Water quantity dispatching method and system for urban sewage treatment system based on plant-network integration

By building an optimization model in the urban sewage treatment system and using multi-objective algorithms to perform water scheduling, the mismatch problem of sewage treatment system in extreme weather and sewage overflow management is solved, and load balance between sewage plants and pollutants are achieved Cuts reduce operating costs and improve water quality.

CN118709452BActive Publication Date: 2024-11-01SOUTHWEST MUNICIPAL ENGINEERING DESIGN & RESEARCH INSTITUTE OF CHINA +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411189832.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-01
Estimated Expiration
2044-08-28

AI Technical Summary

Technical Problem

The existing urban sewage treatment system has problems such as mismatch in water scheduling, uneven load distribution, and difficulty in optimizing operating costs and environmental benefits in extreme weather and sewage overflow management. The traditional scheduling model is difficult to effectively reduce sewage treatment costs and improve water quality.

Method used

Adopt the water volume scheduling method of urban sewage treatment system based on the plant network, and by constructing an optimization model to minimize annual operating costs and maximize target pollutant reduction, use a multi-objective algorithm to perform water volume scheduling, and combine the design water volume treatment of the sewage plant Capacity and pollutant reduction, optimize water distribution and pollutant treatment between sewage plants.

Benefits of technology

It effectively reduces the operating costs of the sewage treatment system, improves the water quality of downstream rivers, and realizes load balance between sewage plants and pollutant reduction, which is suitable for practical engineering applications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118709452B_ABST
    Figure CN118709452B_ABST
Patent Text Reader

Abstract

The present invention discloses a water scheduling method and system for a city sewage treatment system based on plant-network integration, and relates to the field of urban sewage data processing. The water scheduling method for a city sewage treatment system based on plant-network integration includes the following steps: Step S1: Collect basic data for model construction; Step S2: Based on the collected basic data, build an optimization model with the goal of minimizing annual operating costs and maximizing target pollutant reduction; Step S3: Input sewage treatment volume and control strategy data, use a multi-objective algorithm to solve the optimization model, and output a water scheduling plan; the control strategy refers to the ratio between two targets object1 and object2. The above method can output a multi-objective optimized water scheduling plan.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of urban sewage data processing, and in particular to a water volume dispatching method and system for an urban sewage treatment system based on plant-network integration. Background Art

[0002] The urban sewage system is mainly composed of underground (drainage) pipe networks, sewage treatment plants and receiving water bodies. At present, global climate change has led to frequent extreme weather events, which has brought unprecedented pressure on urban sewage infrastructure, thus affecting the water safety and water environment quality in urban areas. Faced with the challenges of urban waterlogging and combined sewer overflows (CSO), the traditional urban sewage treatment operation and control model has become insufficient. Therefore, the "plant-network integration" joint control strategy came into being. It is regarded as an effective means to prevent urban waterlogging and the risk of sewage overflow in rainy seasons, effectively reduce operating costs, and further ensure the quality of the water environment.

[0003] The "plant-network integration" scheduling of urban sewage treatment systems refers to the coordinated scheduling of drainage networks, sewage treatment plants and receiving water bodies, aiming to achieve the best overall environmental benefits. The core of the scheduling strategy is to achieve optimal water allocation. There are currently three main problems:

[0004] First, the water volume between the sewage treatment plant and the drainage network is not coordinated enough, resulting in a mismatch between the treatment capacity of the sewage treatment plant and the collection capacity of the network, which in turn causes sewage overflow and poses a serious threat to the surrounding water environment;

[0005] Second, the load distribution among urban sewage treatment plants is uneven, with some treatment plants operating at overload while others are underutilized, affecting the overall benefits of the sewage treatment system;

[0006] Third, related research generally focuses on the impact of sewage treatment plant tailwater discharge on receiving water bodies, and lacks comprehensive assessment and consideration of operating costs, overflow risks and water accumulation problems. Ultimately, this limits the optimal performance of urban sewage treatment systems in terms of economic and environmental benefits.

[0007] In the prior art, there are also some studies on water volume scheduling of urban sewage treatment systems based on multi-objective integrated plant and network. For example, Chinese patent document CN112950096A discloses a classification intelligent scheduling method for integrated plant, network and river. The main problems of this technology are as follows:

[0008] (1) In the water safety scheduling scenario model and water environment scheduling scenario model that take cost as the target, only the pump station operation cost is considered. In fact, the operation cost of the sewage treatment plant of the engineering contractor is the main operation cost of the entire system. The sole pursuit of the operation cost of the pump station may cause a substantial increase in the subsequent sewage treatment cost.

[0009] (2) The switching of water safety and water ecological scheduling modes has limited support for actual engineering projects, because the tailwater in the same area either flows into the main stream or the tributary, and the space for change is limited.

[0010] (3) Only the overflow in front of the plant is considered. In actual projects, the sewage treatment plant is unwilling to accept more sewage, closes the gate in front of the plant, and fails to execute the dispatch order in time. Therefore, it cannot be judged solely based on the overflow volume in front of the plant.

[0011] In short, the parameters selected in the prior art and the mathematical models constructed based on the parameters are difficult to apply to actual engineering. Summary of the invention

[0012] The purpose of the present invention is to provide a water volume scheduling method and system for an urban sewage treatment system based on an integrated plant-network system. The method performs scheduling control between sewage treatment plants with the dual goals of reducing the operating cost of the sewage treatment system and improving the water quality of downstream rivers (receiving water bodies), and the method can be applied to actual projects.

[0013] In order to achieve the above object, the technical solution adopted by the present invention is as follows:

[0014] The water quantity dispatching method of the urban sewage treatment system based on plant-network integration includes the following steps:

[0015] Step S1: Collect basic data for model construction;

[0016] Step S2: constructing an optimization model based on the collected basic data with the goal of minimizing annual operating costs and maximizing target pollutant reduction;

[0017] Step S3: Input sewage treatment volume data, use a multi-objective algorithm to solve the optimization model, and output a water volume scheduling plan;

[0018] The optimization model constructed in the above step S2 is as follows:

[0019] (1)

[0020] (2)

[0021] (3)

[0022] (4)

[0023] In equations (1) and (2), x is the decision variable, representing the water allocation ratio of each sewage treatment plant that constitutes the sewage treatment system; r is the minimum multiplier; is the original objective function; is the objective function that is expected to be achieved; is the weight of each goal; and Represent inequality and equality constraints respectively; constrain the value range of decision variable x; Represents the conditions are met; The distance between the objective functions representing the two objectives is the minimum;

[0024] In formula (3) and formula (4), Y n is the annual operating cost of the nth sewage treatment plant; R n is the annual target pollutant reduction of the nth sewage treatment plant, n=1,...,m; m is the total number of sewage treatment plants in the region;

[0025] The target pollutant is a single characteristic pollutant or at least two combined pollutants.

[0026] As a preferred technical solution, in step S3, the method for solving the optimization model using a multi-objective algorithm includes the following process:

[0027] Step S31: Based on the basic data, the water allocation threshold of each sewage plant is set, and the fmincon function is called to obtain the optimal solutions of object1 and object2 respectively; and the following relationship is constructed:

[0028]

[0029]

[0030] Step S32: Call the fgoalattain function to minimize r and obtain different The result of satisfying both object1 and object2 at the same time;

[0031] in, is the minimum distance between the objective functions representing the two objectives; r is the minimum multiplier; is the weight of each target.

[0032] As a preferred technical solution, the basic data includes boundary conditions of the sewage treatment system;

[0033] Boundary conditions include the water volume limit of each sewage treatment plant that constitutes the sewage treatment system, the water volume load of the pumping station, the target pollutants, and the operation cost pricing method; the water volume limit includes: the biochemical reaction guarantee volume, the agreed minimum water volume, the design scale water volume, and the kz converted maximum water volume; among them, the biochemical reaction guarantee volume: refers to the basic water volume that the sewage plant wants to ensure the basic biological treatment capacity. The agreed minimum water volume: is the minimum water volume agreed upon by the sewage plant when signing the franchise agreement. The design scale water volume: is the water volume treatment scale designed by the sewage plant. The Kz converted maximum water volume: represents the maximum water load that the sewage plant can handle.

[0034] As a preferred technical solution, in the above step S31, the water allocation threshold of each sewage treatment plant is set based on the biochemical reaction guarantee volume of the sewage treatment plant, the agreed minimum water volume, the designed scale water volume, and the kz converted maximum water volume.

[0035] When the annual target pollutant reduction of the sewage treatment plant is comprehensive pollutants, the annual target pollutant reduction R n The method of obtaining includes the following steps:

[0036] Step A1: Select several pollutant indicators, use the corresponding pollutant reduction as parameters, and construct a data matrix. The data matrix is ​​as follows:

[0037]

[0038] Among them, a represents the number of samples; b represents the number of indicators; represents the value of the i-th sample of the j-th pollutant indicator, that is, the unit pollutant reduction; X is the original matrix of water quality indicators;

[0039] Step A2: Normalized matrix calculation; the calculation formula is as follows:

[0040]

[0041]

[0042] In the formula, is the minimum value in matrix X; is the maximum value in matrix X; represents the normalized value of the i-th sample of the j-th pollutant indicator; is the normalized matrix of water quality indicators;

[0043] Step A3: Calculate entropy weight :

[0044]

[0045]

[0046]

[0047]

[0048] In the formula, Represents the weight of the i-th sample in the j-th indicator; is the entropy value of the j-th indicator, ≥0; λ is the Boltzmann constant, λ=1 / ln(a), ( ); is the variation index of the jth indicator; is the entropy weight of the j-th indicator;

[0049] Step A4: Calculation of comprehensive pollutant reduction:

[0050]

[0051] Where: is the comprehensive pollutant reduction of the i-th sample; and are the pollutant concentrations of the inlet and outlet of the i-th sample of the j-th indicator respectively; The amount of sewage treated.

[0052] As a preferred approach, when the annual target pollutant of a sewage treatment plant is a single characteristic pollutant, the annual target pollutant reduction is the annual reduction of the characteristic pollutant.

[0053]

[0054] Where: a is the number of samples; is the reduction amount of characteristic pollutants of the i-th sample; and are the pollutant concentrations in and out of the factory of the i-th sample of the indicator respectively; The amount of sewage treated.

[0055] As a preferred technical solution, the method further includes step S4: executing water scheduling based on the output water scheduling scheme to control the inlet and outlet water of each sewage treatment plant.

[0056] As a preferred embodiment, the basic data includes boundary conditions of the sewage treatment system;

[0057] As a preferred method, the annual operating cost calculation formula of the sewage treatment plant is calculated based on the actual payment method of the sewage treatment fee of the sewage treatment plant and the water inflow method. The payment method includes but is not limited to any one of pay-for-performance, fixed cost, and cost-plus;

[0058] Pay-for-performance means that wastewater treatment fees include pollutant reduction fees and water fees;

[0059] Fixed cost means that the sewage treatment fee is a fixed unit price;

[0060] Cost plus means that the sewage treatment fee includes variable costs, fixed costs, net profit, and income tax;

[0061] The water inlet methods include gravity flow and pump station lifting. The gravity flow method does not generate electricity costs, while the pump station lifting method generates electricity costs as operating costs.

[0062] Based on this, the annual operating cost of the sewage plant is Y n There are many ways to calculate the cost. Since cost calculation is mathematical knowledge, this application does not apply to the non-operating cost Y n Clearly define the calculation method of

[0063] However, it is worth explaining that no matter what payment method is used for sewage treatment fees, it is linked to the amount of sewage treatment, that is, it has a direct relationship with the annual operating cost of the sewage treatment plant and the water allocation ratio x of each sewage treatment plant, and can be expressed by a formula based on the fee collection method agreed in different contracts.

[0064] The water dispatching system of the urban sewage treatment system based on the integration of plant and network includes the project boundary definition module, historical data collection and analysis module, optimization model module and control module;

[0065] The project boundary definition module collects the water volume limit and water load of each sewage treatment plant; collects the name of the target pollutant, collects the data required to calculate the annual operating cost of the sewage plant, collects the water treatment allocation ratio data of each sewage plant, and collects the unit reduction of each pollutant; calls the pollutant treatment formula from the database to calculate the reduction of each pollutant including the target pollutant; calls the calculation formula that matches the cost calculation method agreed in the contract to calculate the annual operating cost of each sewage plant.

[0066] The historical data collection module imports historical data and analyzes and processes the historical data to obtain historical sewage treatment volume, historical precipitation, the relationship between historical precipitation and historical sewage treatment volume, the relationship between historical precipitation and water allocation ratio, and generates a relationship diagram; historical data includes rainfall in each historical year, sewage treatment volume in each year, water allocation ratio, pollutant reduction, and operating costs.

[0067] The optimization model module calls the optimization model, inputs the control strategy and sewage treatment volume, and outputs the optimization result. The input control strategy is the proportional relationship between object1 and object2; the output optimization result is the output water distribution ratio x.

[0068] The control module executes the water allocation scheduling plan based on the output optimization results; the control module includes the water inlet control system and the water outlet control system of each sewage treatment plant.

[0069] As a preferred embodiment, in the optimization model module, the sewage treatment volume is the sewage treatment volume called from the historical data collection module.

[0070] Compared with the prior art, the present invention has the following beneficial effects:

[0071] In the present invention, the optimization model uses the overall operating cost of the sewage treatment plant and the reduction of pollutants in the sewage treatment plant as targets, so as to be effectively applied to actual projects and reduce costs.

[0072] In the present invention, the basic data for constructing the optimization model includes boundary conditions, takes into account the designed water treatment capacity of the sewage plant, gives full play to the rainy season protection role of the sewage plant, and does not rely solely on the overflow flow in front of the plant for judgment.

[0073] Based on the above objectives and practical considerations of actual projects, the present invention constructs different optimization model frameworks to achieve water scheduling between sewage treatment plants. BRIEF DESCRIPTION OF THE DRAWINGS

[0074] Figure 1 It is a schematic diagram of the process of the present invention. DETAILED DESCRIPTION

[0075] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0076] Example 1: This example selects the sewage treatment system in Buji area of ​​Shenzhen as the object of technical application, and adopts the water scheduling method and system of the urban sewage treatment system based on plant-network integration to carry out water scheduling transformation on the existing sewage treatment system in Buji area of ​​Shenzhen with the goal of minimizing annual operating costs and maximizing target pollutant reduction, thereby obtaining a transformed water scheduling plan that meets the target needs.

[0077] In the process of transforming the sewage scheduling plan of the existing sewage treatment system in Buji area of ​​Shenzhen City by using the water scheduling method and system based on the integrated plant-network urban sewage treatment system, it is necessary to collect the environmental data and actual operation data of the sewage treatment system in Buji area of ​​Shenzhen City, that is, the basic data for building the sewage scheduling model.

[0078] The actual environmental data (situation) of the existing sewage treatment system in Buji District, Shenzhen (hereinafter referred to as the "application object") are as follows:

[0079] Application object receiving water body: The receiving water body for sewage discharge in the area is Buji River, which is a first-level tributary of Shenzhen River. The main stream is about 9.8 km long and the basin area is about 30.1 km 2 .

[0080] Target pollutant of the application object: In this embodiment, the target pollutant of the application object is selected as a single characteristic pollutant TN.

[0081] Structural characteristics of application objects: The area includes three sewage treatment plants, named No. 1, No. 2 and No. 3. There are two storage tanks in the area, named Y storage tank and S storage tank. Sewage is uniformly dispatched by Y storage tank and distributed to sewage treatment plants No. 1, No. 2 and No. 3. Among them, in addition to receiving the distribution from Y storage tank, No. 2 sewage treatment plant also needs to receive sewage from S storage tank.

[0082] The minimum water treatment volume for the area sewage allocation is the biochemical reaction guarantee volume (i.e. a certain proportion of the design scale of the area sewage treatment system); the design scale is the standard sewage volume set for an area sewage treatment system during the design stage.

[0083] When the daily treated water volume is ≤350,000 tons, the maximum value of the area's sewage water allocation is the designed scale water volume; when the daily treated water volume is >350,000 tons, the maximum value of the area's sewage water allocation is the maximum water treatment volume in Table 1 (i.e. Kz converted maximum water volume, Kz converted maximum water volume refers to the maximum water load that the sewage treatment plant can handle).

[0084] The water volume limits of the three sewage treatment plants are shown in Table 1. According to the actual operation data of the three sewage treatment plants in 2023, the total sewage treatment capacity of the three sewage treatment plants is generally lower than the design scale (350,000 tons / day), and the rainy season backup capacity has not yet been effectively exerted.

[0085] Operational characteristics of application objects: In order to ensure the safe and stable operation of each sewage treatment plant in the Buji area, it is necessary to ensure that the water volume of the sewage treatment plant is above the minimum water treatment volume; due to the minimum guarantee agreement, the daily water treatment volume of Buji Phase II (Sewage Plant No. 2) shall not be less than 40,000 tons. If it is less than 40,000 tons, it shall pay according to the treatment volume of 40,000 tons; the design scale water volume of Buji Phase I (Sewage Plant No. 1), Phase II (Sewage Plant No. 2) and Phase III (Sewage Plant No. 3) are 200,000, 50,000 and 100,000 tons / day respectively; the maximum treatment water volume of Sewage Plant No. 1, Sewage Plant No. 2 and Sewage Plant No. 3 are 260,000, 65,000 and 150,000 tons / day respectively.

[0086] Table 1: Water volume limit table for each sewage treatment plant (unit: 10,000 tons / day)

[0087]

[0088] The guaranteed water volume in the agreement in Table 1 refers to the minimum water treatment volume of the sewage treatment plant agreed in the agreement.

[0089] In specific applications, based on the actual situation of the three sewage treatment plants in Buji area, there are three sewage treatment plant transformation scenarios:

[0090] The first scenario is that the wastewater plant remains as is;

[0091] The second scenario is to upgrade the No. 1 sewage treatment plant. The tailwater TN concentrations of No. 2 and No. 3 sewage treatment plants are 5.8 mg / L and 5.0 mg / L respectively, while the No. 1 sewage treatment plant is significantly higher than the other two sewage treatment plants, at 8.0 mg / L. In order to further improve the water quality of the downstream receiving water body, the No. 1 sewage treatment plant is upgraded to a concentration of no more than 5.0 mg / L.

[0092] The third scenario is based on the upgrading and transformation of Wastewater Treatment Plant No. 1 as described in the second scenario above, while Wastewater Treatment Plant No. 2 breaks the minimum water volume agreement.

[0093] Table 2: Water treatment capacity of three sewage treatment plants in Buji area corresponding to the sewage treatment system under different scenarios

[0094]

[0095] like Figure 1 As shown, on the above application object, basic data is collected and a water quantity dispatching method for an urban sewage treatment system based on plant-network integration is applied, and its implementation includes the following steps:

[0096] Step S1: Collect basic data for model construction.

[0097] The basic data include boundary conditions of the wastewater treatment system;

[0098] The boundary conditions include the water volume limits (minimum and maximum treatment volumes) of each sewage treatment plant that constitutes the sewage treatment system, the water load of the pumping station, the target pollutants, and the operating costs.

[0099] Water volume limits include: guaranteed volume for biochemical reactions, agreed minimum water volume, designed scale water volume, and maximum water volume converted by kz.

[0100] Step S2: Based on the collected basic data, an optimization model is constructed with the optimization objectives of minimizing the annual operating cost and maximizing the reduction of the target pollutant (in this embodiment, the single characteristic pollutant TN).

[0101] The specific implementation of step S2 includes the following process:

[0102] Process 1, calculate the annual operating costs of the three sewage treatment plants to obtain the annual operating costs. The operating costs of the three sewage treatment plants are calculated based on the terms agreed upon in the operating agreements of each plant, including three models: fixed cost, pay-per-performance and cost-plus. (The cost accounting method is an existing technology and does not belong to the improvement point of this application. It can be calculated according to the actual situation. This application only briefly describes the calculation results)

[0103] The No. 1 Sewage Treatment Plant adopts the "pay-for-performance" principle. The sewage treatment service fee includes pollutant reduction fees and water charges (calculated at 0.3922 yuan / ton); the water inlet of the No. 1 Sewage Treatment Plant adopts the "gravity flow" method (no need to calculate the electricity charge of the pump station); the No. 1 Sewage Treatment Plant has no minimum water volume requirement, but after the treated water volume exceeds the design scale (200,000 tons), the excess will be paid at 70%.

[0104] Sewage Treatment Plant No. 2 adopts the "fixed cost" principle, and the basic unit price of sewage treatment services is 0.988 yuan / ton; Sewage Treatment Plant No. 2 requires a minimum water volume of 40,000 tons / day, and no fees will be paid for sewage exceeding 50,000 tons.

[0105] Sewage Treatment Plant No. 3 adopts the "cost plus" principle, and the sewage treatment service fee includes variable costs, fixed costs, net profit, and income tax; Sewage Treatment Plant No. 3 has no minimum water volume requirement.

[0106] The water inlet of No. 2 and No. 3 sewage treatment plants is lifted by pumping stations (the electricity charges of the pumping stations need to be calculated), and the unit electricity charges of the pumping stations are approximately 0.15 yuan / ton.

[0107]

[0108]

[0109]

[0110] Where, Y1, Y2, and Y3 are the annual operating cost calculation formulas for No. 1, No. 2, and No. 3 sewage treatment plants respectively; M COD is the unit COD reduction, tons / 10,000 tons; 100 is the TP reduction coefficient; M TP is the unit TP reduction, tons / 10,000 tons; 20 is the TN reduction coefficient, M TN is the unit TN reduction, tons / 10,000 tons; 2 is the SS reduction coefficient; M SS is the unit SS reduction, tons / 10,000 tons; 2 is the BOD reduction coefficient, 0.386 is the BOD conversion coefficient; M BOD is the unit BOD reduction, tons / 10,000 tons; =M BOD . Q is the total daily sewage treatment volume in the area, 10,000 tons; in the above formula, D is the number of days the sewage treatment plant is in operation; 0.97 is the performance coefficient; 290.69 is the unit price of pollutant reduction, RMB / ton; 0.3922 is the unit water price, RMB / ton; other constants are agreed conversions; 0.988 is the fixed unit operating cost, 0.15 is the unit pump station electricity fee; 0.6896 is the variable cost coefficient; 7409.976 is the total annual fixed cost, 10,000 yuan; 1.06 is the profit and income tax coefficient; x1, x2, and x3 are the water allocation ratios of the three sewage treatment plants, and the sum of the three is 1. This embodiment illustrates the above formula: It refers to the annual operating cost calculation formula Y1 of the No. 1 sewage treatment plant when the water volume of Buji Phase I water plant is 60,000 to 200,000 tons / day; It refers to the annual operating cost calculation formula Y1 of the No. 1 sewage treatment plant when the water volume of Buji Phase I water plant is between 6 (excluding 6) and 200,000 tons / day; It refers to the annual operating cost calculation formula Y2 of the No. 2 sewage treatment plant when the water volume of Buji Phase II water plant is between 5 (excluding 5) and 65,000 tons / day; It refers to the annual operating cost calculation formula Y2 of the No. 2 sewage treatment plant when the water volume of Buji Phase II water plant is between 4 (excluding 4) and 45,000 tons / day; It refers to the annual operating cost calculation formula Y2 of the No. 2 sewage treatment plant when the water volume of the Buji Phase II water plant is 12,000 to 40,000 tons / day.

[0111] Process 2, calculate the target pollutant reduction amount and obtain the annual target pollutant reduction amount: According to the actual operation data of the three sewage treatment plants in the area in 2023, the reduction amount of different pollutants per unit water volume of the three sewage treatment plants can be known (as shown in Table 3); according to the weights of different pollution indicators, the calculation formula for the reduction amount of characteristic pollutants is obtained. In the following Table 3, before the standard increase refers to the increase of TN reduction amount of sewage treatment plant No. 1; after the standard increase refers to the increase of TN reduction amount of sewage treatment plant No. 1;

[0112] Table 3: Unit pollutant reduction table of three sewage treatment plants (tons / 10,000 tons)

[0113]

[0114] The target pollutant of the sewage treatment system in Buji area is the characteristic pollutant TN.

[0115] Specifically, in the above process 2, the method for obtaining the target pollutant reduction amount includes the following steps:

[0116] Step B1: Select the reduction of four water quality indicators (TN, COD, TP, SS) as parameters and construct a data matrix. The data matrix is ​​as follows:

[0117]

[0118] Among them, a represents the number of samples; b represents the number of indicators; represents the value of the i-th sample of the j-th pollutant indicator, that is, the unit pollutant reduction; X represents the original matrix of water quality indicators;

[0119] Step B2: Normalized matrix calculation; the calculation formula is as follows:

[0120]

[0121]

[0122] In the formula, is the minimum value in matrix X; is the maximum value in matrix X; represents the normalized value of the i-th sample of the j-th pollutant indicator; is the normalized matrix of water quality indicators;

[0123] Step B3: Calculate entropy weight :

[0124]

[0125]

[0126]

[0127]

[0128] In the formula, Represents the weight of the i-th sample in the j-th indicator; is the entropy value of the j-th indicator, ≥0; λ is the Boltzmann constant, λ=1 / ln(a), ( ); is the variation index of the jth indicator; is the entropy weight of the j-th indicator;

[0129] Step B4: The characteristic pollutant in the Buji area is TN (total nitrogen). The target pollutant reduction calculation formula for sewage treatment plants No. 1, No. 2, and No. 3 is as follows:

[0130]

[0131]

[0132]

[0133] Where R1, R2, and R3 are the reduction amounts of target pollutants No. 1, No. 2, and No. 3, respectively; Q is the total daily sewage treatment volume in the area, 10,000 tons; D is the number of days the sewage treatment plant is in operation; x1, x2, and x3 are the water allocation ratios of the three sewage treatment plants, respectively, and their sum is 1. 0.24, 0.27, 0.38, and 0.33 are the entropy weights of the TN pollutant indicators in Table 3 above (obtained in step B3).

[0134] Process 3, based on the above annual operating costs and annual target pollutant reduction, an optimization model is constructed with the optimization objectives of minimizing annual operating costs and maximizing comprehensive pollutant reduction:

[0135] (1)

[0136] (2)

[0137] (3)

[0138] (4)

[0139] In formula (1) and formula (2), x is the decision variable, representing the water allocation ratio of sewage treatment plants 1, 2, and 3; r is the minimum multiplier; is the original objective function; is the objective function that is expected to be achieved; is the weight of each target; (in this embodiment, w1 and w2 are 1 respectively, that is, the ratio of object1 to object2 is 1:1); and Represent inequality and equality constraints respectively; constrain the value range of the decision variable x; Represents the conditions are met; The distance between the objective functions representing the two objectives is the minimum;

[0140] In formula (3) and formula (4), Y n is the annual operating cost of each sewage treatment plant; R n It is the annual comprehensive pollutant reduction of each sewage treatment plant.

[0141] Step S3: using a multi-objective algorithm to solve the optimization model and output water scheduling plans under different scenarios; the different scenarios refer to a scenario where the sewage treatment system is not modified and a scenario where the sewage treatment system is upgraded.

[0142] Since the Buji area sewage treatment system has been completed and put into operation, environmental benefit results and operating cost results have been generated based on the actual boundary conditions. Based on this, when making a scheduling plan, the sewage treatment system can be upgraded and transformed, and the theoretical boundary conditions can be reset at the theoretical level; the scheduling plan based on the actual boundary conditions and the scheduling plan based on the theoretical boundary conditions can be output to provide theoretical and data support for the subsequent upgrading and transformation of the sewage treatment system.

[0143] Specifically, the implementation process of step S3 is as follows:

[0144] S31: Based on the boundary conditions, the water allocation threshold of each sewage plant is set, the fmincon function is called to obtain the optimal solution of object1 and object2, and the following relationship is constructed:

[0145]

[0146]

[0147] S32: Call fgoalattain function to minimize r and obtain different The result is that both object1 and object2 are satisfied at the same time.

[0148] According to the actual operation data of No. 1, No. 2, and No. 3 sewage treatment plants in Buji area in 2023, the minimum daily sewage treatment volume in the area is 153,000 tons and the maximum is 403,000 tons. Therefore, the water allocation plan with a daily treatment volume of 150,000 to 400,000 tons is calculated based on the established model. Under the application of the method described in this embodiment, the sewage treatment plants in the sewage treatment system of the Buji area described in this embodiment obtained the following specific scheduling plan as shown in Table 4:

[0149] Table 4: The optimal scheduling plan for operating cost and pollutant balance

[0150]

[0151] Specifically, based on the above method, by setting the optimization model under different scenarios and inputting the sewage volume (Q) and control strategy, the appropriate water scheduling scheme can be dynamically calculated in real time. The control strategy is the ratio of object1 to object2.

[0152] Step S4: Execute water scheduling based on the output water scheduling plan to control the inlet and outlet water of each sewage treatment plant.

[0153] Step S5: Use the data model to evaluate the output scheduling plan after implementation to obtain the environmental benefits of the scheduling plan.

[0154] Specifically, the implementation of S5 includes the following processes:

[0155] Process A1: Select a matching water quality model based on the actual situation of the receiving water body. Water quality models can be divided into zero-dimensional models, one-dimensional models, and two-dimensional models according to different dimensions. The three water plant outlets in this embodiment are no more than 1 km away from the downstream assessment section, and the receiving water body-Buji River is a small and medium-sized river. The one-dimensional water environment model of non-persistent pollutants in the river is selected to analyze the environmental benefits after the implementation of engineering measures.

[0156] One-dimensional water environment model:

[0157]

[0158]

[0159] In the formula, is the pollutant concentration at the outlet, mg / L; q is the amount of sewage, m 3 / s; is the pollutant concentration in the upstream river, mg / L; is the upstream water flow, m 3 / s; K is the water quality degradation coefficient; x is the distance from the sewage outlet to the water quality section, m; u is the river flow rate, m / s; It is a one-dimensional water environment model; It is a uniform mixing model.

[0160] Process A2: The sewage overflow volume of the area is obtained by simulating the sewage overflow volume. The method includes the following steps:

[0161] Step M1: Use AutoCAD to generalize the complex pipe network in the Buji area, and retain pipes with a diameter of more than 200 mm;

[0162] Step M2: ArcGIS is used to calculate and extract attributes, including pipeline topology correction, sub-catchment area division, average slope, and impervious area ratio;

[0163] Step M3: Input the data processed by ArcGIS into the SWMM model, and use the comprehensive runoff coefficient method to verify the reliability of the SWMM model. Take the 24-hour rainfall of N times (>1 mm rainfall) in the previous year as the rainfall condition, simulate and analyze the regional overflow situation, and calculate the sewage overflow volume.

[0164] It should be noted that the comprehensive runoff coefficient is a parameter that describes the ratio of rainwater to runoff on the catchment area during rainfall. Its value is affected by many factors, including ground cover type, soil type, slope, vegetation conditions and degree of urbanization.

[0165] The water quantity dispatching system of the urban sewage treatment system based on the integration of plant and network includes a project boundary definition module, a historical data collection module, an optimization model module and a control module.

[0166] The project boundary definition module collects the water volume limit and water load of each sewage treatment plant; collects the name of the target pollutant, collects the data required to calculate the annual operating cost of the sewage plant, collects the water treatment allocation ratio data of each sewage plant, and collects the unit reduction of each pollutant; calls the pollutant treatment formula from the database to calculate the reduction of each pollutant including the target pollutant; calls the calculation formula that matches the cost calculation method agreed in the contract to calculate the annual operating cost of each sewage plant.

[0167] The historical data collection module imports historical data and analyzes and processes the historical data to obtain historical sewage treatment volume, historical precipitation, the relationship between historical precipitation and historical sewage treatment volume, the relationship between historical precipitation and water allocation ratio, and generates a relationship diagram; historical data includes rainfall in each historical year, sewage treatment volume in each year, water allocation ratio, pollutant reduction, and operating costs.

[0168] The optimization model module calls the optimization model, inputs the control strategy and sewage treatment volume, and outputs the optimization result. The input control strategy is the proportional relationship between object1 and object2; the output optimization result is the output water distribution ratio x.

[0169] The control module executes the water allocation scheduling plan based on the output optimization results; the control module includes the water inlet control system and the water outlet control system of each sewage treatment plant.

[0170] As a preferred embodiment, in the optimization model module, the sewage treatment volume is the sewage treatment volume called from the historical data collection module.

[0171] So far, various embodiments of the present invention have been described in detail. In order to avoid obscuring the concept of the present invention, some details known in the art are not described. Based on the above description, those skilled in the art can fully understand how to implement the technical solutions disclosed herein. Those skilled in the art should understand that the above embodiments can be modified or some technical features can be replaced by equivalents without departing from the scope and spirit of the present invention. The scope of the present invention is defined by the appended claims.

Claims

1. Water quantity dispatching method of urban sewage treatment system based on plant-network integration, It is characterized in that Its implementation includes the following steps: Step S1: Collect basic data for model construction; Step S2: constructing an optimization model based on the collected basic data with the goal of minimizing annual operating costs and maximizing target pollutant reduction; Step S3: Input the sewage treatment volume and control strategy data, use the multi-objective algorithm to solve the optimization model, and output the water volume scheduling plan; the control strategy refers to the ratio between the two targets object1 and object2; The optimization model constructed in the above step S2 is as follows: (1) (2) (3) (4) In equations (1) and (2), x is the decision variable, representing the water allocation ratio of each sewage treatment plant that constitutes the sewage treatment system; r is the minimum multiplier; is the original objective function; is the objective function that is expected to be achieved; is the weight of each goal; and Represent inequality and equality constraints, respectively, constraining the value range of the decision variable x; Represents the conditions are met; The distance between the objective functions representing the two objectives is the minimum; In formula (3) and formula (4), Y n is the annual operating cost of the nth sewage treatment plant; R n is the annual target pollutant reduction of the nth sewage treatment plant, n=1,...,m; m is the total number of sewage treatment plants in the region; The target pollutant is a single characteristic pollutant or at least two combined pollutants.

2. The water volume dispatching method for the urban sewage treatment system based on plant-network integration according to claim 1, It is characterized in that In step S3, the implementation method of solving the optimization model using a multi-objective algorithm includes the following process: Step S31: Based on the basic data, the water allocation threshold of each sewage plant is set, and the fmincon function is called to obtain the optimal solutions of object1 and object2 respectively; and the following relationship is constructed: Step S32: Call the fgoalattain function to minimize r and obtain different The result of satisfying both object1 and object2 at the same time; in, is the minimum distance between the objective functions representing the two objectives; r is the minimum multiplier; is the weight of each target.

3. The water volume dispatching method for the urban sewage treatment system based on plant-network integration according to claim 2, It is characterized in that The basic data include boundary conditions of the wastewater treatment system; The boundary conditions include the water volume limit of each sewage treatment plant that constitutes the sewage treatment system, the water volume load of the pumping station, the target pollutants, and the operating cost pricing method; the water volume limit includes: the guaranteed volume of biochemical reaction, the agreed minimum water volume, the designed scale water volume, and the maximum water volume converted by kz.

4. The water quantity dispatching method for the urban sewage treatment system based on plant-network integration according to claim 3, It is characterized in that In the above step S31, the water allocation threshold of each sewage treatment plant is set based on the biochemical reaction guarantee volume, the agreed minimum water volume, the designed scale water volume, and the kz converted maximum water volume of the sewage treatment plant.

5. The water quantity dispatching method of the urban sewage treatment system based on plant-network integration according to claim 1, It is characterized in that When the annual target pollutant reduction of the sewage treatment plant is comprehensive pollutants, the annual target pollutant reduction R n The method of obtaining includes the following steps: Step A1: Select several pollutant indicators, use the corresponding pollutant reduction as parameters, and construct a data matrix. The data matrix is ​​as follows: Among them, a represents the number of samples; b represents the number of indicators; represents the value of the i-th sample of the j-th pollutant indicator, i.e., the unit pollutant reduction; is the original matrix of water quality indicators; Step A2: Normalized matrix calculation; the calculation formula is as follows: in, is the minimum value in matrix X; is the maximum value in matrix X; represents the normalized value of the i-th sample of the j-th pollutant indicator; is the normalized matrix of water quality indicators; Step A3: Calculate entropy weight : In the formula, Represents the weight of the i-th sample in the j-th indicator; is the entropy value of the j-th indicator, ≥0; λ is the Boltzmann constant, λ=1 / ln(a), ( ); is the variation index of the jth indicator; is the entropy weight of the j-th indicator; Step A4: Calculation of comprehensive pollutant reduction: ; Where: is the comprehensive pollutant reduction of the i-th sample; and are the pollutant concentrations in and out of the factory of the ith sample of the jth indicator; The amount of sewage treated.

6. The water volume dispatching method for the urban sewage treatment system based on plant-network integration according to claim 1, It is characterized in that When the annual target pollutant of a sewage treatment plant is a single characteristic pollutant, the annual target pollutant reduction amount is the annual reduction amount of the characteristic pollutant: Where: a is the number of samples; is the reduction amount of characteristic pollutants of the i-th sample; and are the pollutant concentrations in and out of the factory of the i-th sample of the indicator respectively; The amount of sewage treated.

7. The water volume dispatching method for the urban sewage treatment system based on plant-network integration according to claim 1, It is characterized in that The method further includes step S4: executing water scheduling based on the output water scheduling plan to control the inlet and outlet water of each sewage treatment plant.

8. Water dispatching system for urban sewage treatment system based on plant-network integration, It is characterized in that It includes engineering boundary definition module, historical data collection and analysis module, optimization model module and control module; The project boundary definition module collects the water volume limit and water volume load of each sewage treatment plant; collects the name of the target pollutant, collects the data required to calculate the annual operating cost of the sewage plant, collects the water volume treatment allocation ratio data of each sewage plant, and collects the unit reduction of each pollutant; calls the pollutant treatment formula from the database to calculate the reduction of each pollutant including the target pollutant; The annual operating cost of each sewage treatment plant is calculated by using a calculation formula that matches the cost calculation method agreed in the contract; The historical data collection module imports historical data and analyzes and processes the historical data to obtain historical sewage treatment volume, historical precipitation, the relationship between historical precipitation and historical sewage treatment volume, the relationship between historical precipitation and water allocation ratio, and generates a relationship diagram; historical data includes historical rainfall in each year, sewage treatment volume in each year, water allocation ratio, pollutant reduction, and operating costs; The optimization model module calls the optimization model described in any one of claims 1 to 7, inputs the control strategy and the sewage treatment volume, and outputs the optimization result, wherein the input control strategy is the proportional relationship between object1 and object2; and the output optimization result is the output water volume allocation ratio x; The control module executes the water allocation scheduling plan based on the output optimization results; the control module includes the water inlet control system and the water outlet control system of each sewage treatment plant.

9. The water quantity dispatching system of the urban sewage treatment system based on plant-network integration according to claim 8, It is characterized in that In the optimization model module, the sewage treatment volume is the sewage treatment volume called from the historical data collection module.

Citation Information

Patent Citations

  • Double-layer multi-objective optimization water pollution load distribution method

    CN110619435A

  • Plant-network-river integrated classified intelligent scheduling method

    CN112950096A

  • KR20230128191A