A method and system for utilizing wind energy for offshore aquaculture

By predicting the future wind energy power and electricity consumption time series, the wind energy shortage period in the offshore breeding area is determined, and the power distribution strategy is generated based on the equipment priority, which solves the power supply problem caused by the instability of wind energy in the offshore breeding area and realizes Optimized management of electrical equipment and efficient energy utilization.

CN118611157BActive Publication Date: 2024-10-08GUANGDONG OCEAN UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411075066.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-10-08
Estimated Expiration
2044-08-07

AI Technical Summary

Technical Problem

The instability and unpredictability of wind energy in offshore farming areas lead to unstable power supply, which affects the operating efficiency of electrical equipment and even adversely affects farmed organisms. How to effectively utilize wind energy in the sea for power distribution is a difficult problem.

Method used

By obtaining the historical offshore wind speed time series, the wind energy power time series is calculated and fitted, and the pre-trained wind energy power prediction model is input to predict the future wind energy power time series; at the same time, the future is predicted based on the historical power consumption time series of the offshore breeding platform. The electricity consumption time series determines the future wind energy power shortage period, generates a power distribution strategy based on the priority of electrical equipment, and dynamically adjusts the power supply of electrical equipment.

Benefits of technology

Predict wind energy power shortage periods in advance, optimize the management and scheduling of electrical equipment, improve energy utilization efficiency, ensure that key equipment is given priority when wind energy resources are insufficient, reduce energy waste, and meet the power needs of breeding activities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118611157B_ABST
    Figure CN118611157B_ABST
Patent Text Reader

Abstract

The present application discloses a method and system for utilizing wind energy for offshore aquaculture. The method comprises the following steps: fitting a wind power time series and a historical actual wind power time series to obtain a historical fitting wind power time series, inputting the historical fitting wind power time series into a wind power prediction model, and outputting a future wind power time series; inputting the acquired historical electricity consumption time series into an electricity consumption prediction model, and outputting a future electricity consumption time series; determining a future wind power shortage time series based on the future wind power time series and the future electricity consumption time series; sorting all electrical equipment in an offshore aquaculture platform based on priority to obtain an electrical equipment sequence, and generating an electrical equipment electricity distribution strategy based on the future wind power shortage time series and the electrical equipment sequence; compared with the prior art, the technical solution of the present application can optimize the management and scheduling of electrical equipment and improve energy utilization efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of energy management, and in particular to a method and system for utilizing wind energy for offshore aquaculture. Background Art

[0002] With the development of the offshore aquaculture industry, the dependence on electricity supply is increasing. Key facilities in offshore aquaculture areas, such as water pumps, oxygen supply systems, temperature control equipment and lighting systems, all require stable and reliable electricity to maintain their normal operation; the stable operation of these equipment is crucial to ensuring the health and production efficiency of farmed organisms.

[0003] However, the power supply in offshore aquaculture areas faces many challenges. Wind energy, as a renewable energy source, has great development potential at sea. However, the instability and unpredictability of wind energy have brought difficulties to the power supply in offshore aquaculture areas. In addition, the intermittent output of wind power generation devices may lead to unstable power supply, affect the operating efficiency of electrical equipment, and may even have an adverse effect on farmed organisms. Therefore, how to use the wind energy in the sea area to realize the distribution of electricity in aquaculture areas is currently a difficult problem. Summary of the invention

[0004] The technical problem to be solved by the present application is to provide a method and system for utilizing wind energy for offshore aquaculture, optimize the management and scheduling of electrical equipment, and improve energy utilization efficiency.

[0005] In order to solve the above technical problems, the present application provides a method for utilizing wind energy for offshore aquaculture, comprising:

[0006] Based on the acquired historical offshore wind speed time series, a wind power time series is calculated, and at the same time, a historical actual wind power time series corresponding to the historical offshore wind speed time series is acquired;

[0007] Fitting the wind power time series and the historical actual wind power time series to obtain a historical fitting wind power time series, and inputting the historical fitting wind power time series into a pre-trained wind power prediction model so that the wind power prediction model outputs a future wind power time series;

[0008] Based on the acquired historical electricity consumption time series of the offshore aquaculture platform, the historical electricity consumption time series is input into a pre-trained electricity consumption prediction model, so that the electricity consumption prediction model outputs a future electricity consumption time series;

[0009] Determining a future wind power shortage time series based on the future wind power time series and the future power consumption time series;

[0010] Obtain the priorities of all electrical equipment in the offshore aquaculture platform, sort all the electrical equipment based on the priorities to obtain a sequence of electrical equipment, and generate a power distribution strategy for the electrical equipment based on the future wind power shortage time series and the sequence of electrical equipment.

[0011] In a possible implementation, based on the future wind power shortage time series and the power consumption equipment sequence, generating a power consumption allocation strategy for the power consumption equipment specifically includes:

[0012] Based on the future wind power shortage time series, determining a plurality of future wind power shortage times and the shortage wind power corresponding to each future wind power shortage time;

[0013] Obtaining the power demand corresponding to each power consumer in the power consumer sequence, and comparing the power demand corresponding to the last power consumer in the power consumer sequence with the shortage wind power corresponding to each of the multiple future wind power shortage times;

[0014] If the power demand corresponding to the last power consumer is not less than the shortage wind power, then the target future wind power shortage time corresponding to the shortage wind power is obtained, and the last power consumer is deleted from the power consumer sequence to obtain a first adjustment power consumer sequence, and based on the first adjustment power consumer sequence, the power allocation object corresponding to the target future wind power shortage time is determined; or,

[0015] If the electricity demand corresponding to the last electricity user is less than the shortage of wind energy power, the adjacent electricity users of the last electricity user are obtained, and the total electricity demand of the last electricity user and the adjacent electricity users is calculated; if the total electricity demand is less than the shortage of wind energy power, the number of adjacent electricity users is increased sequentially until the total electricity demand of the last electricity user and the target number of adjacent electricity users is not less than the shortage of wind energy power, the last electricity user and the target number of adjacent electricity users are deleted from the electricity user sequence to obtain a second adjusted electricity user sequence, and based on the second adjusted electricity user sequence, the electricity allocation object corresponding to the target future wind energy power shortage time is determined.

[0016] In a possible implementation, the wind power time series is calculated based on the acquired historical offshore wind speed time series, specifically including:

[0017] Acquire multiple historical offshore wind speeds within a preset historical time period, and arrange the multiple historical offshore wind speeds based on time sequence to obtain a historical offshore wind speed time series;

[0018] Inputting each historical offshore wind speed in the historical offshore wind speed time series into a preset wind energy density calculation formula respectively, obtaining the historical offshore wind energy density corresponding to each historical offshore wind speed, and generating a historical offshore wind energy density time series corresponding to the historical offshore wind speed time series;

[0019] A target historical offshore wind energy density corresponding to a historical time point is extracted from the historical offshore wind energy density time series, and a target historical offshore wind speed corresponding to a historical time point is extracted from the historical offshore wind speed time series. The target historical offshore wind energy density and the target historical offshore wind speed are substituted into a preset wind energy power calculation formula to obtain the wind energy power corresponding to the historical time point, and a wind energy power time series is generated based on the wind energy power corresponding to the historical time point.

[0020] In a possible implementation, the wind energy density calculation formula is as follows:

[0021] ;

[0022] In the formula, is the offshore wind energy density, is the air density, is the wind-exposed area of ​​the wind turbine blades, is the wind speed at sea;

[0023] The wind power calculation formula is as follows:

[0024] ;

[0025] In the formula, is the wind power, is the offshore wind energy density, is the conversion efficiency of the wind energy conversion device, The wind-exposed area of ​​the wind turbine blades.

[0026] In a possible implementation, fitting the wind power time series and the historical actual wind power time series to obtain the historical fitting wind power time series specifically includes:

[0027] Calculating the sum of wind power corresponding to the wind power time series, and calculating the average wind power corresponding to the wind power time series based on the number of wind power data points in the wind power time series and the sum of wind power;

[0028] Calculating the sum of the historical actual wind power corresponding to the historical actual wind power time series, and calculating the average historical actual wind power corresponding to the historical actual wind power time series based on the amount of wind power data points in the historical actual wind power time series and the sum of the historical actual wind power;

[0029] Calculating a first difference between the average wind power and the average historical actual wind power, and when the first difference is not greater than a preset difference threshold, averaging the wind power time series and the historical actual wind power time series to obtain a historical fitting wind power time series; or,

[0030] When the first difference is greater than a preset difference threshold, weighted averaging is performed on the wind power time series and the historical actual wind power time series to obtain a historical fitting wind power time series.

[0031] In a possible implementation, the training process of the wind power prediction model specifically includes:

[0032] Setting an initial wind power prediction model, wherein the initial wind power prediction model includes a first prediction layer and a second prediction layer, and the first prediction layer is connected to the second prediction layer;

[0033] Obtain wind power time series samples corresponding to the same day in multiple preset historical years, and meteorological time series samples corresponding to each wind power time series sample;

[0034] The wind power time series samples corresponding to the first preset year are used as the input of the first prediction layer, and the meteorological time series samples corresponding to the second preset year are used as the output of the first prediction layer; the output of the first prediction layer is used as the output of the second prediction layer, and the wind power time series samples corresponding to the second preset year are used as the output of the second prediction layer, and the initial wind power prediction model is trained until the model converges or reaches a preset number of iterations, so as to obtain a wind power prediction model, wherein the second preset year is the year after the first preset year.

[0035] In a possible implementation, determining a future wind power shortage time series based on the future wind power time series and the future power consumption time series specifically includes:

[0036] Extract the target future wind power and the target future power consumption corresponding to each target time point from the future wind power time series and the future power consumption time series, and perform comparison processing on the target future wind power and the target future power consumption corresponding to the same target time point respectively;

[0037] When the target future wind power is less than the target future electricity consumption, a wind power shortage value is calculated based on the target future wind power and the target future electricity consumption, and the wind power shortage value is used as a sequence value corresponding to the current time point;

[0038] When the target future wind energy power is not less than the target future electricity consumption, a sufficient wind energy power value is calculated based on the target future wind energy power and the target future electricity consumption, and the sufficient wind energy power value is used as a sequence value corresponding to the current time point;

[0039] Integrate the sequence values ​​corresponding to all target time points to obtain a wind power surplus or shortage time series, traverse each sequence value in the wind power surplus or shortage time series one by one, and when the sequence value traversed is the wind power shortage value, and the wind power sufficient value does not exist before the wind power shortage value, retain the wind power shortage value;

[0040] When the sequence value traversed is the wind power shortage value, and the wind power sufficient value exists before the wind power shortage value, the wind power sufficient value before the wind power shortage value is obtained, and based on the wind power sufficient value, the wind power shortage value is adjusted to obtain the adjusted sequence value, until the wind power surplus or shortage time series is traversed, and the future wind power shortage time series is determined.

[0041] In a possible implementation, obtaining the priorities of all electrical equipment in the offshore aquaculture platform specifically includes:

[0042] Obtaining the usage corresponding to each of all electrical devices, and setting first weight values ​​corresponding to each of all electrical devices based on the usage;

[0043] Acquire all first electrical devices with the same initial weight value, and set second weight values ​​corresponding to all first electrical devices respectively based on the power demands corresponding to all the first electrical devices;

[0044] Based on the first weight value and the second weight value, the priorities corresponding to all the electrical devices are determined.

[0045] The present application also provides a wind energy utilization system for offshore aquaculture, including: a wind energy power time series acquisition module, a future wind energy power time series prediction module, a future electricity consumption time series prediction module, a future wind energy power shortage time series determination module and an electricity consumption distribution strategy generation module for electric equipment;

[0046] The wind power time series acquisition module is used to calculate the wind power time series based on the acquired historical offshore wind speed time series, and simultaneously acquire the historical actual wind power time series corresponding to the historical offshore wind speed time series;

[0047] The future wind power time series prediction module is used to perform fitting processing on the wind power time series and the historical actual wind power time series to obtain a historical fitting wind power time series, and input the historical fitting wind power time series into a pre-trained wind power prediction model so that the wind power prediction model outputs a future wind power time series;

[0048] The future power consumption time series prediction module is used to input the historical power consumption time series into the pre-trained power consumption prediction model based on the acquired historical power consumption time series of the offshore aquaculture platform, so that the power consumption prediction model outputs the future power consumption time series;

[0049] The future wind power shortage time series determination module is used to determine the future wind power shortage time series based on the future wind power time series and the future power consumption time series;

[0050] The power consumption allocation strategy generation module for power equipment is used to obtain the priorities of all power equipment in the offshore aquaculture platform, sort all the power equipment based on the priorities to obtain a sequence of power equipment, and generate a power consumption allocation strategy for power equipment based on the future wind power shortage time series and the power equipment sequence.

[0051] In a possible implementation, the power consumption allocation strategy generation module for power consumption equipment is used to generate a power consumption allocation strategy for power consumption equipment based on the future wind power shortage time series and the power consumption equipment sequence, specifically including:

[0052] Based on the future wind power shortage time series, determining a plurality of future wind power shortage times and the shortage wind power corresponding to each future wind power shortage time;

[0053] Obtaining the power demand corresponding to each power consumer in the power consumer sequence, and comparing the power demand corresponding to the last power consumer in the power consumer sequence with the shortage wind power corresponding to each of the multiple future wind power shortage times;

[0054] If the power demand corresponding to the last power consumer is not less than the shortage wind power, then the target future wind power shortage time corresponding to the shortage wind power is obtained, and the last power consumer is deleted from the power consumer sequence to obtain a first adjustment power consumer sequence, and based on the first adjustment power consumer sequence, the power allocation object corresponding to the target future wind power shortage time is determined; or,

[0055] If the electricity demand corresponding to the last electricity user is less than the shortage of wind energy power, the adjacent electricity users of the last electricity user are obtained, and the total electricity demand of the last electricity user and the adjacent electricity users is calculated; if the total electricity demand is less than the shortage of wind energy power, the number of adjacent electricity users is increased sequentially until the total electricity demand of the last electricity user and the target number of adjacent electricity users is not less than the shortage of wind energy power, the last electricity user and the target number of adjacent electricity users are deleted from the electricity user sequence to obtain a second adjusted electricity user sequence, and based on the second adjusted electricity user sequence, the electricity allocation object corresponding to the target future wind energy power shortage time is determined.

[0056] In a possible implementation, the wind power time series acquisition module is used to calculate the wind power time series based on the acquired historical offshore wind speed time series, specifically including:

[0057] Acquire multiple historical offshore wind speeds within a preset historical time period, and arrange the multiple historical offshore wind speeds based on time sequence to obtain a historical offshore wind speed time series;

[0058] Inputting each historical offshore wind speed in the historical offshore wind speed time series into a preset wind energy density calculation formula respectively, obtaining the historical offshore wind energy density corresponding to each historical offshore wind speed, and generating a historical offshore wind energy density time series corresponding to the historical offshore wind speed time series;

[0059] A target historical offshore wind energy density corresponding to a historical time point is extracted from the historical offshore wind energy density time series, and a target historical offshore wind speed corresponding to a historical time point is extracted from the historical offshore wind speed time series. The target historical offshore wind energy density and the target historical offshore wind speed are substituted into a preset wind energy power calculation formula to obtain the wind energy power corresponding to the historical time point, and a wind energy power time series is generated based on the wind energy power corresponding to the historical time point.

[0060] In a possible implementation, the wind energy density calculation formula is as follows:

[0061] ;

[0062] In the formula, is the offshore wind energy density, is the air density, is the wind-exposed area of ​​the wind turbine blades, is the wind speed at sea;

[0063] The wind power calculation formula is as follows:

[0064] ;

[0065] In the formula, is the wind power, is the offshore wind energy density, is the conversion efficiency of the wind energy conversion device, The wind-exposed area of ​​the wind turbine blades.

[0066] In a possible implementation, the future wind power time series prediction module is used to perform fitting processing on the wind power time series and the historical actual wind power time series to obtain the historical fitting wind power time series, specifically including:

[0067] Calculating the sum of wind power corresponding to the wind power time series, and calculating the average wind power corresponding to the wind power time series based on the number of wind power data points in the wind power time series and the sum of wind power;

[0068] Calculating the sum of the historical actual wind power corresponding to the historical actual wind power time series, and calculating the average historical actual wind power corresponding to the historical actual wind power time series based on the amount of wind power data points in the historical actual wind power time series and the sum of the historical actual wind power;

[0069] Calculating a first difference between the average wind power and the average historical actual wind power, and when the first difference is not greater than a preset difference threshold, averaging the wind power time series and the historical actual wind power time series to obtain a historical fitting wind power time series; or,

[0070] When the first difference is greater than a preset difference threshold, weighted averaging is performed on the wind power time series and the historical actual wind power time series to obtain a historical fitting wind power time series.

[0071] In a possible implementation, the training process of the wind power prediction model specifically includes:

[0072] Setting an initial wind power prediction model, wherein the initial wind power prediction model includes a first prediction layer and a second prediction layer, and the first prediction layer is connected to the second prediction layer;

[0073] Obtain wind power time series samples corresponding to the same day in multiple preset historical years, and meteorological time series samples corresponding to each wind power time series sample;

[0074] The wind power time series samples corresponding to the first preset year are used as the input of the first prediction layer, and the meteorological time series samples corresponding to the second preset year are used as the output of the first prediction layer; the output of the first prediction layer is used as the output of the second prediction layer, and the wind power time series samples corresponding to the second preset year are used as the output of the second prediction layer, and the initial wind power prediction model is trained until the model converges or reaches a preset number of iterations, so as to obtain a wind power prediction model, wherein the second preset year is the year after the first preset year.

[0075] In a possible implementation, the future wind power shortage time series determination module is used to determine the future wind power shortage time series based on the future wind power time series and the future power consumption time series, specifically including:

[0076] Extract the target future wind power and the target future power consumption corresponding to each target time point from the future wind power time series and the future power consumption time series, and perform comparison processing on the target future wind power and the target future power consumption corresponding to the same target time point respectively;

[0077] When the target future wind power is less than the target future electricity consumption, a wind power shortage value is calculated based on the target future wind power and the target future electricity consumption, and the wind power shortage value is used as a sequence value corresponding to the current time point;

[0078] When the target future wind energy power is not less than the target future electricity consumption, a sufficient wind energy power value is calculated based on the target future wind energy power and the target future electricity consumption, and the sufficient wind energy power value is used as a sequence value corresponding to the current time point;

[0079] Integrate the sequence values ​​corresponding to all target time points to obtain a wind power surplus or shortage time series, traverse each sequence value in the wind power surplus or shortage time series one by one, and when the sequence value traversed is the wind power shortage value, and the wind power sufficient value does not exist before the wind power shortage value, retain the wind power shortage value;

[0080] When the sequence value traversed is the wind power shortage value, and the wind power sufficient value exists before the wind power shortage value, the wind power sufficient value before the wind power shortage value is obtained, and based on the wind power sufficient value, the wind power shortage value is adjusted to obtain the adjusted sequence value, until the wind power surplus or shortage time series is traversed, and the future wind power shortage time series is determined.

[0081] In a possible implementation, the power consumption allocation strategy generation module for power consumption equipment is used to obtain the priority of all power consumption equipment in the offshore aquaculture platform, specifically including:

[0082] Obtaining the usage corresponding to each of all electrical devices, and setting first weight values ​​corresponding to each of all electrical devices based on the usage;

[0083] Acquire all first electrical devices with the same initial weight value, and set second weight values ​​corresponding to all first electrical devices respectively based on the power demands corresponding to all the first electrical devices;

[0084] Based on the first weight value and the second weight value, the priorities corresponding to all the electrical devices are determined.

[0085] The present application also provides a terminal device, including a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, and when the processor executes the computer program, the method for utilizing wind energy for offshore aquaculture as described in any one of the above items is implemented.

[0086] The present application also provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute the wind energy utilization method for offshore aquaculture as described in any one of the above.

[0087] The wind energy utilization method and system for offshore aquaculture in the embodiment of the present application have the following beneficial effects compared with the prior art:

[0088] By predicting the future wind power time series and the future power consumption time series, the possible wind power shortage time period can be predicted in advance; and all power-consuming equipment on the offshore platform is sorted based on priority to obtain a power equipment sequence, and a power distribution strategy for the power equipment is generated based on the future wind power shortage time series and the power equipment sequence, so as to dynamically adjust the power distribution strategy for the power equipment based on the preset future wind power shortage data, so as to more effectively utilize the predictable wind energy resources, help reduce energy waste and improve energy utilization efficiency; this priority management combined with wind power prediction can ensure that key power-consuming equipment is powered first when wind energy resources are insufficient, realize the optimization of power equipment management and scheduling, and thus meet the needs of breeding activities to the greatest extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0089] Figure 1 This is a flow chart of an embodiment of a method for utilizing wind energy for offshore aquaculture provided by the present application;

[0090] Figure 2 This is a structural schematic diagram of an embodiment of a wind energy utilization system for offshore aquaculture provided by the present application;

[0091] Figure 3 It is a structural schematic diagram of a terminal device provided by the present invention. DETAILED DESCRIPTION

[0092] The following will be combined with the drawings in this application to clearly and completely describe the technical solutions in the embodiments of this application. Obviously, the described embodiments are only part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0093] Example 1, see Figure 1 , Figure 1 This is a flow chart of an embodiment of a method for utilizing wind energy for offshore aquaculture provided by the present application. Figure 1 As shown, the method includes steps 101 to 105, which are specifically as follows:

[0094] Step 101: Based on the acquired historical offshore wind speed time series, a wind power time series is calculated, and at the same time, a historical actual wind power time series corresponding to the historical offshore wind speed time series is acquired.

[0095] In one embodiment, a plurality of historical offshore wind speeds within a preset historical time period are obtained, and the plurality of historical offshore wind speeds are arranged based on a time sequence to obtain a historical offshore wind speed time series.

[0096] Preferably, historical offshore wind speeds are obtained from weather stations, buoys or satellite remote sensing data, and 24 hours within a historical day is used as a preset historical time period, wherein the historical day is the day of the previous year corresponding to the same day in the current year.

[0097] Specifically, the collected historical offshore wind speeds are arranged in chronological order to form a historical offshore wind speed time series.

[0098] In one embodiment, each historical offshore wind speed in the historical offshore wind speed time series is input into a preset wind energy density calculation formula to obtain the historical offshore wind energy density corresponding to each historical offshore wind speed, and generate a historical offshore wind energy density time series corresponding to the historical offshore wind speed time series.

[0099] Specifically, the wind energy density calculation formula is as follows:

[0100] ;

[0101] In the formula, is the offshore wind energy density, is the air density, is the wind-exposed area of ​​the wind turbine blades, is the wind speed at sea.

[0102] Specifically, the calculated historical offshore wind energy density is arranged in chronological order to generate a historical offshore wind energy density time series.

[0103] In one embodiment, a target historical offshore wind energy density corresponding to a historical time point is extracted from the historical offshore wind energy density time series, and a target historical offshore wind speed corresponding to a historical time point is extracted from the historical offshore wind speed time series. The target historical offshore wind energy density and the target historical offshore wind speed are substituted into a preset wind power calculation formula to obtain the wind power corresponding to the historical time point, and a wind power time series is generated based on the wind power corresponding to the historical time point.

[0104] Specifically, the wind energy power calculation formula is as follows:

[0105] ;

[0106] In the formula, is the wind power, is the offshore wind energy density, is the conversion efficiency of the wind energy conversion device, The wind-exposed area of ​​the wind turbine blades.

[0107] Specifically, the calculated wind power is arranged in chronological order to generate a wind power time series.

[0108] Step 102: Fit the wind power time series and the historical actual wind power time series to obtain a historical fitting wind power time series, and input the historical fitting wind power time series into a pre-trained wind power prediction model so that the wind power prediction model outputs a future wind power time series.

[0109] In one embodiment, the sum of wind power corresponding to the wind power time series is calculated, and based on the number of wind power data points in the wind power time series and the sum of wind power, the average wind power corresponding to the wind power time series is calculated.

[0110] Specifically, all data points in the wind power time series are summed to obtain the total wind power, and the obtained total wind power is divided by the number of wind power data points in the wind power time series to obtain the average wind power.

[0111] In one embodiment, the sum of the historical actual wind power corresponding to the historical actual wind power time series is calculated, and based on the number of wind power data points in the historical actual wind power time series and the sum of the historical actual wind power, the average historical actual wind power corresponding to the historical actual wind power time series is calculated.

[0112] Specifically, all data points in the historical actual wind power time series are summed to obtain the total historical actual wind power, and the total historical actual wind power is divided by the number of wind power data points in the historical actual wind power time series to obtain the average historical actual wind power.

[0113] In one embodiment, a first difference between the average wind power and the average historical actual wind power is calculated. When the first difference is not greater than a preset difference threshold, the wind power time series and the historical actual wind power time series are averaged to obtain a historical fitting wind power time series.

[0114] Specifically, when the wind power time series and the historical actual wind power time series are averaged, the average value of two corresponding data points in the wind power time series and the historical actual wind power time series is calculated, and based on the average value corresponding to each data point, a historical fitting wind power time series is generated.

[0115] In one embodiment, when the first difference is greater than a preset difference threshold, a weighted average process is performed on the wind power time series and the historical actual wind power time series to obtain a historical fitting wind power time series.

[0116] Specifically, a first weighting factor is set for the wind power time series, and a second weighting factor is set for the historical actual wind power time series. Each data point in the wind power time series is multiplied by the first weighting factor to obtain a first wind power time series, and each data point in the historical actual wind power time series is multiplied by the second weighting factor to obtain a first historical actual wind power time series. The first wind power time series and the first historical actual wind power time series are added to obtain a historical fitting wind power time series.

[0117] In one embodiment, during the training process of the wind power prediction model, an initial wind power prediction model is set, wherein the initial wind power prediction model includes a first prediction layer and a second prediction layer, and the first prediction layer is connected to the second prediction layer; wind power time series samples corresponding to the same day in multiple preset historical years and meteorological time series samples corresponding to each wind power time series sample are obtained; the wind power time series samples corresponding to the first preset year are used as input of the first prediction layer, and the meteorological time series samples corresponding to the second preset year are used as output of the first prediction layer; the output of the first prediction layer is used as output of the second prediction layer, and the wind power time series samples corresponding to the second preset year are used as output of the second prediction layer, and the initial wind power prediction model is trained until the model converges or reaches a preset number of iterations to obtain a wind power prediction model, wherein the second preset year is the next year of the first preset year.

[0118] Specifically, after obtaining the wind power time series samples corresponding to the same day in multiple preset historical years, and the meteorological time series samples corresponding to each wind power time series sample, data preprocessing is performed on the wind power time series samples and the meteorological time series samples, wherein the data preprocessing includes cleaning, standardization or normalization processing to ensure consistency in data format.

[0119] Specifically, after obtaining the wind power time series samples corresponding to the same day in multiple preset historical years and the meteorological time series samples corresponding to each wind power time series sample, a first preset year is arbitrarily selected from the multiple preset historical years, and based on the first preset year, the corresponding next year is selected as the second preset year; the meteorological time series samples corresponding to the second preset year are used as the first labels of the wind power time series samples in the first preset year, and the wind power time series samples corresponding to the second preset year are used as the second labels of the meteorological time series samples corresponding to the second preset year.

[0120] Specifically, after the initial wind power prediction model is set, the initial wind power prediction model is also initialized, wherein the model initialization includes setting initial values ​​for the weights and bias items of the model, usually using small random numbers or zero initialization.

[0121] Specifically, when the initial wind power prediction model is trained, the wind power time series samples corresponding to the first preset year are used as input to the first prediction layer. The first prediction layer processes the input data, extracts features, and uses these features as output. The output of the first prediction layer is passed to the second prediction layer. The second prediction layer generates a predicted value of wind power based on these features. The loss value between the predicted value output by the second prediction layer and the actual wind power time series samples is calculated based on a preset loss function. According to the loss function, the weights and bias items of the model are updated through a back propagation algorithm to reduce the prediction error. The above process is repeated until the model converges or the preset number of iterations is reached.

[0122] Preferably, the loss function is mean square error (MSE) or root mean square error (RMSE).

[0123] In one embodiment, the historically fitted wind power time series is input into a pre-trained wind power prediction model so that when the wind power prediction model outputs a future wind power time series, the historically fitted wind power time series is input into a first prediction layer of the wind power prediction model so that the first prediction layer outputs a future meteorological time series corresponding to the historically fitted wind power time series, and the future meteorological time series is used as an input to a second prediction layer so that the second prediction layer outputs a future wind power time series.

[0124] Step 103: Based on the acquired historical electricity consumption time series of the offshore aquaculture platform, the historical electricity consumption time series is input into a pre-trained electricity consumption prediction model, so that the electricity consumption prediction model outputs a future electricity consumption time series.

[0125] In one embodiment, during the training process of the electricity consumption prediction model, an initial electricity consumption prediction model is set, and electricity consumption time series samples corresponding to the same day in multiple preset historical years are obtained; based on the multiple preset historical years, adjacent first preset years and second preset years are determined; the electricity consumption time series samples corresponding to the second preset year are set as labels of the electricity consumption time series samples corresponding to the first preset year; and the electricity consumption time series samples corresponding to the first preset year are used as inputs of the initial electricity consumption prediction model, and the labels of the electricity consumption time series samples corresponding to the first preset year are used as outputs of the model, and the initial electricity consumption prediction model is trained until the model converges or reaches a preset number of iterations to obtain an electricity consumption prediction model, wherein the second preset year is the year after the first preset year.

[0126] In one embodiment, the historical electricity consumption time series is input into a pre-trained electricity consumption prediction model so that the electricity consumption prediction model outputs a future electricity consumption time series, wherein the future electricity consumption time series is the electricity consumption time series of the next year of the year corresponding to the historical electricity consumption time series.

[0127] Preferably, the historical electricity consumption time series is the electricity consumption time series corresponding to the year before the current year.

[0128] Step 104: Determine a future wind power shortage time series based on the future wind power time series and the future power consumption time series.

[0129] In one embodiment, the target future wind power and the target future power consumption corresponding to each target time point are extracted from the future wind power time series and the future power consumption time series.

[0130] In one embodiment, the target future wind power and the target future electricity consumption corresponding to the same target time point are compared and processed respectively.

[0131] In one embodiment, when the target future wind power is less than the target future electricity consumption, a wind power shortage value is calculated based on the target future wind power and the target future electricity consumption, and the wind power shortage value is used as the sequence value corresponding to the current time point.

[0132] Specifically, when calculating the wind power shortage value based on the target future wind power and the target future electricity consumption, the target future wind power is subtracted from the target future electricity consumption to obtain the wind power shortage value.

[0133] In one embodiment, when the target future wind power is not less than the target future electricity consumption, a wind power sufficiency value is calculated based on the target future wind power and the target future electricity consumption, and the wind power sufficiency value is used as the sequence value corresponding to the current time point.

[0134] Specifically, when calculating the wind power sufficiency value based on the target future wind power and the target future electricity consumption, the target future wind power is subtracted from the target future electricity consumption to obtain the wind power sufficiency value.

[0135] In one embodiment, the sequence values ​​corresponding to all target time points are integrated to obtain a wind power surplus or shortage time series, and each sequence value in the wind power surplus or shortage time series is traversed one by one. When the sequence value traversed is the wind power shortage value, and the wind power sufficient value does not exist before the wind power shortage value, the wind power shortage value is retained.

[0136] Specifically, when traversing each sequence value in the wind power surplus / deficit time series one by one, if the current sequence value is a wind power shortage value and there is no wind power sufficient value before the sequence value, the sequence value is retained.

[0137] In one embodiment, when the sequence value traversed is the wind power shortage value, and the wind power sufficient value exists before the wind power shortage value, the wind power sufficient value before the wind power shortage value is obtained, and based on the wind power sufficient value, the wind power shortage value is adjusted to obtain an adjusted sequence value, until the wind power surplus or shortage time series is traversed and the future wind power shortage time series is determined.

[0138] Specifically, all wind energy power sufficient values ​​before the wind energy power shortage value are obtained, and the sum of the wind energy power sufficient values ​​corresponding to all the wind energy power sufficient values ​​is calculated, and the sum of the wind energy power sufficient values ​​is compared with the wind energy power shortage value. If the sum of the wind energy power sufficient values ​​is less than the wind energy power shortage value, the shortage difference between the sum of the wind energy power sufficient values ​​and the wind energy power shortage value is calculated, and the wind energy power shortage value is set to the shortage difference; if the sum of the wind energy power sufficient values ​​is not less than the wind energy power shortage value, the sufficient difference between the sum of the wind energy power sufficient values ​​and the wind energy power shortage value is calculated, and the wind energy power shortage value is set to 0, and based on the sufficient difference, all wind energy power sufficient values ​​before the wind energy power shortage value are adjusted.

[0139] Specifically, based on the sufficient difference, when adjusting all wind power sufficient values ​​before the wind power shortage value, the wind power sufficient value before the wind power shortage value is set to the sufficient difference, and the wind power sufficient value exceeding the sufficient difference is set to 0.

[0140] Step 105: Obtain the priorities of all electrical equipment in the offshore aquaculture platform, sort all the electrical equipment based on the priorities to obtain a sequence of electrical equipment, and generate a power distribution strategy for the electrical equipment based on the future wind power shortage time series and the sequence of electrical equipment.

[0141] In one embodiment, the usage degree of all electrical devices is obtained, and based on the usage degree, the first weight value corresponding to each of the electrical devices is set respectively; all first electrical devices with the same initial weight value are obtained, and based on the power demand corresponding to each of the first electrical devices, the second weight value corresponding to each of the first electrical devices is set respectively; based on the first weight value and the second weight value, the priority level corresponding to each of the electrical devices is determined.

[0142] Specifically, the equipment information of all electrical equipment in the offshore aquaculture platform is collected, wherein the equipment information includes the usage frequency of the equipment, and based on the usage frequency of the equipment, the usage degree corresponding to each of the electrical equipment is determined.

[0143] Specifically, a first weight value is allocated to each electrical device according to the usage degree of each electrical device, wherein the first weight value is proportional to the usage degree.

[0144] Specifically, all the electric devices are classified based on the first weight value to obtain a plurality of electric device sets with the same first weight value, that is, the electric device set is all first electric devices with the same initial weight value.

[0145] Specifically, the device information also includes power demand. Based on the device information, the power demand corresponding to all first power devices with the same initial weight value is directly determined, and according to the power demand corresponding to each first power device, a second weight value is assigned to each power device, wherein the second weight value is inversely proportional to the power demand.

[0146] Specifically, the first weight value and the second weight value are added to obtain a comprehensive weight value, and the comprehensive weight value is used as the priority corresponding to each of all electrical devices.

[0147] In one embodiment, all the electric devices are sorted in descending order of priority to obtain an electric device sequence.

[0148] In one embodiment, based on the future wind power shortage time series, multiple future wind power shortage times and the shortage wind power corresponding to each future wind power shortage time are determined, and based on this, the wind power shortage situation at each future time point is determined.

[0149] In one embodiment, the power demand corresponding to each power-consuming device in the power-consuming device sequence is obtained.

[0150] In one embodiment, the power demand corresponding to the last power consumer in the power consumer sequence is compared with the shortage wind power corresponding to each of the multiple future wind power shortage times.

[0151] In one embodiment, if the electricity demand corresponding to the last power consumer is not less than the shortage of wind power, the target future wind power shortage time corresponding to the shortage of wind power is obtained, and the last power consumer is deleted from the power consumer sequence to obtain a first adjustment power consumer sequence, and based on the first adjustment power consumer sequence, the power allocation object corresponding to the target future wind power shortage time is determined.

[0152] Preferably, the first adjusted electric device sequence does not include the last electric device.

[0153] Specifically, since the sequence of power consumers is arranged according to a certain priority, the priority of the last power consumer is the lowest. Therefore, when the demand of the last power consumer is not less than the shortage of wind power, the equipment that needs to reduce or stop power supply can be directly determined, which simplifies the decision-making process. This setting allows the system to dynamically adjust the sequence of power consumers according to real-time data to adapt to the changing power supply situation.

[0154] In one embodiment, if the electricity demand corresponding to the last electricity user is less than the shortage of wind energy power, the adjacent electricity users of the last electricity user are obtained, and the total electricity demand of the last electricity user and the adjacent electricity users is calculated; if the total electricity demand is less than the shortage of wind energy power, the number of adjacent electricity users is increased sequentially until the total electricity demand of the last electricity user and the target number of adjacent electricity users is not less than the shortage of wind energy power, the last electricity user and the target number of adjacent electricity users are deleted from the electricity user sequence to obtain a second adjusted electricity user sequence, and based on the second adjusted electricity user sequence, the electricity allocation object corresponding to the target future wind energy shortage time is determined.

[0155] Specifically, when the electricity demand corresponding to the last power consumer is less than the shortage of wind energy power, the total electricity demand of the last power consumer and the adjacent power consumers is calculated. If the total electricity demand is less than the shortage of wind energy power, the number of adjacent power consumers is increased sequentially until the calculated total electricity demand is not less than the shortage of wind energy power. The last power consumer and its target number of adjacent power consumers are deleted from the power consumer sequence to obtain a second adjusted power consumer sequence.

[0156] Preferably, the second adjusted electric user sequence does not include the last electric user and one or more electric users adjacent to it.

[0157] In one embodiment, the power allocation objects corresponding to all target future wind power shortage times are integrated to obtain a time series of power allocation objects, and the power allocation time series is used as a power allocation strategy for power consuming devices.

[0158] In one embodiment, by comparing the power demand of the last power-consuming equipment with the shortage of wind power, it can be determined which equipment can be given priority to reduce or stop power supply when power is tight, thereby optimizing resource allocation and ensuring the rationality and effectiveness of power supply in the case of wind power shortage; and when power is short, by gradually reducing the number of power-consuming equipment rather than a large-scale reduction at one time, the impact on the power grid can be reduced and the stability of the power grid can be maintained.

[0159] Example 2, see Figure 2 , Figure 2 : is a structural schematic diagram of an embodiment of a wind energy utilization system for offshore aquaculture provided by the present application, such as Figure 2 As shown, the system includes a wind power time series acquisition module 201, a future wind power time series prediction module 202, a future power consumption time series prediction module 203, a future wind power shortage time series determination module 204 and a power consumption equipment power distribution strategy generation module 205, which are specifically as follows:

[0160] The wind power time series acquisition module 201 is used to calculate the wind power time series based on the acquired historical offshore wind speed time series, and simultaneously acquire the historical actual wind power time series corresponding to the historical offshore wind speed time series.

[0161] The future wind power time series prediction module 202 is used to fit the wind power time series and the historical actual wind power time series to obtain a historical fitting wind power time series, and input the historical fitting wind power time series into a pre-trained wind power prediction model so that the wind power prediction model outputs a future wind power time series.

[0162] The future electricity consumption time series prediction module 203 is used to input the historical electricity consumption time series of the offshore aquaculture platform into a pre-trained electricity consumption prediction model based on the acquired historical electricity consumption time series, so that the electricity consumption prediction model outputs the future electricity consumption time series.

[0163] The future wind power shortage time series determination module 204 is used to determine the future wind power shortage time series based on the future wind power time series and the future power consumption time series.

[0164] The power consumption allocation strategy generation module 204 for power equipment is used to obtain the priorities of all power equipment in the offshore aquaculture platform, sort all the power equipment based on the priorities to obtain a sequence of power equipment, and generate a power consumption allocation strategy for power equipment based on the future wind power shortage time series and the power equipment sequence.

[0165] In one embodiment, the power consumption allocation strategy generating module 205 for power consumption equipment is used to generate a power consumption allocation strategy for power consumption equipment based on the future wind power shortage time sequence and the power consumption equipment sequence, specifically including: determining multiple future wind power shortage times and the shortage wind power corresponding to each future wind power shortage time based on the future wind power shortage time sequence; obtaining the power demand corresponding to each power consumption equipment in the power consumption equipment sequence, and comparing the power demand corresponding to the last power consumption equipment in the power consumption equipment sequence with the shortage wind power corresponding to each of the multiple future wind power shortage times; if the power demand corresponding to the last power consumption equipment is not less than the shortage wind power, obtaining the target future wind power shortage time corresponding to the shortage wind power, and deleting the last power consumption equipment from the power consumption equipment sequence, to obtain A first adjustment sequence of power users is prepared, and based on the first adjustment sequence of power users, a power allocation object corresponding to the target future wind power shortage time is determined; or, if the power demand corresponding to the last power user is less than the wind power shortage, the adjacent power users of the last power user are obtained, and the total power demand of the last power user and the adjacent power users are calculated; if the total power demand is less than the wind power shortage, the number of adjacent power users is increased sequentially until the total power demand of the last power user and the target number of adjacent power users is not less than the wind power shortage, the last power user and the target number of adjacent power users are deleted from the power user sequence to obtain a second adjustment sequence of power users, and based on the second adjustment sequence of power users, a power allocation object corresponding to the target future wind power shortage time is determined.

[0166] In one embodiment, the wind power time series acquisition module 201 is used to calculate the wind power time series based on the acquired historical offshore wind speed time series, specifically including: acquiring multiple historical offshore wind speeds within a preset historical time period, and arranging the multiple historical offshore wind speeds based on time order to obtain a historical offshore wind speed time series; inputting each historical offshore wind speed in the historical offshore wind speed time series into a preset wind energy density calculation formula respectively to obtain the historical offshore wind energy density corresponding to each historical offshore wind speed, and generating a historical offshore wind energy density time series corresponding to the historical offshore wind speed time series; extracting a target historical offshore wind energy density corresponding to a historical time point from the historical offshore wind energy density time series, and extracting a target historical offshore wind speed corresponding to a historical time point from the historical offshore wind speed time series, substituting the target historical offshore wind energy density and the target historical offshore wind speed into a preset wind power calculation formula to obtain the wind power corresponding to the historical time point, and generating a wind power time series based on the wind power corresponding to the historical time point.

[0167] In one embodiment, the wind energy density calculation formula is as follows:

[0168] ;

[0169] In the formula, is the offshore wind energy density, is the air density, is the wind-exposed area of ​​the wind turbine blades, is the wind speed at sea.

[0170] In one embodiment, the wind energy power calculation formula is as follows:

[0171] ;

[0172] In the formula, is the wind power, is the offshore wind energy density, is the conversion efficiency of the wind energy conversion device, The wind-exposed area of ​​the wind turbine blades.

[0173] In one embodiment, the future wind power time series prediction module 201 is used to perform fitting processing on the wind power time series and the historical actual wind power time series to obtain a historical fitting wind power time series, specifically including: calculating the sum of wind power corresponding to the wind power time series, and based on the number of wind power data points in the wind power time series and the sum of wind power, calculating the average wind power corresponding to the wind power time series; calculating the sum of historical actual wind power corresponding to the historical actual wind power time series, and based on the number of wind power data points in the historical actual wind power time series The average historical actual wind power corresponding to the historical actual wind power time series is calculated based on the point quantity and the sum of the historical actual wind power; a first difference between the average wind power and the average historical actual wind power is calculated, and when the first difference is not greater than a preset difference threshold, the wind power time series and the historical actual wind power time series are averaged to obtain a historical fitting wind power time series; or, when the first difference is greater than a preset difference threshold, the wind power time series and the historical actual wind power time series are weighted averaged to obtain a historical fitting wind power time series.

[0174] In one embodiment, the training process of the wind power prediction model specifically includes: setting an initial wind power prediction model, wherein the initial wind power prediction model includes a first prediction layer and a second prediction layer, and the first prediction layer is connected to the second prediction layer; obtaining wind power time series samples corresponding to the same day in multiple preset historical years, and meteorological time series samples corresponding to each wind power time series sample; using the wind power time series samples corresponding to the first preset year as the input of the first prediction layer, and using the meteorological time series samples corresponding to the second preset year as the output of the first prediction layer; using the output of the first prediction layer as the output of the second prediction layer, and using the wind power time series samples corresponding to the second preset year as the output of the second prediction layer, and training the initial wind power prediction model until the model converges or reaches a preset number of iterations to obtain a wind power prediction model, wherein the second preset year is the next year of the first preset year.

[0175] In one embodiment, the future wind power shortage time series determination module 204 is used to determine the future wind power shortage time series based on the future wind power time series and the future power consumption time series, specifically including: extracting the target future wind power and the target future power consumption corresponding to each target time point from the future wind power time series and the future power consumption time series, and comparing the target future wind power and the target future power consumption corresponding to the same target time point respectively; when the target future wind power is less than the target future power consumption, based on the target future wind power and the target future power consumption, calculating the wind power shortage value, and using the wind power shortage value as the sequence value corresponding to the current time point; when the target future wind power is not less than the target future power consumption, based on the target future wind power The wind energy power sufficiency value is calculated by combining the wind energy power rate with the target future power consumption, and the wind energy power sufficiency value is used as the sequence value corresponding to the current time point; the sequence values ​​corresponding to all target time points are integrated to obtain the wind energy power surplus or shortage time series, and each sequence value in the wind energy power surplus or shortage time series is traversed one by one. When the sequence value traversed to is the wind energy power shortage value, and the wind energy power sufficiency value does not exist before the wind energy power shortage value, the wind energy power shortage value is retained; when the sequence value traversed to is the wind energy power shortage value, and the wind energy power sufficiency value exists before the wind energy power shortage value, the wind energy power sufficiency value before the wind energy power shortage value is obtained, and based on the wind energy power sufficiency value, the wind energy power shortage value is adjusted to obtain the adjusted sequence value, until the wind energy power surplus or shortage time series is traversed to determine the future wind energy power shortage time series.

[0176] In one embodiment, the power consumption allocation strategy generation module 205 for power users is used to obtain the priority of all power users in the offshore aquaculture platform, specifically including: obtaining the usage degree corresponding to each of the power users, and setting the first weight value corresponding to each of the power users based on the usage degree; obtaining all first power users with the same initial weight value, and setting the second weight value corresponding to each of the first power users based on the power demand corresponding to each of the first power users; and determining the priority corresponding to each of the power users based on the first weight value and the second weight value.

[0177] The wind energy utilization system for offshore aquaculture can implement the wind energy utilization method for offshore aquaculture of the method embodiment. The options in the method embodiment are also applicable to this embodiment and will not be described in detail here.

[0178] Figure 3 A schematic diagram of the structure of a terminal device. Figure 3 As shown, the terminal device 3 of this embodiment includes: at least one processor 301 ( Figure 3 Only one is shown in the figure) a processor, a memory 302, and a computer program 303 stored in the memory 302 and executable on at least one processor 301, and when the processor 301 executes the computer program 303, the steps in any of the above method embodiments are implemented.

[0179] The terminal device 3 may be a computing device such as a smart phone, a laptop, a tablet computer, and a desktop computer. The terminal device may include but is not limited to a processor 301 and a memory 302. Those skilled in the art will appreciate that Figure 3 It is only an example of the terminal device 3 and does not constitute a limitation on the terminal device 3. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, etc.

[0180] The processor 301 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0181] In some embodiments, the memory 302 may be an internal storage unit of the terminal device 3, such as a hard disk or memory of the terminal device 3. In other embodiments, the memory 302 may also be an external storage device of the terminal device 3, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the terminal device 3. Further, the memory 302 may also include both an internal storage unit and an external storage device of the terminal device 3. The memory 302 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as program codes of a computer program, etc. The memory 302 may also be used to temporarily store data that has been output or is to be output.

[0182] In addition, an embodiment of the present application further provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the steps in any of the above method embodiments are implemented.

[0183] In several embodiments provided in the present application, it is understood that each box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and a module, a program segment or a part of a code includes one or more executable instructions for realizing a specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from that marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes also be executed in the opposite order, depending on the functions involved.

[0184] If the function is implemented in the form of a software function module and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including a number of instructions for a terminal device to execute all or part of the steps of each embodiment method of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program code.

[0185] In summary, the present application provides a method and system for utilizing wind energy for offshore aquaculture, which obtains a historical fitted wind power time series by fitting the wind power time series and the historical actual wind power time series, inputs the historical fitted wind power time series into the wind power prediction model, and outputs the future wind power time series; inputs the acquired historical electricity consumption time series into the electricity consumption prediction model, and outputs the future electricity consumption time series; determines the future wind power shortage time series based on the future wind power time series and the future electricity consumption time series; sorts all electrical equipment in the offshore aquaculture platform based on priority to obtain a sequence of electrical equipment, and generates an electrical equipment electricity distribution strategy based on the future wind power shortage time series and the sequence of electrical equipment; compared with the prior art, the technical solution of the present application can optimize the management and scheduling of electrical equipment and improve energy utilization efficiency.

[0186] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present application. These improvements and substitutions should also be regarded as the scope of protection of the present application.

Claims

1. A method for utilizing wind energy for offshore aquaculture, characterized in that: include: Based on the acquired historical offshore wind speed time series, a wind power time series is calculated, and at the same time, a historical actual wind power time series corresponding to the historical offshore wind speed time series is acquired; Fitting the wind power time series and the historical actual wind power time series to obtain a historical fitting wind power time series, and inputting the historical fitting wind power time series into a pre-trained wind power prediction model so that the wind power prediction model outputs a future wind power time series; Based on the acquired historical electricity consumption time series of the offshore aquaculture platform, the historical electricity consumption time series is input into a pre-trained electricity consumption prediction model, so that the electricity consumption prediction model outputs a future electricity consumption time series; Determining a future wind power shortage time series based on the future wind power time series and the future power consumption time series; Obtaining the priorities of all power-consuming devices in the offshore aquaculture platform, sorting all the power-consuming devices based on the priorities to obtain a power-consuming device sequence, and generating a power consumption allocation strategy for the power-consuming devices based on the future wind power shortage time sequence and the power-consuming device sequence; Based on the future wind power shortage time series and the power consumption equipment sequence, a power consumption allocation strategy for the power consumption equipment is generated, which specifically includes: Based on the future wind power shortage time series, determining a plurality of future wind power shortage times and the shortage wind power corresponding to each future wind power shortage time; Obtaining the power demand corresponding to each power consumer in the power consumer sequence, and comparing the power demand corresponding to the last power consumer in the power consumer sequence with the shortage wind power corresponding to each of the multiple future wind power shortage times; If the power demand corresponding to the last power consumer is not less than the shortage wind power, then the target future wind power shortage time corresponding to the shortage wind power is obtained, and the last power consumer is deleted from the power consumer sequence to obtain a first adjustment power consumer sequence, and based on the first adjustment power consumer sequence, the power allocation object corresponding to the target future wind power shortage time is determined; or, If the electricity demand corresponding to the last power user is less than the shortage of wind energy power, the adjacent power users of the last power user are obtained, and the total electricity demand of the last power user and the adjacent power users is calculated. If the total electricity demand is less than the shortage of wind energy power, the number of adjacent power users is increased in sequence until the total electricity demand of the last power user and the target number of adjacent power users is not less than the shortage of wind energy power, and the last power user and the target number of adjacent power users are deleted from the power user sequence to obtain a second adjusted power user sequence, and based on the second adjusted power user sequence, the power allocation object corresponding to the target future wind energy power shortage time is determined; Based on the historical offshore wind speed time series obtained, the wind power time series is calculated, including: Acquire multiple historical offshore wind speeds within a preset historical time period, and arrange the multiple historical offshore wind speeds based on time sequence to obtain a historical offshore wind speed time series; Inputting each historical offshore wind speed in the historical offshore wind speed time series into a preset wind energy density calculation formula respectively, obtaining the historical offshore wind energy density corresponding to each historical offshore wind speed, and generating a historical offshore wind energy density time series corresponding to the historical offshore wind speed time series; A target historical offshore wind energy density corresponding to a historical time point is extracted from the historical offshore wind energy density time series, and a target historical offshore wind speed corresponding to a historical time point is extracted from the historical offshore wind speed time series. The target historical offshore wind energy density and the target historical offshore wind speed are substituted into a preset wind energy power calculation formula to obtain the wind energy power corresponding to the historical time point, and a wind energy power time series is generated based on the wind energy power corresponding to the historical time point.

2. A method for utilizing wind energy for marine aquaculture according to claim 1, characterized in that: The wind energy density calculation formula is as follows: ; In the formula, is the offshore wind energy density, is the air density, is the wind-exposed area of ​​the wind turbine blades, is the wind speed at sea; The wind power calculation formula is as follows: ; In the formula, is the wind power, is the offshore wind energy density, is the conversion efficiency of the wind energy conversion device, The wind-exposed area of ​​the wind turbine blades.

3. A method for utilizing wind energy for marine aquaculture according to claim 1, characterized in that: Performing fitting processing on the wind power time series and the historical actual wind power time series to obtain a historical fitting wind power time series specifically includes: Calculating the sum of wind power corresponding to the wind power time series, and calculating the average wind power corresponding to the wind power time series based on the number of wind power data points in the wind power time series and the sum of wind power; Calculating the sum of the historical actual wind power corresponding to the historical actual wind power time series, and calculating the average historical actual wind power corresponding to the historical actual wind power time series based on the amount of wind power data points in the historical actual wind power time series and the sum of the historical actual wind power; Calculating a first difference between the average wind power and the average historical actual wind power, and when the first difference is not greater than a preset difference threshold, averaging the wind power time series and the historical actual wind power time series to obtain a historical fitting wind power time series; or, When the first difference is greater than a preset difference threshold, weighted averaging is performed on the wind power time series and the historical actual wind power time series to obtain a historical fitting wind power time series.

4. The method for utilizing wind energy for marine aquaculture according to claim 1, characterized in that: The training process of the wind power prediction model specifically includes: Setting an initial wind power prediction model, wherein the initial wind power prediction model includes a first prediction layer and a second prediction layer, and the first prediction layer is connected to the second prediction layer; Obtain wind power time series samples corresponding to the same day in multiple preset historical years, and meteorological time series samples corresponding to each wind power time series sample; The wind power time series samples corresponding to the first preset year are used as the input of the first prediction layer, and the meteorological time series samples corresponding to the second preset year are used as the output of the first prediction layer; the output of the first prediction layer is used as the output of the second prediction layer, and the wind power time series samples corresponding to the second preset year are used as the output of the second prediction layer, and the initial wind power prediction model is trained until the model converges or reaches a preset number of iterations, so as to obtain a wind power prediction model, wherein the second preset year is the year after the first preset year.

5. The method for utilizing wind energy for offshore aquaculture according to claim 1, characterized in that: Determining a future wind power shortage time series based on the future wind power time series and the future power consumption time series specifically includes: Extract the target future wind power and the target future power consumption corresponding to each target time point from the future wind power time series and the future power consumption time series, and perform comparison processing on the target future wind power and the target future power consumption corresponding to the same target time point respectively; When the target future wind power is less than the target future electricity consumption, a wind power shortage value is calculated based on the target future wind power and the target future electricity consumption, and the wind power shortage value is used as a sequence value corresponding to the current time point; When the target future wind energy power is not less than the target future electricity consumption, a sufficient wind energy power value is calculated based on the target future wind energy power and the target future electricity consumption, and the sufficient wind energy power value is used as a sequence value corresponding to the current time point; Integrate the sequence values ​​corresponding to all target time points to obtain a wind power surplus or shortage time series, traverse each sequence value in the wind power surplus or shortage time series one by one, and when the sequence value traversed is the wind power shortage value, and the wind power sufficient value does not exist before the wind power shortage value, retain the wind power shortage value; When the sequence value traversed is the wind power shortage value, and the wind power sufficient value exists before the wind power shortage value, the wind power sufficient value before the wind power shortage value is obtained, and based on the wind power sufficient value, the wind power shortage value is adjusted to obtain the adjusted sequence value, until the wind power surplus or shortage time series is traversed, and the future wind power shortage time series is determined.

6. The method for utilizing wind energy for marine aquaculture according to claim 1, characterized in that: Obtain the priorities of all electrical equipment in the offshore aquaculture platform, including: Obtaining the usage corresponding to each of all electrical devices, and setting first weight values ​​corresponding to each of all electrical devices based on the usage; Acquire all first electrical devices with the same initial weight value, and set second weight values ​​corresponding to all first electrical devices respectively based on the power demands corresponding to all the first electrical devices; Based on the first weight value and the second weight value, the priorities corresponding to all the electrical devices are determined.

7. A wind energy utilization system for marine aquaculture, characterized in that: include: Wind power time series acquisition module, future wind power time series prediction module, future power consumption time series prediction module, future wind power shortage time series determination module and power consumption distribution strategy generation module for power consuming equipment; The wind power time series acquisition module is used to calculate the wind power time series based on the acquired historical offshore wind speed time series, and simultaneously acquire the historical actual wind power time series corresponding to the historical offshore wind speed time series; The future wind power time series prediction module is used to perform fitting processing on the wind power time series and the historical actual wind power time series to obtain a historical fitting wind power time series, and input the historical fitting wind power time series into a pre-trained wind power prediction model so that the wind power prediction model outputs a future wind power time series; The future power consumption time series prediction module is used to input the historical power consumption time series into the pre-trained power consumption prediction model based on the acquired historical power consumption time series of the offshore aquaculture platform, so that the power consumption prediction model outputs the future power consumption time series; The future wind power shortage time series determination module is used to determine the future wind power shortage time series based on the future wind power time series and the future power consumption time series; The power consumption allocation strategy generation module for power consumption equipment is used to obtain the priorities of all power consumption equipment in the offshore aquaculture platform, sort all power consumption equipment based on the priorities to obtain a power consumption equipment sequence, and generate a power consumption allocation strategy for power consumption equipment based on the future wind power shortage time sequence and the power consumption equipment sequence; The power consumption allocation strategy generation module for power consumption equipment is used to generate a power consumption allocation strategy for power consumption equipment based on the future wind power shortage time series and the power consumption equipment sequence, specifically including: Based on the future wind power shortage time series, determining a plurality of future wind power shortage times and the shortage wind power corresponding to each future wind power shortage time; Obtaining the power demand corresponding to each power consumer in the power consumer sequence, and comparing the power demand corresponding to the last power consumer in the power consumer sequence with the shortage wind power corresponding to each of the multiple future wind power shortage times; If the power demand corresponding to the last power consumer is not less than the shortage wind power, then the target future wind power shortage time corresponding to the shortage wind power is obtained, and the last power consumer is deleted from the power consumer sequence to obtain a first adjustment power consumer sequence, and based on the first adjustment power consumer sequence, the power allocation object corresponding to the target future wind power shortage time is determined; or, If the electricity demand corresponding to the last power user is less than the shortage of wind energy power, the adjacent power users of the last power user are obtained, and the total electricity demand of the last power user and the adjacent power users is calculated. If the total electricity demand is less than the shortage of wind energy power, the number of adjacent power users is increased in sequence until the total electricity demand of the last power user and the target number of adjacent power users is not less than the shortage of wind energy power, and the last power user and the target number of adjacent power users are deleted from the power user sequence to obtain a second adjusted power user sequence, and based on the second adjusted power user sequence, the power allocation object corresponding to the target future wind energy power shortage time is determined; The wind power time series acquisition module is used to calculate the wind power time series based on the acquired historical offshore wind speed time series, specifically including: acquiring multiple historical offshore wind speeds within a preset historical time period, and arranging the multiple historical offshore wind speeds based on time sequence to obtain the historical offshore wind speed time series; inputting each historical offshore wind speed in the historical offshore wind speed time series into a preset wind energy density calculation formula respectively to obtain the historical offshore wind energy density corresponding to each historical offshore wind speed, and generating a historical offshore wind energy density time series corresponding to the historical offshore wind speed time series; extracting a target historical offshore wind energy density corresponding to a historical time point from the historical offshore wind energy density time series, and extracting a target historical offshore wind speed corresponding to a historical time point from the historical offshore wind speed time series, substituting the target historical offshore wind energy density and the target historical offshore wind speed into a preset wind power calculation formula to obtain the wind power corresponding to the historical time point, and generating a wind power time series based on the wind power corresponding to the historical time point.