Underground hydrogen storage and construction method thereof
By designing a circular hydrogen storage cavern and optimizing the structure, combined with finite element numerical simulation and drainage system, the safety and cost issues of large-scale underground hydrogen storage are solved, and efficient hydrogen energy storage and utilization is achieved.
Patent Information
- Application Number
- CN202411148396.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-08-21
AI Technical Summary
It is difficult to realize large-scale underground hydrogen storage with existing technology. Hydrogen easily reacts with rocks in caves, which increases the safety risk of hydrogen storage. Moreover, geological conditions and geographical location limitations make it difficult to meet the construction needs of large-scale hydrogen storage.
A circular hydrogen storage cavern is used, and the storage pressure is set to 5MPa~10MPa. Multiple groups of hydrogen storage caverns are set up and separated by tunnels and shafts. The sealing layer, slip layer, concrete lining layer and external surrounding rock structure are designed, combined with finite element Numerical simulation was used to optimize the initial support parameters, and drainage tunnels and drainage holes were set up to keep the hydrogen storage cavern dry.
It achieves the safety and reliability of large-scale underground hydrogen storage, reduces hydrogen storage costs, improves the economic benefits of the hydrogen energy industry chain, solves the problems of geological conditions and geographical location limitations, and has time and spatial scales. Huge advantage.
Smart Images

Figure CN118669699B_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present disclosure belong to the technical field of underground hydrogen storage, and specifically relate to an underground hydrogen storage reservoir and a construction method thereof. Background Art
[0002] Hydrogen storage is a crucial technology and has become a bottleneck for the large-scale utilization of hydrogen energy. The main methods of hydrogen energy storage include high-pressure storage tanks, liquid hydrogen storage, solid hydrogen storage, rare earth hydrogen storage and geological hydrogen storage. The first four hydrogen storage methods are subject to considerations such as new materials, hydrogen storage density, hydrogen storage safety and cost control, and are only suitable for short-term small-scale storage. Geological hydrogen storage is the best choice for large-scale and long-term hydrogen storage. The hydrogen storage problem involves all aspects such as hydrogen production, transportation, and final application. If the hydrogen storage problem is not solved, it will be difficult to promote the application of hydrogen energy. Research on large-scale hydrogen storage technology has become a hot topic. Hydrogen energy, as the ultimate energy source, is expected to become one of the important means of regulating and absorbing renewable energy. It is also considered to be one of the most important links in building a hydrogen energy society.
[0003] In the relevant technologies, the main types of geological hydrogen storage construction include underground salt caverns, underground aquifers, depleted gas fields, underground caverns, etc. Salt cavern hydrogen storage must select salt mines with appropriate burial depth, certain thickness, and high purity, and the site selection is extremely limited. Aquifer-type hydrogen storage requires an in-depth survey of deep geological structures. Depleted gas reservoir-type hydrogen storage must rely on depleted gas fields. The main users of hydrogen in my country are concentrated in the east and south, and these regions do not have oil and gas fields. Cavern hydrogen storage only needs to select hard and complete rock mass. Among the many hydrogen storage technology routes, cavern hydrogen storage has the advantages of large time scale and spatial scale. Using cavern hydrogen storage is one of the best ways to store hydrogen on a large scale in the long term.
[0004] There are few reports on underground hydrogen storage in rock caves in China, and the following issues need to be considered and resolved: Hydrogen, as a highly active small molecule gas, will react with other elements and steel, affecting the rock and surface environment. Hydrogen has high fluidity and can communicate macroscopic properties with microstructures, increasing the risk of underground storage leakage. It is necessary to solve the key construction technology of large-scale underground hydrogen storage based on hydrogen properties, geological characteristics and injection and production processes. In addition, underground hydrogen storage is buried hundreds of meters underground, and its tank wall structure is in a dry-wet alternating or wet environment, which will accelerate the structural corrosion of the sealing layer and affect the safety of underground hydrogen storage caves. Summary of the invention
[0005] The embodiments of the present disclosure aim to solve at least one of the technical problems existing in the prior art and provide an underground hydrogen storage reservoir and a construction method thereof.
[0006] An embodiment of the first aspect of the present disclosure provides a method for constructing an underground hydrogen storage reservoir, the method comprising the following steps:
[0007] Step 1: Based on the deformation of the surrounding rock and the construction condition parameters, the hydrogen storage cavern is set to a circular cross-section with a diameter greater than 10m; and, based on the hydrogen storage economic constraint, the storage pressure of the hydrogen storage cavern is set to 5MPa~10MPa; at least two groups of hydrogen storage caverns are set, and an air inlet shaft and an air outlet shaft are set on both sides of each hydrogen storage cavern; each group of hydrogen storage caverns is separated into independent caverns by tunnel sealing plugs and shaft sealing plugs;
[0008] Step 2: Determine the layout area of the hydrogen storage cavern; wherein the layout area needs to meet the requirements of simple geological structure, complete and stable rock mass, moderate thickness of overlying rock layer, and low hydrogeological water seepage; the vault of the hydrogen storage cavern is set at least 20m below the top surface of the micro-weathering layer, and the buried depth of the hydrogen storage reservoir is calculated based on the deadweight pressure of the overlying rock mass of the hydrogen storage cavern and the pressure inside the hydrogen storage reservoir;
[0009] Step 3: Set up at least one construction tunnel as a transportation channel for excavating the hydrogen storage cavern; wherein the slope of the construction tunnel is not greater than 10%, and a connecting tunnel is used in the middle, and the cross-sectional dimensions of the connecting tunnel and the construction tunnel are consistent;
[0010] Step 4: design the structure of the hydrogen storage cavern, wherein the tank wall structure of the hydrogen storage cavern includes a sealing layer, a sliding layer, a concrete lining layer, anchor bolts and embedded plates, welded steel reinforcement, a sprayed concrete primary support layer and external surrounding rock;
[0011] Step 5: During the excavation of the hydrogen storage cavern during the construction period, different initial support parameters are obtained through finite element numerical simulation verification according to different surrounding rock geological conditions; wherein, anchor spraying structure support is adopted in conventional sections, and steel arch reinforcement support is adopted in poor geological cavern sections; the initial support parameters and the concrete lining layer in step 4 together constitute the final structural support scheme of the hydrogen storage cavern;
[0012] Step 6: a drainage channel is set at the bottom of the hydrogen storage cavern, and the drainage channel is provided with oblique drainage holes in the upper and lower directions of the hydrogen storage cavern respectively; wherein the drainage holes extend beyond the hydrogen storage cavern by no less than 10m in each direction;
[0013] Step seven, at the junction of the shaft and the hydrogen storage cavern, and at the junction of the connecting tunnel and the hydrogen storage cavern, respectively set a transverse reinforced concrete sealing plug and a vertical reinforced concrete sealing plug; wherein, the transverse reinforced concrete sealing plug and the vertical reinforced concrete sealing plug are of truncated cone type, and the concrete strength grade is greater than C40.
[0014] In some embodiments of the present disclosure, the depth of the hydrogen storage reservoir is calculated based on the deadweight pressure of the overlying rock mass of the hydrogen storage cavern and the pressure inside the hydrogen storage reservoir, including:
[0015] A calculation model for the buried depth of a hydrogen storage reservoir is established based on a rigid cone limit equilibrium model; wherein the lower part of the calculation model is a rigid rock layer of a rock layer, and the upper part of the calculation model is a rigid rock layer of a weathering layer;
[0016] Based on the cross-sectional area of the lower part of the calculation model, the formation bulk density of the rock layer and the pressure diffusion angle of the rock layer, the total gravity of the rigid rock layer of the lower rock layer is calculated;
[0017] Based on the cross-sectional area of the upper part of the calculation model, the stratum bulk density of the weathered layer and the pressure diffusion angle of the weathered layer, the total gravity of the upper weathered layer rigid rock layer is calculated;
[0018] Calculating the pressure inside the hydrogen storage tank of the hydrogen storage cavern;
[0019] The sum of the total gravity of the lower rock layer rigid rock mass layer and the total gravity of the upper weathering layer rigid rock mass layer is greater than the hydrogen storage reservoir pressure corresponding to the hydrogen storage reservoir burial depth as the target hydrogen storage reservoir burial depth.
[0020] In some embodiments of the present disclosure, the buried depth of the hydrogen storage reservoir is obtained based on the following formula:
[0021] The calculation formula for the total gravity of the rigid rock mass overlying the hydrogen storage cavern is as follows:
[0022]
[0023]
[0024]
[0025] Where: W is the total gravity of the overlying rigid rock mass, W1 is the total gravity of the lower rock layer rigid rock mass layer, and W2 is the total gravity of the upper weathering layer rigid rock mass layer;
[0026] ρ1 is the formation density of the rock layer, ρ2 is the formation density of the weathering layer, g is the gravitational acceleration, R is the radius of the hydrogen storage cavern, h1 is the thickness of the rock layer overlying the hydrogen storage cavern, h2 is the thickness of the weathering layer overlying the hydrogen storage cavern; a1 is the formation diffusion angle of the overlying rock layer, a2 is the formation diffusion angle of the overlying weathering layer,
[0027] The calculation formula for the pressure inside the hydrogen storage tank of the gas storage tank is as follows:
[0028]
[0029] Where: is the pressure inside the hydrogen storage chamber of the hydrogen storage cavern, and P is the maximum working pressure of the hydrogen storage cavern;
[0030] The safety factor S against ground uplift can meet the safety requirements if S is greater than 1.2. The calculation equation is as follows:
[0031]
[0032] The buried depth of the hydrogen storage reservoir corresponding to the above-mentioned safety factor S for preventing ground uplift is taken as the target buried depth of the hydrogen storage reservoir.
[0033] In some embodiments of the present disclosure, the sealing layer adopts Q345R lining steel plate, and the thickness of the lining steel plate ranges from 8mm to 20mm, and the lining steel plate is processed in an arc, and a corrugated plate is provided every 10° to increase the compensation measures of the lining to control the displacement of the sealing layer;
[0034] and / or,
[0035] The slip layer is used to reduce the friction between the structural layers and avoid cracks in the concrete lining layer caused by strain peaks. At the same time, the slip layer provides anti-corrosion protection for the sealing layer and seals on the surface of the lining concrete to prevent gas leakage. The slip layer is obtained by arranging multiple layers of aluminum foil at equal intervals between the sealing layer and the concrete lining layer. The aluminum foil and the concrete are bonded by high-strength adhesive, and the thickness of the aluminum foil ranges from 3 mm to 7 mm.
[0036] In some embodiments of the present disclosure, the concrete lining layer is used to transfer the internal gas pressure to the rock mass, so that the strain caused by the storage pressure change is evenly distributed in the tank structure, and has a leveling function, providing a sliding surface for the sealing layer; the concrete lining layer is cast by supporting the formwork to form a 200mm~500mm reinforced concrete lining layer, and the concrete type is not less than C40;
[0037] and / or,
[0038] The anchor bolts and embedded plates are used to fix the sealing layer and the sliding layer to the concrete lining layer; the sealing layer is an inner lining steel plate, the embedded plates are connected to the inner lining steel plate by fillet welding, and the spacing of the embedded plates in the width and length directions of the inner lining steel plate is consistent with the plate width of the inner lining steel plate;
[0039] and / or,
[0040] The sprayed concrete primary supporting layer is used for the initial support during the construction of the hydrogen storage cavern to ensure the stability of the cavern during the construction period; the sprayed concrete primary supporting layer adopts sprayed steel fiber concrete, the model is not less than CF35, and the thickness ranges from 100mm to 250mm; or, the sprayed concrete primary supporting layer adopts sprayed plain concrete + hanging mesh, the plain concrete model is not less than C30, the thickness ranges from 100mm to 200mm, and is supplemented by a single-layer and double-layer steel mesh structure.
[0041] In some embodiments of the present disclosure, during the excavation of the hydrogen storage cavern during the construction period, different initial support parameters are obtained through finite element numerical simulation verification according to different surrounding rock geological conditions, including:
[0042] According to the initial support design of the hydrogen storage cavern and the secondary lining structure design, the underground surrounding rock, anchor bolt, concrete anchor spraying primary support layer, concrete secondary lining layer, and inner lining steel plate sealing layer models are established from outside to inside. Except for the anchor bolt model, plane strain units are used in all other models, and beam units are used in the anchor bolt model.
[0043] Boundary conditions are set: the distance from the left boundary and the right boundary to the nearest hydrogen storage cavern is 80m~120m, and both are constrained by normal hinge supports; the distance from the bottom plate of the hydrogen storage cavern to the bottom boundary is 20m~40m, which is a normal hinge support constraint; the distance from the top plate of the hydrogen storage cavern to the top of the model is 110m~130m; the anchor spraying layer and the excavated surrounding rock section and the anchor spraying layer and the lining layer are in TIE contact, the inner lining steel plate sealing layer and the lining layer are in limited sliding contact, the anchor rod is in embedded contact and bears force together with the surrounding rock, and its end is in TIE contact with the surrounding rock excavation interface, which simulates the mechanical response of each structural layer more realistically;
[0044] Setting the model analysis steps: The hydrogen storage cavern is set for one-time excavation. On the basis of excavation, the ground stress balance analysis step is first set to make the deformation of the underground stress field zero. After the hydrogen storage cavern is excavated, the anchor rod and anchor spray layer unit are activated to realize the hydrogen storage cavern support design simulation. After the hydrogen storage cavern is supported, the concrete lining layer and the lining steel plate sealing layer are activated to realize the stability analysis simulation of the entire gas storage reservoir construction period. There are three analysis steps in total;
[0045] Set model constitutive parameters: Use the Hoek-Brown strength criterion to determine the rock mass Mohr-Coulomb strength criterion parameters and then calculate the rock mass mechanical parameters and assign values; Set anchor parameters according to the structural form. The anchor constitutive model is an elastic constitutive model with an elastic modulus of 200GPa~220GPa and a Poisson's ratio of 0.1~0.4; According to different surrounding rock grades , , , , , set the parameters of the initial concrete anchor spray layer and the secondary lining layer, both using the elasto-plastic model; set the parameters of the lining steel plate sealing layer, using the elastic constitutive model, with an elastic modulus of 200GPa~220GPa and a Poisson's ratio of 0.1~0.4, which fits closely with the concrete lining layer;
[0046] Calculate the mechanical response of the temperature field-stress field caused by thermal expansion: The generalized Hu Ke's law is used to calculate the mechanical response of the temperature field-stress field of the hydrogen storage cavern caused by heat conduction, and the ground stress is assigned in the model; within 0~100℃, the linear expansion coefficient α of concrete is 1.5×10-5 The linear expansion coefficient α of steel is 1.2×10 -5 ; Based on this, the operation parameter setting of the numerical simulation is completed;
[0047] Modeling and calculation of the structural stability of the hydrogen storage cavern at different stages: 1) Calculate the deformation of the surrounding rock of the hydrogen storage cavern and the stress distribution around the hydrogen storage cavern during the excavation stage to determine the short-term stability or self-stability of the surrounding rock; 2) Calculate the tensile strength of the anchor rods during the excavation stage to determine the structural stability of the initial support; 3) Calculate the deformation of the surrounding rock of the hydrogen storage cavern and the stress distribution around the cavern during the operation stage corresponding to the minimum working pressure to determine the long-term stability of the surrounding rock; 4) Calculate the displacement value and yield strength of the free surface of the lining steel plate during the operation stage corresponding to the minimum working pressure to determine the stability of the sealing structure; 5) Calculate the maximum The deformation of the surrounding rock of the hydrogen storage cavern during the operation phase corresponding to the working pressure and the stress distribution around the hydrogen storage cavern are used to calculate the ground uplift data and determine the long-term stability of the surrounding rock of the hydrogen storage cavern; 6) The compressive strength value of the anchor rod during the operation phase corresponding to the maximum working pressure is calculated to determine the long-term stability of the initial support; 7) The maximum deformation of the lining layer during the operation phase corresponding to the maximum working pressure is calculated to determine the long-term stability of the secondary lining and evaluate the force transmission effect of the support structure to the surrounding rock; 8) The displacement value and yield strength of the free surface of the lining steel plate during the operation phase corresponding to the maximum working pressure are calculated to determine the stability of the sealing structure;
[0048] The hydrogen storage cavern is judged to be stable in the long term based on the fact that the ratio of the surrounding rock conditions and the high stress of the hydrogen storage cavern is lower than the preset value, the convergence deformation rate of the hydrogen storage cavern is less than or equal to the preset deformation rate, the compression value of the anchor rod is less than the design value of the compressive strength, the tension value of the anchor rod is less than the design value of the tensile strength, the simulated ground uplift value is lower than the preset value, the calculated value of the secondary lining deformation is lower than the design value, the calculated value of the sealing steel plate deformation is lower than the preset value, and the maximum stress value of the sealing steel plate is less than the yield strength.
[0049] In some embodiments of the present disclosure, the spacing between the drainage holes ranges from 10m to 20m, and the aperture of the drainage holes ranges from 90mm to 120mm.
[0050] In some embodiments of the present disclosure, the method for determining the parameters of the drainage channel and the drainage hole includes:
[0051] Construct a groundwater seepage model: set the regional model boundary according to the underground engineering design scheme of the drainage tunnel, underground hydrogen storage reservoir, groundwater source and sink area and discharge datum surface. The surrounding boundaries are given a fixed head boundary according to the discharge datum surface, the upper boundary of the model is constructed according to the actual terrain of the underground hydrogen storage reservoir, the lower boundary of the model exceeds the bottom plate of the hydrogen storage cavern by more than 200m, and the two side boundaries of the model exceed the boundary of the hydrogen storage cavern by more than 500m;
[0052] Set model parameters: set the permeability coefficients in the x, y, and z main directions according to the single-hole experimental data, set the fixed head boundary according to the buried depth of the hydrogen storage cavern and the groundwater level information, and set the phreatic level according to the topographic survey data. The upper boundary of the model is the precipitation recharge, evaporation, and well discharge boundary, which are assigned values according to the second and third boundary conditions. The lower boundary of the model is a water-blocking boundary with zero flux. The surrounding areas of the model are flow boundaries, which are assigned values according to the first boundary conditions. The drainage lanes and drainage holes are set as flow boundaries, which are assigned values according to the first boundary conditions.
[0053] Set the simulated working conditions: 1) Set the upper drainage holes at 20m intervals, and set the lower drainage holes at 20m intervals; 2) Set the upper drainage holes at 15m intervals, and set the lower drainage holes at 20m intervals; 3) Set the upper drainage holes at 15m intervals, and set the lower drainage holes at 15m intervals; 4) Set the upper drainage holes at 10m intervals, and set the lower drainage holes at 15m intervals; 5) Set the upper drainage holes at 10m intervals, and set the lower drainage holes at 10m intervals;
[0054] Finite element software is used to simulate the groundwater seepage field of the underground hydrogen storage reservoir during construction, and the rock cave water inflow of the underground hydrogen storage caverns under various working conditions during construction is calculated. Based on the fact that all groundwater traces around the underground hydrogen storage caverns point to the outside of the cave, and / or based on the fact that the rock cave water inflow of the underground hydrogen storage caverns is zero, the parameters of the drainage laneway and the drainage hole are determined.
[0055] In some embodiments of the present disclosure, the transverse reinforced concrete sealing plug and the vertical reinforced concrete sealing plug are designed with elastic bodies and subjected to stress analysis using finite elements, specifically including:
[0056] a) Boundary conditions
[0057] The rock mass 2 to 3 times larger than the sealing plug was selected as the research object, and the displacement of the outer boundary of the surrounding rock mass was zero; according to the maximum storage pressure of the hydrogen storage cavern, the pressure was applied to the left and right ends of the sealing type connecting the tunnel; in addition, the upper end of the sealing plug was subjected to the water head pressure of 90m to 100m above;
[0058] b) Interface Assumptions
[0059] The sealing plug is a structure formed by weaving a steel frame and cast concrete in the cavity formed after the construction tunnel is excavated. The bonding effect of the interface between the sealing plug and the surrounding rock is crucial to the stability of the plug structure and the sealing effect. According to the design, it is assumed that the sealing plug has good contact with the surrounding rock without relative sliding, which is a consolidated contact form.
[0060] c) Calculation results
[0061] The finite element calculation was completed on the assumption that there is no relative sliding at the interface. The gas pressure on both sides of the sealing plug, the head pressure on the upper interface of the sealing plug, the elastic modulus and Poisson's ratio of the rock mass, and the elastic modulus and Poisson's ratio of the sealing plug were selected to obtain the force analysis results of the sealing plug.
[0062] A second aspect of the present disclosure provides an underground hydrogen storage reservoir, the underground hydrogen storage reservoir comprising:
[0063] A storage body, the storage body comprising: at least two groups of hydrogen storage caverns, a connecting tunnel and a construction tunnel, each group of hydrogen storage caverns being separated into independent caverns by tunnel sealing plugs and shaft sealing plugs, an air intake shaft and an exhaust shaft being respectively arranged at both ends of each hydrogen storage cavern, the air intake shaft and the exhaust shaft being both dug from the ground surface perpendicularly to the ground, a tank wall structure being formed on the inner wall of the hydrogen storage cavern, the tank wall structure comprising a sealing layer, a sliding layer, a concrete lining layer, a shotcrete primary support layer and an external surrounding rock layer being sequentially arranged along the direction from the inside to the outside of the hydrogen storage cavern;
[0064] Two adjacent hydrogen storage caverns are connected by two connecting lanes, and the two connecting lanes are arranged at intervals along the length direction of the hydrogen storage caverns, wherein one connecting lane connects the upper parts of the two adjacent hydrogen storage caverns, and the other connecting lane connects the lower parts of the two adjacent hydrogen storage caverns;
[0065] The construction lane is arranged in the middle of at least two groups of hydrogen storage caverns, the construction lane is arranged along the length direction of the hydrogen storage caverns, and the two connecting lanes located in the middle of the storage body are connected to the construction lane;
[0066] A drainage system, the drainage system comprising: a drainage alley and a drainage hole, the connecting alley is connected to the drainage alley, the drainage alley is communicated with the drainage hole, the drainage alley is provided between each pair of the hydrogen storage caverns, and a plurality of drainage holes are arranged around each of the hydrogen storage caverns.
[0067] According to the underground hydrogen storage reservoir and its construction method of the embodiment of the present disclosure, the construction method can meet the needs of large-scale hydrogen storage in the underground hydrogen storage reservoir, and solve the problem that it is difficult to store hydrogen on a large scale on the ground. In addition, the moisture in the rock mass around each hydrogen storage cavern is introduced into the drainage lane through multiple drainage holes, and the groundwater around the hydrogen storage cavern is discharged from the underground hydrogen storage reservoir through the drainage lane, so as to keep the inner wall of the hydrogen storage cavern dry and improve the safety and reliability of the hydrogen storage cavern. At the same time, the drainage holes are arranged around the hydrogen storage cavern to reduce the influence of the drainage system on the internal arrangement of the hydrogen storage cavern.
[0068] The underground hydrogen storage tank and the construction method thereof according to the disclosed embodiment also have the following advantages:
[0069] (1) The present invention aims at the current situation that there is no underground hydrogen storage construction case in China, and the existing storage technology is mainly concentrated in salt caverns, depleted gas reservoirs, abandoned mines and other construction types. The above types are greatly limited by geological structure, geographical resources and location, and it is difficult to meet the construction needs of large-scale underground hydrogen storage. A large-scale cave underground hydrogen storage construction method, system and device are created, which has great advantages in time scale and space scale, is the best way to store hydrogen on a large scale for a long time, is of great significance for overcoming the bottleneck of hydrogen storage technology, and is a domestic first;
[0070] (2) The present invention solves the problems of small scale, high cost, and great limitations of geological conditions and geographical location of existing hydrogen energy storage methods. It invents a method, system and device for constructing a large-scale underground hydrogen storage in rock caves. It describes a system solution from the pressure, burial depth, cave layout, construction tunnels, connecting tunnels, shafts, sealing layers, drainage tunnels to sealing plugs of the hydrogen storage caverns. It only needs to select hard rock formations with moderate strength to meet all construction requirements. It has a high tolerance for geological conditions and a wide range of applications.
[0071] (3) The tank wall structure of the present invention adopts four structures, namely, a concrete primary lining, a sliding layer, a concrete secondary lining, and a sealing material, which effectively solves the problems of hydrogen leakage, corrosion, and brittle cracking caused by the high activity and low viscosity of small molecular hydrogen. The device parameters can be appropriately adjusted according to the actual working conditions, and there is a large optimization space;
[0072] (4) The present invention, through the comprehensive use of a variety of underground structures, monomers and materials, has the advantages of strong targeting, high reliability, convenient operation, low cost and wide application range. It can be quickly applied to my country's hydrogen energy construction, effectively reducing the storage cost of hydrogen and improving the economic benefits of hydrogen, thereby promoting the healthy development of the hydrogen energy industry chain. BRIEF DESCRIPTION OF THE DRAWINGS
[0073] Figure 1 It is a schematic diagram of the plan structure of the underground hydrogen storage tank according to an embodiment of the present disclosure;
[0074] Figure 2 A schematic diagram of the three-dimensional structure of an underground hydrogen storage tank according to an embodiment of the present disclosure;
[0075] Figure 3 for Figure 1 A partial cross-sectional view of an underground hydrogen storage reservoir is shown;
[0076] Figure 4 for Figure 1 A cross-section of the drainage alley shown;
[0077] Figure 5 for Figure 1 The cross-section of the construction tunnel shown;
[0078] Figure 6 for Figure 1 The cross-sectional view of the tank wall structure of the hydrogen storage cavern shown;
[0079] Figure 7 It is the support section of 4<Q≤10 hydrogen storage cavern;
[0080] Figure 8 It is the support section of hydrogen storage cavern with Q≤0.1;
[0081] Fig. 9 is the maximum principal stress distribution when the gas storage pressure of the hydrogen storage cavern is 10MPa (unit: Pa);
[0082] Fig.10 is the minimum principal stress distribution when the gas storage pressure of the hydrogen storage cavern is 10MPa (unit: Pa);
[0083] Fig.11 It is the plastic zone of the surrounding rock when the gas storage pressure of the hydrogen storage cavern is 10MPa;
[0084] Fig.12 is the deformation distribution of the hydrogen storage cavern (unit: m);
[0085] Fig.13 is the displacement field vector state of the hydrogen storage cavern (unit: m);
[0086] Fig.14 is the axial compression cloud diagram of the anchor rod (unit: N);
[0087] Fig.15 is the deformation cloud map of the concrete lining layer (unit: m);
[0088] Fig.16 is the stress cloud diagram of the sealing layer of the lining steel plate (unit: Pa);
[0089] Fig.17 is the comprehensive displacement of the sealing plug (unit: m);
[0090] Fig.18 is the stress distribution diagram of the sealing plug (unit: Pa);
[0091] Fig.19 is the internal stress distribution diagram of the surrounding rock (unit: Pa);
[0092] Fig. 20 Schematic diagram of the structure of the hydrogen storage cavern cover layer.
[0093] Reference numerals:
[0094] 100. Underground hydrogen storage;
[0095] 10. Reservoir body; 11. Hydrogen storage cavern; 12. Connecting tunnel; 13. Construction tunnel; 141. Air intake shaft; 142. Exhaust shaft;
[0096] 20. Drainage system; 21. Drainage lane; 22. Drainage hole; 221. Upper water hole; 222. Lower water hole;
[0097] 30. Tank wall structure; 31. Sealing layer; 32. Sliding layer; 33. Concrete lining layer; 34. Sprayed concrete primary support layer; 35. External surrounding rock layer; 361. Embedded plate; 362. Anchor bolt; 37. Rebar; 38. Steel arch frame; 39. Anchor rod. DETAILED DESCRIPTION
[0098] In order to enable those skilled in the art to better understand the technical solution of the present disclosure, the present disclosure is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0099] like Figures 1 to 8 As shown, an embodiment of the first aspect of the present disclosure provides an underground hydrogen storage reservoir 100, which includes: a reservoir body 10 and a drainage system 20, wherein the reservoir body 10 includes: at least two groups of hydrogen storage caverns 11, a connecting tunnel 12 and a construction tunnel 13, the construction tunnel 13 is connected to the connecting tunnel 12, the connecting tunnel 12 connects two adjacent hydrogen storage caverns 11, and an air intake shaft 141 and an exhaust shaft 142 are respectively provided at both ends of each hydrogen storage cavern 11, and a tank wall structure 30 is formed on the inner wall of the hydrogen storage cavern 11. The drainage system 20 includes: a drainage tunnel 21 and a drainage hole 22, the drainage tunnel 21 is connected to the drainage hole 22, a drainage tunnel 21 is provided between each pair of hydrogen storage caverns 11, and a plurality of drainage holes 22 are arranged around each hydrogen storage cavern 11.
[0100] According to the underground hydrogen storage reservoir 100 of the embodiment of the present disclosure, the underground hydrogen storage reservoir 100 includes a reservoir body 10 and a drainage system 20. The drainage system 20 is arranged around the hydrogen storage cavern 11. Specifically, a plurality of drainage holes 22 are arranged around each hydrogen storage cavern 11, and a drainage lane 21 is provided between each pair of hydrogen storage caverns 11, and the drainage lane 21 is connected to the plurality of drainage holes 22. The moisture in the rock mass around each hydrogen storage cavern 11 is introduced into the drainage lane 21 through the plurality of drainage holes 22, and the groundwater around the hydrogen storage cavern 11 is discharged from the underground hydrogen storage reservoir 100 through the drainage lane 21 and the construction lane 13, so as to keep the inner wall of the hydrogen storage cavern 11 dry and improve the safety and reliability of the hydrogen storage cavern 11. At the same time, the drainage holes 22 are arranged around the hydrogen storage cavern 11 to reduce the influence of the drainage system on the internal arrangement of the hydrogen storage cavern 11.
[0101] In some embodiments of the present disclosure, the drainage hole 22 includes: an upper water hole 221 and a lower water hole 222. The first end of the upper water hole 221 is connected to the center of the vertical wall of the drainage tunnel 21, and the second end of the upper water hole 221 is located above the hydrogen storage cavern 11, and the vertical distance from the hydrogen storage cavern 11 is not less than 10m. The upper water hole 221 is used to introduce the groundwater above the hydrogen storage cavern 11 into the drainage tunnel 21. The first end of the lower water hole 222 is connected to the bottom plate of the drainage tunnel 21, and the second end of the lower water hole 222 is located below the hydrogen storage cavern 11, and the vertical distance from the hydrogen storage cavern 11 is not less than 10m. The lower water hole 222 is used to introduce the groundwater below the hydrogen storage cavern 11 into the drainage tunnel 21. The groundwater around the hydrogen storage cavern 11 is drained through the upper water hole 221 and the lower water hole 222 to keep the inner wall of the hydrogen storage cavern 11 dry.
[0102] In some embodiments of the present disclosure, Figure 2 and Figure 3 As shown, the upper water hole 221 and the lower water hole 222 are radially arranged in the direction from the drainage lane 21 to the hydrogen storage cavern 11, and the upper water hole 221 and the lower water hole 222 exceed the plane projection of the hydrogen storage cavern 11 by no less than 10m. Specifically, the first end of the upper water hole 221 is connected with the drainage lane 21, the upper water hole 221 extends from the drainage lane 21 to the top of the hydrogen storage cavern 11, and the second end of the upper water hole 221 covers the corresponding hydrogen storage cavern 11, that is, on a cross section perpendicular to the length direction of the hydrogen storage cavern 11, along the width direction of the hydrogen storage cavern 11, the first end and the second end of the upper water hole 221 are respectively located on both sides of the corresponding hydrogen storage cavern 11, so that the upper water hole 221 covers the hydrogen storage cavern 11 along the width direction of the hydrogen storage cavern 11. The first end of the downhole 222 is in communication with the drainage lane 21, and the downhole 222 extends from the drainage lane 21 to the bottom of the hydrogen storage cavern 11, and the second end of the downhole 222 covers the corresponding hydrogen storage cavern 11, that is, on a cross section perpendicular to the length direction of the hydrogen storage cavern 11, along the width direction of the hydrogen storage cavern 11, the first end and the second end of the downhole 222 are respectively located on both sides of the corresponding hydrogen storage cavern 11, so that the downhole 222 covers the hydrogen storage cavern 11 along the width direction of the hydrogen storage cavern 11. In other words, on a cross section perpendicular to the length direction of the hydrogen storage cavern 11, along the height direction of the hydrogen storage cavern 11, the hydrogen storage cavern 11 is located between the corresponding upper water hole 221 and the lower water hole 222, along the width direction of the hydrogen storage cavern 11, the hydrogen storage cavern 11 is located between the two ends of the upper water hole 221, and the hydrogen storage cavern 11 is located between the two ends of the lower water hole 222.
[0103] Specifically, the upper water hole 221 is a linear hole, and the lower water hole 222 is also a linear hole. The minimum distance between the upper water hole 221 and the top of the hydrogen storage cavern 11 is 10 meters, and the minimum distance between the lower water hole 222 and the bottom of the hydrogen storage cavern 11 is 10 meters. On a cross section perpendicular to the length direction of the hydrogen storage cavern 11, along the width direction of the hydrogen storage cavern 11, the minimum distance between the upper water hole 221 and the side of the hydrogen storage cavern 11 away from the drainage lane 21 is 10 meters, and the minimum distance between the lower water hole 222 and the side of the hydrogen storage cavern 11 away from the drainage lane 21 is 10 meters. At the above minimum distance, the drainage hole 22 can discharge part of the moisture in the rock mass around the hydrogen storage cavern 11 to ensure that the moisture in the hydrogen storage cavern 11 is within a preset range. The above minimum distance is based on the diameter of the hydrogen storage cavern 11 being 10 meters. If the diameter of the hydrogen storage cavern 11 changes, the distances in all directions between the upper water hole 221 and the hydrogen storage cavern 11 and the distances in all directions between the lower water hole 222 and the hydrogen storage cavern 11 will be adjusted accordingly.
[0104] In some embodiments of the present disclosure, there are multiple water holes 221, and the multiple water holes 221 are spaced and evenly arranged along the length direction of the hydrogen storage cavern 11. The multiple water holes 221 arranged along the length direction of the hydrogen storage cavern 11 can discharge the moisture in the rock mass above the hydrogen storage cavern 11 as much as possible. The multiple water holes 221 are evenly arranged along the length direction of the hydrogen storage cavern 11, which can ensure that the moisture in the rock mass above the hydrogen storage cavern 11 is evenly discharged along the length direction of the hydrogen storage cavern 11, avoiding insufficient water discharge from the rock mass above a certain part of the hydrogen storage cavern 11, thereby causing excessive moisture in the hydrogen storage cavern 11 in that part.
[0105] In some embodiments of the present disclosure, there are multiple water holes 222, and the multiple water holes 222 are spaced and evenly arranged along the length direction of the hydrogen storage cavern 11. The multiple water holes 222 arranged along the length direction of the hydrogen storage cavern 11 can discharge the moisture in the rock mass below the hydrogen storage cavern 11 as much as possible. The multiple water holes 222 are evenly arranged along the length direction of the hydrogen storage cavern 11, which can ensure that the moisture in the rock mass below the hydrogen storage cavern 11 is evenly discharged along the length direction of the hydrogen storage cavern 11, avoiding insufficient water discharge from the rock mass below a certain part of the hydrogen storage cavern 11, thereby causing excessive moisture in the hydrogen storage cavern 11 in that part.
[0106] Specifically, the spacing between the upper water holes 221 is 20 meters, and the diameter of the upper water holes 221 is 110 mm. The spacing between the lower water holes 222 is 20 meters, and the diameter of the lower water holes 222 is 110 mm. The length of the drainage tunnel 21 is the same as the length of the hydrogen storage cavern 11, both of which are 430 meters. Since the drainage tunnel 21 does not store high-pressure hydrogen, it is set as a straight wall circular arch section with a size of 7m (width) × 6m (height), such as Figure 4In the drainage tunnel 21, oblique drainage holes 22 are drilled toward the upper and lower parts of the hydrogen storage cavern 11, respectively, to evacuate the groundwater around the cavern during operation to keep the cavern in a desaturated state.
[0107] In some embodiments of the present disclosure, Figure 1 , Figure 2 , Figure 5 As shown, the construction tunnel 13 is arranged in the middle of the reservoir body 10, which helps to improve the construction efficiency. The construction tunnel 13 is connected with the drainage tunnel 21 through the connecting tunnel 12. Specifically, the reservoir body 10 includes four hydrogen storage caverns 11, and the construction tunnel 13 is arranged in the middle of the four hydrogen storage caverns 11 along the length direction of the four hydrogen storage caverns 11, that is, two hydrogen storage caverns 11 are arranged on both sides of the construction tunnel 13, that is, a pair of hydrogen storage caverns 11 are arranged on both sides of the construction tunnel 13.
[0108] The reservoir 10 includes two drainage lanes 21. A drainage lane 21 is provided in the middle of each pair of hydrogen storage caverns 11. The drainage lanes 21 are arranged along the length direction of the hydrogen storage caverns 11, that is, the two drainage lanes 21 are respectively located on both sides of the construction lane 13. The drainage lane 21 is connected to the construction lane 13 so as to discharge the water in the drainage hole 22 out of the reservoir 10 through the construction lane 13. In some other embodiments of the present disclosure, more pairs of hydrogen storage caverns 11 may be provided, such as four pairs of hydrogen storage caverns 11, six pairs of hydrogen storage caverns 11, eight pairs of hydrogen storage caverns 11, ten pairs of hydrogen storage caverns 11 or more even pairs of hydrogen storage caverns 11, and the number of construction lanes 13 is increased, but the construction lanes 13 are all located in the middle of the reservoir 10, so as to facilitate the discharge of the gravel and other parts generated after the construction on both sides of the construction lanes 13. The number of hydrogen storage caverns 11 can also be set to three, five, seven, nine or more odd pairs of hydrogen storage caverns 11, and the number of construction lanes 13 can be increased. In this case, some construction lanes 13 can be set at positions off-center of the storage body 10, so as to set drainage lanes 21 and drainage holes 22 between the paired hydrogen storage caverns 11. In order to reduce the difficulty of transportation, the present embodiment takes an even number of pairs of hydrogen storage caverns 11 as the preferred solution.
[0109] In some embodiments of the present disclosure, Figure 1 and Figure 2As shown, the connecting tunnel 12 connects two adjacent hydrogen storage caverns 11, and the construction tunnel 13 is connected to the connecting tunnel 12. Specifically, in this embodiment, there are four hydrogen storage caverns 11, and two adjacent hydrogen storage caverns 11 are connected through the connecting tunnel 12 to achieve the connection between the hydrogen storage caverns 11. The construction tunnel 13 is connected to the connecting tunnel 12 between the two hydrogen storage caverns 11 located in the middle, so that the connecting tunnel 12 is excavated through the construction tunnel 13, thereby realizing the excavation of the hydrogen storage caverns 11 connected to the connecting tunnel 12. At the same time, the construction waste in the hydrogen storage caverns 11 and the connecting tunnel 12 is transported out of the storage body 10 through the construction tunnel 13.
[0110] Furthermore, in order to complete the excavation of the hydrogen storage cavern 11 more quickly, two adjacent hydrogen storage caverns 11 are connected by two connecting tunnels 12, and the two connecting tunnels 12 are arranged at intervals along the length direction of the hydrogen storage cavern 11, one of the connecting tunnels 12 is connected to the middle and upper part of the hydrogen storage cavern 11, so as to realize the excavation of the upper layer of the hydrogen storage cavern 11 through the connecting tunnel 12, and the other connecting tunnel 12 is connected to the lower part of the hydrogen storage cavern 11, so as to realize the excavation of the lower layer of the hydrogen storage cavern 11 through the connecting tunnel 12, and the excavation efficiency of the hydrogen storage cavern 11 is improved by excavating the upper and lower layers at the same time. The construction tunnel 13 is arranged in the middle position of the four storage bodies 10 along the length direction of the hydrogen storage cavern 11, and the two connecting tunnels 12 located in the middle of the four storage bodies 10 are respectively connected to the construction tunnel 13.
[0111] The connecting tunnel 12 is connected to the drainage tunnel 21. Specifically, the drainage tunnel 21 arranged between each pair of hydrogen storage caverns 11 is connected to the corresponding connecting tunnel 12, so that the moisture in the rock mass around the hydrogen storage cavern 11 can be transported to the construction tunnel 13 through the connecting tunnel 12, and then discharged from the storage body 10 through the construction tunnel 13.
[0112] In some embodiments of the present disclosure, Figure 1 and Figure 2 As shown, along the length direction of the hydrogen storage cavern 11, an air intake shaft 141 is provided at one end of the hydrogen storage cavern 11, and the high-pressure hydrogen to be stored is input into the hydrogen storage cavern 11 through the air intake shaft 141, and an exhaust shaft 142 is provided at the other end of the hydrogen storage cavern 11, and the high-pressure hydrogen to be transported out of the hydrogen storage cavern 11 is transported to the process facilities outside the storage body 10 through the exhaust shaft 142. In order to facilitate the transportation of the gas in each hydrogen storage cavern 11, an air intake shaft 141 and an exhaust shaft 142 are respectively provided at both ends of each hydrogen storage cavern 11.
[0113] In some embodiments of the present disclosure, Figure 6As shown, the inner wall of the hydrogen storage cavern 11 is formed with a tank wall structure 30, which includes a sealing layer 31, a sliding layer 32, a concrete lining layer 33, a sprayed concrete primary support layer 34 and an external surrounding rock layer 35 arranged in sequence from the inside to the outside of the hydrogen storage cavern 11. In addition, the tank wall structure 30 fixes the sealing layer 31 through anchor bolts 362 and embedded plates 361, so that the sealing layer 31 is fixedly connected to the concrete lining layer 33. The tank wall structure 30 reinforces the concrete lining layer 33 by welding steel bars 37.
[0114] The second aspect of the present disclosure provides a method for constructing an underground hydrogen storage reservoir, and the method for constructing an underground hydrogen storage reservoir comprises the following steps:
[0115] Step 1: Based on the deformation of the surrounding rock and the construction condition parameters, the hydrogen storage cavern is set to a circular cross-section with a diameter greater than 10m; and, based on the hydrogen storage economic constraint, the storage pressure of the hydrogen storage cavern is set to 5MPa~10MPa; at least two groups of hydrogen storage caverns are set, and an air inlet shaft and an air outlet shaft are set on both sides of each hydrogen storage cavern; each group of hydrogen storage caverns is separated into independent caverns by tunnel sealing plugs and shaft sealing plugs;
[0116] Step 2: Determine the layout area of the hydrogen storage reservoir; wherein the layout area must meet the requirements of simple geological structure, complete and stable rock mass, moderate thickness of overlying rock layer, and low hydrogeological water seepage; the vault of the hydrogen storage cavern is set at least 20m below the top surface of the micro-weathering layer, and the buried depth of the hydrogen storage reservoir is calculated based on the deadweight pressure of the overlying rock mass of the hydrogen storage cavern and the pressure inside the hydrogen storage reservoir;
[0117] Step 3: Set up at least one construction tunnel as a transportation channel for excavating the hydrogen storage cavern; wherein the slope of the construction tunnel is not greater than 10%, and a connecting tunnel is used in the middle, and the cross-sectional dimensions of the connecting tunnel and the construction tunnel are consistent;
[0118] Step 4: design the structure of the hydrogen storage cavern, wherein the tank wall structure of the hydrogen storage cavern includes a sealing layer, a sliding layer, a concrete lining layer, anchor bolts and embedded plates, welded steel reinforcement, a sprayed concrete primary support layer and external surrounding rock;
[0119] Step 5: During the excavation of the hydrogen storage cavern during the construction period, different initial support parameters are obtained through finite element numerical simulation verification according to different surrounding rock geological conditions; wherein, anchor spraying structure support is adopted in conventional sections, and steel arch reinforcement support is adopted in poor geological cavern sections; the initial support parameters and the concrete lining layer in step 4 together constitute the final structural support scheme of the hydrogen storage cavern;
[0120] Step 6: a drainage channel is set at the bottom of the hydrogen storage cavern, and the drainage channel is provided with oblique drainage holes in the upper and lower directions of the hydrogen storage cavern respectively; wherein the drainage holes extend beyond the hydrogen storage cavern by no less than 10m in each direction;
[0121] Step seven, at the junction of the shaft and the hydrogen storage cavern, and at the junction of the connecting tunnel and the hydrogen storage cavern, respectively set a transverse reinforced concrete sealing plug and a vertical reinforced concrete sealing plug; wherein, the transverse reinforced concrete sealing plug and the vertical reinforced concrete sealing plug are of truncated cone type, and the concrete strength grade is greater than C40.
[0122] According to the construction method of the underground hydrogen storage disclosed in the present invention, the construction method can meet the needs of large-scale hydrogen storage in the underground hydrogen storage, and solve the problem that it is difficult to store hydrogen on a large scale on the ground. In addition, the moisture in the rock mass around each hydrogen storage cavern 11 is introduced into the drainage lane 21 through a plurality of drainage holes 22, and the groundwater around the hydrogen storage cavern 11 is discharged from the underground hydrogen storage 100 through the drainage lane 21 and the construction lane 13, so as to keep the inner wall of the hydrogen storage cavern 11 dry and improve the safety and reliability of the hydrogen storage cavern 11. At the same time, the drainage holes 22 are arranged around the hydrogen storage cavern 11 to reduce the influence of the drainage system on the internal arrangement of the hydrogen storage cavern 11.
[0123] The construction method of the underground hydrogen storage according to the present disclosure also has the following advantages:
[0124] (1) The present invention aims at the current situation that there is no underground hydrogen storage construction case in China, and the existing storage technology is mainly concentrated in salt caverns, depleted gas reservoirs, abandoned mines and other construction types. The above types are greatly limited by geological structure, geographical resources and location, and it is difficult to meet the construction needs of large-scale underground hydrogen storage. A large-scale cave underground hydrogen storage construction method, system and device are created, which has great advantages in time scale and space scale, is the best way to store hydrogen on a large scale for a long time, is of great significance for overcoming the bottleneck of hydrogen storage technology, and is a domestic first;
[0125] (2) The present invention solves the problems of small scale, high cost, and great limitations of geological conditions and geographical location of existing hydrogen energy storage methods. It invents a method, system and device for constructing a large-scale underground hydrogen storage in rock caves. It describes a system solution from the pressure, burial depth, cave layout, construction tunnels, connecting tunnels, shafts, sealing layers, drainage tunnels to sealing plugs of the hydrogen storage caverns. It only needs to select hard rock formations with moderate strength to meet all construction requirements. It has a high tolerance for geological conditions and a wide range of applications.
[0126] (3) The tank wall structure of the present invention adopts four structures, namely, a concrete primary lining, a sliding layer, a concrete secondary lining, and a sealing material, which effectively solves the problems of hydrogen leakage, corrosion, and brittle cracking caused by the high activity and low viscosity of small molecular hydrogen. The device parameters can be appropriately adjusted according to the actual working conditions, and there is a large optimization space;
[0127] (4) The present invention, through the comprehensive use of a variety of underground structures, monomers and materials, has the advantages of strong targeting, high reliability, convenient operation, low cost and wide application range. It can be quickly applied to my country's hydrogen energy construction, effectively reducing the storage cost of hydrogen and improving the economic benefits of hydrogen, thereby promoting the healthy development of the hydrogen energy industry chain.
[0128] Step 1: Based on the deformation of the surrounding rock and the construction condition parameters, the hydrogen storage cavern is set to a circular cross-section with a diameter greater than 10m; and, based on the economic constraints of hydrogen storage, the storage pressure of the hydrogen storage cavern is set to 5MPa~10MPa; no less than two groups of hydrogen storage caverns are set, and air inlet shafts and air outlet shafts are set on both sides of each hydrogen storage cavern; each group of hydrogen storage caverns is separated into independent caverns by tunnel sealing plugs and shaft sealing plugs.
[0129] Specifically, no less than 2 groups of hydrogen storage caverns are arranged. The embodiment of the present invention arranges 4 groups of hydrogen storage caverns. The length of a single cavern is set to 430m. A Φ6m air inlet shaft and a Φ6m air outlet shaft are arranged on both sides of each hydrogen storage cavern. A total of 8 process shafts are arranged.
[0130] In each group of hydrogen storage caverns, there is an air inlet shaft and an air outlet shaft with a circular cross-section and a direct length of 6m. In the later stage of construction, each group of hydrogen storage caverns is separated into independent caverns by 2 tunnel sealing plugs and 2 shaft sealing plugs to facilitate later operation and maintenance. The above settings are mainly related to the land acquisition of the embodiment of the present invention.
[0131] With reference to the cross-sectional dimensions of similar process shafts, and taking into account the need to use the process shaft as a temporary ventilation shaft during the construction period, as well as the process requirements of the hydrogen storage pipeline, the shaft diameter was determined to be 6.00m.
[0132] Step 2: determine the layout area of the hydrogen storage cavern; wherein, the layout area must meet the requirements of simple geological structure, intact and stable rock mass, moderate thickness of overlying rock layer, and low hydrogeological seepage; the vault of the hydrogen storage cavern is set at least 20m below the top surface of the micro-weathered layer, and the buried depth of the hydrogen storage reservoir is calculated based on the self-weight pressure of the overlying rock mass of the hydrogen storage cavern and the pressure inside the hydrogen storage reservoir.
[0133] Specifically, the buried depth of the hydrogen storage reservoir is calculated based on the deadweight pressure of the rock mass overlying the hydrogen storage cavern and the pressure inside the hydrogen storage reservoir, including:
[0134] A calculation model for the buried depth of a hydrogen storage reservoir is established based on a rigid cone limit equilibrium model; wherein the lower part of the calculation model is a rigid rock layer of a rock layer, and the upper part of the calculation model is a rigid rock layer of a weathering layer;
[0135] Based on the cross-sectional area of the lower part of the calculation model, the formation bulk density of the rock layer and the pressure diffusion angle of the rock layer, the total gravity of the rigid rock layer of the lower rock layer is calculated;
[0136] Based on the cross-sectional area of the upper part of the calculation model, the stratum bulk density of the weathered layer and the pressure diffusion angle of the weathered layer, the total gravity of the upper weathered layer rigid rock layer is calculated;
[0137] Calculating the pressure inside the hydrogen storage tank of the hydrogen storage cavern;
[0138] The sum of the total gravity of the lower rock layer rigid rock mass layer and the total gravity of the upper weathering layer rigid rock mass layer is greater than the hydrogen storage reservoir pressure corresponding to the hydrogen storage reservoir burial depth as the target hydrogen storage reservoir burial depth.
[0139] Furthermore, the buried depth of the hydrogen storage reservoir is obtained based on the following formula:
[0140] The calculation formula for the total gravity of the rigid rock mass overlying the hydrogen storage cavern is as follows:
[0141]
[0142]
[0143]
[0144] Where: W is the total gravity of the overlying rigid rock mass, in N;
[0145] W1 is the total gravity of the rigid rock mass of the overlying rock layer, in N;
[0146] W2 is the total gravity of the rigid rock mass of the overlying weathering layer, in N;
[0147] ρ1 is the formation density of the rock layer, which can be obtained by looking up the table in the Engineering Geology Manual or by indoor test, and the unit is kg / m3;
[0148] ρ2 is the stratum density of the weathered layer, which can be obtained by looking up the table in the Engineering Geology Manual or by indoor test, and the unit is kg / m3;
[0149] g is the acceleration due to gravity, generally taken as 9.81m / s2;
[0150] R is the radius of the hydrogen storage cavern, in m;
[0151] h1 is the thickness of the rock layer overlying the hydrogen storage cavern, in m;
[0152] h2 is the thickness of the weathering layer overlying the hydrogen storage cavern, in m;
[0153] a1 is the stratigraphic diffusion angle of the overlying rock layer, which has no unit and is usually expressed in degrees;
[0154] a1 is the stratum diffusion angle of the overlying weathering layer, which has no unit and is usually expressed in degrees, such as Fig. 20 Shown
[0155] The formula for calculating the pressure inside the hydrogen storage tank of the gas storage tank is as follows:
[0156]
[0157] Where: is the vertical pressure of the hydrogen storage chamber, in N; P is the maximum working pressure of the hydrogen storage chamber, in Pa.
[0158] The safety factor S against ground uplift can meet the safety requirements if S is greater than 1.2. The calculation equation is as follows:
[0159]
[0160] The buried depth of the hydrogen storage reservoir corresponding to the above-mentioned safety factor S for preventing ground uplift is taken as the target buried depth of the hydrogen storage reservoir.
[0161] The depth of the hydrogen storage cavern is about 100m. The upper 45m is a fully weathered to strongly weathered granite layer and a covering soil layer. The stratum bulk density is 2.0×103kg / m3, and the pressure diffusion angle of the weathering layer is 20°. The lower 55m is a moderately weathered to slightly weathered granite stratum. The stratum bulk density is 2.6×103 kg / m3, and the pressure diffusion angle of the rock layer is 30°. The diameter of the hydrogen storage cavern is 10m, and the working pressure is 10MPa, that is, 10×106Pa, so W1=2.6×103×9.81×3.14×(52×55+ ×552×tan230°×55)=3.07×109; W2=2.0×103×9.81×3.14×[(55×tan30°+5)2×45+ ×452×tan220°×45]=0.58×109; W=W1+W2=3.65×109N, and =3.14×52×10×106=7.85×108N, and the safety factor S against ground uplift is 4.65. Therefore, the burial depth of 100m can meet the requirement that the self-weight stress of the overlying rock and soil is greater than the upward compressive stress of the hydrogen storage cavern under the maximum operating pressure, and can meet the safety requirements of the cavern burial depth.
[0162] Step three, set up at least one construction tunnel as a transportation channel for excavating the hydrogen storage cavern; wherein, the slope of the construction tunnel is not greater than 10%, and a connecting tunnel is used in the middle, and the cross-sectional dimensions of the connecting tunnel are consistent with those of the construction tunnel.
[0163] Specifically, the construction tunnels during the construction period are used for construction traffic, water supply and drainage, electricity, slag discharge, and transportation of construction materials for the hydrogen storage caverns. The air inlet and outlet shafts are used for construction ventilation during the construction period, and as entrance and exit passages for hydrogen storage pipelines and maintenance passages during the operation period. With reference to the cross-sectional dimensions of construction tunnels of similar projects, and based on the dimensions of large excavator equipment and the requirements for two-way traffic of large vehicles during construction, the dimensions of the construction tunnel are determined to be 9m (width) × 8m (height) after comprehensive consideration.
[0164] Specifically, two layers of connecting tunnels are used in the middle. Considering the construction convenience, the cross-section of the connecting tunnel is set to the same cross-section as the construction tunnel, with dimensions of 9m (width) × 8m (height).
[0165] Step 4: Design the structure of the hydrogen storage cavern. The tank wall structure of the hydrogen storage cavern includes a sealing layer, a sliding layer, a concrete lining layer, anchor bolts and embedded plates, welded steel reinforcement, a sprayed concrete primary support layer and external surrounding rock.
[0166] Specifically, the sealing layer 31 is used to ensure the tightness of the hydrogen storage cavern 11 and effectively limit the expansion of fine cracks in the external concrete lining layer 33; in order to effectively curb the migration of highly active hydrogen and its reaction with rocks and ordinary steel, the sealing layer 31 mainly uses Q345R lining steel plate with a thickness of 8-20mm, arc processing, and a corrugated plate is set every 10°, and the compensation measures of the lining are increased to control the displacement of the sealing layer 31. In order to effectively reduce the tensile and compressive damage of the tank wall structure under the alternating cyclic load of the underground hydrogen storage, a slip layer 32 is set to reduce the friction between the structural layers of the tank wall structure 30, avoid the strain peak causing cracks in the concrete lining layer 33, and at the same time, the slip layer 32 provides anti-corrosion protection for the sealing layer 31 and seals on the surface of the lining concrete to prevent gas leakage; by arranging 3 layers of aluminum foil at equal intervals between the sealing layer 31 and the concrete lining layer 33, the aluminum foil and the concrete are bonded by high-strength glue, and the thickness of the aluminum foil is 5mm, as the slip layer 32 of the hydrogen storage cavern 11. The concrete lining layer 33 is used to transfer the internal gas pressure to the rock mass, so that the strain caused by the storage pressure change is evenly distributed in the tank wall structure 30, and it also has a leveling function, providing a sliding surface for the sealing layer 31; the 200-500mm steel bar 37 concrete lining layer 33 is cast by formwork, and the concrete type is not less than C40. The sprayed concrete primary support layer 34 is used for the initial support during the construction of the hydrogen storage cavern 11 to ensure the stability of the hydrogen storage cavern 11 during the construction period; generally, two structural forms are adopted: sprayed steel fiber concrete, the type is not less than CF35, and the thickness is set according to the surrounding rock grade, preferably between 100-250mm; sprayed plain concrete + hanging mesh, the plain concrete type is not less than C30, the thickness is set according to the surrounding rock grade, preferably between 100-200, and supplemented by the structural form of hanging a single or double layer of Φ8 steel mesh 37. The external surrounding rock layer 35 is used to bear the alternating cyclic load transmitted from the tank wall structure 30 layers. The tank wall structure 30 of the hydrogen storage cavern 11 is mainly a force-transmitting structure, and the final operation and maintenance load is mainly borne by the external surrounding rock. Therefore, the saturated uniaxial compressive strength of the external surrounding rock should not be less than 60MPa, and the point load splitting tensile strength should not be less than 6MPa.
[0167] Step 5. During the excavation of the hydrogen storage cavern during the construction period, different initial support parameters are obtained through finite element numerical simulation verification based on different surrounding rock geological conditions; among them, anchor spraying structure support is adopted in conventional sections, and steel arch frame reinforced support is adopted in poor geological sections; the initial support parameters and the concrete lining layer in step 4 together constitute the final structural support plan of the hydrogen storage cavern.
[0168] Specifically, as shown in Table 1, Barton's Q system method is used to classify the surrounding rock and take corresponding support measures. , , , , ) Among them, the section with good surrounding rock geological conditions (Q>0.1) adopts anchor spraying structure (for example, 4<Q≤10 support scheme such as Figure 7 As shown in the figure), the steel arch frame 38 is used to strengthen the support structure in areas with poor surrounding rock geological conditions (Q≤0.1 support scheme as shown in the figure). Figure 8 As shown), that is, the poor geological section (Q < 0.1) adopts steel arch frame 38 to strengthen the support structure.
[0169] Table 1 Initial support parameters of gas storage caverns in underground hydrogen storage
[0170]
[0171] Step 51: According to the hydrogen storage cavern support design and the secondary lining structure design, the underground surrounding rock, anchor 39, concrete anchor spraying layer, concrete lining layer and inner lining steel plate sealing layer models are established from the outside to the inside, among which plane strain units are used except for the anchor model, and the anchor model uses beam units.
[0172] Step 52: Boundary conditions: The distance from the left boundary and the right boundary to the nearest hydrogen storage cavern edge is 80m~120m, preferably, the distance is 100m, and both are constrained by normal hinge supports; the distance from the bottom plate of the hydrogen storage cavern to the bottom boundary is 20m~40m, preferably, the distance from the bottom plate of the hydrogen storage cavern to the bottom boundary is 30m, which is a normal hinge support constraint; the distance from the top plate of the hydrogen storage cavern to the top of the model is 110m~130m, preferably, the distance from the bottom plate of the hydrogen storage cavern to the bottom boundary is 120m; the anchor spraying layer and the excavated surrounding rock section and the anchor spraying layer and the lining layer are both in TIE contact, the inner lining steel plate sealing layer and the lining layer are in finite sliding contact, the anchor rod is in embedded contact and bears force together with the surrounding rock, and its end is set to TIE contact with the surrounding rock excavation interface to more realistically simulate the mechanical response of each structural layer.
[0173] Step 53: Set up the model analysis step: The hydrogen storage cavern is set up for one-time excavation. On the basis of the excavation, the ground stress balance analysis step is first set up to make the deformation of the underground stress field zero. After the cavern is excavated, the anchor rod and anchor spray layer unit are activated to realize the cavern support design simulation. After the cavern support, the concrete lining layer and the inner lining steel plate sealing layer are activated to realize the stability analysis simulation of the entire gas storage cavern during the construction period. There are a total of 3 analysis steps.
[0174] Step 54: Set model constitutive parameters: Use the Hoek-Brown strength criterion to determine the rock mass Mohr-Coulomb strength criterion parameters and then calculate the rock mass mechanical parameters and assign values; set anchor parameters according to the structural form. The anchor constitutive model is an elastic constitutive model with an elastic modulus of 200 GPa~220 GPa and a Poisson's ratio of 0.1~0.4; according to different surrounding rock grades , , , , , the parameters of the initial concrete anchor spray layer and the secondary lining layer are set, both using the elastoplastic model; the parameters of the inner lining steel plate sealing layer are set, using the elastic constitutive model, the elastic modulus is 200GPa~220GPa, the Poisson's ratio is 0.1~0.4, and it fits closely with the concrete lining layer.
[0175] Further, according to the survey report of this embodiment, the principal stress of the rock mass increases with depth. Within the test depth range, the magnitude relationship between the three principal stresses is: σ1>σ2>σ3, indicating that horizontal stress in the shallow crust of the region is dominant and horizontal tectonic activity is relatively strong. The load on the model is set as the initial geostress, and the geostress σ2 caused by the model's own weight is vertically set. The maximum horizontal geostress σ1 and the minimum horizontal geostress σ3 are recommended according to the relevant specifications:
[0176] ;
[0177] ;
[0178] Where: is the density of the rock mass, kN / m3; h is the depth of the surrounding rock, m.
[0179] The constitutive parameters are selected according to the following rules:
[0180] ① The Hoek-Brown strength criterion is used to determine the Mohr-Coulomb strength criterion parameters of the rock mass, and the relationship between the principal stresses when the rock block and the rock mass are destroyed is obtained as follows:
[0181] ;
[0182] In the formula, is the maximum principal stress at failure; is the minimum principal stress acting on the rock specimen; is the uniaxial compressive strength of the rock block; m and s are constants related to lithology and structural surface. The relationship table between rock mass quality and empirical constants is obtained according to (Hoek-Brown, 1980).
[0183] Other relevant quantities are calculated as follows:
[0184] ;
[0185] ;
[0186] ;
[0187] ;
[0188] ;
[0189] ;
[0190] In the formula, σ n is the average effective normal stress; To calculate the friction angle in rock mass; To calculate the rock mass cohesion; is the uniaxial compressive strength; is the uniaxial tensile strength of the rock mass. The theoretical calculation results are shown in the following table.
[0191] Table 1 HOEK-BROWN criterion parameter values (mi=25)
[0192]
[0193] ② Anchor parameter values;
[0194] The supporting anchor rods are made of φ25 HRB500 grade hot-rolled steel bars with a spacing of 1000mm×1000mm. The anchor rod length is 4.5m. During the numerical simulation, the anchor rod constitutive model is an elastic constitutive model with an elastic modulus of 210GPa and a Poisson's ratio of 0.3.
[0195] ③ Parameters of anchor spraying layer and concrete lining layer;
[0196] In the design of support for poor strata, the support anchor spray layer uses 300mm thick C30 concrete, and the lining layer uses 500mm thick C40 concrete. In the numerical simulation, the elastic-plastic model is used for both parts.
[0197] ④ Parameters of the inner lining steel plate sealing layer;
[0198] The inner lining plate is processed by arc, Q345R, t=8mm. In the numerical analysis, this part adopts the elastic constitutive model, with an elastic modulus of 210GPa and a Poisson's ratio of 0.3, which fits tightly with the concrete lining layer.
[0199] Step 55: Calculate the mechanical response of the temperature field-stress field caused by thermal expansion: The generalized Hu Ke's law is used to calculate the mechanical response of the temperature field-stress field of the hydrogen storage cavern caused by heat conduction, and the ground stress is assigned in the model; within 0~100℃, the linear expansion coefficient α of concrete is 1.5×10 -5 The linear expansion coefficient α of steel is 1.2×10 -5 ; Based on this, the operating parameter setting of the numerical simulation is completed.
[0200] Specifically, the mechanical response of the temperature field-stress field caused by thermal expansion;
[0201] The gas injection and production work during the operation period of the underground hydrogen storage depot is relatively complicated. The movement of gas under high-pressure hydrogen storage conditions causes the surrounding temperature to rise, and the surrounding temperature drops when the hydrogen storage cavern is emptied. At the same time, the injection and production of hydrogen will produce thermal convection. Therefore, the operation of the hydrogen storage cavern involves complex changes in thermal-structural coupling. To simplify the numerical analysis, the present invention does not consider the thermal convection energy transfer, but only considers the mechanical response of the temperature field-stress field of the hydrogen storage cavern caused by heat conduction.
[0202] The stress caused by temperature change in the elastic body is called thermal stress. When the object is free to expand but is constrained, and the temperature distribution is uniform, no temperature stress will be generated. When the structure is composed of several parts, and the temperature changes evenly and is constrained by the outside world, due to the different thermal expansion coefficients α of various materials, or different expansion modes, each structure is constrained to each other, thus generating different temperature stress fields.
[0203] Since thermal expansion will produce linear expansion or volume expansion instead of shear strain, it conforms to the generalized Hooke's law when analyzing different gas storage conditions in hydrogen storage caverns:
[0204]
[0205] Where: , , are the first, second and third principal stresses respectively; is Poisson's ratio; is the linear expansion coefficient.
[0206] Set the operating parameters of the numerical model:
[0207] The underground hydrogen storage of the present invention can meet the working pressure range of 0-10MPa, and can be charged and depressurized every day in any pressure interval within the working pressure range, and the daily charging and depressurization cycle is 0-4 times. During the operation period of the hydrogen storage cavern, the temperature field needs to be added while simulating the stress field. The temperature field assumes that the cavern temperature during the construction period is 20°C. When the hydrogen storage pressure reaches a peak value of 10MPa, the cavern temperature reaches 60°C. When the hydrogen storage cavern is emptied to 0MPa, the cavern temperature reaches 0°C.
[0208] The storage medium of the present invention is compressed hydrogen. Since the temperature of the hydrogen storage cavern varies within the range of 0-60°C, according to the query of the thermal stress linear expansion coefficient of the concrete lining layer and the lining steel plate sealing layer, within the range of 0-100°C, the linear expansion coefficient α of the concrete is 1.5×10 -5 The linear expansion coefficient α of steel is 1.2×10 -5 Based on this, the operating parameters of the numerical simulation are set.
[0209] Step 56: Model and calculate the structural stability of the underground hydrogen storage reservoir at different stages: 1) Calculate the deformation of the surrounding rock of the hydrogen storage reservoir and the stress distribution around the hydrogen storage cavern during the excavation stage to determine the short-term stability or self-stability of the surrounding rock; 2) Calculate the tensile strength of the anchor rods during the excavation stage to determine the structural stability of the initial support; 3) Calculate the deformation of the surrounding rock of the hydrogen storage reservoir and the stress distribution around the cavern during the operation stage corresponding to the minimum working pressure to determine the long-term stability of the surrounding rock; 4) Calculate the displacement value and yield strength of the free surface of the lining steel plate during the operation stage corresponding to the minimum working pressure to determine the stability of the sealing structure; 5) Calculate 1) Calculate the deformation of the surrounding rock of the hydrogen storage cavern and the stress distribution around the hydrogen storage cavern during the operation stage corresponding to the maximum working pressure, calculate the ground uplift data, and determine the long-term stability of the surrounding rock of the hydrogen storage cavern; 2) Calculate the compressive strength value of the anchor rod during the operation stage corresponding to the maximum working pressure, and determine the long-term stability of the initial support; 3) Calculate the maximum deformation of the lining layer during the operation stage corresponding to the maximum working pressure, determine the long-term stability of the secondary lining, and evaluate the force transmission effect of the support structure to the surrounding rock; 4) Calculate the displacement value and yield strength of the free surface of the lining steel plate during the operation stage corresponding to the maximum working pressure, and determine the stability of the sealing structure.
[0210] Step 57: Determine the long-term stability of the hydrogen storage reservoir based on the ratio of the surrounding rock conditions to the high stress of the hydrogen storage reservoir being lower than the preset value ratio, the convergence deformation rate of the hydrogen storage reservoir being less than or equal to the preset deformation rate, the anchor compressive value being less than the design value of the compressive strength, the anchor tensile value being less than the design value of the tensile strength, the ground uplift simulation value being lower than the preset value, the calculated value of the secondary lining deformation being lower than the design value, the calculated value of the sealing steel plate deformation being lower than the preset value, and the maximum stress value of the sealing steel plate being less than the yield strength.
[0211] 1. The ratio of the surrounding rock conditions of the hydrogen storage cavern to the high stress is lower than the preset value:
[0212] σ max / σ c <0.6;
[0213] Among them, σ max is the maximum secondary principal stress of excavation determined by analysis and calculation, σ c It is the uniaxial compressive strength of rock obtained through indoor tests.
[0214] like Figures 9 to 13 As shown in the figure, under the action of gas storage pressure of 10MPa, the surrounding rock pressure will diffuse far away, causing the circular section to have an enlargement trend, and forming a certain range of plastic zone at the top and bottom of the cavern section.
[0215] The maximum and minimum principal stresses of the chamber section are 0.9 MPa and 10.1 MPa, 10.1 / 45≈0.22, which is much smaller than the index level of 0.6 required for the occurrence of stress risk. That is, the surrounding rock of the cavern does not have the stress conditions that induce stress-type failure risk when the gas storage pressure is 10 MPa.
[0216] 2. The convergence deformation rate of the hydrogen storage cavern is less than or equal to the preset deformation rate;
[0217] The convergence deformation rate is determined according to the large deformation failure criterion. For a circular tunnel, it is the ratio of the convergence deformation to the tunnel diameter. When the convergence deformation rate reaches about 2.5%, the deformation problem begins to become more prominent. Therefore, when the convergence deformation rate of the hydrogen storage cavern is less than or equal to 2.5%, it is determined to meet the stability. Figures 9 to 13 As shown in the figure, the maximum displacement of the cave section is 2.56 mm, and the convergence strain rate is less than 1%, which meets the stability requirements.
[0218] 3. The compression value of the anchor rod is less than the design value of the compressive strength;
[0219] like Fig.14 As shown in the figure, after the cavern gas storage reaches its peak value, the support anchor rod is mainly subjected to axial pressure deep into the surrounding rock, with a maximum value of 32.2KN. The support anchor rod is HRB500 grade hot-rolled steel bar, and its compressive strength design value is 410N / mm 2 , it is calculated that the compressive value of the support anchor is much smaller than the design value of the compressive strength.
[0220] 4. The tensile force on the anchor is less than the design tensile strength;
[0221] When the tensile force value of the anchor rod is less than the design value of the tensile strength, the stability of the anchor rod under tension can be guaranteed.
[0222] 5. The ground uplift simulation value is lower than the preset value;
[0223] When the simulated value of the ground uplift in the hydrogen storage cavern is lower than the preset value of the ground uplift, the ground uplift part of the hydrogen storage cavern meets the stability requirement.
[0224] 6. The calculated value of secondary lining deformation is lower than the design value;
[0225] like Fig.15 As shown, when the calculated value of the deformation of the concrete lining layer is lower than the preset value of the lining layer, the deformation of the concrete lining layer meets the stability requirement.
[0226] 7. The calculated value of the deformation of the sealing steel plate is lower than the preset value;
[0227] When the calculated value of the deformation amount of the steel plate of the sealing layer is lower than the preset value of the steel plate, the steel plate of the sealing layer meets the stability requirement.
[0228] 8. The maximum stress value of the steel plate in the sealing layer is less than the yield strength.
[0229] like Fig.16 As shown, after the cavern gas storage reaches its peak, the maximum deformation of the concrete lining layer is 2.87 mm, and the maximum stress of the sealing layer steel plate is 196 MPa, which is less than the yield strength of the steel in the sealing layer.
[0230] In some embodiments of the present disclosure, the spacing between the drainage holes of the drainage system ranges from 10m to 20m, and the aperture range of the drainage holes is from 90mm to 120mm. The effect of the drainage holes is to drain the groundwater within 10m around the hydrogen storage cavern, keep the surrounding rock around the hydrogen storage cavern dry, and thus keep the desaturated state of the tank wall structure of the hydrogen storage cavern, so that the sealing steel plate can avoid being in a wet or dry-wet alternating environment. The wet or dry-wet alternating environment will accelerate the corrosion of the steel plate and affect the service life of the hydrogen storage cavern. Usually, the design service life of the underground cavern is 50 years. Since the sealing steel plate is welded to the second lining concrete embedded part, it is impossible to carry out anti-corrosion construction when it is close to the second lining concrete layer, and anti-corrosion construction can only be carried out on the air-facing side close to the cavern, so it is very susceptible to groundwater corrosion when it is close to the second lining concrete layer, so the drainage hole is set. The design of drainage holes is usually simulated and calculated using finite element software FEFLOW or MODFLOW. A groundwater seepage model is constructed based on the actual engineering design. The formation permeability coefficient is set based on the permeability coefficient zoning obtained from hydrogeological tests. Then, different operating conditions and drainage systems with different spacings are set up, and the final layout plan is obtained through simulation and calculation.
[0231] The method for determining the parameters of the drainage system includes:
[0232] Constructing a groundwater seepage model: setting the regional model boundary according to the drainage lanes of the underground hydrogen storage reservoir, the underground engineering design plan of the underground hydrogen storage reservoir, the groundwater source and sink area and the discharge datum surface, wherein the surrounding boundaries are given a fixed head boundary according to the discharge datum surface, the upper boundary of the model is constructed according to the actual terrain of the underground hydrogen storage reservoir, the lower boundary of the model exceeds the bottom plate of the underground hydrogen storage reservoir by more than 200m, and the boundaries on both sides of the model exceed the boundaries of the underground hydrogen storage reservoir by more than 500m;
[0233] Set model parameters: set the permeability coefficients in the x, y, and z directions according to the single-hole experimental data, set the fixed head boundary according to the buried depth of the hydrogen storage reservoir and the groundwater level information, and set the phreatic level according to the topographic survey data. The upper boundary of the model is the precipitation recharge, evaporation, and well discharge boundary, which are assigned according to the second and third boundary conditions. The lower boundary of the model is a water-blocking boundary with zero flux. The surrounding areas of the model are flow boundaries, which are assigned according to the first boundary conditions. The drainage lanes and drainage holes are set as flow boundaries, which are assigned according to the first boundary conditions.
[0234] Set the simulated working conditions: 1) Set the upper drainage holes at 20m intervals, and set the lower drainage holes at 20m intervals; 2) Set the upper drainage holes at 15m intervals, and set the lower drainage holes at 20m intervals; 3) Set the upper drainage holes at 15m intervals, and set the lower drainage holes at 15m intervals; 4) Set the upper drainage holes at 10m intervals, and set the lower drainage holes at 15m intervals; 5) Set the upper drainage holes at 10m intervals, and set the lower drainage holes at 10m intervals;
[0235] Finite element software is used to simulate the groundwater seepage field of the underground hydrogen storage reservoir during construction, and the water inflow of the rock cave of the underground hydrogen storage reservoir under various working conditions during construction is calculated. The drainage system is determined to be stable based on the fact that all groundwater traces around the underground hydrogen storage reservoir point to the outside of the hydrogen storage cavern and / or the fact that the water inflow of the hydrogen storage cavern of the underground hydrogen storage reservoir is zero, and the parameters of the drainage laneway and the drainage hole are determined.
[0236] According to the recommended drainage system scheme, the parameters of the finite element numerical model are changed to simulate the groundwater seepage field of the underground hydrogen storage reservoir during construction, and the water inflow of the hydrogen storage cavern of the underground hydrogen storage reservoir during construction is calculated. Combined with the calculation results of the seepage field during operation, the construction organization design of the drainage tunnels and drainage holes during construction is reasonably set. For example, N drainage holes are constructed in advance to keep the underground hydrogen storage reservoir dry during construction, which helps to reduce the difficulty of construction and save project costs.
[0237] In some embodiments of the present disclosure, at the end of construction, sealing plugs are installed between the hydrogen storage cavern and the air intake shaft, between the hydrogen storage cavern and the exhaust shaft, and between the hydrogen storage cavern and the connecting tunnel.
[0238] Specifically, the sealing plug adopts a truncated cone type, and the concrete strength grade should be greater than C40; in addition to bearing static loads (self-weight, equipment, pipelines, hydrostatic pressure, soil pressure), the sealing plug must also withstand the gas storage pressure during the gas storage cavern filling and deflation process and the vibration load from the inside;
[0239] The length of the sealing plug shaft section is 6m, and the length of the sealing plug connecting tunnel section is 10m. Fig.17 As shown in the figure, the sealing plug is designed as an elastic body, and the force is analyzed by finite element analysis. The joint between the sealing plug and the surrounding rock will be strengthened with anchor support; considering its sealing effect, system grouting is carried out within 10m on both sides of the sealing plug, and backfill grouting and contact grouting are carried out at the joint between the surrounding rock and concrete.
[0240] The upper part of the shaft sealing plug will be backfilled with a bentonite waterproof layer with a thickness of not less than 17m.
[0241] The sealing plug is made of non-shrinkage concrete with a concrete strength grade of C40 and a water-resistance grade of P12. The thickness of the steel bar protective layer is 70mm. A Ф8@150x150 steel mesh is installed in the protective layer (no mesh is installed on the keyway surface). The thickness of the steel mesh protective layer is 25mm.
[0242] Except for the Ф8@150x150 steel mesh which uses HPB300 grade steel bars, the rest are HRB400E grade steel bars.
[0243] All steel materials used are Q235-B grade structural steel. Exposed concrete embedded parts are sandblasted and derusted before installation (rust removal grade 2.5), first sprayed with 80μm epoxy zinc-rich primer, and then sprayed with 220μm solvent-free liquid epoxy paint as topcoat.
[0244] The cement used for sealing plug concrete is 42.5 grade ordinary Portland cement; fly ash, slag, etc. can be added in the mix proportion test to reduce the hydration heat. In order to meet the construction needs, expansion agent, water reducer, air entraining agent, retarder and other admixtures should also be added according to the performance requirements of concrete in different parts.
[0245] Grouting is done with cement slurry, and the strength grade of cement is not less than 42.5. However, when the width of the rock crack is less than 0.2mm, in order to meet the specified waterproof requirements, ultra-fine cement slurry of not less than 42.5 can be used. Grouting materials should be properly stored to prevent material hydration and loss of original material properties. In particular, cement should be strictly moisture-proof and the storage time should be shortened. Cement that is damp and agglomerated should not be used. Grouting water should not contain substances that prevent bentonite hydration and cement coagulation, and should comply with the regulations for mixing water for hydraulic concrete. The type and amount of admixtures and additives added to the grouting slurry should be determined through indoor slurry material tests and on-site grouting tests.
[0246] Contact grouting slurry should use non-shrinkage cement slurry, the water-cement ratio should be 0.8~1.0, and bentonite should not be added. The 28-day compressive strength of a 5cm×5cm×5cm cubic specimen should not be less than 12MPa.
[0247] The transverse reinforced concrete sealing plug and the vertical reinforced concrete sealing plug are designed with elastic body and the stress analysis is carried out by finite element method, including:
[0248] a) Boundary conditions
[0249] Usually in geotechnical engineering, the rock mass within 2 to 3 times the span of the hydrogen storage cavern is taken as the research object. Since the cavern of this embodiment is located in a high-strength, high-integrity rock mass, the present invention complies with this convention and selects a rock mass about 3 times the span around the sealing plug as the research object, and the displacement of the outer boundary of the surrounding rock mass is zero. According to the regulation that the maximum storage pressure of the hydrogen storage cavern is 10MPa, the pressure is applied to the left and right ends of the sealing type in the connecting tunnel; in addition, the upper end of the sealing plug is subjected to the head pressure of 90 to 100m above.
[0250] b) Interface Assumptions
[0251] The sealing plug is a structure formed by woven steel skeleton and cast concrete in the cavity formed after the excavation of the construction tunnel. The bonding effect at the interface between the sealing plug and the surrounding rock is crucial to the stability of the plug structure and the sealing effect. According to the design, it is assumed that the sealing plug is in good contact with the surrounding rock without relative sliding, which is a consolidated contact form.
[0252] c) Calculation results
[0253] The finite element calculation was completed based on the assumption that there is no relative sliding on the interface, and the parameters selected are as follows:
[0254] The gas pressure on both sides of the sealing plug is 10MPa, and the upper interface of the sealing plug is subjected to a water head pressure of 1MPa
[0255] Rock mass elastic modulus: 9000MPa, Poisson's ratio: 0.2; sealing plug elastic modulus: 11500MPa, Poisson's ratio: 0.2.
[0256] The sealing plug is determined to be safe based on the fact that the maximum displacement of the sealing plug is less than the preset displacement and the fact that the stress value of the sealing plug is less than the preset stress value.
[0257] like Fig.17 As shown, the maximum displacement value of the sealing plug is 0.05 mm, which is smaller than the preset displacement value. Fig.18 , Fig.19 As shown in the figure, the maximum combined stress of the sealing plug is 15.7MPa, and the maximum combined stress is distributed at the edge of the sealing plug. The average pressure on the bearing surface of the sealing plug is between 8 and 10MPa. Both the maximum combined stress and the average pressure on the bearing surface are less than the design value of the concrete axial compressive strength, that is, less than the preset stress value of the sealing plug. Therefore, the maximum displacement of the sealing plug, 0.05mm, is less than the preset displacement, and the maximum combined stress of the sealing plug and the average pressure on the bearing surface of the sealing plug are less than the preset stress value of the sealing plug, that is, the sealing plug structure is safe.
[0258] It is to be understood that the above embodiments are merely exemplary embodiments used to illustrate the principles of the present disclosure, but the present disclosure is not limited thereto. For those of ordinary skill in the art, various modifications and improvements can be made without departing from the spirit and substance of the present disclosure, and these modifications and improvements are also considered to be within the scope of protection of the present disclosure.
Claims
1. A method for constructing an underground hydrogen storage reservoir, characterized in that: The method comprises the following steps: Step 1: Based on the deformation of the surrounding rock and the construction condition parameters, the hydrogen storage cavern is set to a circular cross-section with a diameter greater than 10m; and, based on the hydrogen storage economic constraint, the storage pressure of the hydrogen storage cavern is set to 5MPa~10MPa; at least two groups of hydrogen storage caverns are set, and an air inlet shaft and an air outlet shaft are set on both sides of each hydrogen storage cavern; each group of hydrogen storage caverns is separated into independent caverns by tunnel sealing plugs and shaft sealing plugs; Step 2: Determine the layout area of the hydrogen storage cavern; wherein the layout area needs to meet the requirements of simple geological structure, complete and stable rock mass, moderate thickness of overlying rock layer, and low hydrogeological water seepage; the vault of the hydrogen storage cavern is set at least 20m below the top surface of the micro-weathering layer, and the buried depth of the hydrogen storage reservoir is calculated based on the deadweight pressure of the overlying rock mass of the hydrogen storage cavern and the pressure inside the hydrogen storage reservoir; Step 3: Set up at least one construction tunnel as a transportation channel for excavating the hydrogen storage cavern; wherein the slope of the construction tunnel is not greater than 10%, and a connecting tunnel is used in the middle, and the cross-sectional dimensions of the connecting tunnel and the construction tunnel are consistent; Step 4: design the structure of the hydrogen storage cavern, wherein the tank wall structure of the hydrogen storage cavern includes a sealing layer, a sliding layer, a concrete lining layer, anchor bolts and embedded plates, welded steel reinforcement, a sprayed concrete primary support layer and external surrounding rock; Step 5: During the excavation of the hydrogen storage cavern during the construction period, different initial support parameters are obtained through finite element numerical simulation verification according to different surrounding rock geological conditions; wherein, anchor spraying structure support is adopted in conventional sections, and steel arch reinforcement support is adopted in poor geological cavern sections; the initial support parameters and the concrete lining layer in step 4 together constitute the final structural support scheme of the hydrogen storage cavern; Step 6: a drainage channel is set at the bottom of the hydrogen storage cavern, and the drainage channel is provided with oblique drainage holes in the upper and lower directions of the hydrogen storage cavern respectively; wherein the drainage holes extend beyond the hydrogen storage cavern by no less than 10m in each direction; Step seven, at the junction of the vertical shaft and the hydrogen storage cavern, and at the junction of the connecting tunnel and the hydrogen storage cavern, respectively set a transverse reinforced concrete sealing plug and a vertical reinforced concrete sealing plug; wherein, the transverse reinforced concrete sealing plug and the vertical reinforced concrete sealing plug are of truncated cone type, and the concrete strength grade is greater than C30.
2. The method according to claim 1, characterized in that The buried depth of the hydrogen storage reservoir is calculated based on the deadweight pressure of the rock mass overlying the hydrogen storage cavern and the pressure inside the hydrogen storage reservoir, including: A calculation model for the buried depth of a hydrogen storage reservoir is established based on a rigid cone limit equilibrium model; wherein the lower part of the calculation model is a rigid rock layer of a rock layer, and the upper part of the calculation model is a rigid rock layer of a weathering layer; Based on the cross-sectional area of the lower part of the calculation model, the formation bulk density of the rock layer and the pressure diffusion angle of the rock layer, the total gravity of the rigid rock layer of the lower rock layer is calculated; Based on the cross-sectional area of the upper part of the calculation model, the stratum bulk density of the weathered layer and the pressure diffusion angle of the weathered layer, the total gravity of the upper weathered layer rigid rock layer is calculated; Calculating the pressure inside the hydrogen storage tank of the hydrogen storage cavern; The sum of the total gravity of the lower rock layer rigid rock mass layer and the total gravity of the upper weathering layer rigid rock mass layer is greater than the hydrogen storage reservoir pressure corresponding to the hydrogen storage reservoir burial depth as the target hydrogen storage reservoir burial depth.
3. The method according to claim 2, characterized in that The buried depth of the hydrogen storage reservoir is obtained based on the following formula: The calculation formula for the total gravity of the rigid rock mass overlying the hydrogen storage cavern is as follows: Where: W is the total gravity of the overlying rigid rock mass, W 1 is the total gravity of the rigid rock layer in the lower rock layer, W 2 is the total gravity of the upper weathering rigid rock layer; ρ1 is the formation density of the rock layer, ρ2 is the formation density of the weathering layer, g is the gravitational acceleration, R is the radius of the hydrogen storage cavern, h1 is the thickness of the rock layer overlying the hydrogen storage cavern, h2 is the thickness of the weathering layer overlying the hydrogen storage cavern; a1 is the formation diffusion angle of the overlying rock layer, and a2 is the formation diffusion angle of the overlying weathering layer; The calculation formula for the pressure inside the hydrogen storage tank of the gas storage tank is as follows: Where: is the pressure inside the hydrogen storage chamber of the hydrogen storage cavern, and P is the maximum working pressure of the hydrogen storage cavern; The safety factor S against ground uplift can meet the safety requirements if S is greater than 1.
2. The calculation equation is as follows: The buried depth of the hydrogen storage reservoir corresponding to the above-mentioned safety factor S for preventing ground uplift is taken as the target buried depth of the hydrogen storage reservoir.
4. The method according to any one of claims 1 to 3, characterized in that: The sealing layer adopts Q345R lining steel plate, and the thickness of the lining steel plate ranges from 8mm to 20mm, and the lining steel plate is processed in an arc, and a corrugated plate is set every 10° to increase the compensation measures of the lining to control the displacement of the sealing layer; and / or, The slip layer is used to reduce the friction between the structural layers and avoid cracks in the concrete lining layer caused by strain peaks. At the same time, the slip layer provides anti-corrosion protection for the sealing layer and seals on the surface of the lining concrete to prevent gas leakage. The slip layer is obtained by arranging multiple layers of aluminum foil at equal intervals between the sealing layer and the concrete lining layer. The aluminum foil and the concrete are bonded by high-strength adhesive, and the thickness of the aluminum foil ranges from 3 mm to 7 mm.
5. The method according to any one of claims 1 to 3, characterized in that: The concrete lining layer is used to transfer the internal gas pressure to the rock mass, so that the strain caused by the storage pressure change is evenly distributed in the tank structure, and has a leveling function, providing a sliding surface for the sealing layer; the concrete lining layer is cast by supporting the formwork to form a 200mm~500mm reinforced concrete lining layer, and the concrete type is not less than C40; and / or, The anchor bolts and embedded plates are used to fix the sealing layer and the sliding layer to the concrete lining layer; the sealing layer is an inner lining steel plate, the embedded plates are connected to the inner lining steel plate by fillet welding, and the spacing of the embedded plates in the width and length directions of the inner lining steel plate is consistent with the plate width of the inner lining steel plate; and / or, The sprayed concrete primary supporting layer is used for the initial support during the construction of the hydrogen storage cavern to ensure the stability of the hydrogen storage cavern during the construction period; the sprayed concrete primary supporting layer adopts sprayed steel fiber concrete, the model is not less than CF35, and the thickness ranges from 100mm to 250mm; or, the sprayed concrete primary supporting layer adopts sprayed plain concrete + hanging mesh, the plain concrete model is not less than C30, the thickness ranges from 100mm to 200mm, and is supplemented by a single-layer and double-layer steel mesh structure.
6. The method according to any one of claims 1 to 3, characterized in that: During the excavation of the hydrogen storage cavern during the construction period, different initial support parameters were obtained through finite element numerical simulation based on different surrounding rock geological conditions, including: According to the initial support design of the hydrogen storage cavern and the secondary lining structure design, the underground surrounding rock, anchor bolt, concrete anchor spraying primary support layer, concrete secondary lining layer, and inner lining steel plate sealing layer models are established from outside to inside. Except for the anchor bolt model, plane strain units are used in all other models, and beam units are used in the anchor bolt model. Boundary conditions are set: the distance from the left boundary and the right boundary to the nearest hydrogen storage cavern is 80m~120m, and both are constrained by normal hinge supports; the distance from the bottom plate of the hydrogen storage cavern to the bottom boundary is 20m~40m, which is a normal hinge support constraint; the distance from the top plate of the hydrogen storage cavern to the top of the model is 110m~130m; the anchor spraying layer and the excavated surrounding rock section and the anchor spraying layer and the lining layer are both in TIE contact, the sealing layer of the inner lining steel plate and the lining layer are in finite sliding contact, the anchor rod is in embedded contact and is subjected to force together with the surrounding rock, and its end is in TIE contact with the surrounding rock excavation interface, which simulates the mechanical response of each structural layer more realistically; Setting the model analysis steps: The hydrogen storage cavern is set for one-time excavation. On the basis of excavation, the ground stress balance analysis step is first set to make the deformation of the underground stress field zero. After the hydrogen storage cavern is excavated, the anchor rod and anchor spray layer unit are activated to realize the hydrogen storage cavern support design simulation. After the hydrogen storage cavern is supported, the concrete lining layer and the lining steel plate sealing layer are activated to realize the stability analysis simulation of the entire gas storage reservoir construction period. There are three analysis steps in total; Set model constitutive parameters: Use the Hoek-Brown strength criterion to determine the rock mass Mohr-Coulomb strength criterion parameters and then calculate the rock mass mechanical parameters and assign values; Set anchor parameters according to the structural form. The anchor constitutive model is an elastic constitutive model with an elastic modulus of 200GPa~220GPa and a Poisson's ratio of 0.1~0.4; According to different surrounding rock grades , , , , , set the parameters of the initial concrete anchor spray layer and the secondary lining layer, both using the elasto-plastic model; set the parameters of the lining steel plate sealing layer, using the elastic constitutive model, with an elastic modulus of 200GPa~220GPa and a Poisson's ratio of 0.1~0.4, which fits closely with the concrete lining layer; Calculate the mechanical response of the temperature field-stress field caused by thermal expansion: The generalized Hu Ke's law is used to calculate the mechanical response of the temperature field-stress field of the hydrogen storage cavern caused by heat conduction, and the ground stress is assigned in the model; within 0~100℃, the linear expansion coefficient α of concrete is 1.5×10 -5 The linear expansion coefficient α of steel is 1.2×10 -5 ; Based on this, the operation parameter setting of the numerical simulation is completed; Modeling and calculation of the structural stability of the hydrogen storage cavern at different stages: 1) Calculate the deformation of the surrounding rock of the hydrogen storage cavern and the stress distribution around the hydrogen storage cavern during the excavation stage to determine the short-term stability or self-stability of the surrounding rock; 2) Calculate the tensile strength of the anchor rods during the excavation stage to determine the structural stability of the initial support; 3) Calculate the deformation of the surrounding rock of the hydrogen storage cavern and the stress distribution around the cavern during the operation stage corresponding to the minimum working pressure to determine the long-term stability of the surrounding rock; 4) Calculate the displacement value and yield strength of the free surface of the lining steel plate during the operation stage corresponding to the minimum working pressure to determine the stability of the sealing structure; 5) Calculate the maximum The deformation of the surrounding rock of the hydrogen storage cavern during the operation phase corresponding to the working pressure and the stress distribution around the hydrogen storage cavern are used to calculate the ground uplift data and determine the long-term stability of the surrounding rock of the hydrogen storage cavern; 6) The compressive strength value of the anchor rod during the operation phase corresponding to the maximum working pressure is calculated to determine the long-term stability of the initial support; 7) The maximum deformation of the lining layer during the operation phase corresponding to the maximum working pressure is calculated to determine the long-term stability of the secondary lining and evaluate the force transmission effect of the support structure to the surrounding rock; 8) The displacement value and yield strength of the free surface of the lining steel plate during the operation phase corresponding to the maximum working pressure are calculated to determine the stability of the sealing structure; The hydrogen storage cavern is judged to be stable in the long term based on the fact that the ratio of the surrounding rock conditions and the high stress of the hydrogen storage cavern is lower than the preset value, the convergence deformation rate of the hydrogen storage cavern is less than or equal to the preset deformation rate, the compression value of the anchor rod is less than the design value of the compressive strength, the tension value of the anchor rod is less than the design value of the tensile strength, the simulated ground uplift value is lower than the preset value, the calculated value of the secondary lining deformation is lower than the design value, the calculated value of the sealing steel plate deformation is lower than the preset value, and the maximum stress value of the sealing steel plate is less than the yield strength.
7. The method according to any one of claims 1 to 3, characterized in that: The spacing between the drainage holes ranges from 10m to 20m, and the diameter of the drainage holes ranges from 90mm to 120mm.
8. The method according to any one of claims 1 to 3, characterized in that: The method for determining the parameters of the drainage lane and the drainage hole comprises: Construct a groundwater seepage model: set the regional model boundary according to the underground engineering design scheme of the drainage tunnel, underground hydrogen storage reservoir, groundwater source and sink area and discharge datum surface. The surrounding boundaries are given a fixed head boundary according to the discharge datum surface, the upper boundary of the model is constructed according to the actual terrain of the underground hydrogen storage reservoir, the lower boundary of the model exceeds the bottom plate of the hydrogen storage cavern by more than 200m, and the two side boundaries of the model exceed the boundary of the hydrogen storage cavern by more than 500m; Set model parameters: set the permeability coefficients in the x, y, and z main directions according to the single-hole experimental data, set the fixed head boundary according to the buried depth of the hydrogen storage cavern and the groundwater level information, and set the phreatic level according to the topographic survey data. The upper boundary of the model is the precipitation recharge, evaporation, and well discharge boundary, which are assigned values according to the second and third boundary conditions. The lower boundary of the model is a water-blocking boundary with zero flux. The surrounding areas of the model are flow boundaries, which are assigned values according to the first boundary conditions. The drainage lanes and drainage holes are set as flow boundaries, which are assigned values according to the first boundary conditions. Set the simulated working conditions: 1) Set the upper drainage holes at 20m intervals, and set the lower drainage holes at 20m intervals; 2) Set the upper drainage holes at 15m intervals, and set the lower drainage holes at 20m intervals; 3) Set the upper drainage holes at 15m intervals, and set the lower drainage holes at 15m intervals; 4) Set the upper drainage holes at 10m intervals, and set the lower drainage holes at 15m intervals; 5) Set the upper drainage holes at 10m intervals, and set the lower drainage holes at 10m intervals; Finite element software is used to simulate the groundwater seepage field of the underground hydrogen storage reservoir during construction, and the rock cave water inflow of the underground hydrogen storage cavern under various working conditions during construction is calculated. Based on the fact that all groundwater traces around the underground hydrogen storage cavern point to the outside of the cave, and / or based on the fact that the rock cave water inflow of the underground hydrogen storage cavern is zero, the parameters of the drainage laneway and the drainage hole are determined.
9. The method according to any one of claims 1 to 3, characterized in that The transverse reinforced concrete sealing plug and the vertical reinforced concrete sealing plug are designed with elastic bodies and subjected to stress analysis using finite elements, specifically including: a) Boundary conditions The rock mass 2 to 3 times larger than the sealing plug was selected as the research object, and the displacement of the outer boundary of the surrounding rock mass was zero; according to the maximum storage pressure of the hydrogen storage cavern, the pressure was applied to the left and right ends of the sealing type connecting the tunnel; in addition, the upper end of the sealing plug was subjected to the water head pressure of 90m to 100m above; b) Interface Assumptions The sealing plug is a structure formed by weaving a steel frame and cast concrete in the cavity formed after the construction tunnel is excavated. The bonding effect of the interface between the sealing plug and the surrounding rock is crucial to the stability of the plug structure and the sealing effect. According to the design, it is assumed that the sealing plug has good contact with the surrounding rock without relative sliding, which is a consolidated contact form. c) Calculation results The finite element calculation was completed on the assumption that there is no relative sliding at the interface. The gas pressure on both sides of the sealing plug, the head pressure on the upper interface of the sealing plug, the elastic modulus and Poisson's ratio of the rock mass, and the elastic modulus and Poisson's ratio of the sealing plug were selected to obtain the force analysis results of the sealing plug.
10. An underground hydrogen storage reservoir, characterized in that: The underground hydrogen storage reservoir is constructed according to the underground hydrogen storage reservoir construction method according to any one of claims 1 to 9, and the underground hydrogen storage reservoir comprises: A storage body, the storage body comprising: at least two groups of hydrogen storage caverns, connecting tunnels and construction tunnels, each group of hydrogen storage caverns being separated into independent caverns by tunnel sealing plugs and shaft sealing plugs, an air intake shaft and an exhaust shaft being respectively arranged at both ends of each hydrogen storage cavern, the air intake shaft and the exhaust shaft being both dug from the surface perpendicular to the ground to the underground, a tank wall structure being formed on the inner wall of the hydrogen storage cavern, the tank wall structure comprising a sealing layer, a sliding layer, a concrete lining layer, a shotcrete primary support layer and an external surrounding rock layer being sequentially arranged along the direction from the inside to the outside of the hydrogen storage cavern; Two adjacent hydrogen storage caverns are connected by two connecting lanes, and the two connecting lanes are arranged at intervals along the length direction of the hydrogen storage caverns, wherein one connecting lane connects the upper parts of the two adjacent hydrogen storage caverns, and the other connecting lane connects the lower parts of the two adjacent hydrogen storage caverns; The construction lane is arranged in the middle of at least two groups of hydrogen storage caverns, the construction lane is arranged along the length direction of the hydrogen storage caverns, and the two connecting lanes located in the middle of the storage body are connected to the construction lane; A drainage system, the drainage system comprising: a drainage alley and a drainage hole, the connecting alley is connected to the drainage alley, the drainage alley is communicated with the drainage hole, the drainage alley is provided between each pair of the hydrogen storage caverns, and a plurality of drainage holes are arranged around each of the hydrogen storage caverns.
Citation Information
Patent Citations
Hydrogen storage structure based on deep underground cavern composite reinforcement and construction method thereof
CN115075879A
Underground hydrogen storage device, system and method
CN115680771A
Cluster type hydrogen storage well of abandoned mine vertical shaft and construction method of cluster type hydrogen storage well
CN116557066A
Underground high-pressure hydrogen storage shaft lining structure of double-steel-plate-concrete combined structure and construction method
CN118208239A
Method of making and operation of underground gas storage in salt bearing rocks
RU2055007C1