Excess computing power scheduling method based on computer network

By building a redundant computing power scheduling system to process and match users' computing power scheduling requests, the resource utilization and security issues in computing power scheduling are solved, and the dynamic balance and optimization of computing power resources are achieved.

CN118733277AInactive Publication Date: 2024-10-01YANAN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410957044.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing computing power scheduling technology lacks effective processing of computing power requests, resulting in dynamic deviations between the computing power center's excess computing power and demand, affecting utilization, and creating security risks, such as illegal scheduling requests.

Method used

A redundant computing power dispatching system is built based on a computer network, including a client, a sending module, a receiving module, a processing unit, a computing power dispatching center, a management module, an encryption module, an update module, an alarm module, a matching module and a server unit. Through screening and identification , hierarchical and encrypted processing of users' computing power scheduling requests to achieve resource matching and safe scheduling.

Benefits of technology

It improves the utilization rate of computing power, enhances the security and operability of scheduling, and realizes the dynamic balance and optimization of redundant computing power resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118733277A_ABST
    Figure CN118733277A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of redundant computing power scheduling, in particular to a redundant computing power scheduling method based on a computer network, and the method comprises the following steps: 1, building a redundant computing power scheduling system, a redundant computing power scheduling platform, a redundant computing power scheduling model and a computing power scheduling evaluation model based on the computer network; step 2, a user inputs a scheduling request through a user side and sends the scheduling request to the redundant computing power scheduling platform to form a computing power scheduling request; step 3, the redundant computing power scheduling platform receives a computing power scheduling request sent by a user and processes the computing power scheduling request to form a computing power scheduling task; according to the method, the redundant computing power is dynamically balanced, the utilization rate of the redundant computing power is improved, redundant computing power scheduling is systematized and standardized, the operability of redundant computing power scheduling is higher, the safety of computing power scheduling is improved, redundant computing power scheduling is classified and graded, and redundant computing power scheduling is better optimized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of redundant computing power scheduling, and in particular to a redundant computing power scheduling method based on a computer network. Background Art

[0002] With the continuous improvement of economic level and the continuous advancement of science and technology, computer network technology has developed rapidly. Computer network refers to a computer system that connects multiple computers and their external devices with independent functions in different geographical locations through communication lines and communication equipment, and realizes resource sharing and information transmission under the management and coordination of network operating system, network management software and network communication protocol. Computing power is the ability of computer equipment or computing / data center to process information, and the ability of computer hardware and software to cooperate to execute certain computing requirements. Computing power scheduling can assist GPU in optimizing computing power resources and solve the constraints of insufficient GPU training resources for large models to a certain extent. Computing power scheduling is an inevitable trend in the new era of computing power construction.

[0003] At present, computing power scheduling sends scheduling requests to computing power servers through the user end. Computing power scheduling lacks processing of computing power requests, resulting in a dynamic deviation between excess computing power and computing power requirements of the computing power center, affecting computing power utilization. In addition, computing power scheduling has security risks, such as illegal computing power scheduling requests. In order to solve the above-mentioned problems, the present invention proposes a method for scheduling excess computing power based on computer networks. Summary of the invention

[0004] In view of the problems in the prior art, the present invention provides a method for scheduling redundant computing power based on a computer network.

[0005] The technical solution adopted by the present invention to solve the technical problem is: a method for scheduling excess computing power based on a computer network, the method for scheduling excess computing power comprising the following steps: Step 1: Based on the computer network, build a redundant computing power scheduling system, redundant computing power scheduling platform, redundant computing power scheduling model and computing power scheduling evaluation model; Step 2: The user inputs a scheduling request through the user terminal and sends the scheduling request to the excess computing power scheduling platform to form a computing power scheduling request; Step 3: The excess computing power scheduling platform receives the computing power scheduling request sent by the user, processes the computing power scheduling request, and forms a computing power scheduling task; Step 4: Based on the excess computing power scheduling model, the computing center resources are matched and scheduled for the current computing power scheduling task, and the current computing power request scheduling server is determined; Step 5: The server provides computing power services to users through encryption according to the scheduling of the excess computing power scheduling system; Step 6: Based on the computing power scheduling evaluation model, evaluate the redundant computing power scheduling system for the current computing power scheduling; The redundant computing power scheduling system includes a user end, a sending module, a receiving module, a processing unit, a computing power scheduling center, a management module, an encryption module, an update module, an alarm module, a matching module, a scheduling module, and a server unit; The processing unit includes a screening module, an identification module, a classification module and an encryption module; The excess computing power scheduling platform includes a user service layer, a business application layer, a computing power scheduling center, and an infrastructure layer.

[0006] Specifically, the output end of the user end is electrically connected to the input end of the receiving module through the sending module, the output end of the receiving module is electrically connected to the input end of the processing unit, the output end of the processing unit is electrically connected to the input end of the computing power scheduling center, the computing power scheduling center is electrically connected to the management module, the update module, and the alarm module, the output end of the computing power scheduling center is electrically connected to the input end of the matching module, the output end of the matching module is electrically connected to the input end of the scheduling module through the encryption module, and the output end of the scheduling module is electrically connected to the server unit; The user terminal provides local services for users and inputs computing power scheduling requests through the user terminal; the sending module is used to send the computing power scheduling requests input by the user through the user terminal to the excess computing power scheduling platform; the receiving module is used to receive the computing power scheduling requests sent by the user; the processing unit is used to process the computing power scheduling requests received by the excess computing power scheduling platform; the computing power scheduling center is used to provide computing power scheduling, and the management module is used to manage the computing power scheduling center; the encryption module is used to encrypt the scheduling of the computing power scheduling center; the update module is used to update the computing power scheduling center; the alarm module is used to alarm the abnormality of the computing power scheduling center; the matching module is used to match the computing power scheduling tasks of the computing power scheduling center; the scheduling module is used to schedule the computing power after the computing power scheduling tasks are matched; the server unit is used to provide computing power scheduling services.

[0007] Specifically, the user service layer includes computing power demanders, computing power providers, computing power operators, and computing power supervision and management parties; the business application layer includes integrated scheduling, computing power mall, smart hub, cloud-edge collaboration, AR / VR, scientific computing, AI recognition, and digital twins; the computing power scheduling center includes a computing power operation center, a computing power orchestration and scheduling center, and a computing power access management center; the infrastructure layer includes general computing power, supercomputing power, intelligent computing power, and edge computing power.

[0008] Specifically, the specific steps of processing the computing power scheduling request are as follows: S1. Determine that the user's computing power scheduling request is safe and remove unsafe user computing power scheduling requests; S2. Determine the category of the user's computing power scheduling request; S3. Determine the priority of the user's computing power scheduling request; S4. Encrypt the user computing power scheduling request according to the priority of the user computing power scheduling request.

[0009] Specifically, the input end of the screening module is electrically connected to the output end of the receiving module, the output end of the screening module is electrically connected to the input end of the identification module, the output end of the identification module is electrically connected to the input end of the grading module, and the output end of the grading module is electrically connected to the input end of the encryption module.

[0010] Specifically, the method for constructing the excess computing power scheduling model is as follows: S1. Collect and organize the historical data of excess computing power scheduling of the excess computing power scheduling system, and establish an excess computing power scheduling database; S2. Process the data in the excess computing power scheduling database to obtain target characteristic data of excess computing power scheduling; S3, determine the test set data and training set data; S4. Input the training set data into the model to build a redundant computing power scheduling model; S5. Input the test set data into the redundant computing power scheduling model to test the accuracy of the model.

[0011] Specifically, the excess computing power scheduling system also includes an evaluation module, which is used to evaluate the excess computing power and computing power demand of the excess computing power scheduling system.

[0012] Specifically, the server unit is composed of one or more computing power servers, and the computing power server includes one or more computing power networks and one or more control circuits.

[0013] Beneficial effects of the present invention: (1) The present invention provides a method for scheduling excess computing power based on a computer network. The present invention is based on an excess computing power scheduling system, an excess computing power scheduling platform and an excess computing power scheduling model to achieve excess computing power scheduling, achieve a dynamic balance of excess computing power, improve the utilization rate of excess computing power, systematize and standardize excess computing power scheduling, and make excess computing power scheduling more operable; (2) The present invention discloses a method for scheduling excess computing power based on a computer network. The present invention adopts computing power scheduling request processing to determine the security, category, and priority of the user's computing power scheduling request. According to the priority of the user's computing power scheduling request, the user's computing power scheduling request is encrypted to form a computing power scheduling task. The computing power scheduling center matches the computing power scheduling task with computing power scheduling, provides computing power services to users through encryption, increases the security of computing power scheduling, classifies and grades excess computing power scheduling, better optimizes excess computing power scheduling, and improves the excess computing power scheduling resource rate. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0015] Figure 1 A flowchart of a method for scheduling redundant computing power based on a computer network provided by the present invention; Figure 2 A schematic diagram of a redundant computing power scheduling system of a redundant computing power scheduling method based on a computer network provided by the present invention; Figure 3 A redundant computing power scheduling platform architecture diagram of a redundant computing power scheduling method based on a computer network provided by the present invention; Figure 4 A flowchart of a computing power scheduling request processing tool for a method for scheduling redundant computing power based on a computer network provided by the present invention; Figure 5 A flowchart for constructing a redundant computing power scheduling model for a redundant computing power scheduling method based on a computer network provided by the present invention. DETAILED DESCRIPTION

[0016] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0017] like Figure 1-Figure 5 As shown, a method for scheduling excess computing power based on a computer network of the present invention comprises the following steps: Step 1: Based on the computer network, build a redundant computing power scheduling system, redundant computing power scheduling platform, redundant computing power scheduling model and computing power scheduling evaluation model; Step 2: The user inputs a scheduling request through the user terminal and sends the scheduling request to the excess computing power scheduling platform to form a computing power scheduling request; Step 3: The excess computing power scheduling platform receives the computing power scheduling request sent by the user, processes the computing power scheduling request, and forms a computing power scheduling task; Step 4: Based on the excess computing power scheduling model, the computing center resources are matched and scheduled for the current computing power scheduling task, and the current computing power request scheduling server is determined; Step 5: The server provides computing power services to users through encryption according to the scheduling of the excess computing power scheduling system; Step 6: Based on the computing power scheduling evaluation model, evaluate the redundant computing power scheduling system for the current computing power scheduling; The redundant computing power scheduling system includes a user end, a sending module, a receiving module, a processing unit, a computing power scheduling center, a management module, an encryption module, an update module, an alarm module, a matching module, a scheduling module, and a server unit; The processing unit includes a screening module, an identification module, a classification module and an encryption module; The excess computing power scheduling platform includes a user service layer, a business application layer, a computing power scheduling center, and an infrastructure layer.

[0018] Specifically, the output end of the user end is electrically connected to the input end of the receiving module through the sending module, the output end of the receiving module is electrically connected to the input end of the processing unit, the output end of the processing unit is electrically connected to the input end of the computing power scheduling center, the computing power scheduling center is electrically connected to the management module, the update module, and the alarm module, the output end of the computing power scheduling center is electrically connected to the input end of the matching module, the output end of the matching module is electrically connected to the input end of the scheduling module through the encryption module, and the output end of the scheduling module is electrically connected to the server unit; The user terminal provides local services for users and inputs computing power scheduling requests through the user terminal; the sending module is used to send the computing power scheduling requests input by the user through the user terminal to the excess computing power scheduling platform; the receiving module is used to receive the computing power scheduling requests sent by the user; the processing unit is used to process the computing power scheduling requests received by the excess computing power scheduling platform; the computing power scheduling center is used to provide computing power scheduling, and the management module is used to manage the computing power scheduling center; the encryption module is used to encrypt the scheduling of the computing power scheduling center; the update module is used to update the computing power scheduling center; the alarm module is used to alarm the abnormality of the computing power scheduling center; the matching module is used to match the computing power scheduling tasks of the computing power scheduling center; the scheduling module is used to schedule the computing power after the computing power scheduling tasks are matched; the server unit is used to provide computing power scheduling services.

[0019] Specifically, the user service layer includes computing power demanders, computing power providers, computing power operators, and computing power supervisors; the business application layer includes integrated scheduling, computing power mall, smart hub, cloud-edge collaboration, AR / VR, scientific computing, AI recognition, and digital twins; the computing power scheduling center includes computing power operation center, computing power orchestration scheduling center, and computing power access management center; the infrastructure layer includes general computing power, supercomputing computing power, intelligent computing power, and edge computing power; The computing power dispatching center provides operation and maintenance management, technical specifications, computing power access standards and security protection. The computing power operation center is used for a one-stop computing power resource application, use and service platform to enable efficient circulation of computing power resources, service catalog, resource application, delivery after-sales and scheduling matching. The computing power operation center includes computing power trading, computing power supply, supply and demand scheduling and computing power billing; The computing power orchestration and scheduling center is used to assist the intelligent hub in unified perception, orchestration and scheduling, underlying computing power resources, computing power perception, computing power strategy, computing power orchestration and computing power scheduling. The computing power orchestration and scheduling center includes a task center, a management center, a resource center and a monitoring center. The computing power access management center is used to shield the complexity of the underlying cloud resource pool, unify access to heterogeneous computing power nodes, cloud management, cloud monitoring, cloud access and cloud operation and maintenance. The computing power access management center includes general computing power, edge computing power, supercomputing power and intelligent computing power.

[0020] Specifically, the specific steps of processing the computing power scheduling request are as follows: S1. Determine that the user's computing power scheduling request is safe and remove unsafe user computing power scheduling requests; S2. Determine the category of the user's computing power scheduling request; S3. Determine the priority of the user's computing power scheduling request; S4. Encrypt the user computing power scheduling request according to the priority of the user computing power scheduling request.

[0021] Specifically, the input end of the screening module is electrically connected to the output end of the receiving module, the output end of the screening module is electrically connected to the input end of the identification module, the output end of the identification module is electrically connected to the input end of the grading module, and the output end of the grading module is electrically connected to the input end of the encryption module.

[0022] Specifically, the method for constructing the excess computing power scheduling model is as follows: S1. Collect and organize the historical data of excess computing power scheduling of the excess computing power scheduling system, and establish an excess computing power scheduling database; S2. Process the data in the excess computing power scheduling database to obtain target characteristic data of excess computing power scheduling; S3, determine the test set data and training set data; S4. Input the training set data into the model to build a redundant computing power scheduling model; S5. Input the test set data into the redundant computing power scheduling model to test the accuracy of the model.

[0023] Specifically, the excess computing power scheduling system also includes an evaluation module, which is used to evaluate the excess computing power and computing power demand of the excess computing power scheduling system.

[0024] Specifically, the server unit is composed of one or more computing power servers, and the computing power server includes one or more computing power networks and one or more control circuits.

[0025] When in use, based on the computer network, a redundant computing power scheduling system, redundant computing power scheduling platform, redundant computing power scheduling model and computing power scheduling evaluation model are constructed. The user inputs the scheduling request through the user terminal, sends the scheduling request to the redundant computing power scheduling platform, and forms a computing power scheduling request. The redundant computing power scheduling platform accepts the computing power scheduling request sent by the user, processes the computing power scheduling request, and forms a computing power scheduling task. Based on the redundant computing power scheduling model, the computing power center resources are matched and scheduled for the current computing power scheduling task, and the current computing power request scheduling server is determined. The server provides computing power services to the user through encryption according to the scheduling of the redundant computing power scheduling system. Based on the computing power scheduling evaluation model, the redundant computing power scheduling system is evaluated for the current computing power scheduling. The user end provides local services for users and inputs computing power scheduling requests through the user end. The sending module sends the computing power scheduling requests input by the user through the user end to the redundant computing power scheduling platform. The receiving module receives the computing power scheduling requests sent by the user. The screening module of the processing unit determines that the user's computing power scheduling request is safe and removes unsafe user computing power scheduling requests. The identification module determines the category of the user's computing power scheduling request. The classification module determines the priority of the user's computing power scheduling request. The encryption module encrypts the user's computing power scheduling request according to the priority of the user's computing power scheduling request, processes the computing power scheduling request received by the redundant computing power scheduling platform, and forms a computing power scheduling task. Then, according to the classification and priority of the computing power scheduling task, the matching module matches the computing power scheduling task with the computing power scheduling center. After the computing power scheduling task is matched, the encryption module encrypts the computing power scheduling center's scheduling. The scheduling module matches the encrypted computing power scheduling with the computing power scheduling task, and the server provides computing power services according to the computing power scheduling.

[0026] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of the present invention is defined by the attached claims and their equivalents.

Claims

1. A method for scheduling redundant computing power based on a computer network, characterized in that: The redundant computing power scheduling method comprises the following steps: Step 1: Based on the computer network, build a redundant computing power scheduling system, redundant computing power scheduling platform, redundant computing power scheduling model and computing power scheduling evaluation model; Step 2: The user inputs a scheduling request through the user terminal and sends the scheduling request to the excess computing power scheduling platform to form a computing power scheduling request; Step 3: The excess computing power scheduling platform receives the computing power scheduling request sent by the user, processes the computing power scheduling request, and forms a computing power scheduling task; Step 4: Based on the excess computing power scheduling model, the computing center resources are matched and scheduled for the current computing power scheduling task, and the current computing power request scheduling server is determined; Step 5: The server provides computing power services to users through encryption according to the scheduling of the excess computing power scheduling system; Step 6: Based on the computing power scheduling evaluation model, evaluate the redundant computing power scheduling system for the current computing power scheduling; The redundant computing power scheduling system includes a user end, a sending module, a receiving module, a processing unit, a computing power scheduling center, a management module, an encryption module, an update module, an alarm module, a matching module, a scheduling module, and a server unit; The processing unit includes a screening module, an identification module, a classification module and an encryption module; The excess computing power scheduling platform includes a user service layer, a business application layer, a computing power scheduling center, and an infrastructure layer.

2. The method for scheduling redundant computing power based on a computer network according to claim 1, characterized in that: The output end of the user end is electrically connected to the input end of the receiving module through the sending module, the output end of the receiving module is electrically connected to the input end of the processing unit, the output end of the processing unit is electrically connected to the input end of the computing power scheduling center, the computing power scheduling center is electrically connected to the management module, the update module, and the alarm module, the output end of the computing power scheduling center is electrically connected to the input end of the matching module, the output end of the matching module is electrically connected to the input end of the scheduling module through the encryption module, and the output end of the scheduling module is electrically connected to the server unit; The user terminal provides local services for users and inputs computing power scheduling requests through the user terminal; the sending module is used to send the computing power scheduling requests input by the user through the user terminal to the excess computing power scheduling platform; the receiving module is used to receive the computing power scheduling requests sent by the user; the processing unit is used to process the computing power scheduling requests received by the excess computing power scheduling platform; the computing power scheduling center is used to provide computing power scheduling, and the management module is used to manage the computing power scheduling center; the encryption module is used to encrypt the scheduling of the computing power scheduling center; the update module is used to update the computing power scheduling center; the alarm module is used to alarm the abnormality of the computing power scheduling center; the matching module is used to match the computing power scheduling tasks of the computing power scheduling center; the scheduling module is used to schedule the computing power after the computing power scheduling tasks are matched; the server unit is used to provide computing power scheduling services.

3. The method for scheduling redundant computing power based on a computer network according to claim 1, characterized in that: The user service layer includes computing power demanders, computing power providers, computing power operators, and computing power supervision and management parties; the business application layer includes integrated scheduling, computing power mall, smart hub, cloud-edge collaboration, AR / VR, scientific computing, AI recognition, and digital twins; the computing power scheduling center includes a computing power operation center, a computing power orchestration and scheduling center, and a computing power access management center; the infrastructure layer includes general computing power, supercomputing power, intelligent computing power, and edge computing power.

4. The method for scheduling redundant computing power based on a computer network according to claim 1, characterized in that: The specific steps of processing the computing power scheduling request are as follows: S1. Determine that the user's computing power scheduling request is safe and remove unsafe user computing power scheduling requests; S2. Determine the category of the user's computing power scheduling request; S3. Determine the priority of the user's computing power scheduling request; S4. Encrypt the user computing power scheduling request according to the priority of the user computing power scheduling request.

5. The method for scheduling redundant computing power based on a computer network according to claim 1, characterized in that: The input end of the screening module is electrically connected to the output end of the receiving module, the output end of the screening module is electrically connected to the input end of the identification module, the output end of the identification module is electrically connected to the input end of the classification module, and the output end of the classification module is electrically connected to the input end of the encryption module.

6. The method for scheduling redundant computing power based on a computer network according to claim 1, characterized in that: The method for constructing the redundant computing power scheduling model is as follows: S1. Collect and organize the historical data of excess computing power scheduling of the excess computing power scheduling system, and establish an excess computing power scheduling database; S2. Process the data in the excess computing power scheduling database to obtain target characteristic data of excess computing power scheduling; S3, determine the test set data and training set data; S4. Input the training set data into the model to build a redundant computing power scheduling model; S5. Input the test set data into the redundant computing power scheduling model to test the accuracy of the model.

7. The method for scheduling redundant computing power based on a computer network according to claim 1, characterized in that: The excess computing power scheduling system also includes an evaluation module, which is used to evaluate the excess computing power and computing power demand of the excess computing power scheduling system.

8. The method for scheduling redundant computing power based on a computer network according to claim 1, characterized in that: The server unit is composed of one or more computing power servers, and the computing power servers include one or more computing power networks and one or more control circuits.