A method, system, medium, and device for improving short-term and ultra-short-term balance margins.

By constructing a power system model and using a hierarchical approach to flexibly allocate resources, the problem of insufficient power system inertia under a high penetration rate of new energy sources was solved, achieving higher precision in power balance and improving the sufficiency and stability of the system, especially ensuring the reliability of power supply under extreme conditions.

CN118676894BActive Publication Date: 2026-11-10CHINA SOUTHERN POWER GRID COMPANY +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410640878.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-22
Publication Date
2026-11-10
Estimated Expiration
2044-05-22

AI Technical Summary

Technical Problem

The power system's inertia is insufficient due to the high penetration rate of new energy sources, resulting in high peak-shaving pressure. Relying solely on thermal power and hydropower is insufficient to meet the power supply and consumption needs. More diversified and flexible resources are required to improve the balance margin of the power system. In particular, under the influence of major events, existing technologies are unable to balance power generation and consumption on a more precise time scale.

Method used

By employing short-term and ultra-short-term balance margin enhancement methods, a basic technical data model of the power system is constructed. Combined with short-term and ultra-short-term time coupling constraints, flexible resources, including energy storage and gas turbine units, are allocated in a hierarchical manner to optimize power balance calculations and ensure the power supply of the system under extreme conditions.

Benefits of technology

While sacrificing some economic efficiency, higher precision power balance was achieved, improving the system's sufficiency and stability, reducing the risk of power shortage, increasing the system's balance margin by 2.73%, and enhancing the system's flexibility and load adaptability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118676894B_ABST
    Figure CN118676894B_ABST
Patent Text Reader

Abstract

This invention discloses a method, system, medium, and equipment for improving short-term and ultra-short-term balance margins. It is used in day-ahead power balance analysis to comprehensively consider power supply issues during extreme evening peak periods. Employing a hierarchical scheduling method for flexible resources, it achieves finer-grained power balance at the short-term and ultra-short-term levels, improving system adequacy while maintaining system economy. This invention comprehensively considers the operational characteristics of various flexible resources, classifying and allocating them to short-term and ultra-short-term time scales. This enables hierarchical scheduling and management of flexible resources, improving their utilization rate. Simultaneously, it couples the short-term and ultra-short-term time scales, considering the volatility and randomness of load and renewable energy at the ultra-short-term scale, thus improving the granularity of calculations. It provides a method for power verification at the ultra-short-term scale and statistically outputs relevant balance indicators for evaluating system balance capabilities.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of power balance technology in power systems, specifically relating to a method, system, medium, and equipment for improving short-term and ultra-short-term balance margin. Background Technology

[0002] With the increasing penetration rate of high-proportion renewable energy sources year by year, the problem of insufficient inertia in the power system is becoming more and more prominent. The large-scale grid connection of wind power and photovoltaic power brings considerable peak-shaving pressure to the power system. The regulation role of thermal power and hydropower alone is insufficient to support the high requirements of power system supply and consumption. There is an urgent need to allocate more diversified and flexible resources to participate in the power balance process of the power system. The growth of flexible resources greatly helps to improve the balance margin of the power system. The balance margin can more intuitively reflect the flexibility requirements of the power system. Higher flexibility allows the power system to dispatch units more calmly when facing uncertainties brought about by wind and solar forecasts, and prevent the occurrence of power curtailment and shortage.

[0003] However, focusing solely on intraday power balance is often insufficient. Considering the higher demands placed on system balance margins by major events, ensuring uninterrupted power supply necessitates considering system power balance at a finer time scale. At a five-minute time granularity, taking into account the random disturbances of wind, solar, and load on ultra-short-term scales, and sacrificing some economic efficiency, more responsive and flexible resources are allocated to meet power balance requirements, guaranteeing power supply for major events and mitigating the vulnerability of a barely balanced power system at the hourly level. Summary of the Invention

[0004] The technical problem to be solved by this invention is to address the shortcomings of the prior art by introducing a short-term and ultra-short-term time period coupling method when solving the day-ahead power balance problem of the power system. This invention provides a method, system, medium, and equipment for improving the short-term and ultra-short-term balance margin, which is used to solve the technical problems of power imbalance risk in the ultra-short-term power system under the influence of major events and the decline in system balance capacity, thereby ensuring the economic efficiency and sufficiency of system operation.

[0005] The present invention adopts the following technical solution:

[0006] A method for improving short-term and ultra-short-term balance margins includes the following steps:

[0007] Based on basic technical data of the power system, short-term and ultra-short-term power balance models are determined, and short-term and ultra-short-term time coupling constraints and flexible resource hierarchical call constraints are constructed.

[0008] Power balance calculations are performed based on short-term and ultra-short-term power balance models to determine power shortage situations.

[0009] Output balance indicators to calculate the system benefits under flexible resource hierarchical scheduling, and improve the system balance margin by calling energy storage in the short term and gas turbine units in the ultra-short term.

[0010] Preferably, the basic technical data of the power system includes: technical parameters of various types of power sources in the power system, grid parameters, predicted load demand, and predicted output information of new energy units.

[0011] Preferably, the objective function of the short-term and ultra-short-term power balance model is as follows:

[0012]

[0013] Among them, Ω Th / Ω Hy / Ω Load / Ω WT / Ω PV / Ω F It is a collection of thermal power units / hydropower plants / loads / wind power units / photovoltaic units / gas turbine units. Let the operating cost function of thermal power units be _____. This refers to the operating power of thermal power units. For the start-up / shutdown status variables of thermal power units / number of start-up units in hydropower plants, For the start-up / shutdown costs of thermal power units / start-up costs of hydropower units, For load shedding power / curtailed wind power / curtailed solar power, For load shedding penalties / wind curtailment penalties / solar curtailment penalties, C F,p Penalties for using gas turbine units T represents the operating power of the ultra-short-term gas turbine unit, and T / T2 represents the short-term / ultra-short-term time scale.

[0014] More preferably, the short-term and ultra-short-term coupling constraints specifically include:

[0015] Ultra-short-term resource curve constraints:

[0016]

[0017]

[0018]

[0019] in, The curve represents the ultra-short-term load / wind power / solar resources, and XN(0,0.04) is a random number generated according to this normal distribution function.

[0020] Constraints on the state curves of ultra-short-term thermal water units:

[0021]

[0022]

[0023]

[0024]

[0025] in, For ultra-short-term thermal power unit operating status variables / ultra-short-term hydropower plant operating unit variables;

[0026] Operating constraints of ultra-short-term thermal power units:

[0027]

[0028]

[0029]

[0030]

[0031]

[0032] in, For ultra-short-term thermal power unit operating power, This represents the minimum output / installed capacity of the thermal power unit. For ultra-short-term thermal power unit operating state variables, The rate of ascent / descent for thermal power units;

[0033] Ultra-short-term hydropower unit operating constraints:

[0034]

[0035]

[0036]

[0037]

[0038]

[0039] in, For ultra-short-term hydropower plant operating power, This represents the minimum output / installed capacity of the hydropower plant units. This refers to the number of operating units in ultra-short-term hydropower plants. The uphill / downhill ramp rate of the hydropower plant unit;

[0040] Short-term curtailment constraints for renewable energy units:

[0041]

[0042]

[0043] in, For ultra-short-term curtailment of solar / wind power, For ultra-short-term photovoltaic / wind power resources;

[0044] Operational constraints of ultra-short-term pumped storage units:

[0045]

[0046]

[0047]

[0048]

[0049] in, For ultra-short-term pumped storage / power generation;

[0050] Ultra-short-term gas turbine unit operating constraints:

[0051]

[0052] in, This refers to the operating power of ultra-short-term gas turbine units.

[0053] More preferably, the system operation constraints specifically include:

[0054] Short-term system power balance constraints:

[0055]

[0056] Short-term cybersecurity constraints:

[0057]

[0058] Among them, F l,i The power flow transfer factor distribution matrix, This represents the upper limit of the line's power transmission capacity.

[0059] Short-term reserve constraints:

[0060]

[0061]

[0062] Where, α RS+ / α RS- The system's upper / lower reserve coefficient;

[0063] Ultra-short-term system power balance constraints:

[0064]

[0065] Ultra-short-term cybersecurity constraints:

[0066]

[0067] in, F represents the upper limit of the transmission capacity of line l. l,i The network transfer factor distribution matrix, For ultra-short-term thermal power unit operating power, For ultra-short-term hydropower plant operating power, For ultra-short-term wind power resources, For ultra-short-term wind curtailment power, For ultra-short-term photovoltaic resource power, For ultra-short-term curtailment power, For ultra-short-term pumped storage power generation, For ultra-short-term pumped storage pumping power, For ultra-short-term gas turbine unit operating power, For ultra-short-term load resources, Ω represents the ultra-short-term power loss, t2 represents the ultra-short-term time granularity, and T2 represents the ultra-short-term time scale. B For the set of busbars, Ω Th For a collection of thermal power units, Ω Hy For the collection of hydropower plants, Ω WT For a collection of wind turbine units, Ω PV For photovoltaic unit assembly, Ω PSS For pumped storage units, Ω F For gas turbine units, Ω Load For load sets.

[0068] Preferably, determining the power shortage situation specifically involves:

[0069] Short-term flexible resources are invoked to recalculate the power balance. The process ends once the power balance for both short-term and ultra-short-term needs are met. If short-term flexible resources are invoked to meet the short-term balance but power shortages still exist in the ultra-short term, ultra-short-term flexible resources are invoked to achieve ultra-short-term power balance.

[0070] Preferably, the balance margin index K is:

[0071]

[0072] in, These are the operating state variables of thermal power units. For the installed capacity of thermal power units, This refers to the number of operating generating units at a hydropower plant. The installed capacity of each hydroelectric generator unit in the hydropower plant. For wind power resources and power, For photovoltaic resource power, For ultra-short-term gas turbine unit operating power, For the power generation state variables of pumped storage units, For the power generation capacity of pumped storage units, For load resource power, Ω Th For a collection of thermal power units, Ω Hy For the collection of hydropower plants, Ω WT For a collection of wind turbine units, Ω PV For photovoltaic unit assembly, Ω PSS For pumped storage units, Ω F For gas turbine units, Ω Load For load sets.

[0073] Secondly, embodiments of the present invention provide a short-term and ultra-short-term balance margin enhancement system, comprising:

[0074] The module is built to determine short-term and ultra-short-term power balance models based on basic power system technical data, and to construct short-term and ultra-short-term time coupling constraints and flexible resource hierarchical call constraints.

[0075] The judgment module performs power balance calculations based on short-term and ultra-short-term power balance models to determine the power shortage situation;

[0076] The enhancement module outputs balance indicators to calculate the system benefits under flexible resource hierarchical scheduling. It improves the system balance margin by calling energy storage in the short term and gas turbine units in the ultra-short term.

[0077] Thirdly, a computer device includes a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor, when executing the computer program, implements the steps of the above-described short-term and ultra-short-term balance margin improvement method.

[0078] Fourthly, embodiments of the present invention provide a computer-readable storage medium including a computer program, which, when executed by a processor, implements the steps of the above-described short-term and ultra-short-term balance margin improvement method.

[0079] Compared with the prior art, the present invention has at least the following beneficial effects:

[0080] A method for improving short-term and ultra-short-term balance margins is proposed for use in day-ahead power balance analysis. This method comprehensively considers power supply issues during peak evening periods and employs a hierarchical scheduling approach for flexible resources to achieve finer-grained power balance in both short-term and ultra-short-term scenarios. By utilizing flexible resources across different time scales in power balance calculations, the method ensures power balance at all times throughout the day and meets power supply demands during extreme periods. While sacrificing some economic efficiency, it achieves higher-precision balance requirements, improves various system balance indicators, and significantly enhances the adequacy and stability of the power grid. This method exhibits excellent parallel computing potential, fully utilizing hardware computing resources to improve system adequacy while maintaining system economy. Results show that the hierarchical inclusion of flexible resources significantly reduces system load shedding, lowering the risk of power shortages. By utilizing energy storage in the short term and gas turbine units in the ultra-short term, the system balance margin is increased by 2.73%.

[0081] Furthermore, obtaining basic technical data from power system planning departments is a necessary condition for conducting short-term and ultra-short-term power balance analysis of the power system.

[0082] Furthermore, determining the short-term and ultra-short-term power balance models, as well as the short-term and ultra-short-term time coupling constraints and flexible resource hierarchical allocation constraints, is the core model of this invention.

[0083] Furthermore, short-term and ultra-short-term coupling constraints are set to connect short-term and ultra-short-term solution variables, strengthen the connection between time periods, and ensure the accuracy and rationality of ultra-short-term boundaries.

[0084] Furthermore, setting system operation constraints to ensure system power balance and meet network power flow security requirements is a necessary condition for performing full system operation simulation and solution.

[0085] Furthermore, conducting power balance calculations is a key step in the benefit analysis of this invention. First, the basic model is balanced. If there is a power shortage, flexible resources at the short-term scale are called in to recalculate the power balance to ensure short-term supply needs. Then, an ultra-short-term power verification is performed. On this basis, if the ultra-short-term power verification fails, ultra-short-term flexible resources are added, and the power balance is recalculated to ensure ultra-short-term supply capacity.

[0086] Furthermore, based on the preceding calculation results, the balance indicators are analyzed, and the benefits of flexible resource tiered scheduling are evaluated from both economic and supply security perspectives to improve the system's balance margin.

[0087] It is understood that the beneficial effects of the second to fourth aspects mentioned above can be found in the relevant descriptions in the first aspect mentioned above, and will not be repeated here.

[0088] In summary, this invention can perform reasonable and effective balance index benefit analysis, especially highlighting the solution to the balance problem caused by load and new energy fluctuations under extreme conditions. It is applicable to power balance calculation and analysis and balance margin improvement in high-proportion new energy power systems.

[0089] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description

[0090] Figure 1 This is a schematic diagram of the process of the present invention;

[0091] Figure 2 A schematic diagram of the ROTS system;

[0092] Figure 3 Here is the Gantt chart for the start-up and shutdown of the thermal power unit in Example 1;

[0093] Figure 4 The graph shows the number of thermal power units in operation and their output in Example 1.

[0094] Figure 5 Here is the short-term power balance diagram for Example 1;

[0095] Figure 6 Here is the ultra-short-term power balance diagram for example 1;

[0096] Figure 7 Example 2: Gantt chart for the start-up and shutdown of thermal power units;

[0097] Figure 8 Example 2: Graph showing the number of thermal power units in operation versus their output.

[0098] Figure 9 This is the short-term power balance diagram for example 2;

[0099] Figure 10 Example 2: Ultra-short-term power balance diagram;

[0100] Figure 11 This is a schematic diagram of a computer device provided according to an embodiment of the present invention.

[0101] Figure 12 This is a block diagram of a chip provided according to an embodiment of the present invention. Detailed Implementation

[0102] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0103] In the description of this invention, it should be understood that the terms "comprising" and "including" indicate the presence of the described features, integrals, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integrals, steps, operations, elements, components and / or collections thereof.

[0104] It should also be understood that the terminology used in this specification is for the purpose of describing particular embodiments only and is not intended to limit the invention. As used in this specification and the appended claims, the singular forms “a,” “an,” and “the” are intended to include the plural forms unless the context clearly indicates otherwise.

[0105] It should also be further understood that the term "and / or" as used in this specification and the appended claims refers to any combination and all possible combinations of one or more of the associated listed items, and includes such combinations. For example, A and / or B can represent three cases: A alone, A and B simultaneously, and B alone. Additionally, the character " / " in this invention generally indicates that the preceding and following objects have an "or" relationship.

[0106] It should be understood that although terms such as first, second, third, etc., may be used in the embodiments of the present invention to describe the preset range, these preset ranges should not be limited to these terms. These terms are only used to distinguish the preset ranges from one another. For example, without departing from the scope of the embodiments of the present invention, the first preset range may also be referred to as the second preset range, and similarly, the second preset range may also be referred to as the first preset range.

[0107] Depending on the context, the word "if" as used here can be interpreted as "when," "when," "in response to determination," or "in response to detection." Similarly, depending on the context, the phrase "if determination" or "if detection (of the stated condition or event)" can be interpreted as "when determination," "in response to determination," "when detection (of the stated condition or event)," or "in response to detection (of the stated condition or event)."

[0108] The accompanying drawings illustrate various structural schematic diagrams according to embodiments disclosed in this invention. These drawings are not to scale, and some details have been enlarged for clarity, and some details may have been omitted. The shapes of the various regions and layers shown in the drawings, as well as their relative sizes and positional relationships, are merely exemplary and may deviate from reality due to manufacturing tolerances or technical limitations. Furthermore, those skilled in the art can design regions / layers with different shapes, sizes, and relative positions as needed.

[0109] This invention provides a method for improving short-term and ultra-short-term balance margins. In day-ahead power balance analysis, it comprehensively considers power supply issues during extreme evening peak periods and employs a hierarchical scheduling method for flexible resources to achieve finer-grained power balance at both the short-term and ultra-short-term levels, improving system adequacy while maintaining system economy. This invention comprehensively considers the operational characteristics of various flexible resources, classifying and allocating them to short-term and ultra-short-term time scales, achieving hierarchical scheduling and management of flexible resources, thus improving their utilization rate. Simultaneously, it couples the short-term and ultra-short-term time scales, considering the volatility and randomness of load and renewable energy at the ultra-short-term scale, improving the granularity of calculations, providing a method for power verification at the ultra-short-term scale, and statistically outputting relevant balance indicators for evaluating system balance capacity. This invention's method has excellent computational efficiency, fully utilizing hardware computing resources. The proposed method can perform reasonable and effective balance indicator benefit analysis, particularly addressing balance problems caused by load and renewable energy fluctuations at extreme times. Therefore, this method is highly suitable for power balance calculation and analysis and balance margin improvement in high-proportion renewable energy power systems.

[0110] Please see Figure 1 The present invention provides a method for improving short-term and ultra-short-term balance margins, comprising the following steps:

[0111] S1. Obtain basic technical data from the power system planning department;

[0112] Basic technical data of the power system includes: technical parameters of various types of power sources in the power system, grid parameters, predicted load demand, and predicted output information of new energy units.

[0113] S2. Determine the short-term and ultra-short-term power balance models, construct short-term and ultra-short-term time coupling constraints, and flexible resource hierarchical allocation constraints;

[0114] S201. Establish the objective function

[0115] The goal is to minimize the economic operating costs of the system, including the start-up and shutdown costs of thermal and hydropower units, the operating costs of thermal power, the cost of curtailment of renewable energy, the cost of load shedding penalties, and the cost of flexible resource allocation.

[0116]

[0117] Among them, Ω Th / Ω Hy / Ω Load / Ω WT / Ω PV / Ω F It is a collection of thermal power units / hydropower plants / loads / wind power units / photovoltaic units / gas turbine units. Let the operating cost function of thermal power units be _____. This refers to the operating power of thermal power units. For the start-up / shutdown status variables of thermal power units / number of start-up units in hydropower plants, For the start-up / shutdown costs of thermal power units / start-up costs of hydropower units, For load shedding power / curtailed wind power / curtailed solar power, C L,Curtail / C WT,Curtail / C PV,Curtail For load shedding penalties / wind curtailment penalties / solar curtailment penalties, C F,p Penalties for using gas turbine units T represents the operating power of the ultra-short-term gas turbine unit, and T / T2 represents the short-term / ultra-short-term time scale.

[0118] S202. Determine the unit's operating constraints.

[0119] 1. Operating constraints of thermal power units

[0120]

[0121]

[0122]

[0123]

[0124]

[0125]

[0126]

[0127]

[0128] in, Let the operating cost function of thermal power units be _____. This refers to the operating power of thermal power units. For the quadratic / primary / constant terms of the operating cost of thermal power units, k i,j / b j The slope / intercept for linearizing the operating cost range of thermal power plants. This represents the minimum output / installed capacity of the thermal power unit. These are the operating / start-up / shutdown status variables for thermal power units. This refers to the rate at which the thermal power unit climbs up or down a slope.

[0129] 2. Clustering Operation Constraints of Hydropower Units

[0130]

[0131]

[0132]

[0133]

[0134]

[0135] in, For the operating power of the hydropower plant, This represents the minimum output / installed capacity of the hydropower plant units. This refers to the number of hydropower plant units in operation, started-up, or shut down. This represents the total number of generating units in the hydropower plant. This refers to the uphill / downhill ramp rate of the hydropower plant's generating units.

[0136] 3. Curtailment constraints of renewable energy units

[0137]

[0138]

[0139] in, For curtailed solar / wind power, This refers to the power of photovoltaic / wind power resources.

[0140] 4. Operating constraints of pumped storage units

[0141]

[0142]

[0143]

[0144]

[0145]

[0146]

[0147]

[0148]

[0149] in, For pumped storage / power generation capacity, To maximize the pumping / power generation capacity of the pumped storage system. For pumped storage / pumped water / power generation state variables, For pumped storage / hydropower generation efficiency, N PSS,cha / N PSS,disThis is the maximum number of pumping / power generation cycles for pumped storage. To pump out the reservoir's electrical capacity, This is for pumping the minimum / maximum reservoir capacity.

[0150] S203. Determine the short-term and ultra-short-term coupling constraints.

[0151] 1. Ultra-short-term resource curve constraints

[0152]

[0153]

[0154]

[0155] in, XN(0,0.04) is the ultra-short-term load / wind power / photovoltaic resource curve, and XN(0,0.04) is a random number generated according to the normal distribution function.

[0156] 2. Constraints on the state curves of ultra-short-term thermal water units

[0157]

[0158]

[0159] in, For ultra-short-term thermal power unit operating status variables / ultra-short-term hydropower plant operating unit variables.

[0160] 3. Operating constraints of ultra-short-term thermal power units

[0161]

[0162]

[0163]

[0164]

[0165]

[0166] in, For ultra-short-term thermal power unit operating power, This represents the minimum output / installed capacity of the thermal power unit. For ultra-short-term thermal power unit operating state variables, This refers to the rate at which the thermal power unit climbs up or down a slope.

[0167] 4. Operating constraints of ultra-short-term hydropower units

[0168]

[0169]

[0170]

[0171]

[0172]

[0173] in, For ultra-short-term hydropower plant operating power, This represents the minimum output / installed capacity of the hydropower plant units. This refers to the number of operating units in ultra-short-term hydropower plants. This refers to the uphill / downhill ramp rate of the hydropower plant unit.

[0174] 5. Curtailment constraints of ultra-short-term renewable energy units

[0175]

[0176]

[0177] in, For ultra-short-term curtailment of solar / wind power, For ultra-short-term photovoltaic / wind power resources.

[0178] 6. Operational constraints of ultra-short-term pumped storage units

[0179]

[0180]

[0181] in, It is for ultra-short-term pumped storage / power generation.

[0182] 7. Operating constraints of ultra-short-term gas turbine units

[0183]

[0184] in, This refers to the operating power of ultra-short-term gas turbine units.

[0185] S204. Determine system operating constraints

[0186] 1. Short-term system power balance constraints

[0187]

[0188] 2. Short-term network security constraints

[0189]

[0190] Among them, F l,i The power flow transfer factor distribution matrix, This represents the upper limit of the line's power transmission capacity.

[0191] 3. Short-term reserve constraints

[0192]

[0193]

[0194] Where, α RS+ / α RS- This refers to the system's upper / lower reserve coefficient.

[0195] 4. Power balance constraints of ultra-short-term systems

[0196]

[0197] 5. Short-term network security constraints

[0198]

[0199] S3. Based on the model established in step S2, perform power balance calculations and analyze whether there is a power shortage. If there is a power shortage, discuss the different cases.

[0200] The basic model is balanced. If there is a power shortage, flexible resources at the short-term scale are called up and the power balance is recalculated to ensure short-term supply needs. Then, an ultra-short-term power verification is performed. If the ultra-short-term power verification fails, ultra-short-term flexible resources are added and the power balance is recalculated to ensure ultra-short-term supply capacity.

[0201] S301. Call upon short-term flexible resources to recalculate the power balance. If the power balance can be satisfied for both short-term and ultra-short-term needs, then the process ends.

[0202] S302. Based on step S301, only short-term flexible resources are called to meet short-term balance, but there is still a power shortage in the ultra-short term. Further ultra-short-term flexible resources are called to achieve ultra-short-term power balance.

[0203] S4. Based on step S3, output the balance index and conduct balance index analysis from the economic and supply guarantee perspectives. Calculate the system benefits under the flexible resource hierarchical scheduling and highlight the role of flexible resources in improving the system balance margin.

[0204] Analyze the balance indicators and evaluate the benefits of flexible resource tiered allocation from both economic and supply security perspectives to improve the system's balance margin.

[0205] This invention proposes a short-term and ultra-short-term balance evaluation system that considers flexible resource hierarchical scheduling. Each dimension index forms its own feature index set based on the time scale, spatial scale, and statistical category.

[0206] 1. Balance Margin Indicators

[0207]

[0208] 2. Cost of thermal power

[0209]

[0210] 3. Water and electricity costs

[0211]

[0212] 4. Gas dispatch cost

[0213]

[0214] 5. Power loss due to load

[0215]

[0216] 6. Insufficient maximum power

[0217]

[0218] 7. Power outage frequency

[0219]

[0220] 8. Longest continuous power outage time

[0221]

[0222] in, These are the operating state variables of thermal power units. For the installed capacity of thermal power units, This refers to the number of operating generating units at a hydropower plant. The installed capacity of each hydroelectric generator unit in the hydropower plant. For wind power resources and power, For photovoltaic resource power, For ultra-short-term gas turbine unit operating power, For the power generation state variables of pumped storage units, For the power generation capacity of pumped storage units, For load resource power, Ω Th For a collection of thermal power units, Ω Hy For hydropower plants, Ω WT For a collection of wind turbine units, Ω PV For photovoltaic unit assembly, ΩPSS For pumped storage units, Ω F For gas turbine units, Ω Load For load set, To linearize the segmented cost of thermal power units, This refers to the operating power of thermal power units. For the start-up cost of thermal power units, These are the startup state variables for thermal power units. For the cost of thermal power unit shutdown, For the shutdown state variables of thermal power units. For the costs of each hydropower plant, For the dispatch cost of each gas turbine unit, This represents the power at which the load is lost.

[0223] In another embodiment of the present invention, a short-term and ultra-short-term balance margin enhancement system is provided. This system can be used to implement the above-mentioned short-term and ultra-short-term balance margin enhancement method. Specifically, the short-term and ultra-short-term balance margin enhancement system includes a construction module, a judgment module, and an enhancement module.

[0224] Among them, the construction module determines the short-term and ultra-short-term power balance models based on the basic technical data of the power system, and constructs short-term and ultra-short-term time coupling constraints and flexible resource hierarchical call constraints;

[0225] The judgment module performs power balance calculations based on short-term and ultra-short-term power balance models to determine the power shortage situation;

[0226] The enhancement module outputs balance indicators to calculate the system benefits under flexible resource hierarchical scheduling. It improves the system balance margin by calling energy storage in the short term and gas turbine units in the ultra-short term.

[0227] In another embodiment of the present invention, a terminal device is provided, comprising a processor and a memory. The memory stores a computer program, the computer program including program instructions, and the processor executes the program instructions stored in the computer storage medium. The processor may be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. It is the computing and control core of the terminal, suitable for implementing one or more instructions, specifically suitable for loading and executing one or more instructions to implement a corresponding method flow or corresponding function. The processor described in this embodiment of the present invention can be used for the operation of short-term and ultra-short-term balance margin improvement methods, including:

[0228] Based on basic power system technical data, short-term and ultra-short-term power balance models are determined, and short-term and ultra-short-term time coupling constraints and flexible resource hierarchical dispatch constraints are constructed. Power balance calculations are carried out based on the short-term and ultra-short-term power balance models to determine power shortage situations. Balance indicators are output to measure the system benefits under flexible resource hierarchical dispatch. The system balance margin is improved by calling energy storage in the short term and gas turbine units in the ultra-short term.

[0229] In another embodiment of the present invention, a storage medium is also provided, specifically a computer-readable storage medium (memory). This computer-readable storage medium is a memory device in a terminal device used to store programs and data. It is understood that the computer-readable storage medium here can include both the built-in storage medium in the terminal device and extended storage media supported by the terminal device. The computer-readable storage medium provides storage space that stores the terminal's operating system. Furthermore, this storage space also stores one or more instructions suitable for loading and execution by a processor. These instructions can be one or more computer programs (including program code). It should be noted that the computer-readable storage medium here can be high-speed RAM or non-volatile memory, such as at least one disk storage device.

[0230] One or more instructions stored in a computer-readable storage medium can be loaded and executed by a processor to implement the corresponding steps of the short-term and ultra-short-term balance margin improvement methods in the above embodiments; one or more instructions in the computer-readable storage medium are loaded and executed by the processor to perform the following steps:

[0231] Based on basic power system technical data, short-term and ultra-short-term power balance models are determined, and short-term and ultra-short-term time coupling constraints and flexible resource hierarchical dispatch constraints are constructed. Power balance calculations are carried out based on the short-term and ultra-short-term power balance models to determine power shortage situations. Balance indicators are output to measure the system benefits under flexible resource hierarchical dispatch. The system balance margin is improved by calling energy storage in the short term and gas turbine units in the ultra-short term.

[0232] Please see Figure 11 The terminal device is a computer device. In this embodiment, the computer device 60 includes a processor 61, a memory 62, and a computer program 63 stored in the memory 62 and executable on the processor 61. When executed by the processor 61, the computer program 63 implements the fluid composition calculation method in the reservoir stimulation wellbore of this embodiment. To avoid repetition, these details are not elaborated here. Alternatively, when executed by the processor 61, the computer program 63 implements the functions of each model / unit in the fluid composition calculation system in the reservoir stimulation wellbore of this embodiment. To avoid repetition, these details are not elaborated here.

[0233] Computer device 60 can be a desktop computer, laptop, handheld computer, cloud server, or other computing device. Computer device 60 may include, but is not limited to, a processor 61 and a memory 62. Those skilled in the art will understand that... Figure 11 This is merely an example of computer device 60 and does not constitute a limitation on computer device 60. It may include more or fewer components than shown, or combine certain components, or different components. For example, computer device may also include input / output devices, network access devices, buses, etc.

[0234] The processor 61 may be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor.

[0235] The memory 62 can be an internal storage unit of the computer device 60, such as a hard disk or RAM of the computer device 60. The memory 62 can also be an external storage device of the computer device 60, such as a plug-in hard disk, smart media card (SMC), secure digital (SD) card, flash card, etc. equipped on the computer device 60.

[0236] Furthermore, the memory 62 may include both internal storage units of the computer device 60 and external storage devices. The memory 62 is used to store computer programs and other programs and data required by the computer device. The memory 62 can also be used to temporarily store data that has been output or will be output.

[0237] Please see Figure 12 The terminal device is a chip. In this embodiment, the chip 600 includes a processor 622, which may be one or more, and a memory 632 for storing computer programs executable by the processor 622. The computer program stored in the memory 632 may include one or more modules, each corresponding to a set of instructions. Furthermore, the processor 622 may be configured to execute the computer program to perform the generalizable monocular absolute depth map estimation method described above.

[0238] Additionally, chip 600 may also include a power supply component 626 and a communication component 650. The power supply component 626 can be configured to perform power management of chip 600, and the communication component 650 can be configured to enable communication of chip 600, such as wired or wireless communication. Furthermore, chip 600 may also include an input / output interface 658. Chip 600 can operate on an operating system stored in memory 632.

[0239] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. The components of the embodiments of the present invention described and shown in the accompanying drawings can generally be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort are within the scope of protection of the present invention.

[0240] To verify the effectiveness of the method of this invention, an improved ROTS system was selected to verify the correctness of the proposed model. The input data is shown in Table 1, and the ROTS system is as follows: Figure 2 As shown, the area can be divided into a resource-rich zone (Zone A), a 500 kV zone (Zone B), and a load zone (Zone C). Information on wind / solar / coal / hydropower connection points, transmission line lengths (represented by numbers on the line), and node voltage levels is as follows: Figure 2 As shown. All nodes are uniformly numbered. Transformer nodes contain different voltage levels, thus corresponding to multiple buses. Long-distance transmission of renewable energy is represented using a grid topology, with the longest distance from the resource area (Area A) to the load area (Area C) reaching 700-800 kilometers. Compared to existing testing systems, coordinating renewable energy generation and consumption over a large scale is more challenging from a system-wide perspective.

[0241] Table 1 ROTS System Input Data

[0242]

[0243]

[0244] Two sets of calculation examples are designed based on whether or not flexible resource hierarchical scheduling is available: Example 1 (without flexible resources) and Example 2 (with flexible resources). The balance index of the two sets of calculation examples is analyzed to further illustrate the role of flexible resource hierarchical scheduling in improving the short-term and ultra-short-term power balance of the power system.

[0245] Please see Figures 3 to 6 Systems lacking flexible resources for regulation struggle to cope with volatile loads and renewable energy sources. Conventional power sources, due to their ramp-up characteristics, result in insufficient capacity to regulate peak loads, leading to significant power shortages at 6 PM. Even at this time, hydropower is at full capacity, and thermal power plants are all operating at near full power generation, yet supply still cannot be guaranteed, indicating a deficiency in system adequacy. Further detailed verification of the evening peak reveals that, considering the drastic fluctuations in short-term loads and renewable energy sources, the power shortage is even more severe, and the system's balance is poor.

[0246] Please see Figures 7 to 10 With the addition of flexible resources through tiered scheduling, the power shortage during the evening peak is effectively resolved at the short-term typical day level. At other times, pumped-storage units act as a substitute for thermal power capacity, reducing the number of thermal power units in operation and significantly lowering the start-up and shutdown costs. At the ultra-short-term typical period level, more flexible gas turbine units are used to handle drastically fluctuating loads, effectively addressing potential peak power shortages at a more refined time granularity and ensuring supply and demand balance during the typical evening peak period.

[0247] Table 2 Comparison of Economic Indicators

[0248]

[0249] As shown in Table 2, the balance margin in Example 1 is 1.10, and the balance margin in Example 2 is 1.13. The balance margin increased by 2.73% after adding flexible resources with hierarchical scheduling, significantly enhancing system adequacy. Due to the capacity substitution effect of flexible resources, the number of thermal power units in operation decreased, reducing thermal power costs from 19.6204 million yuan to 19.5977 million yuan. However, thermal power units generally have large installed capacities and high minimum outputs. Therefore, the capacity of shut-down units cannot be completely replaced by the smaller flexible resource units, leading to increased hydropower output and higher hydropower costs. As for the cost of gas turbine units within the flexible resources, they are primarily used for peak load regulation during ultra-short-term typical periods. This ensures complete load supply and meets system demand while sacrificing some economic efficiency.

[0250] Table 3 Comparison of Short-Term Supply Guarantee Indicators

[0251]

[0252] As shown in Table 3, under the short-term scale, the load shedding amounts in Example 1 and Example 2 are 434.47 MWh and 71.13 MWh, respectively; the maximum power shortages are 401.13 MW and 71.13 MW, respectively; the outage frequencies are 0.13 and 0.04, respectively; and the longest continuous outage time is 1 hour for both. This indicates that the investment of flexible resources at the short-term level greatly improves the system's supply guarantee capability, with a decrease of 83.63% in load shedding, a decrease of 82.27% in maximum power shortage, and a reduction of 0.09 in outage frequency, resulting in a significant enhancement of system stability.

[0253] Table 4 Comparison of Indicators for Ultra-Short-Term Supply Guarantee

[0254]

[0255] As shown in Table 4, under the ultra-short-term scale, the load shedding in Case 1 and Case 2 were 378.45 MWh and 0 MWh, respectively; the maximum power shortage was 1064.34 MW and 0 MW, respectively; the outage frequency was 0.42 and 0, respectively; and the longest continuous outage time was 30 min and 0 min, respectively. This indicates that the deployment of flexible resources at the ultra-short-term level completely solved the power shortage caused by drastic load fluctuations and ensured power supply at the minute level.

[0256] In summary, this invention provides a method, system, medium, and equipment for improving short-term and ultra-short-term balance margins. It performs refined modeling of diverse flexible resources and, based on the operational characteristics of various flexible resources, allocates them to short-term and ultra-short-term time scales, achieving hierarchical scheduling and management of flexible resources. This improves the utilization rate of flexible resources and further enhances the system's balance margin. By coupling short-term and ultra-short-term time scales and considering the volatility and randomness of load and new energy sources at the ultra-short-term scale, it improves the granularity of calculations and provides a method for power verification at the ultra-short-term scale. This invention combines short-term and ultra-short-term power balance analysis, achieving finer-grained power supply by calling flexible units at different time scales, improving system balance margins, and balancing system economy and sufficiency.

[0257] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the above-described division of functional units and modules is merely an example. In practical applications, the above functions can be assigned to different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiments can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or as a software functional unit. Furthermore, the specific names of the functional units and modules are only for easy differentiation and are not intended to limit the scope of protection of this application. The specific working process of the units and modules in the above system can be referred to the corresponding process in the foregoing method embodiments, and will not be repeated here.

[0258] In the above embodiments, the descriptions of each embodiment have different focuses. For parts that are not described in detail or recorded in a certain embodiment, please refer to the relevant descriptions of other embodiments.

[0259] Those skilled in the art will recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed in this invention can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementations should not be considered beyond the scope of this invention.

[0260] In the embodiments provided by this invention, it should be understood that the disclosed devices / terminals and methods can be implemented in other ways. For example, the device / terminal embodiments described above are merely illustrative. For instance, the division of modules or units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces; the indirect coupling or communication connection between devices or units may be electrical, mechanical, or other forms.

[0261] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.

[0262] Furthermore, the functional units in the various embodiments of the present invention can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or as a software functional unit.

[0263] If the integrated module / unit is implemented as a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, all or part of the processes in the methods of the above embodiments can also be implemented by a computer program instructing related hardware. The computer program can be stored in a computer-readable storage medium, and when executed by a processor, it can implement the steps of the various method embodiments described above. The computer program includes computer program code, which can be in the form of source code, object code, executable files, or certain intermediate forms. The computer-readable medium can include: any entity or device capable of carrying the computer program code, recording media, USB flash drives, portable hard drives, magnetic disks, optical disks, computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signals, telecommunication signals, and software distribution media, etc. It should be noted that the content included in the computer-readable medium can be appropriately added or removed according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electrical carrier signals and telecommunication signals.

[0264] This application is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of this application. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart... Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.

[0265] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.

[0266] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.

[0267] The above content is only for illustrating the technical concept of the present invention and should not be construed as limiting the scope of protection of the present invention. Any modifications made to the technical solution based on the technical concept proposed in this invention shall fall within the scope of protection of the claims of this invention.

Claims

1. A method for improving short-term and ultra-short-term balance margins, characterized in that, Includes the following steps: Based on basic technical data of the power system, short-term and ultra-short-term power balance models are determined, and short-term and ultra-short-term time coupling constraints and flexible resource hierarchical call constraints are constructed. The objective functions of the short-term and ultra-short-term power balance models are as follows: in, It is a collection of thermal power units / hydropower plants / loads / wind turbine units / photovoltaic units / gas turbine units. Let the operating cost function of thermal power units be _____. This refers to the operating power of thermal power units. For the start-up / shutdown status variables of thermal power units / number of start-up units in hydropower plants, For the start-up / shutdown costs of thermal power units / start-up costs of hydropower units, For load shedding power / curtailed wind power / curtailed solar power, For load shedding penalties / wind curtailment penalties / solar curtailment penalties, Penalties for using gas turbine units For ultra-short-term gas turbine unit operating power, For short-term / ultra-short-term timescales; The specific conditions for the coupling constraints between short-term and ultra-short-term time include: Ultra-short-term resource curve constraints: in, For ultra-short-term load / wind / solar resource curves, Random numbers generated to conform to this normal distribution function; Constraints on the state curves of ultra-short-term thermal water units: in, For ultra-short-term thermal power unit operating status variables / ultra-short-term hydropower plant operating unit variables; Operating constraints of ultra-short-term thermal power units: in, For ultra-short-term thermal power unit operating power, This represents the minimum output / installed capacity of the thermal power unit. For ultra-short-term thermal power unit operating state variables, The rate of ascent / descent for thermal power units; Power balance calculations are performed based on short-term and ultra-short-term power balance models to determine power shortage situations. Based on the output balance index under power shortage conditions, the high system balance margin is improved by short-term energy storage and ultra-short-term gas turbine unit calls.

2. The method for improving short-term and ultra-short-term balance margins according to claim 1, characterized in that, Basic technical data of the power system includes: technical parameters of various types of power sources in the power system, grid parameters, predicted load demand, and predicted output information of new energy units.

3. The method for improving short-term and ultra-short-term balance margins according to claim 1, characterized in that, Short-term and ultra-short-term coupling constraints specifically include: Ultra-short-term hydropower unit operating constraints: in, For ultra-short-term hydropower plant operating power, This represents the minimum output / installed capacity of the hydropower plant units. This refers to the number of operating units in ultra-short-term hydropower plants. The uphill / downhill ramp rate of the hydropower plant unit; Short-term curtailment constraints for renewable energy units: in, For ultra-short-term curtailment of solar / wind power, For ultra-short-term photovoltaic / wind power resources; Operational constraints of ultra-short-term pumped storage units: in, For ultra-short-term pumped storage / power generation; Ultra-short-term gas turbine unit operating constraints: in, This refers to the operating power of ultra-short-term gas turbine units.

4. The method for improving short-term and ultra-short-term balance margins according to claim 1, characterized in that, The specific system operation constraints include: Short-term system power balance constraints: Short-term cybersecurity constraints: in, The power flow transfer factor distribution matrix, This represents the upper limit of the line's power transmission capacity. Short-term reserve constraints: in, The system's upper / lower reserve coefficient; Ultra-short-term system power balance constraints: Ultra-short-term cybersecurity constraints: in, For the line Maximum transmission capacity The network transfer factor distribution matrix, For ultra-short-term thermal power unit operating power, For ultra-short-term hydropower plant operating power, For ultra-short-term wind power resources, For ultra-short-term wind curtailment power, For ultra-short-term photovoltaic resource power, For ultra-short-term curtailment power, For ultra-short-term pumped storage power generation, For ultra-short-term pumped storage pumping power, For ultra-short-term gas turbine unit operating power, For ultra-short-term load resources, For ultra-short-term power loss, For ultra-short time granularity, For an ultra-short timescale, For the set of busbars, For the collection of thermal power units, For the collection of hydropower plants, A collection of wind turbine units. A collection of photovoltaic units, A collection of pumped storage units. For the collection of gas turbine units, For load sets.

5. The method for improving short-term and ultra-short-term balance margins according to claim 1, characterized in that, The specific details of the power shortage are as follows: Short-term flexible resources are invoked to recalculate the power balance. The process ends once the power balance for both short-term and ultra-short-term needs are met. If short-term flexible resources are invoked to meet the short-term balance but power shortages still exist in the ultra-short term, ultra-short-term flexible resources are invoked to achieve ultra-short-term power balance.

6. The method for improving short-term and ultra-short-term balance margins according to claim 1, characterized in that, Balance Margin Indicators for: in, These are the operating state variables of thermal power units. For the installed capacity of thermal power units, This refers to the number of operating generating units at a hydropower plant. The installed capacity of each hydroelectric generator unit in the hydropower plant. For wind power resources and power, For photovoltaic resource power, For ultra-short-term gas turbine unit operating power, For the power generation state variables of pumped storage units, For the power generation capacity of pumped storage units, For load resource power, For the collection of thermal power units, For the collection of hydropower plants, A collection of wind turbine units. A collection of photovoltaic units, A collection of pumped storage units. For the collection of gas turbine units, For load sets.

7. A short-term and ultra-short-term balance margin enhancement system, characterized in that, include: The module is built to determine short-term and ultra-short-term power balance models based on basic power system technical data, and to construct short-term and ultra-short-term time coupling constraints and flexible resource hierarchical call constraints. The objective functions of the short-term and ultra-short-term power balance models are as follows: in, It is a collection of thermal power units / hydropower plants / loads / wind turbine units / photovoltaic units / gas turbine units. Let the operating cost function of thermal power units be _____. This refers to the operating power of thermal power units. For the start-up / shutdown status variables of thermal power units / number of start-up units in hydropower plants, For the start-up / shutdown costs of thermal power units / start-up costs of hydropower units, For load shedding power / curtailed wind power / curtailed solar power, For load shedding penalties / wind curtailment penalties / solar curtailment penalties, Penalties for using gas turbine units For ultra-short-term gas turbine unit operating power, For short-term / ultra-short-term timescales; The specific conditions for the coupling constraints between short-term and ultra-short-term time include: Ultra-short-term resource curve constraints: in, For ultra-short-term load / wind / solar resource curves, Random numbers generated to conform to this normal distribution function; Constraints on the state curves of ultra-short-term thermal water units: in, For ultra-short-term thermal power unit operating status variables / ultra-short-term hydropower plant operating unit variables; Operating constraints of ultra-short-term thermal power units: in, For ultra-short-term thermal power unit operating power, This represents the minimum output / installed capacity of the thermal power unit. For ultra-short-term thermal power unit operating state variables, The rate of ascent / descent for thermal power units; The judgment module performs power balance calculations based on short-term and ultra-short-term power balance models to determine the power shortage situation; The enhancement module outputs balance indicators based on power shortage conditions and conducts balance indicator analysis from both economic and supply guarantee perspectives, calculating the system benefits under flexible resource hierarchical scheduling.

8. A computer-readable storage medium for storing one or more programs, characterized in that, The one or more programs include instructions that, when executed by a computing device, cause the computing device to perform the method of any one of claims 1 to 6.

9. A computing device, characterized in that, include: One or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and configured to be executed by the one or more processors, the one or more programs including steps for performing the method of any one of claims 1 to 6.

Citation Information

Patent Citations

  • Power system resource optimization scheduling method considering flexibility and terminal

    CN116780646A