A power tower settlement monitoring and early warning system based on multi-dimensional information fusion technology

Through multi-dimensional information fusion technology, satellite signals are used to calculate the three-dimensional coordinates of power tower monitoring points to determine settlement and tilt, solving the problem of data deviation caused by changes in reference points, achieving efficient power tower settlement monitoring and early warning, and reducing labor costs.

CN118654634BActive Publication Date: 2024-10-29ZHANGYE POWER SUPPLY COMPANY OF STATE GRID GANSU ELECTRIC POWER
View PDF 14 Cites 0 Cited by

Patent Information

Application Number
CN202411127688.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-10-29
Estimated Expiration
2044-08-16

AI Technical Summary

Technical Problem

In the existing power tower settlement monitoring technology, reference points are laid out on the ground. Over time and changes in geological movements lead to data deviations, which may lead to missed settlement reports. Total station monitoring is time-consuming and requires a lot of labor costs.

Method used

The power tower settlement monitoring and early warning system based on multi-dimensional information fusion technology is used to calculate the three-dimensional coordinates of the monitoring point through the difference between the satellite signal reception and launch time, calculate the settlement value, and judge the settlement or tilt of the tower through the analysis module, output early warning instructions, and use The early warning module alarms.

Benefits of technology

It achieves accurate monitoring and early warning of settlement and tilt of power towers, reduces the impact of geological movements on data, improves monitoring efficiency, and reduces labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118654634B_ABST
    Figure CN118654634B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of electric pole tower settlement monitoring, and specifically is an electric pole tower settlement monitoring and early warning system based on multi-dimensional information fusion technology, comprising a monitoring module, wherein the monitoring module comprises: a data acquisition unit, which obtains basic data for calculating the three-dimensional coordinates of a monitoring point based on the difference between the reception and transmission times of satellite signals; a data processing unit, which calculates and obtains the three-dimensional coordinates of the monitoring point based on the basic data for calculating the three-dimensional coordinates of the monitoring point; and also comprises: a calculation module, which calculates a first calculated settlement value Si based on the initial three-dimensional coordinates and the real-time three-dimensional coordinates of the monitoring point; the real-time three-dimensional coordinates of N monitoring points on the electric pole tower are obtained by using satellites, which are not affected by geological movements, and can accurately obtain the real-time three-dimensional coordinates of the N monitoring points, and then calculate with the initial three-dimensional coordinates to obtain the position change information of the N monitoring points on the electric pole tower, which is conducive to judging the actual state of the electric pole tower.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of power pole tower settlement monitoring, in particular to a power pole tower settlement monitoring and early warning system based on multi-dimensional information fusion technology. Background Art

[0002] Power poles and towers are structures used to support the conductors and lightning conductors of high-voltage or ultra-high-voltage overhead transmission lines. They play an important role in different power transmission lines, ensuring that electric energy is safely and efficiently transmitted from power stations to end users. Power poles and towers can be divided into tension towers, straight towers, corner towers, transposition towers, terminal towers and spanning towers according to their uses. Each tower has its own unique structure and function to meet the needs of different transmission lines. During the construction of power poles and towers, a detailed survey of geological conditions must be conducted to ensure that there are no risks of geological disasters such as goafs and landslides, so as to ensure that the power poles and towers can operate stably after they are built.

[0003] Since power poles and towers involve settlement, tilt and other issues during their actual operation, real-time monitoring and regular maintenance are required during the later operation of the power poles and towers to ensure long-term and stable operation of the power poles and towers. At present, the monitoring of settlement and tilt of power poles and towers mainly relies on total stations. First, the reference point is determined, and then after the power poles and towers are built, the total station is used to measure the initial elevations of multiple monitoring points. In the subsequent operation, the reference point is ensured not to change, and the real-time elevations of multiple monitoring points are measured again. If there is a change, it means that the position of the power pole and tower has changed. Then, through specific analysis of the data, it is determined whether settlement has occurred.

[0004] However, in the above-mentioned prior art, since the benchmark points are arranged on the ground, although they are far away from the position of the power tower, they may still change with the passage of time and geological movement, and the change is incremental over time. If the benchmark points cannot be accurately calibrated, it may cause deviations in the monitored data, and thus lead to the risk of underreporting due to the actual settlement of the power tower exceeding the threshold. In addition, the total station needs to set up multiple benchmark points for monitoring the power tower. For example, a benchmark point needs to be arranged on the projection line of the central axis in the east, west, south and north directions of the power tower to measure the elevation and inclination angle. Therefore, it takes a long time to monitor the settlement of the power tower using a total station, and it requires more manpower costs.

[0005] To this end, the present invention provides a power tower settlement monitoring and early warning system based on multi-dimensional information fusion technology. Summary of the invention

[0006] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.

[0007] The technical solution adopted by the present invention to solve the technical problem is: a power tower settlement monitoring and early warning system based on multi-dimensional information fusion technology described in the present invention comprises: a monitoring module, wherein the monitoring module comprises:

[0008] The data acquisition unit obtains basic data for calculating the three-dimensional coordinates of the monitoring point based on the difference between the satellite signal reception and transmission times;

[0009] A data processing unit, based on basic data for calculating the three-dimensional coordinates of the monitoring points, calculates and obtains the three-dimensional coordinates of the monitoring points;

[0010] Also includes:

[0011] A calculation module, which calculates a first calculated settlement value Si based on the initial three-dimensional coordinates and the real-time three-dimensional coordinates of the monitoring point;

[0012] Analysis module, based on the first calculated settlement value of N monitoring points Analysis of tower settlement status:

[0013] When the analysis tower body is found to have subsidence, the first warning instruction is output;

[0014] When the tower body is tilted and the tilt angle exceeds the tilt threshold, the first warning instruction is output;

[0015] The early warning module receives a first early warning instruction and generates an alarm signal based on the first early warning instruction.

[0016] Preferably, the method for obtaining the three-dimensional coordinates of the monitoring point is:

[0017] After the tower is installed, the satellite signal is received in advance through a satellite receiver;

[0018] Based on the difference between the satellite signal reception and transmission time, the distance between the satellite receiver and the satellite is calculated and recorded as pseudorange;

[0019] Based on the fixed-position base station coordinates and pseudoranges, the data processing unit calculates the three-dimensional coordinates of N monitoring points, which are recorded as the initial three-dimensional coordinates ;

[0020] Set a fixed interval period and calculate the three-dimensional coordinates of N monitoring points again, which are recorded as real-time three-dimensional coordinates. ;

[0021] Among them, N monitoring points are arranged on the central axis of the tower, and the uppermost and lowermost monitoring points are located at the top and bottom of the tower respectively; any satellite receiver corresponds to one monitoring point; the initial three-dimensional coordinates , real-time 3D coordinates , all of which have been calibrated and optimized by the data processing unit.

[0022] Preferably, the first calculated settlement values ​​of the N monitoring points are calculated The method is:

[0023] The initial three-dimensional coordinates of any monitoring point , real-time 3D coordinate data Perform calculations;

[0024] According to the formula:

[0025]

[0026] in, Indicates the real-time Z-axis value of any monitoring point. represents the initial Z-axis value of any monitoring point; i represents any monitoring point;

[0027] The initial three-dimensional coordinates of any monitoring point , real-time 3D coordinates Substitute into the formula;

[0028] Calculate the first calculated settlement value of any monitoring point .

[0029] Preferably, based on the first calculated sedimentation value The method for analyzing the tower settlement state is:

[0030] Summarize the first calculated settlement values ​​of N monitoring points at the same time ;

[0031] For all first calculated settlement values Analyze the size of:

[0032] When all first calculated settlement values When it approaches zero, it is analyzed that the tower body has no settlement;

[0033] When all first calculated settlement values If both are positive values, it is analyzed that the tower body has no settlement;

[0034] When there is a partial first calculate the settlement value approaches zero, and the other part first calculates the settlement value If it is a positive value, the tower body has no settlement;

[0035] When all first calculated settlement values If they are all negative values, it is analyzed that the tower body has settled;

[0036] When there is a partial first calculate the settlement value approaches zero, and the other part first calculates the settlement value If it is a negative value, the tower is suspected to be tilted;

[0037] When the first calculated settlement value Si contains both positive and negative values, it is analyzed that the tower body is suspected to be tilted.

[0038] Preferably, the analysis module is also used to output a verification instruction, the method is as follows:

[0039] When the tower is suspected to be tilted, a verification instruction is output to the calculation module;

[0040] The calculation module receives the verification instruction and obtains the real-time three-dimensional coordinates of the monitoring points at the top and bottom of the tower. , ;

[0041] Calculate the tilt vector T of the two monitoring points according to the formula:

[0042]

[0043] According to the formula:

[0044]

[0045] in, represents the tilt angle, V represents the vertical vector, and V=(0,0,1), It represents the product of the tilt vector T and the modulus length of the vertical vector V;

[0046] Based on calculation, when , it means that there is indeed a tilt;

[0047] Setting the Tilt Threshold , using the calculated tilt angle With tilt threshold Compare:

[0048] when When the warning signal is detected, a second warning instruction is output to the warning module.

[0049] Preferably, the analysis module is further used to output a warning instruction according to the inclination angles of two adjacent monitoring points, in the following method:

[0050] According to the formula, calculate the inclination angle between two adjacent monitoring points ;

[0051] Based on the calculated N-1 tilt angles , calculate N-1 tilt angles respectively The average and standard deviation ;

[0052] when , then the average value As the inclination angle of the tower body, and if there is any inclination angle , then output a second warning instruction to the warning module;

[0053] when , directly output the third warning instruction to the warning module;

[0054] in, is the standard deviation threshold, which is used to measure the discrete degree of the inclination angles of multiple tower sections.

[0055] Preferably, the analysis module is also used to analyze the cause of the tilt, the method is:

[0056] According to the obtained N-1 tilt angles Standard Deviation :

[0057] when , analyzing the tower tilt caused by foundation collapse;

[0058] when , analyze the tower inclination caused by external wind load and ice load.

[0059] Preferably, the data acquisition unit is also used to collect monitoring data of the total station;

[0060] The total station is arranged on the projection line of the central axis of the tower body.

[0061] Preferably, the calculation module is also used to calculate the second calculated settlement value according to the total station monitoring data ;

[0062] According to the formula:

[0063]

[0064] Among them, h1 represents the initial elevation of any monitoring point; h2 represents the real-time elevation of any monitoring point.

[0065] Preferably, it also includes a calibration module, the calibration module is used to calculate the sedimentation value according to the second Calibrate the total station benchmark elevation;

[0066] Get the first calculated settlement value of any monitoring point ;

[0067] According to the formula:

[0068]

[0069] The initial elevation h1 of any monitoring point and the first calculated settlement Substitute it and get the calculated real-time elevation

[0070] Based on the calculated real-time elevation Difference calculation with the real-time elevation h2 monitored by the total station:

[0071]

[0072] According to the obtained Adjust the elevation of the total station benchmark;

[0073] in, Indicates the change value of the total station reference point, represents the temperature influence coefficient, It indicates the difference between the ambient temperature when the initial elevation h1 is obtained and the ambient temperature when the real-time elevation h2 is obtained.

[0074] The beneficial effects of the present invention are as follows:

[0075] 1. The power tower settlement monitoring and early warning system based on multi-dimensional information fusion technology described in the present invention can obtain the first calculated settlement value of any monitoring point by calculating the difference between the initial three-dimensional coordinates and the real-time three-dimensional coordinates of any monitoring point through the calculation module. , based on the analysis module, the first calculated settlement value The analysis module can determine whether the power tower has settled or tilted, and then send instructions to the early warning module to use the early warning module to alarm, so as to realize the settlement monitoring and early warning of the power tower. Compared with the use of total station to monitor whether any monitoring point has settled, the use of satellite to obtain the real-time three-dimensional coordinates of N monitoring points on the power tower is not affected by geological movement, and can accurately obtain the real-time three-dimensional coordinates of N monitoring points. Then, by calculating with the initial three-dimensional coordinates, the position change information of the N monitoring points on the power tower can be obtained, which is conducive to judging the actual state of the power tower.

[0076] 2. The electric power tower settlement monitoring and early warning system based on multi-dimensional information fusion technology described in the present invention calculates the inclination vectors of the two monitoring points at the top and bottom of the tower, and the angle between the line connecting the monitoring points at the top and bottom of the tower and the line connecting the monitoring points at the top and bottom of the tower at the initial moment can be obtained according to the formula, which is then used as the inclination angle of the electric power tower. , in obtaining the tilt angle Then, the tilt angle With tilt threshold Compared with the tilt angle Greater than the tilt threshold When the power pole tower is tilted and collapsed, it means that the power pole tower may tilt and collapse, which will affect the normal operation of the power pole tower. At this time, the analysis module is used to output the second warning instruction to the early warning module, so as to intervene in the operation of the power pole tower in time to avoid accidents caused by the collapse of the power pole tower and the impact on power transmission. BRIEF DESCRIPTION OF THE DRAWINGS

[0077] The present invention will be further described below in conjunction with the accompanying drawings.

[0078] Figure 1 It is a flow chart of the present invention. DETAILED DESCRIPTION

[0079] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0080] like Figure 1 As shown, a power tower settlement monitoring and early warning system based on multi-dimensional information fusion technology according to an embodiment of the present invention includes: a monitoring module, wherein the monitoring module includes:

[0081] The data acquisition unit obtains basic data for calculating the three-dimensional coordinates of the monitoring point based on the difference between the satellite signal reception and transmission times;

[0082] A data processing unit, based on basic data for calculating the three-dimensional coordinates of the monitoring points, calculates and obtains the three-dimensional coordinates of the monitoring points;

[0083] Also includes:

[0084] A calculation module, which calculates a first calculated settlement value Si based on the initial three-dimensional coordinates and the real-time three-dimensional coordinates of the monitoring point;

[0085] Analysis module, based on the first calculated settlement value of N monitoring points Analysis of tower settlement status:

[0086] When the analysis tower body is found to have subsidence, the first warning instruction is output;

[0087] When the tower body is tilted and the tilt angle exceeds the tilt threshold, the first warning instruction is output;

[0088] The early warning module receives a first early warning instruction and generates an alarm signal based on the first early warning instruction.

[0089] In the prior art, since the benchmark points are arranged on the ground, although they are far away from the location of the power towers, they may still change with the passage of time and geological movement, and the change is incremental over time. If the benchmark points cannot be accurately calibrated, it may lead to deviations in the monitored data, and thus lead to the risk of underreporting due to the actual settlement of the power towers exceeding the threshold. In addition, the total station needs to set up multiple benchmark points to monitor the power towers. For example, a benchmark point needs to be arranged on the projection line of the central axis in the east, west, south and north directions of the power towers to measure the elevation and tilt angle. Therefore, it takes a long time to monitor the settlement of power towers using a total station, and it requires more manpower costs.

[0090] Based on the above, in one embodiment of the present invention, the position of the power tower is located by using satellite differential technology, including obtaining the three-dimensional coordinates of any monitoring point on the power tower. Specifically, after the power tower is built, N monitoring points are arranged on the central axis of the power tower, and then the initial three-dimensional coordinates of the N monitoring points are obtained by satellite. Then, an interval period is set, and the real-time three-dimensional coordinates of the N monitoring points are obtained again by satellite. The difference between the initial three-dimensional coordinates and the real-time three-dimensional coordinates of any monitoring point is calculated by the calculation module, and the first calculated settlement value of any monitoring point can be obtained. , based on the analysis module, the first calculated settlement value The analysis module can determine whether the power tower has settled or tilted, and then send instructions to the early warning module to use the early warning module to alarm, so as to realize the settlement monitoring and early warning of the power tower. Compared with the use of total station to monitor whether any monitoring point has settled, the use of satellite to obtain the real-time three-dimensional coordinates of N monitoring points on the power tower is not affected by geological movement, and can accurately obtain the real-time three-dimensional coordinates of N monitoring points. Then, by calculating with the initial three-dimensional coordinates, the position change information of the N monitoring points on the power tower can be obtained, which is conducive to judging the actual state of the power tower.

[0091] In one embodiment, the method for obtaining the three-dimensional coordinates of the monitoring point is:

[0092] After the tower is installed, the satellite signal is received in advance through a satellite receiver;

[0093] Based on the difference between the satellite signal reception and transmission time, the distance between the satellite receiver and the satellite is calculated and recorded as pseudorange;

[0094] Based on the fixed-position base station coordinates and pseudoranges, the data processing unit calculates the three-dimensional coordinates of N monitoring points, which are recorded as the initial three-dimensional coordinates ;

[0095] Set a fixed interval period and calculate the three-dimensional coordinates of N monitoring points again, which are recorded as real-time three-dimensional coordinates. ;

[0096] Among them, N monitoring points are arranged on the central axis of the tower, and the uppermost and lowermost monitoring points are located at the top and bottom of the tower respectively; any satellite receiver corresponds to one monitoring point; the initial three-dimensional coordinates , real-time 3D coordinates , all of which have been calibrated and optimized by the data processing unit.

[0097] As an embodiment of the present invention, during the construction of the power tower, N monitoring points are arranged on the central axis of the power tower in advance to ensure that the uppermost monitoring point and the lowermost monitoring point are located at the top and bottom of the tower respectively, and the remaining monitoring points correspond to the angle steel connection points respectively. The initial three-dimensional coordinates of the N monitoring points are monitored by satellite. , the initial three-dimensional coordinates of N monitoring points Record in the database, and then set the monitoring cycle for the power tower, that is, set a fixed interval period, and use satellites to re-monitor the real-time three-dimensional coordinates of N monitoring points , by obtaining the real-time three-dimensional coordinates of N monitoring points , and the initial three-dimensional coordinates of N monitoring points By comparing, it can be directly reflected whether the positions of N monitoring points on the power tower have changed. As for the specific settlement or tilt of N monitoring points on the power tower, further calculation is required using the calculation module;

[0098] The method for the data processing unit to obtain the three-dimensional coordinates of any monitoring point is:

[0099] Assume that the pseudorange of a known base station is monitored by four satellites, recorded as , , , ;

[0100] By calculating the differential correction number, according to the formula:

[0101]

[0102] Based on the above calculation, the pseudo-range differential correction numbers of the four satellite monitoring base stations with known coordinates are obtained;

[0103] Sending the pseudo-range differential correction number corresponding to the satellite to the satellite receiver at the monitoring point via radio;

[0104] The pseudoranges of the monitoring points are obtained by four satellites respectively, which are recorded as , , , ;

[0105] Apply the differential correction number to update the pseudorange of the four satellites to obtain the monitoring point, denoted as , , , ;

[0106]

[0107]

[0108]

[0109]

[0110] Based on the pseudorange and light speed of the monitoring point obtained by the updated satellite, four spherical equations are constructed and the spherical equations are solved by the least squares method to obtain the three-dimensional coordinates of the monitoring point.

[0111] In one embodiment, the first calculated settlement values ​​of the N monitoring points are calculated The method is:

[0112] The initial three-dimensional coordinates of any monitoring point , real-time 3D coordinate data Perform calculations;

[0113] According to the formula:

[0114]

[0115] in, Indicates the real-time Z-axis value of any monitoring point. represents the initial Z-axis value of any monitoring point; i represents any monitoring point;

[0116] The initial three-dimensional coordinates of any monitoring point , real-time 3D coordinates Substitute into the formula;

[0117] Calculate the first calculated settlement value of any monitoring point .

[0118] As an embodiment of the present invention, a calculation module is used to calculate the first calculated settlement value. By obtaining the initial three-dimensional coordinates of any monitoring point With real-time 3D coordinates , the change in vertical height of the monitoring point can be obtained, that is, the first calculated settlement value , calculate the first calculated settlement value of N monitoring points in sequence , the data can be used to intuitively express whether the vertical height positions of N monitoring points have changed, and then used to determine whether the power tower as a whole has settled.

[0119] In one embodiment, based on the first calculated sedimentation value The method for analyzing the tower settlement state is:

[0120] Summarize the first calculated settlement values ​​of N monitoring points at the same time ;

[0121] For all first calculated settlement values Analyze the size of:

[0122] When all first calculated settlement values When it approaches zero, it is analyzed that the tower body has no settlement;

[0123] When all first calculated settlement values If both are positive values, it is analyzed that the tower body has no settlement;

[0124] When there is a partial first calculate the settlement value approaches zero, and the other part first calculates the settlement value If it is a positive value, the tower body has no settlement;

[0125] When all first calculated settlement values If they are all negative values, it is analyzed that the tower body has settled;

[0126] When there is a partial first calculate the settlement value approaches zero, and the other part first calculates the settlement value If it is a negative value, the tower is suspected to be tilted;

[0127] When the first calculated settlement value Si contains both positive and negative values, it is analyzed that the tower body is suspected to be tilted.

[0128] When the power tower settles as a whole, the N monitoring points should also settle. However, if the power tower is tilted only due to loose foundation, some monitoring points will be lowered in vertical height, but not all monitoring points will be lowered in vertical height. Therefore, as an embodiment of the present invention, after obtaining the first calculated settlement values ​​of the N monitoring points, After that, the settlement values ​​are calculated based on all the first The value of , also needs corresponding analysis, to judge the actual state of the power tower:

[0129] When all first calculated settlement values When they are all positive values, it means that the vertical height of any monitoring point has not decreased, but increased. Therefore, it can be judged that the foundation of the power tower should be moved upward.

[0130] When all first calculated settlement values All of them are negative values, indicating that the vertical height of any monitoring point is lowered, from which it can be judged that the foundation of the power tower must sink, that is, the power tower as a whole has settled;

[0131] When the first calculation of the settlement value That is, there are both positive and negative values, indicating that the vertical height of the monitoring point has decreased, and the vertical height of the monitoring point has increased. This can be used to determine that the power tower is suspected to be tilted.

[0132] In one embodiment, the analysis module is further used to output a verification instruction, the method is as follows:

[0133] When the tower is suspected to be tilted, a verification instruction is output to the calculation module;

[0134] The calculation module receives the verification instruction and obtains the real-time three-dimensional coordinates of the monitoring points at the top and bottom of the tower. , ;

[0135] Calculate the tilt vector T of the two monitoring points according to the formula:

[0136]

[0137] According to the formula:

[0138]

[0139] in, represents the tilt angle, V represents the vertical vector, and V=(0,0,1), It represents the product of the tilt vector T and the modulus length of the vertical vector V;

[0140] Based on calculation, when , it means that there is indeed a tilt;

[0141] Setting the Tilt Threshold , using the calculated tilt angle With tilt threshold Compare:

[0142] when When the warning signal is detected, a second warning instruction is output to the warning module.

[0143] When the power tower sinks, it means that the foundation of the power tower is loose. If the foundation of the power tower continues to sink, it may affect the normal operation of the power tower. Therefore, in one embodiment of the present invention, when the foundation of the power tower sinks, the first early warning instruction output by the analysis module is used to make the early warning module alarm, so that the staff can pay close attention to the operating status of the power tower in time and perform maintenance and repair; wherein, when all the first calculated settlement values ​​are All positive values ​​and the first calculated settlement value That is, when there are both positive and negative values, tilting may occur. Since the tilting and collapse of the power tower will also affect the normal operation of the power tower, and the settlement and tilting of the power tower will occur at the same time, it is also necessary to verify the tilt degree of the power tower, that is, to calculate the tilt angle of the power tower. In this embodiment, by calculating the inclination vectors of the two monitoring points at the top and bottom of the tower, according to the formula:

[0144] The angle between the line connecting the monitoring point at the top of the tower and the monitoring point at the bottom of the tower and the line connecting the monitoring point at the top of the tower and the bottom of the tower at the initial moment can be obtained, and then used as the inclination angle of the power tower , in obtaining the tilt angle Then, the tilt angle With tilt threshold Compared with the tilt angle Greater than the tilt threshold When the power pole tower is tilted and collapsed, it means that the power pole tower may tilt and collapse, which will affect the normal operation of the power pole tower. At this time, the analysis module is used to output the second warning instruction to the early warning module, so as to intervene in the operation of the power pole tower in time to avoid accidents caused by the collapse of the power pole tower and the impact on power transmission.

[0145] In one embodiment, the analysis module is further used to output a warning instruction according to the inclination angles of two adjacent monitoring points, in the following method:

[0146] According to the formula, calculate the inclination angle between two adjacent monitoring points ;

[0147] Based on the calculated N-1 tilt angles , calculate N-1 tilt angles respectively The average and standard deviation ;

[0148] when , then the average value As the inclination angle of the tower body, and if there is any inclination angle , then output a second warning instruction to the warning module;

[0149] when , directly output the third warning instruction to the warning module;

[0150] in, is the standard deviation threshold, which is used to measure the discrete degree of the inclination angles of multiple tower sections.

[0151] Since the angle between the line connecting the monitoring point at the top of the tower and the line connecting the monitoring point at the top of the tower and the bottom of the tower at the initial moment can only reflect the inclination angle of the entire tower body, it does not mean that the inclination angles between multiple sections of the tower body are consistent. Therefore, in one embodiment of the present invention, it is also necessary to calculate the inclination angle between two adjacent monitoring points. Calculate and obtain N-1 tilt angles , through standard deviation calculation, it can reflect N-1 tilt angles The degree of discreteness, if , indicating N-1 tilt angles The discrete degree is small, that is, N-1 tilt angles Basically consistent, at this time the above-obtained inclination angle That is, the inclination angle of the tower body, or the average value As the inclination angle of the tower body, if any inclination angle When The analysis module outputs the second warning instruction to the warning module; When , it indicates N-1 tilt angles The degree of dispersion is large, that is, the inclination angles of the multiple sections of the tower body are different. In this case, the inclination angle obtained above is It cannot be used as the inclination angle of the tower, the average value It also cannot be used as the inclination angle of the tower body. At this time, the analysis module outputs the third warning instruction to the warning module, requiring immediate maintenance of the tower body and stopping of power supply to prevent losses caused by sudden collapse of the tower body.

[0152] In one embodiment, the analysis module is further used to analyze the cause of the tilt, and the method is:

[0153] According to the obtained N-1 tilt angles Standard Deviation :

[0154] when , analyzing the tower tilt caused by foundation collapse;

[0155] when , analyze the tower inclination caused by external wind load and ice load.

[0156] Based on the above, the calculated N-1 tilt angles on the tower It can be used to determine the cause of the tower's current state, that is, the cause of the tilt. , indicating that the internal structure of the tower has not been greatly affected, and the overall tilt angle Keeping the consistency, it can be analyzed that the inclination of the tower is caused by the collapse of the foundation, which leads to the inclination of the tower; when , indicating that the internal structure of the tower is affected. The angle steel connections corresponding to the N monitoring points are bent or broken to varying degrees. From this, it can be analyzed that the inclination of the tower is caused by external wind loads and ice loads. For example, if there is ice and snow on the tower, the center of gravity of the tower is offset, resulting in a greater force on one side of the tower, resulting in breakage or bending deformation.

[0157] In one embodiment, the data acquisition unit is also used to collect monitoring data of the total station;

[0158] The total station is arranged on the projection line of the central axis of the tower body.

[0159] Although satellites are not affected by geological changes, satellite differential technology is affected by signal strength, which may lead to increased errors in bad weather or when there are many interference signals. Therefore, as an embodiment of the present invention, in addition to obtaining the real-time three-dimensional coordinates of the monitoring points through satellites, , and then calculate the first settlement value In addition to the calculation, it is also necessary to monitor the elevation of N monitoring points on the tower body through a total station. By monitoring the elevation, it can be determined whether the tower body has settled.

[0160] In one embodiment, the calculation module is also used to calculate the second calculated settlement value based on the total station monitoring data. ;

[0161] According to the formula:

[0162]

[0163] Among them, h1 represents the initial elevation of any monitoring point; h2 represents the real-time elevation of any monitoring point.

[0164] Assuming that the reference point of the total station does not change, the change in the elevation of any monitoring point on the tower after an interval period can be calculated based on the above formula, and then the settlement value calculated based on the second It can be used as the specific value of tower settlement, thereby participating in the monitoring and early warning of tower settlement.

[0165] In one embodiment, a calibration module is further included, wherein the calibration module is used to calculate the sedimentation value according to the second Calibrate the total station benchmark elevation;

[0166] Get the first calculated settlement value of any monitoring point ;

[0167] According to the formula:

[0168]

[0169] The initial elevation h1 of any monitoring point and the first calculated settlement value Substitute it and get the calculated real-time elevation

[0170] Based on the calculated real-time elevation Difference calculation with the real-time elevation h2 monitored by the total station:

[0171]

[0172] According to the obtained Adjust the elevation of the total station benchmark;

[0173] in, Indicates the change value of the total station reference point, represents the temperature influence coefficient, It indicates the difference between the ambient temperature when the initial elevation h1 is obtained and the ambient temperature when the real-time elevation h2 is obtained.

[0174] Based on the above, since the total station reference point is arranged on the ground, it will be affected by geological movement, but the satellite will also be affected by signal interference and cause errors. In order to be able to regularly monitor the power towers and not be affected by signals and geological movements, combining satellites and total stations to monitor the position changes of any monitoring point on the power towers is conducive to real-time settlement monitoring and early warning of power towers;

[0175] As an embodiment of the present invention, considering that the reference point of the total station may be affected by geological movement, the first calculated settlement value of any monitoring point is obtained by using satellite differential technology without interference. , and then use the total station to obtain the real-time elevation of the monitoring point ;

[0176] Due to the change of the benchmark point, the real-time elevation collected by the total station It cannot directly participate in the calculation to obtain the second calculated settlement value. ; Use the formula and the first calculation of the settlement value Reversely obtain the theoretical calculated real-time elevation of the monitoring point , and then calculate the change value of the total station benchmark point through the formula , thus, according to the obtained change value , you can adjust the total station reference point, so as to realize the calibration of the total station reference point. When signal interference occurs in the later monitoring process, the first calculated settlement value When there is a difference, temporary monitoring can be carried out by the total station to ensure that the settlement monitoring and early warning of power towers are effective and there is no risk of missed reports.

[0177] Working principle: The calculation module calculates the difference between the initial three-dimensional coordinates and the real-time three-dimensional coordinates of any monitoring point, and the first calculated settlement value of any monitoring point can be obtained. , based on the analysis module, the first calculated settlement value The analysis module can determine whether the power tower has settled or tilted, and then send instructions to the early warning module to use the early warning module to alarm, so as to realize the settlement monitoring and early warning of the power tower. Compared with the use of total station to monitor whether any monitoring point has settled, the use of satellite to obtain the real-time three-dimensional coordinates of N monitoring points on the power tower is not affected by geological movement, and can accurately obtain the real-time three-dimensional coordinates of N monitoring points. Then, by calculating with the initial three-dimensional coordinates, the position change information of the N monitoring points on the power tower can be obtained, which is conducive to judging the actual state of the power tower.

[0178] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A power tower settlement monitoring and early warning system based on multi-dimensional information fusion technology, characterized in that: include: A monitoring module, the monitoring module comprising: The data acquisition unit obtains basic data for calculating the three-dimensional coordinates of the monitoring point based on the difference between the satellite signal reception and transmission times; A data processing unit, based on basic data for calculating the three-dimensional coordinates of the monitoring points, calculates and obtains the three-dimensional coordinates of the monitoring points; Also includes: A calculation module, which calculates a first calculated settlement value Si based on the initial three-dimensional coordinates and the real-time three-dimensional coordinates of the monitoring point; Analysis module, based on the first calculated settlement value of N monitoring points Analysis of tower settlement status: When the analysis tower body is found to have subsidence, the first warning instruction is output; When the tower body is tilted and the tilt angle exceeds the tilt threshold, the first warning instruction is output; An early warning module receives a first early warning instruction and generates an alarm signal based on the first early warning instruction; The analysis module is also used to output verification instructions, the method is as follows: When the tower is suspected to be tilted, a verification instruction is output to the calculation module; The calculation module receives the verification instruction and obtains the real-time three-dimensional coordinates of the monitoring points at the top and bottom of the tower. , ; Calculate the tilt vector T of the two monitoring points according to the formula: According to the formula: in, represents the tilt angle, V represents the vertical vector, and V=(0,0,1), It represents the product of the tilt vector T and the modulus length of the vertical vector V; Based on calculation, when , it means that there is indeed a tilt; Setting the Tilt Threshold , using the calculated tilt angle With tilt threshold Compare: when When the second warning instruction is output to the warning module; The analysis module is also used to output a warning instruction according to the inclination angles of two adjacent monitoring points, in the following method: According to the formula, calculate the inclination angle between two adjacent monitoring points ; Based on the calculated N-1 tilt angles , calculate N-1 tilt angles respectively The average and standard deviation ; when , then the average value As the inclination angle of the tower body, and if there is any inclination angle , then output a second warning instruction to the warning module; when , directly output the third warning instruction to the warning module; in, is the standard deviation threshold, which is used to measure the discrete degree of the inclination angles of multiple tower sections.

2. The power tower settlement monitoring and early warning system based on multi-dimensional information fusion technology according to claim 1 is characterized by: The method for obtaining the three-dimensional coordinates of the monitoring point is: After the tower is installed, the satellite signal is received in advance through a satellite receiver; Based on the difference between the satellite signal reception and transmission time, the distance between the satellite receiver and the satellite is calculated and recorded as pseudorange; Based on the fixed-position base station coordinates and pseudoranges, the data processing unit calculates the three-dimensional coordinates of N monitoring points, which are recorded as the initial three-dimensional coordinates ; Set a fixed interval period and calculate the three-dimensional coordinates of N monitoring points again, which are recorded as real-time three-dimensional coordinates. ; Among them, N monitoring points are arranged on the central axis of the tower, and the uppermost and lowermost monitoring points are located at the top and bottom of the tower respectively; any satellite receiver corresponds to one monitoring point; the initial three-dimensional coordinates , real-time 3D coordinates , all of which have been calibrated and optimized by the data processing unit.

3. The power tower settlement monitoring and early warning system based on multi-dimensional information fusion technology according to claim 2 is characterized by: Calculate the first calculated settlement value of the N monitoring points The method is: The initial three-dimensional coordinates of any monitoring point ( , , ), real-time 3D coordinate data ( , , ) to perform calculations; According to the formula: , in, Indicates the real-time Z-axis value of any monitoring point. represents the initial Z-axis value of any monitoring point; i represents any monitoring point; The initial three-dimensional coordinates of any monitoring point , real-time 3D coordinates Substitute into the formula; Calculate the first calculated settlement value of any monitoring point .

4. The power tower settlement monitoring and early warning system based on multi-dimensional information fusion technology according to claim 3 is characterized by: Based on the first calculated sedimentation value The method for analyzing the tower settlement state is: Summarize the first calculated settlement values ​​of N monitoring points at the same time ; For all first calculated settlement values Analyze the size of: When all first calculated settlement values When it approaches zero, it is analyzed that the tower body has no settlement; When all first calculated settlement values If both are positive values, it is analyzed that the tower body has no settlement; When there is a partial first calculate the settlement value approaches zero, and the other part first calculates the settlement value If it is a positive value, the tower body has no settlement; When all first calculated settlement values If they are all negative values, it is analyzed that the tower body has settled; When there is a partial first calculate the settlement value approaches zero, and the other part first calculates the settlement value If it is a negative value, the tower is suspected to be tilted; When the first calculated settlement value Si contains both positive and negative values, it is analyzed that the tower body is suspected to be tilted.

5. The power tower settlement monitoring and early warning system based on multi-dimensional information fusion technology according to claim 1 is characterized by: The analysis module is also used to analyze the cause of the tilt, the method is as follows: According to the obtained N-1 tilt angles Standard Deviation : when , analyzing the tower tilt caused by foundation collapse; when , analyze the tower inclination caused by external wind load and ice load.

6. The power tower settlement monitoring and early warning system based on multi-dimensional information fusion technology according to claim 1 is characterized by: The data acquisition unit is also used to collect monitoring data of the total station; The total station is arranged on the projection line of the central axis of the tower body.

7. The power tower settlement monitoring and early warning system based on multi-dimensional information fusion technology according to claim 1 is characterized by: The calculation module is also used to calculate the second calculated settlement value according to the total station monitoring data ; According to the formula: , Among them, h1 represents the initial elevation of any monitoring point; h2 represents the real-time elevation of any monitoring point.

8. The power tower settlement monitoring and early warning system based on multi-dimensional information fusion technology according to claim 1 is characterized by: Also included is a calibration module, the calibration module being used to calculate the sedimentation value according to the second Calibrate the total station benchmark elevation; Get the first calculated settlement value of any monitoring point ; According to the formula: , The initial elevation h1 of any monitoring point and the first calculated settlement value Substitute it and get the calculated real-time elevation , Based on the calculated real-time elevation Difference calculation with the real-time elevation h2 monitored by the total station: , According to the obtained Adjust the elevation of the total station benchmark; in, Indicates the change value of the total station reference point, represents the temperature influence coefficient, It indicates the difference between the ambient temperature when the initial elevation h1 is obtained and the ambient temperature when the real-time elevation h2 is obtained.

Citation Information

Patent Citations

  • Tower comprehensive monitoring and intelligent early warning platform and early warning method

    CN112202242A

  • Settlement monitoring method and system based on Beidou

    CN112629488A

  • Settlement monitoring method for wind power tower drum foundation based on Beidou positioning

    CN113236509A

  • Power transmission line multi-parameter Internet of Things monitoring system and method

    CN113739758A

  • Electric power tower online monitoring device and method based on Beidou

    CN115218951A