Double-layer vacuum cold insulation cold box sleeving process

By using the backing plate, saddle and roller frame in the production process of the double-layer vacuum cold box, combined with infrared level and argon arc welding technology, horizontal assembly and precise welding are achieved, solving the high cost and high cost in the existing technology. High risk and inefficiency issues while improving safety and productivity.

CN118744267APending Publication Date: 2024-10-08ZHUHAI GONGTONG MECHANICAL EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410920740.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

The existing production process of double-layer vacuum insulated cold boxes requires the erection of scaffolding and safety nets, which increases costs and safety risks. Moreover, production cannot be carried out in windy and rainy weather, and welding is difficult, auxiliary materials are wasted, and efficiency is low.

Method used

The backing plate, saddle and roller frame are set up, and an infrared level is used for precise positioning and welding. The outer cylinder assembly and the inner cylinder assembly are arranged horizontally, and the docking and welding are carried out by moving the vehicle, reducing the dependence on hoisting equipment and high-altitude operations. , using argon arc welding segmented welding method.

Benefits of technology

It reduces equipment, management and material costs, improves safety and production efficiency, avoids the influence of weather factors, improves product coaxiality and production accuracy, and reduces production difficulty and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118744267A_ABST
    Figure CN118744267A_ABST
Patent Text Reader

Abstract

The invention discloses a double-layer vacuum cold insulation cold box sleeving process which comprises the steps of setting a base plate, setting a saddle and a roller frame, positioning an outer cylinder assembly, an inner cylinder assembly and a skirt, butting the inner cylinder assembly and the skirt, welding the inner cylinder assembly and the skirt and detecting the air tightness of the inner cylinder assembly. Butt joint of the outer cylinder assembly and the skirt; welding of the outer cylinder assembly, the inner cylinder assembly and the skirt; and airtightness detection of the outer cylinder assembly. The outer cylinder assembly and the inner cylinder assembly are both arranged in a horizontal mode, the outer cylinder assembly and the inner cylinder assembly do not need to be vertically hoisted through large hoisting equipment, safety facilities such as scaffolds and safety nets do not need to be erected, and the cost of equipment and materials and the management cost of the equipment and the materials are reduced; the manufacturing of the vacuum cold-insulation cold box can be completed in a plant, the influence of weather factors on the manufacturing of the vacuum cold-insulation cold box is avoided, workers do not need to work high above the ground, the safety is high, and the product precision, quality and production efficiency are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pressure equipment, and in particular to a double-layer vacuum cold-insulation cold box package process. Background Art

[0002] The double-layer vacuum cold box is set upright on the skirt (skid). The double-layer vacuum cold box has an inner tube assembly and an outer tube assembly. The current manufacturing process is to first install the inner tube assembly upright on the skirt, then lift the outer tube assembly to the top of the inner tube assembly, and then put the outer tube assembly on the inner tube assembly from top to bottom to form a double-layer vacuum cold box. This method requires the construction of safety facilities such as scaffolding and safety nets, which increases the production cost; the production environment is uncontrollable. In case of windy and rainy weather, production cannot be carried out, which increases management costs; and the use of large lifting equipment has a high safety risk. For the safety of the equipment, additional management costs need to be added; this method is difficult to weld, which not only wastes auxiliary materials, but also increases production costs. In summary, this manufacturing process requires high equipment, management and material costs, a high risk factor, low efficiency and high processing difficulty. Summary of the invention

[0003] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention proposes a double-layer vacuum cold box package process, which can reduce equipment, management and material costs, improve efficiency and improve safety.

[0004] A double-layer vacuum cold-insulation cold box set process according to an embodiment of the present invention includes the steps of setting a pad, setting a saddle and a roller frame, positioning an outer cylinder assembly, an inner cylinder assembly and a skirt seat, docking the inner cylinder assembly and the skirt seat, welding the inner cylinder assembly and the skirt seat, testing the air tightness of the inner cylinder assembly, docking the outer cylinder assembly and the skirt seat, welding the outer cylinder assembly, the inner cylinder assembly and the skirt seat, and testing the air tightness of the outer cylinder assembly.

[0005] Setting of the pad: Setting the pad horizontally, and drawing a center line on the pad, the center line being in the left-right direction;

[0006] Setting of saddles and roller frames: multiple first saddles, multiple second saddles and roller frames are distributed from left to right on the center line of the pad, the first saddle is used to support the outer cylinder assembly, the second saddle is used to support the inner cylinder assembly, and the roller frame is used to support the skirt seat, the height of the first saddle and the second saddle is adjusted, and the height and horizontal position of the first saddle, the second saddle and the roller frame are measured by an infrared level meter, and it is calculated whether all the first saddles, the second saddles and the roller frame are in the same straight line;

[0007] Positioning of the outer cylinder assembly, the inner cylinder assembly and the skirt seat: respectively placing the outer cylinder assembly, the inner cylinder assembly and the skirt seat flat on the first saddles, the second saddles and the roller frame, and using the infrared level to measure the horizontal positions of the outer cylinder assembly, the inner cylinder assembly and the skirt seat and calculate the coaxiality of the outer cylinder assembly, the inner cylinder assembly and the skirt seat;

[0008] Docking of the inner cylinder assembly and the skirt seat: using a crane to hoist the inner cylinder assembly horizontally, and moving the inner cylinder assembly from left to right until the bottom plate of the inner cylinder assembly is attached to the skirt seat, during which the inner cylinder assembly is kept attached to the plurality of second saddles, and the second saddles that will interfere with the inner cylinder assembly are removed;

[0009] Welding of the inner cylinder assembly and the skirt: welding the inner cylinder assembly and the skirt at the connection between the inner cylinder assembly and the skirt;

[0010] Inner cylinder assembly air tightness test: perform air tightness test on the inner cylinder assembly;

[0011] Docking of the outer cylinder assembly and the skirt seat: the outer cylinder assembly is hoisted horizontally by a crane, and the outer cylinder assembly is moved from left to right, and the outer cylinder assembly is sleeved on the inner cylinder assembly until the outer cylinder assembly is attached to the skirt seat. During this process, the outer cylinder assembly is kept attached to the plurality of the first saddles, and the first saddle and the second saddle that interfere with the outer cylinder assembly are removed, and the pad plate is provided with a plurality of the first saddles in the installation area corresponding to the second saddle, so that the outer cylinder assembly can be attached to the plurality of the first saddles provided on the second saddle installation area at the same time;

[0012] Welding of the outer cylinder assembly, the inner cylinder assembly and the skirt: welding the outer cylinder assembly and the skirt at the connection between the outer cylinder assembly and the skirt, and welding the outer cylinder assembly and the inner cylinder assembly at the connection between the outer cylinder assembly and the inner cylinder assembly;

[0013] Air tightness test of outer cylinder assembly: an interlayer is formed between the outer cylinder assembly and the inner cylinder assembly, and the interlayer is tested for air tightness.

[0014] At least the following beneficial effects are achieved:

[0015] The outer cylinder assembly and the inner cylinder assembly are both arranged horizontally, and the outer cylinder assembly and the inner cylinder assembly are moved in the left and right directions by a crane. There is no need for large-scale lifting equipment to lift the outer cylinder assembly and the inner cylinder assembly upright, and there is no need to set up safety facilities such as scaffolding and safety nets, thereby reducing the cost of equipment and materials as well as their management costs; there is no high-altitude equipment, so the production of the vacuum cold-insulation cold box can be completed in the factory, avoiding the influence of weather factors on the production of the vacuum cold-insulation cold box; there is no high-altitude equipment, there is no need to lift the outer cylinder assembly and the inner cylinder assembly high, and there is no need for workers to work at high altitudes, so the safety is high; compared with the upright lifting of the inner cylinder assembly and the outer cylinder assembly, the first saddle, the second saddle and the roller frame respectively support the outer cylinder assembly, the inner cylinder assembly and the skirt seat, which is convenient for realizing the precise adjustment, docking and welding of the outer cylinder assembly, the inner cylinder assembly and the skirt seat, improving the coaxiality of the outer cylinder assembly, the inner cylinder assembly and the skirt seat as well as the product manufacturing accuracy and quality, reducing the difficulty of manufacturing, and improving production efficiency.

[0016] According to some embodiments of the present invention, after the docking step of the inner cylinder assembly and the skirt and the welding step of the inner cylinder assembly and the skirt, the infrared level is used to measure the horizontal positions of the inner cylinder assembly and the skirt, and then the coaxiality of the inner cylinder assembly and the skirt is calculated; after the docking step of the outer cylinder assembly and the skirt and the welding step of the outer cylinder assembly, the inner cylinder assembly and the skirt, the infrared level is used to measure the horizontal position of the outer cylinder assembly, and then the coaxiality of the outer cylinder assembly, the inner cylinder assembly and the skirt is calculated.

[0017] According to some embodiments of the present invention, after the welding step of the inner cylinder assembly and the skirt, the temperature of the inner cylinder assembly, the skirt and the weld is lowered to the ambient temperature, and then the infrared level meter is used to measure the horizontal positions of the inner cylinder assembly and the skirt. After the welding step of the outer cylinder assembly, the inner cylinder assembly and the skirt, the temperature of the outer cylinder assembly, the inner cylinder assembly, the skirt and the weld is lowered to the ambient temperature, and then the infrared level meter is used to measure the horizontal position of the outer cylinder assembly.

[0018] According to some embodiments of the present invention, after the air tightness test of the inner cylinder assembly is qualified, before the step of docking the outer cylinder assembly and the skirt, several layers of composite paper film are coated on the inner cylinder assembly.

[0019] According to some embodiments of the present invention, before the step of docking the outer cylinder assembly and the skirt, a plurality of pairs of support rods are provided on the outer cylinder assembly, wherein a pair of the support rods comprises two support rods with identical structures, the two support rods of a pair of the support rods extend into the outer cylinder assembly and can rest against the inner cylinder assembly, and the two support rods of a pair of the support rods are symmetrically arranged with the central axis of the outer cylinder assembly as the center of symmetry.

[0020] According to some embodiments of the present invention, when the first saddle, the second saddle, the roller frame, the outer cylinder assembly, the inner cylinder assembly and the skirt are offset in horizontal position, a pry bar and a wedge are used to perform fine adjustment of the horizontal position.

[0021] According to some embodiments of the present invention, the pad is a steel plate with a thickness greater than or equal to 20 mm, and the crane and the roller frame are both 50T grade.

[0022] According to some embodiments of the present invention, the welding steps of the inner cylinder assembly and the skirt seat and the welding steps of the outer cylinder assembly, the inner cylinder assembly and the skirt seat all adopt argon arc welding, and the argon arc welding adopts segmented symmetry and multi-pass low-current welding.

[0023] According to some embodiments of the present invention, the welding parameters of the argon arc welding are welding current 85A-95A, argon gas flow rate 11L / min-12L / min, and welding speed 90mm / min-100mm / min.

[0024] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The present invention will be further described below with reference to the accompanying drawings and embodiments, wherein:

[0026] Figure 1 This is a schematic structural diagram of a double-layer vacuum cold storage box according to an embodiment of the present invention;

[0027] Figure Number:

[0028] The backing plate 100 ; the first saddle 200 ; the roller frame 300 ; the outer cylinder assembly 400 ; the inner cylinder assembly 500 ; the skirt 600 ; and the support rod 700 . DETAILED DESCRIPTION

[0029] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0030] In the description of the present invention, it should be understood that descriptions involving orientations, such as up, down, front, back, left, right, etc., and orientations or positional relationships indicated are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0031] In the description of the present invention, "a plurality" means more than two. If there is a description of "first" or "second", it is only used for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0032] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.

[0033] See also Figure 1 The present invention discloses a double-layer vacuum cold-insulation cold box set process, including the steps of setting a pad, setting a saddle and a roller frame, positioning an outer cylinder assembly, an inner cylinder assembly and a skirt seat, docking the inner cylinder assembly and the skirt seat, welding the inner cylinder assembly and the skirt seat, detecting the air tightness of the inner cylinder assembly, docking the outer cylinder assembly and the skirt seat, welding the outer cylinder assembly, the inner cylinder assembly and the skirt seat, and detecting the air tightness of the outer cylinder assembly.

[0034] Setting of the pad: Set the pad 100 horizontally, draw a center line on the pad 100, and the center line is in the left and right direction;

[0035] Setting of saddles and roller racks: multiple first saddles 200, multiple second saddles and roller racks 300 are distributed from left to right on the center line of the pad 100, the first saddle 200 is used to support the outer cylinder assembly 400, the second saddle is used to support the inner cylinder assembly 500, and the roller rack 300 is used to support the skirt 600, the height of the first saddle 200 and the second saddle is adjusted, and the height and horizontal position of the first saddle 200, the second saddle and the roller rack 300 are measured by an infrared level meter, and it is calculated whether all the first saddles 200, the second saddles and the roller rack 300 are in the same straight line;

[0036] Positioning of the outer cylinder assembly, the inner cylinder assembly and the skirt seat: the outer cylinder assembly 400, the inner cylinder assembly 500 and the skirt seat 600 are respectively placed flat on the first saddles 200, the second saddles and the roller frame 300, and the horizontal positions of the outer cylinder assembly 400, the inner cylinder assembly 500 and the skirt seat 600 are measured by using an infrared level meter, and the coaxiality of the outer cylinder assembly 400, the inner cylinder assembly 500 and the skirt seat 600 is calculated;

[0037] Docking of the inner cylinder assembly and the skirt seat: Use a crane to hoist the inner cylinder assembly 500 horizontally, and move the inner cylinder assembly 500 from left to right until the bottom plate of the inner cylinder assembly 500 is attached to the skirt seat 600. During this process, keep the inner cylinder assembly 500 attached to the multiple second saddles, and remove the second saddles that will interfere with the inner cylinder assembly 500;

[0038] Welding of the inner cylinder assembly and the skirt seat: Weld the inner cylinder assembly 500 and the skirt seat 600 at the connection between the inner cylinder assembly 500 and the skirt seat 600;

[0039] Inner cylinder assembly air tightness test: perform air tightness test on the inner cylinder assembly 500;

[0040] Docking of the outer cylinder assembly and the skirt seat: Use a crane to hoist the outer cylinder assembly 400 horizontally, move the outer cylinder assembly 400 from left to right, and sleeve the outer cylinder assembly 400 on the inner cylinder assembly 500 until the outer cylinder assembly 400 fits on the skirt seat 600. During this process, keep the outer cylinder assembly 400 fit on the multiple first saddles 200, remove the first saddle 200 and the second saddle that will interfere with the outer cylinder assembly 400, and set the multiple first saddles 200 in the mounting area corresponding to the second saddle on the backing plate 100, so that the outer cylinder assembly 400 can fit on the multiple first saddles 200 provided on the second saddle mounting area at the same time;

[0041] Welding of the outer cylinder assembly, the inner cylinder assembly and the skirt: the outer cylinder assembly 400 and the skirt 600 are welded at the connection between the outer cylinder assembly 400 and the skirt 600, and the outer cylinder assembly 400 and the inner cylinder assembly 500 are welded at the connection between the outer cylinder assembly 400 and the inner cylinder assembly 500;

[0042] Air tightness test of the outer cylinder assembly: An interlayer is formed between the outer cylinder assembly 400 and the inner cylinder assembly 500, and the air tightness test of the interlayer is performed.

[0043] The outer cylinder assembly 400 and the inner cylinder assembly 500 are both arranged horizontally, and the outer cylinder assembly 400 and the inner cylinder assembly 500 are moved in the left and right directions by a crane. There is no need for large-scale lifting equipment to lift the outer cylinder assembly 400 and the inner cylinder assembly 500 upright, and there is no need to set up safety facilities such as scaffolding and safety nets, thereby reducing the cost of equipment and materials and their management costs; there is no high-altitude equipment, so the vacuum cold storage box can be made in the factory, avoiding the influence of weather factors on the production of the vacuum cold storage box; there is no high-altitude equipment, and there is no need to lift the outer cylinder assembly 400 and the inner cylinder assembly 500 upright. 00 is lifted high, and there is no need for workers to work at high altitude, which is highly safe. Compared with the upright lifting of the inner cylinder assembly 500 and the outer cylinder assembly 400, the first saddle 200, the second saddle and the roller frame 300 respectively support the outer cylinder assembly 400, the inner cylinder assembly 500 and the skirt seat 600, which is convenient for realizing the precise adjustment, docking and welding of the outer cylinder assembly 400, the inner cylinder assembly 500 and the skirt seat 600, improving the coaxiality of the outer cylinder assembly 400, the inner cylinder assembly 500 and the skirt seat 600 as well as the product manufacturing accuracy and quality, reducing the difficulty of manufacturing and improving production efficiency.

[0044] It saves assembly time, equipment and materials, greatly improves production efficiency, and the entire assembly process can be carried out in a dust-free environment indoors, which meets the needs of working conditions. The environment, safety, quality, production progress, etc. are all controllable, which can ensure safety, quality, and delivery time, reduce the difficulty and cost of the assembly process, and improve product quality.

[0045] After the welding step of the inner cylinder assembly and the skirt seat, the inner cylinder assembly 500 is promptly tested for air tightness, so as to promptly find out whether the inner cylinder assembly 500 is damaged during the installation process, and then promptly repair the inner cylinder assembly 500 to avoid subsequent rework of the inner cylinder assembly 500.

[0046] After the welding steps of the outer cylinder assembly, the inner cylinder assembly and the skirt seat, the air tightness test is carried out on the interlayer between the outer cylinder assembly 400 and the inner cylinder assembly 500 in time, so that it can be found in time whether the finished product obtained by welding the outer cylinder assembly, the inner cylinder assembly and the skirt seat is qualified. Once it is found that the sealing is unqualified, it needs to be repaired in time.

[0047] In some of the embodiments, after the docking step of the inner barrel assembly and the skirt seat and the welding step of the inner barrel assembly and the skirt seat, the horizontal positions of the inner barrel assembly 500 and the skirt seat 600 are measured using an infrared level meter, and then the coaxiality of the inner barrel assembly 500 and the skirt seat 600 is calculated, which can effectively ensure the accuracy of the connection between the inner barrel assembly 500 and the skirt seat 600. If it is unqualified, it can be repaired and reworked in time.

[0048] After the welding steps of the inner cylinder assembly and the skirt, wait until the temperature of the inner cylinder assembly 500, the skirt 600 and the weld drops to the ambient temperature, and then use an infrared level to measure the horizontal position of the inner cylinder assembly 500 and the skirt 600 to avoid the increase of measurement error caused by deformation of the inner cylinder assembly 500, the skirt 600 and the weld due to thermal expansion and contraction.

[0049] In some of the embodiments, after the steps of docking the outer cylinder assembly and the skirt and welding the outer cylinder assembly, the inner cylinder assembly and the skirt, an infrared level is used to measure the horizontal position of the outer cylinder assembly 400, and then the coaxiality of the outer cylinder assembly 400, the inner cylinder assembly 500 and the skirt 600 is calculated, which can effectively ensure the connection accuracy of the outer cylinder assembly 400, the inner cylinder assembly 500 and the skirt 600. If it is unqualified, it can be repaired and reworked in time.

[0050] In some of the embodiments, after the welding steps of the outer cylinder assembly, the inner cylinder assembly and the skirt, after the temperature of the outer cylinder assembly 400, the inner cylinder assembly 500, the skirt 600 and the weld is reduced to the ambient temperature, an infrared level meter is used to measure the horizontal position of the outer cylinder assembly 400 to avoid an increase in measurement error caused by deformation of the outer cylinder assembly 400, the inner cylinder assembly 500, the skirt 600 and the weld due to thermal expansion and contraction.

[0051] In some embodiments, after the air tightness test of the inner cylinder assembly 500 is qualified, before the step of docking the outer cylinder assembly and the skirt seat, several layers of composite paper film are coated on the inner cylinder assembly 500. The composite paper film plays a role of heat insulation and cold preservation, which can reduce the effect and efficiency of heat conduction between the outer cylinder assembly 400 and the inner cylinder assembly 500, and improve the cold preservation effect of the inner cylinder assembly 500.

[0052] In some of the embodiments, before the step of docking the outer cylinder assembly and the skirt, a plurality of pairs of support rods are provided on the outer cylinder assembly 400, and a pair of support rods includes two support rods 700 of identical structure, and the two support rods 700 of a pair of support rods extend into the outer cylinder assembly 400 and can rest on the inner cylinder assembly 500, and the two support rods 700 of a pair of support rods are symmetrically arranged with the central axis of the outer cylinder assembly 400 as the center of symmetry.

[0053] A cavity for accommodating the inner cylinder assembly 500 is formed between the multiple support rods 700. When the outer cylinder assembly 400 is sleeved on the inner cylinder assembly 500, the multiple support rods 700 are pressed against the inner cylinder assembly 500. The multiple support rods 700 can limit the relative position of the outer cylinder assembly 400 and the inner cylinder assembly 500, ensure the alignment of the outer cylinder assembly 400 and the inner cylinder assembly 500, and further improve the coaxiality of the outer cylinder assembly 400 and the inner cylinder assembly 500.

[0054] It is understandable that the support rod 700 can be directly welded to the inner wall of the outer cylinder assembly 400, or a through hole can be opened on the outer cylinder assembly 400, and the outer end of the support rod 700 is passed through the through hole on the outer cylinder assembly 400 through an adapter and fixed on the outer cylinder assembly 400.

[0055] In some of the embodiments, when the first saddle 200, the second saddle, the roller frame 300, the outer cylinder assembly 400, the inner cylinder assembly 500 and the skirt 600 are offset in horizontal position, a pry bar and a wedge are used to fine-tune the horizontal position.

[0056] The first saddle 200 and the second saddle may be height-adjustable saddles.

[0057] In some embodiments, the pad 100 is a steel plate with a thickness greater than or equal to 20 mm, which ensures the bearing capacity of the pad 100 while minimizing the deformation of the pad 100 and ensuring the flatness of the pad 100. The crane and the roller frame 300 are both 50T grade, which ensures the bearing capacity of the crane and the roller frame 300, and can provide for the production of a variety of small-sized vacuum cold boxes.

[0058] In some of the embodiments, argon arc welding is used for the welding steps of the inner cylinder assembly and the skirt seat, as well as the welding steps of the outer cylinder assembly, the inner cylinder assembly and the skirt seat. The argon arc welding adopts segmented symmetry and multi-pass low-current welding methods to ensure the quality of welding, reduce stress concentration of various components of the vacuum insulation cold box, and reduce the risk of deformation of the vacuum insulation cold box.

[0059] In some of the embodiments, the welding parameters of argon arc welding are welding current 85A-95A, argon gas flow rate 11L / min-12L / min, and welding speed 90mm / min-100mm / min.

[0060] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0061] Of course, the present invention is not limited to the above-mentioned embodiments, and those skilled in the art may make equivalent modifications or substitutions without violating the spirit of the present invention, and these equivalent modifications or substitutions are all included in the scope defined by the claims of this application.

Claims

1. A double-layer vacuum cold box set process, characterized in that: include: Setting of the pad: setting the pad (100) horizontally, and drawing a center line on the pad (100), wherein the center line is in the left-right direction; The saddle and roller frame are arranged as follows: a plurality of first saddles (200), a plurality of second saddles and a roller frame (300) are distributed from left to right on the center line of the pad (100); the first saddle (200) is used to support an outer cylinder assembly (400); the second saddle is used to support an inner cylinder assembly (500); the roller frame (300) is used to support a skirt seat (600); the height of the first saddle (200) and the second saddle is adjusted; the height and horizontal position of the first saddle (200), the second saddle and the roller frame (300) are measured using an infrared level meter; and it is calculated whether all the first saddles (200), the second saddles and the roller frame (300) are in the same straight line; Positioning of the outer cylinder assembly, the inner cylinder assembly and the skirt seat: the outer cylinder assembly (400), the inner cylinder assembly (500) and the skirt seat (600) are respectively placed flat on a plurality of the first saddles (200), a plurality of the second saddles and the roller frame (300), and the horizontal positions of the outer cylinder assembly (400), the inner cylinder assembly (500) and the skirt seat (600) are measured using the infrared level meter, and the coaxiality of the outer cylinder assembly (400), the inner cylinder assembly (500) and the skirt seat (600) is calculated; Docking the inner cylinder assembly and the skirt seat: using a crane to hoist the inner cylinder assembly (500) horizontally, moving the inner cylinder assembly (500) from left to right until the bottom plate of the inner cylinder assembly (500) is attached to the skirt seat (600), during which the inner cylinder assembly (500) is kept attached to the plurality of second saddles, and the second saddles that will interfere with the inner cylinder assembly (500) are removed; Welding the inner cylinder assembly and the skirt seat: welding the inner cylinder assembly (500) and the skirt seat (600) at the connection between the inner cylinder assembly (500) and the skirt seat (600); Inner cylinder assembly air tightness test: performing an air tightness test on the inner cylinder assembly (500); Docking of the outer cylinder assembly and the skirt seat: the outer cylinder assembly (400) is hoisted horizontally by a crane, and the outer cylinder assembly (400) is moved from left to right, and the outer cylinder assembly (400) is sleeved on the inner cylinder assembly (500) until the outer cylinder assembly (400) is attached to the skirt seat (600). During this process, the outer cylinder assembly (400) is kept attached to the plurality of first saddles (200), and the first saddle (200) and the second saddle that will interfere with the outer cylinder assembly (400) are removed, and the pad (100) is provided with a plurality of the first saddles (200) in the installation area corresponding to the second saddle, so that the outer cylinder assembly (400) can be attached to the plurality of the first saddles (200) provided in the second saddle installation area at the same time; Welding the outer cylinder assembly, the inner cylinder assembly and the skirt seat: welding the outer cylinder assembly (400) and the skirt seat (600) at the connection between the outer cylinder assembly (400) and the skirt seat (600), and welding the outer cylinder assembly (400) and the inner cylinder assembly (500) at the connection between the outer cylinder assembly (400) and the inner cylinder assembly (500); Air tightness test of the outer cylinder assembly: an interlayer is formed between the outer cylinder assembly (400) and the inner cylinder assembly (500), and the air tightness test of the interlayer is performed.

2. A double-layer vacuum cold box package process according to claim 1, characterized in that: After the steps of docking the inner cylinder assembly and the skirt seat and welding the inner cylinder assembly and the skirt seat, the infrared level meter is used to measure the horizontal positions of the inner cylinder assembly (500) and the skirt seat (600), and then the coaxiality of the inner cylinder assembly (500) and the skirt seat (600) is calculated. After the steps of docking the outer cylinder assembly and the skirt seat and welding the outer cylinder assembly, the inner cylinder assembly and the skirt seat, the infrared level meter is used to measure the horizontal position of the outer cylinder assembly (400), and then the coaxiality of the outer cylinder assembly (400), the inner cylinder assembly (500) and the skirt seat (600) is calculated.

3. A double-layer vacuum cold box package process according to claim 2, characterized in that: After the welding step of the inner cylinder assembly and the skirt seat, the temperature of the inner cylinder assembly (500), the skirt seat (600) and the weld is lowered to the ambient temperature, and then the infrared level meter is used to measure the horizontal position of the inner cylinder assembly (500) and the skirt seat (600). After the welding step of the outer cylinder assembly, the inner cylinder assembly and the skirt seat, the temperature of the outer cylinder assembly (400), the inner cylinder assembly (500), the skirt seat (600) and the weld is lowered to the ambient temperature, and then the infrared level meter is used to measure the horizontal position of the outer cylinder assembly (400).

4. A double-layer vacuum cold-insulation cold box package process according to claim 1, characterized in that: After the air tightness test of the inner cylinder assembly (500) is passed, before the step of docking the outer cylinder assembly and the skirt seat, several layers of composite paper film are coated on the inner cylinder assembly (500).

5. A double-layer vacuum cold-insulation cold box package process according to claim 1, characterized in that: Before the step of docking the outer cylinder assembly and the skirt, a plurality of pairs of support rods are provided on the outer cylinder assembly (400), wherein a pair of the support rods comprises two support rods (700) of identical structure, wherein the two support rods (700) of the pair of the support rods extend into the outer cylinder assembly (400) and can be abutted against the inner cylinder assembly (500), and the two support rods (700) of the pair of the support rods are symmetrically arranged with the central axis of the outer cylinder assembly (400) as the center of symmetry.

6. A double-layer vacuum cold box package process according to claim 1, characterized in that: When the horizontal positions of the first saddle (200), the second saddle, the roller frame (300), the outer cylinder assembly (400), the inner cylinder assembly (500) and the skirt seat (600) are offset, a pry bar and a wedge are used to fine-tune the horizontal positions.

7. A double-layer vacuum cold-insulation cold box package process according to claim 1, characterized in that: The pad (100) is a steel plate with a thickness greater than or equal to 20 mm, and the crane and the roller frame (300) are both 50T grade.

8. The double-layer vacuum cold-insulation cold box package process according to claim 1, characterized in that: The welding steps of the inner cylinder assembly and the skirt seat and the welding steps of the outer cylinder assembly, the inner cylinder assembly and the skirt seat all adopt argon arc welding, and the argon arc welding adopts segmented symmetry and multi-pass low-current welding.

9. A double-layer vacuum cold-insulation cold box package process according to claim 8, characterized in that: The welding parameters of the argon arc welding are welding current 85A-95A, argon gas flow rate 11L / min-12L / min, and welding speed 90mm / min-100mm / min.