By adopting the engagement structure and sealing structure in the automatic powder spraying and explosion suppression device of gas pipeline conveying, the problem of poor sealing of fixed engagement connections in the prior art is solved, and the high sealing and thermal conductivity of the powder sprayer and the controller are achieved. , ensuring the safety and reliability of the device.
Patent Information
- Application Number
- CN202411217029.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-09-02
AI Technical Summary
The fixed and engaging connection method of the existing automatic powder spraying and explosion suppression device of gas pipeline conveying leads to poor sealing and easy loosening, causing air leakage and powder leakage from the powder sprayer. After the controller is removed, the gas pipeline has a gap, affecting the sealing performance. and security.
Adopt a engaging structure and a sealing structure, including the first flange, the second flange, the movable ring, the engaging block, the sealing gasket and the thermal conductivity structure. The engaging connection is achieved through the spring and the positioning block to ensure that the powder sprayer, the controller and the Connect the sealing properties of the tube and reduce heat conduction through thermal conduction rings and heat sinks.
It significantly improves the sealing of the powder sprayer, controller and connecting pipe, prevents air leakage and powder leakage, ensures safety, and reduces heat transmission to the gas pipeline through the thermally conductive structure, improving the reliability and service life of the device.
Smart Images

Figure CN118728467B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mine safety, in particular to an automatic powder spraying explosion suppression device for gas pipeline transportation. Background Art
[0002] The environment of gas mines is complex and full of potential dangers, such as gas leakage and fire. In order to ensure the safety and efficiency of gas mine operations, it is necessary to install an automatic powder spraying explosion suppression device for gas pipeline transportation on the transmission pipeline. The function of the automatic powder spraying explosion suppression device for gas pipeline transportation is: when a fire source (such as friction sparks, impact sparks, static sparks, electrical sparks, internal fires, external fires, etc.) or an explosion accident occurs, the ultraviolet flame sensor will detect the fire source or flame signal in time, and output a trigger level to the explosion suppressor to quickly spray dry powder fire extinguishing agent to extinguish the fire source or flame, which will play a role in blocking the further expansion of the explosion range at the initial stage.
[0003] The patent document with the prior art publication number CN218522690U provides a gas pipeline powder spray explosion suppression treatment device. Through the cooperation of the mounting seat, the connecting ring, the mounting groove, the fixing card, the slot, the slide groove and the mounting card, the connecting ring and the mounting seat can be simply and conveniently connected and installed, and the connecting ring and the mounting seat can be fixed. After the explosion suppressor has been used once, the connecting ring and the mounting seat can be conveniently disassembled, so as to facilitate the replenishment of dry powder of the explosion suppressor; the explosion suppressor tank body and the excavation can be improved by the sealing ring, but when the patent CN218522690U is in use, the fixing card is engaged with the outside of the connecting ring, and the fixing card is opened for disassembly, but this connection method has poor sealing performance, and the engaging connection is easy to loosen, which leads to gas leakage and powder leakage of the powder sprayer. Therefore, there is an urgent need for an automatic powder spray explosion suppression device for gas pipeline transportation. Summary of the invention
[0004] The purpose of the present invention is to solve the problem that the fixing card is engaged with the outside of the connecting ring and can be disassembled by opening the fixing card, but this connection method has poor sealing performance and the engaging connection is easy to loosen, which leads to air leakage and powder leakage of the powder sprayer, and a gap appears in the gas pipeline after the spray distributor and the controller are removed, which requires timely sealing treatment; the spray distributor and the controller are exposed to the outside, and their own temperature is easily transmitted to the gas pipeline, which has an adverse effect on the gas. Provided is an automatic powder spraying explosion suppression device for gas pipeline transportation.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solution: an automatic powder spraying explosion suppression device for gas pipeline transportation, comprising a powder sprayer, a controller is arranged at the bottom end of the powder sprayer, a clamping structure is arranged at the outside of the controller, and a connecting pipe is arranged at the bottom end of the controller, the bottom end of the connecting pipe is connected to the gas pipeline, and sealing structures are arranged on both sides of the connecting pipe, and a heat conducting structure is arranged at the outside of the clamping structure.
[0006] The clamping structure includes a first flange, a second flange is connected to the bottom end of the first flange, a fixing ring is fixed to the outside of the controller, a first spring is connected to the top of the fixing ring, a first movable ring is arranged on the top of the first spring, a clamping block is fixed to the top of the first movable ring, a clamping plate is clamped on the inside of the clamping block, a second spring is connected to one side of the clamping plate, a positioning block is arranged on the side of the second spring away from the clamping plate, a second movable ring is arranged below the fixing ring, the bottom ends of the powder sprayer and the controller are both connected to the first flange, the top ends of the controller and the connecting pipe are both provided with a second flange, and the top end of the first flange above and the bottom end of the second flange below are both provided with a clamping plate, a second spring and a positioning block.
[0007] The sealing structure includes a support seat, a rotating seat is arranged at the top of the support seat, a magnetic attraction plate is arranged on the right side of the rotating seat, and a cover plate is arranged at the top of the rotating seat, a sealing gasket is arranged on the inner wall of the cover plate, and a threaded block is fixed to the outer wall of the cover plate, a protective film is arranged on the surface of the sealing gasket, and a threaded ring is sleeved on the outer side of the threaded block.
[0008] The heat-conducting structure includes a first protective cover, a second protective cover is arranged on the left side of the first protective cover, and a heat insulation pad is arranged at the bottom end of the first protective cover, a mounting plate is arranged on the outer wall of the first protective cover, and a heat dissipation ring is arranged on the inner wall of the first protective cover, a heat-conducting ring is arranged on the inner side of the heat dissipation ring, and a heat sink is arranged on the heat dissipation ring.
[0009] Preferably, a sealing ring is sandwiched between the first flange and the second flange, first springs are provided at both ends of the fixed ring, two groups of first springs are fixedly connected to the first movable ring and the second movable ring respectively, a clamping sleeve is provided at the bottom end of the powder sprayer and the controller, and the powder sprayer and the controller are sealed connected by the clamping sleeve and the sealing ring, and the controller and the connecting pipe are sealed connected by the clamping sleeve and the sealing ring.
[0010] Preferably, the first movable ring and the second movable ring are sleeved on the outer wall of the controller.
[0011] Preferably, a snap-fit block is provided at the top end of the first movable ring and the bottom end of the second movable ring, a fixing groove matching the snap-fit block is provided on the inner side of the first flange and the second flange, and the first flange and the second flange are snap-fitted and connected via the snap-fit block and the snap-fit plate.
[0012] Preferably, the support seat is fixed on the top of the gas pipe, the cover plate and the support seat are movably connected via a rotating seat, and the cover plate and the magnetic plate are magnetically fixed.
[0013] Preferably, the number of the cover plates is two, and the two cover plates are fixedly connected via a threaded block and a threaded ring, and the threaded ring is movably connected to the threaded block via threads.
[0014] Preferably, the first protective cover, the second protective cover and the gas pipe are fixedly connected by means of a mounting plate, bolts and a thermal insulation pad, and the thermal insulation pad and the first protective cover and the second protective cover are fixedly connected by means of glue.
[0015] Preferably, both ends of the front ends of the first protective cover and the second protective cover are provided with mounting plates, and the first protective cover and the second protective cover are fixedly connected by the mounting plates and bolts.
[0016] Preferably, the heat sink penetrates to the outside of the first protective cover and the second protective cover, and the heat conductive ring is located on the outer wall of the connecting pipe.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] First, the present invention provides a first movable ring, a snap-fit block, a snap-fit plate, a first flange and a second flange. When the duster and the controller are installed, the first flange at the bottom of the duster is aligned with the second flange at the top of the controller. After alignment, the first movable ring drives the snap-fit block to move upward and pass through the first flange. The snap-fit plate is inserted into the inner side of the snap-fit block under the support of the second spring, and the snap-fit block is fixed to the first flange, and the first flange is fixed to the second flange. Since the snap-fit sleeves are engaged between the duster and the controller, and between the controller and the connecting pipe, and a sealing ring is provided between the first flange and the second flange, the connection between the duster, the controller and the connecting pipe has a very strong sealing property.
[0019] Second, the present invention sets a cover plate, a sealing gasket, a rotating seat, a threaded block and a threaded ring. After the controller is disassembled, the protective film on the sealing gasket on the inner wall of the two cover plates is immediately removed, and then the two cover plates are pulled to rotate inward through the rotating seat to disengage from the magnetic suction plate. Then the two cover plates are attached to the top of the second flange on the connecting pipe through the sealing gasket. At this time, the two cover plates are squeezed to make the threaded blocks on them fit together. After fitting, the threaded ring is screwed on the outside of the threaded block, so that the two threaded blocks are fixed together, and then the two cover plates are fixed on the second flange to cover and seal the connecting pipe.
[0020] Third, the present invention sets a first protective cover, a second protective cover, a heat-conducting ring, a heat-dissipating ring and a heat sink, and after the powder sprayer and the controller are installed, the first protective cover and the second protective cover are attached to the outer wall of the gas pipe body through the heat-insulating pad at the bottom, and the first protective cover and the second protective cover are aligned, and after alignment, they are fixed to the gas pipe body through the mounting plate of the outer wall and bolts. At this time, the first protective cover and the second protective cover are fixed together by bolts and mounting plates, and the fixed first protective cover and the second protective cover protect the controller and the clamping structure. At the same time, the heat-conducting rings on the inner walls of the first protective cover and the second protective cover are attached to the outer wall of the connecting pipe, absorb the heat conducted from the controller to the connecting pipe, and conduct the heat to the heat-dissipating ring, so that the heat is dissipated into the air through multiple heat sinks, thereby reducing the heat conducted by the controller to the connecting pipe and the gas pipe body. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0022] Figure 2 It is a front view structural schematic diagram of the present invention;
[0023] Figure 3 It is a schematic diagram of the clamping structure of the present invention;
[0024] Figure 4 is a schematic diagram of a first flange of the present invention;
[0025] Figure 5 For the present invention Figure 4 A is an enlarged schematic diagram;
[0026] Figure 6 It is a schematic diagram of the clamping plate of the present invention;
[0027] Figure 7 is a schematic diagram of a first spring of the present invention;
[0028] Figure 8 It is a schematic diagram of the clamping sleeve of the present invention;
[0029] Fig. 9 It is a schematic diagram of the sealing structure of the present invention;
[0030] Fig.10 It is a schematic diagram of the cover plate of the present invention;
[0031] Fig.11 For the present invention Fig.10 A magnified schematic diagram of B;
[0032] Fig.12 It is a schematic diagram of the heat conduction structure of the present invention;
[0033] Fig.13 Schematic diagram of the heat conducting ring of the present invention.
[0034] In the figure: 1, powder sprayer; 2, controller; 3, connecting pipe; 4, clamping structure; 401, first flange; 402, second flange; 403, fixed ring; 404, first spring; 405, first movable ring; 406, clamping block; 407, clamping plate; 408, second spring; 409, positioning block; 410, second movable ring; 411, sealing ring; 5, gas pipeline body; 6, sealing structure; 60 1. Support seat; 602. Rotating seat; 603. Cover plate; 604. Magnetic plate; 605. Sealing pad; 606. Protective film; 607. Thread block; 608. Thread ring; 7. Heat-conducting structure; 701. First protective cover; 702. Second protective cover; 703. Mounting plate; 704. Heat-insulating pad; 705. Heat-conducting ring; 706. Heat dissipation ring; 707. Heat sink; 708. Mounting sheet; 8. Snap-fit sleeve. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] See also Figure 1-8, an automatic powder spraying explosion suppression device for gas pipeline transportation, comprising a powder sprayer 1, a controller 2 is arranged at the bottom end of the powder sprayer 1, a clamping structure 4 is arranged on the outside of the controller 2, and a connecting pipe 3 is arranged at the bottom end of the controller 2, the bottom end of the connecting pipe 3 is connected to a gas pipeline body 5, and sealing structures 6 are arranged on both sides of the connecting pipe 3, a heat conducting structure 7 is arranged on the outside of the clamping structure 4, the clamping structure 4 comprises a first flange 401, the bottom end of the first flange 401 is connected to a second flange 402, a fixing ring 403 is fixed on the outside of the controller 2, a first spring 404 is connected to the top of the fixing ring 403, a first movable ring 405 is arranged on the top of the first spring 404, a clamping block 406 is fixed on the top of the first movable ring 405, and the inner side of the clamping block 406 is clamped with A snap-fit plate 407 is provided, one side of the snap-fit plate 407 is connected to a second spring 408, a positioning block 409 is provided on the side of the second spring 408 away from the snap-fit plate 407, a second movable ring 410 is provided below the fixed ring 403, the bottom ends of the powder sprayer 1 and the controller 2 are connected to the first flange 401, the top ends of the controller 2 and the connecting pipe 3 are provided with a second flange 402, the top end of the upper first flange 401 and the bottom end of the lower second flange 402 are provided with a snap-fit plate 407, a second spring 408 and a positioning block 409, a sealing ring 411 is sandwiched between the first flange 401 and the second flange 402, first springs 404 are provided at both ends of the fixed ring 403, and two groups of first springs 404 are respectively connected to the first movable ring 405 and the second movable ring 406. The movable ring 410 is fixedly connected, the bottom ends of the powder sprayer 1 and the controller 2 are both provided with a snap-fit sleeve 8, and the powder sprayer 1 and the controller 2 are sealed by the snap-fit sleeve 8 and the sealing ring 411, the controller 2 and the connecting pipe 3 are sealed by the snap-fit sleeve 8 and the sealing ring 411, the bottom ends of the powder sprayer 1 and the controller 2 are both connected with a first flange 401, the top ends of the controller 2 and the connecting pipe 3 are both provided with a second flange 402, the first movable ring 405 and the second movable ring 410 are sleeved on the outer wall of the controller 2, the top end of the first movable ring 405 and the bottom end of the second movable ring 410 are both provided with a snap-fit block 406, the inner sides of the first flange 401 and the second flange 402 are both provided with a fixing groove matching the snap-fit block 406, the first flange 401 and the second flange 40 2 is connected by the snap-fit block 406 and the snap-fit plate 407. When the duster 1 and the controller 2 are installed, the first movable ring 405 is first pressed downward to make the snap-fit block 406 retract into the inner side of the second flange 402 at the top of the controller 2. At this time, the first flange 401 at the bottom of the duster 1 is aligned with the second flange 402 at the top of the controller 2. After alignment, the two sets of snap-fit plates 407 are pushed at the same time to squeeze the second spring 408 to move inward, and the first movable ring 405 is released at the same time. Then, the snap-fit block 406 is supported by the elastic force of the first spring 404 and moves upward to pass through the first flange 401. Then, the two sets of snap-fit plates 407 are released. The snap-fit plates 407 are supported by the second spring 408 and the positioning block 409 and pop out to the outside, thereby being inserted into the inner side of the snap-fit block 406.The engaging block 406 is fixed to the first flange 401, and then the first flange 401 is fixed to the second flange 402, and the duster 1 is fixedly connected to the controller 2. In the same way, the controller 2 is fixedly connected to the connecting pipe 3 on the gas pipeline body 5 through the first flange 401, the second flange 402, the second movable ring 410, the engaging plate 407 on the first flange 401, the second spring 408, and the engaging block 406 on the second movable ring 410. The controller 2 and the connecting pipe 3 are all engaged with the engaging sleeve 8, and the first flange 401 and the second flange 402 are provided with a sealing ring 411, so that the connection between the powder sprayer 1, the controller 2 and the connecting pipe 3 has a very strong sealing performance. When the powder sprayer 1 is disassembled, it is only necessary to push the two sets of engaging plates 407 inward to separate from the engaging block 406. After separation, the powder sprayer 1 is lifted up to disassemble the powder sprayer 1, or the powder sprayer 1 and the controller 2 are disassembled.
[0037] See also Figure 9-11 , an automatic powder spray explosion suppression device for gas pipeline transportation, the sealing structure 6 includes a support seat 601, a rotating seat 602 is arranged at the top of the support seat 601, a magnetic plate 604 is arranged on the right side of the rotating seat 602, and a cover plate 603 is arranged at the top of the rotating seat 602, a sealing gasket 605 is arranged on the inner wall of the cover plate 603, and a threaded block 607 is fixed on the outer wall of the cover plate 603, a protective film 606 is arranged on the surface of the sealing gasket 605, and a threaded ring 608 is sleeved on the outer side of the threaded block 607, the support seat 601 is fixed to the top of the gas pipeline body 5, the cover plate 603 and the support seat 601 are movably connected through the rotating seat 602, and the cover plate 603 is magnetically fixed to the magnetic plate 604, and the number of the cover plates 603 is two, and the two cover plates 603 are connected through the threaded block 6 07. The threaded ring 608 is fixedly connected, and the threaded ring 608 is movably connected to the threaded block 607 through threads. After the controller 2 is disassembled, the protective film 606 on the sealing gasket 605 on the inner wall of the two cover plates 603 is immediately removed, and then the two cover plates 603 are pulled inward through the rotating seat 602 to disengage from the magnetic suction plate 604, and then the two cover plates 603 are attached to the top of the second flange 402 on the connecting pipe 3 through the sealing gasket 605. At this time, the two cover plates 603 are squeezed to make the threaded blocks 607 on them fit together. After fitting, the threaded ring 608 is screwed on the outside of the threaded block 607, so that the two threaded blocks 607 are fixed together, and then the two cover plates 603 are fixed on the second flange 402, and the connecting pipe 3 is covered and sealed.
[0038] See also Figure 12-13, gas pipeline transportation automatic powder spray explosion suppression device, the heat conductive structure 7 comprises a first protective cover 701, a second protective cover 702 is arranged on the left side of the first protective cover 701, and a heat insulating pad 704 is arranged at the bottom end of the first protective cover 701, a mounting plate 703 is arranged on the outer wall of the first protective cover 701, and a heat dissipation ring 706 is arranged on the inner wall of the first protective cover 701, a heat conductive ring 705 is arranged on the inner side of the heat dissipation ring 706, and a heat sink 707 is arranged on the heat dissipation ring 706, the first protective cover 701, the second protective cover 702 The gas pipe body 5 is fixedly connected by a mounting plate 703, bolts and a heat insulating pad 704, and the heat insulating pad 704 is fixedly connected to the first protective cover 701 and the second protective cover 702 by glue, and the front ends of the first protective cover 701 and the second protective cover 702 are both provided with mounting pieces 708, and the first protective cover 701 and the second protective cover 702 are fixedly connected by the mounting pieces 708 and bolts, and the heat sink 707 penetrates the outside of the first protective cover 701 and the second protective cover 702, and the heat conducting ring 705 is located at the connecting pipe 3. The outer wall of the gas pipe body 5 is fixed with the first protective cover 701 and the second protective cover 702 through the heat insulation pad 704 at the bottom after the dust sprayer 1 and the controller 2 are installed. The heat insulation pad 704 fills the gap between the first protective cover 701, the second protective cover 702 and the gas pipe body 5, and the first protective cover 701 and the second protective cover 702 are aligned. After alignment, they are fixed to the gas pipe body 5 through the mounting plate 703 of the outer wall and bolts. At this time, the first protective cover 701 and the second protective cover 702 are fixed with the bolts and the mounting sheet 708. The second protective cover 702 is fixed together, and the fixed first protective cover 701 and the second protective cover 702 protect the controller 2 and the locking structure 4. At the same time, the heat-conducting ring 705 on the inner wall of the first protective cover 701 and the second protective cover 702 fits with the outer wall of the connecting pipe 3, absorbs the heat conducted from the controller 2 to the connecting pipe 3, and conducts the heat to the heat dissipation ring 706, so that the heat is dissipated into the air through multiple heat sinks 707, thereby reducing the heat conducted by the controller 2 to the connecting pipe 3 and the gas pipe body 5.
[0039] Working principle: When the present invention is used, when the powder sprayer 1 and the controller 2 are installed, the first movable ring 405 is first squeezed downward to make the locking block 406 retract into the inner side of the second flange 402 at the top of the controller 2. At this time, the first flange 401 at the bottom of the powder sprayer 1 is aligned with the second flange 402 at the top of the controller 2. After alignment, the two groups of locking plates 407 are pushed to squeeze the second spring 408 to move inward, and then the first movable ring 405 is released. The locking block 406 is supported by the elastic force of the first spring 404 and moves upward through the first flange 401. At this time, the two groups of locking plates 407 are released. The locking plates 407 are supported by the second spring 408 and the positioning block 409 and pop out to the outside, thereby being inserted into the inner side of the locking block 406, so that the locking block 406 The first flange 401 is fixed to the second flange 402, and the powder sprayer 1 is fixedly connected to the controller 2. In the same way, the controller 2 is fixedly connected to the connecting pipe 3 on the gas pipeline body 5 through the first flange 401, the second flange 402, the second movable ring 410, the clamping plate 407 on the first flange 401, the second spring 408, and the clamping block 406 on the second movable ring 410. Since the clamping sleeve 8 is clamped between the powder sprayer 1 and the controller 2, and between the controller 2 and the connecting pipe 3, and a sealing ring 411 is provided between the first flange 401 and the second flange 402, the connection between the powder sprayer 1, the controller 2 and the connecting pipe 3 has a very strong sealing performance, and during powder spraying, the connection between the powder sprayer 1, the controller 2 and the connecting pipe 3 is very strong. After the device 1 and the controller 2 are installed, the first protective cover 701 and the second protective cover 702 are attached to the outer wall of the gas pipe body 5 through the heat insulation pad 704 at the bottom, and the first protective cover 701 and the second protective cover 702 are aligned. After alignment, they are fixed to the gas pipe body 5 through the mounting plate 703 on the outer wall and bolts. At this time, the first protective cover 701 and the second protective cover 702 are fixed together by bolts and the mounting sheet 708. The fixed first protective cover 701 and the second protective cover 702 protect the controller 2 and the clamping structure 4. At the same time, the heat conductive ring 705 on the inner wall of the first protective cover 701 and the second protective cover 702 is attached to the outer wall of the connecting pipe 3, absorbing the heat conducted from the controller 2 to the connecting pipe 3, and conducting the heat to On the heat dissipation ring 706, the heat is dissipated into the air through multiple heat sinks 707, thereby reducing the heat conducted by the controller 2 to the connecting pipe 3 and the gas pipe body 5. When the powder sprayer 1 is disassembled, it is only necessary to push the two sets of clamping plates 407 to move inward and separate them from the clamping block 406. After separation, the powder sprayer 1 is lifted up to disassemble the powder sprayer 1, or the powder sprayer 1 and the controller 2 are disassembled at the same time. After the controller 2 is disassembled, the protective film 606 on the sealing gasket 605 on the inner wall of the two cover plates 603 is immediately removed, and then the two cover plates 603 are pulled to rotate inward through the rotating seat 602 to separate from the magnetic suction plate 604, and then the two cover plates 603 are attached to the top of the second flange 402 on the connecting pipe 3 through the sealing gasket 605.At this time, squeeze the two cover plates 603 so that the threaded blocks 607 on them fit together. After fitting together, screw the threaded ring 608 on the outside of the threaded block 607 to fix the two threaded blocks 607 together, thereby fixing the two cover plates 603 on the second flange 402 to cover and seal the connecting pipe 3.
[0040] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. An automatic powder spray explosion suppression device for gas pipeline transportation, comprising a powder sprayer (1), Features: A controller (2) is provided at the bottom end of the powder sprayer (1), a snap-fit structure (4) is provided on the outside of the controller (2), a connecting pipe (3) is provided at the bottom end of the controller (2), a gas pipeline body (5) is connected to the bottom end of the connecting pipe (3), sealing structures (6) are provided on both sides of the connecting pipe (3), and a heat-conducting structure (7) is provided on the outside of the snap-fit structure (4); The locking structure (4) comprises a first flange (401), the bottom end of the first flange (401) is connected to a second flange (402), a fixing ring (403) is fixed to the outside of the controller (2), the top end of the fixing ring (403) is connected to a first spring (404), a first movable ring (405) is arranged at the top end of the first spring (404), a locking block (406) is fixed to the top end of the first movable ring (405), a locking plate (407) is locked on the inner side of the locking block (406), and one side of the locking plate (407) is connected to the second spring (408), a positioning block (409) is provided on the side of the second spring (408) away from the locking plate (407), a second movable ring (410) is provided below the fixed ring (403), the bottom ends of the powder sprayer (1) and the controller (2) are both connected to the first flange (401), the top ends of the controller (2) and the connecting pipe (3) are both provided with a second flange (402), and the top end of the first flange (401) above and the bottom end of the second flange (402) below are both provided with a locking plate (407), a second spring (408) and a positioning block (409); The sealing structure (6) comprises a support seat (601), a rotating seat (602) is arranged at the top of the support seat (601), a magnetic attraction plate (604) is arranged on the right side of the rotating seat (602), and a cover plate (603) is arranged at the top of the rotating seat (602), a sealing gasket (605) is arranged on the inner wall of the cover plate (603), and a threaded block (607) is fixed to the outer wall of the cover plate (603), a protective film (606) is arranged on the surface of the sealing gasket (605), and a threaded ring (608) is sleeved on the outer side of the threaded block (607); The heat-conducting structure (7) comprises a first protective cover (701), a second protective cover (702) is arranged on the left side of the first protective cover (701), and a heat-insulating pad (704) is arranged at the bottom end of the first protective cover (701), a mounting plate (703) is arranged on the outer wall of the first protective cover (701), and a heat-dissipating ring (706) is arranged on the inner wall of the first protective cover (701), a heat-conducting ring (705) is arranged on the inner side of the heat-dissipating ring (706), and a heat sink (707) is arranged on the heat-dissipating ring (706).
2. The automatic powder spraying explosion suppression device for gas pipeline transportation according to claim 1, Features: A sealing ring (411) is sandwiched between the first flange (401) and the second flange (402); first springs (404) are provided at both ends of the fixed ring (403); two groups of first springs (404) are fixedly connected to the first movable ring (405) and the second movable ring (410), respectively; a clamping sleeve (8) is provided at the bottom end of the powder sprayer (1) and the controller (2); the powder sprayer (1) and the controller (2) are sealedly connected via the clamping sleeve (8) and the sealing ring (411); and the controller (2) and the connecting pipe (3) are sealedly connected via the clamping sleeve (8) and the sealing ring (411).
3. The automatic powder spraying explosion suppression device for gas pipeline transportation according to claim 1, Features: The first movable ring (405) and the second movable ring (410) are sleeved on the outer wall of the controller (2).
4. The automatic powder spraying explosion suppression device for gas pipeline transportation according to claim 1, Features: A snap-fit block (406) is provided at the top end of the first movable ring (405) and the bottom end of the second movable ring (410), and a fixing groove matching the snap-fit block (406) is provided on the inner sides of the first flange (401) and the second flange (402), and the first flange (401) and the second flange (402) are snap-fitted and connected via the snap-fit block (406) and the snap-fit plate (407).
5. The automatic powder spraying explosion suppression device for gas pipeline transportation according to claim 1, Features: The support seat (601) is fixed on the top of the gas pipe body (5), the cover plate (603) and the support seat (601) are movably connected via a rotating seat (602), and the cover plate (603) and the magnetic plate (604) are magnetically fixed.
6. The automatic powder spraying explosion suppression device for gas pipeline transportation according to claim 1, Features: The number of the cover plates (603) is two, and the two cover plates (603) are fixedly connected via a threaded block (607) and a threaded ring (608), and the threaded ring (608) is movably connected to the threaded block (607) via threads.
7. The automatic powder spraying explosion suppression device for gas pipeline transportation according to claim 1, Features: The first protective cover (701), the second protective cover (702) and the gas pipe body (5) are fixedly connected via a mounting plate (703), bolts and a heat insulating pad (704), and the heat insulating pad (704) and the first protective cover (701) and the second protective cover (702) are fixedly connected via glue.
8. The automatic powder spraying explosion suppression device for gas pipeline transportation according to claim 1, Features: Both ends of the front ends of the first protective cover (701) and the second protective cover (702) are provided with mounting plates (708), and the first protective cover (701) and the second protective cover (702) are fixedly connected via the mounting plates (708) and bolts.
9. The automatic powder spraying explosion suppression device for gas pipeline transportation according to claim 1, Features: The heat sink (707) penetrates the outside of the first protective cover (701) and the second protective cover (702), and the heat conduction ring (705) is located on the outer wall of the connecting pipe (3).