A debris flow flood disaster monitoring and early warning system and method
By utilizing distributed processing and multi-level risk prediction methods in the debris flow and flood monitoring and early warning system, combined with static and dynamic image analysis, and weather prediction information, the problem of high data processing pressure on cloud equipment is solved, and response speed and risk assessment are improved. The accuracy of the system enhances the flexibility and adaptability of the system and reduces the cost.
Patent Information
- Application Number
- CN202411100508.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-08-12
AI Technical Summary
In the existing debris flow and flood monitoring and early warning systems, the data processing pressure of cloud equipment is high and the response delay is high. As the risk possibility increases, the possibility of interruption of the identification process also increases, affecting the timeliness and accuracy of early warning.
By performing preliminary risk prediction and data upload on the first image acquisition device, the data processing burden of the cloud device is reduced, a distributed processing method is adopted to transfer the initial risk prediction to the fixed device, and a multi-level risk prediction method is combined with static and Dynamic image analysis, combined with weather forecast information for progressively precise assessment, and using knowledge distillation technology to run models suitable for their computing capabilities on different devices.
It improves the overall response time and data processing efficiency, reduces the computing burden on cloud devices, enhances the flexibility and adaptability of monitoring and early warning systems, improves the accuracy and reliability of risk assessment, and reduces the need for high-performance computing resources. demand and save related costs.
Smart Images

Figure CN118674274B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of big data processing technology, and in particular to a debris flow and flood disaster monitoring and early warning system and method. Background Art
[0002] Debris flow and flood monitoring and early warning refers to the identification and assessment of potential risks in advance through real-time monitoring, data analysis and prediction of areas where debris flow and floods occur, so as to take preventive measures and emergency responses in a timely manner. Its main purpose is to reduce the damage caused by disasters and protect people's lives and property.
[0003] At present, when monitoring and warning of debris flow and flood disasters, most of the potential risks are identified and assessed in advance by the cloud. Therefore, the data processing pressure of cloud devices is high and the response delay is high. As the possibility of risk continues to increase, the possibility of interruption of the identification process also increases. Summary of the invention
[0004] The present application provides a debris flow and flood disaster monitoring and early warning system and method, and the present application adopts the following technical solutions:
[0005] In a first aspect, a debris flow and flood disaster monitoring and early warning method is provided, the method comprising:
[0006] The first image acquisition device acquires a static monitoring image of a first monitoring period of the area to be monitored, and determines an initial risk prediction result of a second period of the area to be monitored based on the static monitoring image of the first monitoring period, wherein the risk prediction result includes a risk prediction level, and the first image acquisition device is a fixed device;
[0007] When the initial risk prediction level is greater than or equal to a preset threshold, the first image acquisition device obtains the current communication state, and uploads the prediction data packet of the area to be monitored to the cloud device according to the communication state;
[0008] The cloud device obtains the forecast weather information of the second period of the area to be monitored, and determines the final risk forecast result of the second period of the area to be monitored based on the forecast weather information of the second period and the forecast data packet;
[0009] When the final risk prediction level of the second period is greater than or equal to the preset threshold, the second image acquisition device acquires static monitoring images and dynamic monitoring images of the second monitoring period of the area to be monitored, and the second image acquisition device is a mobile device;
[0010] The second image acquisition device determines the risk prediction results and corresponding early warning strategies for the third period of the monitored area based on the static monitoring images and dynamic monitoring images of the second monitoring period. The second period is the period after the first period, and the third period is the period after the second period.
[0011] In one embodiment of the present application, the first image acquisition device is deployed with a first model, and the initial risk prediction result of the second period of the monitored area is determined according to the static monitoring image of the first monitoring period, including:
[0012] Inputting the static monitoring images of the first monitoring period into the first model to obtain the initial risk prediction results and risk identification confidence of the second period of the monitored area;
[0013] When the risk identification confidence level is greater than or equal to a threshold, the initial risk prediction result, the static monitoring image, and the historical data packet are encapsulated as a prediction data packet;
[0014] When the risk identification confidence is less than a threshold, the risk identification confidence, the static monitoring image and the initial risk prediction result are packaged as a historical data packet.
[0015] In one embodiment of the present application, obtaining the current communication state and uploading the predicted data packet of the area to be monitored to the cloud device according to the communication state includes:
[0016] Obtaining a stored node status table, and determining a plurality of candidate communication links according to the node status table;
[0017] Determine a primary communication link and multiple secondary communication links according to the matching degree between the predicted data packet and the candidate communication links;
[0018] The prediction data packet is divided into multiple sub-prediction data packets, and the multiple sub-prediction data packets are uploaded to the cloud device through a main communication link and multiple auxiliary communication links.
[0019] In one embodiment of the present application, the final risk prediction result of the second period of the monitored area is determined according to the forecast weather information and forecast data packet of the second period, including:
[0020] The cloud device dynamically constructs a second model according to the forecast data packet, constructs a first input feature according to the static monitoring image of the first monitoring period, and constructs a second input feature according to the forecast weather information of the second period;
[0021] The first input feature and the second input feature are input into the second model to obtain a final risk prediction result of the second cycle.
[0022] In one embodiment of the present application, the second image acquisition device acquires static monitoring images and dynamic monitoring images of the second monitoring period of the area to be monitored, including:
[0023] The cloud device determines a mobile monitoring strategy for the second image acquisition device according to the final risk prediction result of the second cycle and the communication status of the first image acquisition device;
[0024] The second image acquisition device inspects the monitored area according to the mobile monitoring strategy, obtains monitoring images of the second monitoring period, and receives the static monitoring images of the second monitoring period of the monitored area uploaded by the first image acquisition device.
[0025] In one embodiment of the present application, before the second image acquisition device acquires the static monitoring image and the dynamic monitoring image of the second monitoring period of the area to be monitored, the method further includes:
[0026] The cloud device performs first-level knowledge distillation on the second model to obtain a third model, and sends the third model to the second image acquisition device;
[0027] The cloud device performs a second level of knowledge distillation on the second model to obtain the first model, and sends the first model to the first image acquisition device. The recognition accuracy of the second model is higher than that of the third model, and the recognition accuracy of the third model is higher than that of the first model.
[0028] In an embodiment of the present application, the risk prediction result also includes a risk prediction location, and the mobile monitoring strategy of the second image acquisition device is determined according to the final risk prediction result of the second cycle and the communication state of the first image acquisition device, including:
[0029] Determining a first mobile monitoring strategy for a second image acquisition device according to the risk prediction location;
[0030] Determine a communication interaction point between the second image acquisition device and the first image acquisition device according to the main communication link and the plurality of auxiliary communication links, and determine a second mobile monitoring strategy for the second image acquisition device according to the communication interaction point;
[0031] According to the matching result of the first movement monitoring strategy and the second movement monitoring strategy, a final movement monitoring strategy of the second image acquisition device is determined.
[0032] In one embodiment of the present application, the second image acquisition device determines the risk prediction result and the corresponding early warning strategy of the third period of the monitored area according to the static monitoring image and the dynamic monitoring image of the second monitoring period, including:
[0033] The second image acquisition device performs image fusion based on the static monitoring image and the dynamic monitoring image to determine a comprehensive monitoring image of the area to be monitored;
[0034] The comprehensive monitoring image is input into the second model to determine the risk prediction results of the third period of the monitored area and the corresponding early warning strategy.
[0035] In an embodiment of the present application, the method further includes:
[0036] The cloud device determines the static image acquisition period of the second monitoring period of the first image acquisition device according to the predicted weather information of the second period.
[0037] In the second aspect, based on the same inventive concept, a debris flow and flood disaster monitoring and early warning system is provided, the system comprising:
[0038] A first prediction module, which is used for a first image acquisition device to obtain a static monitoring image of a first monitoring period of the area to be monitored, and to determine an initial risk prediction result of a second period of the area to be monitored based on the static monitoring image of the first monitoring period, wherein the first image acquisition device is a fixed device;
[0039] An uploading module is used for the first image acquisition device to obtain the current communication state when the initial risk prediction level is greater than or equal to a preset threshold, and upload the prediction data packet of the area to be monitored to the cloud device according to the communication state;
[0040] The review module is used for the cloud device to obtain the forecast weather information of the second period of the monitored area, and determine the final risk forecast result of the second period of the monitored area based on the forecast weather information and forecast data packet of the second period;
[0041] An acquisition module, used for obtaining static monitoring images and dynamic monitoring images of the second monitoring period of the monitored area by a second image acquisition device when the final risk prediction level of the second period is greater than or equal to a preset threshold value, wherein the second image acquisition device is a mobile device;
[0042] The second prediction module is used for the second image acquisition device to determine the risk prediction results and corresponding early warning strategies for the third period of the monitored area based on the static monitoring images and dynamic monitoring images of the second monitoring period. The second period is the period after the first period, and the third period is the period after the second period.
[0043] In one embodiment of the present application, the first prediction module includes:
[0044] An input submodule, used to input the static monitoring image of the first monitoring period into the first model to obtain the initial risk prediction result and risk identification confidence of the second period of the monitored area;
[0045] The first encapsulation submodule is used to encapsulate the initial risk prediction result, the static monitoring image and the historical data packet into a prediction data packet when the risk identification confidence is greater than or equal to the threshold;
[0046] The second encapsulation submodule is used to encapsulate the risk identification confidence, the static monitoring image and the initial risk prediction result into a historical data packet when the risk identification confidence is less than a threshold.
[0047] In one embodiment of the present application, the upload module includes:
[0048] An input submodule, used to obtain a stored node status table and determine a plurality of candidate communication links according to the node status table;
[0049] A selection submodule, for determining a primary communication link and a plurality of secondary communication links according to a matching degree between a predicted data packet and an alternative communication link;
[0050] The upload submodule is used to divide the prediction data packet into multiple sub-prediction data packets, and upload the multiple sub-prediction data packets to the cloud device through the main communication link and multiple auxiliary communication links.
[0051] In one embodiment of the present application, the review module includes:
[0052] A construction submodule is used for the cloud device to dynamically construct a second model according to the forecast data packet, and to construct a first input feature according to the static monitoring image of the first monitoring period, and to construct a second input feature according to the forecast weather information of the second period;
[0053] The input submodule is used to input the first input feature and the second input feature into the second model to obtain the final risk prediction result of the second cycle.
[0054] In one embodiment of the present application, the acquisition module includes:
[0055] A mobile monitoring strategy determination submodule, used for the cloud device to determine the mobile monitoring strategy of the second image acquisition device according to the final risk prediction result of the second cycle and the communication status of the first image acquisition device;
[0056] The image acquisition submodule is used for the second image acquisition device to patrol the monitored area according to the mobile monitoring strategy, obtain the monitoring image of the second monitoring period, and receive the static monitoring image of the second monitoring period of the monitored area uploaded by the first image acquisition device.
[0057] In one embodiment of the present application, the review module further includes:
[0058] The first model processing submodule is used for the cloud device to perform first-level knowledge distillation on the second model to obtain a third model, and send the third model to the second image acquisition device;
[0059] The second model processing submodule is used for the cloud device to perform the second level of knowledge distillation on the second model to obtain the first model, and send the first model to the first image acquisition device. The recognition accuracy of the second model is higher than that of the third model, and the recognition accuracy of the third model is higher than that of the first model.
[0060] In one embodiment of the present application, the risk prediction result also includes a risk prediction location, and a mobile monitoring strategy determination submodule includes:
[0061] A first strategy determination unit, configured to determine a first mobile monitoring strategy of the second image acquisition device according to the risk prediction location;
[0062] A second strategy determination unit is used to determine a communication interaction point between the second image acquisition device and the first image acquisition device according to the communication main link and the plurality of communication auxiliary links, and determine a second mobile monitoring strategy for the second image acquisition device according to the communication interaction point;
[0063] The matching unit is used to determine a final motion monitoring strategy of the second image acquisition device according to the matching result of the first motion monitoring strategy and the second motion monitoring strategy.
[0064] In one embodiment of the present application, the second prediction module includes:
[0065] An image fusion submodule, used for the second image acquisition device to perform image fusion according to the static monitoring image and the dynamic monitoring image to determine a comprehensive monitoring image of the area to be monitored;
[0066] The early warning strategy determination submodule is used to input the comprehensive monitoring image into the second model to determine the risk prediction results of the third period of the monitored area and the corresponding early warning strategy.
[0067] In summary, the above debris flow and flood disaster monitoring and early warning system and method have the following technical effects:
[0068] The debris flow and flood monitoring and early warning method provided by the present application transfers part of the initial risk prediction work (such as static image analysis and preliminary risk level determination) to the first image acquisition device, reducing the data processing burden of the cloud device. This distributed processing method can effectively share the computing tasks, thereby reducing the response delay of the cloud device. By performing preliminary risk prediction and data upload on the first image acquisition device, this solution can speed up the overall response time. The cloud device only needs to process data that has been preliminarily screened and preprocessed, thereby improving data processing efficiency and response speed. This solution gradually refines the assessment of debris flow and flood disasters through three stages of risk prediction. The static image analysis in the first stage provides a preliminary prediction, the second stage combines weather forecasts for a more accurate risk assessment, and the third stage performs a detailed final prediction through dynamic image analysis. This multi-level prediction method can improve the accuracy and reliability of risk assessment.
[0069] Furthermore, the dynamic monitoring image analysis of the second image acquisition device enables real-time updates of the situation in the monitored area. This dynamic monitoring can reflect changes in the area more promptly, ensuring that risk prediction and early warning strategies can adapt to actual conditions. The first image acquisition device is a fixed device suitable for long-term stable monitoring, while the second image acquisition device is a mobile device that can be flexibly moved and adjusted as needed. This combination of equipment layout makes the monitoring and early warning system more flexible and adaptable. By combining the use of static and dynamic monitoring images with weather forecast information, the risk of debris flow and flood disasters can be more comprehensively assessed. This comprehensive analysis method helps to formulate more accurate early warning strategies and improve the effectiveness of the early warning system.
[0070] Reducing the computing burden of cloud devices can reduce the demand for high-performance computing resources, thereby saving related computing resources and costs. In addition, through phased processing, it also reduces the waste of resources that may be caused by data processing delays. BRIEF DESCRIPTION OF THE DRAWINGS
[0071] Figure 1 A schematic diagram of the steps of a debris flow and flood disaster monitoring and early warning method provided in an embodiment of the present application;
[0072] Figure 2 A schematic diagram of the functional modules of a debris flow and flood disaster monitoring and early warning system provided in an embodiment of the present application. DETAILED DESCRIPTION
[0073] The terms used in the following embodiments are only for the purpose of describing specific embodiments, and are not intended to be used as limitations to the present application. As used in the specification and appended claims of the present application, the singular expressions "one", "a kind of", "", "above", "the" and "this" are intended to also include expressions such as "one or more", unless there is a clear contrary indication in the context. It should also be understood that in the following embodiments of the present application, "at least one", "one or more" refer to one or more than two (including two). The character " / " generally indicates that the objects associated before and after are in a "or" relationship.
[0074] The technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.
[0075] In the following, the terms "first", "second", etc. are used only for convenience of description and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more. For example, a plurality of processing units refers to two or more processing units.
[0076] In addition, in the embodiments of the present application, "upper", "lower", "left" and "right" are not limited to being defined relative to the orientation of the components schematically placed in the drawings. It should be understood that these directional terms can be relative concepts, which are used for description and clarification relative to the components, and can change accordingly according to the change in the orientation of the components placed in the drawings. In the drawings, for the sake of clarity, the thickness of the layers and regions is exaggerated, and the size ratio relationship between the parts in the drawings does not reflect the actual size ratio relationship.
[0077] In the embodiments of the present application, unless otherwise clearly specified and limited, the term "connection" should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection or an indirect connection through an intermediate medium. In addition, the term "electrical connection" can be a direct electrical connection or an indirect electrical connection through an intermediate medium.
[0078] In the embodiments of the present application, the term "module" is generally a functional structure divided according to logic, and the "module" can be implemented by pure hardware, or by a combination of software and hardware. In the embodiments of the present application, "and / or" describes the association relationship of associated objects, indicating that three relationships can exist. For example, A and / or B can represent: A exists alone, B exists alone, and A and B exist at the same time.
[0079] In the embodiments of the present application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.
[0080] The technical solution in this application will be described below in conjunction with the accompanying drawings.
[0081] At present, when monitoring and warning of debris flow and flood disasters, image acquisition equipment is usually deployed at various monitoring sites. The image acquisition equipment can be a camera or other types of image sensors. The image acquisition equipment collects real-time image data at the scene and uploads these image data to the cloud server through the network. The cloud device analyzes and processes these collected real-time images, and uses image recognition algorithms and machine learning models to identify potential debris flow signs and dangerous areas.
[0082] However, there are some problems in the above scheme. First, cloud devices need to process a large amount of image data, which not only places high demands on computing resources, but also may lead to slow processing speed and affect the timeliness of early warning. Secondly, the risk identification accuracy of the models deployed by cloud devices varies in different regions because the geological conditions and environmental factors in different regions are different, resulting in insufficient prediction accuracy for some areas.
[0083] Reference Figure 1 The embodiment of the present invention provides a debris flow and flood disaster monitoring and early warning method, which may specifically include the following steps:
[0084] S101: A first image acquisition device acquires a static monitoring image of a first monitoring period of a to-be-monitored area, and determines an initial risk prediction result of a second period of the to-be-monitored area based on the static monitoring image of the first monitoring period.
[0085] In this embodiment, the first image acquisition device is a fixed device, which may be a camera or other type of image sensor fixed to the monitored area. For example, the first image acquisition device may be a camera or a group of cameras. The first image acquisition device acquires a static monitoring image of the first monitoring period of the monitored area according to a preset image acquisition period, and then determines the initial risk prediction result of the second period of the monitored area based on the static monitoring image. The risk prediction result may include a risk prediction level and a risk location. The risk prediction level is used to characterize the possibility of debris flow and flood disasters in the monitored area. The specific steps for determining the initial risk prediction result of the second period of the monitored area may include:
[0086] S1011: Inputting the static monitoring image of the first monitoring period into the first model to obtain the initial risk prediction result and risk identification confidence of the second period of the monitored area;
[0087] S1012: When the risk identification confidence level is greater than or equal to the threshold, encapsulate the initial risk prediction result, the static monitoring image, and the historical data packet into a prediction data packet;
[0088] S1013: When the risk identification confidence is less than a threshold, the risk identification confidence, the static monitoring image, and the initial risk prediction result are packaged into a historical data packet.
[0089] In the implementation of S1011 to S1013, the first model is deployed in the first image device, so the first image device has preliminary risk judgment capabilities, and even without the real-time participation of the cloud device, the first image device can perform preliminary risk assessment and early warning. The first model is a machine learning or deep learning model that has been initially deployed, which can preliminarily analyze monitoring images and assess the risks of natural disasters such as mudslides. In this way, the initial risk prediction results of the monitored area in the second cycle (i.e., the next time period) can be obtained, and the model will also generate a risk identification confidence, indicating the model's confidence in the prediction result. If the risk identification confidence is greater than or equal to the preset threshold (such as 90%), it means that the model has a high confidence in the prediction result. If the risk identification confidence is less than the preset threshold, it means that the model lacks confidence in the prediction result.
[0090] This localized risk judgment capability can improve the system's response speed, reduce the delay of relying on cloud processing, and greatly reduce the data processing pressure of cloud devices, thereby improving the timeliness and accuracy of early warnings. In addition, when the risk identification confidence is high, the initial risk prediction results, static monitoring images, and historical data packets are encapsulated as prediction data packets to facilitate subsequent in-depth analysis and processing; when the risk identification confidence is low, by encapsulating the relevant data into historical data packets, it can provide valuable reference information for subsequent model improvements and regional risk feature analysis.
[0091] S102: When the initial risk prediction level is greater than or equal to a preset threshold, the first image acquisition device obtains the current communication status, and uploads the prediction data packet of the area to be monitored to the cloud device according to the communication status.
[0092] In this embodiment, when the prediction result of the first image acquisition device shows that the risk prediction level is greater than or equal to the preset threshold, the cloud device needs to perform further verification and calibration. That is, when the potential risk is detected to reach a certain warning level, the data will be uploaded to the cloud, and the cloud device will perform further analysis and verification through a more accurate and comprehensive algorithm to ensure the accuracy and reliability of the prediction results. This process helps to reduce false positives and false negatives, and improve the overall system's risk management capabilities and the accuracy of response measures. The specific steps may include:
[0093] S1021: Acquire a stored node status table, and determine a plurality of candidate communication links according to the node status table;
[0094] S1022: Determine a primary communication link and multiple secondary communication links according to the matching degree between the predicted data packet and the candidate communication links;
[0095] S1023: Divide the prediction data packet into multiple sub-prediction data packets, and upload the multiple sub-prediction data packets to the cloud device through the main communication link and multiple auxiliary communication links.
[0096] In the implementation of S1021 to S1023, first, the first image acquisition device obtains the stored node status table. The node status table contains currently available communication nodes and their status information, such as signal strength, bandwidth, delay, etc. Based on this information, the system can determine multiple alternative communication links, which are candidate paths for transmitting data from the first image acquisition device to the cloud device. It should be noted that each first image acquisition device in the monitored area can be regarded as a communication node, which is not only responsible for collecting monitoring images, but also responsible for transmitting data to the cloud device or other nodes. Each communication node plays an important role in the network to ensure the flow and sharing of data in the entire monitoring system. These communication nodes can be connected via wired or wireless networks to form a dynamic and flexible communication network. The nodes can cooperate with each other to ensure the reliable transmission of data in a complex geographical environment through multi-hop transmission. In addition, the status and connection status of each node are updated in real time in the node status table, providing a basis for the system to select the best communication link under different conditions.
[0097] Next, the system matches the predicted data packet size, importance, and urgency with the various indicators of the alternative communication links. For example, large data packets require high bandwidth, and urgent data packets require low-latency links. Through this matching, the system can determine the optimal primary communication link for primary data transmission, and select multiple secondary communication links as backup paths to ensure the reliability and redundancy of data transmission.
[0098] After determining the communication link, the system divides the prediction data packet into multiple sub-prediction data packets. The division can be based on the size of the data packet and the bandwidth of the link. The system then uploads these sub-prediction data packets to the cloud device through the determined main communication link and multiple auxiliary communication links. This can speed up data transmission and ensure that data transmission can continue smoothly even if there is a problem with a link.
[0099] Assume that the first image acquisition device in a mountainous area detects a debris flow risk with a risk prediction level of 8 (the preset threshold is 7). The prediction data packet needs to be uploaded to the cloud device for further verification and calibration.
[0100] Obtaining a stored node status table, and determining a plurality of candidate communication links according to the node status table The system obtains the node status table and finds that there are currently three candidate communication links.
[0101] Link A: high signal strength, wide bandwidth, and low latency.
[0102] Link B: medium signal strength, medium bandwidth, medium latency.
[0103] Link C: Low signal strength, narrow bandwidth, and high latency.
[0104] After analyzing the predicted data packet, it is found that the data packet is large and urgent. Therefore, link A is selected as the main communication link, and link B and link C are selected as auxiliary communication links. The system divides the predicted data packet into five sub-predicted data packets:
[0105] Sub-prediction data packets 1, 2, and 3 are uploaded via link A.
[0106] Sub-prediction data packet 4 is uploaded via link B.
[0107] Sub-prediction data packet 5 is uploaded via link C.
[0108] In this way, even if there is a problem with link B or link C, link A can still ensure the transmission of the main data, improving the reliability and efficiency of data transmission. Finally, all sub-prediction data packets are uploaded to the cloud device for further risk verification and calibration.
[0109] S103: The cloud device obtains the forecast weather information of the second period of the area to be monitored, and determines the final risk forecast result of the second period of the area to be monitored based on the forecast weather information of the second period and the forecast data packet.
[0110] In this embodiment, after obtaining the prediction data packet, the cloud device obtains the latest weather forecast data by connecting to the meteorological service provider or meteorological database, which includes key meteorological elements such as rainfall, wind speed, and temperature. Then, the cloud device integrates and analyzes these meteorological data with the prediction data packet uploaded from the first image acquisition device. By comprehensively considering the weather information and the initial risk prediction results, the second model is constructed and trained, and then the final risk prediction results of the second period of the monitored area are determined based on the second model. The specific implementation steps may include:
[0111] S1031: The cloud device dynamically constructs a second model according to the forecast data packet, constructs a first input feature according to the static monitoring image of the first monitoring period, and constructs a second input feature according to the forecast weather information of the second period;
[0112] S1032: Input the first input feature and the second input feature into the second model to obtain a final risk prediction result of the second cycle.
[0113] In the implementation of S1031 to S1032, the second model can be used to characterize the correlation between weather information and risk prediction results. The cloud device receives the prediction data packet uploaded from the first image acquisition device, and first analyzes and preprocesses the data in the prediction data packet. According to the preprocessed data, two main input features are constructed. The first input feature: feature information extracted from the static monitoring image of the first monitoring period. These features may include terrain structure, vegetation density, rock formation state, etc. in the image. The second input feature: features constructed based on the predicted weather information of the second period (such as rainfall, temperature, humidity, wind speed, etc.). The cloud device dynamically adjusts and selects a suitable model architecture based on the currently received data. First, based on the complexity and characteristics of the data, select a suitable model type (such as convolutional neural network CNN, long short-term memory network LSTM, random forest, etc.). Then, the parameters of the model are tuned to find the optimal parameter settings so that the model achieves the best performance on the current data set. The selected model is trained using the data in the prediction data packet. This training process may involve large-scale calculations and iterative optimization to ensure that the model can accurately capture the complex patterns and relationships in the data. The second model is verified and evaluated. Through cross-validation and test data sets, the performance indicators of the model, such as accuracy and recall, are evaluated to ensure that the model has good predictive ability.
[0114] Finally, the cloud device completes the construction of the second model and deploys it for real-time prediction. At this point, the second model has the ability to process the complex data and characteristics of the current monitoring area and period, and can provide more accurate and reliable risk prediction results.
[0115] It should be noted that the second model is dynamically established. Specifically, different second models can be automatically selected and used according to the prediction data packets uploaded by different first image acquisition devices. In this way, the second model can be flexibly adjusted according to the specific situation and the characteristics of the input data to provide more accurate prediction results and analysis.
[0116] The first input feature is constructed based on the static monitoring image of the first monitoring period, and the second input feature is constructed based on the predicted weather information of the second period. The first input feature and the second input feature are input into the second model to obtain the final risk prediction result of the second period. In this step, the cloud device inputs the previously constructed first input feature and the second input feature into the second model. The second model uses these input features to generate the final risk prediction result of the second period through complex calculations and analysis. This final result is more accurate and reliable than the preliminary prediction of the first model because it comprehensively considers more factors and data and can better reflect the actual risk level of the monitored area in the second period.
[0117] In a feasible implementation, before the second image acquisition device acquires the static monitoring image and the dynamic monitoring image of the second monitoring period of the monitored area, the method further includes the following steps: First, the cloud device performs a first level of knowledge distillation on the second model to obtain a third model, and sends the third model to the second image acquisition device. Knowledge distillation is a technique that extracts knowledge from a complex model and transfers it to a simpler model. In this process, the cloud device extracts key knowledge and patterns from the second model, and through simplification and optimization, generates a third model that has a slightly lower recognition accuracy than the second model but is lighter. This third model is suitable for the second image acquisition device because the device may need to operate with limited computing resources and real-time processing capabilities.
[0118] Secondly, the cloud device performs a second-level knowledge distillation on the second model to obtain the first model, and sends the first model to the first image acquisition device. This process is similar to the first-level knowledge distillation, but because the first image acquisition device may have more limited resources and processing power, the generated first model has relatively lower recognition accuracy, but is lighter and more efficient, and is suitable for running on these devices. Here, the second model has the highest recognition accuracy and can provide the most accurate risk prediction results, but due to its complexity and computing requirements, it can usually only run on cloud devices. The third model has a slightly lower recognition accuracy, but still maintains a high degree of accuracy, and is suitable for mobile devices with certain computing capabilities (such as drones). The first model has the lowest recognition accuracy, but is lightweight enough to be used on resource-constrained first image acquisition devices.
[0119] Through this multi-level knowledge distillation and model distribution strategy, models suitable for their computing capabilities can be run on different devices, ensuring effective monitoring and prediction under various resource conditions. This approach not only improves the operating efficiency of each device, but also ensures the flexibility and reliability of the entire monitoring system, thereby enabling more accurate monitoring and early warning of natural disasters.
[0120] S104: When the final risk prediction level of the second period is greater than or equal to the preset threshold, the second image acquisition device obtains the static monitoring image and the dynamic monitoring image of the second monitoring period of the area to be monitored.
[0121] In this embodiment, after the risk prediction results of the second period of the first image device are reviewed by the cloud device, if it is determined that the final risk prediction level of the monitored area in the second period is greater than or equal to the preset threshold, it means that the monitored area has a higher risk in the second period and requires more stringent monitoring and early warning measures. The second image acquisition device can be a mobile image acquisition device such as a drone. When the potential risk of the monitored area is high, it is necessary to pay closer attention and predict the risk. A single static monitoring image may not be able to fully reflect the dynamic changes in risks, while dynamic monitoring images can capture changes and trends over time and provide richer prediction data. Therefore, it is necessary to obtain static monitoring images and dynamic monitoring images of the second monitoring period of the monitored area for more accurate predictions. The specific steps may include:
[0122] S1041: The cloud device determines a mobile monitoring strategy for the second image acquisition device according to the final risk prediction result of the second cycle and the communication status of the first image acquisition device;
[0123] S1042: The second image acquisition device inspects the area to be monitored according to the mobile monitoring strategy, obtains monitoring images of the second monitoring period, and receives static monitoring images of the area to be monitored of the second monitoring period uploaded by the first image acquisition device.
[0124] In the implementation of S1041 to S1042, due to the possible occurrence of risks, the communication status of the first device may continue to deteriorate. For example, some communication nodes that were able to operate normally in the previous monitoring cycle cannot operate normally in the current monitoring cycle. Therefore, the cloud device needs to consider the current communication status of the first image acquisition device when formulating the mobile monitoring strategy. The mobile monitoring strategy includes inspection routes, monitoring frequency, shooting angles and heights, etc., to ensure key monitoring in key areas and time points.
[0125] The second image acquisition device can perform inspections in the monitored area according to a pre-defined mobile monitoring strategy. During the inspection process, the second image acquisition device performs comprehensive monitoring and data collection on the entire area through different paths and angles.
[0126] Static surveillance images can be high-resolution images taken at a specific location and time, capturing specific terrain and environmental changes.
[0127] Dynamic monitoring images can be recorded through videos or continuous images, recording dynamic changes over a period of time, such as water flow, soil and rock movement, etc.
[0128] Due to changes in the communication status, the first image acquisition device may not be able to stably upload data to the cloud device. In the case of poor communication status, the transmitted data packets may be lost or damaged, resulting in incomplete monitoring data. The increase in communication delay makes it impossible for the data uploaded by the first image acquisition device to reach the cloud in time, affecting the real-time and accuracy of the prediction. Therefore, during the inspection process, the drone can also receive and collect static monitoring images of the second monitoring cycle uploaded by the first image acquisition device.
[0129] Determining the mobile monitoring strategy of the second image acquisition device according to the final risk prediction result of the second cycle and the communication state of the first image acquisition device may include:
[0130] S10411: Determine a first mobile monitoring strategy for a second image acquisition device according to the risk prediction location;
[0131] S10412: Determine a communication interaction point between the second image acquisition device and the first image acquisition device according to the main communication link and the plurality of auxiliary communication links, and determine a second movement monitoring strategy for the second image acquisition device according to the communication interaction point;
[0132] S10413: Determine a final motion monitoring strategy of the second image acquisition device according to the matching result of the first motion monitoring strategy and the second motion monitoring strategy.
[0133] In the implementation of S10411 to S10413, high-risk areas can be determined based on the final risk prediction results of the second cycle. These areas are locations where the prediction results show that there is a higher risk and need to be monitored. The specific geographical location and range of these high-risk locations are determined. According to the location of the high-risk area, the first mobile monitoring strategy of the second image acquisition device is formulated.
[0134] In the moving path of the second image acquisition device, determine the best location for data interaction with the first image acquisition device. The communication interaction point is the location where the device can stably receive or transmit data during the inspection process. Select a location with a strong communication signal and less interference as the interaction point. According to the determined communication interaction point, formulate a second mobile monitoring strategy for the second image acquisition device. This includes the device's residence time at the interaction point, data transmission plan, and interaction frequency. Ensure that when the communication status is poor, the data of the first image acquisition device can still be effectively received through the interaction point to ensure the integrity and timeliness of the monitoring data. Therefore, the second image acquisition device can respond faster and more accurately to mudslide and flood risk warnings when the communication status of the first image acquisition device continues to deteriorate.
[0135] Match and integrate the first mobile monitoring strategy with the second mobile monitoring strategy. Evaluate the compatibility and conflicts between the two to ensure that the final strategy can cover high-risk areas and effectively use communication interaction points for data transmission. Resolve possible conflicts, such as adjusting the flight path or dwell time, to ensure the effective combination of monitoring and communication. Based on the matching results, determine the final mobile monitoring strategy for the second image acquisition device. This strategy is an optimization and integration of the first two strategies to ensure that the device can complete the monitoring task efficiently and accurately. The final strategy can include the detailed flight path of the device, inspection frequency, monitoring height and angle, dwell time at the communication interaction point, and data transmission plan.
[0136] S105: The second image acquisition device determines the risk prediction result of the third period of the monitored area and the corresponding early warning strategy according to the static monitoring image and the dynamic monitoring image of the second monitoring period.
[0137] In this embodiment, after acquiring the static monitoring image and the dynamic monitoring image of the second monitoring period of the area to be monitored, the second image acquisition device can predict the risk prediction result of the third period of the area to be monitored.
[0138] In this application, the risk of debris flow and flood disasters in the monitored area can be divided into three time periods for comprehensive assessment and management. The first time period is that each first device uses a relatively low-precision first model to make a preliminary prediction of the risk conditions that may occur in the monitored area in the next monitoring cycle. The purpose of this stage is to quickly identify potential risk areas. Although the accuracy is general, it can cover a wide range and provide basic information for subsequent stages. The second time period is for the cloud device to review and verify the small number of areas with higher risks identified in the first stage. Through higher-level computing power and more sophisticated data analysis, the cloud device can conduct a more in-depth analysis and verification of these potential risk areas to ensure the reliability and accuracy of the prediction results. The third time period is that the second image device further refines and confirms the risk prediction results of the monitored area in the third monitoring cycle according to the second model with higher accuracy during the second monitoring cycle. The second image device can quickly and accurately assess the risk of risk areas through higher-resolution image data and more advanced prediction algorithms, providing a more reliable basis for emergency response and risk management. Through the gradual refinement and verification of these three time periods, the prediction accuracy and management efficiency of debris flow and flood disaster risks can be effectively improved. The second image acquisition device determines the risk prediction result of the third period of the monitored area and the corresponding early warning strategy according to the static monitoring image and the dynamic monitoring image of the second monitoring period, including:
[0139] S1051: The second image acquisition device performs image fusion according to the static monitoring image and the dynamic monitoring image to determine a comprehensive monitoring image of the area to be monitored;
[0140] S1052: Input the comprehensive monitoring image into the second model to determine the risk prediction results of the third period of the monitored area and the corresponding early warning strategy.
[0141] In the implementation methods of S1051 to S1052, first, the static monitoring image and the dynamic monitoring image are preprocessed to ensure that they are aligned in space and time. The static monitoring image provides detailed static information of the area, while the dynamic monitoring image shows the temporal change characteristics of the area. Then, the two images are aligned in the same coordinate system through image registration technology, and the image fusion algorithm is applied to synthesize the information of the static and dynamic images. Common fusion methods include weighted averaging, principal component analysis or deep learning methods. These methods can combine the structural details in the static image and the temporal changes in the dynamic image to generate a comprehensive monitoring image that fully displays the status of the area to be monitored. The final comprehensive monitoring image can provide richer regional information and provide a reliable data basis for subsequent analysis and decision-making.
[0142] The comprehensive monitoring images are input into the second model, which generates risk prediction results for the monitored area in the third period based on the existing data and algorithms. The output of the model is then used to formulate corresponding early warning strategies, which will be based on the predicted risk level, including setting alarm levels, recommended preventive measures and emergency response plans, so as to effectively manage and respond to potential debris flow and flood risks.
[0143] In a feasible implementation, the method further includes: the cloud device determines the image acquisition period of the second monitoring period of the first image acquisition device according to the predicted weather information of the second period.
[0144] In this embodiment, by adjusting the image acquisition cycle according to the weather forecast, more image data can be obtained during the critical time period. For example, when extreme weather such as heavy rain or flooding is predicted, increasing the image acquisition frequency can capture more key data and help to more accurately assess risks. When the weather is stable and the risk is low, the image acquisition frequency can be reduced, thereby reducing the pressure on data transmission and storage and saving system resources. This dynamic adjustment strategy improves the overall efficiency of the system. Adjusting the acquisition cycle according to weather forecast information makes the monitoring system more forward-looking and proactive, and can better respond to sudden weather changes and potential risks.
[0145] The present application provides a method for monitoring debris flow and flood disasters, which transfers part of the initial risk prediction work (such as static image analysis and preliminary risk level determination) to the first image acquisition device, reducing the data processing burden of the cloud device. This distributed processing method can effectively share the computing tasks, thereby reducing the response delay of the cloud device. By performing preliminary risk prediction and data upload on the first image acquisition device, this solution can speed up the overall response time. The cloud device only needs to process data that has been preliminarily screened and preprocessed, thereby improving data processing efficiency and response speed. This solution gradually refines the assessment of debris flow and flood disasters through three stages of risk prediction. The static image analysis in the first stage provides a preliminary prediction, the second stage combines weather forecasts for a more accurate risk assessment, and the third stage performs a detailed final prediction through dynamic image analysis. This multi-level prediction method can improve the accuracy and reliability of risk assessment.
[0146] Furthermore, the dynamic monitoring image analysis of the second image acquisition device enables real-time updates of the situation in the monitored area. This dynamic monitoring can reflect changes in the area more promptly, ensuring that risk prediction and early warning strategies can adapt to actual conditions. The first image acquisition device is a fixed device suitable for long-term stable monitoring, while the second image acquisition device is a mobile device that can be flexibly moved and adjusted as needed. This combination of equipment layout makes the monitoring and early warning system more flexible and adaptable. By combining the use of static and dynamic monitoring images with weather forecast information, the risk of debris flow and flood disasters can be more comprehensively assessed. This comprehensive analysis method helps to formulate more accurate early warning strategies and improve the effectiveness of the early warning system.
[0147] Reducing the computing burden of cloud devices can reduce the demand for high-performance computing resources, thereby saving related computing resources and costs. In addition, through phased processing, it also reduces the waste of resources that may be caused by data processing delays.
[0148] In the second aspect, based on the same inventive concept, refer to Figure 2 , shows a debris flow flood disaster monitoring and early warning system 200 provided in an embodiment of the present application, the system comprising:
[0149] The first prediction module 201 is used for the first image acquisition device to obtain a static monitoring image of the first monitoring period of the area to be monitored, and determine the initial risk prediction result of the second period of the area to be monitored based on the static monitoring image of the first monitoring period, and the first image acquisition device is a fixed device;
[0150] The uploading module 202 is used for the first image acquisition device to obtain the current communication state when the initial risk prediction level is greater than or equal to the preset threshold, and upload the prediction data packet of the area to be monitored to the cloud device according to the communication state;
[0151] The review module 203 is used for the cloud device to obtain the forecast weather information of the second period of the monitored area, and determine the final risk prediction result of the second period of the monitored area according to the forecast weather information of the second period and the forecast data packet;
[0152] The acquisition module 204 is used for acquiring static monitoring images and dynamic monitoring images of the second monitoring period of the monitored area by a second image acquisition device when the final risk prediction level of the second period is greater than or equal to a preset threshold value, and the second image acquisition device is a mobile device;
[0153] The second prediction module 205 is used for the second image acquisition device to determine the risk prediction results and corresponding early warning strategies for the third period of the monitored area based on the static monitoring images and dynamic monitoring images of the second monitoring period, where the second period is the period after the first period and the third period is the period after the second period.
[0154] In one embodiment of the present application, the first prediction module includes:
[0155] An input submodule, used to input the static monitoring image of the first monitoring period into the first model to obtain the initial risk prediction result and risk identification confidence of the second period of the monitored area;
[0156] The first encapsulation submodule is used to encapsulate the initial risk prediction result, the static monitoring image and the historical data packet into a prediction data packet when the risk identification confidence is greater than or equal to the threshold;
[0157] The second encapsulation submodule is used to encapsulate the risk identification confidence, the static monitoring image and the initial risk prediction result into a historical data packet when the risk identification confidence is less than a threshold.
[0158] In one embodiment of the present application, the upload module includes:
[0159] An input submodule, used to obtain a stored node status table and determine a plurality of candidate communication links according to the node status table;
[0160] A selection submodule, for determining a primary communication link and a plurality of secondary communication links according to a matching degree between a predicted data packet and an alternative communication link;
[0161] The upload submodule is used to divide the prediction data packet into multiple sub-prediction data packets, and upload the multiple sub-prediction data packets to the cloud device through the main communication link and multiple auxiliary communication links.
[0162] In one embodiment of the present application, the review module includes:
[0163] A construction submodule is used for the cloud device to dynamically construct a second model according to the forecast data packet, and to construct a first input feature according to the static monitoring image of the first monitoring period, and to construct a second input feature according to the forecast weather information of the second period;
[0164] The input submodule is used to input the first input feature and the second input feature into the second model to obtain the final risk prediction result of the second cycle.
[0165] In one embodiment of the present application, the acquisition module includes:
[0166] A mobile monitoring strategy determination submodule, used for the cloud device to determine the mobile monitoring strategy of the second image acquisition device according to the final risk prediction result of the second cycle and the communication status of the first image acquisition device;
[0167] The image acquisition submodule is used for the second image acquisition device to patrol the monitored area according to the mobile monitoring strategy, obtain the monitoring image of the second monitoring period, and receive the static monitoring image of the second monitoring period of the monitored area uploaded by the first image acquisition device.
[0168] In one embodiment of the present application, the review module further includes:
[0169] The first model processing submodule is used for the cloud device to perform first-level knowledge distillation on the second model to obtain a third model, and send the third model to the second image acquisition device;
[0170] The second model processing submodule is used for the cloud device to perform the second level of knowledge distillation on the second model to obtain the first model, and send the first model to the first image acquisition device. The recognition accuracy of the second model is higher than that of the third model, and the recognition accuracy of the third model is higher than that of the first model.
[0171] In one embodiment of the present application, the risk prediction result also includes a risk prediction location, and a mobile monitoring strategy determination submodule includes:
[0172] A first strategy determination unit, configured to determine a first mobile monitoring strategy of the second image acquisition device according to the risk prediction location;
[0173] A second strategy determination unit is used to determine a communication interaction point between the second image acquisition device and the first image acquisition device according to the communication main link and the plurality of communication auxiliary links, and determine a second mobile monitoring strategy for the second image acquisition device according to the communication interaction point;
[0174] The matching unit is used to determine a final motion monitoring strategy of the second image acquisition device according to the matching result of the first motion monitoring strategy and the second motion monitoring strategy.
[0175] In one embodiment of the present application, the second prediction module includes:
[0176] An image fusion submodule, used for the second image acquisition device to perform image fusion according to the static monitoring image and the dynamic monitoring image to determine a comprehensive monitoring image of the area to be monitored;
[0177] The early warning strategy determination submodule is used to input the comprehensive monitoring image into the second model to determine the risk prediction results of the third period of the monitored area and the corresponding early warning strategy.
[0178] It should be noted that the specific implementation of a debris flow and flood monitoring and early warning system 200 in an embodiment of the present application refers to the specific implementation of a debris flow and flood monitoring and early warning method proposed in the first aspect of the aforementioned embodiment of the present application, and will not be repeated here.
[0179] The above embodiments can be implemented in whole or in part by software, hardware (such as circuits), firmware or any other combination. When implemented using software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When a computer instruction or computer program is loaded or executed on a computer, a process or function according to an embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network or other programmable system. The computer program or instruction can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer program or instruction can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center by wired (such as infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (for example, a floppy disk, a hard disk, a tape), an optical medium (for example, a DVD) or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.
[0180] It should be understood that the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. A and B can be singular or plural. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship, but it may also indicate an "and / or" relationship. Please refer to the context for specific understanding.
[0181] In this application, "at least one" means one or more, and "plurality" means two or more. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items. For example, at least one of a, b, or c can mean: a, b, c, ab, ac, bc, or abc, where a, b, and c can be single or multiple.
[0182] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0183] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0184] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the above-described systems, systems and units can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0185] In the several embodiments provided in the present application, it should be understood that the disclosed systems, systems and methods can be implemented in other ways. For example, the system embodiments described above are only schematic. For example, the division of units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, and the indirect coupling or communication connection of the system or unit can be electrical, mechanical or other forms.
[0186] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0187] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0188] If the function is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the steps of the various embodiments of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk, and other media that can store program codes.
[0189] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A debris flow flood monitoring and early warning method, characterized in that: The method comprises: The first image acquisition device acquires a static monitoring image of a first monitoring period of the area to be monitored, and determines an initial risk prediction result of a second period of the area to be monitored based on the static monitoring image of the first monitoring period, wherein the risk prediction result includes a risk prediction level, and the first image acquisition device is a fixed device; The first image acquisition device acquires the current communication state when the initial risk prediction level is greater than or equal to the preset threshold, and uploads the prediction data packet of the area to be monitored to the cloud device according to the communication state; The cloud device obtains the forecast weather information of the second period of the area to be monitored, and determines the final risk forecast result of the second period of the area to be monitored according to the forecast weather information of the second period and the forecast data packet; When the final risk prediction level of the second period is greater than or equal to the preset threshold, the second image acquisition device acquires the static monitoring image and the dynamic monitoring image of the second monitoring period of the area to be monitored, and the second image acquisition device is a mobile device; The second image acquisition device determines the risk prediction result and the corresponding early warning strategy of the third period of the monitored area according to the static monitoring image and the dynamic monitoring image of the second monitoring period, the second period is the period after the first period, and the third period is the period after the second period; The first image acquisition device is deployed with a first model, and the initial risk prediction result of the second period of the monitored area is determined according to the static monitoring image of the first monitoring period, including: Inputting the static monitoring image of the first monitoring period into the first model to obtain the initial risk prediction result and risk identification confidence of the second period of the monitored area; When the risk identification confidence level is greater than or equal to a threshold, encapsulating the initial risk prediction result, the static monitoring image, and the historical data packet into the prediction data packet; When the risk identification confidence is less than a threshold, encapsulating the risk identification confidence, the static monitoring image and the initial risk prediction result into the historical data packet; The obtaining of the current communication state and uploading the predicted data packet of the area to be monitored to the cloud device according to the communication state includes: Acquire a stored node status table, and determine a plurality of candidate communication links according to the node status table; Determining a primary communication link and a plurality of secondary communication links according to a matching degree between the predicted data packet and the candidate communication link; Dividing the prediction data packet into a plurality of sub-prediction data packets, and uploading the plurality of sub-prediction data packets to a cloud device via the main communication link and the plurality of auxiliary communication links; Determining the final risk prediction result of the second period of the monitored area according to the predicted weather information of the second period and the prediction data packet includes: The cloud device dynamically constructs a second model according to the forecast data packet, constructs a first input feature according to the static monitoring image of the first monitoring period, and constructs a second input feature according to the forecast weather information of the second period; Inputting the first input feature and the second input feature into a second model to obtain a final risk prediction result of the second period; The second image acquisition device acquires a static monitoring image and a dynamic monitoring image of a second monitoring period of the area to be monitored, including: The cloud device determines a mobile monitoring strategy for the second image acquisition device according to the final risk prediction result of the second period and the communication status of the first image acquisition device; The second image acquisition device inspects the area to be monitored according to the mobile monitoring strategy, obtains monitoring images of the second monitoring period, and receives static monitoring images of the area to be monitored of the second monitoring period uploaded by the first image acquisition device.
2. The debris flow and flood disaster monitoring and early warning method according to claim 1 is characterized in that: Before the second image acquisition device acquires the static monitoring image and the dynamic monitoring image of the second monitoring period of the area to be monitored, the method further includes: The cloud device performs a first level of knowledge distillation on the second model to obtain a third model, and sends the third model to the second image acquisition device; The cloud device performs a second level of knowledge distillation on the second model to obtain the first model, and sends the first model to the first image acquisition device. The recognition accuracy of the second model is higher than that of the third model, and the recognition accuracy of the third model is higher than that of the first model.
3. The debris flow and flood disaster monitoring and early warning method according to claim 1 is characterized in that: The risk prediction result also includes a risk prediction location. The determining of the mobile monitoring strategy of the second image acquisition device according to the final risk prediction result of the second cycle and the communication state of the first image acquisition device includes: Determining a first mobile monitoring strategy of the second image acquisition device according to the risk prediction location; Determine a communication interaction point between the second image acquisition device and the first image acquisition device according to a main communication link and a plurality of auxiliary communication links, and determine a second movement monitoring strategy of the second image acquisition device according to the communication interaction point; A final movement monitoring strategy of the second image acquisition device is determined according to a matching result between the first movement monitoring strategy and the second movement monitoring strategy.
4. The debris flow and flood disaster monitoring and early warning method according to claim 1 is characterized in that: The second image acquisition device determines the risk prediction result of the third period of the monitored area and the corresponding early warning strategy according to the static monitoring image and the dynamic monitoring image of the second monitoring period, including: The second image acquisition device performs image fusion according to the static monitoring image and the dynamic monitoring image to determine a comprehensive monitoring image of the area to be monitored; The comprehensive monitoring image is input into the second model to determine the risk prediction result of the third period of the monitored area and the corresponding early warning strategy.
5. The debris flow and flood disaster monitoring and early warning method according to claim 1 is characterized in that: The method further comprises: The cloud device determines the image acquisition period of the second monitoring period of the first image acquisition device according to the predicted weather information of the second period.
6. A debris flow flood monitoring and early warning system, characterized in that: The system comprises: A first prediction module, configured for obtaining, by a first image acquisition device, a static monitoring image of a first monitoring period of a region to be monitored, and determining, based on the static monitoring image of the first monitoring period, an initial risk prediction result of a second period of the region to be monitored, wherein the first image acquisition device is a fixed device; An uploading module, used for the first image acquisition device to obtain a current communication state when the initial risk prediction level is greater than or equal to a preset threshold, and upload the prediction data packet of the area to be monitored to a cloud device according to the communication state; A review module, used for the cloud device to obtain the forecast weather information of the second period of the monitored area, and determine the final risk prediction result of the second period of the monitored area according to the forecast weather information of the second period and the forecast data packet; An acquisition module, configured to acquire, by a second image acquisition device, static monitoring images and dynamic monitoring images of the second monitoring period of the monitored area when the final risk prediction level of the second period is greater than or equal to a preset threshold, the second image acquisition device being a mobile device; The second prediction module is used for the second image acquisition device to determine the risk prediction results and corresponding early warning strategies for the third period of the monitored area based on the static monitoring images and dynamic monitoring images of the second monitoring period, the second period being the period after the first period, and the third period being the period after the second period.