A flood analysis method based on artificial intelligence

Through flood analysis methods based on artificial intelligence, multi-source data and real-time monitoring are used to build a dynamic flood evolution prediction model, which solves the problem of inefficiency of traditional methods, achieves accurate prediction and assessment of flood risks, and provides scientific decision-making support for flood prevention and disaster reduction. .

CN118692226BActive Publication Date: 2024-10-25水利部珠江水利委员会珠江水利综合技术中心
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411163720.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-10-25
Estimated Expiration
2044-08-23

AI Technical Summary

Technical Problem

Traditional flood analysis methods are inefficient and difficult to deal with complex and changeable flood events. The static model cannot be updated in time, resulting in lagging analysis results and unable to provide effective decision support for flood prevention and disaster reduction. The accuracy of flood risk assessment is insufficient, resulting in inaccurate flood control measures.

Method used

Using flood analysis methods based on artificial intelligence, through multi-source data collection and real-time monitoring data integration, we build a dynamic flood evolution prediction model, conduct flood risk area prediction and spatio-temporal evolution simulation, generate flood inundation range analysis maps, and conduct risk assessment and early warning reports. .

Benefits of technology

It significantly improves the efficiency and accuracy of flood analysis, provides timely and scientific decision support, reduces deviations from measured data, enhances the practicality and effectiveness of early warning systems, and helps formulate more reasonable and effective flood control measures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118692226B_ABST
    Figure CN118692226B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of hydrological monitoring technology, and in particular to a flood analysis method based on artificial intelligence. The method comprises the following steps: multi-source data collection is performed on the target area to obtain a comprehensive flood characteristic data set, wherein the comprehensive flood characteristic data set includes a historical flood event data set, topographic data of the target area, a historical meteorological monitoring data set, and a historical hydrological monitoring data set; a flood evolution prediction model is constructed based on the comprehensive flood characteristic data set to obtain a flood dynamic evolution prediction model; Internet of Things data is collected on the target area to obtain real-time meteorological monitoring data and real-time hydrological monitoring data; the flood dynamic evolution prediction model is dynamically mapped using the real-time meteorological monitoring data and the real-time hydrological monitoring data to obtain a homomorphic flood dynamic evolution prediction model. The present invention significantly improves the efficiency of flood analysis and makes the response to flood events more rapid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of hydrological monitoring, and in particular to a flood analysis method based on artificial intelligence. Background Art

[0002] Traditional flood analysis methods rely on empirical models and manual analysis, which is not only inefficient but also difficult to cope with complex and changeable flood events. In particular, the existing technology shows obvious limitations in the integrated processing of multi-source data and the rapid response of real-time monitoring data. The construction and optimization of flood analysis models is another difficult problem in the existing technology. Traditional flood models are usually based on static data and lack the ability to dynamically respond to real-time data. In rapidly changing flood events, such static models often cannot be updated in time, resulting in delayed analysis results and failure to provide effective decision-making support for flood prevention and disaster reduction. The accuracy of flood risk assessment is another challenge faced by existing technologies. Although existing flood risk assessment models can provide a certain risk level distribution, due to the lack of model accuracy, these assessment results often have large deviations from the measured data of actual hydrological stations. This deviation limits the effectiveness of the model in practical applications and makes the formulation of flood control measures less accurate. Summary of the invention

[0003] Based on this, it is necessary for the present invention to provide a flood analysis method based on artificial intelligence to solve at least one of the above technical problems.

[0004] To achieve the above purpose, a flood analysis method based on artificial intelligence includes the following steps:

[0005] Step S1: Collect multi-source data in the target area to obtain a comprehensive flood characteristic data set, wherein the comprehensive flood characteristic data set includes a historical flood event data set, topographic data of the target area, a historical meteorological monitoring data set, and a historical hydrological monitoring data set; construct a flood evolution prediction model based on the comprehensive flood characteristic data set to obtain a flood dynamic evolution prediction model;

[0006] Step S2: collect IoT data in the target area to obtain real-time meteorological monitoring data and real-time hydrological monitoring data; dynamically map the flood dynamic evolution prediction model using the real-time meteorological monitoring data and the real-time hydrological monitoring data to obtain a homomorphic flood dynamic evolution prediction model;

[0007] Step S3: Utilize the homomorphic flood dynamic evolution prediction model to predict the flood risk area and obtain the time series of the target area, and obtain the predicted flood risk area distribution image and the predicted flood arrival time series; perform hydrological monitoring of the target area at the corresponding time points according to the predicted flood arrival time series, and obtain a verification hydrological monitoring data set; perform model accuracy correction on the homomorphic flood dynamic evolution prediction model according to the predicted flood risk area distribution image and the verification hydrological monitoring data set, and obtain an optimized flood dynamic evolution prediction model;

[0008] Step S4: simulating the evolution of floods in the target area using the optimized flood dynamic evolution prediction model according to the predicted flood risk area distribution image and the predicted flood arrival time series, and obtaining flood spatiotemporal evolution data; generating a flood inundation range analysis diagram according to the flood spatiotemporal evolution data;

[0009] Step S5: Conduct flood risk assessment on the flood inundation range analysis map to obtain flood inundation risk assessment data; and generate a flood warning report based on the flood inundation risk assessment data.

[0010] The present invention significantly improves the efficiency of flood analysis through automated multi-source data collection and integration of real-time monitoring data, makes the response to flood events more rapid, and effectively addresses the problem of low efficiency in traditional methods. The flood dynamic evolution prediction model constructed by using artificial intelligence technology can process real-time data, realize dynamic simulation and prediction of flood conditions, overcome the limitations of traditional static models, and provide more timely and accurate decision support for flood prevention and disaster reduction. By combining real-time monitoring data and historical data, the model of the present invention can accurately predict flood risk areas, and correct the model through verification data, thereby improving the accuracy of flood risk assessment and reducing the deviation from measured data. By generating flood spatiotemporal evolution data, the evolution process of floods in the target area can be simulated, providing a more intuitive and comprehensive flood inundation range analysis diagram, which helps to better understand the spatiotemporal characteristics of flood development. Based on accurate risk assessment data, the present invention can generate detailed flood warning reports, provide a scientific basis for the formulation of flood control measures and emergency response, and enhance the practicality and effectiveness of the early warning system. By comprehensively considering multiple factors such as topography, meteorological conditions and hydrological data, more scientific decision support is provided, which helps to formulate more reasonable and effective flood control measures. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments thereof made with reference to the following drawings:

[0012] Figure 1 A schematic flow chart of the steps of a flood analysis method based on artificial intelligence according to an embodiment is shown.

[0013] Figure 2 A detailed flow chart of step S3 of an embodiment is shown.

[0014] Figure 3 A detailed flow chart of step S4 of an embodiment is shown. DETAILED DESCRIPTION

[0015] The technical method of the present invention is described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by technicians in this field without creative work are within the scope of protection of the present invention.

[0016] In addition, the accompanying drawings are only schematic illustrations of the present invention and are not necessarily drawn to scale. The same reference numerals in the figures represent the same or similar parts, and their repeated description will be omitted. Some of the block diagrams shown in the accompanying drawings are functional entities and do not necessarily correspond to physically or logically independent entities. The functional entities can be implemented in software form, or implemented in one or more hardware modules or integrated circuits, or implemented in different networks and / or processor methods and / or microcontroller methods.

[0017] It should be understood that, although the terms "first", "second", etc. may be used herein to describe various units, these units should not be limited by these terms. These terms are used only to distinguish one unit from another unit. For example, without departing from the scope of the exemplary embodiments, the first unit may be referred to as the second unit, and similarly the second unit may be referred to as the first unit. The term "and / or" used herein includes any and all combinations of one or more of the listed associated items.

[0018] To achieve this, please refer to Figures 1 to 3 , the present invention provides a flood analysis method based on artificial intelligence, comprising the following steps:

[0019] Step S1: Collect multi-source data in the target area to obtain a comprehensive flood characteristic data set, wherein the comprehensive flood characteristic data set includes a historical flood event data set, topographic data of the target area, a historical meteorological monitoring data set, and a historical hydrological monitoring data set; construct a flood evolution prediction model based on the comprehensive flood characteristic data set to obtain a flood dynamic evolution prediction model;

[0020] Step S2: collect IoT data in the target area to obtain real-time meteorological monitoring data and real-time hydrological monitoring data; dynamically map the flood dynamic evolution prediction model using the real-time meteorological monitoring data and the real-time hydrological monitoring data to obtain a homomorphic flood dynamic evolution prediction model;

[0021] Step S3: Utilize the homomorphic flood dynamic evolution prediction model to predict the flood risk area and obtain the time series of the target area, and obtain the predicted flood risk area distribution image and the predicted flood arrival time series; perform hydrological monitoring of the target area at the corresponding time points according to the predicted flood arrival time series, and obtain a verification hydrological monitoring data set; perform model accuracy correction on the homomorphic flood dynamic evolution prediction model according to the predicted flood risk area distribution image and the verification hydrological monitoring data set, and obtain an optimized flood dynamic evolution prediction model;

[0022] Step S4: simulating the evolution of floods in the target area using the optimized flood dynamic evolution prediction model according to the predicted flood risk area distribution image and the predicted flood arrival time series, and obtaining flood spatiotemporal evolution data; generating a flood inundation range analysis diagram according to the flood spatiotemporal evolution data;

[0023] Step S5: Conduct flood risk assessment on the flood inundation range analysis map to obtain flood inundation risk assessment data; and generate a flood warning report based on the flood inundation risk assessment data.

[0024] The present invention significantly improves the efficiency of flood analysis through automated multi-source data collection and integration of real-time monitoring data, makes the response to flood events more rapid, and effectively addresses the problem of low efficiency in traditional methods. The flood dynamic evolution prediction model constructed by using artificial intelligence technology can process real-time data, realize dynamic simulation and prediction of flood conditions, overcome the limitations of traditional static models, and provide more timely and accurate decision support for flood prevention and disaster reduction. By combining real-time monitoring data and historical data, the model of the present invention can accurately predict flood risk areas, and correct the model through verification data, thereby improving the accuracy of flood risk assessment and reducing the deviation from measured data. By generating flood spatiotemporal evolution data, the evolution process of floods in the target area can be simulated, providing a more intuitive and comprehensive flood inundation range analysis diagram, which helps to better understand the spatiotemporal characteristics of flood development. Based on accurate risk assessment data, the present invention can generate detailed flood warning reports, provide a scientific basis for the formulation of flood control measures and emergency response, and enhance the practicality and effectiveness of the early warning system. By comprehensively considering multiple factors such as topography, meteorological conditions and hydrological data, more scientific decision support is provided, which helps to formulate more reasonable and effective flood control measures.

[0025] In this embodiment, first, multi-source data collection work for the target area is started. This process involves operating geographic information system (GIS) software such as ArcGIS to collect and analyze historical flood events and topographic data; using remote sensing technology, extracting water distribution information through satellite image processing software such as ENVI; and collaborating with meteorological monitoring stations and hydrological monitoring networks to obtain meteorological and hydrological monitoring data in real time. These data are preprocessed and integrated to form a comprehensive flood feature data set. Further, using statistical software such as the scikit-learn library in R or Python, in-depth statistical analysis and machine learning modeling are performed on the comprehensive flood feature data set to develop a dynamic model that can predict flood evolution. The model combines historical data and machine learning algorithms such as random forests or neural networks to identify patterns and trends in flood development. Subsequently, Internet of Things (IoT) devices such as automatic weather stations and water level sensors are deployed to collect meteorological and hydrological data of the target area in real time through the IoT platform. These real-time data are combined with the flood dynamic evolution prediction model through data fusion technology, and dynamically mapped to generate a homomorphic flood dynamic evolution prediction model that can reflect environmental changes in real time. Using the same-state flood dynamic evolution prediction model, the flood risk area is predicted, the flood impact range is determined, and the predicted flood risk area distribution image and predicted flood arrival time series are generated. On this basis, an automated hydrological monitoring system, such as an automatic water level monitoring station, is set up to collect verification hydrological data at key time points according to the predicted time series. These data are used to calibrate and optimize the accuracy of the flood prediction model. The optimized model is then used to simulate the flood evolution and generate flood spatiotemporal evolution data, which describes in detail the diffusion path, speed and potential inundation range of the flood. GIS software is applied to these data for spatial analysis and visualization to generate a flood inundation range analysis map. Finally, based on the flood inundation range analysis map, risk assessment tools, such as ArcGIS's Risk Analyst, are used to assess the flood inundation risk, determine the risk level, and generate a flood warning report in combination with the emergency plan. The report details the flood risk area, the communities and infrastructure that will be affected.

[0026] Preferably, step S1 comprises the following steps:

[0027] Step S11: extracting and structuring spatiotemporal data from a preset flood event record database to obtain a historical flood event data set, wherein the historical flood event data set includes a number of historical flood event data;

[0028] Specifically, for example, geographic information system (GIS) software, such as ArcGIS or QGIS, can be used to extract the required flood event records from a preset flood event record database by writing query statements or using spatial analysis tools. These records include but are not limited to the time, location, and intensity information of the flood. After the data is extracted, it is structured and data cleaning and standardization techniques can be used to ensure that the data set meets the requirements of subsequent analysis and modeling. Through these operations, a complete data set containing multiple historical flood event data can be established.

[0029] Step S12: performing laser radar mapping on the target area to obtain topographic data of the target area;

[0030] Specifically, for example, LiDAR (Light Detection and Ranging) technology can be used to perform high-precision topographic mapping of the target area. By deploying LiDAR equipment, emitting laser pulses and receiving signals reflected by the ground, the round-trip time of the laser pulses is measured to calculate the distance between the device and the ground. These data points are used to generate a high-precision digital elevation model (DEM), which can show the undulations of the terrain with extremely high resolution. In addition, professional geospatial analysis software such as ArcGIS or QGIS is used to further process and analyze the DEM, extract terrain features such as slope, aspect, and water flow direction, and finally obtain the topographic data of the target area.

[0031] Step S13: extracting historical meteorological data of the target area through the meteorological monitoring station to obtain a historical meteorological monitoring data set, wherein the historical meteorological monitoring data set includes a plurality of historical meteorological monitoring data, and the historical meteorological monitoring data corresponds to the historical flood event data one by one;

[0032] Specifically, for example, it is possible to cooperate with meteorological monitoring sites to obtain historical meteorological data recorded by the sites, including but not limited to meteorological parameters such as rainfall, temperature, humidity, and wind speed. Then, the data acquisition system and the meteorological data interface are used to automatically import data from the monitoring sites. Next, the meteorological data from different sites and at different times are integrated through data fusion technology to form a continuous and consistent historical meteorological monitoring data set. Finally, statistical analysis software such as R or MATLAB is used to analyze the data set, identify meteorological patterns related to historical flood events, and ensure that the historical meteorological monitoring data and the historical flood event data accurately correspond in time and space, and finally obtain a historical meteorological monitoring data set, wherein the historical meteorological monitoring data set contains several historical meteorological monitoring data.

[0033] Step S14: historical hydrological data of the target area is collected and standardized through a preset hydrological monitoring network to obtain a historical hydrological monitoring data set, wherein the historical hydrological monitoring data set includes a plurality of historical hydrological monitoring data, and the historical hydrological monitoring data corresponds to the historical flood event data one by one;

[0034] Specifically, for example, distributed hydrological monitoring stations, such as water level meters and flow meter equipment, can be used to collect real-time data on hydrological elements (such as rivers and reservoirs) in the target area. These monitoring data are recorded in the form of time series, covering changes in hydrological parameters such as water level, flow, and river morphology. The collected raw data needs to be time-aligned. Time alignment processing can be assisted by data processing software such as Python's Pandas library or MATLAB, and ultimately form a historical hydrological monitoring data set that corresponds one-to-one with historical flood event data.

[0035] Step S15: integrating the historical flood event data set, the topographic data of the target area, the historical meteorological monitoring data set, and the historical hydrological monitoring data set to obtain a comprehensive flood characteristic data set;

[0036] Specifically, for example, through geographic information system (GIS) software such as ArcGIS or QGIS, the historical flood event datasets of the target area, the topographic data of the target area, the historical meteorological monitoring datasets, and the historical hydrological monitoring datasets can be spatially superimposed and data associated. This includes using spatial analysis tools to superimpose different data layers together and perform spatial interpolation to fill in the blank areas between the data, and finally obtain a comprehensive flood characteristic dataset.

[0037] Step S16: constructing a flood evolution prediction model based on the comprehensive flood characteristic data set to obtain a flood dynamic evolution prediction model.

[0038] Specifically, please refer to the sub-steps of step S16 for the specific implementation process of this embodiment.

[0039] The present invention ensures the comprehensiveness and accuracy of the data set through the spatiotemporal extraction and structured processing of historical flood event data, providing a detailed historical background for analysis. Secondly, through the application of lidar mapping technology, high-precision topographic information is provided for flood flow simulation. In addition, the one-to-one correspondence between historical meteorological monitoring data and flood events allows for correlation analysis between meteorological conditions and flood occurrence, thereby enhancing the explanatory power of the prediction model. The standardized historical hydrological monitoring data further improves the data quality and ensures the consistency and comparability of hydrological data. Data integration technology effectively integrates multi-source data and provides rich multi-dimensional input features for flood prediction models. Finally, the flood dynamic evolution prediction model constructed based on these comprehensive data not only improves the scientificity and foresight of flood prediction, but also enhances the adaptability and flexibility of the model, enabling it to meet the prediction needs under different regions and conditions, and provides strong technical support for flood prevention and disaster reduction decision-making.

[0040] Preferably, step S16 comprises the following steps:

[0041] Step S161: extracting time-series remote sensing images from historical flood event data to obtain a multi-temporal flood remote sensing image sequence, wherein the multi-temporal flood remote sensing image sequence includes a plurality of multi-temporal flood remote sensing images;

[0042] Specifically, for example, remote sensing image processing software, such as ENVI or ERDAS IMAGINE, can be used to analyze historical flood event data. Through the time series analysis tools of these software, remote sensing images within a specific time period are selected, which can represent the severity and scope of different historical flood events. Finally, these extracted images are arranged in chronological order to form a multi-temporal flood remote sensing image sequence.

[0043] Step S162: contour drawing of the multi-temporal flood remote sensing image according to the topographic data of the target area to obtain a contour image of the flood area;

[0044] Specifically, for example, the topographic data of the target area can be imported into GIS software, such as ArcGIS or QGIS. Use the contour generation tool of the GIS software to create a contour layer based on the terrain data. Then, the contour layer is overlaid with the multi-temporal flood remote sensing image to identify the correspondence between the flood coverage area and the terrain characteristics. Through the terrain analysis tools of the GIS software, such as slope analysis or flow direction analysis, the terrain characteristics of the flood area are further refined. Finally, a contour image of the flood area is generated.

[0045] Step S163: performing flood area segmentation on the flood area contour image to obtain flood area mask data;

[0046] Specifically, for example, the flood area contour image can be imported into image processing software, such as MATLAB or Python's OpenCV library. Image segmentation techniques, such as threshold segmentation based on water body features or more advanced deep learning-based segmentation models, are used to distinguish flood areas from non-flood areas, and finally obtain flood area mask data. During the segmentation process, image morphological operations, such as dilation or erosion, need to be applied to improve the boundary clarity of the flood area.

[0047] Step S164: using the flood area mask data to vectorize the flood boundary of the corresponding flood area contour image to obtain a flood boundary vector image. When the multi-temporal flood remote sensing image sequence is traversed, a flood boundary vector image sequence is obtained.

[0048] Specifically, for example, the flood area mask data can be imported into professional geographic information system (GIS) software, such as ArcGIS or QGIS. Use the vectorization tool of the GIS software to convert the flood area in the flood area mask data into a vector format. This process is usually called vector extraction or contour digitization. By setting appropriate parameters and attribute fields, ensure that each vector feature can be associated with a specific flood event. After vectorization is completed, the obtained flood boundary vector image is assigned attributes to record the time, location and other relevant information of the flood event. When the multi-temporal flood remote sensing image sequences are processed, a series of flood boundary vector images will be generated, and finally a flood boundary vector image sequence will be obtained.

[0049] Step S165: extracting timestamps from the flood boundary vector image sequence to obtain a flood shooting time sequence;

[0050] Specifically, for example, the time data processing function of GIS software can be used to extract the timestamp information of each flood boundary vector image, which is stored in the attribute table of the vector feature. By creating a time field and associating it with the corresponding flood event date and time, a flood photography time series is constructed. Finally, an ordered flood photography time series is obtained.

[0051] Step S166: Calculating flood diffusion rate and flood height change for adjacent flood boundary vector images based on the flood boundary vector image sequence according to the flood shooting time sequence, and obtaining a plurality of flood diffusion rate data and a plurality of flood height change data;

[0052] Specifically, for example, GIS software can be used to time-sort the flood boundary vector image sequence to ensure that the image sequence is arranged in the order of the flood shooting time sequence. Then, a geospatial analysis tool, such as ArcGIS's spatial analysis tool or QGIS's geographic analysis tool, is used to perform a difference analysis on adjacent flood boundary vector images. By calculating the area change and boundary position change between adjacent images, the flood diffusion rate and flood height change are obtained. Finally, flood diffusion rate data and flood height change data are generated.

[0053] Step S167: Based on the flood boundary vector image sequence, the flood diffusion rate data and the flood height change data are used to perform spatiotemporal correlation mapping on the corresponding adjacent flood boundary vector images to obtain flood spatiotemporal correlation data;

[0054] Specifically, for example, a sequence of flood boundary vector images, flood diffusion rate data, and flood height change data can be loaded and processed through geographic information system (GIS) software such as ArcGIS or QGIS. For each adjacent flood boundary vector image, the flood diffusion rate data is used to calculate the temporal changes of the flood boundary, and the flood height change data is used to calculate the spatial expansion range of the flood boundary. In this process, spatiotemporal interpolation methods such as spatial linear interpolation or probability-based interpolation methods can be used to generate a continuous sequence of flood boundary vector images. The resulting spatiotemporal flood correlation data contains the changing characteristics of the flood boundary at different times and spaces.

[0055] Step S168: record the flood boundary vector image sequence, several flood diffusion rate data and several flood height change data, flood spatiotemporal correlation data, corresponding historical meteorological monitoring data and corresponding historical hydrological monitoring data as a flood prediction training data set. When the historical flood event data set is traversed, execute steps S161-S167 to obtain the flood prediction training data set. Based on the flood shooting time series, the flood prediction training data set is used to learn and train the preset network training architecture to obtain a flood dynamic evolution prediction model.

[0056] Specifically, please refer to the sub-steps of step S168 for the specific implementation process of this embodiment.

[0057] The present invention ensures that the data used for model training has high spatiotemporal continuity and integrity by extracting time-series remote sensing images of historical flood event data. By using contour line drawing technology, the topographic and geomorphic features of the flood area are accurately expressed, providing key elevation information for flood simulation. By generating mask data of the flood area, the flood boundary can be accurately identified, providing a clear regional definition for flood diffusion analysis. By applying flood boundary vectorization technology, the image data is converted into vector data, which enhances the data analysis and processing capabilities. By calculating the flood diffusion rate and height change, the speed and range of flood evolution can be simulated, providing important parameters for predicting flood development trends. By using flood spatiotemporal correlation data, the spatial distribution characteristics of floods at different time points can be analyzed, enhancing the understanding of the flood evolution process. By combining multi-source data, including flood boundary vector images, diffusion rates, height changes, and meteorological and hydrological monitoring data, rich and comprehensive training samples are provided for model training. Based on the flood shooting time series and the comprehensive flood prediction training data set, the trained flood dynamic evolution prediction model can accurately reflect the spatiotemporal dynamic characteristics of floods. Through learning and training, a flood dynamic evolution prediction model is obtained, which can adapt to different hydrological and meteorological conditions and improve the generalization ability of the model in different environments.

[0058] Preferably, step S168 includes the following steps:

[0059] Step S1681: performing time series data slicing on the corresponding historical meteorological monitoring data and the corresponding historical hydrological monitoring data according to the flood shooting time series, to obtain a historical meteorological data slice sequence and a historical hydrological data slice sequence;

[0060] Specifically, for example, a database query tool, such as an SQL query analyzer, can be used to extract complete time series data from historical meteorological and hydrological databases, i.e., the corresponding historical meteorological monitoring data and the corresponding historical hydrological monitoring data. Then, according to the flood shooting time series, these data are screened using data processing software (such as the Pandas library in Python), and the data are segmented according to the time nodes of the flood, generating meteorological and hydrological data slices corresponding to the flood event. These slice sequences will be arranged in chronological order to ensure alignment with the time of the flood event, thereby obtaining a historical meteorological data slice sequence and a historical hydrological data slice sequence.

[0061] Step S1682: performing multi-source data spatiotemporal alignment on a flood boundary vector image sequence, a plurality of flood diffusion rate data and a plurality of flood height change data, flood spatiotemporal correlation data, a historical meteorological data slice sequence and a historical hydrological data slice sequence according to the flood shooting time sequence, to obtain spatiotemporal synchronized flood characteristic data, and recording the spatiotemporal synchronized flood characteristic data as a flood prediction training data;

[0062] Specifically, for example, in GIS software, a flood boundary vector image sequence, a number of flood diffusion rate data and a number of flood height change data, flood spatiotemporal correlation data, a historical meteorological data slice sequence and a historical hydrological data slice sequence can be integrated. Using the spatiotemporal analysis tools of GIS software, such as ArcGIS's spatiotemporal analyst, these data are synchronously processed to form spatiotemporal synchronized flood feature data, and the spatiotemporal synchronized flood feature data is recorded as a flood prediction training data.

[0063] Step S1683: after traversing the historical flood event data set, execute steps S161 to S167 to obtain a flood prediction training data set;

[0064] Specifically, for example, a script can be written in a programming language (such as Python) to automatically perform all operations in steps S161 to S167, and these steps are repeated for each historical flood event. In this way, flood prediction training data corresponding to each flood event can be generated in batches. After the traversal is completed, a flood prediction training data set that integrates all historical flood events will be obtained, and the data set contains all spatiotemporal features and related parameters used for model training.

[0065] Step S1684: Use the flood prediction training data set to train the preset network training architecture to obtain a flood dynamic evolution prediction model.

[0066] Specifically, for example, a suitable machine learning or deep learning framework, such as TensorFlow or PyTorch, can be selected to build a preset network training architecture. Then, the flood prediction training data set is input into the network architecture. The model is trained using these data, and the prediction error is minimized by adjusting the model parameters and structure. During the training process, the flood prediction training data set is used as input to optimize and train the model parameters. The trained flood dynamic evolution prediction model can predict the dynamic evolution process of floods based on new meteorological data, hydrological data, and flood characteristic data, providing important prediction capabilities for flood disaster management and early warning systems. Finally, a flood dynamic evolution prediction model is obtained.

[0067] The present invention ensures high-precision matching of meteorological, hydrological and flood event data in time series through time series data slicing, providing a more synchronized data basis for flood feature analysis. Through the application of multi-source data spatiotemporal alignment technology, the accurate fusion of different types of data in time and space dimensions is achieved. The generation of spatiotemporal synchronized flood feature data enables the model to capture key features in the flood evolution process. By systematically training the model using the constructed flood prediction training data set and the preset network training architecture, the efficiency and quality of the model learning the laws of flood evolution are improved. The flood dynamic evolution prediction model obtained by training based on the flood shooting time series and the comprehensive feature data set can accurately predict the occurrence and development process of floods, providing a more scientific decision-making basis for flood prevention and disaster reduction.

[0068] Preferably, step S2 comprises the following steps:

[0069] Step S21: Perform real-time remote sensing monitoring on the target area to obtain a real-time remote sensing image of the target area;

[0070] Specifically, for example, remote sensing monitoring equipment, such as high-resolution cameras carried by drones or satellites, can be deployed to perform regular or continuous imaging of the target area. Remote sensing image processing software, such as ENVI or ERDAS IMAGINE, is used to receive and process these image data. Ultimately, real-time remote sensing images of the target area are obtained.

[0071] Step S22: collecting multi-parameter meteorological data of the target area in real time through the meteorological monitoring station to obtain real-time meteorological monitoring data;

[0072] Specifically, for example, meteorological monitoring stations can be deployed in the target area, which are equipped with a variety of meteorological sensors, such as thermometers, hygrometers, anemometers, and rain gauges. Real-time data from these sensors is collected using an automated data acquisition system (DAS). The data is transmitted to a central server via a wired or wireless communication network. In the data processing center, meteorological data management software, such as Weather Data Manager, is used to store, format, and preliminarily analyze the collected data. Real-time monitoring and anomaly detection of data are achieved through real-time data visualization tools, such as a weather station network monitoring system. Finally, real-time meteorological monitoring data for the target area is obtained.

[0073] Step S23: Performing distributed real-time monitoring of hydrological parameters in the target area through a preset hydrological monitoring network to obtain real-time hydrological monitoring data;

[0074] Specifically, for example, a preset hydrological monitoring network can be used, which consists of hydrological monitoring stations distributed at key hydrological points in the target area. These monitoring stations are equipped with hydrological monitoring equipment, such as water level meters, flow meters, and water quality analyzers. Using telemetry technology, the monitoring data is transmitted to the data processing center in real time. Through an automated hydrological analysis process, hydrological parameters such as flow, flow velocity, and water level are calculated, and hydrological time series data are generated. In addition, data visualization tools such as charts and maps are used to display the real-time changes in hydrological parameters. Finally, real-time hydrological monitoring data is obtained.

[0075] Step S24: performing semantic segmentation of the flood area on the real-time remote sensing image of the target area to obtain real-time flood range vector data;

[0076] Specifically, for example, the real-time remote sensing images of the target area can be imported into deep learning frameworks such as TensorFlow or PyTorch, which support the use of convolutional neural networks (CNN) for image segmentation tasks. Select a suitable pre-trained model, such as U-Net or DeepLab. Next, fine-tune the model to adapt to the specific flood detection task, using the historical flood images of the target area and the corresponding annotated data as a training set. Through training, the model learns the features to distinguish between flooded and non-flooded areas. Finally, the trained model is applied to the real-time remote sensing images of the target area, the flooded area is automatically segmented, and the results are exported as vector data, and finally the real-time flood range vector data is obtained.

[0077] Step S25: Use the real-time flood range vector data, real-time meteorological monitoring data and real-time hydrological monitoring data to perform spatiotemporal state synchronous mapping on the flood dynamic evolution prediction model to obtain a homomorphic flood dynamic evolution prediction model.

[0078] Specifically, for example, real-time flood range vector data, real-time meteorological monitoring data and real-time hydrological monitoring data can be combined. In GIS software, these data are superimposed and analyzed with topographic data through spatial analysis tools to identify high-risk flood areas. Next, a flood simulation software, such as ArcGIS Flood Analyst or HEC-GeoRAS, is applied, which can simulate the diffusion process of floods in a geographical environment. The fused data is input into the flood simulation software, and the model parameters are set to match the current meteorological and hydrological conditions. Using the model's spatiotemporal state synchronous mapping function, the real-time data is mapped into the flood dynamic evolution prediction model, and finally a homomorphic flood dynamic evolution prediction model is obtained.

[0079] The present invention can timely capture the current hydrological and meteorological status of the target area through real-time remote sensing monitoring and real-time collection of multi-parameter meteorological and hydrological data, providing continuous and dynamic monitoring data for flood analysis. By using real-time remote sensing images to perform semantic segmentation of flood areas, the flood range can be accurately identified and converted into vector data, thereby enhancing the automation and accuracy of flood area identification. Combining real-time flood range vector data with other real-time monitoring data, through synchronous mapping technology, real-time tracking and simulation of the dynamic evolution of floods are achieved, improving the timeliness and adaptability of the prediction model. Through synchronous mapping of spatiotemporal states, the flood dynamic evolution prediction model can be continuously updated to ensure that the model always reflects the latest flood conditions and trends.

[0080] Preferably, step S3 comprises the following steps:

[0081] Step S31: Obtain flood prediction time series;

[0082] Specifically, for example, the flood time nodes that need to be predicted can be manually input, and the input time nodes that need to be predicted can be arranged in chronological order to form a flood prediction time series.

[0083] Step S32: collecting time series weather forecast data for the target area according to the flood prediction time series to obtain a number of weather forecast data;

[0084] Specifically, for example, a weather forecast service API, such as Weather API or OpenWeatherMapAPI, can be used to obtain weather forecast data within the corresponding time period according to the time point at which the flood occurs in the flood prediction time series. This includes but is not limited to meteorological parameters such as rainfall, wind speed, and air pressure. Finally, several weather forecast data are obtained, and these weather forecast data are associated with the flood prediction time series.

[0085] Step S33: inputting the flood prediction time series and a number of meteorological forecast data into the homomorphic flood dynamic evolution prediction model to predict the flood risk area, and obtaining a number of flood risk area prediction images. At the same time, the flood prediction time series is recorded as the predicted flood arrival time series;

[0086] Specifically, for example, you can use flood simulation software such as ArcGIS Flood Analyst or HEC-RAS, combined with real-time hydrological data, topographic data, flood prediction time series and meteorological forecast data, to run the model to predict flood risk areas. Set parameters in the model, such as rainfall intensity, terrain slope and water flow resistance, and the time nodes that need to be predicted. After the model is run, a series of flood risk area prediction images will be generated, which show the areas that are likely to be covered by floods at different time points. At the same time, the flood prediction time series is used as the predicted flood arrival time series to mark the time point corresponding to each prediction image.

[0087] Step S34: identifying and coloring the flood risk areas of each flood risk area prediction image to obtain a plurality of colored flood risk area prediction images, wherein the color of the flood risk area in the colored flood risk area prediction image is unique;

[0088] Specifically, for example, GIS software, such as ArcGIS or QGIS, can be used to load and process various flood risk area prediction images. The flood risk areas in the flood risk area prediction image are identified and colored using the classification and coloring tools of the GIS software. For example, in ArcGIS, the "Unique Value Renderer" tool can be used to color the flood area with a unique color based on the flood risk level or other attribute fields, ensuring that each level or category of flood risk area has its corresponding color representation. This step will produce several colored flood risk area prediction images.

[0089] Step S35: performing spatiotemporal superposition and projection fusion on a plurality of colored flood risk area prediction images to obtain a comprehensive risk flood prediction image;

[0090] Specifically, for example, in GIS software, you can use the "Map Algebra" tool or the "Overlay" function to overlay flood risk area prediction images at different time points to identify the cumulative effect of flood risk in time and space. By adjusting the transparency of the layer or using fusion technology, you can better observe and analyze the distribution and changes of flood risk areas. This process will generate a comprehensive risk flood prediction image that reflects the overall situation of flood risk after considering different factors and time points.

[0091] Step S36: extracting and marking the vectorized boundaries of the comprehensive risk flood prediction image, and at the same time, using the predicted flood arrival time series to time-mark the corresponding extracted vectorized boundaries to obtain a predicted flood risk area distribution image;

[0092] Specifically, for example, GIS software can be used to vectorize the comprehensive risk flood prediction image. Using the "Polygonal Tools" or "Vectorization" tools, the flood risk areas in the comprehensive risk flood prediction image are converted into vector boundaries. These vector boundaries can be polygons or other shapes that accurately represent the scope of the flood risk area. Next, use the 'Attribute Table function to add attribute information to these vector boundaries, including the predicted flood arrival time series. In this way, a time label is assigned to each flood risk area, indicating the time point when the predicted flood arrives or occurs. Finally, predicted flood risk area distribution images are obtained, which not only show the spatial distribution of flood risk, but also contain temporal information.

[0093] Step S37: Conduct hydrological monitoring of the target area at corresponding time points according to the predicted flood arrival time series to obtain a verification hydrological monitoring data set; perform model accuracy correction on the homomorphic flood dynamic evolution prediction model according to the predicted flood risk area distribution image and the verification hydrological monitoring data set to obtain an optimized flood dynamic evolution prediction model.

[0094] Specifically, please refer to the sub-steps of step S37 for the specific implementation process of this embodiment.

[0095] The present invention can timely reflect the dynamic changes of flood development by acquiring and applying flood prediction time series, and provide timely prediction information for flood control measures. By combining time-series meteorological forecast data, the role of meteorological factors in flood prediction is strengthened, and the responsiveness of the prediction model to meteorological changes is improved. By using the homomorphic flood dynamic evolution prediction model, the flood risk area can be accurately predicted, and the risk area can be effectively identified and colored by image processing technology, thereby improving the visualization effect of the risk area. Through the spatiotemporal superposition and projection fusion technology, multiple risk area prediction images can be integrated to obtain a more comprehensive comprehensive risk flood prediction image. By vectorizing the boundary extraction and time labeling of the comprehensive risk flood prediction image, the distribution and evolution process of the flood risk area can be accurately defined. By real-time correction of the prediction model through hydrological monitoring data, the prediction accuracy of the model can be continuously optimized to ensure the reliability of the prediction results. The optimized flood dynamic evolution prediction model can adapt to different flood events and environmental conditions, and improves the adaptability and flexibility of the model in diversified situations.

[0096] Preferably, step S37 includes the following steps:

[0097] Step S371: continuously tracking the current time to obtain real-time time data;

[0098] Specifically, for example, it can be implemented by programming, using a scripting language such as Python, combined with its built-in datetime module to obtain the current date and time. The script can be set to run periodically, for example, automatically executed once every minute or every hour to update the time data, and finally obtain real-time time data.

[0099] Step S372: input the predicted flood arrival time series into a preset time trigger to set a data collection trigger time point, and obtain a number of data collection trigger time points. When the real-time time data matches the data collection trigger time point, the target area is monitored for hydrological parameters in real time through a preset hydrological monitoring network to obtain a verification hydrological monitoring data set, wherein the verification hydrological monitoring data set includes a number of verification hydrological monitoring data. At the same time, the target area is photographed by remote sensing in real time to obtain a verification flood area remote sensing image set, wherein the verification flood area remote sensing image set includes a number of verification flood area remote sensing images;

[0100] Specifically, for example, a time series of predicted flood arrival can be defined in the data acquisition system based on the predicted flood arrival time series. Use time trigger software, such as cron jobs (in Unix-like systems) or Windows Task Scheduler, to set triggers based on the predicted time series. When the current time matches the preset time trigger point, the trigger automatically activates the data acquisition process. This can be achieved by writing a script that contains instructions for monitoring hydrological parameters, such as starting the automatic recording program of flow meter and water level meter monitoring equipment. When the time trigger is activated, the target area is monitored for real-time hydrological parameters through the preset hydrological monitoring network. This involves deploying a series of hydrological monitoring equipment, such as automatic water level recorders, rain gauges, and flow meters in the target area. These devices are connected to the central monitoring system by wire or wireless means. When the time trigger sends a signal, these devices start working, collect hydrological data in real time, and transmit the data to the central database. At the same time, use drones or satellite remote sensing technology to take real-time photos of the target area to obtain high-resolution images of the flood area. The drone or remote sensing satellite automatically or manually triggers the shooting according to the predetermined flight path and shooting plan to capture the real-time situation of the flood area. Finally, several verification hydrological monitoring data are obtained to form a verification hydrological monitoring data set, and several verification flood area remote sensing images are obtained to form a verification flood area remote sensing image set;

[0101] Step S373: The model accuracy of the homomorphic flood dynamic evolution prediction model is calibrated according to the predicted flood risk area distribution image, the verification flood area remote sensing image set and the verification hydrological monitoring data set to obtain an optimized flood dynamic evolution prediction model.

[0102] Specifically, please refer to the sub-steps of step S373 for the specific implementation process of this embodiment.

[0103] The present invention ensures the synchronization of hydrological monitoring and remote sensing data collection with the timeliness of flood events by continuously tracking the current time and setting the data collection trigger time point, thereby improving the relevance and practicality of the data. The data set obtained through real-time hydrological monitoring and remote sensing photography can be used to verify the flood conditions on the spot, ensuring the authenticity and reliability of the monitoring data. By combining the verification hydrological monitoring data and remote sensing image data, the flood dynamic evolution prediction model can be accurately calibrated, improving the accuracy of the model prediction. By comparing and correcting with the actual monitoring data, the optimized flood dynamic evolution prediction model can provide more reliable prediction results.

[0104] Preferably, step S373 includes the following steps:

[0105] Step S3731: traverse the verification flood area remote sensing image set and the verification hydrological monitoring data set, use the verification hydrological monitoring data to annotate the corresponding verification flood area remote sensing image with elevation and water depth, and obtain a verification water depth annotated remote sensing image set;

[0106] Specifically, for example, remote sensing image processing software, such as ENVI or ERDAS IMAGINE, can be used to open and load the verification flood area remote sensing image set. Then, combined with hydrological monitoring data, which include but are not limited to water level, flow rate and water depth parameters, ArcGIS, QGIS or other GIS software are used to perform elevation and water depth annotation. Through the editing tools of the GIS software, the water depth information is manually or automatically annotated at the corresponding position on the remote sensing image, which involves drawing contour lines corresponding to the water depth on the image and assigning specific water depth values ​​as attribute information. After the annotation is completed, a verification water depth annotated remote sensing image set is generated, which integrates terrain and water depth information.

[0107] Step S3732: traversing the verification water depth annotated remote sensing image set, identifying the flood coverage area of ​​each verification water depth annotated remote sensing image, and performing boundary vectorization to obtain a verification flood boundary vector image set, wherein the verification flood boundary vector image set includes a plurality of verification flood boundary vector images;

[0108] Specifically, for example, a verification water depth annotated remote sensing image set can be loaded into GIS software. Use the spatial analysis tools of GIS software, such as ArcGIS's "Spatial Analyst" tool, to perform identification of flood coverage areas. After identifying the flood coverage areas, use vectorization tools, such as QGIS's "Vector Creation Tools" or ArcGIS's "Feature Analyst" to vectorize the boundaries of these areas. The vectorization process involves converting the flood boundaries in the image into vector polygons, each of which contains its attribute information, such as location, area, and shape. After vectorization is completed, a verification flood boundary vector image set is obtained.

[0109] Step S3733: traverse the verification flood boundary vector image set, perform spatial error analysis on the verification flood boundary vector image and the predicted flood risk area at the corresponding predicted time point in the predicted flood risk area distribution image, and obtain a number of flood area error data and a number of flood height error data;

[0110] Specifically, for example, GIS software such as ArcGIS or QGIS can be used to load a set of vector images of validated flood boundaries and images of predicted flood risk area distribution. Using the spatial analysis tools of the GIS software, a spatial overlay analysis is performed on the two to identify and compare the differences between the predicted flood risk area and the actual flood boundary. Through calculation, the error data of the flood area area is obtained, which involves measuring the area of ​​the predicted area and the actual flood area and calculating the difference between them. Similarly, in order to obtain the error data of flood height, the water depth information is used to compare the predicted water depth with the actual water depth, and the height difference between the two is calculated. This step requires the application of digital elevation model (DEM) data to assist in the analysis. Ultimately, through the analysis of these error data, the accuracy of the prediction model can be quantified and a basis for model correction can be provided.

[0111] Step S3734: adjusting the parameters of the homomorphic flood dynamic evolution prediction model according to the flood area error data and the flood height error data to obtain an optimized flood dynamic evolution prediction model.

[0112] Specifically, for example, in a model training environment, such as a Python programming environment, in conjunction with a machine learning library (such as scikit-learn), a homomorphic flood dynamic evolution prediction model, flood area area error data, and flood height error data can be loaded. Based on the flood area area error data and flood height error data, the systematic deviations in the prediction of the homomorphic flood dynamic evolution prediction model are analyzed to determine the model parameters that need to be adjusted, such as the flood diffusion coefficient, the parameters of the water depth prediction algorithm, or the weights of the neural network. The optimal parameter combination is found to minimize the prediction error by manual adjustment or using automated parameter optimization techniques, such as grid search or Bayesian optimization. Then, these optimized parameters are used to retrain the model, or to update the existing flood prediction model. Finally, an optimized flood dynamic evolution prediction model is obtained.

[0113] The present invention provides accurate water depth information for remote sensing images through the application of elevation and water depth annotation, greatly enhancing the quantitative analysis capability of the depth of flood areas. Secondly, the recognition accuracy of flood coverage areas is further improved through boundary vectorization processing, providing a clear definition for risk assessment. In addition, by comparing verification and predictive data, spatial error analysis of flood risk areas is realized, providing a reliable basis for model correction. These error data guide the precise adjustment of model parameters and optimize the prediction accuracy of the model. At the same time, the model enhances adaptability and flexibility through continuous error feedback and self-correction to cope with changing flood events and environmental conditions. Finally, the optimized flood dynamic evolution prediction model significantly improves the practicality of the prediction, provides strong scientific support for flood prevention and disaster reduction decisions, and ensures the timeliness and accuracy of flood warnings.

[0114] Preferably, step S4 comprises the following steps:

[0115] Step S41: extracting the time series initial state of the predicted flood risk area distribution image to obtain a flood initial state distribution image;

[0116] Specifically, for example, image processing software such as ENVI or ArcGIS can be used to analyze the distribution image of the predicted flood risk area. By selecting representative time points or conditions, the distribution of the initial state of the flood can be extracted from the sequence image. The threshold segmentation function of the image processing tool can be used to distinguish between water bodies and non-water body areas, thereby obtaining the distribution image of the initial state of the flood.

[0117] Step S42: inputting the flood initial state distribution image into the optimized flood dynamic evolution prediction model for initialization setting, and inputting the predicted flood risk area distribution image and the predicted flood arrival time series into the initialized optimized flood dynamic evolution prediction model for spatiotemporal dynamic simulation to obtain flood spatiotemporal evolution data;

[0118] Specifically, for example, flood simulation software, such as HEC-RAS or ArcGIS Flood Analyst, can be used to initialize the model. The flood initial state distribution image, the predicted flood risk area distribution image and the predicted flood arrival time series are input into the optimized flood dynamic evolution prediction model, and the optimized flood dynamic evolution prediction model is run to perform spatiotemporal dynamic simulation. This process requires setting model parameters, such as flood wave velocity and terrain data. Xxx..., and finally the spatiotemporal evolution data of floods are obtained.

[0119] Step S43: extracting the maximum inundation range from the flood spatiotemporal evolution data to obtain maximum inundation range vector data;

[0120] Specifically, for example, the maximum inundation range in the simulation process can be extracted using analysis tools of GIS software, such as ArcGIS's "Extract by Attributes" or QGIS's "Vector Layer Selection". This involves identifying and selecting the layer or feature representing the maximum inundation area in the simulation results and converting it into a vector data format, thereby obtaining the maximum inundation range vector data.

[0121] Step S44: Obtain a target area map, and perform spatial overlay analysis and depth graded rendering on the target area map according to the maximum flood range vector data to obtain a flood inundation range analysis map.

[0122] Specifically, for example, map data of the target area can be obtained, which can be a vector map or a raster map, derived from a GIS database or an online map service. Use GIS software, such as ArcGIS or QGIS, to perform spatial overlay analysis on the maximum flood range vector data and the target area map. Use the "Map Overlay" function of the GIS software to identify the intersection of the flood range and the target area map. Next, use the "Depth Grading" tool or similar rendering technology to perform depth-grading rendering on the flood range, using different colors or transparencies to represent flooded areas of different depths. Finally, a flood inundation range analysis map is generated.

[0123] The present invention accurately identifies the initial state of the flood through time series initial state extraction, providing a reliable starting point for flood evolution simulation. Subsequently, using the initialized flood dynamic evolution prediction model, the spatiotemporal dynamic process of the flood can be simulated in detail to capture the time series changes of flood development. In addition, by deeply analyzing the spatiotemporal evolution data of the flood, the extraction of the maximum inundation range is optimized, providing key data for evaluating the extreme impacts of floods. Furthermore, by combining the target area map and the maximum inundation range vector data, an intuitive and easy-to-understand flood inundation range analysis diagram is generated through spatial overlay analysis and deep grading rendering technology, which significantly improves the visualization of flood risk areas. Ultimately, these analysis diagrams that integrate spatial distribution and inundation depth information greatly enhance the practicality of flood risk assessment, provide a powerful support tool for disaster management decision-making, and help to more effectively plan flood control measures and emergency responses.

[0124] Preferably, step S5 comprises the following steps:

[0125] Step S51: Perform three-dimensional geographic information modeling on the target area to obtain a geographic digital model of the target area;

[0126] Specifically, for example, 3D geographic information modeling software, such as ArcGIS 3D Analyst or GlobalMapper, can be used to collect detailed terrain data for the target area. High-precision terrain point cloud data is obtained through laser radar (LiDAR) technology, and then these point cloud data are converted into digital elevation models (DEM) through software. Then, combined with existing geographic information system (GIS) data, such as land use and building locations, 3D modeling is performed to construct a digital model of the target area.

[0127] Step S52: using the flood inundation range analysis map to perform hydrodynamic spatial mapping on the target area geographic digital model to obtain a three-dimensional flood inundation scene model;

[0128] Specifically, for example, the analysis tools of GIS software, such as ArcGIS's "Spatial Analyst" tool, can be used to convert the two-dimensional data of the flood inundation range in the flood inundation range analysis map into a form that matches the three-dimensional geographic model. Then, a hydrodynamic model, such as the three-dimensional flood model of HEC-RAS, is applied to spatially map the inundation range. This process involves applying flood dynamics parameters (such as water depth and flow velocity) to the three-dimensional geographic model to generate a three-dimensional flood inundation scene model that can simulate the flow and spread of floods in the target area.

[0129] Step S53: performing building damage distribution statistics on the flood-inundated three-dimensional scene model to obtain building inundation distribution data;

[0130] Specifically, for example, 3D scene model analysis software, such as Flood Map or AutoCAD Civil3D, can be used to perform building damage distribution statistics on the flood-inundated 3D scene model. Through the query and analysis tools of the software, the locations of the buildings in the model are identified, and their inundation depths and the distribution of inundated buildings in the flood simulation are calculated. This step will generate building inundation distribution data, including but not limited to the inundation height and affected volume of each building.

[0131] Step S54: performing risk level determination on the building inundation distribution data and the preset disaster impact threshold to obtain flood inundation risk assessment data; and generating a flood warning report based on the flood inundation risk assessment data.

[0132] Specifically, for example, the building inundation distribution data can be compared with the preset disaster impact threshold. Using data processing software such as Microsoft Excel or Python, the buildings can be assigned to different risk level categories according to the inundation depth and the degree of impact. For example, the risk level of the building can be determined according to the inundation depth threshold (such as 0.5 meters, 1 meter). Then, using GIS software or report generation tools such as ArcGIS Report Tool or QGIS PrintLayout, the risk assessment results are integrated into the flood warning report. The report will include the flood inundation range, the distribution of affected buildings, and the risk level map.

[0133] The present invention significantly improves the practicality of flood analysis and the authenticity of simulation through three-dimensional geographic information modeling and hydrodynamic space mapping. This three-dimensional scene model not only provides an intuitive and three-dimensional representation of the target area for hydrological analysis, ensuring that the analysis results are closer to the actual geographical environment, but also can truly reflect the dynamic behavior and distribution characteristics of floods in geographic space. In addition, through in-depth statistical analysis of the three-dimensional scene model, a refined assessment of the damage to buildings is achieved, providing detailed data support for rescue operations and post-disaster reconstruction. Combined with the risk level determination of the disaster impact threshold, the accuracy and practicality of flood risk assessment are further improved. Finally, the flood warning report quickly generated based on the evaluation results provides timely reference information for flood control decisions and public warnings, effectively improving the effectiveness of the warning system.

[0134] Therefore, the embodiments should be regarded as illustrative and non-restrictive from all points, and the scope of the present invention is limited by the appended claims rather than the above description, and it is therefore intended that all changes falling within the meaning and range of equivalent elements of the application documents are included in the present invention.

[0135] The above description is only a specific embodiment of the present invention, so that those skilled in the art can understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but should conform to the widest scope consistent with the principles and novel features invented herein.

Claims

1. A flood analysis method based on artificial intelligence, characterized in that: The following steps are involved: Step S1: Collect multi-source data in the target area to obtain a comprehensive flood characteristic data set, wherein the comprehensive flood characteristic data set includes a historical flood event data set, topographic data of the target area, a historical meteorological monitoring data set, and a historical hydrological monitoring data set; construct a flood evolution prediction model based on the comprehensive flood characteristic data set to obtain a flood dynamic evolution prediction model; Step S2: collect IoT data in the target area to obtain real-time meteorological monitoring data and real-time hydrological monitoring data; dynamically map the flood dynamic evolution prediction model using the real-time meteorological monitoring data and the real-time hydrological monitoring data to obtain a homomorphic flood dynamic evolution prediction model; Step S3: Utilize the homomorphic flood dynamic evolution prediction model to predict the flood risk area and obtain the time series of the target area, and obtain the predicted flood risk area distribution image and the predicted flood arrival time series; perform hydrological monitoring of the target area at the corresponding time points according to the predicted flood arrival time series, and obtain a verification hydrological monitoring data set; perform model accuracy correction on the homomorphic flood dynamic evolution prediction model according to the predicted flood risk area distribution image and the verification hydrological monitoring data set, and obtain an optimized flood dynamic evolution prediction model; Step S4: simulating the evolution of floods in the target area using the optimized flood dynamic evolution prediction model according to the predicted flood risk area distribution image and the predicted flood arrival time series, and obtaining flood spatiotemporal evolution data; generating a flood inundation range analysis diagram according to the flood spatiotemporal evolution data; Step S5: Conduct flood risk assessment on the flood inundation range analysis map to obtain flood inundation risk assessment data; and generate a flood warning report based on the flood inundation risk assessment data.

2. The flood analysis method based on artificial intelligence according to claim 1 is characterized in that: Step S1 includes the following steps: Step S11: extracting and structuring spatiotemporal data from a preset flood event record database to obtain a historical flood event data set, wherein the historical flood event data set includes a number of historical flood event data; Step S12: performing laser radar mapping on the target area to obtain topographic data of the target area; Step S13: extracting historical meteorological data of the target area through the meteorological monitoring station to obtain a historical meteorological monitoring data set, wherein the historical meteorological monitoring data set includes a plurality of historical meteorological monitoring data, and the historical meteorological monitoring data corresponds to the historical flood event data one by one; Step S14: historical hydrological data of the target area is collected and standardized through a preset hydrological monitoring network to obtain a historical hydrological monitoring data set, wherein the historical hydrological monitoring data set includes a plurality of historical hydrological monitoring data, and the historical hydrological monitoring data corresponds to the historical flood event data one by one; Step S15: integrating the historical flood event data set, the topographic data of the target area, the historical meteorological monitoring data set, and the historical hydrological monitoring data set to obtain a comprehensive flood characteristic data set; Step S16: constructing a flood evolution prediction model based on the comprehensive flood characteristic data set to obtain a flood dynamic evolution prediction model.

3. The flood analysis method based on artificial intelligence according to claim 2 is characterized in that: Step S16 includes the following steps: Step S161: extracting time-series remote sensing images from historical flood event data to obtain a multi-temporal flood remote sensing image sequence, wherein the multi-temporal flood remote sensing image sequence includes a plurality of multi-temporal flood remote sensing images; Step S162: contour drawing of the multi-temporal flood remote sensing image according to the topographic data of the target area to obtain a contour image of the flood area; Step S163: performing flood area segmentation on the flood area contour image to obtain flood area mask data; Step S164: using the flood area mask data to vectorize the flood boundary of the corresponding flood area contour image to obtain a flood boundary vector image. When the multi-temporal flood remote sensing image sequence is traversed, a flood boundary vector image sequence is obtained. Step S165: extracting timestamps from the flood boundary vector image sequence to obtain a flood shooting time sequence; Step S166: Calculating flood diffusion rate and flood height change for adjacent flood boundary vector images based on the flood boundary vector image sequence according to the flood shooting time sequence, and obtaining a plurality of flood diffusion rate data and a plurality of flood height change data; Step S167: Based on the flood boundary vector image sequence, the flood diffusion rate data and the flood height change data are used to perform spatiotemporal correlation mapping on the corresponding adjacent flood boundary vector images to obtain flood spatiotemporal correlation data; Step S168: record the flood boundary vector image sequence, several flood diffusion rate data and several flood height change data, flood spatiotemporal correlation data, corresponding historical meteorological monitoring data and corresponding historical hydrological monitoring data as a flood prediction training data set. When the historical flood event data set is traversed, execute steps S161-S167 to obtain the flood prediction training data set. Based on the flood shooting time series, the flood prediction training data set is used to learn and train the preset network training architecture to obtain a flood dynamic evolution prediction model.

4. The artificial intelligence-based flood analysis method according to claim 3 is characterized in that: Step S168 includes the following steps: Step S1681: performing time series data slicing on the corresponding historical meteorological monitoring data and the corresponding historical hydrological monitoring data according to the flood shooting time series, to obtain a historical meteorological data slice sequence and a historical hydrological data slice sequence; Step S1682: performing multi-source data spatiotemporal alignment on a flood boundary vector image sequence, a plurality of flood diffusion rate data and a plurality of flood height change data, flood spatiotemporal correlation data, a historical meteorological data slice sequence and a historical hydrological data slice sequence according to the flood shooting time sequence, to obtain spatiotemporal synchronized flood characteristic data, and recording the spatiotemporal synchronized flood characteristic data as a flood prediction training data; Step S1683: after traversing the historical flood event data set, execute steps S161 to S167 to obtain a flood prediction training data set; Step S1684: Use the flood prediction training data set to train the preset network training architecture to obtain a flood dynamic evolution prediction model.

5. The flood analysis method based on artificial intelligence according to claim 1 is characterized in that: Step S2 includes the following steps: Step S21: Perform real-time remote sensing monitoring on the target area to obtain a real-time remote sensing image of the target area; Step S22: collecting multi-parameter meteorological data of the target area in real time through the meteorological monitoring station to obtain real-time meteorological monitoring data; Step S23: Performing distributed real-time monitoring of hydrological parameters in the target area through a preset hydrological monitoring network to obtain real-time hydrological monitoring data; Step S24: performing semantic segmentation of the flood area on the real-time remote sensing image of the target area to obtain real-time flood range vector data; Step S25: Use the real-time flood range vector data, real-time meteorological monitoring data and real-time hydrological monitoring data to perform spatiotemporal state synchronous mapping on the flood dynamic evolution prediction model to obtain a homomorphic flood dynamic evolution prediction model.

6. The flood analysis method based on artificial intelligence according to claim 1 is characterized in that: Step S3 includes the following steps: Step S31: Obtain flood prediction time series; Step S32: collecting time series weather forecast data for the target area according to the flood prediction time series to obtain a number of weather forecast data; Step S33: inputting the flood prediction time series and a number of meteorological forecast data into the homomorphic flood dynamic evolution prediction model to predict the flood risk area, and obtaining a number of flood risk area prediction images. At the same time, the flood prediction time series is recorded as the predicted flood arrival time series; Step S34: identifying and coloring the flood risk areas of each flood risk area prediction image to obtain a plurality of colored flood risk area prediction images, wherein the color of the flood risk area in the colored flood risk area prediction image is unique; Step S35: performing spatiotemporal superposition and projection fusion on a plurality of colored flood risk area prediction images to obtain a comprehensive risk flood prediction image; Step S36: extracting and marking the vectorized boundaries of the comprehensive risk flood prediction image, and at the same time, using the predicted flood arrival time series to time-mark the corresponding extracted vectorized boundaries to obtain a predicted flood risk area distribution image; Step S37: Conduct hydrological monitoring of the target area at corresponding time points according to the predicted flood arrival time series to obtain a verification hydrological monitoring data set; perform model accuracy correction on the homomorphic flood dynamic evolution prediction model according to the predicted flood risk area distribution image and the verification hydrological monitoring data set to obtain an optimized flood dynamic evolution prediction model.

7. The artificial intelligence-based flood analysis method according to claim 6, characterized in that: Step S37 includes the following steps: Step S371: continuously tracking the current time to obtain real-time time data; Step S372: input the predicted flood arrival time series into a preset time trigger to set a data collection trigger time point, and obtain a number of data collection trigger time points. When the real-time time data matches the data collection trigger time point, the target area is monitored for hydrological parameters in real time through a preset hydrological monitoring network to obtain a verification hydrological monitoring data set, wherein the verification hydrological monitoring data set includes a number of verification hydrological monitoring data. At the same time, the target area is photographed by remote sensing in real time to obtain a verification flood area remote sensing image set, wherein the verification flood area remote sensing image set includes a number of verification flood area remote sensing images; Step S373: The model accuracy of the homomorphic flood dynamic evolution prediction model is calibrated according to the predicted flood risk area distribution image, the verification flood area remote sensing image set and the verification hydrological monitoring data set to obtain an optimized flood dynamic evolution prediction model.

8. The artificial intelligence-based flood analysis method according to claim 7, characterized in that: Step S373 includes the following steps: Step S3731: traverse the verification flood area remote sensing image set and the verification hydrological monitoring data set, use the verification hydrological monitoring data to annotate the corresponding verification flood area remote sensing image with elevation and water depth, and obtain a verification water depth annotated remote sensing image set; Step S3732: traversing the verification water depth annotated remote sensing image set, identifying the flood coverage area of ​​each verification water depth annotated remote sensing image, and performing boundary vectorization to obtain a verification flood boundary vector image set, wherein the verification flood boundary vector image set includes a plurality of verification flood boundary vector images; Step S3733: traverse the verification flood boundary vector image set, perform spatial error analysis on the verification flood boundary vector image and the predicted flood risk area at the corresponding predicted time point in the predicted flood risk area distribution image, and obtain a number of flood area error data and a number of flood height error data; Step S3734: adjusting the parameters of the homomorphic flood dynamic evolution prediction model according to the flood area error data and the flood height error data to obtain an optimized flood dynamic evolution prediction model.

9. The artificial intelligence-based flood analysis method according to claim 1, characterized in that: Step S4 includes the following steps: Step S41: extracting the time series initial state of the predicted flood risk area distribution image to obtain the flood initial state distribution image; Step S42: inputting the flood initial state distribution image into the optimized flood dynamic evolution prediction model for initialization setting, and inputting the predicted flood risk area distribution image and the predicted flood arrival time series into the initialized optimized flood dynamic evolution prediction model for spatiotemporal dynamic simulation to obtain flood spatiotemporal evolution data; Step S43: extracting the maximum inundation range from the flood spatiotemporal evolution data to obtain maximum inundation range vector data; Step S44: Obtain a target area map, and perform spatial overlay analysis and depth graded rendering on the target area map according to the maximum flood range vector data to obtain a flood inundation range analysis map.

10. The artificial intelligence-based flood analysis method according to claim 1, characterized in that: Step S5 includes the following steps: Step S51: Perform three-dimensional geographic information modeling on the target area to obtain a geographic digital model of the target area; Step S52: using the flood inundation range analysis map to perform hydrodynamic spatial mapping on the target area geographic digital model to obtain a three-dimensional flood inundation scene model; Step S53: performing building damage distribution statistics on the flood-inundated three-dimensional scene model to obtain building inundation distribution data; Step S54: performing risk level determination on the building inundation distribution data and the preset disaster impact threshold to obtain flood inundation risk assessment data; and generating a flood warning report based on the flood inundation risk assessment data.