Construction site cable construction laying process

By designing a cable supporter including a U-shaped bracket, a support piece and an elastic column at the construction site, the problem that the existing cable support frame is easy to roll over is solved, and stable support of the cable and safety of the construction site are achieved. promote.

CN118739166APending Publication Date: 2024-10-01CHINA WATER CONSERVANCY & HYDROPOWER NO 9 ENG BUREAU CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410936147.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

When the existing cable support frame is shaken at the construction site due to the long cable length, it is easy to roll over, causing the U-shaped support frame to be unstable.

Method used

A construction site cable supporter is designed, which includes a U-shaped bracket, a support piece, an angle frame and an elastic column. It is fixedly installed on the mounting plate at the lower part of the angle frame through the support piece. The elastic damping force of the elastic column is used to offset the shaking inertial force. , to ensure that the cable is not easy to roll over.

Benefits of technology

It effectively avoids the problem of the cable rolling over with the U-shaped bracket on the top of the tripod, improves the stable support of the cable, and enhances the safety of the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118739166A_ABST
    Figure CN118739166A_ABST
Patent Text Reader

Abstract

The invention discloses a construction site cable construction laying process. The construction site cable construction laying process comprises the construction process of obtaining rollover-preventing stable support on a support device of a construction site cable. The construction process specifically comprises the steps that a cable is supported on a temporary hardening road on the side edge of the protective fence through a support device of the cable on the construction site, the cable is set off and supported in a U-shaped support, an elastic column is correspondingly hooked on a mounting plate and the protective fence through a hook A and a hook B, and the cable is stably supported to avoid rollover. When the U-shaped support shakes to generate large inertia force, the U-shaped support is fixedly mounted on the mounting plate at the lower part of the corner bracket through the supporting piece, so that the shaking inertia force is not easy to roll over relative to the supporting angle through the mounting plate at the lower part of the corner bracket, and the problem that the shaking cable is easy to roll over at the top of the triangular bracket with the U-shaped support is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a cable laying process at a construction site and belongs to the technical field of building construction. Background Art

[0002] During foundation construction, it is necessary to temporarily set up cables (electric cables or communication cables) in the construction site. To avoid damage caused by contact and friction between the cables and sharp debris such as gravel and nails in the foundation, the cables need to be supported at intervals on the temporary hardened road on the side of the guardrail through support frames.

[0003] The existing support frame for supporting cables at intervals is shown in Chinese patent publication number CN213027237U. Although there is a U-shaped bracket on the tripod to support the cables, the U-shaped bracket is connected to the top of the tripod. In order to flexibly adjust the tripod to support the cables, the bottom of the tripod is not fixed. When the long cable shakes, the inertia force is large, and there is a problem that the shaking cable is prone to tipping over with the U-shaped bracket on the top of the tripod. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a construction site cable laying process.

[0005] The present invention is achieved through the following technical solutions.

[0006] The present invention provides a construction site cable laying process, comprising: a construction process of achieving stable support for the cable on a cable supporter at the construction site to avoid rollover.

[0007] The construction process is specifically as follows: the cable is supported by a cable support at the construction site on a temporary hardened road on the side of the guardrail, the cable is supported in a U-shaped support, and the elastic column is hooked on the mounting plate and the guardrail through hooks A and hooks B respectively, so that the cable obtains stable support to prevent rollover.

[0008] The supporter of the construction site cable comprises:

[0009] U-shaped bracket;

[0010] Supporting parts, which are fixedly installed with the bottom of the U-shaped support;

[0011] An angle bracket is provided for fixing the bottom of the support member, and the support member is fixedly installed at the bottom of the angle bracket.

[0012] The angle bracket comprises a supporting angle and a mounting plate installed at the lower part of the supporting angle, and a supporting member supporting the U-shaped bracket is fixedly installed on the mounting plate at the lower part of the angle bracket.

[0013] There are four supporting angles, and the supporting angles are fixedly connected to the four corners of the mounting plate from outside to inside to form a corner frame, and the mounting plate is fixedly mounted on the lower part of the supporting angle of the corner frame.

[0014] The support angle is a cone that is small at the top and large at the bottom. The support angle of the cone is recessed downward from the top surface to form a receiving space for receiving water or sand.

[0015] The mounting plate is provided with a hook through hole, a hook A is hooked in the hook through hole, an elastic column is fixed to the hook A, a hook B is fixed to the elastic column, and the hook B is hooked on the guardrail.

[0016] The elastic columns are made of elastic rubber, and are two parallel and spaced apart.

[0017] The beneficial effect of the present invention is that when the cable shakes on the U-shaped bracket and generates a large inertial force, since the U-shaped bracket is fixedly mounted on the mounting plate at the bottom of the angle bracket through a support, the shaking inertial force is not easy to cause tipping over through the mounting plate at the bottom of the angle bracket relative to the supporting angle, thereby solving the problem that the shaking cable is prone to tipping over with the U-shaped bracket on the top of the tripod. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the structure of the support device of the present invention when it is in use;

[0019] Figure 2 It is a schematic diagram of the structure of the present invention;

[0020] In the figure: 1-U-shaped bracket; 2-support member; 3-angle bracket; 31-support angle; 32-mounting plate; 33-accommodating space; 34-angle plate; 35-hook through hole; 36-hook A; 37-elastic column; 38-hook B; 11-cable; 12-guardrail; 13-foundation; 4-temporary hardened road. DETAILED DESCRIPTION

[0021] The technical solution of the present invention is further described below, but the scope of protection claimed is not limited to the description.

[0022] like Figure 1 to Figure 2 shown.

[0023] A support device for cables at a construction site of the present application comprises:

[0024] The U-shaped support 1 for supporting the supporting cable 11 has a retractable support member 2 installed at the bottom thereof, and the support member 2 may be a hydraulic retractable member or a threaded rod retractable member, etc. The U-shaped support 1 for supporting the supporting cable 11 is adjusted in height by the retraction of the support member 2.

[0025] It also includes an angle bracket 3 for fixing the bottom of the support member 2, the angle bracket 3 includes three or four support angles 31 and a mounting plate 32 installed at the bottom of the support angles 31, the support angles 31 are fixedly connected to the four corners of the mounting plate 32 from the outside to the inside to form the angle bracket 3, the mounting plate 32 is installed at the bottom of the support angle 31, the support member 2 supporting the U-shaped bracket 1 is welded or threadedly fixed to the mounting plate 32 at the bottom of the angle bracket 3, which lowers the height of the cable 11 shaking inertia force relative to the angle plate 34 contacting the temporary hardened road 4.

[0026] When the cable 11 shakes and generates a large inertial force on the U-shaped bracket 1, since the U-shaped bracket 1 is fixedly mounted on the mounting plate 32 at the bottom of the angle bracket 3 through the support member 2, the shaking inertial force is not easy to pass through the mounting plate 32 at the bottom of the angle bracket 3 to cause tipping relative to the supporting angle 31, thereby solving the problem that the shaking cable is prone to tipping over with the U-shaped bracket on the top of the tripod.

[0027] The supporting angle 31 is a cone that is small at the top and large at the bottom. The supporting angle 31 of the cone is recessed downward from the top surface to form a receiving space 33 for receiving water or sand. Water or sand is put into the receiving space 33. Since the supporting angle 31 is a cone that is small at the top and large at the bottom, the water or sand can further pull the center of gravity of the angle frame 3 downward, ensuring that the U-shaped support 1 on the upper part of the angle frame 3 supports the cable 11, which is less likely to tip over.

[0028] The bottom of the support angle 31 is provided with an angle plate 34 , and the angle plate 34 is provided with a mounting through hole for bolts to penetrate and fix on the temporary hardened road 4 .

[0029] The mounting plate 32 is provided with a hook through hole 35, in which a hook A36 is hooked, and an elastic column 37 is welded and wrapped to fix the hook A36, and a hook B38 is welded and wrapped to fix the elastic column 37, and the hook B38 is hooked on the guardrail 12. The elastic column 37 is made of elastic rubber, and there are two elastic columns 37 distributed in parallel and at intervals. When the cable 11 with the U-shaped bracket 1 shakes, the shaking inertial force is transmitted to the mounting plate 32 through the support member 2, and the elastic column 37 is elastically deformed to generate an elastic damping force to offset the shaking, further improving the stability of the angle bracket 3 supporting the cable 11 on the U-shaped bracket 1.

[0030] A construction site cable laying process of the present application includes the following construction process:

[0031] A temporary hardened road 4 is formed by pouring and solidifying concrete on the side of the foundation 13, and a guardrail 12 is fixed in an upright state on the side of the temporary hardened road 4 close to the inner side of the foundation 13. The cable 11 is then supported by a cable supporter at the construction site on the temporary hardened road 4 on the side of the guardrail 12. The elastic column 37 is hooked on the mounting plate 32 and the guardrail 12 through hooks A36 and B38 respectively, so as to achieve stable support of the cable 11 on the cable supporter at the construction site to avoid rollover.

Claims

1. A construction site cable laying process, characterized in that: The construction process is realized in which the cable (11) is provided with a stable support on the cable supporter at the construction site to avoid rollover.

2. The construction site cable laying process according to claim 1, characterized in that: The construction process specifically comprises: supporting the cable (11) on the temporary hardened road (4) on the side of the guardrail (12) by means of a cable support at the construction site, the cable (11) being supported in the U-shaped support (1), and the elastic column (37) being hooked on the mounting plate (32) and the guardrail (12) by means of a hook A (36) and a hook B (38) respectively, so that the cable (11) obtains stable support to prevent rollover.

3. The construction site cable laying process according to claim 1 or 2, characterized in that: The supporter of the construction site cable comprises: U-shaped support (1); A support member (2), the support member (2) is fixedly mounted on the bottom of the U-shaped support (1); A corner bracket (3) is fixedly mounted on the bottom of the support member (2), and the support member (2) is fixedly mounted on the lower part of the corner bracket (3).

4. The construction site cable laying process as claimed in claim 3, characterized in that: The angle bracket (3) comprises a supporting angle (31) and a mounting plate (32) mounted at the bottom of the supporting angle (31); a supporting member (2) supporting the U-shaped bracket (1) is fixedly mounted on the mounting plate (32) at the bottom of the angle bracket (3).

5. The construction site cable laying process as claimed in claim 4, characterized in that: There are four supporting angles (31), and the supporting angles (31) are fixedly connected to the four corners of the mounting plate (32) from the outside to the inside to form a corner frame (3), and the mounting plate (32) is fixedly mounted on the lower part of the supporting angles (31) of the corner frame (3).

6. The construction site cable laying process as claimed in claim 5, characterized in that: The support angle (31) is a cone that is small at the top and large at the bottom. The support angle (31) of the cone is recessed downward from the top surface to form a receiving space (33) for receiving water or sand.

7. The construction site cable laying process as claimed in claim 4, characterized in that: The mounting plate (32) is provided with a hook through hole (35), a hook A (36) is hooked in the hook through hole (35), an elastic column (37) is fixed to the hook A (36), a hook B (38) is fixed to the elastic column (37), and the hook B (38) is hooked on the guardrail (12).

8. The construction site cable laying process as claimed in claim 7, characterized in that: The elastic columns (37) are made of elastic rubber, and the elastic columns (37) consist of two columns that are parallel and spaced apart.