above steps b1 to b2 until i=Q, then end the loop and obtain M overload power consumption partitions and N underload power consumption partitions.

[0080] The analysis module 12 is used to obtain the power load demand of the i-th overloaded power consumption partition, and to call the power supply partition corresponding to the j-th underloaded power consumption partition, and to use the power supply partition corresponding to the j-th underloaded power consumption partition as a candidate power supply partition, and to use the preconfigured second regression model to predict the stability of the candidate power supply partition in the future time period, where i and j are integers greater than zero.

[0081] In implementation, the predicting of the stability of the candidate power supply partition in the future period includes:

[0082] Obtain the power supply stability characteristics of the candidate power supply partitions within a given acquisition period [TU, T];

[0083] The power supply stability characteristics include battery temperature, battery current, battery resistance, charging efficiency and discharging efficiency at each moment;

[0084] The power supply stability characteristics are input into the pre-configured second regression model to obtain the stability of the candidate power supply partitions in the future period.

[0085] Specifically, the generation logic of the preconfigured second regression model is as follows:

[0086] Acquire historical power supply stability training data, and divide the historical power supply stability training data into a power supply stability training set and a power supply stability test set; the historical power supply stability training data includes power supply stability characteristics and corresponding failure rates reflecting stability;

[0087] It should be noted that: in the historical power supply stability training data, the power supply stability characteristics are collected by various sensors, including but not limited to Hall effect voltage sensors, Hall effect current sensors and temperature sensors, etc.; the failure rate is determined by the technicians based on the experimental data or historical data records;

[0088] Constructing a second regression network, taking the power supply stability training set in the power supply stability training set as input data of the second regression network, taking the failure rate in the power supply stability training set as output data of the second regression network, training the second regression network, and obtaining an initial second regression model;

[0089] The initial second regression model is verified by using the power supply stability test set, and an initial second regression model that is less than or equal to a preset second test error threshold is output as the preconfigured second regression model.

[0090] It can be understood that: the greater the failure rate, the lower the stability of the corresponding candidate power supply partition in the future period. On the contrary, the smaller the failure rate, the higher the stability of the corresponding candidate power supply partition in the future period.

[0091] The matching module 13 is used to determine whether the ith overload power consumption partition is compatible with the candidate power supply partition based on the power load demand of the ith overload power consumption partition and the stability of the candidate power supply partition in the future time period. If compatible, the corresponding candidate power supply partition is used as the adaptive power supply partition of the ith overload power consumption partition, and the number K of adaptive power supply partitions is recorded, and N=NK, i=i+1 is set, and the analysis module 12 is triggered; if not compatible, j=j+1 is set, and the analysis module 12 is triggered, and K is an integer greater than zero.

[0092] In implementation, before determining whether the i-th overloaded power consumption partition is compatible with the candidate power supply partition, the following steps are included:

[0093] Retrieve the power load demand of the i-th overloaded power consumption partition in the future period, as well as the failure rate and energy storage capacity of the candidate power supply partitions;

[0094] The power load demand, failure rate and energy storage are input into the pre-constructed objective function to obtain the adaptability of the i-th overload power consumption partition and the candidate power supply partition; wherein the expression of the objective function is: ; Where: is the adaptability between the i-th overloaded power consumption partition and the candidate power supply partition, is the power load demand of the i-th overload power consumption partition in the future period, is the first power load demand threshold, is the power output of the candidate power supply zone in the future period, is the failure rate of the candidate power supply partition.

[0095] It should be noted that: the first power load demand threshold is set according to the maximum energy storage capacity of the power supply partition, and the maximum energy storage capacity of each power supply partition is the same; for example, assuming that the power load demand (i.e., the required power consumption) of the i-th overloaded power partition in the future time period is 800 kilowatt-hours (kWh), and the maximum energy storage capacity of the power supply partition associated with the i-th overloaded power partition is 750 kilowatt-hours (kWh), therefore, the supply of the power supply partition associated with the i-th overloaded power partition is less than the demand of the i-th overloaded power partition, then the i-th overloaded power partition is determined to be in an overloaded state, and the difference between them (i.e., 50 kilowatt-hours (kWh)) is marked as the overload amount of the i-th overloaded power partition.

[0096] It should also be noted that: the power output of the candidate power supply partition in the future time period is equal to the power load demand of the power consumption partition associated with the candidate power supply partition in the future time period; therefore, by obtaining the power load demand of the power consumption partition associated with the candidate power supply partition in the future time period, the power output of the candidate power supply partition in the future time period can be determined; the power load demand of the power consumption partition associated with the candidate power supply partition in the future time period can be predicted by the above-mentioned pre-configured first regression model. For details, please refer to the above logic and will not be repeated here; in summary, it can be understood that Surplus storage energy for candidate power supply partitions in future periods.

[0097] It can be further understood that: the closer the overload amount of the i-th overloaded power consumption partition is to the surplus storage energy of the candidate power supply partition in the future period, the more compatible the i-th overloaded power consumption partition is with the candidate power supply partition.

[0098] In implementation, the step of determining whether the i-th overloaded power consumption partition is compatible with the candidate power supply partition includes:

[0099] Extracting the compatibility between the i-th overloaded power consumption partition and the candidate power supply partition, and comparing the compatibility with a preset compatibility threshold;

[0100] If the adaptability is greater than or equal to the preset adaptability threshold, it is determined that the i-th overloaded power consumption partition is adapted to the candidate power supply partition;

[0101] If the adaptability is less than a preset adaptability threshold, it is determined that the i-th overloaded power consumption partition is not compatible with the candidate power supply partition.

[0102] It should be understood that: every time an adaptive power supply partition is obtained, the number of adaptive power supply partitions K is accumulated and N=NK; a further explanation is that every time an adaptive power supply partition is obtained, the corresponding adaptive power supply partition should be removed from the power supply partition corresponding to the low-load power consumption partition to avoid repeated screening.

[0103] The loop module 14 is used to repeat the above analysis module 12 to matching module 13 until i=M, then the loop ends to obtain the matching result.

[0104] Specifically, the matching result includes an adapted power supply partition adapted to each overloaded power consumption partition.

[0105] It can be understood that: when an adaptive power supply partition is assigned to each overloaded power consumption partition, the matching is completed; therefore, when in the future abnormal period, the adaptive power supply partition can be controlled according to the matching results to perform power scheduling, thereby realizing dynamic allocation of power resources, which is conducive to rapid response and automated processing, and ensuring the continuity and stability of the data center.

[0106] The power supply control module 15 is used to control the adapted power supply partition to perform power dispatch according to the matching result when in the future abnormal period.

[0107] It can be understood that: when in the future abnormal period, the system will connect the secondary power supply line between each overloaded power consumption partition and its corresponding adapted power supply partition according to the matching results, and perform power dispatch through the secondary power supply line to complete the dynamic allocation of power resources, so as to avoid power overload in some power consumption partitions while other power supply partitions have surplus power. Embodiment 2

[0108] See also Figure 2 As shown, based on the same inventive concept, this embodiment discloses a data center power supply control method. For details not provided in this embodiment, please refer to the relevant parts in the above embodiment 1. The method includes:

[0109] S21: using the preconfigured first regression model, obtaining the power load demand of each power consumption partition in the future period, and screening out M overloaded power consumption partitions and N underloaded power consumption partitions in the future abnormal period based on the power load demand, where M and N are integers greater than zero;

[0110] S22: Obtain the power load demand of the i-th overload power consumption partition, and call the power supply partition corresponding to the j-th underload power consumption partition, take the power supply partition corresponding to the j-th underload power consumption partition as a candidate power supply partition, and use the pre-configured second regression model to predict the stability of the candidate power supply partition in the future period, where i and j are integers greater than zero;

[0111] S23: Based on the power load demand of the i-th overload power consumption partition and the stability of the candidate power supply partition in the future period, determine whether the i-th overload power consumption partition is compatible with the candidate power supply partition. If compatible, use the corresponding candidate power supply partition as the adaptive power supply partition of the i-th overload power consumption partition, and record the number K of adaptive power supply partitions, set N=NK, i=i+1, and return to step S22; if not compatible, set j=j+1, and return to step S22, K is an integer greater than zero;

[0112] S24: Repeat the above steps S22 to S23 until i=M, then end the loop and obtain the matching result;

[0113] Specifically, the matching result includes an adapted power supply partition adapted to each overloaded power consumption partition;

[0114] S25: When in the future abnormal period, control the adaptive power supply partition to perform power dispatch according to the matching result.

[0115] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters, weights and thresholds in the formula are set by technicians in this field according to actual conditions.

[0116] The above embodiments may be implemented in whole or in part by software, hardware, firmware or any other combination thereof. When implemented by software, the above embodiments may be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present invention is generated in whole or in part. The computer may be a general-purpose computer, a special-purpose computer, a computer network or other programmable device. The computer instructions may be stored in a computer-readable storage medium or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions may be transmitted from one website, computer, server or data center to another website, computer, server or data center via a wired network or a wireless network. The computer-readable storage medium may be any available medium that can be accessed by a computer or a data storage device such as a server or data center that includes one or more available media sets. The available medium may be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD) or a semiconductor medium. The semiconductor medium may be a solid-state hard disk.

[0117] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed in the present invention can be implemented in electronic hardware or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0118] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0119] In the several embodiments provided by the present invention, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of the units is only one, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0120] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0121] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0122] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

[0123] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A data center power supply control system, wherein the data center comprises Q independent power consumption partitions, each independent power consumption partition is associated with an independent power supply partition, Q is an integer greater than zero, and is characterized in that: The system comprises: A screening module, used to obtain the power load demand of each power consumption partition in a future period by using a preconfigured first regression model, and screen out M overloaded power consumption partitions and N underloaded power consumption partitions in a future abnormal period based on the power load demand, where M and N are integers greater than zero; An analysis module is used to obtain the power load demand of the i-th overload power consumption partition, and to retrieve the power supply partition corresponding to the j-th underload power consumption partition, and to use the power supply partition corresponding to the j-th underload power consumption partition as a candidate power supply partition, and to use a preconfigured second regression model to predict the stability of the candidate power supply partition in the future period, where i and j are integers greater than zero; The matching module is used to retrieve the power load demand of the i-th overload power consumption partition in the future period, as well as the failure rate and energy storage capacity of the candidate power supply partition; the power load demand, failure rate and energy storage capacity are input into the pre-built objective function to obtain the adaptability of the i-th overload power consumption partition and the candidate power supply partition; wherein the expression of the objective function is: ; Where: is the adaptability between the i-th overload power consumption partition and the candidate power supply partition, is the power load demand of the i-th overload power consumption partition in the future period, is the first power load demand threshold, is the power output of the candidate power supply zone in the future period, is the failure rate of the candidate power supply partition, and determines whether the i-th overload power consumption partition is compatible with the candidate power supply partition. If so, the corresponding candidate power supply partition is used as the adaptive power supply partition of the i-th overload power consumption partition, and the number of adaptive power supply partitions K is recorded, and N=NK, i=i+1 is set, and the analysis module is triggered; if not, j=j+1 is set, and the analysis module is triggered, and K is an integer greater than zero; A loop module is used to repeat the above analysis module to the matching module until i=M, then the loop ends and the matching result is obtained; The power supply control module is used to control the adaptive power supply partition to perform power dispatch according to the matching results when in the future abnormal period.

2. The data center power supply control system according to claim 1, characterized in that: The obtaining of the power load demand of each power consumption partition in the future period includes: a1: Obtain the device status data of the i-th power supply partition within a predetermined collection period [TU, T], wherein the device status data includes the device utilization rate, network traffic and device temperature at each moment, where T and U are integers greater than zero; a2: Obtain the number and type of devices in the i-th power supply partition, and use the number of devices, device temperature, and device status data within a predetermined collection period [TU, T] as power load demand characteristics; a3: Input the power load demand characteristics into the preconfigured first regression model to obtain the power load demand of the i-th power consumption area in the future period, and set i=i+1, and return to step a1; a4: Repeat steps a1 to a3 until i=Q, then end the loop and obtain the power load demand of each power supply partition in the future time period [T+U, T+2U].

3. The data center power supply control system according to claim 2, characterized in that: The generation logic of the preconfigured first regression model is as follows: Acquire historical power load demand training data, and divide the historical power load demand training data into a load demand training set and a load demand test set; the historical power load demand training data includes power load demand characteristics and their corresponding power load demands; the power load demand is power consumption; Constructing a first regression network, taking the electric load demand characteristics in the load demand training set as input data of the electric load demand characteristics, and taking the electric load demand in the load demand training set as output data of the electric load demand characteristics, training the first regression network, and obtaining an initial first regression model; The initial first regression model is validated using the load demand test set, and an initial first regression model that is less than or equal to a preset first test error threshold is output as the preconfigured first regression model.

4. The data center power supply control system according to claim 3, characterized in that: The screening out of M overloaded power consumption partitions and N underloaded power consumption partitions in the future abnormal period includes: b1: Extract the power load demand of the i-th power consumption partition in the future period; b2: Compare the power load demand of the ith power supply partition with the preset power load demand threshold. If the power load demand of the ith power supply partition is greater than the preset first power load demand threshold, mark the corresponding ith power supply partition as an overload power consumption partition, and mark the corresponding future period as a future abnormal period, let i=i+1, and return to step b1; if the power load demand of the ith power supply partition is less than the preset second power load demand threshold, mark the corresponding ith power supply partition as an underload power consumption partition, and mark the corresponding future period as a future abnormal period, let i=i+1, and return to step b1; b3: Repeat the above steps b1 to b2 until i=Q, then end the loop and obtain M overload power consumption partitions and N underload power consumption partitions.

5. The data center power supply control system according to claim 4, characterized in that: The first electrical load demand threshold is greater than the second electrical load demand threshold.

6. The data center power supply control system according to claim 5, characterized in that: The predicting of the stability of the candidate power supply partition in the future period includes: Obtain the power supply stability characteristics of the candidate power supply partitions within a given acquisition period [TU, T]; The power supply stability characteristics include battery temperature, battery current, battery resistance, charging efficiency and discharging efficiency at each moment; The power supply stability characteristics are input into the pre-configured second regression model to obtain the stability of the candidate power supply partitions in the future period.

7. The data center power supply control system according to claim 6, characterized in that: The generation logic of the preconfigured second regression model is as follows: Acquire historical power supply stability training data, and divide the historical power supply stability training data into a power supply stability training set and a power supply stability test set; the historical power supply stability training data includes power supply stability characteristics and corresponding failure rates reflecting stability; Constructing a second regression network, taking the power supply stability training set in the power supply stability training set as input data of the second regression network, taking the failure rate in the power supply stability training set as output data of the second regression network, training the second regression network, and obtaining an initial second regression model; The initial second regression model is verified by using the power supply stability test set, and an initial second regression model that is less than or equal to a preset second test error threshold is output as the preconfigured second regression model.

8. The data center power supply control system according to claim 7, characterized in that: The determining whether the i-th overloaded power consumption partition is compatible with the candidate power supply partition includes: Extracting the compatibility between the i-th overloaded power consumption partition and the candidate power supply partition, and comparing the compatibility with a preset compatibility threshold; If the adaptability is greater than or equal to the preset adaptability threshold, it is determined that the i-th overloaded power consumption partition is adapted to the candidate power supply partition; If the adaptability is less than a preset adaptability threshold, it is determined that the i-th overloaded power consumption partition is not compatible with the candidate power supply partition.

9. A data center power supply control method, characterized in that: The method is implemented based on the data center power supply control system according to any one of claims 1 to 8, and the method comprises: S21: using the preconfigured first regression model, obtaining the power load demand of each power consumption partition in the future period, and screening out M overloaded power consumption partitions and N underloaded power consumption partitions in the future abnormal period based on the power load demand, where M and N are integers greater than zero; S22: Obtain the power load demand of the i-th overload power consumption partition, and call the power supply partition corresponding to the j-th underload power consumption partition, take the power supply partition corresponding to the j-th underload power consumption partition as a candidate power supply partition, and use the pre-configured second regression model to predict the stability of the candidate power supply partition in the future period, where i and j are integers greater than zero; S23: Based on the power load demand of the i-th overload power consumption partition and the stability of the candidate power supply partition in the future period, determine whether the i-th overload power consumption partition is compatible with the candidate power supply partition. If compatible, use the corresponding candidate power supply partition as the adaptive power supply partition of the i-th overload power consumption partition, and record the number K of adaptive power supply partitions, set N=NK, i=i+1, and return to step S22; if not compatible, set j=j+1, and return to step S22, K is an integer greater than zero; S24: Repeat the above steps S22 to S23 until i=M, then end the loop and obtain the matching result; S25: When in the future abnormal period, control the adaptive power supply partition to perform power dispatch according to the matching result.