Wind-solar hybrid storage system scheduling method, device, electronic equipment and storage medium

By generating scene sets and building operation models, optimizing the scheduling strategy of the wind and light mixed storage system, the problem of flexibility needs of the wind and light mixed storage system is solved, and the system's scheduling reliability and economicality are improved.

CN118659465BActive Publication Date: 2024-11-01THREE GORGES GROUP IND DEVELOPMENT (BEIJING) CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411153317.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-01
Estimated Expiration
2044-08-21

AI Technical Summary

Technical Problem

The flexibility requirements of the mixed storage system on different time scales are difficult to meet. Changes in operating characteristics after the conventional water and electricity transformation into a mixed storage system affect the comprehensive water use needs. How to conduct reasonable scheduling has become a technical problem that needs to be solved urgently.

Method used

By obtaining random variables of the prediction error of wind power and photovoltaic output, generating a scene set, building an operation model of wind power, photovoltaic and hybrid pumping power stations, establishing a scheduling model of wind and photovoltaic storage system, solving it to obtain the optimal scheduling operation strategy, and optimizing wind power , complementary operation of photovoltaic and hybrid pumping and storage plants.

Benefits of technology

The reasonable scheduling of the mixed storage system of the wind and light system has been achieved, the reliability and economicality of the system has been improved, the short-term complementary operation process has been optimized, and the operation safety and economicality of the system has been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118659465B_ABST
    Figure CN118659465B_ABST
Patent Text Reader

Abstract

The present application provides a method, device, electronic device and storage medium for dispatching a wind-solar hybrid storage system. The method includes: obtaining a wind power random variable representing a wind power output prediction error, and a photovoltaic random variable representing a photovoltaic output prediction error, generating a scenario set according to the wind power random variable and the photovoltaic random variable; constructing an operation model of a wind power and photovoltaic power station, including: the first constraint conditions of the wind power and photovoltaic power station under the scenario set; constructing an operation model of a hybrid pumped storage power station, including: the second constraint conditions of the hybrid pumped storage power station under the scenario set; constructing a dispatching model of a wind-solar hybrid storage system, including: the objective function of the wind-solar hybrid storage system, the third constraint conditions of the wind-solar hybrid storage system under the scenario set, the operation models of wind power and photovoltaic power stations, and the operation model of the hybrid pumped storage power station; solving the dispatching model of the wind-solar hybrid storage system, obtaining the optimal dispatching operation strategy of the wind power, photovoltaic power station and hybrid pumped storage power station, and reasonably dispatching the wind-solar hybrid storage system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of energy technology, and in particular to a method, device, electronic equipment and storage medium for dispatching a wind-solar hybrid storage system. Background Art

[0002] In recent years, with the continuous advancement of the construction of new power systems, the scale of wind power and photovoltaic grid connection has increased significantly. At present, the installed capacity of wind power and photovoltaic power generation is 440 million kilowatts and 610 million kilowatts respectively, accounting for 36% of the total installed capacity of power generation. The large-scale and high-proportion grid connection of new energy sources such as wind power and photovoltaics has intensified the peak load regulation pressure of the power grid and the pressure of new energy consumption, resulting in a sharp increase in the demand for flexible adjustment capabilities of the system.

[0003] Conventional hydropower is a flexible and reliable power source, but it is difficult to meet the flexibility requirements of wind and solar energy on different time scales due to seasonal changes in runoff water and the size of the regulating reservoir. In order to meet the challenge of flexibility, an effective way is to transform conventional hydropower into hybrid pumped storage (referred to as hybrid pumped storage) by adding pumping stations or reversible units, so that it has both the functions of water diversion power generation and pumped storage, which can greatly improve the regulation capacity of hydropower. Through the complementary operation of wind power, photovoltaics and hybrid pumped storage, the pressure of new energy consumption and grid peak regulation can be alleviated.

[0004] In terms of wind-solar-hydropower complementary scheduling, current research focuses on the optimal scheduling of complementary systems such as wind-solar-conventional hydropower and wind-solar-conventional pumped storage. Moreover, after conventional hydropower is transformed into hybrid pumped storage operation, the operating characteristics change, which may affect the comprehensive water demand. Therefore, how to reasonably schedule the wind-solar hybrid storage system is a technical problem that needs to be solved urgently. Summary of the invention

[0005] In view of the above problems, the embodiments of the present application propose a wind-solar hybrid storage system scheduling method, device, electronic device and storage medium to reasonably schedule the wind-solar hybrid storage system.

[0006] According to one aspect of an embodiment of the present application, a method for scheduling a wind-solar hybrid storage system is provided, the method comprising:

[0007] Acquire a wind power random variable representing a wind power output prediction error and a photovoltaic random variable representing a photovoltaic output prediction error, and generate a scenario set according to the wind power random variable and the photovoltaic random variable, wherein the scenario set includes a wind power output scenario set and a photovoltaic output scenario set;

[0008] Constructing a wind power plant and a photovoltaic power plant operation model, wherein the wind power plant and the photovoltaic power plant operation model include: a first constraint condition of the wind power plant and the photovoltaic power plant under the scenario set;

[0009] Constructing a hybrid pumped storage power station operation model, the hybrid pumped storage power station operation model comprising: a second constraint condition of the hybrid pumped storage power station under the scenario set;

[0010] Constructing a wind-solar hybrid storage system scheduling model, the wind-solar hybrid storage system scheduling model comprising: an objective function of the wind-solar hybrid storage system, a third constraint condition of the wind-solar hybrid storage system under the scenario set, the wind power and photovoltaic power station operation models, and the hybrid pumped storage power station operation model;

[0011] The wind-solar-hybrid-storage system dispatching model is solved to obtain the optimal dispatching and operating strategies for the wind power, photovoltaic power station and the hybrid pumped-storage power station.

[0012] Optionally, obtaining a wind power random variable representing a wind power output prediction error and a photovoltaic random variable representing a photovoltaic output prediction error includes:

[0013] Collect the wind power output forecast value, wind power output actual value, photovoltaic output forecast value and photovoltaic output actual value in each historical period;

[0014] Based on the wind power output prediction value and the actual wind power output value, the wind power random variable of each time period is calculated, and based on the photovoltaic output prediction value and the actual photovoltaic output value, the photovoltaic random variable of each time period is calculated.

[0015] Optionally, generating a scenario set according to the wind power random variable and the photovoltaic random variable includes:

[0016] Obtaining a probability distribution function of the wind power random variable and a probability distribution function of the photovoltaic random variable;

[0017] Based on the probability distribution function of the wind power random variable, an initial wind power output prediction error scenario set is generated, and based on the probability distribution function of the photovoltaic random variable, an initial photovoltaic output prediction error scenario set is generated;

[0018] A wind power output scenario set is generated based on the initial wind power output prediction error scenario set, and a photovoltaic output scenario set is generated based on the initial photovoltaic output prediction error scenario set.

[0019] Optionally, obtaining the probability distribution function of the wind power random variable includes:

[0020] Performing equidistant binning processing on the wind power random variable to obtain a wind power random variable data box;

[0021] The probability distribution function of the wind power random variable data box is fitted by using a normal distribution function or an empirical distribution function to obtain the probability distribution function of the wind power random variable data box.

[0022] Optionally, the wind power random variable is subjected to equidistant binning processing to obtain a wind power random variable data box, including:

[0023] Acquire a wind power random variable sample set, wherein the wind power random variable sample set includes wind power sample data pairs in each time period, and the wind power sample data pairs include wind power output prediction values ​​and wind power random variables;

[0024] After the wind power random variable sample set is sorted in ascending order according to the wind power output prediction value, it is subjected to equidistant binning processing according to the wind power output prediction value to obtain a wind power random variable data box.

[0025] Optionally, a probability distribution function is fitted to the wind power random variable data box using a normal distribution function or an empirical distribution function to obtain a probability distribution function of the wind power random variable data box, including:

[0026] Using a skewness and kurtosis test method to determine whether the wind power random variables in the wind power random variable data box obey a normal distribution;

[0027] When the condition is met, a normal distribution function is used to fit the probability distribution function of the wind power random variable data box to obtain the probability distribution function of the wind power random variable data box;

[0028] When it does not comply, the probability distribution function is fitted to the wind power random variable data box using the empirical distribution function to obtain the probability distribution function of the wind power random variable data box.

[0029] Optionally, after performing equidistant binning processing on the wind power random variable to obtain a wind power random variable data box, the method further includes:

[0030] Based on the mean value and standard deviation of the wind power random variables in the wind power random variable data box, a target wind power random variable interval of the wind power random variable data box is determined, and wind power random variables in the wind power random variable data box that do not belong to the target wind power random variable interval are deleted.

[0031] Optionally, generating an initial wind power output prediction error scenario set based on the probability distribution function of the wind power random variable, and generating an initial photovoltaic output prediction error scenario set based on the probability distribution function of the photovoltaic random variable, includes:

[0032] Constructing a multivariate Gaussian distribution, and generating Gaussian random numbers based on the multivariate Gaussian distribution;

[0033] Performing inverse transformation sampling based on the Gaussian random number and the probability distribution function of the wind power random variable to obtain an initial wind power output prediction error scenario set;

[0034] An inverse transformation sampling is performed based on the Gaussian random number and the probability distribution function of the photovoltaic random variable to obtain an initial photovoltaic output prediction error scenario set.

[0035] Optionally, the Gaussian random number is a plurality of groups of Gaussian random numbers; performing inverse transformation sampling based on the Gaussian random number and the probability distribution function of the wind power random variable to obtain an initial wind power output prediction error scenario set includes:

[0036] Calculate the cumulative distribution function value of each group of Gaussian random numbers;

[0037] The cumulative distribution function values ​​of each group of Gaussian random numbers are substituted into the probability distribution function of the wind power random variable to obtain an initial wind power output prediction error scenario set.

[0038] Optionally, generating a wind power output scenario set based on the initial wind power output prediction error scenario set includes:

[0039] Performing scenario reduction on the initial wind power output prediction error scenario set to obtain a reduced wind power output prediction error scenario set;

[0040] A summation transformation is performed based on the post-reduction wind power output prediction error scenario set to obtain a wind power output scenario set.

[0041] Optionally, performing scenario reduction on the initial wind power output prediction error scenario set to obtain a reduced wind power output prediction error scenario set includes:

[0042] Repeat the following process until the number of scenarios reaches a preset number to obtain a reduced wind power output prediction error scenario set: calculate the probability distance between any two scenarios in the initial wind power output prediction error scenario set, delete one of the two scenarios with the smallest probability distance, and adjust the occurrence probability of the other scenario in the two wind scenarios with the smallest probability distance to the sum of the occurrence probabilities of the two scenarios with the smallest probability distance.

[0043] Optionally, a summation transformation is performed based on the post-reduction wind power output prediction error scenario set to obtain a wind power output scenario set, including: based on the wind power output prediction value, calculating the wind power generation capacity under the scenarios in the post-reduction wind power output prediction error scenario set to obtain the wind power output scenario set.

[0044] Optionally, the first constraint condition includes at least one of the following: an output upper and lower limit constraint condition, and a utilization rate constraint condition.

[0045] Optionally, the second constraint includes at least one of the following: water balance constraint, flow constraint, reservoir capacity constraint, output constraint, power conversion relationship constraint, head constraint, characteristic curve constraint, and comprehensive water use constraint; the comprehensive water use constraint includes at least one of the following: ecological flow constraint and shipping constraint.

[0046] Optionally, the objective function includes at least one of the following: a peak load regulation objective function and a new energy consumption objective function.

[0047] Optionally, the third constraint condition includes a system operation constraint condition.

[0048] Optionally, the objective function is at least two objective functions; solving the wind-solar hybrid storage system scheduling model to obtain the optimal scheduling operation strategy of the wind power, photovoltaic power station and the hybrid pumped storage power station includes:

[0049] Converting the at least two objective functions into a single objective function, converting the nonlinear constraint in the third constraint into a linear constraint, and obtaining a converted wind-solar hybrid storage system scheduling model;

[0050] The set basic data is obtained, and the converted wind-solar hybrid storage system scheduling model is solved based on the basic data using the set optimization solver to obtain the optimal scheduling and operation strategy of the wind power, photovoltaic power station and the hybrid pumped storage power station.

[0051] Optionally, the at least two objective functions include a peak load regulation objective function and a new energy consumption objective function; converting the at least two objective functions into a single objective function comprises:

[0052] Based on the preset auxiliary variables, the peak-shaving objective function is converted into a peak-shaving objective function in a minimum value form;

[0053] Calculate the first product of the peak-shaving objective function in the form of the minimum value and the weight of the peak-shaving objective function, and the second product of the new energy consumption objective function and the weight of the new energy consumption objective function, and determine the difference between the first product and the second product as a single objective function.

[0054] Optionally, converting the nonlinear constraint in the third constraint into a linear constraint includes:

[0055] Dividing the value interval of the variable in the nonlinear constraint condition into a plurality of subintervals;

[0056] Determining the variable conditions and linear function relationships satisfied by the subintervals;

[0057] Based on the variable conditions and the linear function relationship satisfied by the subintervals, the nonlinear constraint conditions are converted into linear constraint conditions.

[0058] According to another aspect of an embodiment of the present application, a wind-solar hybrid storage system scheduling device is provided, the device comprising:

[0059] A generation module, used to obtain a wind power random variable representing a wind power output prediction error and a photovoltaic random variable representing a photovoltaic output prediction error, and generate a scenario set according to the wind power random variable and the photovoltaic random variable, wherein the scenario set includes a wind power output scenario set and a photovoltaic output scenario set;

[0060] A first construction module is used to construct an operation model of a wind power plant and a photovoltaic power plant, wherein the operation model of the wind power plant and the photovoltaic power plant includes: a first constraint condition of the wind power plant and the photovoltaic power plant under the scenario set;

[0061] A second construction module is used to construct a hybrid pumped storage power station operation model, wherein the hybrid pumped storage power station operation model includes: a second constraint condition of the hybrid pumped storage power station under the scenario set;

[0062] The third construction module is used to construct a wind-solar hybrid storage system scheduling model, wherein the wind-solar hybrid storage system scheduling model includes: an objective function of the wind-solar hybrid storage system, a third constraint condition of the wind-solar hybrid storage system under the scenario set, the wind power and photovoltaic power station operation models, and the hybrid pumped storage power station operation model;

[0063] The solution module is used to solve the wind-solar hybrid storage system scheduling model to obtain the optimal scheduling and operation strategy of the wind power, photovoltaic power station and the hybrid pumped storage power station.

[0064] Optionally, the generating module includes:

[0065] The first acquisition submodule is used to collect the wind power output prediction value, wind power output actual value, photovoltaic output prediction value and photovoltaic output actual value of each historical time period; based on the wind power output prediction value and the wind power output actual value, the wind power random variables of each time period are calculated; based on the photovoltaic output prediction value and the photovoltaic output actual value, the photovoltaic random variables of each time period are calculated.

[0066] Optionally, the generating module includes:

[0067] A second acquisition submodule is used to acquire the probability distribution function of the wind power random variable and the probability distribution function of the photovoltaic random variable;

[0068] A first generating submodule is used to generate an initial wind power output prediction error scenario set based on the probability distribution function of the wind power random variable, and to generate an initial photovoltaic output prediction error scenario set based on the probability distribution function of the photovoltaic random variable;

[0069] The second generation submodule is used to generate a wind power output scenario set based on the initial wind power output prediction error scenario set, and to generate a photovoltaic output scenario set based on the initial photovoltaic output prediction error scenario set.

[0070] Optionally, the second acquisition submodule includes:

[0071] A binning unit, used for performing equidistant binning processing on the wind power random variable to obtain a wind power random variable data bin;

[0072] The fitting unit is used to perform probability distribution function fitting on the wind power random variable data box using a normal distribution function or an empirical distribution function to obtain the probability distribution function of the wind power random variable data box.

[0073] Optionally, the boxing unit includes:

[0074] A sample acquisition subunit, used to acquire a wind power random variable sample set, wherein the wind power random variable sample set includes a pair of wind power sample data in each time period, wherein the pair of wind power sample data includes a wind power output prediction value and a wind power random variable;

[0075] The equidistant binning unit is used to sort the wind power random variable sample set in ascending order according to the wind power output prediction value, and then perform equidistant binning according to the wind power output prediction value to obtain the wind power random variable data box.

[0076] Optionally, the fitting unit includes:

[0077] A judgment subunit, used to judge whether the wind power random variables in the wind power random variable data box obey the normal distribution by using the skewness and kurtosis test method;

[0078] A first fitting subunit is used for, when complying with , fitting the probability distribution function of the wind power random variable data box using a normal distribution function to obtain the probability distribution function of the wind power random variable data box;

[0079] The second fitting subunit is used for fitting the probability distribution function of the wind power random variable data box by using the empirical distribution function when the wind power random variable data box does not comply with the requirements, so as to obtain the probability distribution function of the wind power random variable data box.

[0080] Optionally, the second acquisition submodule also includes: a cleaning unit, used to determine the target wind power random variable interval of the wind power random variable data box based on the mean value and standard deviation of the wind power random variables in the wind power random variable data box, and delete the wind power random variables in the wind power random variable data box that do not belong to the target wind power random variable interval.

[0081] Optionally, the first generating submodule includes:

[0082] A random number generation unit, used for constructing a multivariate Gaussian distribution and generating a Gaussian random number based on the multivariate Gaussian distribution;

[0083] A first sampling unit is used to perform inverse transformation sampling based on the Gaussian random number and the probability distribution function of the wind power random variable to obtain an initial wind power output prediction error scenario set;

[0084] The second sampling unit is used to perform inverse transformation sampling based on the Gaussian random number and the probability distribution function of the photovoltaic random variable to obtain an initial photovoltaic output prediction error scenario set.

[0085] Optionally, the Gaussian random number is a plurality of groups of Gaussian random numbers; and the first sampling unit includes:

[0086] A function calculation subunit, used for calculating the cumulative distribution function value of each group of Gaussian random numbers;

[0087] The scenario acquisition subunit is used to substitute the cumulative distribution function value of each group of Gaussian random numbers into the probability distribution function of the wind power random variable to obtain an initial wind power output prediction error scenario set.

[0088] Optionally, the second generating submodule includes:

[0089] A reduction unit, configured to perform scenario reduction on the initial wind power output prediction error scenario set to obtain a reduced wind power output prediction error scenario set;

[0090] The transformation unit is used to perform a summation transformation based on the post-reduction wind power output prediction error scenario set to obtain a wind power output scenario set.

[0091] Optionally, the reduction unit is specifically used to repeatedly execute the following process until the number of scenarios reaches a preset number to obtain a set of wind power output prediction error scenarios after reduction: calculate the probability distance between any two scenarios in the initial wind power output prediction error scenario set, delete one of the two scenarios with the smallest probability distance, and adjust the occurrence probability of the other scenario of the two wind scenarios with the smallest probability distance to the sum of the occurrence probabilities of the two scenarios with the smallest probability distance.

[0092] Optionally, the conversion unit is specifically used to calculate the wind power generation capacity under the scenarios in the post-reduction wind power output prediction error scenario set based on the wind power output prediction value, and obtain the wind power output scenario set.

[0093] Optionally, the first constraint condition includes at least one of the following: an output upper and lower limit constraint condition, and a utilization rate constraint condition.

[0094] Optionally, the second constraint includes at least one of the following: water balance constraint, flow constraint, reservoir capacity constraint, output constraint, power conversion relationship constraint, head constraint, characteristic curve constraint, and comprehensive water use constraint; the comprehensive water use constraint includes at least one of the following: ecological flow constraint and shipping constraint.

[0095] Optionally, the objective function includes at least one of the following: a peak load regulation objective function and a new energy consumption objective function.

[0096] Optionally, the third constraint condition includes a system operation constraint condition.

[0097] Optionally, the objective function is at least two objective functions; and the solution module includes:

[0098] A model conversion unit, used to convert the at least two objective functions into a single objective function, convert the nonlinear constraint condition in the third constraint condition into a linear constraint condition, and obtain a converted wind-solar hybrid storage system scheduling model;

[0099] The model solving unit is used to obtain the set basic data, and use the set optimization solver to solve the converted wind-solar hybrid storage system scheduling model based on the basic data to obtain the optimal scheduling operation strategy of the wind power, photovoltaic power station and the hybrid pumped storage power station.

[0100] Optionally, the at least two objective functions include a peak-shaving objective function and a new energy consumption objective function; the model conversion unit includes: a function conversion subunit, used to convert the peak-shaving objective function into a minimum form of a peak-shaving objective function based on preset auxiliary variables; calculate the first product of the peak-shaving objective function in the minimum form and the weight of the peak-shaving objective function, and the second product of the new energy consumption objective function and the weight of the new energy consumption objective function, and determine the difference between the first product and the second product as a single objective function.

[0101] Optionally, the model conversion unit includes: a condition conversion subunit, used to divide the value interval of the variable in the nonlinear constraint condition into multiple sub-intervals; determine the variable conditions and linear function relationships satisfied by the sub-intervals; and convert the nonlinear constraint condition into a linear constraint condition based on the variable conditions and linear function relationships satisfied by the sub-intervals.

[0102] According to another aspect of an embodiment of the present application, an electronic device is provided, comprising a processor and a computer-readable storage medium, wherein a computer program is stored on the computer-readable storage medium; when the computer program is executed by the processor, the processor executes the wind-solar hybrid storage system scheduling method as described in any one of the above items.

[0103] According to another aspect of an embodiment of the present application, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the processor executes the wind-solar hybrid storage system scheduling method as described in any one of the above items.

[0104] The embodiments of the present application can achieve the following beneficial effects:

[0105] A scenario set is generated based on a wind power random variable representing a wind power output prediction error and a photovoltaic random variable representing a photovoltaic output prediction error, so that the generated scenario set can accurately describe the randomness and volatility of wind power and photovoltaic output, thereby being closer to the actual scenario;

[0106] When constructing wind power, photovoltaic power station operation models, hybrid pumped storage power station operation models, and wind-solar hybrid storage system scheduling models, adding the above more accurate scenario set factors can achieve accurate modeling of the operation process of wind power, photovoltaic power stations and hybrid pumped storage power stations, and improve the reliability of the wind-solar hybrid storage system scheduling process;

[0107] The randomness of the output of wind power and photovoltaic power stations and the operating characteristics of the hybrid pumped-storage power station are comprehensively considered, and the objective function of the wind-solar hybrid storage system and the constraints under the scenario set are taken into account. A wind-solar hybrid storage system scheduling model is established. By solving the wind-solar hybrid storage system scheduling model, the optimal scheduling and operation strategies of wind power, photovoltaic power stations and hybrid pumped-storage power stations can be obtained, thereby optimizing the short-term complementary operation process of wind power, photovoltaic power stations and hybrid pumped-storage power stations, and being able to reasonably schedule the wind-solar hybrid storage system to improve the economy and safety of the wind-solar hybrid storage system operation.

[0108] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0109] In order to more clearly illustrate the technical solution of the embodiment of the present application, the drawings required for use in the description of the embodiment of the present application will be briefly introduced below. Obviously, the drawings described below are only some drawings of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0110] Figure 1 This is a flow chart of the steps of a method for dispatching a wind-solar hybrid storage system according to an embodiment of the present application;

[0111] Figure 2 is a schematic diagram of a topological structure of a hybrid pumped storage power station according to an embodiment of the present application;

[0112] Figure 3 This is a structural block diagram of a wind-solar hybrid storage system scheduling device according to an embodiment of the present application;

[0113] Figure 4 is a structural block diagram of an electronic device according to an embodiment of the present application;

[0114] Figure 5 It is a structural block diagram of a computer-readable storage medium in an embodiment of the present application. DETAILED DESCRIPTION

[0115] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0116] In the embodiment of the present application, firstly, considering the randomness of the output of wind power and photovoltaic power stations, a set of wind power and photovoltaic output scenarios is generated to construct the operation models of wind power and photovoltaic power stations; then, the operation characteristics of the hybrid pumped storage power station are analyzed, and the constraints such as water level, flow, output, water balance, and comprehensive water use are comprehensively considered to construct the operation model of the hybrid pumped storage power station; finally, taking into account the peak regulation target and the new energy consumption target, a scheduling model of the wind-solar hybrid storage system is constructed, and mixed integer linear programming is used to solve it, so as to obtain the optimal scheduling and operation strategy of the wind-solar hybrid storage system. The following is a detailed introduction.

[0117] Reference Figure 1 , showing a step flow chart of a wind-solar hybrid storage system scheduling method according to an embodiment of the present application.

[0118] like Figure 1As shown, the wind-solar hybrid storage system scheduling method may include the following steps:

[0119] Step 101, obtaining a wind power random variable representing a wind power output prediction error and a photovoltaic random variable representing a photovoltaic output prediction error, and generating a scenario set according to the wind power random variable and the photovoltaic random variable, wherein the scenario set includes a wind power output scenario set and a photovoltaic output scenario set.

[0120] In the embodiment of the present application, the randomness of the output of wind power and photovoltaic power stations is taken into consideration to construct a wind power output scenario set and a photovoltaic output scenario set.

[0121] In an embodiment of the present application, a wind power random variable representing a wind power output prediction error and a photovoltaic random variable representing a photovoltaic output prediction error are constructed. Based on data binning technology, a normal distribution function or an empirical distribution function is used to fit the probability distribution function of the random variable. Scene sampling is performed through multivariate Gaussian distribution and inverse transformation sampling. The scene reduction is performed using the synchronous back-substitution elimination method to obtain a wind power output scene set and a photovoltaic output scene set.

[0122] Exemplarily, the process of obtaining a wind power random variable representing a wind power output prediction error and a photovoltaic random variable representing a photovoltaic output prediction error may include: collecting wind power output prediction values, wind power output actual values, photovoltaic output prediction values, and photovoltaic output actual values ​​for each historical time period; calculating the wind power random variables for each time period based on the wind power output prediction values ​​and the wind power output actual values, and calculating the photovoltaic random variables for each time period based on the photovoltaic output prediction values ​​and the photovoltaic output actual values.

[0123] In the embodiment of the present application, the time period represents the scheduling time period, and the specific division of the time period can be set according to actual needs, for example, every hour can be set as a time period, every 15 minutes can be set as a time period, etc. The specific setting of the historical range can be set according to actual needs, for example, the historical range can be set to a historical year, and the hourly scale data in a year is 8760 time periods, and so on.

[0124] Exemplarily, for any time period, the wind power random variable of the time period refers to the difference between the actual wind power output of the time period and the predicted wind power output of the time period; the photovoltaic random variable of the time period refers to the difference between the actual photovoltaic output of the time period and the predicted photovoltaic output of the time period.

[0125] Construct a wind power random variable representing the wind power output forecast error and a photovoltaic random variable representing the photovoltaic output forecast error, which are expressed as follows:

[0126]

[0127] in, represents the wind power random variable, represents the photovoltaic random variable, Indicates the actual value of wind power output, represents the predicted value of wind power output, Indicates the actual value of photovoltaic output. Indicates the predicted value of photovoltaic output.

[0128] The wind power output forecast value, wind power output actual value, photovoltaic output forecast value and photovoltaic output actual value of each period in the historical data are collected, and the wind power random variable sample set and photovoltaic random variable sample set are calculated according to formula (1), which are expressed as follows:

[0129]

[0130] in, Indicates the time period number. represents the total number of time periods in the collected historical data. represents the sample set of wind power random variables, Indicates time period The wind power sample data pair, represents the sample set of photovoltaic random variables, Indicates time period The photovoltaic sample data pair.

[0131] Time Wind power sample data and time period Photovoltaic sample data for , which can be further expressed as:

[0132]

[0133] in, Indicates time period The wind power output forecast value, Indicates time period The predicted value of photovoltaic output, Indicates time period The wind power random variable, Indicates time period The meaning of other parameters can be referred to the explanations in the above related formulas.

[0134] In an optional implementation, the process of generating a scenario set according to the wind power random variable and the photovoltaic random variable may include the following steps A1 to A3:

[0135] Step A1, obtaining the probability distribution function of the wind power random variable and the probability distribution function of the photovoltaic random variable.

[0136] Exemplarily, the process of obtaining the probability distribution function of the wind power random variable may include the following steps A11 to A12:

[0137] Step A11, performing equidistant binning processing on the wind power random variable to obtain a wind power random variable data box.

[0138] Exemplarily, the process of performing equidistant binning processing on the wind power random variables to obtain wind power random variable data boxes may include: obtaining a wind power random variable sample set, the wind power random variable sample set including wind power sample data pairs for each time period, the wind power sample data pairs including wind power output prediction values ​​and wind power random variables; sorting the wind power random variable sample set in ascending order according to the wind power output prediction values, and then performing equidistant binning processing according to the wind power output prediction values ​​to obtain wind power random variable data boxes.

[0139] First, the wind power sample data pairs in the wind power random variable sample set are sorted in ascending order according to the wind power output prediction value. Then, according to the principle of equidistant binning, the value range of the variable wind power output prediction value is evenly divided into Each interval is regarded as a wind power random variable data box, and the wind power sample data pairs in the wind power random variable sample set are placed in the corresponding wind power random variable data box.

[0140] The wind power random variable data box can be expressed as follows:

[0141]

[0142] in, represents the wind power random variable data box number, represents the first Wind power random variable data boxes, Indicates The lower limit of the time period number corresponding to the wind power random variable data box, Indicates The upper limit of the time period number corresponding to the wind power random variable data box. The meaning of other parameters can refer to the explanation in the above related formulas.

[0143] In an optional implementation, in order to further improve the accuracy of the data, each wind power random variable data box may be cleaned to delete abnormal values.

[0144] Exemplarily, after the wind power random variables are subjected to equidistant binning processing to obtain a wind power random variable data box, it also includes: determining a target wind power random variable interval of the wind power random variable data box based on the mean value and standard deviation of the wind power random variables in the wind power random variable data box, and deleting wind power random variables in the wind power random variable data box that do not belong to the target wind power random variable interval.

[0145] For any wind power random variable data box, for example, Wind power random variable data box, calculate the The average value of the wind power random variable in the wind power random variable data box and standard deviation .according to (3 Sigma) criterion, can determine the The target wind power random variable interval of the wind power random variable data box is . If Wind power random variables in the wind power random variable data box , If it does not belong to, then the wind power random variable is considered As an outlier, delete the wind power random variable The corresponding wind power sample data pair , complete the Data cleaning in a wind power random variable data box.

[0146] Step A12: performing probability distribution function fitting on the wind power random variable data box using a normal distribution function or an empirical distribution function to obtain a probability distribution function of the wind power random variable data box.

[0147] Exemplarily, the process of fitting the probability distribution function of the wind power random variable data box using the normal distribution function or the empirical distribution function to obtain the probability distribution function of the wind power random variable data box may include: using the skewness and kurtosis test method to determine whether the wind power random variables in the wind power random variable data box obey the normal distribution; if they obey, fitting the probability distribution function of the wind power random variable data box using the normal distribution function to obtain the probability distribution function of the wind power random variable data box; if they do not obey, fitting the probability distribution function of the wind power random variable data box using the empirical distribution function to obtain the probability distribution function of the wind power random variable data box.

[0148] For any wind power random variable data box, check whether the wind power random variables in the wind power random variable data box satisfy the normal distribution. If so, use the normal distribution function to fit its probability distribution function; if not, use the empirical distribution function to describe its probability distribution function.

[0149] ①Assume that The wind power random variables in the wind power random variable data box satisfy the normal distribution. The average value of the wind power random variable in the wind power random variable data box , Standard Deviation ,variance . Then, The wind power random variables in the wind power random variable data box obey the expectation , the variance is The normal distribution of .

[0150] ②Use the skewness and kurtosis test method to The normality test of wind power random variables in the wind power random variable data box is performed.

[0151] First, calculate the The skewness coefficient and kurtosis coefficient of the wind power random variable in the wind power random variable data box are calculated as follows:

[0152]

[0153] in, Indicates The skewness coefficient of the wind power random variable in the wind power random variable data box, Indicates The kurtosis coefficient of the wind power random variable in the wind power random variable data box. The meaning of other parameters can refer to the explanation in the above related formulas.

[0154] Then, calculate the The Z score of the skewness of the wind power random variable in the wind power random variable data box, and the The Z score of the kurtosis of the wind power random variable in the wind power random variable data box is calculated as follows:

[0155]

[0156] in, Indicates The Z score of the skewness of the wind power random variables in the wind power random variable data box, Indicates The Z score of the kurtosis of the wind power random variables in the wind power random variable data box, Indicates The skewness standard error of the wind power random variable in the wind power random variable data box, Indicates The standard error of the kurtosis of the wind power random variable in the wind power random variable data box. The meaning of other parameters can refer to the explanation in the above related formula.

[0157] ③ In the confidence level parameter For the test level with the preset confidence level, if , Within the preset scoring threshold range, it can be considered that The wind power random variables in the wind power random variable data box meet the normality test and approximately obey the normal distribution. Its probability density function is expressed as The preset confidence level and the preset scoring threshold range can be set according to actual needs. For example, the preset confidence level can be set to 0.05, the preset scoring threshold range can be set to ±1.96, etc. This embodiment does not limit this.

[0158] The cumulative distribution function (also known as the probability distribution function) is expressed as follows:

[0159]

[0160] in, represents the wind power random variable Any possible value of Express satisfaction The meanings of other parameters can be found in the explanations of the above related formulas.

[0161] ④ If If the wind power random variables in the wind power random variable data box do not meet the normality test, the empirical distribution function is used to represent its distribution.

[0162] The cumulative distribution function (also known as the probability distribution function) is expressed as follows:

[0163]

[0164] in, is an integer between 0 and 1. If established, ,otherwise The meanings of other parameters can be found in the explanations in the above related formulas.

[0165] Exemplarily, the process of obtaining the probability distribution function of the photovoltaic random variable may include: performing equidistant binning processing on the photovoltaic random variable to obtain a photovoltaic random variable data box; performing probability distribution function fitting on the photovoltaic random variable data box using a normal distribution function or an empirical distribution function to obtain the probability distribution function of the photovoltaic random variable data box.

[0166] Exemplarily, the process of performing equidistant binning processing on the photovoltaic random variables to obtain photovoltaic random variable data boxes may include: obtaining a photovoltaic random variable sample set, the photovoltaic random variable sample set including photovoltaic sample data pairs for each time period, the photovoltaic sample data pairs including photovoltaic output prediction values ​​and photovoltaic random variables; after sorting the photovoltaic random variable sample set in ascending order according to the photovoltaic output prediction values, performing equidistant binning processing according to the photovoltaic output prediction values ​​to obtain photovoltaic random variable data boxes.

[0167] Exemplarily, the process of fitting the probability distribution function of the photovoltaic random variable data box using the normal distribution function or the empirical distribution function to obtain the probability distribution function of the photovoltaic random variable data box may include: using the skewness and kurtosis test method to determine whether the photovoltaic random variables in the photovoltaic random variable data box obey the normal distribution; if they obey, fitting the probability distribution function of the photovoltaic random variable data box using the normal distribution function to obtain the probability distribution function of the photovoltaic random variable data box; if they do not obey, fitting the probability distribution function of the photovoltaic random variable data box using the empirical distribution function to obtain the probability distribution function of the photovoltaic random variable data box.

[0168] Exemplarily, after the photovoltaic random variables are equally spaced into bins to obtain a photovoltaic random variable data box, it also includes: determining a target photovoltaic random variable interval of the photovoltaic random variable data box based on the mean and standard deviation of the photovoltaic random variables in the photovoltaic random variable data box, and deleting photovoltaic random variables in the photovoltaic random variable data box that do not belong to the target photovoltaic random variable interval.

[0169] For the specific process of obtaining the probability distribution function of the photovoltaic random variable, reference may be made to the above description of the specific process of obtaining the probability distribution function of the wind power random variable, which will not be discussed in detail in this embodiment.

[0170] Step A2: generating an initial wind power output prediction error scenario set based on the probability distribution function of the wind power random variable, and generating an initial photovoltaic output prediction error scenario set based on the probability distribution function of the photovoltaic random variable.

[0171] In the embodiment of the present application, a multivariate Gaussian distribution is constructed to generate Gaussian random numbers, and inverse transformation sampling is performed to obtain an initial wind power output prediction error scenario set and an initial photovoltaic output prediction error scenario set.

[0172] Exemplarily, generating an initial wind power output prediction error scenario set based on the probability distribution function of the wind power random variable, and generating an initial photovoltaic output prediction error scenario set based on the probability distribution function of the photovoltaic random variable can include: constructing a multivariate Gaussian distribution, and generating a Gaussian random number based on the multivariate Gaussian distribution; performing inverse transformation sampling based on the Gaussian random number and the probability distribution function of the wind power random variable to obtain an initial wind power output prediction error scenario set; performing inverse transformation sampling based on the Gaussian random number and the probability distribution function of the photovoltaic random variable to obtain an initial photovoltaic output prediction error scenario set.

[0173] Constructing a multivariate Gaussian distribution ,in, represents a multivariate random variable, represents the mean vector, represents the covariance matrix. The dimension of the multivariate Gaussian distribution is equal to the total number of time periods (i.e., scheduling periods), is a zero-mean vector. It is represented by an exponential covariance structure as follows:

[0174]

[0175] in, , represents the random variable number in the multivariate random variable, represents the correlation parameter, , is any random variable, Represents a random variable , The covariance coefficient between them. Among them, the correlation parameter The value can be set according to actual needs, such as setting the correlation parameter The value is 90, etc., and this embodiment does not impose any limitation on this.

[0176] Based on the multivariate Gaussian distribution, multiple groups of Gaussian random numbers can be generated in any applicable manner. For example, multiple groups of Gaussian random numbers can be generated based on the multivariate Gaussian distribution using the Monte Carlo method. The specific process of generating Gaussian random numbers based on the multivariate Gaussian distribution can be processed according to actual experience, and this embodiment will not be discussed in detail here.

[0177] Exemplarily, the process of performing inverse transformation sampling based on the Gaussian random numbers and the probability distribution function of the wind power random variables to obtain the initial wind power output prediction error scenario set may include: calculating the cumulative distribution function value of each group of Gaussian random numbers, substituting the cumulative distribution function value of each group of Gaussian random numbers into the probability distribution function of the wind power random variables to obtain the initial wind power output prediction error scenario set.

[0178] Exemplarily, the process of performing inverse transformation sampling based on the probability distribution function of the Gaussian random number and the photovoltaic random variable to obtain an initial photovoltaic output prediction error scenario set may include: calculating the cumulative distribution function value of each group of Gaussian random numbers, substituting the cumulative distribution function value of each group of Gaussian random numbers into the probability distribution function of the photovoltaic random variable to obtain an initial photovoltaic output prediction error scenario set.

[0179] Calculate the cumulative distribution function value of each group of Gaussian random numbers respectively ,in Represents the group number of Gaussian random numbers, Indicates Cumulative distribution function value of a group of Gaussian random numbers. The calculation process of the cumulative distribution function value of any group of Gaussian random numbers can be processed according to actual experience, and this embodiment will not be discussed in detail here.

[0180] For example, generate Set Gaussian random numbers and set the cumulative distribution function value Substitute them into the probability distribution function of wind power random variable and the probability distribution function of photovoltaic random variable respectively to satisfy The probability of , and obtain the initial wind power output prediction error scenario set , initial photovoltaic output prediction error scenario set ,in, For the The initial wind power output prediction error scenario set obtained by sampling a group of Gaussian random numbers, For the The initial photovoltaic output prediction error scenario set obtained by sampling a group of Gaussian random numbers. , The probability of occurrence is .

[0181] , It can be further expressed as:

[0182]

[0183] in, Indicates the time period number. Indicates the total number of time periods (i.e. the total number of scheduling time periods), Representation scene Next period The wind power output prediction error is Representation scene Next period The meaning of other parameters can refer to the explanations in the above related formulas.

[0184] Step A3: generating a wind power output scenario set based on the initial wind power output prediction error scenario set, and generating a photovoltaic output scenario set based on the initial photovoltaic output prediction error scenario set.

[0185] The above initial wind power output prediction error scenario set and initial photovoltaic output prediction error scenario set are the initial scenario sets. The synchronous back-substitution elimination method is used to reduce the scenarios, and then a summation transformation is performed to obtain the final wind power output scenario set and photovoltaic output scenario set.

[0186] Exemplarily, the process of generating a wind power output scenario set based on the initial wind power output prediction error scenario set may include: performing scenario reduction on the initial wind power output prediction error scenario set to obtain a reduced wind power output prediction error scenario set; performing a summation transformation based on the reduced wind power output prediction error scenario set to obtain a wind power output scenario set.

[0187] Exemplarily, the initial wind power output prediction error scenario set is subjected to scenario reduction to obtain a reduced wind power output prediction error scenario set, including: repeatedly executing the following process until the number of scenarios reaches a preset number to obtain a reduced wind power output prediction error scenario set: calculating the probability distance between any two scenarios in the initial wind power output prediction error scenario set, deleting one of the two scenarios with the smallest probability distance, and adjusting the occurrence probability of the other scenario of the two scenarios with the smallest probability distance to the sum of the occurrence probabilities of the two scenarios with the smallest probability distance.

[0188] Exemplarily, a summation transformation is performed based on the post-reduction wind power output prediction error scenario set to obtain a wind power output scenario set, including: based on the wind power output prediction value, calculating the wind power generation capacity under the scenarios in the post-reduction wind power output prediction error scenario set to obtain the wind power output scenario set.

[0189] Exemplarily, the process of generating a photovoltaic output scenario set based on the initial photovoltaic output prediction error scenario set may include: performing scenario reduction on the initial photovoltaic output prediction error scenario set to obtain a reduced photovoltaic output prediction error scenario set; and performing a summation transformation based on the reduced photovoltaic output prediction error scenario set to obtain a photovoltaic output scenario set.

[0190] Exemplarily, the initial photovoltaic output prediction error scenario set is subjected to scenario reduction to obtain a reduced photovoltaic output prediction error scenario set, including: repeatedly executing the following process until the number of scenes reaches a preset number to obtain a reduced photovoltaic output prediction error scenario set: calculating the probability distance between any two scenes in the initial photovoltaic output prediction error scenario set, deleting one of the two scenes with the smallest probability distance, and adjusting the occurrence probability of the other scene of the two scenes with the smallest probability distance to the sum of the occurrence probabilities of the two scenes with the smallest probability distance.

[0191] Exemplarily, a summation transformation is performed based on the photovoltaic output prediction error scenario set after reduction to obtain the photovoltaic output scenario set, including: based on the photovoltaic output prediction value, calculating the photovoltaic power generation capacity under the scenarios in the photovoltaic output prediction error scenario set after reduction to obtain the photovoltaic output scenario set.

[0192] 1) Based on the initial wind power output prediction error scenario set , calculate any two scenes , The probability distance between them is expressed as follows:

[0193]

[0194] in, For the scene With scene The probability distance between Representation scene The probability of occurrence, Representation scene The probability of occurrence, Representation scene Next period The wind power output prediction error is Representation scene Next period The wind power output prediction error is 0.0000. The meanings of other parameters can be referred to the explanations in the above related formulas. Among them, the probability of occurrence of each scenario can be calculated based on actual experience. For example, the initial probability of occurrence of each scenario can be , and updated during the scene reduction process.

[0195] 2) Select the two scenes with the smallest probability distance, which are expressed as scenes , Scene . Delete scenarios from the initial wind power output forecast error scenario set , and make the scene The probability of occurrence , and perform probability merging.

[0196] 3) Determine whether the current number of scenes has reached the preset number If not, return to step 1); if it is reached, then the wind power output prediction error scenario set after reduction is obtained .

[0197] Based on the initial photovoltaic output prediction error scenario set Repeat the above steps 1) to 3) to obtain the scenario set of photovoltaic output prediction error after reduction .

[0198] Based on the wind power output prediction value and photovoltaic output prediction value, the final wind power output scenario set is obtained. , Photovoltaic output scenario set , which is expressed as follows:

[0199]

[0200] in, Representation scene The wind power generation capacity vector under Representation scene The photovoltaic power generation capacity vector under Representation scene Next period of wind power generation capacity, Representation scene Next period The photovoltaic power generation capacity, Indicates time period The wind power output forecast value (i.e. wind power generation capacity forecast value), Indicates time period The photovoltaic output forecast value (that is, the photovoltaic power generation capacity forecast value) of the PV system is shown in the figure. The meanings of other parameters can be found in the explanations in the above related formulas.

[0201] Step 102, constructing a wind power plant and a photovoltaic power plant operation model, wherein the wind power plant and the photovoltaic power plant operation model include: a first constraint condition of the wind power plant and the photovoltaic power plant under the scenario set.

[0202] In the embodiments of the present application, wind power and photovoltaic operation constraints in different scenarios are analyzed, and wind power and photovoltaic power station operation models are constructed.

[0203] Exemplarily, the first constraint condition includes but is not limited to at least one of the following: an output upper and lower limit constraint condition, and a utilization rate constraint condition.

[0204] The output upper and lower limit constraints can be expressed as follows:

[0205]

[0206] in, Representation scene Next period The planned wind power output is Representation scene Next period The meaning of other parameters can be referred to the explanations in the above related formulas.

[0207] The utilization constraint can be expressed as follows:

[0208]

[0209] in, is the lower limit of the utilization rate of new energy consumption. The meanings of other parameters can be referred to the explanations in the above related formulas.

[0210] Step 103, constructing a hybrid pumped storage power station operation model, wherein the hybrid pumped storage power station operation model includes: a second constraint condition of the hybrid pumped storage power station under the scenario set.

[0211] Hybrid pumped storage power station is based on conventional cascade hydropower station, by adding reversible units in the power plant of the upper reservoir, and has the dual functions of pumped storage and water diversion power generation. The water intake of the reversible unit is generally located in the backwater flooding area of ​​the lower reservoir.

[0212] Figure 2 A schematic diagram of a hybrid pumped-storage power station topology structure according to an embodiment of the present application.

[0213] exist Figure 2 In the structure shown, during the operation of the hybrid pumped storage power station, when the system load is at a peak period or there is a gap in the power supply, the upper reservoir draws water for power generation, and the water is discharged from the upper reservoir to the lower reservoir; when the system load is at a low period or when new energy is generated, the reversible unit is turned on, and the water is pumped from the lower reservoir to the upper reservoir using electricity, realizing the conversion of surplus electricity into gravitational potential energy. The lower reservoir adjusts its own output according to system demand to achieve flexible peak regulation.

[0214] Since hybrid pumped-storage power stations frequently participate in system regulation, the discharge flow of the reservoir and the downstream water level fluctuate greatly, affecting the comprehensive water demand of downstream river navigation, ecology, etc. Therefore, the operation model of hybrid pumped-storage power stations is constructed by comprehensively considering the constraints such as water level, flow, output, water balance, and comprehensive water use faced by hybrid pumped-storage power stations during operation.

[0215] Exemplarily, the second constraint includes at least one of the following: water balance constraint, flow constraint, reservoir capacity constraint, output constraint, power conversion relationship constraint, head constraint, characteristic curve constraint, and comprehensive water use constraint; the comprehensive water use constraint includes at least one of the following: ecological flow constraint and shipping constraint.

[0216] The water balance constraint can be expressed as follows:

[0217]

[0218] in, Indicates that the upper reservoir is in the scene Next period The storage capacity, Indicates that the lower reservoir is in the scene Next period The storage capacity, Indicates that the upper reservoir is in the scene Next period The storage capacity, Indicates that the lower reservoir is in the scene Next period The storage capacity, Indicates that the upper reservoir is in the scene Next period The inbound flow, Indicates that the upper reservoir is in the scene Next period Outbound flow, Indicates that the upper reservoir is in the scene Next period The pumping flow rate, Indicates that the lower reservoir is in the scene Next period The inbound flow, Indicates that the lower reservoir is in the scene Next period Outbound flow, Indicates the step length of the scheduling period. The meanings of other parameters can be found in the explanations in the above related formulas.

[0219] The flow constraint can be expressed as follows:

[0220]

[0221] in, For the upper reservoir in the scene Time The power generation flow, For the upper reservoir in the scene Time The abandoned water flow rate, For the next reservoir in the scene Time The interval flow, For the next reservoir in the scene Time The power generation flow, For the next reservoir in the scene Time The abandoned water flow rate, For the upper reservoir during the period The upper limit of power generation flow, For the upper reservoir during the period The lower limit of power generation flow, For the lower reservoir during the period The upper limit of power generation flow, For the lower reservoir during the period The meaning of other parameters can be referred to the explanation in the above related formulas.

[0222] The storage capacity constraint can be expressed as follows:

[0223]

[0224] in, is the lower limit of the upper reservoir capacity, is the upper storage capacity of the upper reservoir, is the lower limit of the storage capacity of the lower reservoir, is the upper limit of the storage capacity of the lower reservoir. The meanings of other parameters can be referred to the explanations in the above related formulas.

[0225] The output constraint can be expressed as follows:

[0226]

[0227] in, For the upper reservoir in the scene Time The power generation capacity, For the upper reservoir in the scene Time The pumping power, For the next reservoir in the scene Time The power generation capacity, is the lower limit of the power generation capacity of the upper reservoir, is the upper limit of the power generation capacity of the upper reservoir, is the lower limit of the pumping power of the upper reservoir, is the upper pumping power limit of the upper reservoir, is the lower limit of the power generation capacity of the lower reservoir, It is the upper limit of the power generation capacity of the lower reservoir.

[0228] The constraints of power conversion relationship can be expressed as follows:

[0229]

[0230] in, For the upper reservoir in the scene Time The power generation head, For the upper reservoir in the scene Time The pumping head For the next reservoir in the scene Time The power generation head, is the power generation function of the upper reservoir, is the power generation function of the lower reservoir, is the pumping power conversion function of the upper reservoir. The meanings of other parameters can be referred to the explanations in the above related formulas.

[0231] The head constraint can be expressed as follows:

[0232]

[0233] in, For the upper reservoir in the scene Time The water level on the dam, For the next reservoir in the scene Time The water level on the dam, For the next reservoir in the scene Time The tailwater level, is the power generation head loss of the upper reservoir, is the pumping head loss of the upper reservoir, is the power generation head loss of the lower reservoir. The meanings of other parameters can be referred to the explanations in the above related formulas.

[0234] The characteristic curve constraints can be expressed as follows:

[0235]

[0236] in, is the upper reservoir water level-storage capacity function relationship, is the relationship between the water level and storage capacity of the lower reservoir, is the functional relationship between the tailwater level of the lower reservoir and the power generation flow. The meanings of other parameters can be referred to the explanations in the above related formulas.

[0237] Comprehensive water use constraints:

[0238] The uneven discharge caused by the frequent participation of hybrid pumped storage power stations in grid regulation will affect the comprehensive water demand for downstream shipping, ecology, etc. Therefore, in order to reduce the impact on the downstream, the following comprehensive water use constraints need to be met:

[0239] 1) Ecological flow constraints

[0240] In order to meet the downstream ecological water demand, the reservoir discharge flow must be controlled within a reasonable range. The ecological flow constraint can be expressed as follows:

[0241]

[0242] in, For the reservoir period The meaning of other parameters can be referred to the explanations in the above related formulas.

[0243] 2) Shipping constraints

[0244] In order to meet the needs of river navigation, the reservoir discharge and downstream water level fluctuation must be controlled within a reasonable range. The navigation constraints can be expressed as follows:

[0245]

[0246] in, To meet the navigation requirements of the lower reservoir during the period The lower limit of the discharge flow rate, To meet the navigation requirements of the lower reservoir during the period The upper limit of the discharge flow rate is The upper limit of the downstream water level fluctuation to meet the navigation requirements. The meanings of other parameters can be referred to the explanations in the above related formulas.

[0247] Step 104, construct a wind-solar hybrid storage system scheduling model, the wind-solar hybrid storage system scheduling model includes: the objective function of the wind-solar hybrid storage system, the third constraint condition of the wind-solar hybrid storage system under the scenario set, the wind power and photovoltaic power station operation models, and the hybrid pumped storage power station operation model.

[0248] In the embodiment of the present application, the peak-shaving target and the new energy consumption target are taken into account, and the system constraints, wind power, photovoltaic power station operation constraints, hybrid pumped-storage power station operation constraints, etc. are comprehensively considered to construct a multi-objective stochastic optimization wind-solar hybrid storage system scheduling model, and mixed integer linear programming is used to solve it to obtain the optimal scheduling operation strategy.

[0249] Exemplarily, the objective function includes but is not limited to at least one of the following: a peak load regulation objective function and a new energy consumption objective function.

[0250] Taking the minimum expected value of the peak-to-valley difference of the system residual load under different scenarios as the goal, the peak load regulation objective function can be expressed as follows:

[0251]

[0252] in, represents the peak load regulation objective function, For the period The system load, For the scene Time The system residual load, Representation scene The probability of occurrence of each scenario can be obtained after the scenario reduction is completed. The meaning of other parameters can refer to the explanation in the above related formulas.

[0253] Taking the maximum expected value of new energy consumption in different scenarios as the goal, the new energy consumption objective function can be expressed as follows:

[0254]

[0255] in, Represents the objective function of new energy consumption. The meanings of other parameters can be found in the explanations of the above related formulas.

[0256] Exemplarily, the third constraint condition may include but is not limited to a system operation constraint condition.

[0257] The wind-solar hybrid storage system needs to meet the interconnection line section constraints during operation. The system operation constraints can be expressed as follows:

[0258]

[0259] in, is the lower limit of the transmission power of the tie line, are the upper limits of the transmission power of the tie line respectively. The meanings of other parameters can be referred to the explanations in the above related formulas.

[0260] The wind power and photovoltaic power station operation models included in the wind-solar hybrid storage system scheduling model can be the first constraint conditions of the wind power and photovoltaic power stations under the scenario set. The hybrid pumped storage power station operation model included in the wind-solar hybrid storage system scheduling model can be the second constraint condition of the hybrid pumped storage power station under the scenario set.

[0261] Step 105, solving the wind-solar-hybrid-storage system scheduling model to obtain the optimal scheduling operation strategy for the wind power, photovoltaic power station and the hybrid pumped-storage power station.

[0262] Exemplarily, the objective function is at least two objective functions; the process of solving the wind-solar-hybrid-storage system scheduling model to obtain the optimal scheduling and operation strategy of the wind power, photovoltaic power station and the hybrid pumped-storage power station may include: converting the at least two objective functions into a single objective function, converting the nonlinear constraint in the third constraint into a linear constraint, and obtaining the converted wind-solar-hybrid-storage system scheduling model; obtaining the set basic data, and using the set optimization solver to solve the converted wind-solar-hybrid-storage system scheduling model based on the basic data to obtain the optimal scheduling and operation strategy of the wind power, photovoltaic power station and the hybrid pumped-storage power station.

[0263] Exemplarily, the at least two objective functions include a peak shaving objective function and a new energy consumption objective function; converting the at least two objective functions into a single objective function includes: based on preset auxiliary variables, converting the peak shaving objective function into a peak shaving objective function in minimum form; calculating a first product of the peak shaving objective function in minimum form and the weight of the peak shaving objective function, and a second product of the new energy consumption objective function and the weight of the new energy consumption objective function, and determining the difference between the first product and the second product as a single objective function.

[0264] Exemplarily, converting the nonlinear constraint in the third constraint into a linear constraint includes: dividing the value interval of the variable in the nonlinear constraint into multiple sub-intervals; determining the variable conditions and linear function relationships satisfied by the sub-intervals; and converting the nonlinear constraint into a linear constraint based on the variable conditions and linear function relationships satisfied by the sub-intervals.

[0265] The wind-solar-hybrid-storage system scheduling model (specifically, the wind-solar-hybrid-storage system short-term scheduling model) is a multi-objective nonlinear optimization model. The weighting method can be used to transform the multi-objective optimization into a single-objective optimization, and the piecewise linearization technology can be used to linearize the two-dimensional and three-dimensional nonlinear function relationships in the model to obtain the transformed wind-solar-hybrid-storage system scheduling model, which is also a single-objective mixed integer linear programming model.

[0266] (1) Converting multiple targets into a single target

[0267] Peak shaving objective function A function in the form of maximum and minimum (min-max) can be converted into a minimum form by introducing auxiliary variables.

[0268] Auxiliary variables , It is expressed as follows:

[0269]

[0270] Among them, for the auxiliary variables , The specific numerical form of can be set according to actual needs, and this embodiment does not limit this. The meanings of other parameters can refer to the descriptions in the above related formulas.

[0271] Accordingly, the peak load regulation objective function in formula (24) is can be converted into the following form:

[0272]

[0273] The meaning of each parameter can be found in the explanations in the above related formulas.

[0274] Using the weight method, given the peak load objective function Weight coefficient and new energy consumption objective function The weight coefficient of , then the single objective function can be expressed as:

[0275]

[0276] in, is the peak load objective function The weight coefficient of is the objective function of new energy consumption The weight coefficient of is the final single objective function, which is a minimum linear form.

[0277] (2) Three-dimensional nonlinear constrained linearization

[0278] In formula (19), , , They are all three-dimensional nonlinear constraints, which are converted into linear constraints by using piecewise linearization technology and introducing integer variables. The details are as follows:

[0279] 1) For nonlinear constraints , the variable The value interval of is divided into segment B, then The value range of can be expressed as , where , Respectively The left and right endpoints of an interval.

[0280] therefore, Satisfy the following formula:

[0281]

[0282] in, It is a 0-1 integer variable. The specific value of can be set according to actual needs, and this embodiment does not limit this. The meanings of other parameters can refer to the descriptions in the above related formulas.

[0283] 2) Each In the sub-interval, Satisfies the following linear function relationship:

[0284]

[0285] in, is a linear function. The meanings of other parameters can be found in the explanations in the above related formulas.

[0286] 3) Constraints The linearized form of is as follows:

[0287]

[0288] The meaning of each parameter can be found in the explanations in the above related formulas.

[0289] For nonlinear constraints and , and the above The processing process is basically the same. For details, please refer to the above instructions to complete the and The linearization processing is not discussed in detail in this embodiment.

[0290] (3) Two-dimensional nonlinear constrained linearization

[0291] In formula (21) , , They are all two-dimensional nonlinear constraints, and their linearization methods are as follows:

[0292] 1) For nonlinear constraints , the variable The value interval of is divided into segment A, then The value range of can be expressed as , where , Respectively The left and right endpoints of an interval.

[0293] therefore, Satisfy the following formula:

[0294]

[0295] in, It is a 0-1 integer variable. The specific value of can be set according to actual needs, and this embodiment does not limit this. The meanings of other parameters can refer to the descriptions in the above related formulas.

[0296] 2) Each In the sub-interval, Satisfies the following linear function relationship:

[0297]

[0298] in, is a linear function. The meanings of other parameters can be found in the explanations in the above related formulas.

[0299] 3) Constraints The linearized form of is as follows:

[0300]

[0301] in, is the upper limit of the water level above the dam of the upper reservoir. The meanings of other parameters can be referred to the explanations in the above related formulas.

[0302] For nonlinear constraints and , and the above The processing process is basically the same. For details, please refer to the above instructions to complete the and The linearization processing is not discussed in detail in this embodiment.

[0303] After the above processing, the converted wind-solar hybrid storage system scheduling model is a single-objective mixed integer linear programming model. In the embodiment of the present application, the programming language (JAVA / Python) can be used for modeling. By setting the basic data, the basic data includes the initial operation data of the wind-solar hybrid storage system (wind power, photovoltaic power station and hybrid pumped storage power station). These initial operation data may include the operation data involved in the above constraints and objective functions, and calling the optimization solver can realize the automatic and efficient solution of the converted wind-solar hybrid storage system scheduling model (MLP (Mixed Integer Linear Programming, mixed integer linear programming) model), thereby obtaining the optimized operation process of wind power, photovoltaic power station and hybrid pumped storage power station under different scenarios.

[0304] Among them, the optimization solver can select any applicable solver, such as CPLEX (CPLEX is a high-performance mathematical programming optimizer used to solve linear programming, mixed integer programming, and quadratic programming problems), Gurobi (Gurobi is a commercial optimization solver used to solve a variety of mathematical problems such as linear programming, mixed integer programming, quadratic programming, and nonlinear programming. It is well-known for its efficient solution performance, rich functions, and flexible interfaces, and supports multiple programming languages ​​and platforms) and other mathematical optimization solvers, which are not limited in this embodiment. For the specific process of solving using the optimization solver, those skilled in the art can handle it based on actual experience, and this embodiment will not be discussed in detail here.

[0305] In the embodiment of the present application, the randomness of wind power and photovoltaic output and the operating characteristics of the hybrid pumped storage power station are comprehensively considered, and a multi-objective random scheduling model of the wind-solar hybrid storage system for peak load regulation and new energy consumption is established to optimize the complementary operation process of wind-solar and hybrid storage. The beneficial effects of the embodiment of the present application are summarized as follows:

[0306] 1) A method for generating and reducing wind power and photovoltaic output scenarios, including coupled data binning technology, empirical distribution function, multivariate Gaussian distribution, inverse transform sampling, and synchronous back-substitution elimination method, is proposed. The resulting scenario set can accurately characterize the randomness and volatility of wind power and photovoltaic output, and can be used as data input for random scheduling models to improve the reliability of power system scheduling and operation.

[0307] 2) Taking into account the constraints faced by the hybrid pumped-storage power station during operation, such as water level, flow, output, water balance, and comprehensive water use, an operation model of the hybrid pumped-storage power station was constructed, which can accurately model the operation process of the hybrid pumped-storage power station and ensure the navigation safety and ecological safety of the downstream river.

[0308] 3) Taking into account the peak-shaving targets and the new energy consumption targets, a multi-objective stochastic optimization scheduling model of the wind-solar hybrid storage system is constructed, and the weight method and piecewise linearization technology are used to transform the original model into a single-objective mixed integer linear programming model for solution. The optimized operation process of wind power, photovoltaic and hybrid pumped-storage power stations is obtained, which helps to give full play to the flexible adjustment capabilities of the hybrid storage power station and support the peak-shaving of the power grid and the grid-connected consumption of new energy.

[0309] Reference Figure 3 , shows a structural block diagram of a wind-solar hybrid storage system scheduling device according to an embodiment of the present application.

[0310] like Figure 3 As shown, the wind-solar hybrid storage system dispatching device may include the following modules:

[0311] A generating module 301 is used to obtain a wind power random variable representing a wind power output prediction error and a photovoltaic random variable representing a photovoltaic output prediction error, and generate a scenario set according to the wind power random variable and the photovoltaic random variable, wherein the scenario set includes a wind power output scenario set and a photovoltaic output scenario set;

[0312] The first construction module 302 is used to construct a wind power plant and a photovoltaic power plant operation model, wherein the wind power plant and the photovoltaic power plant operation model include: a first constraint condition of the wind power plant and the photovoltaic power plant under the scenario set;

[0313] The second construction module 303 is used to construct a hybrid pumped storage power station operation model, wherein the hybrid pumped storage power station operation model includes: a second constraint condition of the hybrid pumped storage power station under the scenario set;

[0314] The third construction module 304 is used to construct a wind-solar hybrid storage system scheduling model, wherein the wind-solar hybrid storage system scheduling model includes: an objective function of the wind-solar hybrid storage system, a third constraint condition of the wind-solar hybrid storage system under the scenario set, the wind power and photovoltaic power station operation models, and the hybrid pumped storage power station operation model;

[0315] The solution module 305 is used to solve the wind-solar hybrid storage system scheduling model to obtain the optimal scheduling operation strategy of the wind power, photovoltaic power station and the hybrid pumped storage power station.

[0316] Optionally, the generating module 301 includes:

[0317] The first acquisition submodule is used to collect the wind power output prediction value, wind power output actual value, photovoltaic output prediction value and photovoltaic output actual value of each historical time period; based on the wind power output prediction value and the wind power output actual value, the wind power random variables of each time period are calculated; based on the photovoltaic output prediction value and the photovoltaic output actual value, the photovoltaic random variables of each time period are calculated.

[0318] Optionally, the generating module 301 includes:

[0319] A second acquisition submodule is used to acquire the probability distribution function of the wind power random variable and the probability distribution function of the photovoltaic random variable;

[0320] A first generating submodule is used to generate an initial wind power output prediction error scenario set based on the probability distribution function of the wind power random variable, and to generate an initial photovoltaic output prediction error scenario set based on the probability distribution function of the photovoltaic random variable;

[0321] The second generation submodule is used to generate a wind power output scenario set based on the initial wind power output prediction error scenario set, and to generate a photovoltaic output scenario set based on the initial photovoltaic output prediction error scenario set.

[0322] Optionally, the second acquisition submodule includes:

[0323] A binning unit, used for performing equidistant binning processing on the wind power random variable to obtain a wind power random variable data bin;

[0324] The fitting unit is used to perform probability distribution function fitting on the wind power random variable data box using a normal distribution function or an empirical distribution function to obtain the probability distribution function of the wind power random variable data box.

[0325] Optionally, the boxing unit includes:

[0326] A sample acquisition subunit, used to acquire a wind power random variable sample set, wherein the wind power random variable sample set includes a pair of wind power sample data in each time period, wherein the pair of wind power sample data includes a wind power output prediction value and a wind power random variable;

[0327] The equidistant binning unit is used to sort the wind power random variable sample set in ascending order according to the wind power output prediction value, and then perform equidistant binning according to the wind power output prediction value to obtain the wind power random variable data box.

[0328] Optionally, the fitting unit includes:

[0329] A judgment subunit, used to judge whether the wind power random variables in the wind power random variable data box obey the normal distribution by using the skewness and kurtosis test method;

[0330] A first fitting subunit is used for, when complying with , fitting the probability distribution function of the wind power random variable data box using a normal distribution function to obtain the probability distribution function of the wind power random variable data box;

[0331] The second fitting subunit is used for fitting the probability distribution function of the wind power random variable data box by using the empirical distribution function when the wind power random variable data box does not comply with the requirements, so as to obtain the probability distribution function of the wind power random variable data box.

[0332] Optionally, the second acquisition submodule also includes: a cleaning unit, used to determine the target wind power random variable interval of the wind power random variable data box based on the mean value and standard deviation of the wind power random variables in the wind power random variable data box, and delete the wind power random variables in the wind power random variable data box that do not belong to the target wind power random variable interval.

[0333] Optionally, the first generating submodule includes:

[0334] A random number generation unit, used for constructing a multivariate Gaussian distribution and generating a Gaussian random number based on the multivariate Gaussian distribution;

[0335] A first sampling unit is used to perform inverse transformation sampling based on the Gaussian random number and the probability distribution function of the wind power random variable to obtain an initial wind power output prediction error scenario set;

[0336] The second sampling unit is used to perform inverse transformation sampling based on the Gaussian random number and the probability distribution function of the photovoltaic random variable to obtain an initial photovoltaic output prediction error scenario set.

[0337] Optionally, the Gaussian random number is a plurality of groups of Gaussian random numbers; and the first sampling unit includes:

[0338] A function calculation subunit, used for calculating the cumulative distribution function value of each group of Gaussian random numbers;

[0339] The scenario acquisition subunit is used to substitute the cumulative distribution function value of each group of Gaussian random numbers into the probability distribution function of the wind power random variable to obtain an initial wind power output prediction error scenario set.

[0340] Optionally, the second generating submodule includes:

[0341] A reduction unit, configured to perform scenario reduction on the initial wind power output prediction error scenario set to obtain a reduced wind power output prediction error scenario set;

[0342] The transformation unit is used to perform a summation transformation based on the post-reduction wind power output prediction error scenario set to obtain a wind power output scenario set.

[0343] Optionally, the reduction unit is specifically used to repeatedly execute the following process until the number of scenarios reaches a preset number to obtain a set of wind power output prediction error scenarios after reduction: calculate the probability distance between any two scenarios in the initial wind power output prediction error scenario set, delete one of the two scenarios with the smallest probability distance, and adjust the occurrence probability of the other scenario of the two wind scenarios with the smallest probability distance to the sum of the occurrence probabilities of the two scenarios with the smallest probability distance.

[0344] Optionally, the conversion unit is specifically used to calculate the wind power generation capacity under the scenarios in the post-reduction wind power output prediction error scenario set based on the wind power output prediction value, and obtain the wind power output scenario set.

[0345] Optionally, the first constraint condition includes at least one of the following: an output upper and lower limit constraint condition, and a utilization rate constraint condition.

[0346] Optionally, the second constraint includes at least one of the following: water balance constraint, flow constraint, reservoir capacity constraint, output constraint, power conversion relationship constraint, head constraint, characteristic curve constraint, and comprehensive water use constraint; the comprehensive water use constraint includes at least one of the following: ecological flow constraint and shipping constraint.

[0347] Optionally, the objective function includes at least one of the following: a peak load regulation objective function and a new energy consumption objective function.

[0348] Optionally, the third constraint condition includes a system operation constraint condition.

[0349] Optionally, the objective function is at least two objective functions; the solution module 305 includes:

[0350] A model conversion unit, used to convert the at least two objective functions into a single objective function, convert the nonlinear constraint condition in the third constraint condition into a linear constraint condition, and obtain a converted wind-solar hybrid storage system scheduling model;

[0351] The model solving unit is used to obtain the set basic data, and use the set optimization solver to solve the converted wind-solar hybrid storage system scheduling model based on the basic data to obtain the optimal scheduling operation strategy of the wind power, photovoltaic power station and the hybrid pumped storage power station.

[0352] Optionally, the at least two objective functions include a peak-shaving objective function and a new energy consumption objective function; the model conversion unit includes: a function conversion subunit, used to convert the peak-shaving objective function into a minimum form of a peak-shaving objective function based on preset auxiliary variables; calculate the first product of the peak-shaving objective function in the minimum form and the weight of the peak-shaving objective function, and the second product of the new energy consumption objective function and the weight of the new energy consumption objective function, and determine the difference between the first product and the second product as a single objective function.

[0353] Optionally, the model conversion unit includes: a condition conversion subunit, used to divide the value interval of the variable in the nonlinear constraint condition into multiple sub-intervals; determine the variable conditions and linear function relationships satisfied by the sub-intervals; and convert the nonlinear constraint condition into a linear constraint condition based on the variable conditions and linear function relationships satisfied by the sub-intervals.

[0354] In the embodiment of the present application, the randomness of the output of wind power and photovoltaic power stations and the operating characteristics of the hybrid pumped-storage power station are comprehensively considered, and a wind-solar hybrid storage system scheduling model is established. By solving the wind-solar hybrid storage system scheduling model, the optimal scheduling and operation strategies of wind power, photovoltaic power stations and hybrid pumped-storage power stations can be obtained, thereby optimizing the short-term complementary operation process of wind power, photovoltaic power stations and hybrid pumped-storage power stations, reasonably scheduling the wind-solar hybrid storage system, and improving the economy and safety of the operation of the wind-solar hybrid storage system.

[0355] As for the device embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0356] In an embodiment of the present application, an electronic device is also provided. The electronic device may include a processor and a computer-readable storage medium, wherein a computer program is stored on the computer-readable storage medium; when the computer program is executed by the processor, the processor executes the wind-solar hybrid storage system scheduling method of any of the above embodiments.

[0357] Reference Figure 4 , shows a structural block diagram of an electronic device according to an embodiment of the present application. Figure 4 As shown, the electronic device 40 includes a processor 401 and a computer-readable storage medium 402 , on which a computer program 4021 is stored.

[0358] The processor 401 is used to execute the computer program 4021 stored on the computer-readable storage medium 402. When the processor 401 executes the computer program 4021, it implements the wind-solar hybrid storage system scheduling method of any of the above-mentioned embodiments and can achieve the same technical effect. To avoid repetition, it will not be repeated here.

[0359] The processor 401 mentioned above may include but is not limited to: a central processing unit (CPU), a network processor (NP), a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc.

[0360] The computer-readable storage medium 402 mentioned above may include, but is not limited to, read-only memory (ROM), random access memory (RAM), compact disc read-only memory (CD-ROM), electronic erasable programmable read-only memory (EEPROM), hard disk, floppy disk, flash memory, and the like.

[0361] In an embodiment of the present application, a computer-readable storage medium is further provided, on which a computer program is stored. The computer program can be executed by a processor of an electronic device. When the computer program is executed by the processor, the processor executes the wind-solar hybrid storage system scheduling method described in any of the above embodiments.

[0362] Reference Figure 5 , shows a block diagram of a computer-readable storage medium according to an embodiment of the present application. Figure 5 As shown, a computer program 501 is stored on a computer-readable storage medium 50. When the computer program 501 is executed by a processor, the processor executes the wind-solar hybrid storage system scheduling method described in any of the above embodiments, and can achieve the same technical effect. To avoid repetition, it will not be repeated here.

[0363] The various embodiments in this specification are interrelated, and each embodiment is described in a progressive manner. Each embodiment focuses on the differences from other embodiments, and the same or similar parts between the various embodiments can be referenced to each other.

[0364] It should be noted that all actions of acquiring signals, information or data in this application are carried out in compliance with the relevant data protection laws and policies of the country where they are located and with the authorization given by the owner of the corresponding device.

[0365] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0366] The various component embodiments of the present application may be implemented in hardware, or in software modules running on one or more processors, or in a combination thereof. It should be understood by those skilled in the art that a microprocessor or a digital signal processor (DSP) may be used in practice to implement some or all functions of some or all components of the computing processing device according to the embodiment of the present application. The present application may also be implemented as a device or apparatus program (e.g., a computer program and a computer program product) for executing part or all of the methods described herein. Such a program implementing the present application may be stored on a computer-readable medium, or may be in the form of one or more signals. Such a signal may be downloaded from an Internet website, or provided on a carrier signal, or provided in any other form.

[0367] The term "one embodiment", "embodiment" or "one or more embodiments" herein means that a particular feature, structure or characteristic described in conjunction with the embodiment is included in at least one embodiment of the present application. In addition, please note that the examples of the term "in one embodiment" here do not necessarily all refer to the same embodiment.

[0368] In the description provided herein, a large number of specific details are described. However, it is understood that the embodiments of the present application can be practiced without these specific details. In some instances, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this description.

[0369] In the claims, any reference signs placed between brackets shall not be construed as limiting the claims. The word "comprising" does not exclude the presence of elements or steps not listed in the claims. The word "a" or "an" preceding an element does not exclude the presence of a plurality of such elements. The present application may be implemented by means of hardware comprising several different elements and by means of a suitably programmed computer. In a unit claim enumerating several means, several of these means may be embodied by the same item of hardware. The use of the words first, second, and third etc. does not indicate any order. These words may be interpreted as names.

[0370] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A method for dispatching a wind-solar hybrid storage system, characterized in that: The method comprises: Acquire a wind power random variable representing a wind power output prediction error and a photovoltaic random variable representing a photovoltaic output prediction error, and generate a scenario set according to the wind power random variable and the photovoltaic random variable, wherein the scenario set includes a wind power output scenario set and a photovoltaic output scenario set; Constructing a wind power plant and a photovoltaic power plant operation model, wherein the wind power plant and the photovoltaic power plant operation model include: a first constraint condition of the wind power plant and the photovoltaic power plant under the scenario set; Constructing a hybrid pumped storage power station operation model, the hybrid pumped storage power station operation model comprising: a second constraint condition of the hybrid pumped storage power station under the scenario set; Constructing a wind-solar hybrid storage system scheduling model, the wind-solar hybrid storage system scheduling model comprising: at least two objective functions of the wind-solar hybrid storage system, the third constraint condition of the wind-solar hybrid storage system under the scenario set, the wind power and photovoltaic power station operation models, and the hybrid pumped storage power station operation model; Solving the wind-solar hybrid storage system dispatching model to obtain the optimal dispatching operation strategy of the wind power, photovoltaic power station and the hybrid pumped storage power station; Solving the wind-solar hybrid storage system scheduling model to obtain the optimal scheduling operation strategy of the wind power, photovoltaic power station and the hybrid pumped storage power station, including: converting the at least two objective functions into a single objective function, converting the nonlinear constraint in the third constraint into a linear constraint, and obtaining the converted wind-solar hybrid storage system scheduling model; acquiring set basic data, and solving the converted wind-solar hybrid storage system scheduling model based on the basic data using a set optimization solver to obtain the optimal scheduling operation strategy of the wind power, photovoltaic power station and the hybrid pumped storage power station; The at least two objective functions include a peak-shaving objective function and a new energy consumption objective function; converting the at least two objective functions into a single objective function, including: based on a preset auxiliary variable, converting the peak-shaving objective function into a peak-shaving objective function in a minimum form; calculating a first product of the peak-shaving objective function in the minimum form and a weight of the peak-shaving objective function, and a second product of the new energy consumption objective function and a weight of the new energy consumption objective function, and determining the difference between the first product and the second product as a single objective function; Converting the nonlinear constraint in the third constraint into a linear constraint, including: dividing the value interval of the variable in the nonlinear constraint into a plurality of sub-intervals; determining the variable conditions and linear function relationships satisfied by the sub-intervals; and converting the nonlinear constraint into a linear constraint based on the variable conditions and linear function relationships satisfied by the sub-intervals.

2. The method according to claim 1, characterized in that Obtain a wind power random variable representing the wind power output prediction error and a photovoltaic random variable representing the photovoltaic output prediction error, including: Collect the wind power output forecast value, wind power output actual value, photovoltaic output forecast value and photovoltaic output actual value in each historical period; Based on the wind power output prediction value and the actual wind power output value, the wind power random variable of each time period is calculated, and based on the photovoltaic output prediction value and the actual photovoltaic output value, the photovoltaic random variable of each time period is calculated.

3. The method according to claim 1, characterized in that Generating a scenario set according to the wind power random variable and the photovoltaic random variable includes: Obtaining a probability distribution function of the wind power random variable and a probability distribution function of the photovoltaic random variable; Based on the probability distribution function of the wind power random variable, an initial wind power output prediction error scenario set is generated, and based on the probability distribution function of the photovoltaic random variable, an initial photovoltaic output prediction error scenario set is generated; A wind power output scenario set is generated based on the initial wind power output prediction error scenario set, and a photovoltaic output scenario set is generated based on the initial photovoltaic output prediction error scenario set.

4. The method according to claim 3, characterized in that: Obtaining the probability distribution function of the wind power random variable includes: Performing equidistant binning processing on the wind power random variable to obtain a wind power random variable data box; The probability distribution function of the wind power random variable data box is fitted by using a normal distribution function or an empirical distribution function to obtain the probability distribution function of the wind power random variable data box.

5. The method according to claim 4, characterized in that The wind power random variable is subjected to equidistant binning to obtain a wind power random variable data box, including: Acquire a wind power random variable sample set, wherein the wind power random variable sample set includes wind power sample data pairs in each time period, and the wind power sample data pairs include wind power output prediction values ​​and wind power random variables; After the wind power random variable sample set is sorted in ascending order according to the wind power output prediction value, it is subjected to equidistant binning processing according to the wind power output prediction value to obtain a wind power random variable data box.

6. The method according to claim 4, characterized in that The probability distribution function is fitted to the wind power random variable data box using a normal distribution function or an empirical distribution function to obtain the probability distribution function of the wind power random variable data box, including: Using a skewness and kurtosis test method to determine whether the wind power random variables in the wind power random variable data box obey a normal distribution; When the condition is met, a normal distribution function is used to fit the probability distribution function of the wind power random variable data box to obtain the probability distribution function of the wind power random variable data box; When it does not comply, the probability distribution function is fitted to the wind power random variable data box using the empirical distribution function to obtain the probability distribution function of the wind power random variable data box.

7. The method according to claim 4, characterized in that After the wind power random variable is subjected to equidistant binning processing to obtain a wind power random variable data box, the method further includes: Based on the mean value and standard deviation of the wind power random variables in the wind power random variable data box, a target wind power random variable interval of the wind power random variable data box is determined, and wind power random variables in the wind power random variable data box that do not belong to the target wind power random variable interval are deleted.

8. The method according to claim 3, characterized in that Based on the probability distribution function of the wind power random variable, an initial wind power output prediction error scenario set is generated; based on the probability distribution function of the photovoltaic random variable, an initial photovoltaic output prediction error scenario set is generated, including: Constructing a multivariate Gaussian distribution, and generating Gaussian random numbers based on the multivariate Gaussian distribution; Performing inverse transformation sampling based on the Gaussian random number and the probability distribution function of the wind power random variable to obtain an initial wind power output prediction error scenario set; An inverse transformation sampling is performed based on the Gaussian random number and the probability distribution function of the photovoltaic random variable to obtain an initial photovoltaic output prediction error scenario set.

9. The method according to claim 8, characterized in that The Gaussian random number is a plurality of groups of Gaussian random numbers; based on the Gaussian random number and the probability distribution function of the wind power random variable, inverse transformation sampling is performed to obtain an initial wind power output prediction error scenario set, including: Calculate the cumulative distribution function value of each group of Gaussian random numbers; The cumulative distribution function values ​​of each group of Gaussian random numbers are substituted into the probability distribution function of the wind power random variable to obtain an initial wind power output prediction error scenario set.

10. The method according to claim 3, characterized in that: Generating a wind power output scenario set based on the initial wind power output prediction error scenario set includes: Performing scenario reduction on the initial wind power output prediction error scenario set to obtain a reduced wind power output prediction error scenario set; A summation transformation is performed based on the post-reduction wind power output prediction error scenario set to obtain a wind power output scenario set.

11. The method according to claim 10, characterized in that The initial wind power output prediction error scenario set is subjected to scenario reduction to obtain a reduced wind power output prediction error scenario set, including: Repeat the following process until the number of scenarios reaches a preset number to obtain a reduced wind power output prediction error scenario set: calculate the probability distance between any two scenarios in the initial wind power output prediction error scenario set, delete one of the two scenarios with the smallest probability distance, and adjust the occurrence probability of the other scenario in the two wind scenarios with the smallest probability distance to the sum of the occurrence probabilities of the two scenarios with the smallest probability distance.

12. The method according to claim 10, characterized in that Based on the post-reduction wind power output prediction error scenario set, a summation transformation is performed to obtain a wind power output scenario set, including: Based on the wind power output prediction value, the wind power generation capacity under the scenarios in the wind power output prediction error scenario set after reduction is calculated to obtain the wind power output scenario set.

13. The method according to claim 1, characterized in that The first constraint condition includes at least one of the following: an upper and lower limit constraint condition for output, and a utilization constraint condition.

14. The method according to claim 1, characterized in that The second constraint condition includes at least one of the following: water balance constraint condition, flow constraint condition, reservoir capacity constraint condition, output constraint condition, power conversion relationship constraint condition, head constraint condition, characteristic curve constraint condition, and comprehensive water use constraint condition; the comprehensive water use constraint condition includes at least one of the following: ecological flow constraint condition and navigation constraint condition.

15. The method according to claim 1, characterized in that The objective function includes at least one of the following: a peak load regulation objective function and a new energy consumption objective function.

16. The method according to claim 1, characterized in that The third constraint condition includes a system operation constraint condition.

17. A wind-solar hybrid storage system dispatching device, characterized in that: The device comprises: A generation module, used to obtain a wind power random variable representing a wind power output prediction error and a photovoltaic random variable representing a photovoltaic output prediction error, and generate a scenario set according to the wind power random variable and the photovoltaic random variable, wherein the scenario set includes a wind power output scenario set and a photovoltaic output scenario set; A first construction module is used to construct an operation model of a wind power plant and a photovoltaic power plant, wherein the operation model of the wind power plant and the photovoltaic power plant includes: a first constraint condition of the wind power plant and the photovoltaic power plant under the scenario set; A second construction module is used to construct a hybrid pumped storage power station operation model, wherein the hybrid pumped storage power station operation model includes: a second constraint condition of the hybrid pumped storage power station under the scenario set; The third construction module is used to construct a wind-solar hybrid storage system scheduling model, wherein the wind-solar hybrid storage system scheduling model includes: at least two objective functions of the wind-solar hybrid storage system, the third constraint condition of the wind-solar hybrid storage system under the scenario set, the wind power and photovoltaic power station operation models, and the hybrid pumped storage power station operation model; A solution module, used to solve the wind-solar hybrid storage system scheduling model to obtain the optimal scheduling operation strategy of the wind power, photovoltaic power station and the hybrid pumped storage power station; The solution module includes: a model conversion unit, which is used to convert the at least two objective functions into a single objective function, and convert the nonlinear constraint condition in the third constraint condition into a linear constraint condition, so as to obtain a converted wind-solar hybrid storage system scheduling model; a model solution unit, which is used to obtain set basic data, and solve the converted wind-solar hybrid storage system scheduling model based on the basic data using a set optimization solver to obtain the optimal scheduling operation strategy of the wind power, photovoltaic power station and the hybrid pumped storage power station; The at least two objective functions include a peak-shaving objective function and a new energy consumption objective function; the model conversion unit includes: a function conversion subunit, used to convert the peak-shaving objective function into a peak-shaving objective function in a minimum form based on preset auxiliary variables; calculate the first product of the peak-shaving objective function in the minimum form and the weight of the peak-shaving objective function, and the second product of the new energy consumption objective function and the weight of the new energy consumption objective function, and determine the difference between the first product and the second product as a single objective function; a condition conversion subunit, used to divide the value interval of the variable in the nonlinear constraint condition into multiple sub-intervals; determine the variable conditions and linear function relationships satisfied by the sub-intervals; based on the variable conditions and linear function relationships satisfied by the sub-intervals, convert the nonlinear constraint condition into a linear constraint condition.

18. An electronic device, characterized in that: The electronic device includes a processor and a computer-readable storage medium, and a computer program is stored on the computer-readable storage medium; when the computer program is executed by the processor, the processor executes the wind-solar hybrid storage system scheduling method according to any one of claims 1 to 16.

19. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the processor executes the wind-solar hybrid storage system scheduling method according to any one of claims 1 to 16.