Intelligent control system for museums

Through the hierarchical modular processing of the intelligent control system and the construction of digital parallel museums, the problem of insufficient monitoring and sensing technology in the museum control system is solved, real-time accurate monitoring and efficient management are achieved, and the accuracy of abnormal warning is improved.

CN118567244BActive Publication Date: 2024-11-19扬州中国大运河博物馆
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411026147.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-19
Estimated Expiration
2044-07-30

AI Technical Summary

Technical Problem

The existing museum control system lacks advanced monitoring and sensing technology and intelligent data interaction methods, making it difficult to conduct real-time accurate monitoring of the museum environment and equipment status, resulting in insufficient accuracy in abnormal warnings.

Method used

Provides an intelligent control system for museums, including permission level confirmation module, intelligent control platform generation module, target control domain determination module, pre-control strategy determination module, control management module and data update feedback control module, through hierarchical modular processing and integration The construction of control modules, cascading control networks and digital parallel museums realizes intelligent management of museums and remote monitoring of equipment.

Benefits of technology

It improves the convenience, efficiency and intelligence of the museum control system, realizes real-time accurate monitoring of the museum environment and equipment status, and enhances the accuracy of abnormal warnings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118567244B_ABST
    Figure CN118567244B_ABST
Patent Text Reader

Abstract

The present invention discloses an intelligent control system for museums, and relates to the field of intelligent control technology. The system includes: performing user login authority authentication and determining authority levels; establishing an integrated control module and a cascade control network, collaboratively constructing a digital parallel museum, and generating an intelligent control platform for a PAD port; determining a target control domain; determining a pre-control strategy; based on an intelligent control center, performing control response timing and instruction conversion, and performing control management in response to a device end; tracking control responses, and synchronizing to the intelligent control platform, and performing platform-side data updates and feedback regulation. The system solves the technical problem that the existing museum control system lacks advanced monitoring sensor technology and intelligent data interaction means, which makes it difficult to perform real-time and accurate monitoring of the museum environment and equipment status, and makes the abnormal warning of the control system inaccurate, and achieves the technical effect of making the museum control system more convenient, efficient, and intelligent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of intelligent control, and in particular to an intelligent control system for museums. Background Art

[0002] In today's world of rapid technological development, museums, as treasure warehouses of human history, culture and art, are constantly adapting to and leading the changes of the times in their management and display methods. With the rapid development of technologies such as the Internet of Things, big data, and artificial intelligence, the research and development and application of museum intelligent control systems have become an important part of modern museum construction. However, many museums still rely on traditional manual methods and limited technical support in management and control. With the continuous increase in the number of visitors, traditional management methods can no longer meet the growing operational needs of museums. Traditional museum control systems mainly rely on manpower for daily operations and management. Although they ensure the normal operation of museums to a certain extent, they are inefficient. Traditional museum control systems have certain limitations in the protection and display of exhibits. Due to the lack of advanced monitoring and sensing technology and intelligent data interaction methods, it is often difficult to provide a personalized visiting experience and it is impossible to warn of abnormalities in the museum.

[0003] Therefore, at the current stage, there is a lack of advanced monitoring sensor technology and intelligent data interaction means in museum control-related technologies, which makes it difficult to accurately monitor the museum environment and equipment status in real time, and makes the control system's abnormal warning not accurate enough. Summary of the invention

[0004] This application provides an intelligent control system for museums and adopts technical means such as building a digital parallel museum to solve the technical problems that the existing museum control system lacks advanced monitoring sensor technology and intelligent data interaction means, making it difficult to conduct real-time and accurate monitoring of the museum environment and equipment status, and making the abnormal warning of the control system not accurate enough, thereby achieving the technical effect of making the museum control system more convenient, efficient and intelligent.

[0005] The present application provides an intelligent control system for a museum, the system comprising: an authority level confirmation module, the authority level confirmation module is used to perform user login authority authentication and determine the authority level; an intelligent control platform generation module, the intelligent control platform generation module is used to perform hierarchical modular processing and control linkage analysis on a target museum, establish an integrated control module and a cascade control network, collaboratively construct a digital parallel museum, and generate an intelligent control platform with a PAD port; a target control domain determination module, the target control domain determination module activates the authority domain of the intelligent control platform based on the authority level and determines the target control domain; a pre-control strategy determination module, the pre-control strategy determination module is used to receive pre-control tasks, perform operation switching control of the target control domain and device-side control decision analysis, and determine the pre-control strategy; a control management module, the control management module performs control response timing and instruction conversion on the pre-control strategy based on an intelligent control center, and performs control management in response to the device side; a data update feedback regulation module, the data update feedback regulation module is used to track control responses and synchronize them to the intelligent control platform to perform platform-side data updates and feedback regulation.

[0006] In a possible implementation, the intelligent control platform generation module also performs the following processing: based on the control dimension and control type, the target museum is divided into modules to determine the hierarchical integration module; based on the hierarchical integration module, the association between layers and within layers is established to generate the integrated control module; the integrated control module is traversed to perform cascade processing of module features based on the control logic to generate the cascade control network.

[0007] In a possible implementation, the intelligent control platform generation module also performs the following processing: determining a digital construction hierarchy, the construction hierarchy including at least a global layer, a partition layer, a local layer, a perspective layer and a feature layer; reading the basic construction data of the target museum, performing hierarchical transformation and inter-layer mapping association based on the construction layer, and determining a hierarchical explosion model; connecting the hierarchical explosion model with a data receiving port to generate a digital parallel museum.

[0008] In a possible implementation, the intelligent control platform generation module further performs the following processing: establishing coupling between the integrated control module, the cascade control network and the parallel museum, including display coupling and control coupling.

[0009] In a possible implementation, the target control domain determination module also performs the following processing: setting multi-level permission levels and determining a permission mapping library, wherein the permission dimensions include display switching permissions and operation control permissions; based on the permission mapping library, matching the permission levels and determining a preset permission domain, including a first permission domain and a second permission domain based on the permission dimension; based on the preset permission domain, mapping and activating the intelligent control platform to determine the target control domain.

[0010] In a possible implementation, the pre-control strategy determination module also performs the following processing: determining an operation control node based on the pre-control task, the pre-control task includes at least one item that can execute concurrent control and sequential control; based on the operation control node, performing navigation switching and operation control, and determining valid task data, wherein hierarchical mapping explosion navigation can be executed; based on the valid task data, performing device-side control scheme decision and control device positioning for the pre-control task, and determining the pre-control strategy.

[0011] In a possible implementation, the control management module also performs the following processing: if there are multiple pre-control tasks, traverse the pre-control strategies of the task mapping and perform control homology analysis and homofrequency analysis to determine the homology mapping group, wherein the control type is used as the homology judgment criterion and the response time node is used as the homology judgment criterion; traverse the homology mapping group to perform the spatiotemporal distribution of the control response to determine the spatiotemporal control sequence; and generate timing control instructions based on the spatiotemporal control sequence.

[0012] In a possible implementation, the data update feedback regulation module also performs the following processing: the intelligent control platform and the target museum change in sync; the control response data is transmitted back to update the platform-side data; the control trend off-axis judgment is performed on the control response data and the pre-control task, a calibration control instruction is generated, and feedback control is performed on the device side.

[0013] The intelligent control system for museums proposed in this application is intended to perform user login authority authentication and determine the authority level; perform hierarchical modular processing and control linkage analysis on the target museum, establish an integrated control module and a cascade control network, and collaboratively construct a digital parallel museum to generate an intelligent control platform for the PAD port; based on the authority level, activate the authority domain of the intelligent control platform and determine the target control domain; receive pre-control tasks, perform operation switching control of the target control domain and device-side control decision analysis, and determine the pre-control strategy; based on the intelligent control center, perform control response timing and instruction conversion on the pre-control strategy, and respond to control management on the device side; track control responses and synchronize them to the intelligent control platform to perform platform-side data updates and feedback regulation. It solves the technical problem that the existing museum control system lacks advanced monitoring sensor technology and intelligent data interaction means, which makes it difficult to monitor the museum environment and equipment status in real time and accurately, and the abnormal warning of the control system is not accurate enough, and achieves the technical effect of making the museum control system more convenient, efficient, and intelligent. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the technical solution of the embodiment of the present disclosure, the accompanying drawings of the embodiment of the present disclosure will be briefly introduced below. A flow chart is used in the present application to illustrate the operations performed by the system according to the embodiment of the present application. It should be understood that the preceding or following operations are not necessarily performed accurately in order. On the contrary, various steps can be processed in reverse order or simultaneously as needed. At the same time, other operations can also be added to these processes, or one or more operations can be removed from these processes.

[0015] Figure 1 A schematic diagram of the structure of an intelligent control system for a museum provided in an embodiment of the present application.

[0016] Figure 2 A schematic diagram of the execution process of a target control domain determination module in an intelligent control system for a museum provided in an embodiment of the present application.

[0017] Explanation of reference numerals: authority level confirmation module 10 , intelligent control platform generation module 20 , target control domain determination module 30 , pre-control strategy determination module 40 , control management module 50 , data update feedback regulation module 60 . DETAILED DESCRIPTION

[0018] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below.

[0019] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings. The described embodiments should not be regarded as limiting the present application. All other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of this application.

[0020] In the following description, reference is made to "some embodiments", which describe a subset of all possible embodiments, but it is understood that "some embodiments" may be the same subset or different subsets of all possible embodiments, and may be combined with each other without conflict, and the terms "first\second" involved are merely to distinguish similar objects and do not represent a specific ordering of objects. The terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, system, product, or server that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, products, or devices. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by technicians in the technical field of this application. The terms used herein are for the purpose of describing the embodiments of the present application only.

[0021] The present application embodiment provides an intelligent control system for a museum, such as Figure 1 As shown, the system comprises:

[0022] The permission level confirmation module 10 is used to perform user login permission authentication and determine the permission level. User login permission authentication is to confirm the identity of the system visitor. When a user tries to log in to the system, the system usually requires the user to enter a username and password. The system checks the username and password entered by the user with the user information stored in the system. If the username and password match, the system further determines whether the user has login permission. It can include multiple authentication methods, such as username and password login, fingerprint, face recognition, etc., and in the permission authentication process, special attention should be paid to ensuring the security of the user's account. For example, use secure encryption methods to ensure the storage and transmission security of user passwords to prevent password leakage or theft by attackers. Determining the permission level is to assign corresponding access rights to the user according to the user's identity and role after the user successfully logs in to the system. The permission level is usually related to the user's role and responsibilities in the organization. For example, administrators or super administrators have advanced permissions and can access and modify all parts of the system, such as switching between different warehouses, and displaying the homepage of the current warehouse after switching; while ordinary users (warehouse managers) may have limited permissions and can only access and modify specific parts related to their work, such as being able to return to the homepage directly and cannot switch back and forth between warehouses. By authenticating user login permissions and determining permission levels, the system can ensure that only super administrators with advanced permissions can access and modify system data, thereby protecting system security and data integrity.

[0023] An intelligent control platform generation module 20 is used to perform hierarchical modular processing and control linkage analysis on the target museum, establish an integrated control module and a cascade control network, collaboratively construct a digital parallel museum, and generate an intelligent control platform for a PAD port. Performing hierarchical modular processing and control linkage analysis on the target museum, establishing an integrated control module and a cascade control network, collaboratively constructing a digital parallel museum, and generating an intelligent control platform for a PAD port mainly refers to the digital transformation and intelligent management of the museum. Specifically, in the digital transformation of the museum, hierarchical modular processing is a method of dividing the various parts of the museum (such as exhibition areas, service areas, storage areas, etc.) according to their functions, locations or characteristics to form different modules, which can make the management of the museum clearer and more orderly, and facilitate subsequent digital transformation and intelligent management; on the basis of hierarchical modular processing, control linkage analysis is performed to achieve collaborative work between modules, by analyzing each module By understanding the relationship and mutual influence between the blocks, we can design a reasonable control strategy so that all parts of the museum can operate efficiently and orderly; the integrated control module is a module that integrates multiple control functions, which can centrally control and manage all parts of the museum. Through the integrated control module, unified control of various equipment, facilities and systems in the museum can be achieved, thereby improving management efficiency; the cascade control network is a way of connecting multiple control modules to form a hierarchical control network. In this network, each control module can exchange information and work together to achieve a higher level of control and management. Through the cascade control network, remote monitoring and control of all parts of the museum can be achieved, thereby improving management flexibility and efficiency. A digital parallel museum refers to a virtualized copy of a physical museum through digital technology, forming a virtual museum corresponding to the physical museum. This virtual museum can be accessed and browsed through the Internet, providing visitors with a more convenient and rich exhibition experience. At the same time, the digital parallel museum can also realize data sharing and interaction with the physical museum, improving the management level and service quality of the museum; the intelligent control platform of the PAD port is an intelligent control system based on a tablet computer (PAD). Through the intelligent control platform of the PAD port, remote monitoring and control of various equipment, facilities and systems in the museum can be realized. At the same time, the platform also provides functions such as data analysis and report generation, providing strong support for the management and operation of the museum. In general, these modules, networks and platforms together constitute a complete museum digital transformation and intelligent management solution. Through this solution, the comprehensive digitalization and intelligent management of the museum can be realized, the management efficiency and service quality of the museum can be improved, and the audience can be provided with a more convenient and rich exhibition experience.

[0024] The target control domain determination module 30 activates the authority domain of the intelligent control platform based on the authority level and determines the target control domain. Based on the authority level, the authority domain is activated on the intelligent control platform and the target control domain is determined, which means that according to the authority level obtained by the user after logging in, the user is allowed or restricted to access and operate specific functions or areas on the intelligent control platform, and the target control domain is determined. Specifically, after the user successfully logs in to the intelligent control platform, the system will first identify the user's authority level. According to the user's authority level, the system will activate or unlock the specific functions or areas that the user has the right to access and operate. These functions or areas are called authority domains. For example, a super administrator may have the authority to access all control functions and data, and his authority domain is large; an ordinary warehouse manager may only be able to view certain information or perform limited operations, and his authority domain is small. After activating the user's authority domain, the authority domain corresponding to the logged-in user is determined according to the logged-in user identity, that is, the target control domain (the specific area currently desired to be operated or accessed), for example, through navigation, menus or buttons on the user interface (UI), and users can select the target control domain they want to operate.

[0025] The pre-control strategy determination module 40 is used to receive the pre-control task, perform the operation switching control of the target control domain and the device-side control decision analysis, and determine the pre-control strategy. Receiving the pre-control task, performing the operation switching control of the target control domain and the device-side control decision analysis to determine the pre-control strategy mainly refers to the decision-making and execution process of the intelligent control system. Specifically, the intelligent control platform first receives a pre-control task. This pre-control task may come from the internal scheduling of the system, or it may be an instruction sent by the user or an external system, which describes the objectives, conditions and expected results to be controlled. According to the requirements of the pre-control task, the system needs to determine the target control domain for the operation. If the current system state does not match the target control domain, then operation switching control is required, including transferring the control right from the current control domain to the target control domain, involving coordination and coordination between different devices or systems. After determining the target control domain, the system conducts control decision analysis on the device side, including collecting device status information, environmental parameters, historical data, etc., and uses decision analysis methods (such as fuzzy control, adaptive control, artificial neural network control, etc.) to determine the best control strategy. The decision analysis may include multiple aspects, such as system stability, response speed, energy consumption, etc. By comprehensively considering these factors, the system can generate multiple alternative control strategies, conduct in-depth analysis of the generated multiple alternative control strategies, and select the optimal pre-control strategy based on certain evaluation principles (such as performance, cost, risk, etc.) to meet the requirements of the pre-control task to the greatest extent, while ensuring the stability and reliability of the system.

[0026] The control management module 50 controls the response timing and instruction conversion of the pre-control strategy based on the intelligent control center, and performs control management in response to the device end. The intelligent control platform of the intelligent control center is used to perform control response timing and command conversion on the pre-control strategy, and respond on the device side for control management. Specifically, control response timing refers to determining the timing of the system issuing control commands to the device side according to the requirements of the pre-control strategy. It is usually necessary to consider factors such as the response time of the device, the stability of the system, and the urgency of the task. Through reasonable control response timing, it can be ensured that the device receives the command at the right time, thereby improving the efficiency and accuracy of control. Since the intelligent control platform may adopt different communication protocols and command formats, and the device side may also have different interface and protocol requirements, command conversion is required. Command conversion refers to converting the general control commands issued by the intelligent control platform into specific commands that the device side can understand and execute. For example, the commands issued by the intelligent control center are parsed, encoded, and formatted to ensure that the commands can be accurately transmitted to the device side and executed. After the conversion command is sent to the device side, the intelligent control platform controls and manages the device side, for example, monitoring the execution status of the device, receiving feedback information from the device, adjusting the control strategy, etc. By real-time monitoring the operation of the device side, the intelligent control platform can promptly discover and solve possible problems to ensure the effective execution of the pre-control strategy.

[0027] The data update feedback control module 60 is used to track the control response and synchronize with the intelligent control platform to perform platform-side data update and feedback control. After the intelligent control platform sends control instructions to the device side, it needs to track the execution of these instructions, that is, the control response, including whether the monitoring device performs the corresponding operation according to the instruction, as well as the completion status and effect of the operation. Tracking the control response helps to ensure the effective execution of the instruction and timely discover and deal with possible problems. Once the control response is tracked, the response information usually needs to be synchronized back to the intelligent control platform through the communication protocol and interface to ensure that the platform can obtain the latest status and data of the device side in real time. The synchronization operation helps to maintain the information consistency between the platform side and the device side. After the control response information is synchronized to the intelligent control platform, the platform needs to process and analyze the data and update its internal data status, for example, update the status information of the device, record the execution status of the control instruction, and count the relevant performance indicators. Through data update, the intelligent control platform can maintain real-time understanding of the system status. Based on the data update on the platform side, the intelligent control platform needs to perform feedback regulation. Specifically, feedback regulation refers to the dynamic adjustment and optimization of the control strategy according to the actual response of the device side and the changes in the system status. Through feedback regulation, the intelligent control platform can continuously improve its control performance and improve the stability and reliability of the system. Tracking control responses and synchronizing them to the intelligent control platform to perform platform-side data updates and feedback regulation are important steps in achieving closed-loop control in intelligent control systems. They help ensure the effective execution of control instructions, improve the control accuracy and efficiency of the system, and achieve real-time management and optimization of system status.

[0028] The intelligent control system for museums according to the embodiment of the present invention is used to solve the technical problem that the existing museum control system lacks advanced monitoring sensor technology and intelligent data interaction means, which makes it difficult to monitor the museum environment and equipment status in real time and accurately, and the abnormal warning of the control system is not accurate enough, thereby achieving the technical effect of making the museum control system more convenient, efficient and intelligent. The intelligent control system for museums includes: an authority level confirmation module 10, an intelligent control platform generation module 20, a target control domain determination module 30, a pre-control strategy determination module 40, a control management module 50, and a data update feedback control module 60.

[0029] The specific configuration of the intelligent control platform generation module 20 will be described in detail below. The intelligent control platform generation module 20 may further include: dividing the target museum into modules based on the control dimension and the control type, and determining the hierarchical integration module. According to the operation, management and control requirements of the museum, the various parts and systems of the museum are classified and combined to form modules with different functions and levels, so as to achieve more efficient, flexible and intelligent control and management. The control dimension refers to which devices are used to control the system, such as switch control, lighting control, sensors, etc. The control type is a group divided according to the actual situation and control requirements of the museum, such as batch control, single control, regional control, remote control, timing control and other control types. According to the control dimension and control type, the various parts and systems of the museum are classified and combined to form modules with different functions and levels. They can be physically independent devices or systems, or logically independent functional units. On the basis of modular design, it is necessary to further determine the hierarchical integration module. The hierarchical integration module refers to combining multiple modules according to a certain hierarchical relationship to form a module with higher integration and control capabilities. Through the hierarchical integration module, cross-module data sharing, collaborative work and unified control are realized to improve the overall operation efficiency and management level of the museum. It also includes, based on the hierarchical integration module, establishing the association between layers and within layers to generate the integrated control module. According to the determined hierarchical integration modules, the association relationship between these modules and the coordination mechanism between the components within the modules are further constructed to form a unified, efficient and coordinated integrated control module. Specifically, the inter-layer association refers to the connection and interaction mode between the integrated modules at different levels. By defining a clear interface and communication protocol, it is ensured that the high-level module can send control instructions to the low-level module and receive the status information fed back by the low-level module; the intra-layer association refers to the coordination and cooperation between different integrated modules at the same level, which usually includes the interoperability, data sharing, and synchronous control of the internal components of the module. By designing a reasonable internal communication mechanism, data exchange format and coordination strategy, it is ensured that the modules at the same level can work together efficiently and complete the control task together; after establishing the association between the inter-layer and the intra-layer, the integrated modules at each level can be integrated into a unified integrated control module, which has a high degree of integration and scalability, can flexibly adapt to various needs of museum operation and management, and can also provide a unified control interface and interface to facilitate user operation and management. It also includes traversing the integrated control module, performing cascade processing of module features based on control logic, and generating the cascade control network.Traverse and check the established integrated control modules, and connect and combine these modules according to certain rules and order according to the preset control logic, so as to form a cascade control network with clear hierarchy and complete functions. Specifically, after traversing all modules, the system will analyze the module features according to the preset control logic, and perform cascade processing on the module features, for example, the module functions, parameters, status, etc. Cascade processing refers to connecting the features of multiple modules in series or in parallel according to certain rules and order to form a higher-level control structure, and finally generate a complete cascade control network, which is composed of multiple integrated control modules connected according to control logic. It has high integration and flexibility, can realize unified control and management of various systems and equipment in the museum, and ensure that each module can work together according to preset rules and strategies.

[0030] The specific configuration of the intelligent control platform generation module 20 will be described in detail below. The intelligent control platform generation module 20 may further include: determining a digital construction level, the construction level including at least a global level, a partition level, a local level, a perspective level and a feature level. In the process of digital construction, the construction levels mentioned include global layer, partition layer, local layer, perspective layer and feature layer. Specifically, the global layer is the foundation and starting point of the entire digital construction, focusing on the overall framework and structure of the entire system to ensure the stability and scalability of the entire digital project; on the basis of the global layer, the partition layer divides the overall system into different areas or modules, making the entire system easier to manage and maintain; the local layer is based on the partition layer, and each area or module is designed and implemented in detail to ensure that each area or module can meet business needs and has high performance, high reliability and good user experience; the perspective layer observes and analyzes the system from different angles or dimensions, providing diversified analysis and evaluation methods; the feature layer is the bottom layer of digital construction, focusing on the specific functions and features in the system or project. At the feature layer, each function and feature needs to be designed and implemented in detail, and strict testing and verification are carried out to ensure that the system or project has the required functions and features and meets business needs and user experience requirements. It also includes reading the basic construction data of the target museum, and based on the construction layer, performing hierarchical transformation and inter-layer mapping association to determine the hierarchical explosion model. Read the basic construction data of the target museum, such as the museum's architectural structure, exhibition layout, equipment configuration, crowd distribution and other information, and perform hierarchical transformation on these data according to the construction layer (divide and organize the original data according to different levels and dimensions). After completing the hierarchical transformation, perform inter-layer mapping association, which means associating and mapping the data between different levels in order to establish the connection and dependency between them. For example, the data of the global layer may need to be mapped to the partition layer, and the data of the partition layer needs to be mapped to the local layer, etc. Finally, the hierarchical explosion model is determined, which describes the impact and chain reaction that other levels may be affected when the data or parameters of a certain level change. It also includes connecting the hierarchical explosion model with the data receiving port to generate a digital parallel museum.Combine museums in the real world with digital technology to create a virtual, digital museum. Specifically, the data receiving port is the interface for the digital parallel museum to interact with external data sources, including the museum's real-time data (such as visitor flow, exhibit status, etc.), historical data (such as exhibition records, maintenance logs, etc.) and other relevant data information. Connecting the hierarchical explosion model with the data receiving port is to configure and synchronize the data flow to ensure that real-time data can correctly flow into the hierarchical explosion model and trigger the corresponding digital response. In fact, it is to digitally reproduce the actual museum to form a simulated environment corresponding to the real museum, and finally generate a digital parallel museum. In this virtual environment, users can browse the various areas and exhibits of the museum, obtain relevant information and introductions, and even interact with the exhibits.

[0031] The specific configuration of the intelligent control platform generation module 20 will be described in detail below. The intelligent control platform generation module 20 may further include: establishing the coupling between the integrated control module, the cascade control network and the parallel museum, including display coupling and control coupling. Establishing the coupling between the integrated control module, the cascade control network and the digital parallel museum, including display coupling and control coupling. Specifically, the display coupling is mainly reflected in the data display and interactive interface. For example, the virtual environment of the parallel museum can display data from the integrated control module and the cascade control network in real time, such as visitor flow, exhibit status, etc. At the same time, the super administrator and the warehouse manager can send instructions to the integrated control module through the interactive interface of the parallel museum to achieve remote control and management of the museum; the control coupling focuses more on the association between functional logic and operation process. Each submodule of the integrated control module needs to call the services or data provided by the parallel museum to achieve specific control functions. Similarly, the parallel museum needs to receive control instructions from the integrated control module and trigger corresponding operations. This control coupling relationship enables the entire system to work together to achieve comprehensive management and control of the museum.

[0032] The specific configuration of the target control domain determination module 30 will be described in detail below. Figure 2As shown, the target control domain determination module 30 may further include: setting a multi-level permission level and determining a permission mapping library, wherein the permission dimension includes display switching permission and operation control permission. The multi-level permission level refers to setting different levels of access and operation permissions in a system or platform according to different user roles, responsibilities or requirements. For example, in a museum management system, multiple levels of permissions such as super administrators, administrators, and ordinary library managers may be set; through a configuration file, a database table or a special permission management system, the permission mapping library is determined. The permission mapping library is a database that stores user roles, permission levels and specific permission mapping relationships. When the system needs to verify the user's access and operation permissions, it will search for the corresponding specific permissions in the permission mapping library according to the user's role and permission level, and perform corresponding control. The permission dimension includes display switching permission and operation control permission. The display switching permission refers to whether the user has the permission to view or switch different interfaces, views or data, and the operation control permission refers to whether the user has the permission to add, delete, modify, and query data in the system. It also includes matching the permission levels based on the permission mapping library to determine a preset permission domain, including a first permission domain and a second permission domain based on the permission dimension. When a user tries to access the system or perform an operation, the system will search for the corresponding permission level in the permission mapping library according to the user's role or user group. Based on the matching results of the permission mapping library, the system will set one or more preset permission domains for the user, limiting the scope within which the user can operate or access which data. The first permission domain refers to the permission domain based on the display switching permission, and the second permission domain is the permission domain based on the operation control permission. It also includes mapping and activating the intelligent control platform based on the preset permission domain to determine the target control domain. Mapping the preset permission domain to the intelligent control platform is to associate the permission range with the functions and operations of the control platform, determine which control instructions, data access or system operations are triggered by which users with specific permissions, and finally determine the target control domain.

[0033] The specific configuration of the pre-control strategy determination module 40 will be described in detail below. The pre-control strategy determination module 40 may further include: determining an operation control node based on the pre-control task, wherein the pre-control task includes at least one item, and concurrent control and sequential control can be performed. Determining an operation control node based on a pre-control task refers to a key control node set in the museum control system to implement the pre-control task. The pre-control task may include one or more items, and may be concurrently controlled or sequentially controlled to ensure the correct operation and safety of the system. Concurrent control refers to when the system needs to process multiple tasks or requests at the same time, ensuring that multiple tasks or requests can be executed simultaneously, efficiently, and safely, avoiding conflicts, competitions, and deadlocks between tasks, and improving the overall performance and throughput of the system; sequential control refers to the execution of pre-control tasks in a specific order to ensure that the first executed tasks will not affect the execution of subsequent tasks, thereby ensuring the correctness and stability of the entire system. It also includes, based on the operation control node, performing guide switching and operation control, determining valid task data, wherein hierarchical mapping explosion guides can be executed. Guidance switching refers to dynamically changing or switching the displayed content, view or interface according to user or system requirements at the system user interface or information display level, for example, switching from one screen to another, from one data view to another, etc.; operation control is the actual control action or command executed on the operation control node, including operations such as reading, writing, modifying, and deleting data, or control commands such as switching of system status and starting / stopping of equipment, and finally determining the effective task data, that is, data directly related to the current task or operation and having an important impact on task execution. Among them, hierarchical mapping explosion guidance is a special guidance switching technology, which is mainly used to display data or information with complex hierarchical structures. In this guidance mode, users can start from the top layer and gradually expand or explode the detailed information of the next layer to gain a deeper understanding of the structure and content of the data layer by layer. It also includes, based on the effective task data, making device-side control scheme decisions and controlling device positioning for the pre-control task, and determining the pre-control strategy. After obtaining valid task data, the system formulates a device-side control plan based on this data. For example, the control plan is decided based on device performance, task priority, resource constraints, etc. After determining the control plan, the system needs to determine which devices need to execute control commands. Accurate device positioning can ensure that control commands can be accurately sent to the target device and effectively executed, and finally determine the pre-control strategy.

[0034] The specific configuration of the control management module 50 will be described in detail below. The control management module 50 may further include: if there are multiple pre-control tasks, traverse the pre-control strategies mapped by the tasks and perform control homology analysis and co-frequency analysis to determine the co-mapping group, wherein the control type is used as the homology judgment standard, and the response time node is used as the co-frequency judgment standard. Control homology analysis is to evaluate whether there are common or similar control types between multiple pre-control strategies. If two or more strategies have the same control type, they belong to the same control source, that is, the homology mapping group; co-frequency analysis is to evaluate whether multiple pre-control strategies are consistent or similar in response time nodes, wherein the response time node refers to the time required from receiving the control instruction to executing the control action. If two or more strategies are similar or consistent in the response time node, a synchronization effect is generated during execution, that is, the co-frequency mapping group; the homology mapping group and the co-frequency mapping group jointly determine the co-mapping group. It also includes traversing the co-mapping group, performing the spatiotemporal distribution of the control response, and determining the spatiotemporal control sequence. The spatiotemporal distribution of control responses refers to the execution order and location of control strategies in time and space, taking into account the execution time, duration, time interval of each strategy, and the distribution of the controlled devices or resources in physical locations. After analyzing the spatiotemporal distribution of control responses, the spatiotemporal control sequence is determined. Usually, based on the time axis, the execution time of each strategy is marked on the time axis, and the time interval and sequence relationship between them are clarified. The execution order and time arrangement of each strategy are specified to ensure that the system can be controlled in the expected manner. It also includes generating timing control instructions based on the spatiotemporal control sequence. According to the spatiotemporal control sequence, a set of commands arranged in time order for guiding the system or device to perform specific actions, namely, timing control instructions, are generated, which contain necessary control information such as target devices, execution actions, action parameters, and execution time.

[0035] The specific configuration of the data update feedback control module 60 will be described in detail below. The data update feedback control module 60 may further include: the intelligent control platform is synchronized with the changes of the target museum. The intelligent control platform is synchronized or coordinated with the operation, management or state changes of the target museum. For example, when the state of the equipment in the museum changes, the intelligent control platform can quickly capture these state changes and make corresponding responses or adjustments. It also includes returning control response data to update the platform-side data. After the control instruction is executed, the system will feed back the execution result or status information as control response data to the platform side through a preset communication protocol or interface, and update the data information on the platform side accordingly, such as updating the current state of the device, recording the execution results, analyzing the execution efficiency, etc. It also includes performing control trend off-axis judgment on the control response data and the pre-control task, generating a calibration control instruction and performing device-side feedback control. When the control response data is returned, the system will compare it with the target or expected state of the pre-control task. If there is a significant deviation between the control response data and the target of the pre-control task, that is, an off-axis phenomenon occurs, the system will identify this trend. After determining that there is a control trend off-axis, the system will generate a set of new control instructions based on the current control response data and the requirements of the pre-control task, namely, calibration control instructions, and send them to the device side. After receiving the instructions, the device side will perform corresponding actions to adjust its state or behavior, realize feedback control, monitor and adjust the state and behavior of the device in real time, and ensure that the device can operate according to the expected goals.

[0036] Although the present application makes various references to certain modules in the system according to the embodiments of the present application, any number of different modules may be used and run on the user terminal and / or server, and the various units and modules included are only divided according to functional logic, but are not limited to the above division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention.

[0037] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.

Claims

1. Intelligent control system for museums, characterized in that: The system comprises: The permission level confirmation module is used to perform user login permission authentication and determine the permission level; An intelligent control platform generation module, which is used to perform hierarchical modular processing and control linkage analysis on the target museum, establish an integrated control module and a cascade control network, collaboratively construct a digital parallel museum, and generate an intelligent control platform for the PAD port; a target control domain determination module, which activates the authority domain of the intelligent control platform based on the authority level and determines the target control domain; A pre-control strategy determination module, the pre-control strategy determination module is used to receive a pre-control task, perform operation switching control of the target control domain and device-side control decision analysis, and determine a pre-control strategy; A control management module, which performs control response timing and instruction conversion on the pre-control strategy based on an intelligent control center, and performs control management in response to the device end; A data update feedback control module, which is used to track control responses and synchronize to the intelligent control platform to perform platform-side data update and feedback control; The steps performed by the intelligent control platform generation module include: Based on the control dimensions and control types, the target museum is divided into modules and the hierarchical integration modules are determined; Based on the hierarchical integration module, establishing associations between layers and within layers to generate the integrated control module; Traversing the integrated control modules, performing cascade processing of module features based on control logic, and generating the cascade control network; The steps performed by the intelligent control platform generation module include: Determining a digital construction hierarchy, wherein the construction hierarchy includes at least a global layer, a partition layer, a local layer, a perspective layer, and a feature layer; Read the basic construction data of the target museum, perform hierarchical conversion and inter-layer mapping association based on the construction layer, and determine the hierarchical explosion model; The hierarchical explosion model is connected to a data receiving port to generate a digital parallel museum.

2. The intelligent control system for a museum as claimed in claim 1, characterized in that: The steps performed by the intelligent control platform generation module include establishing coupling between the integrated control module, the cascade control network and the parallel museum, including display coupling and control coupling.

3. The intelligent control system for a museum as claimed in claim 1, characterized in that: The target control domain determination module performs the following steps: Set up multiple levels of permissions and determine the permission mapping library, where the permission dimensions include display switching permissions and operation control permissions; Based on the permission mapping library, the permission levels are matched to determine a preset permission domain, including a first permission domain and a second permission domain based on the permission dimension; Based on the preset authority domain, the intelligent control platform is mapped and activated to determine the target control domain.

4. The intelligent control system for a museum as claimed in claim 1, characterized in that: The pre-control strategy determination module performs the following steps: Determining an operation control node based on the pre-control task, wherein the pre-control task includes at least one item capable of executing concurrent control and sequential control; Based on the operation control node, guide switching and operation control are performed to determine valid task data, wherein hierarchical mapping explosion guide can be executed; Based on the effective task data, a device-side control scheme decision and control device positioning are performed on the pre-control task to determine the pre-control strategy.

5. The intelligent control system for a museum as claimed in claim 1, characterized in that: The control management module performs the following steps: If there are multiple pre-control tasks, traverse the pre-control strategies of the task mapping and perform control homology analysis and homofrequency analysis to determine the homology mapping group, wherein the control type is used as the homology judgment standard and the response time node is used as the homology judgment standard; Traversing the same mapping group, performing spatiotemporal distribution of control responses, and determining a spatiotemporal control sequence; Based on the spatiotemporal control sequence, a timing control instruction is generated.

6. The intelligent control system for a museum as claimed in claim 1, characterized in that: The data update feedback control module performs the following steps: The intelligent control platform changes in sync with the target museum; Return control response data to update the platform-side data; The control response data and the pre-control task are subjected to a control trend off-axis determination, a calibration control instruction is generated, and feedback control is performed on the device side.